FORM-I. Environmental Clearance (EC)

Similar documents
APPENDIX I (See paragraph 6) FORM 1

APPENDIX I. (See paragraph-6) FORM 1

FORM I TERMS OF REFERENCE. For. QUARRY OF ROAD METAL (6.265 Ha) Sri K Kasi Raju. PROP: K.Kasi Raju

M/s. Karthika Mines & Minerals Pvt.Ltd.-Colour Granite Quarry Ha. FORM - I

APPENDIX I. (See paragraph-6) FORM 1

APPENDIX I (See paragraph 6) FORM 1

FORM 1 BASIC INFORMATION S.NO.

FORM I SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH. BY. Asst.Director of Mines and Geology, Rajamahendravaram

Annex F Scoping Checklist

FORM-I. 13. Name of Applicant District Collector Nasik 14. Registered Address Address : Collector Office, Nasik

FORM 1 & 1 A. Palladium Grand II RESIDENTIAL & COMMERCIAL DEVELOPMENT. Palladium Grand II, S. No. 17/1A/2, Dhanori, Pune, Maharashtra

Submitted To State Expert Appraisal Committee (SEAC), State Environmental Impact Assessment Authority, Andhra Pradesh.

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

Molvan- Chhamuchhal Group Gram Panchayat. Taluka- Mangrol, District- Surat. Ph. No

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

APPENDIX I. (See paragraph 6) FORM 1

UPDATED FORM I, (Submitted to State Expert Appraisal Committee, Telangana)

FORM 1. APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE VIDE PARA 6 OF S.O.1533 OF MOEF NOTIFICATION DATED 14 th SEPTEMBER 2006

Sri.T.N.Balasubramanya

APPENDIX I (See paragraph - 6) FORM 1

FORM-I for seeking clearance for project attracting CRZ notification

APPENDIX- I FORM- 1. (I) Basic Information:

Form -1. [Vide Notification dated 1 st December 2009] FOR PROPOSED. COSTAL ROAD AT DRONAGIRI, NAVI MUMBAI Precast RCC Bridges On Holding Ponds-

Appendix I. Form 1 BASIC INFORMATION PAWA MASONARY STONE MINING PROJECT VILLAGE PAWA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

FORM 1. Gownivaripalli Village, Tehsil. Gorantla Mandal, District. Anantapur District, State

M/s. SURYA ENTERPRISES H.No: , Sri Paradise Apartments, New Andhra Bank Colony, Anantapuramu District

No 1 Name of the Project/s M/s. Velchal Laterite Mine 2 S. No in the Schedule 1(a)

FORM 1. No condition? If yes, please specify. 8. Does it attract the specific. No condition? If yes, please specify. 9. Location Geo Coordinates

FORM 1. 8 Does it attract the specific condition? It yes, No Please specify 9 Location At Village Akurli, Akurli Road, Kandivali(E), Mumbai

APPENDIX I (See paragraph 6) FORM 1 (Application for Environment Clearance)

UPDATED FORM I. SUBMISSION To Ministry of Environment & Forests & Climate Change, New Delhi. Prepared by. M/s. VIJAYNAGAR SUGAR PVT. LTD.

FORM 1 (As per new Notification of MoEF dated vide S.O 3067 (E))

FORM 1. /area/length/tonnage. No condition? If yes, please specify. 8. Does it attract the specific

.APPENDIX I (See paragraph 6) FORM 1. Sl. No. Item Details 1. Name of the project/s

(Residential cum Commercial Project) APPENDIX I (See paragraph 6) FORM 1. Plot area: 37,039 m 2 Built up area: 1,11, m 2

UPDATED FORM-1 EXTENSION OF VALIDITY OF ENVIRONMENTAL CLEARANCE. Sri Fakir Rohidas

Sand, Stone & Bajri Mining Project Applicant: Shri Ashish Kumar, M/s Ashish Stone Crusher. Form-1 FORM-1 SRUSHTI SEWA, NAGPUR 1

