ACTIVITY BASED COSTING PERFORMANCE MEASUREMNENT ABC. Benchmarking

Similar documents
Chapter 4 Activity-based Costing Systems

Activity Based Costing: A Decision Making Tool. with Dr. Joseph Ugras December 2017

Traditional Costing Systems

Activity-Based Costing Systems

ACTIVITY BASED COSTING

P2 Performance Management

ACCTG 221 / ABC Costing

Chapter 5: Activity-Based Costing

PAPER 4 QUESTION ONE. The ABC system can therefore be described as constituting the following stages:

4 The balanced scorecard

Chapter 2 An Introduction to Cost Terms and Purposes

activity-based EXAMPLE 1 See Table 1 opposite.

Activity Based Costing

Activity Based Costing

P2 Performance Management September 2012 examination

CHAPTER ONE: OVEVIEW OF MANAGERIAL ACCOUNTING

CIPS Knowledge Works. Activity Based Costing (ABC) - What the buyer needs to know. Contents

The Examiner's Answers Specimen Paper. Performance Management

Answer_MTP_Final_Syllabus 2016_Dec2017_Set 1 Paper 15 Strategic Cost Management and Decision Making

Subbu Ramakrishnan. Manufacturing Finance with SAP. ERP Financials. Bonn Boston

Can Innovation of Time Driven ABC System Replace Conventional ABC System?

Management Accounting

Chapter 7. A closer look at. overhead costs

Real-time enterprise solutions for discrete manufacturing and consumer goods

Control Plans: Ensuring the Economic Return of the Application of Statistical Thinking in Improvement Projects. Robert Mitchell 3M Corporate Quality

BALANCE SCORECARD. Introduction. What is Balance Scorecard?

LOYOLA COLLEGE (AUTONOMOUS), CHENNAI

MODULE 1: INTRODUCTION TO STRATEGIC MANAGEMENT ACCOUNTING

MANAGEMENT CASE STUDY NOVEMBER 2018 EXAM ANSWERS. Variant 2

Management Accounting for Multinational Companies. Solution to the Wilkerson Case. Igor Baranov. Executive Summary

LANDMARKS OF IMPLEMENTING LEAN MANAGEMENT IN PUBLIC SERVICES

Online Course Manual By Craig Pence. Module 12

DEVELOPING KEY PERFORMANCE INDICATORS. - The Balanced Scorecard Framework -

DECENTRALISATION AND THE NEED FOR PERFORMANCE MEASUREMENT 06/04/2017

Lecture 2: Flow of resource costs

Introduction to Cost Accounting. Samir K Mahajan

Activity Based Costing in Gem and Jewellery Industry

Introduction to Cost Accounting. Samir K Mahajan

Part 1 Study Unit 5. Cost Accumulations Systems Jim Clemons, CMA Ronald Schmidt, CMA, CFM

Introduction to Cost Accounting. Samir K Mahajan

COST AND MANAGEMENT ACCOUNTING

The following points should be noted by candidates when reflecting on the paper just taken, and when preparing for future CIMA examinations:

APPROACHES FOR CUTTING COSTS: A THOUGHT-STARTER

Cost concepts, Cost Classification and Estimation

Learning the ABC: case analysis of activity-based costing and profitability management

An accounting perspective: Business insight

Nehemiah UCHA (N.UCHA) Value for Money (VfM) Strategy 2016

Ch.4 Evaluating Requisitions.

2. Standard costs imply a) Predetermined cost for a period b) Incurred cost c) Conversion cost d) Incremental cost

THE PUBLIC ACCOUNTANTS EXAMINATION COUNCIL OF MALAWI 2009 EXAMINATIONS FOUNDATION STAGE PAPER 3 : MANAGEMENT INFORMATION

PROJECT MANAGEMENT - BUSINESS CASES AND GATEWAYS BY KEN GARRETT

Not All Customers are Created Equal: Looking at Lifetime Value

Willow Company produces lawn mowers. One of its plants produces two versions of mowers: a basic model and a deluxe model. The deluxe model has a

Module 9: Balanced Scorecard

6. IT Governance 2006

Reengineering Maintenance Process Section 9

Cost Behavior. Material Cost: Direct material: 1. seen in the final product 2. economic/visible to trace Indirect Material:

Competitive benchmark report

Welcome to: FNSACC507A Provide Management Accounting Information

Activity- Based Costing

Introduction to Finance. 31 May Marking Scheme

Think ROI, Not Cost When Evaluating ERP Software

IPCC, Paper 3, Costing, Chapter 4 B.N.Pattabhi., M.Com, FCA

Software review: Is there a role for Activity Based Costing (ABC) in database marketing?

