COMMISSION. OGC File: LNG Canada Development Inc th Avenue SW Calgary, AB T2P 0J4. Attention: Surface Land Administrator

Similar documents
CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

Temporary Watercourse Crossing: Culverts

Code of Practice for Watercourse Crossing

GENERAL PERMISSIONS, AUTHORIZATIONS and CONDITIONS

(2) The permission to occupy and use Crown land does not entitle the permit holder to exclusive possession of the operating area.

RE: Permit Extension for Application Determination Number , OGC Legacy #

Beaver Dam Removal in the Omineca Region Ecosystem Standard Operating Procedures

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

Appendix D. Fisheries and Oceans Canada (DFO) Letter of Advice

Temporary Stream Crossing

Temporary Stream Crossing

UNDERGROUND UTILITY CROSSING (TRENCHLESS) General Submission Requirements

CLOCA Rural & Agricultural Guide to Permits

Temporary Watercourse Crossing: Fords

GENERAL APPROVALS and CONDITIONS

COTTON CREEK CULVERT REPLACMENT

Terms and Conditions for Water Sustainability Act

Nottawasaga Valley Conservation Authority

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN WATERBODIES AND ON WATERBODY BANKS

Audit of Forest Planning and Practices. West Fraser Mills Ltd. Skeena Sawmills Division Tree Farm Licence 41

CONSTRUCTION PLAN CHECKLIST

GUIDE TO THE CODE OF PRACTICE FOR WATERCOURSE CROSSINGS, INCLUDING GUIDELINES FOR COMPLYING WITH THE CODE OF PRACTICE

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

MINISTRY OF TRANSPORTATION BEST MANAGEMENT PRACTICES MANUAL FOR FISHERIES DRAFT

Chapter 11 Culverts and Bridges

Fish-stream Crossing Guidebook

FRST 557 Lecture 7b Cross Drainage Structures: Culverts and Bridges

FLOODPLAIN PERMIT APPLICATION SUBMITTAL REQUIREMENTS

CREEK RESTORATION/EROSION PROTECTION WORKS. General Submission Requirements

APPENDIX B DFO OPERATIONAL STATEMENTS

Fish Passage Culvert Inspection (FPCI)

Bridge Planning Updates. Bridge Planning Practitioners Workshop April 2012

CCSD#1 Stormwater Standards

TEMPORARY STREAM DIVERSION

I hope that this explanation suffices, Thx, Robert

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Temporary Stream Crossing (TSC)

Permit Application Review Permit No Received complete: March 19, 2019

Application for Paragraph 35(2)(b) Fisheries Act Authorization for Workforce Accommodation Centre Revision 1, November 2015

Sizing Hydraulic Structures in Cold Regions to Balance Fish Passage, Stream Function, and Operation and Maintenance Cost

OFFICE OF STRUCTURES MANUAL FOR HYDROLOGIC AND HYDRAULIC DESIGN CHAPTER 19 CONSTRUCTION GUIDELINES

Code of Practice for Pipelines and Telecommunication Lines Crossing A Water Body

Clergue Forest Management Inc. Operations Change Documentation for the ALGOMA FOREST

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Stormwater Erosion Control & Post-Construction Plans (Stormwater Quality Plans)

12 DRAINAGE General Administrative Requirements Standards

Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Bipole III Transmission Project Construction Environmental Protection Plan Construction Section N1 Environmentally Sensitive Site Locations Map 9

UPRR criteria for sizing waterway openings under bridges and through culverts are as follows:

IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS

Maine Department of Environmental Protection (DEP)

STORM DRAINAGE DESIGN MANUAL

DESIGN BULLETIN #16/2003 (Revised July 2007) Drainage Guidelines for Highways Under Provincial Jurisdiction in Urban Areas.