Project: Bhidauni Khadar Ordinary Sand Mining Project on Yamuna River FORM 1 Applicant: M/s Satyug Foods Pvt. Ltd. FORM- I

APPENDIX - I (See paragraph 6) FORM 1

M/s. PRAKRUTHI INFRA & SHELTERSS (INDIA) PVT LTD

FORM-1. PROJECT: Sati & Garhi Sand Ghat,Ulai River (Area-22 Ha), Dist:-Jamui. APPLICANT: M/s Westlink Trading Pvt. Ltd. FORM- I.

APPENDIX I (See paragraph 6) FORM 1

Ms.Thriveni Earthmovers Private Limited HO.22/110,Greenways Roads,Fairlands,Salem,Tamilnadu

APPENDIX I (See paragraph 6) Form 1 (I) Basic Information

FORM 1. Basic Information. Sl. No.

Proposed Construction Multi Specialty Hospital Naruvi Hospitals 2. S. No. in the schedule 8(a)

APPENDIX I (See paragraph 6) FORM 1. Plot area: 10,439 m 2 Built up area: 50, m 2

M/S Overseas Min Tech Consultants, Jaipur 1

REPORT OF SAND STONE MINING PROJECT (KHATADARI Q.L. No. 178 FOR

FORM 1. Basic Information Sr. No. 1 Name of the project River Sand Mining Project of Shree Sabarmati Majur Kamdar Sahakari Mandali LTD.

FORM 1. 1 Name of the Project Pinakin Mangubhai Patel 2 S. number in schedule 8 (a)

Details required for submitting Fresh EC Application. (Category B2 Projects: Mining of Minor Minerals)

FORM I (OPENCAST LATERITE MINE ha)

APPENDIX I (See paragraph 6) FORM 1

M/S. JUMBO MINING LIMITED Surya Arcade, 4th Floor /4F & D, Near Indian Oil Petrol Pump, Begumpet,Hyderabad Telangana.

APPENDIX I (See paragraph 6) FORM 1. Plot area: 13,114 m 2 Built up area: 81, m 2

A 'N 'E B 'N 'E C 'N 'E D 'N 'E

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

APPENDIX VIII (See paragraph 6) FORM 1 M APPLICATION FOR MINING OF MINOR MINERALS UNDER CATEGORY B2 FOR LESS THAN AND EQUAL TO FIVE HECTARE

FORM I. [Vide M.o.E.F & C.C Notification dated 14 th September, 2006] For Proposed Residential & Commercial Project ALCOVE. M/s.

APPENDIX I (See paragraph - 6) FORM 1

Revised FORM - I & PRE-FEASIBILITY REPORT

APPENDIX I (See paragraph - 6) FORM 1

Appendix I. Form 1 BASIC INFORMATION MASONARY STONE MINING PROJECT VILLAGE KOLIYA, TEHSIL DIDWANA, DISTRICT NAGAUR, RAJSTHAN

(I) Basic Information:

Application for Prior Environmental Clearance (EC)

Submitted To Ministry of Environment and Forest, GOI, New Delhi. Submitted By

FOR THE PROPOSED EXPANSION IN BACKWARD INTEGRATION PROJECT FOR

Form I. for. Proposed Construction of High Rise Residential Cum Commercial Building Eco Gardens

FORM 1 Riverbed Sand Mining Project

Proposed Ordinary Sand Mining Project at Gata No.- 8Ka/195, Village- Ratauli, Tehsil- Laharpur, District- Sitapur, U.P. FORM 1

FORM 1 Riverbed Sand/Morrum / Mining Project

APPENDIX I (See paragraph - 6) FORM 1

Application Forms for Prior Environmental Clearance as per Environmental Impact Assessment Notification dtd &

FORM 1 (Application for Environment Clearance)

