DRAFT. SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605 Corridor Improvement Project (CIP) I-605/SR-60 EA# 3101U0

Similar documents
FOR INTERSTATE 81 AND ROUTE 37 INTERCHANGE FREDERICK COUNTY, VIRGINIA MILEPOST 310

APPENDIX A TIER 1 ANALYSIS

I 75 PD&E STUDIES TABLE OF CONTENTS DTTM, TECHNICAL REPORT No. 2 TABLE OF CONTENTS

The Folded Interchange: An Unconventional Design for the Reconstruction of Cloverleaf Interchanges

Military Highway Interchange

9.0 I-26 & I-526 Interchange Improvements

Community Advisory Committee Meeting No. 2. June 22, 2006

PROJECT STUDY REPORT. Cal Poly Pomona Senior Project

WELCOME. Public Meeting for I-35 / I-44 Interchange. October 6, 2015

US 14 EIS (New Ulm to N. Mankato) Interchange and Intersection Type Comparison

CHAPTER 5 PARALLEL PARKWAY CORRIDOR IMPROVEMENTS

APPENDIX B. Excerpts from the October 2002 Conceptual Alternatives Report

Woodburn Interchange Project Transportation Technical Report

Environmental Consequences and Mitigation

A three-stage process was implemented in order to develop and evaluate the project concepts and provide recommendations for the project.

I-65/I-70 North Split Project

Conclusions & Lessons Learned

Consideration of a Diverging Diamond Interchange in Saskatchewan. Paul H. A. Steel, Project Manager, M. Eng., P.Eng., Tetra Tech EBA Inc.

I-35/80 Operations Study: Douglas Avenue to NW 86 th Street FOR

INTERCHANGE MODIFICATION REPORT

WELCOME IL 47. Community Advisory Group Meeting #5 Waubonsee Community College Wednesday, May 31, 2017

TRANSPORTATION PROJECT REPORT DRAFT CONCEPTUAL ACCESS MODIFICATION PROPOSAL OCTOBER 2002

On behalf of the Carolina Crossroads project team we thank you for taking the time to attend this meeting.

DEVELOPMENT, ANALYSIS, AND DESIGN OF A NEW PARKWAY AT GRADE INTERSECTION (PAGI)

Diverging Diamond Interchanges in Michigan

500 Interchange Design

M D 355 [FR E D E R IC K R O A D] OVER

MEMORANDUM: INITIAL CONCEPTS SUMMARY

Appendix B Highway 407 Interchange Review - Cochrane Street Area

I-65/I-70 North Split Project. Alternatives Screening Report CAC Meeting October 9, 2018

500 Interchange Design

CLA /10.54, PID Project Description:

GRE PID 80468

BCEO TRAFFIC IMPACT STUDY GUIDELINES

MEMORANDUM. Date: July 14, 2006 Project #: To: US 97 & US 20 Refinement Plan Steering Committee

FLORIDA DEPARTMENT OF TRANSPORTATION Planning and Environmental Management Office INTERCHANGE MODIFICATION REPORT

Vicinity Map. Interstate 605 (I-605) and State Route 91 (SR-91) in Los Angeles County

I-10 CONNECT. Public Meeting #1

DDI s Can Move More Than Cars. Alex Ariniello. Presentation for the ITE Western District Annual Meeting. July, 2016 in Albuquerque, New Mexico

I-10 CORRIDOR IMPROVEMENTS STAGE 0 FEASIBILITY STUDY STATE PROJECT NUMBER H FEDERAL AID PROJECT NUMBER H004100

VIII. LAND USE ISSUES

NORTHWEST CORRIDOR PROJECT. NOISE TECHNICAL REPORT 2015 Addendum Phase IV

INTERCHANGE SAFETY. Steve Allen. Houston Daugherty. Director, Strategic Transportation Investments Division (TDOT)

