Upper Eastern Shore WIP Workshop November 21, 2014

Similar documents
Clean Water Optimization Tool Case Study: Kent County

Clean Water Optimization Tool Case Study: Queen Anne s County

Cost-Effectiveness Study of Urban Stormwater BMPs in the James River Basin

Effectiveness of Non-Structural Measures in Watershed Restoration

WICOMICO COUNTY PHASE II WATERSHED IMPLEMENTATION PLAN

Cost Efficiency and Other

Stormwater Retrofitting for Nutrient Reduction

PA Municipal Separate Storm Sewer System (MS4) TMDL Plan

In order to develop these comprehensive watershed retrofit plans, six key tasks were undertaken, each of which is described further below:

CHESAPEAKE BAY TMDL PHASE III WIP NORTHERN VIRGINIA OPENING STAKEHOLDER MEETING AUGUST 17, 2018 NORMAND GOULET NVRC

A Case Study of Suburban Infill Redevelopment, Stormwater challenges, and Partnerships

SOMERSET COUNTY WATERSHED IMPLEMENTATION PLAN PHASE II

Andrea Ludwig, PhD, EIT Assistant Professor Biosystems Engineering and Soil Science University of Tennessee

Stormwater Utility Credits. February 25, 2014

Maryland Phase II WIP Strategies. MONTGOMERY Agriculture - Annual Practices

Presented to the WQGIT August 13, 2012

Meeting the Chesapeake Bay TMDL

BUREAU OF CLEAN WATER

Linking Local TMDLs to the Chesapeake Bay TMDL in the James River Basin

Stormwater Management Update Requirements for Plans and Approvals. Doug Beisch (WEG, now Stantec)

Presented to the Urban Stormwater Workgroup April 30, 2012

What Does It All Mean? CWA? Sara Esposito, P.E. DNREC Division of Watershed Stewardship

A Primer on Stormwater Management, your Facility and the Chesapeake Bay. Tom Schueler Chesapeake Stormwater Network June

Baltimore City MS4 and TMDL Watershed Implementation Plan

SHA MDE Water Quality Bank

Determining How Much You Need: Stormwater Program Cost

September 15, 2014 Winston Salem, VA Stormwater Capital Improvement Planning for Total Maximum Daily Load Compliance

Roadside Ditch Management in the Chesapeake Bay Watershed

Second Wednesdays 1:00 2:15 pm ET USDA is an equal opportunity provider and employer.

Sustaining Our Water Resources Public Health. April 27, 2011

In order to develop these comprehensive watershed retrofit plans, six key tasks were undertaken, each of which is described further below:

GUIDELINES FOR STORMWATER BACTERIA REDUCTIONS THROUGH BMP IMPLEMENTATION NY/NJ HARBOR TMDL DEVELOPMENT

Watershed Management Program To Meet our MS4 Permit

Bringing It All Together: Accounting for Practices Across the Watershed

Norm Goulet, Chair Urban Stormwater Workgroup Tom Schueler, Chesapeake Bay Program Stormwater Coordinator

Tom Schueler, Chesapeake Bay Program Stormwater Coordinator

Chesapeake Bay Maryland Phase I WIP Strategy Key Concepts: Septics and Stormwater June 13 th, 2011

Isle of Wight County Chesapeake Bay TMDL Action Plan. May 2015

Session 4 Retrofit Costs, Delivery and Maintenance

Appendix A. Compliance Calculator Guidance

CSN TECHNICAL BULLETIN No. 6 TESTING DRAFT. Users Guide for the ESD to the MEP Compliance Tool Version 1.0 February 15, 2010

CSN TECHNICAL BULLETIN No. 6 Version 2.0. Users Guide for the ESD to the MEP Compliance Tool. Released June 15, 2010

Virginia Stormwater Regulations Proposed Changes. Planning Commission May 5, 2009

Chesapeake Bay TMDL Action Plan and MS4 Program Update. Presentation to the Herndon Town Council. May 5, 2015

Surviving the Local WIP: a practical guide on nutrient accounting for the Chesapeake Bay TMDL

Chapter 12. VIRGINIA RUNOFF REDUCTION METHOD Compliance Spreadsheet User s Guide & Documentation (Version 2.7, April 2013) Table of Contents

Credit Calculations and Calculator Functions

Retrofitting Revisited: A Post-Expert Panel Perspective

12/1/2015. Stream Restoration as a BMP for TMDL Compliance SCASM 4th Quarter Meeting. Overview of SCR Permit Section

Recommendations of the Expert Panel to Define Removal Rates for Urban Stormwater Retrofit Projects

Updates on EPA Stormwater Program

Anacostia River Watershed Restoration Plan. Paint Branch Subwatershed Provisional Restoration Project Inventory