CHAPTER 7 Accounting 1B. Activity-Based Costing(ABC): A tool to Aid Decision Making

Activity-Based Costing. Managerial Accounting, Fourth Edition

A beginners guide to moving to an ERP

Designing cost accounting systems. by David Derichs Lecture 1 Helsinki, 02 January 2018

WHY INDUSTRIAL MANUFACTURING NEEDS IoT

Week 1 Understanding Processes and Value Creation

Developing a successful governance strategy. By Muhammad Iqbal Hanafri, S.Pi., M.Kom. IT GOVERNANCE STMIK BINA SARANA GLOBAL

How Lean Six Sigma reduces the Cost of Poor Quality in Organisations. Alex Colman. Lean Six Sigma MBB - BEng Mech. Eng.

EBITDA Optimization for High Tech Manufacturing

Simulation for strategy and international business. Introduction. Ver 2.11

CHAPTER 1 INTRODUCTION

A presentation by Prof Tripurari Jha M.Com, CS-Executive, CA-IPCC, Research Scholar (PhD) UGC NET Lecturer in Accountancy, Balbharati s MJP College,

What is the pay-off from Build-to-Order?

Accounting Information Systems, 12e (Romney/Steinbart) Chapter 14 The Production Cycle

Session 8: Process Critique

MBP1133 Managerial Accounting Prepared by Dr Khairul Anuar

TUTORIAL -ABC. Ir. Haery Sihombing/IP Pensyarah Pelawat Fakulti Kejuruteraan Pembuatan Universiti Teknologi Malaysia Melaka

Strategic Professional Options, Paper APM

A Consumer s Guide to... Return on Training Investment

target and lifecycle 01 technical taken by conventional costing. accounting so it is worth first looking at the approach

OPERATIONAL CASE STUDY NOVEMBER 2016 EXAM ANSWERS. Variant 1. The November 2016 exam can be viewed at

Assessing the ROI of training

Topic. Balanced Scorecard. Performance measurement. William Meaney MBA BSc. ACMA 1

Chapter 2--Product Costing: Manufacturing Processes, Cost Terminology, and Cost Flows

Overheads/Job and Batch Costing. RST Ltd. has two production departments Machining and Finishing. There are three service

HIGH-PERFORMANCE MACHINING CENTER ROI: HOW TO DETERMINE A MACHINE S TRUE VALUE

Sales salaries. Factory repairs. Advertising Office supplies used $ $

Lean Manufacturing 1

Paper F5. Performance Management. Fundamentals Pilot Paper Skills module. The Association of Chartered Certified Accountants

Overcosting and Undercosting (Example 1 at the end of these notes)

WORLD CLASS MAINTENANCE PROGRAM UTILIZING TPM & ISM

5-54 Volume-based Costing Versus ABC

As Easy As ABC - An Introduction to Activity Based Costing

Introduction to Production Planning

LEAN ADMINISTRATION.

Transcription:

PERFORMANCE MEASUREMNENT Benchmarking Measuring and benchmarking supply chain performance is a vital first step in any reengineering programme. Understanding the differences between value adding time and non-value adding time can help identify opportunities for time compression in the supply chain. Whilst benchmarking often implies comparison outside the business with best-in-class organisations, it can also be a powerful tool for use internally. ACTIVITY BASED COSTING ABC 1

One benefit of a rigorous approach to logistics and supply chain benchmarking is that it soon becomes apparent that there are a number of critical measures of performance that need to be continuously monitored. The idea of key performance indicators (KPI s) suggests that whilst there are many measures of performance that can be deployed in an organisation, is a relatively small number of critical dimensions which contribute more than proportionally to success or failure in the marketplace. Because logistics costs can account for a large proportion of total costs in the business it is critical that they be carefully managed. However it is not always the case that the true costs of logistics are fully understood. Traditional approaches in accounting based upon full-cost allocation can be misleading and dangerous. Activity Based Costing (ABC) provides significant advantages in identifying the real costs of serving different types of customers or different channels of distribution. The key to ABC is to seek out the cost drivers along the logistics pipeline that cause costs because they consume resources. The advantage of ABC is that it enables each customer s unique characteristics in terms of ordering behaviour and distribution requirements to be separately accounted for. Once the cost attached to each level of activity is identified then a clearer picture of the true cost to serve will emerge. 2

