WELCOME The Walk Bridge Project CTDOT Project No

Similar documents
Walk Bridge Replacement Project

Executive Summary. ES-1 Introduction. ES-2 Background

Raritan River Bridge Replacement. Public Information Session September 2016

Walk Bridge Project. Norwalk Shellfish Commission. November 1,

2-2 ALTERNATIVES CONSIDERED AND ELIMINATED

LONG BRIDGE - PRESENT & FUTURE: A MULTIMODAL ANALYSIS

Fore River Bridge Replacement Project. Spanning the Weymouth Fore River between Quincy and Weymouth, Massachusetts. Highway

Project Purpose. Federal Railroad Administration

NATIONAL CAPITAL REGION TRANSPORTATION PLANNING BOARD

MOVABLE SPAN BRIDGES. Bridge of Lions, St. Augustine, Florida

Whittier Bridge I-95 Improvement Project Newburyport/Amesbury/Salisbury

Figure 28 Ocean Drive Improvements and Middle Thorofare Bridge Replacement Alternatives Comparison Matrix

Long Bridge - Present & Future: A Multimodal Analysis

REHABILITATION PACKAGE 4-a

New Haven-Hartford-Springfield High-Speed Intercity Passenger Rail Project

Willamette River Transit Bridge. Portland - Milwaukie Light Rail Willamette River Bridge Willamette River Bridge Advisory Committee

30 DAY PUBLIC NOTICE FEDERAL MAINTENANCE OF EAST BREAKWATER STONINGTON HARBOR STONINGTON, CONNECTICUT

Several intersection improvements, bicycle-pedestrian improvements, and ITS/signage improvements are recommended for the short- and medium-term.

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE FEDERAL NAVIGATION PROJECT IN THE HOUSATONIC RIVER, STRATFORD AND MILFORD, CONNECTICUT

Appendix C: Port Jervis Line Capacity Improvements Analysis. Technical Memorandum 2: Passing Siding Alternative

Distribution Restriction Statement Approved for public release; distribution is unlimited.

5 Recommendations 5.1 LONG-TERM ALTERNATIVES CONSIDERED

Honorable Louise Slaughter

30 DAY PUBLIC NOTICE MAINTENANCE DREDGING OF THE GUILFORD HARBOR FEDERAL NAVIGATION PROJECT GUILFORD, CONNECTICUT

CHEF MENTEUR BRIDGE REPLACEMENT

Public Notice October 21, 2016 U.S. Army Corps of Engineers Charleston District

Unionport Bridge Replacement Design Twin Single Leaf Bascules

DESIGN PUBLIC HEARING MAY 16, 2013 ABIGAIL ADAMS MIDDLE SCHOOL WEYMOUTH, MASSACHUSETTS 6:30 PM FOR THE PROPOSED BRIDGE REPLACEMENT PROJECT

SCOPE OF WORK FOR CONSULTANT INSPECTIONS Type III-S (Current Date) (State or County) Bridges Group XXXX State Job No. XXXXXXX

Public Meeting. Draft Environmental Impact Statement (EIS) and Section 106 Consultation. Preferred Alternative Selection November 29, 2018

A more detailed description of Transportation, and its programs and initiatives can be found at

Prepared in accordance with the Connecticut Environmental Policy Act NEW HAVEN-HARTFORD-SPRINGFIELD LINE HIGH SPEED INTERCITY PASSENGER RAIL PROJECT

SIXTH BIENNIAL SYMPOSIUM

Baltimore & Potomac Tunnel Project.

THE COMMONWEALTH OF MASSACHUSETTS NON-NHS BRIDGE R&R POLICY

Well Road Project Accelerated Bridge Construction Using Self-Propelled Modular Transporters (SPMT s) By: Mark Bucci, P.E.

Fort Street M-85 Bascule Bridge Looking to the Past to Build Bridge for the Future

Outline of Presentation

FY17 Columbia-Snake River Navigation Lock Extended Outage All locks Bonneville Lock and Dam The Dalles Lock and Dam

PIANC Commission Working Group Report Reviews

Chester Bridge Environmental Assessment (EA) CAG Meeting #2. October 12, 2017

Design Challenges and Construction Benefits of Precast Segmental Rail Bridges

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

Movable Bridge Maintenance and Preservation

FOCUS40 MassDOT Board Presentation March 13, 2017

VENETIAN CAUSEWAY. (Venetian Way) Project Development & Environment (PD&E) Study FROM NORTH BAYSHORE DRIVE TO PURDY AVENUE. FM No.