Shirley E. Clark, Ph.D., P.E. October 5, /30/2012

Urban Stormwater Verification Guidance

Rhode Island DOT Consent Decree: Quantitative Targets for Stormwater Control

APPENDIX I WATER QUALITY FACTORS FOR FEE CREDIT CALCULATIONS

Montgomery County MD MS4 Phase I/ II WIP Contributions November 18, 2011 CONTACTS:

PROTECTING OUR WATERWAYS: STORMWATER POLLUTION REDUCTION EFFORTS

Municipal Separate Storm Sewer Systems (MS4) Implementation. Craig Carson Montgomery County Department of Environmental Protection

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session

CHESAPEAKE BAY TOTAL MAXIMUM DAILY LOAD (TMDL) STUDY FOR JOINT BASE MYER- HENDERSON HALL

low impact development demonstration project

Wicomico County Programmatic Milestones 1/29/2016. Wicomico County s Programmatic Two-Year Milestones

ESD Retrofits in Montgomery County: A Maryland MS-4 Case Study

Modeling the Urban Stormwater (and the rest of the watershed) Katherine Antos, Coordinator Water Quality Team U.S. EPA Chesapeake Bay Program Office

TMDL and Stormwater Regulations & Policy: Recent Developments and their Implications for MS4 Permit Holders

Sustainable Stormwater: Optimized Management of Ponds and Other BMPs. Kerry A Reed, P.E., LEED AP MACTEC Engineering and Consulting, Inc.

Recommended Best Management Practices Nutrients (Includes Phosphorus, Nitrogen, & Ammonia)

Key Driver Stewardship

Stormwater BMP Maintenance

Appendix 12. Pollutant Load Estimates and Reductions

Big Creek Watershed Retrofit Ranking Project

How Impacts Are Mitigated In Advance of Impacts? Within the Jurisdiction? At an Off-site Location? Description. Mitigation banking

15A NCAC 02B.0281 FALLS WATER SUPPLY NUTRIENT STRATEGY: STORMWATER REQUIREMENTS FOR STATE AND FEDERAL ENTITIES The following is the stormwater

Practical Applications of Stormwater BMPs for addressing Nutrient & Water Quality Challenges in Watersheds

Minimum Design Criteria: Shaping the Future of Stormwater Management

DC STORMWATER PLAN CONSOLIDATED TOTAL MAXIMUM DAILY LOAD (TDML) IMPLEMENTATION PLAN

Stormwater Retrofit Assessments and Developing Policy to Forward our Treatment of the Urban Stormwater Dilemma An NAI Approach

POST-CONSTRUCTION STORM WATER

CAROLINE COUNTY BMPS AND THE CHOPTANK RIVER

Beyond Pipe and Pond. Research Based Stormwater System Design. August 9, 2010

Low Impact Development in Western WA Municipal Stormwater Permits

VIRGINIA RUNOFF REDUCTION METHOD Compliance Spreadsheet User s Guide & Documentation (April, 2012 Version 2.5)

CITY OF CHARLOTTESVILLE, VIRGINIA INPUT FOR VIRGINIA S PHASE II WATERSHED IMPLEMENTATION PLAN 2/1/12

STORMWATER MANAGEMENT AND IMPAIRED WATERS. Eric H. Livingston Watershed Management Services, LLC Crawfordville, FL

Chesapeake Bay TMDL Action Plan

UW-MADISON GREEN INFRASTRUCTURE PLAN

Basics of ESD and the New Design Sequence

Making Urban Trees Count:

Watch Us WIP, Now Watch Us Bay Bay: Delaware s Choreographed Approach to Chesapeake Bay Restoration

Hickory Creek 319 grant project City of Denton

NOAA s Role in Coastal Zone Management in the Chesapeake Region

Anne Arundel County Programmatic Two-Year Milestones January 2018 December 2019

Session I Water Quality, Green Infrastructure, Drainage and Stormwater Management Community Drainage and Surface Water Management in Delaware

Crediting BMPs Used for New and Redevelopment

Project Priority List scoring worksheet - stormwater Guidance document

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

The Chesapeake Bay TMDL

City of Charlottesville Water Resources Protection Program

Transcription:

Clean Water Optimization Tool for Maryland s Eastern Shore Karen Cappiella Program Director Center for Watershed Protection Upper Eastern Shore WIP Workshop November 21, 2014 Funded by the Town Creek Foundation

We Work Here.. National non-profit 501(c)3 organization 22 staff Offices in MD, VA, NY, PA What we do Distill research into practical tools Provide local watershed services Train others to manage watersheds www.cwp.org

Clean Water Optimization Tool for Eastern Shore Overview Purpose: To help Eastern Shore municipalities develop more realistic and cost-effective scenarios to meet the Chesapeake Bay TMDL and other local water quality goals Excel spreadsheet-based tool Quickly and easily develop BMP scenarios based on costeffectiveness Compare scenarios Considers practical limitations on BMP implementation Tailored to the Eastern Shore Focuses on pollutant reductions from the stormwater sector