CHAPTER 4 GRADE SEPARATIONS AND INTERCHANGES

I-35/I-80/Iowa 141 Interchange IJR and NEPA A Practical Approach to Resolving a Decades-Old Traffic Operations Challenge

WOO-SR Feasibility Study (PID 90541) Feasibility Study Report April 22, 2011

DRAFT AIR QUALITY TECHNICAL MEMORANDUM

Placerville, a Unique Historical Past Forging into a Golden Future

CHAPTER 8: I-71 ACCESS IMPROVEMNETS

Jim Alexander Director of Design and Engineering, Southwest Light Rail Transit Project

Goleta Ramp Metering Study

Interchange Improvements at the Queen Elizabeth Way and Glendale Avenue

I 95 EXPRESS LANES SOUTHERN TERMINUS EXTENSION TRAFFIC OPERATIONS AND SAFETY ANALYSIS REPORT

Interchange Workshop Report (August 2004)

South Dakota Department of Transportation. Interchange Modification Justification Report. Interstate 90 Exit 44 (Bethlehem Road - Piedmont)

St. Francis Drive through the City of Santa Fe Corridor Study

Chapter 4: Alternatives Analysis

CHAPTER 1 PROPOSED PROJECT

Going/Greeley Interchange Enhancements for Truck Operations

2017 TIGER DISCRETIONARY GRANT APPLICATION

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

Summary. Preliminary Alternative Development and Screening. DEIS July 23, 2018

Informational Brochure. Proposed Interchange. Interstate Route 295 (I-295) AT Greenville Avenue (State Route 5) Town of Johnston, Rhode Island

Refinement of Alternatives I-84/Route 8 Waterbury Interchange Needs Study

I-64 Peninsula Shoulder Usage Evaluation. Eric Stringfield VDOT Hampton Roads Transportation Planning April 3, 2013

A Unique Application of Railroad Preemption with Queue Mitigation at a Roundabout Interchange

Traffic Analysis. Appendix I

Preliminary Assessment of Interchange Concepts. Seven Corners Task Force March 11, 2014

Project History Interchange Innovation Existing Conditions Proposed Design Approval Process Final Details PRESENTATION FOCUS

THE PROJECT. Executive Summary. City of Industry. City of Diamond Bar. 57/60 Confluence.

The New Highway Capacity Manual 6 th Edition It s Not Your Father s HCM

NW La Center Road/I-5 Interchange Improvement Project (MP 16.80)

Breaking the Diamond: DDIs, CFIs, and SPUIs

LOCATION AND DESIGN DIVISION

Exit 73 I-29 Interchange Modification Justification Study

LAS VEGAS STREET RAILROAD CROSSING RR/PUC CONNECTION AND PRELIMINARY DESIGN

APPENDIX B. Public Works and Development Engineering Services Division Guidelines for Traffic Impact Studies

Rapid City, SD HDR Project No RE: Replacement of Existing I-190 Twin Bridges at I-190/Silver Street Interchange, Rapid City, SD

8.0 Chapter 8 Alternatives Analysis

Overall project. The $288 million Phase 2 DesignBuild project starts construction. this spring, with completion by December 31, 2016

EXECUTIVE SUMMARY. The IP developed the following purpose and need statement for the Part B I-71 Access Improvement Study.

Existing vs. Proposed Ramp Noise Sensitivity Analysis Austin Boulevard Interchange

CITY OF VALLEJO PUBLIC WORKS DEPARTMENT TRAFFIC IMPACT Analysis/Study GUIDELINES

Conceptual Design Report

South Dakota Interstate Corridor Study. Phase I Summary Report

Interchange Design. Nick Hoernke, Bill Roth and Eric Sorensen

DIVISION I TRAFFIC IMPACT STUDY GUIDELINES ENGINEERING STANDARDS

University Region FY 2023 Final Scoping Package

FINAL PROJECT PRIORITIZATION PLAN FOR THE NM 599 CORRIDOR

January 16, Rhode Island Energy Facilities Siting Board 89 Jefferson Boulevard Warwick, Rhode Island 02888