FORM 1 FOR PROPOSED CONSCTRUCTION BUILDING PROJECT ( SQ. M) ANAMOL LIFE STYLE

Proposed Multiplex & Commercial Complex FORM I

HIMALAYA MINES & MINERALS SURVEY NO. 4595, 4654, 4661 & 4662, RAMACHANDRAPURAM VILLAGE, MULUGU MANDAL, WARANGAL DISTRICT, TELANGANA STATE FORM I

Updated FORM I, (for extension of validity of Environmental clearance

APPENDIX I. (See Paragraph 6) FORM 1

FORM min Village. Chowgund, Tehsil. Doru District. Anantnag State

FORM Name of the project/s Amendment in Existing Environmental Clearance to

APPENDIX I. (See paragraph 6) FORM 1

THE SINGARENI COLLIERIES COMPANY LIMITED (A Government Company)

APPENDIX I. (See paragraph-6) FORM 1

UPDATED FORM I 433 TPD CALCINED PETROLEUM COKE PLANT WITH 9 MW COGENERATION OF POWER PROPOSED AT

ITHC/PRJ/18-19/EIA/138 1 IND TECH HOUSE CONSULT

APPENDIX I. (See paragraph 6) FORM 1

Form-1 FORM 1. Proposed salhan-bagda limestone mine ha( acres) M/s Jharkhand State Mineral Development Corporation Ltd.

FORM-1. Sr. No 1 Name of the Project Harbour Heights 2 S. No. in the Schedule 8(b) Townships and Area Development projects.

APPENDIX I FORM 1. Basic Information:

MOHIT PETROCHEMICALS (P) LTD, (NAGINA ROAD, BIJNOR)

FORM 1 Riverbed Sand Mining Project

Application Form for Obtaining Environmental Clearance from State Level Environment Impact Assessment Authority (SEIAA), Tamil Nadu

APPLICATION FOR OBTAINING ENVIRONMENTAL CLEARANCE FOR QUARRYING BRICK EARTH. Natham Group Village. Kamuthi Taluk, Ramanathapuram District

Salai Godhani Stone Quarry of Mr. Arvind Janraoji Gajbhiye in Village Salai Godhani, Th Nagpur (Gra) & Dist Nagpur Form I APPENDIX-I FORM-1

FORM 1 SRI LAKSHMI GAYATRI HOSPITAL (P) LTD.

FORM-I, PRE-FEASIBILITY REPORT FOR ENVIRONMENTAL CLEARANCE (EC) (Under Clause 6 of S.O.1533 of Environment Impact Assessment Notification, 2006)

JAI MAA SHARDA STONE CRUSHING

Haridarshan Residency ( Row Type House & School Building )

Transcription:

FORM-I Environmental Clearance (EC) FOR M/S. Mahanth mica mines (MICA, QUARTZ & FELDSPAR MINES) Léase Area : 47.01 Acres/ 19.05 Ha Sy.. 140/P, 142, 143/P & 139/3 Kalichedu (V), Sydapuram (M), SPSR Nellore District, Andhra Pradesh Prepared & Submitted by SV ENVIRO LABS & CONSULTANTS BLOCK-B, B-1, IDA, AUTONAGAR -12 VISAKHAPATNAM, ANDHRA PRADESH QCI. 145 1