CITY OF NEW WESTMINSTER. Bylaw No. 7033, 2005 RIPARIAN AREAS PROTECTION BYLAW

Designing roads for fish, floods and foxes

Brush layering construction

DECISION MEMO FOR CATEGORICAL EXCLUSION HOLY JIM CREEK CROSSING REPLACEMENT

Cutblock (Lot 450) Inspection Powell River. - Island TimberLands-

COON CREEK WATERSHED DISTRICT PERMIT REVIEW

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

Permission for Routine Infrastructure Works Letter of Approval Qualification Criteria

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

Larimer County Land Use Code Section 5.8: Rural Land Use Process

Chapter 10. Conduit Outlet Structures Introduction General Layout Information

Forest Service AOP Policy and Program. John R. Kattell, P.E. Northern Region Structures Engineer

The Manitoba Water Services Board SECTION Standard Construction Specifications CONSTRUCTION OF WATERWAYS September 2013 Page 1 of 9

Ministry of Forests, Lands and Natural Resource Operations

Phase II: Proposed (regulated) Impervious in disturbed area (ac) Long Lake Existing Impervious in disturbed area (ac)

(Updated February, 2011)

INSPECTION RECORD. Project Name: Coastal GasLink Inspection

Stormwater Local Design Manual For Houston County, Georgia

CONSTRUCTION SPECIFICATION FOR DEWATERING

Warner Robins Stormwater Local Design Manual

Clergue Forest Management Inc. Operations Change Documentation for the ALGOMA FOREST

REVISION TO THE ANNUAL WORK SCHEDULE for the ALGOMA FOREST

CATEGORY a protection of the natural environment, its ecosystems and biodiversity.

ZONING ORDINANCE FOR THE ZONED UNINCORPORATED AREAS ARTICLE 1500 OF PUTNAM COUNTY, WEST VIRGINIA Page 149 ARTICLE 1500 DRAINAGE AND STORM SEWERS

Hydrology and Watershed Management

SR 202 Stream and Wetland Mitigation:

Public Notice of Application for Permit

MODEL Stormwater Local Design Manual. City of Centerville

Formal Annual Inspection It is recommended that you customize this form to fit your dam. Pre-Inspection Information

4. FISH PASSAGE CONCEPTS

Case Study 12. Grubbs Concrete Slab Vented Ford

Re: Correction of Application Determination Number , OGC Legacy #

SCRCA SECTION 28 WETLAND POLICY

FORM B: DAMMING AND DIVERSION OF WATER

BMP No. 1 Access Roads, Skid Trails, and Landings

HYDROLOGIC RESTORATION OF THE CASH CREEK BASIN IN TATE'S HELL STATE FOREST

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

GRASS-LINED CHANNEL (acre) CODE 840

Storm Water System Improvements


Applicant s Proposed Mitigation Statements Seward Highway 75-90, POA , Turnagain Arm Phase 1 May 2017

f) Culverts in series shall be spaced at least 20 feet between each other. 2.7 C Culverts


Massachusetts River and Stream Crossing Standards: Technical Guidelines

Maine s Land Use Regulations and Erosion Control Techniques

Application for resource consent Form B Damming and diversion of water

Transcription:

COMMISSION OGC File: 9642638 LNG Canada Development Inc. 400-4th Avenue SW Calgary, AB T2P 0J4 Attention: Surface Land Administrator Re: Approval for Changes in and About a Stream Date of issuance: July 29, 2015 The Oil and Gas Commission hereby authorizes the holder under section 9 of the Water Act to make changes in and about streams at Crossing location 1: UTM Zone 9 N. 5985774, E. 520452; Crossing location 2: UTM Zone 9 N. 5985888, E. 520546; and Crossing location 3: UTM Zone 9 N. 5985882, E. 520468, as shown on drawing Project No. 13-1447-0183, Revision A, Figure 1, dated June 22, 2015 and drawing Project No. 13-1447-0183, Revision A, Figure 2, dated June 24, 2015, subject to the following conditions: 1. Any substance, sediment, debris or material that could adversely impact the stream a. must not be allowed or permitted to enter or leach or seep into the stream from an activity, construction, worksite, machinery or from components used in the construction of any works, or b. must not be placed, used or stored within the stream channel; 2. Temporary material, fill, bridge, culvert, pump, pipe, conduit, ditch or other structure used in the construction of any works must be constructed and maintained only during the period of construction, and must be removed upon completion of the works; 3. Activities associated with the stream crossing are carried out in accordance with the regional and /or species -specific timing windows or the periods of time in the year when change can proceed without causing serious harm to fish, wildlife or habitat; 4. Instream works associated with this project must not prevent the movement of fish, nor impede the movement of fish to the extent that it is harmful to the survival of the fish. 5. During the temporary ford of a stream the authorization holder must ensure that: a. the construction occurs at a time of the year during which the construction can occur without causing harm to fish, wildlife or habitat, b. the 1 in 10 year maximum daily flow over the ford is accommodated without the loss of the ford and without scouring the stream, c. a stream culvert, if used, is designed and installed to pass the average low flow during the period of use, d. the stream channel is protected against erosion during the period of construction and use of the ford, and e. the temporary ford is removed at the end of the period of use at a time, before the next freshet, when the removal can proceed without causing serious harm to fish, wildlife or habitat. Fort St. John, BCV1J4M6