2. Alternatives ENVIRONMENTAL ASSESSMENT US 52 OPERATIONAL IMPROVEMENTS. 2.1 Introduction

Transportation Connectivity, Accessibility and Economic Opportunity Study

Executive Summary. How to Use this Document

IH 30/IH 35E Reconstruction Project Pegasus Final Technical Memorandum - Evaluation of Conceptual Alternatives Task 7.5

Functional Planning Study Highway 15:06 From Range Road 220 to Highway 830

Route 7 Connector Ramp MODIF IE D I N T ER C H A N G E M OD IFICATIO N R E PO RT TRA N S F O R M I : I N S ID E THE BE LTWAY

04 ALA /6.7. Vicinity Map

Transportation and Works Department The Regional Municipality of York Yonge Street Newmarket, Ontario L3Y 6Z1

Chapter GRADE SEPARATIONS & INTERCHANGES

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM New Jersey Department of Transportation Project Descriptions ($ millions)

Transcription:

SR-60 7 th Avenue Intersection Control Evaluation (ICE) I-605/SR-60 EA# 3101U0 October 9, 2017

Contents 1 Purpose of ICE Memo... 1 2 Background... 1 3 Existing Interchange Deficiencies... 1 4 Context Sensitive Elements... 5 5 Traffic Volumes... 5 6 Step 1 - Screening... 6 6.1 Interchange Options... 6 6.1.1 Removal of EB off-ramp to SB 7 th Avenue... 6 6.2 Intersection Options... 10 6.2.1 EB and WB On- and Off-Ramp Intersection Roundabouts... 10 6.2.2 Other Intersection Designs... 11 6.2.3 Other Intersection Options Screened... 12 6.3 Recommended Options for Further Analysis... 14 6.3.1 Interchange Options... 14 6.3.2 Intersection Options... 14 7 Step 2 Design and Traffic Analysis... 15 7.1 Interchange Options... 15 7.2 Intersection Options... 15 7.3 Recommendations... 16 Tables Table 6-1 - Interchange Configuration Options Screening... 9 Table 6-2. At-grade Intersection Configurations... 14 Table 7-1 Intersection Control Evaluation- EB-ramp Intersections... 15 Figures Figure 3-1 SR 60 at 7th Avenue Existing Interchange Configuration and Geometric Deficiencies... 2 Figure 3-2 SR-60 at 7th Avenue Interchange Accident Locations... 4 Figure 5-1 Traffic Volumes at SR-60/7th Avenue Interchange... 5 Figure 6-1 7 th Avenue Interchange Design Configuration... 7 Figure 6-2 EB to SB 7 th Avenue Off-Ramp Removed Configuration... 8 Figure 6-3 Conceptual Roundabout Design at WB Ramps... 10 Figure 6-4 Conceptual Roundabout Design at EB Ramps... 11 Figure 6-5 Continuous Green T- Intersection Design at EB Ramps... 12 Figure 6-6 Conceptual WB off ramp Green Tee Intersection Design... 13 Figure 6-7 Quadrant Roadway Design... 13 i