Activity-Based Costing (ABC) A cost management technique which regards the activity cost as a building block to analyse how and to which order, product, customer, etc. the resources are consumed over time ABC was introduced by Kaplan and Cooper of Harvard Business School as an alternative to traditional accounting techniques in the 1980 s. Many have since used this method for product costing in both manufacturing and business applications The ABC method of accounting involves the breakdown of a system into individual activities and costing of the amount of time and resources spent on each activity in the manufacture of a product. A schematic diagram to illustrate this point is given in the Figure. Activity-Based Costing Cash Outflows Resources: staff premises plant & machinery I.T. Activities consume resources to meet business objectives $ $ $ $ $ ABC is based on an understanding of how activities consume recourses 3

Traditional accounting methods concentrate on volume based costs systems and these methods are highly inaccurate in the modern manufacturing environment. Today much of the significant cost in producing an item are not volume related, for example the cost of engineering, order processing, planning, quality control, etc. for high technology, make-to-order products, or just-in-time delivery. ABC, however, takes into account the cost incurred at activity level and then attributes the cost to products according to the activities that a product goes through. Even with a simple case ABC can be very complex and time consuming, that is why it is not widely applied in the manufacturing industry. It is recognised that ABC can be used to enhance rather than replace the accounting system when the company finds it too difficult to implement fullscale ABC-based accounting. In this case, ABC is used as a cost management tool by the operational departments to compliment the existing accounting practice. In ABC cost pools must be identified for each activity. The cost is incurred once the product passes through the activity. The factor that causes the cost to be incurred in the activity is known as the cost driver. The development of an ABC model is relatively simple. The accuracy usually depends on the how detailed the ABC model and the type of cost driver used. Developers have a choice of three types of activity cost drivers which are, in order of increasing accuracy (and cost of measurement): 4

transaction drivers which count each time an activity takes place; duration drivers which represent the time taken for each activity and so takes into account variation; and intensity drivers which directly cost for the resources used each time an activity takes place. ABC systems relate organisation spending of recourses to the activities and business processes performed by these resources. Activities can be classified into four general categories Unit Level performed each time a unit is produced Batch Level performed each time a batch of goods is produced Product Level performed as needed to support the production of each type of product Facility Level performed to sustain the factory s performance such as rent, depreciation, insurance etc. In ABC variable overhead costs are traced to individual products however it is not always straightforward to assign fixed overhead costs to unit drivers. ABC systems have the advantage of associating many of the costs that are defined in traditional costing systems as fixed overheads with changes other than production volume. 5

ABC therefore helps to clarify the relationship between the causes of cost increase and decrease and the individual products. It is this cause and effect relationship which allows management to differentiate between value added and non value added activities ABC systems therefore have the potential Strategic Decision making tool for process redesign and continuous improvement Cost Accounting vs. ABC - An Example: Product Costing Cost Accounting Material Cost Labour rate x product volume + + Overhead rate x product volume Activity-Based Costing Material Cost + +...... + Cost of Activity 1 Cost of Activity n ABC provides a more detailed, timely and accurate allocation of the cost factors and value to the product Product Costing - Cost A/C Indirect Cost Overhead Rate Not effective for cost management: Product Cost Including indirect Indirect cost is far cost in overhead more than the hide the non-value direct labour cost added activities for electronics manufacturers No distinction of cost of design, engineering, quality, business process, etc. 6

Product Costing - ABC Indirect Cost Activity 1 Activity 2 Activity 3 Activity 4 Activity 5 change-over time store time inspect time handle time process time prepare time Product Cost Activity cost is a meaningful link between products and the resources they consume ABC v Traditional Accounting Cost Accounting too late: most cost reports are at accounting period, e.g. end of the month too aggregated: aggregate to simplify, not enough for cost management distorted cost allocation: only direct material/labour are traced. Engineering, planning, & sales cost are averaged out although they may be direct causes to a product, order, etc. ABC immediate: on request by cost management or by improvement project detailed: costing at the same level as operating management: activity linking cost cause-effect via activity: allocate cost to activity, and then analyse and manage cost of the activities which contribute to the product, order, etc. Application of ABC $ $ $ Activity Cost $ $ $ $ $ $ $ $ $ $ $ $ by budget centre $ $ $ $ $ $ $ by process by product $ $ $ market sector customer product by profitability by type Non- Value Value Added Added $ $ Activity Costs are building blocks for many forms of management information 7