Hampton Roads Bridge-Tunnel Expansion Feasibility Study. Design Considerations

Maritime Work Plan for the High Rise Bridge Construction

We have engaged Beacon Construction Consultants to act as the price estimate reviewer.

TIER 1 DRAFT ENVIRONMENTAL IMPACT STATEMENT. 7. Affected Environment, Environmental Consequences, and Mitigation Strategies

All Aboard Florida Project Status Update TREASURE COAST REGIONAL PLANNING COUNCIL

30 DAY PUBLIC NOTICE MAINTENANCE OF THE NEW HAVEN HARBOR FEDERAL NAVIGATION PROJECT NEW HAVEN, CONNECTICUT

Waterfront Access. Emergency Planning Implications. Transportation Research Board Summer Ports, Waterways, Freight & International Trade Conference

Bonner Bridge: Ensuring Connectivity and Resilience on North Carolina's Coastal Barrier Islands

Inner Harbor Navigation Canal Lock Replacement Project Public Scoping Meeting

Red Wing Bridge Alternates

RE-ISSUED NOTICE OF PREPARATION SUBSEQUENT ENVIRONMENTAL IMPACT REPORT

Appendix C. Clean Water Act: Section 404(b)(1) Evaluation

PUBLIC NOTICE. Section 404 of the Clean Water Act (33 U.S.C. 1344) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C.

5. Construction Period Impacts

Fort (M-85) Street Bascule Bridge

Integrated Bridge Management System (ICOMPASS ) at Burlington County Bridge Commission (BCBC)

Section IMPLEMENTATION PLAN. 7. Implementation Plan

Offshore Wind Delivers Energy Where it s Needed

RARITAN RIVER BRIDGE REPLACEMENT PROJECT

2.0 Purpose. 3.0 Work Plan. Page 1 of 7

Haystack Bridge: Repurpose of a Bascule

Design & Seismic Detailing of Nonstandard Deep Precast Concrete Box Girders For Long Span Railroad Bridges By:

A long-term, comprehensive solution

Port of Long Beach Port Master Plan Overview December 22, 2008

Sandpoint Junction Connector

Request for a Proposal The Bolsa Chica Lowlands Restoration Project: Sustainability Alternatives Study January 2019

40TH AVENUE NE BRIDGE REPLACEMENT

PA-03. Honorable Mike Kelly. Pennsylvania 114th Congress. 3rd Congressional District. Miles

Executive Summary. and appendices, as well as. can be obtained by calling (206) or by sending an e mail to

Load Transfer Sequencing for Maintenance of Lift Span Bridges

Foundation Strengthening Of Bascule Piers At The Bridge Of Lions

Section IMPLEMENTATION PLAN. 7. Implementation Plan

U.S. Army Corps of Engineers New Jersey Back Bays Flood Risk Management Planning Workshop. Background Reading/Pre Workshop Activity

Replacing the Aging US 52 Mississippi River Bridge

Slide 3 Introductory slide to Part 1 of the presentation Development of the TZB rehabilitation alternative.

LONE HILL TO WHITE DOUBLE TRACK STUDY Community Open Houses May 16 & 17

LIFT-SLIDE DRAWBRIDGE: An innovation

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

PROJECT SCOPING PHASE ~ SCOPE OF SERVICES MAIN STREET BRIDGE OVER WINOOSKI RIVER CITIES OF BURLINGTON & WINOOSKI VERMONT

Exhibit A Mn/DOT Contract No

Public Information Meeting Tuesday, February 26, 2013 Belle Chasse Auditorium

Public Notice. Applicant: BNSF Railway Company Project No.: SWF Date: November 27, 2018

SECTION 4(f) EVALUATION ALASKA RAILROAD MOODY TUNNEL REMOVAL FEDERAL TRANSIT ADMINISTRATION U.S. Department of Transportation

THIS IS NOT A PAID ADVERTISEMENT. Public Notice No.

Specializing in top down bridge construction through environmentally sensitive areas.