This page is intentionally left blank. ii

1 Purpose of ICE Memo In accordance with Caltrans Interchange Design Procedure (Topic 503 of the Highway Design Manual), interchanges are to be reviewed by the Design Coordinator and/or the Design Reviewer, Headquarters Traffic Liaison, and the Federal Highway Administration Transportation Engineer. In accordance with Caltrans Traffic Operations Policy Directive 13-02, the District ICE Coordinator shall review intersection control strategies considered during the interchange review. This memorandum documents the interchange configurations considered, along with associated intersection control strategies, the recommended configuration to feature in the I-605 Corridor Project alternatives, and the rationale supporting the recommendation. Caltrans has provided further guidance through its ICE Process Informational Guide. This memorandum documents the interchange configurations considered, along with associated intersection control strategies, the recommended configuration to feature in the I-605 Corridor Improvement Project alternatives, and the rationale supporting the recommendation. 2 Background The SR-60 / 7th Avenue Interchange is located in a highly urbanized area within Hacienda Heights in Unincorporated Los Angeles County. The project is providing improvements to the westbound on-ramp from 7th Avenue, the westbound (WB) off-ramp to 7 th Avenue and the eastbound (EB) off-ramp to southbound 7th Avenue. These improvements are being made in order to accommodate SR 60 mainline widening required to improve the I-605 / SR-60 Interchange. 3 Existing Interchange Deficiencies The existing interchange is configured as shown in Figure 3-1 below: 1

Figure 3-1 SR 60 at 7th Avenue Existing Interchange Configuration and Geometric Deficiencies RESIDENTIAL WB OFF-RAMP - Non-standard curve radii - Non-standard SSD - Non-standard Access Control RESIDENTIAL COMMERCIAL Overhead Electrical Lines COMMERCIAL RESIDENTIAL RESIDENTIAL 2

As shown, the existing interchange doesn t follow a typical configuration. In the northeast quadrant there exists a single hook off-ramp similar to a Type L-6 configuration. In the northwest and southwest quadrants, compact diamond configurations (Type L-1) exist. Geometric deficiencies include: Westbound off-ramp to 7th Avenue: o o o The existing hook ramp radius is a non-standard 200 providing a design speed of 30 mph There is non-standard, horizontal stopping sight distance of 181 providing a design speed of 28 mph There is an existing commercial driveway (In-N-Out), located 42 west of the terminus. This is less than the 50 required for standard access control. Eastbound off-ramps to 7th Avenue: o o o The existing EB off-ramp to SB 7 th Avenue has non-standard vertical stopping sight distance, a non-standard intersection angle, and non-standard corner sight distance. The existing EB off-ramp to NB 7 th Avenue has a non-standard curve radius of 163 providing a design speed of 22 mph and non-standard lane widening required for trucks on curved ramps. The existing EB on-ramp has a non-standard curve radius of 400 providing a design speed of 34 mph Accidents at this interchange are noted in Figure 3-2. Accident data was received from Caltrans for each of the interchange ramps for the most recent three year period available. Locations that are above the State average rates for similar facilities include: EB to SB 7 th Avenue off-ramp where the accident rate is 155% higher than the state average. Of the nine total accidents more than half (5) were rear ends. EB to NB 7 th Avenue off-ramp where the accident rate is 31% higher than the state average. Of the 11 total accidents four were hit objects, three were rear ends, two were sideswipes and one was a broadside/overturn accident. EB 7 th Avenue on-ramp where the accident rate is 30% higher than the state average. Of the five total accidents three were broadsides and two were sideswipes. WB 7 th Avenue off-ramp at Gale Avenue where the accident rate is 129% higher than the state average. Of the ten total accidents three were rear ends, three were broadsides, two were sideswipes and two were hit objects. 3

Figure 3-2 SR-60 at 7th Avenue Interchange Accident Locations 5 129 % > State Ave. 2 3 3 1 5 3 155% > State Ave. 2 Legend: X Number and location of accident Accident Percentage Higher than XX% > State Ave. the Statewide Average 3 3 30 % > State Ave. 31 % > State Ave. 4

4 Context Sensitive Elements This interchange is located in a highly urbanized area which creates several physical constraints as shown in Figure 3-1 including: Commercial development in the northeast quadrant of the interchange (In-N-Out Burger) Commercial development in the southeast quadrant of the interchange (Chevron, Denny s, Motel 6) Residential properties adjacent to right of way in each quadrant Overhead distribution electrical lines adjacent to the roadway and crossing mainline freeway. There are no bike path facilities located at this interchange and there are none planned. Foothill Transit operates the bus system within this interchange area. Routes 281 and 282 operate on 7th Avenue north of Gale Avenue and along Gale Avenue. 5