Application of ABC 1. To calculate product cost To sum the cost of all the activities that contribute to make the product: Ni Ci = Mi + CAij - (1) j= 1 2. To calculate inventory value/cost To sum the cost of all the activities that have taken place to make it: Ki Wi = Mi + CAij - (2) j= 1 Ci: cost of the ith product; Wi: inventory value of the ith product; Mi = material cost of the ith product; CAij = cost of the jth activity in making the ith product; Ni = total number of activities to make the ith product; Ki = number of activities that have taken place to make the ith product Application of ABC 3. To identify non-productive resources Resources that are unused can be for other tasks, i.e. surplus capacity: m Ni S = Tc CAij - (3) i = 1 j = 1 4. To simplify and improve process Categorising the cost by activity type help identify the high-cost activity type to simplify or improve: k Lx CA max( xy) x = 1 y = 1 - (4) S: surplus capacity; Tc: total capital investment & operating cost to the process m = total number of products been produced; k = total number of activity types CAxy = cost of the yth activity in the xth activity type; Lx = total number of activities of the xth activity type; Application of ABC 5. Business Process Reengineering (BPR) ABC stimulates BPR by identifying the high-cost activity in a business process, and help cost-benefit analysis of BPR by measuring the cost of activities that are productive. 6. To analyse cost-benefit of QA Defective products should be scrapped as early as possible. However, it is costly to devise many QA in the process. ABC can quantify the activity cost required to continuously manufacture the defective products vs. the investment on QA, thus providing quantitative information to support decisions. 8

Application of ABC 7. To justify investment of Automation Automation improves efficiency but requires high capital investment. ABC can quantify the improved product cost vs. the automation investment, thus helping analyse the cost-benefit. 8. To maximise profitability To select the product with the max. profitability as calculated below: m Ni max[( Pi Mi CAij) / Pi] - (5) i = 1 j = 1 Pi: the selling price of the ith product CAij = cost of the jth activity in making the ith product Issues to Consider in ABC 1. Where will ABC be applied? A great amount of data needs to be collected and updated for ABC. It is easier to implement by functions. It works best in functions where fairly discrete, repetitive activities take place: Manufacturing Process: production, QA, store, handling & shipping of items with long time or large volume Business Process: sales/plan, purchase Issues to Consider in ABC 2. At which level will the activity be? Line Accuracy Detail Allocate Procedure of cost of data cost simpler closer to exist A/C Work centre Machine more accurate more clear relationship 9

Issues to Consider in ABC 3. What cost factors will be included? Direct to activity - Direct labour - Machine/Tooling - Utilities Indirect to activity - Computers - Maintenance - Consumables Update data on time Allocate cost - etc. more less clear difficult relationship Allocate Cost to Activity - An Example Activity: Testing Steps: 1. Waiting 2. Setup 3. Testing Resources Required: Utilities Machine Tooling Utilities Operator Machine Tooling Utilities A simplified model of an automated test activity to illustrate that the activity cost is calculated by resource consumption Allocate Cost to Activity - An Example Step 1 Step 2 Step 3 Activity Cost Driver Waiting Set-up Testing (total) Direct labour(c 1) X X Depreciation Machine(C 2) X X X Tooling(C 3) X X X Utilities(C 4) X X X X Time T1 T2 T3 Activity cost: CA = C1xT2 + (C2+C3)x(T2+T3) + C4x(T1+T2+T3) 10

The Balanced Scorecard 11

Kaplan and Johnson in their book Relevance Lost attacked corporate reporting systems saying that they were too oriented towards meeting the needs of the stock market, and that this was a major reason why Western manufacturing was losing out to Japan. For too long, performance measurement has been dominated by backward looking and financial measures of performance. Balanced Measures? Traditional financial Balanced financial past future past future operations operations size of circle indicates number of measures Obviously what are needed are both financial and non-financial performance measures, looking forward as well as back. The balanced scorecard developed by Kaplan and Norton is now widely regarded as being a significant advance in performance measurement. This approach develops a methodology for a balanced set of measures, whereby financial are but one element. According to Kaplan and Norton there are four aspects that any measurement system needs to cover 12