FORM -1 (I) Basic Information Sl.. Item Details 1. Name of the project/s M/s. Mahanth Mica Mines 2. S.. in the schedule Schedule 1(a) 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled. Mica, Quartz, Feldspar Mining in 5.766 Production: Hectares 4. New/Expansion/Modernization New for EC 5. Existing Capacity/Area etc. 19.05 6. Category of Project i.e. A or B Category B 2 7. Does it attract the general condition? If yes, please specify. 8. Does it attract the specific condition? If yes, please specify. 9. Location Plot/Survey/Khasra. Village Tehsil District State 10. Nearest railway station/airport along with distance in kms. 11. Nearest Town, city, district Headquarters along with distance in kms. 12. Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given) Mica- 115.2 T/Annum Mica Scrap-1271.2 T/Annum Quartz- 352.56 T/Annum Feldspar- 1175.2 T/ Annum Sy.. 140/P, 142, 143/P & 139/3P Kalichedu (V), Sydapuram (M) SPSR Nellore District, Andhra Pradesh Gudur Railway Station at 20.99 kms from site. Tirupati airport at a distance 75.18 kms Gudur at a distance of 20.91 kms Kalichedu (V), Sydapuram (M), SPSR Nellore District, Andhra Pradesh 13. Name of the applicant M/s mahanth mica Mines 2

14. Registered Address Sri. Ch. Suresh Kumar Reddy 15. Address for correspondence: Name Designation (Owner/Partner /CEO) Pin code E-mail Telephone. Fax. 16. Details of Alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. 17. Interlinked Projects Nil 18. Whether separate application of interlinked project has been submitted? Managing Partner, Kalichedu Village, Sydapuram Mandal SPSR Nellore District, Andhra Pradesh Sri. Ch. Suresh Kumar Reddy Managing Partner, 524409 mahanth19.05@yahoo.com 9908953521 -- Existence of mineral is natural and site specific. The mine area falls under Toposheet no. 57 N/11. NA 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. i. The Forest (Conservation) Act, ii. 1980? The Wildlife (Protection) Act, 1972? iii. The C.R.Z. tification, 1991? 22. Whether there is any Government Order/Policy relevant /relating to the site? NA NA NA 23. Forest land involved (hectares) Nil 24. Whether there is any litigation pending against the project and/or land in which 3

the project is propose to be set up? a) Name of the Court b) Case. c) Orders/directions of the Court, if any and its relevance with the proposed project. (II) Activities 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.. Information/Checklist confirmation 1.1 Permanent or temporary change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, vegetation and buildings? Yes/ Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data The land is earmarked for mining of Mica, Mica Scrap, Quartz, and Feldspar. It will be taken up in a total of 19.05 Ha of land. The above said land consists of no structures. The existing land is barren and undeveloped land. 1.3 Creation of new land uses? extra new land will be used. The 1.4 Pre-construction investigations e.g. bore houses, soil testing? facility having 19.05 Ha of land. Within this land premises only the proposed activity will be taken up. Site survey was carried out.. 1.5 Construction works? structures will be constructed. 1.6 Demolition works? Quarters are present at mining site for 1.7 Temporary sites used for construction works Or housing of construction workers? 1.8 Above ground buildings, structures or -- mine workers and will be vacated before commencement of the mining activity t envisaged. 4

earthworks including linear structures, cut and fill or excavations 1.9 Underground works including mining Yes The lessee is undertaking mining of or tunneling? Quartz, Feldspar, and Mica by underground mining since date of commencement of operations. w underground mining is been carried out at pegmatite no. 2 in pit no. 3 with help of drilling and blasting. 1.10 Reclamation works? reclamation work 1.11 Dredging? t applicable 1.12 Offshore structures? t applicable 1.13 Production and manufacturing processes? 1.14 Facilities for storage of goods or materials? 1.15 Facilities for treatment or disposal of solid waste or liquid effluents? 1.16 Facilities for long term housing of operational workers? 1.17 New road, rail or sea traffic during construction or operation? Yes It is proposed to operate the mine by manual method B Category an open cast mining with systematic & scientific method of mining. Mica- 115.2 T/Annum Mica Scrap-1271.2 T/Annum Quartz- 352.56 T/Annum Feldspar- 1175.2 T/ Annum Stock yard and waste dump yard facilities are identified for storage of goods and materials in the mine lease area. Yes Solid waste will be generated for five years. It will be dumped in mine lease area. Majority of manpower will be recruited from local people only. Therefore no housing scheme proposed. The site is well connected to roadway. new road, rail or sea 5