5 Traffic Volumes Existing Traffic Volumes for the intersections (2016) and projected traffic volumes for the ramps (2051) are provided in Figure 5-1 below: Figure 5-1 Traffic Volumes at SR-60/7th Avenue Interchange 5

Notable features include: Existing traffic volumes are an acceptable LOS of D and better. WB on-ramp from 7th Avenue, the NB left-turn lane does not have adequate storage length in the AM peak period and the SB left-turn lane does not have adequate storage length in the PM peak period EB off-ramp to SB 7th Avenue volume is relatively low. WB off-ramp to 7th Avenue volume is relatively low; however, there is a high percentage of trucks that utilize this ramp (approximately 7%.) Most of these trucks are turning left towards the industrial tracts located to the north in the City of Industry. The highest volume ramp is the WB on-ramp from SB 7th Ave. 6 Step 1 - Screening 6.1 Interchange Options Various interchange configurations were considered and are summarized in Table 6-1. This interchange is located within a highly urbanized area that has been fully developed. Due to the context sensitive elements any major reconfiguration of the interchange would cause significant impacts beyond what would be gained by a modified interchange. As a result, it was determined that any major modification to the interchange configuration would not be viable or practical; however, improvements to individual ramps could be considered and are presented in the next section. Figure 6-1 provides a design option for this interchange in which the EB and WB on- and off-ramps are signalized or stop controlled. 6.1.1 Removal of EB off-ramp to SB 7 th Avenue Removal of the EB off-ramp to SB 7 th Avenue has been considered because of the higher than average level of accidents experienced at this ramp. If this ramp were removed vehicles would be routed to the existing EB to NB loop off-ramp. An additional ramp lane would be required at the exit as well as at the intersection to accommodate both NB and SB movements, The existing stop-controlled intersection would require signalization and a free-right turn would be evaluated considering the high volume of traffic heading north on 7 th Avenue. This option is shown in Figure 6-2. 6

Design Option (Existing Configuration Improved) Figure 6-1 7 th Avenue Interchange Design Configuration WB Alternatives 02/2A: WB direct on-ramp (signalized) & hook off-ramp (signalized) EB Alternatives 02/2A: EB direct off-ramp (stop-controlled) 7

Figure 6-2 EB to SB 7 th Avenue Off-Ramp Removed Configuration 8

Interchange Type Existing Interchange Configuration Table 6-1 - Interchange Configuration Options Screening Existing Interchange Configuration with EB to SB ramp removed Configurations from Chapter 500 Figure 502.2 of HDM (Types L-1 to L-12) Double Roundabout (Teardrop or Raindrop) Divergent Diamond Interchange (DDI) Single Point Urban Interchange (SPUI) (Type L-13) Right of Way Impacts Minor Minor Major Major Major Major Construction Cost Moderate Moderate Very High High Very High Very High Ease of Construction Traffic impact during construction Moderate Moderate Complex Complex Complex Complex Moderate Moderate Major Major Major Major Expected Driver Acceptance Good Good Good Moderate Moderate Moderate Recommended for further study? Yes Yes No No No No Notes The existing interchange option meets purpose and need for the project. EB to SB ramp removal considered due to higher accident rates. Any major modification to the existing configurations as outlined in Chapter 500 would cause significant impacts with little gained benefits. This configuration is not applicable as ramp intersections are offset from each other. A DDI is not applicable as intersections are offset from each other. It would be a major modification that would cause significant impact with little gained benefits. Not applicable as ramp intersections are offset from each other. 9