Clean Water Optimization Tool How Does it Relate to the Maryland Assessment and Scenario Tool? Consistent land use pollutant loading rates Includes cost adjustments for Eastern Shore counties Includes BMPs not yet available in MAST Allows user to optimize BMP selection based on cost-effectiveness for a particular pollutant Requires assumptions about practicality of installing each BMP type Results can be used to inform MAST scenario development for reporting/crediting

Required: County Timeframe (2017 or 2025) NPDES regulatory status Pollutant on which to optimize (N, P, TSS or N & P) Maximum practical number of units treated by each BMP For certain BMPs, % impervious cover in the drainage area Clean Water Optimization Tool for Eastern Shore Overview Tool Inputs Optional: User-defined pollutant load reduction requirements Priority BMPs to receive higher weight in the optimization process Portion of load reductions to be met through trading Load reductions from BMPs installed between 2009 and the present

Clean Water Optimization Tool for Eastern Shore Overview Tool outputs: Number of units treated by each BMP Total (and per-bmp) annual load reductions for TN, TP and TSS Total (and per-bmp) annual cost

Permeable pavement Permeable pavers Rainwater harvesting Stormwater planter Green roof Downspout disconnection Bioretention Rain garden Green streets Vegetated filter strips Hydrodynamic structures Filtering practices Infiltration practices * Not currently credited by CBP ** More on the way Clean Water Optimization Tool Overview BMPs in the Tool: Stormwater Retrofits** Tree pits/structural soils Sand filters Dry swales Wet swales Vegetated open channels Bioswales Regenerative Stormwater Conveyance Wet ponds Constructed wetlands Extended detention ponds Ditch enhancement* Conversion of dry pond to wet pond

Land Use Change BMPs: Forest buffers Urban tree planting Impervious cover removal Urban cover crops* Soil augmentation* * Not currently credited by CBP Clean Water Optimization Tool Overview BMPs in the Tool Municipal Programs and Other Practices: Pet waste programs* Street sweeping Outfall netting systems* IDDE* Living shorelines Stream restoration User-defined BMP*

Clean Water Optimization Tool for Eastern Shore Overview Cost Components Initial Costs - design, construction, land costs Operation and Maintenance annual routine maintenance, intermittent maintenance, county implementation cost (inspection and enforcement) Annualized life cycle costs are estimated as the annual bond payment required to finance the initial cost of the BMP (20- year bond at 3%) plus average annual routine and intermittent maintenance costs. Primary data sources: King and Hagan (2011); Schueler et al (2007)

Clean Water Optimization Tool Overview BMP Effectiveness Stormwater retrofit BMPs based on Expert Panel recommendations To date, these have not been implemented in MAST Land use change BMPs based on differences in land use pollutant loading rates from MAST These are specific to Eastern Shore counties Programmatic and other practices based on various sources Expert Panel recommendations on stream restoration, living shorelines, IDDE Research studies and available literature on outfall netting systems, pet waste programs, etc.

Clean Water Optimization Tool Steps Step 1: Scenario Setup Enter County of interest, NPDES status and timeframe of interest (2017 or 2025) Optional: enter user-defined reduction goal Enter maximum practical units treated for each applicable BMP Optional: give more weight to high priority practices Account for externalities (i.e. established rain garden program)

Clean Water Optimization Tool Steps

Clean Water Optimization Tool Steps to Use the Tool Maximum Practical Units treated example 100 home owners have expressed interest in rainwater harvesting It s likely another 900 would be interested if approached Assuming 1500 square feet of roof per home being treated 1000 participating homes would treat ~34 acres of impervious

Clean Water Optimization Tool Steps to Use the Tool Maximum Practical Units treated example Use GIS to calculate acres of land within 100 feet of stream = 2,834 acres Of this, 1,497 acres is forest and 229 acres is impervious cover Remaining 1,106 can potentially be reforested 25% (276 acres) is on public land Assume that 10% (83 acres) of the privately owned acres can be reforested (willing landowner)

Clean Water Optimization Tool Steps Step 2: BMP Costs Review BMP cost data Optional: Replace with local values Optional: Review and replace other variables used to calculate cost

Clean Water Optimization Tool Steps Step 3: Optimization Results Optional: Enter reductions from installed BMPs Optional: Enter cross sector trading limits Select BMP on which to optimize (TN, TP, TSS, or TN&TP)

Use results to re-evaluate feasibility of more costeffective BMPs Help determine where to focus efforts (and when) Communicate & report results Clean Water Optimization Tool Steps

Clean Water Optimization Tool Next Steps Pilot the Tool in Queen Anne s, Talbot, Wicomico and Kent Counties Revise and disseminate the Tool to all Counties Provide training and a user guide Future updates to include new BMPs, a revised interface and expansion to all of Maryland

Questions? Karen Cappiella kc@cwp.org 410-461-8323 ext. 3203 Center for Watershed Protection