1.18 New road, rail, air waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or pipelines? NA NA -- traffic required. t applicable. transmission & pipeline existing. Therefore not required to divert transmission lines / pipelines. 1.21 Impoundment, damming, culverting, realignment or other changes to the t applicable hydrology of watercourses or aquifers? 1.22 Stream crossings? perennial streams in the site area. 1.23 Abstraction or transfers of water form ground or surface waters? 1.24 Changes in water bodies or the land surface affecting drainage or run-off? 1.25 Transport of personnel or materials for construction, operation or decommissioning? 1.26 Long-term dismantling or decommissioning or restoration works? 1.27 Ongoing activity during decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either temporarily or permanently? Yes Water drums are sufficient for the proposed unit. drains or water bodies present. There is no construction work in the proposed site. During operation lorries, trucks, Proclain will be used. dismantling work will be carried in the project. decommissioning activity proposed. influx of people into this area either temporarily or permanently. 1.29 Introduction of alien species? -- 1.30 Loss of native species or genetic -- 6

diversity? 1.31 Any other actions? -- 2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non- renewable or in short supply): S.. Information/Checklist confirmation Yes/ 2.1 Land especially undeveloped or agricultural land (ha) 2.2 Water (expected source & competing users) unit: KLD Yes Details thereof (with approximate quantities / rates, wherever possible) with source of information data The mine lease area is Government land. cultivation is carried out in mine lease area. Domestic : 1.0 KLD Dust suppression : 2.5 KLD Green belt : 2.0 KLD 2.3 Minerals (MT) t applicable 2.4 Construction material stone, aggregates, sand / soil (expected source MT) Yes Requirement of small quantities of construction materials are sourced from nearby areas for construction of office and rest shelter. 2.5 Forests and timber (source MT) timber will be used. 2.6 Energy including electricity and fuels (source, competing users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources (use appropriate standard units) Yes For vehicles diesel will be used. Nil 7

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with approximate S.. Information/Checklist confirmation Yes/ quantities /rates, wherever possible) with source of information data 3.1 Use of substances or materials, which are hazardous (as per MSIHC rules) to hazardous material is used in mining activities. human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence of disease or -- affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by changing living conditions? 3.3 Affect the welfare of people e.g., by changing living conditions? Yes The proposed activity will provide employment to the local villagers thereby improving their living conditions. 3.4 Vulnerable groups of people who -- could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes? -- 4. Production of solid wastes during construction or operation or commissioning (MT/month) S.. Information/Checklist confirmation Yes/ Details thereof (with approximate quantities /rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes Yes The waste will be dumped within the 4.2 Municipal waste (domestic and or commercial wastes) Mine land (ML) area. Nil 8

4.3 Hazardous wastes (as per Hazardous Waste Management Rules) hazardous waste will be generated from the proposed facility. 4.4 Other industrial process wastes industrial process waste will be generated. 4.5 Surplus product As it is a mining activity, there will 4.6 Sewage sludge or other sludge from effluent treatment -- not be any production activity. 4.7 Construction or demolition wastes construction activity will be taken up. 4.8 Redundant machinery or equipment -- 4.9 Contaminated soils or other materials soil / material will be contaminated. 4.10 Agricultural wastes agricultural waste will be 4.11 Other solid wastes Nil. generated. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) Details thereof (with approximate S.. Information/Checklist confirmation Yes/ quantities /rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil combustion of fossil fuels is fuels from stationary or mobile sources proposed. 5.2 Emissions from production processes Yes Fugitive dust will be generated 5.3 Emissions from materials handling including storage or transport 5.4 Emissions from construction activities including mine and equipment 5.5 Dust or odours from handling of materials including construction materials, sewage and waste Yes -- Yes from mining activities. Adequate control measures like water sprinkling will be taken to control devices will be used while drilling. Emissions will be generated during mining and transport. Dust will generated during mining, operations and transportation of materials. However, odor is nor 9