6.2 Intersection Options Other viable options are considered for the signalized at-grade intersections with the local roads. Improvements are considered for the EB on- and off-ramp intersection and WB on- and off-ramp intersection. 6.2.1 EB and WB On- and Off-Ramp Intersection Roundabouts A roundabout configuration was considered for both intersections at the WB on-ramp and 7 th Avenue/Gale Ave and the WB off-ramp to 7 th Avenue. Figure 6-3 below is a conceptual design that features a two-lane roundabout, three-lane SB approach, and three-lane WB approach which includes one by-pass lane. As designed, this roundabout would achieve the acceptable levels of service; however, properties along Kinbrae Avenue and Doverfield Avenue would be significantly impacted. Consideration was given to reducing the property impacts of this design by reducing the geometric footprint; however, by reducing the footprint the LOS would be worsened. For example, if a short by-pass lane is removed at the 7 th Avenue SB approach, the SB approach would have a LOS E. If there is no short by-pass at the 7 th Avenue WB approach, the WB leg would have a LOS F and the queue would spill back to the upstream intersection at Gale Avenue and WB SR-60 off ramp. Figure 6-3 Conceptual Roundabout Design at WB Ramps Significant ROW Impact s Impact to existing columns Heavy truck traffic heading west (7% or more) 10

Figure 6-4 is a conceptual design for a roundabout at the EB on- and off-ramp intersection. This design assumes that the existing EB to SB off-ramp would be eliminated. This design option would operate at an acceptable LOS; however, as shown, residential and commercial right of way impacts would be incurred. Figure 6-4 Conceptual Roundabout Design at EB Ramps ROW Impacts 6.2.2 Other Intersection Designs Another intersection option was considered. Figure 6-5 provides a design for 7 th Avenue south of SR-60. The design below takes advantage of the Continuous Green T- intersection design in which the through movement for SB 7 th Avenue has a continuous green light. This design assumes the existing EB off-ramp to SB 7 th Avenue would remain. Two right turns would be required for the EB off-ramp to NB 7 th Avenue. In addition, preliminary analysis shows that the intersection of the EB ramps and 7 th Avenue will require signalization. Optimization of this signal will be analyzed as this concept moves to Step 2. 11

Figure 6-5 Continuous Green T- Intersection Design at EB Ramps 6.2.3 Other Intersection Options Screened As part of the evaluation several other at-grade configurations were considered as shown in Table 6-2 below. Closer consideration was given to the Continuous Green Tee intersection and to the Quadrant Roadway in the WB direction and is discussed below. WB off ramp Continuous Green Tee Intersection A Continuous Green Tee Intersection could be considered at the westbound off-ramp to Gale Avenue (Figure 6-6). This modification would allow vehicles heading west to continue at the top of the T-intersection. The benefit of this design is that through vehicles would not need to stop thus reducing a conflict point; however, because of the closely spaced intersections (350 ) and high truck volumes this option would cause undesirable weaving transitions. As a result this option is screened from further analysis. 12

Figure 6-6 Conceptual WB off ramp Green Tee Intersection Design Kinbrae Avenue Gale Avenue WB Off-ramp Quadrant Roadway The quadrant roadway as shown in Figure 6-7 was evaluated. The impacts to the context sensitive elements of these options would be significant in that the quadrant roadway configuration would result in undesirable levels of traffic encroaching into the existing residential neighborhoods. As a result this option is screened from further analysis. Figure 6-7 Quadrant Roadway Design Kinbrae Avenue Gale Avenue 13