Innovative Fisheries Protection for MassDOT Design-Build Projects. Frank Welch Resident Engineer MassDOT District 4 Construction

Agency Scoping. May 31, :00 a.m. 1:00 p.m. Environmental Impact Statement Port Columbus International Airport

The Norwich Street Bridge

An Overview and Comparison of the Tennessee Department of Transportation s Environmental Evaluation Process

New techniques for the rapid repair of levee breaches

Atlantic Coast of New York East Rockaway Inlet to Rockaway Inlet and Jamaica Bay, NY

NEW HAVEN HARBOR CONNECTICUT NAVIGATION IMPROVEMENT

Atlantic Street Bridge Project CTDOT Project Nos (Phase 1) & (Phase 2)

INDUSTRIAL/COMMERCIAL FACILITIES AIRPORT INTERSTATE BRIDGE MARINA

Transcription:

1 WELCOME The Walk Bridge Project CTDOT Project No. 0301-0176

Walk Bridge Public Scoping/Public Information Meeting 1. Project description 2. Study process 3. Findings 4. Potential solutions 5. Next steps 6. Ways to be involved 7. Questions and comments 2

The Public Scoping/Public Information Meeting... enables you to help shape this project and its outcomes through input regarding: Public Scoping Purpose & Need Goals & Objectives Impacts and Mitigation Alternatives Engineering Analysis & Design Preferred Solution Environmental Assessment & Mitigation Agency & Stakeholder Coordination 3

4 The Walk Bridge Project Location

5 The Walk Bridge Project

Bridge Issues Prompted the Project Recent history of span opening and closing difficulties. Open bridge shuts down the Northeast rail corridor. Hurricane Sandy shows need for bridge to withstand significant weather events. Rail use requires bridge to withstand substantial storm, maritime accident or earthquake damage. Making only emergency and scheduled maintenance repairs will not stop failures and unexpected expense. 6

Purpose and Need The purpose of this project is to rehabilitate or replace the existing, deteriorated bridge resulting in a resilient bridge structure which will enhance the safety and reliability of commuter and intercity passenger rail service, offer operational flexibility and ease of maintenance, as well as provide for increased capacity and efficiencies of rail transportation along the New Haven Line/ Northeast Corridor. The needs of the Walk Bridge are to increase bridge reliability, incorporate bridge redundancy, and provide a sustainable bridge design for significant weather events. 7

Purpose and Need The purpose of this project is to rehabilitate or replace the existing, deteriorated bridge resulting in a resilient bridge structure which will enhance the safety and reliability of commuter and intercity passenger rail service, offer operational flexibility and ease of maintenance, as well as provide for increased capacity and efficiencies of rail transportation along the New Haven Line/ Northeast Corridor. The needs of the Walk Bridge are to increase bridge reliability, incorporate bridge redundancy, and provide a sustainable bridge design for significant weather events. 8

Agency Stakeholder Coordination City of Norwalk Historical Commission Connecticut Department of Energy & Environmental Protection, Office of Long Island Sound Program Connecticut Office of Policy Management Connecticut State Historic Preservation Office Federal Transit Administration National Marine Fisheries Service Norwalk Harbor Management Commission Norwalk Preservation Trust US Army Corps of Engineers US Coast Guard US Fish and Wildlife Service 9

Our To-Do List Improve Reliability Redundancy Resiliency REHABILITATION Strengthen and Repair Truss Members Strengthen Bridge Piers Modernize Mechanical and Electrical systems Strengthen High Towers REPLACEMENT Removal of Existing Bridge 2 Movable Spans New Bridge Spans and Piers Modern Mechanical and Electrical Systems New Rail Systems 10

What We Examined - Bridge and Rail Rehabilitation needs Movable span types Track alignments High tower needs Geotechnical screening Traffic impacts Right-of-way Utility impacts Construction staging 11

What We Examined - Navigation Navigation needs o Vertical clearance o Horizontal clearance o Channel Alignment Opening requirements Vessel collision data Maritime user needs o Norwalk Harbor Management Commission o Marinas o Other interests Channel hydraulics 12

What We Examined Construction Overall construction staging to limit impacts to railroad and maritime operations Identified access and staging area needs Construction adjacent to operating tracks Construction adjacent to existing bridge piers Construction adjacent to buildings/properties Seasonal limitations on in-water construction 13