envisaged. 5.6 Emissions from incineration of waste -- 5.7 Emissions from burning of waste in -- open air (e.g. slash materials, construction debris) 5.8 Emissions from any other sources -- 6. Generation of ise and Vibration, and Emissions of Light and Heat: S.. Information/Checklist confirmation Yes/ 6.1 From operation of equipment e.g. engines, ventilation mine, crushers Yes Details thereof (with approximate quantities /rates, wherever possible) with source of information data ise will be generated from transport vehicles, machinery and drilling operations. 6.2 From industrial or similar processes The work will be done from dawn 6.3 From construction or demolition -- to dusk. The operations will not cause more than 75 db (A). Therefore no noise / vibrations disturbance occurs. 6.4 From blasting or piling Yes ise will be generated during 6.5 From construction or operational traffic 6.6 From lighting or cooling systems -- 6.7 From any other sources -- operation, which will be instantaneous in nature. construction activity required. The noise is due to vehicular movement only. 7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Details thereof (with approximate S.. Information/Checklist confirmation Yes/ quantities /rates, wherever possible) with source of information data 7.1 From handling, storage, use or Nil. spillage of hazardous materials 10

7.2 From discharge of sewage or other Yes The domestic wastewater of 0.8 effluents to water or the land KLD will be disposed to septic tank (expected mode and place of followed by soak pit. discharge) 7.3 By deposition of pollutants emitted to Nil air into the land or into water 7.4 From any other sources? Nil 7.5 Is there a risk of long term build up of pollutants in the environment from these sources? Yes It is only mining site. The only emission is in the form of fugitive dust during excavation and it will be suppressed by water sprinkling. 8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment S.. Information/Checklist confirmation Yes/ 8.1 From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances 8.2 From any other causes Nil Details thereof (with approximate quantities /rates, wherever possible) with source of information data Mining operations will be carried in a controlled manner. 8.3 Could the project be affected by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)? The area of project site will not be affected by natural disasters. 11

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S.. Information/Checklist confirmation Yes/ 9.1 Lead to development of supporting. lities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: Supporting infrastructure (roads, power supply, Waste or waste water treatment, etc.) Housing development Extractive industries Supply industries Other 9.2 Lead to after-use of the site, which could have an impact on the environment Details thereof (with approximate quantities /rates, wherever possible) with source of information data Yes Supporting and ancillary Yes development will take place. Greenbelt will be developed all along the mining lease area which will increase the aesthetic beauty of the site 9.3 Set a precedent for later developments such cases. 9.4 Have cumulative effects due to proximity to other existing or planned projects with similar effects Yes Dust accumulation on the roads. 12

(III) Environmental Sensitivity S.. Area Name/ Identity 1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive Yes for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests Aerial distance (within 15 km.) Proposed project location boundary ne within 15 km Aerial distance from proposed mine site. Water Bodies: Talupur Cheruvu at a distance of 2.10 kms from mine site. Reserved Forest: Munagapadu RF at 3.77 kms Podalkur RF at 4.55 kms Tummalatalupur RF at 4.40 kms Turimerla RF at 5.01 kms Duggunta RF ar 5.93 kms 3 Areas used by protected, important or ne within 15 km Aerial distance sensitive species of flora or fauna for from proposed mine site. breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or underground ne within 15 km aerial distance waters from proposed mine site. 5 State, National boundaries ne within 15 km aerial distance from proposed mine site. 6 Routes or facilities used by the public Yes Village roads are available to this for access to recreation or other site at Kalichedu. tourist, pilgrim areas 7 Defense installations ne within 15 km aerial distance from proposed mine site. 8 Densely populated or built-up area Yes kalichedu village is at a distance of 0.96 kms from mine site. 13