Table 6-2. At-grade Intersection Configurations At-grade configuration Displaced Left Turn Reason for not considering A displaced left turn requires that the left turn be several hundred feet prior to intersection. This can not be accomplished without major impacts to adjacent land uses at any of the intersections Continuous Green Tee Offset Tee Pair For the WB ramp intersection this configuration is impractical as weaving needed weaving distances between interchanges would not be desirable; however, a configuration similar to the concept is being considered for the EB ramp intersections. An offset tee pair intersection requires minor street offsets. This configuration is not applicable to ramp intersections. Jughandle Quadrant Roadway Bowtie Split Paired The jughandle requires displacement of left and right turn movements. Improvements to this configuration would cause substantial impacts to the neighborhood. The quadrant roadway requires a bypass side street. This option was reviewed and it was determined that the disruption to the existing neighborhood would be too great of an impact. The bowtie configuration requires upstream and downstream improvements and would not fit into the existing configuration Split phase signalization is not applicable to these intersections. Would not fit into existing configuration 6.3 Recommended Options for Further Analysis 6.3.1 Interchange Options The two interchange options as shown in Figures 6-1 and 6-2 are recommended for further analysis. The interchange shown in Figure 6-1 takes advantage of the existing configuration, is adapted for the proposed widening of the mainline and improves on existing operational and geometric deficiencies. Figure 6-2 proposes to remove the existing EB to SB 7 th Avenue off-ramp and improve on the existing EB to NB 7 th Avenue off-ramp to accommodate both NB and SB traffic movements. 6.3.2 Intersection Options For the WB ramp intersections, it is expected that the roundabout option would have negligible operational benefits when compared to the existing signalized intersection. The capital costs and the right of way requirements of the roundabout option are considerably higher. As a result it is recommended that the roundabout option for the WB ramp intersections be screened from further consideration. Also, for the WB ramp intersections, the option of a Continuous Green Tee intersection and the Quadrant Roadway should be screened from further consideration. 14

For the EB ramp intersection further analysis is recommended. Two options to be considered and refined are as shown in Figures 6-4 and 6-5. The roundabout in Figure 6-4 should be further analyzed to determine if its footprint can be reduced to avoid right of way encroachments. The design would be compared to the costs and benefits of the conventional intersection conceptual design presented in Figure 6-5. The analysis of these intersections will be completed in Step 2. 7 Step 2 Design and Traffic Analysis Step 2 is to be completed when the recommended options for further analysis are concurred with. 7.1 Interchange Options As part of the Step 1 screening process it was determined that the existing configuration would be compared to the proposal of removing the EB to SB 7 th Avenue off-ramp. The analysis for this determination is summarized in Table 6-1. To reach a determination of the preferred option consideration will be given to the costs and benefits of each option. 7.2 Intersection Options As part of the screening process it has been recommended that the EB ramps intersections be further analysed. The analysis would take into consideration context sensitive elements, traffic operations, safety performance, right of way impacts, environmental constraints, construction costs and impacts and life cycle costs as summarized on Table 7-1. Table 7-1 Intersection Control Evaluation- EB-ramp Intersections No. Feature Roundabout Continuous Green T - Intersection Conventional Signal Notes 1 2051 No Build Traffic Operations AM/PM Level of Service (LOS) 2 2051 Build Traffic Operations AM/PM Level of Service (LOS) 3 Right of Way Acquisition Area (ft2) A/B TBD C/C TBD TBD TBD TBD None None 15

Table 7-1 Intersection Control Evaluation- EB-ramp Intersections No. Feature Roundabout Continuous Green T - Intersection Conventional Signal Notes 4 Right of Way Impacts (No Potential Impact = 0) (Potential Adverse Impact = 5) 4 0 0 Note type of acquisition: -Residential -Commercial -Industrial -Parks/Recreation 5 Environmental Constraints (No Potential Impact = 0) (Potential Adverse Impact = 5) TBD TBD TBD Note type of constraint: - Noise - Air Quality - Safety - Historic/Archeological - Natural Resources - Hazardous Waste - Adjacent Access 6 Construction Traffic Control Constraints (All lanes remain open = 0) (Full closure = 5) 3 1 1 7 Total Cost (High, Moderate, Low) 8 Life Cycle Cost (High, Moderate, Low) 9 Safety Performance B/C Ratio Moderate Moderate Moderate Low Moderate Moderate TBD TBD TBD 7.3 Recommendations Recommendations for the interchange and intersections control systems will be provided at the conclusion of Step 2 Design and Traffic Analysis. 16