Environmental Resources to be Evaluated Catalog resources, quantify potential impacts to resources, identify measures to avoid or minimize impacts and propose mitigation for impacts that cannot be avoided. Resources include: Traffic Air and Noise Water resources Wetlands Water quality Coastal resources T&E species Fish and Wildlife Historic/archaeologically sites Hazardous materials Energy Health and safety Environmental justice Municipal, regional plans State plan of conservation and development 14

15 More than 70 Options Were Considered

Option 14 - Rehabilitation of Existing Bridge Estimated Cost Construction Time Vertical Clearance Horizontal Clearance Channel Alignment $400 - $450 million 48-54 months (estimated) Span Open: 203 feet (unchanged) Span Closed: 16 feet (unchanged) Channel clearances unchanged Unchanged 16

Factors to Narrowing Bridge Replacement Options Movable Span Types Navigation Clearances Counterweight Configuration Approach Span Types Substructure Types Mechanical Systems Electrical Systems Architectural Requirements Resiliency Redundancy Track Alignment 17

Bridge Replacement - Structure Type Study The final design and actual look of a selected bridge rehabilitation or replacement option will evolve over time. 18

Navigation Clearances All options increase the horizontal clearance All options increase the span-down vertical clearance All options improve channel alignment 27 200 Existing Horizontal - 58 Existing Vertical - 16 (span closed) 19

20 Option 2G - - 130 Trunnion Bascule Span

Option 2G - - 130 Trunnion Bascule Span Estimated Cost Construction Time Vertical Clearance Horizontal Clearance Channel Alignment $350 - $400 million 36 42 months (estimated) Span Open: 60 feet (minimum) Span Closed: 26 feet (approximately) 80 100 feet Alignment improved 21

22 Option 2G - - 130 Trunnion Bascule Span

23 Option 2G - - 130 Trunnion Bascule Span

24 Option 3A - - 130 Rolling Bascule Span

Option 3A - - 130 Rolling Bascule Span Estimated Cost Construction Time Vertical Clearance Horizontal Clearance Channel Alignment $300 - $350 million 30 36 months (estimated) Span Open: 60 feet (minimum) Span Closed: 20 feet (approximately) 80 100 feet Alignment improved 25

26 Option 3A - - 130 Rolling Bascule Span

27 Option 3A - - 130 Rolling Bascule Span

28 Option 4S - - 200 Rolling Bascule Truss

Option 4S - - 200 Rolling Bascule Truss Estimated Cost Construction Time Vertical Clearance Horizontal Clearance Channel Alignment $350 - $400 million 30 36 months (estimated) Span Open: 60 feet (minimum) Span Closed: 27 feet (approximately) 150 170 feet Alignment improved 29

30 Option 4S - - 200 Rolling Bascule Truss

31 Option 4S - - 200 Rolling Bascule Truss

32 Option 8A - - 180 Vertical Lift Span

Option 8A - - 180 Vertical Lift Span Estimated Cost Construction Time Vertical Clearance Horizontal Clearance Channel Alignment $500 - $550 million 36 42 months (estimated) Span Open: 60 feet (minimum) Span Closed: 27 feet (approximately) 125 140 feet Alignment improved 33

34 Option 8A - - 180 Vertical Lift Span

35 Option 8A - - 180 Vertical Lift Span

36 Option 11C - - 250 Vertical Lift Truss

Option 11C - - 250 Vertical Lift Truss Estimated Cost Construction Time Vertical Clearance Horizontal Clearance Channel Alignment $550 - $600 million 42 48 months (estimated) Span Open: 60 feet (minimum) Span Closed: 27 feet (approximately) 200 feet Alignment improved 37

38 Option 11C - - 250 Vertical Lift Truss

39 Option 11C - - 250 Vertical Lift Truss

Next Steps This summary schedule shows the broad range of The Walk Bridge Project activities that began in 2014 and will continue through 2017. The schedule will become more detailed once a preferred alternative is selected. 40

Ways to Stay Involved www.walkbridgect.com or visit CTDOT's Office of Engineering, 2800 Berlin Turnpike, Newington, CT, 06131 Monday - Friday, 8:30 a.m. to 4:30 p.m. 41

Ways to Stay Involved Mr. John D. Hanifin Transportation Supervising Engineer Telephone: (860) 594-2899 Email: John.Hanifin@ct.gov Written comments due March 10, 2015 42

43 Ways to Stay Involved

44 Questions and Comments