9 Areas occupied by sensitive manmade land uses (Hospitals, schools, places of worship, community facilities) 10 Areas containing important, high quality or scarce resources (Ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected to pollution or environmental damage. (Those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural hazard which could cause the project to present environmental problems (Earthquakes, subsidence, landslides, erosion, flooding for extreme or adverse climatic conditions) Yes Hospitals, Schools, community facilities are available at Sydapuram mandal. -- ne within 15 km aerial distance from proposed mine site. -- 14

15

STANDARD TEMPLATE FOR EVALUATION OF ALL PROJECTS/ ACTIVITIES:- S. Information required Information to be furnished by the proponents 1 Name of the project or activity M/s. Mahanth Mica Mines, (Mica, Quartz & Feldspar Mining) 2 Name of the organization/owner. Ch. Suresh Kumar Reddy (Managing Partner) 3 Address for communication Sri. Ch. Suresh Kumar Reddy Managing Partner, Kalichedu Village, Sydapuram Mandal SPSR Nellore District, Andhra Pradesh 4 Telephone numbers 9908953521 5 Email ID of the organization or contact person 6 Location of the Proposed project or activity 7 Appraisal Category (B2 or B1) B2 mahanth19.05@yahoo.com Sy.. 140/P, 142, 143/P & 139/3P Kalichedu (V), Sydapuram (M) SPSR Nellore District, Andhra Pradesh 8 Nearest habitation and distance from the Kalichedu Village at 0.96 kms project or activity 9 Installed capacity / Production Capacities Mica- 115.2 T/Annum 10 Specify the Fuel (Coal / CNG / -- biomass/others) and quantity required 11 Details of Land use/land Cover Enclosed 12 Occupancy, ownership of the land in which the activity is proposed: (Government land / Private land / Forest land /Revenue land /Temple land /leased land/ land belongs to other Department) 13 If it is a Forest land, the following details shall be furnished: Mica Scrap-1271.2 T/Annum Quartz- 352.56 T/Annum Feldspar- 1175.2 T/ Annum Extent 19.05 Ha - Govt. Land forest area covers under the proposed site area. 16

(Whether it is a Reserved forest / Protected forest/demarcated forest/ National Parks/Sanctuaries/any land in possession of Forest Department.) (The village map with Sy.. indicating nearest forest boundary line from the site shall be enclosed) 14 Total investment of the project/activity. Rs. 60 lakhs a. Funds allocated for EMP (capital cost and recurring cost per annum) 14 Brief description of the project with special reference to specific pollution and its control measures. Rs. 6 Lakhs The lessee is undertaking mining of Quartz, Feldspar, and Mica by underground mining since date of commencement of operations. w underground mining is been carried out at pegmatite no. 2 in pit no. 3 with help of drilling and blasting. 15 Compliance report on the following : i. Status of compliance of the conditions and environmental safeguards stipulated in the earlier clearance letters. During mining operations fugitive dust emissions will be generated. Control devices such as water sprinklers and covering drill with cloth will reduce the generation of dust. ise levels will be increased during operations and these will be controlled with ears protection/use of latest noise controlled equipment. Vibrations level during mining operations and these will be minimized by using low explosives and low quantities. Greenbelt will be developed all along the mining lease area. NA 17

ii. Details of the court cases, if any, pending in any Court of Law against the project as well as any directions court case/litigation is pending against the proposed project. passed by the Court relating to the project directly or indirectly. iii. Details of the notices, if any, given to t applicable the project under Section 5 of the Environmental (Protection) Act, 1986 and Section 18 of the Air (Prevention & Control of Pollution) Act, 1981. 17 Whether the project attracts the provisions laid under the OM dt. 16.11.2010 issued by the MoE&F, GOI, w.r.t. violation of EIA tification, 2006 and its amendments there of? (Yes / ) Present stage and status of the Project : Credible action cleared 419/2016. Presently mining work was stopped and not yet started. 16 Name of the Consultant: SV Enviro Labs & Consultants, Visakhapatnam. 18

19

20