These are: Financial Customer (or externally) oriented Business Process (or internally) oriented) Learning and Growth All are necessary Moreover, there is a logic that sees financial performance emerging from customer understanding, from internal operations, and these last two being sustained by learning and growth. The figure gives examples of generic measures and their relationships. The Balanced Scorecard Financial perspective return on capital employed cash flow profit turnover per employee Customer perspective customer satisfaction index market share percentage sales from new products delivery performance Internal business perspective tender success rate ppm levels cycle times inventory turns OEE after Kaplan & Norton HBR, Jan/Feb 1992 Innovation and Learning perspective time to develop new products % revenue from new services number of employee suggestions successful platform derivatives The concept of the Balance Scorecard is that there area number of key performance indicators most of them probably non-financial which will provide better means of meeting strategic goals than more traditional financial measures. The KPI s derive from the strategic goals themselves. Thus the intention is that the balanced scorecard will provide ongoing guidance on those critical areas where action may be needed to ensure the achievement of those goals. 13

Kaplan and Norton maintain that the measures should be capable of telling the story that is that they should from a logical sequence showing how learning and growth lead to operational growth, which is both assisted by customer and market orientation, which finally result in financial return to shareholders. Such a framework can be both top down and bottom up, with participation at all levels. Whilst the balanced scorecard is useful, many manufacturing and operations-based companies base their measurement systems on the central issues of the business which are cost, quality,delivery, people, suppliers, markets and new product introduction. The DTI recommend 7 measures: defects per million, units per operator hour, inventory turns, delivery achievement, OEE, value added per person, and turn over per floor area. These measures can be fitted into a balanced scorecard approach. It is important to measure the process rather than the function These ideas transfer readily into the management of the supply chain. If suitable performance measures can be identified that link with the achievement of these strategic goals they can become the basis for a more appropriate scorecard than might traditionally be the case. A logical four-step framework could be: 14

1. Articulate logistics and supply chain strategy how does supply chain strategy contribute to the overall achievement of corporate and marketing goals. 2. What are the measurable outcomes of success typically these might be summarised as better, faster, cheaper. In other words superior service quality, achieved in shorter time frames at less cost to the supply chain as a whole 3. What are the processes that impact these outcomes - in the case of better, faster cheaper, the process that lead to perfect order achievement, shorter pipeline times, and reduced cost-toserve need to be achieved. 4. What are the drivers of performance within these processes these activities are the basis for the derivation of the key performance indicators. Cause and effect analysis can help in their identification In this framework it is suggested that the three key outcomes are: better faster; cheaper. This triad of interconnected goals is almost universal in its desirability. These goals are significant because they combine a number of customer based measures of performance in terms of total quality with internal measures of resource and asset utilisation. The figure highlights the customer facing, process orientation of this concept of performance measurement. 15

Creating a Logistics Scorecard Better Service Quality Perfect Order Achievement Faster Time End-to-End Pipeline Time Cheaper Cost Cost-to-serve Since what gets measured, gets managed it is inevitable that once measures such as these are put in place, management attention will be directed to these key issues. The role that benchmarking plays is pivotal. In the first place it helps identify what current best practice is and the focuses on how processes might be reengineered and managed to achieve excellence in these critical competitive areas. Balancing Activity Based Management Cost Process Control Yield Management 16

A variation of the balanced scorecard approach, developed by the University of Cambridge, sees performance measurement in terms of an input/output model. Here there are six groups of necessary measures: suppliers, customers, internal processes, people, learning and innovation and financial achievement. WHAT TO MEASURE? 6 Starting Points for Performance Measures ENVIRONMENT Environment Community Ethics Employee family FINANCIAL PERFORMANCE Profit ROI / ROCE Cash Flow Value Added INPUTS Cost Quality Delivery PROCESS Cost Quality Time Productivity Throughput Inventory Product contribution INNOVATION and LEARNING Time to market Product age profile Continuous improvement R&D OUTPUT Delivery Customer satisfaction Service Productivity 2 18 16 14 12 10 4 6 8 Cost Yield 0 2 4 6 8 10 12 14 16 18 20 0 2 17