6. During the installation, maintenance or removal of a stream culvert for crossing a stream, the authorization holder must ensure that: a. equipment used for site preparation, construction, maintenance or removal of the culvert is operated from the top of the bank, b. in fish bearing waters, the culvert allows fish in the stream to pass up or down stream under all flow conditions, c. the culvert inlet and outlet incorporate measures to protect the structure and the stream channel against erosion and scour, d. if debris cannot safely pass, provision is made to prevent the entrance of debris into the culvert, e. the installation, maintenance or removal does not destabilize the stream channel, f. the culvert and its approach roads do not produce a backwater effect or increase the head of the stream, g. the culvert capacity is equivalent to the hydraulic capacity of the stream channel or is capable of passing the 1 in 10 year maximum daily flow without the water level at the culvert inlet exceeding the top of the culvert, h. the culvert has a minimum equivalent diameter of 600 mm, i. a culvert having an equivalent diameter of 2 metres or greater, or having a design capacity to pass a flow of more than 6 cubic metres a second, is designed by a professional engineer and is constructed in conformance with that design, j. the stream channel, located outside the cleared width, is not altered, k. embankment fill materials do not and will not encroach on culvert inlets and outlets, l. the culvert has a depth of fill cover which is at least 300 mm or as required by the culvert manufacturer's specifications, m. the maximum fill heights above the top of the culvert do not exceed 2 m, and n. the culvert is fabricated in compliance with the Canadian Standards Association standard CSA G401, Corrugated Steel Pipe Products, or section B182.2 of the Canadian Standards Association standard CSA B1800, whichever is applicable; 7. During the construction, maintenance or removal of a clear span bridge, the authorization holder must ensure that: a. the bridge and its approach roads do not produce a back water effect or increase the head in the stream, b. the equipment used for construction, including site preparation, maintenance or removal of the bridge, is situated in a dry stream channel or is operated from the top of the bank, c. the hydraulic capacity of the bridge is equivalent to the hydraulic capacity of the stream channel, or is capable of passing the 1 in 10 year maximum daily flow, whichever is greater, and the height under the bridge will provide free passage of flood debris and ice flows, and d. the bridge is designed and fabricated in compliance with the Canadian Bridge Design Code, CAN/CSA-86, of the Canadian Standards Association; 8. During the restoration of a change in and about a stream, the authorization holder must ensure that: a. any structures constructed to cross the stream are removed, b. the channel is restored to its natural state, to the extent practicable, c. the site of the crossing and associated approaches (including cut and fill slopes and ditch lines) are restored by: i. stabilizing any waste materials removed from the site to above the high water mark to prevent them from entering the stream, Fort St. John, BC V1J4M6

COMMISSION ii. iii. iv. re-vegetating disturbed areas associated with the crossing using seed or vegetative propagules of an ecologically suitable species, redistributing coarse wood debris in a manner that aids soil stabilization, and ensuring that surface drainage associated with approaches will not transport sediments into the stream. Additional Conditions: 1. Instream activities associated with this permit must occur during the reduced risk work window from June 1st to February 1st. 2. The permit holder must notify Haisla Nation office prior to the commencement of activities. The attached plan(s) form an integral part of this authorization Justin Anderson Review Approval resource Officer cc: Roy Northern Land Service cc: 9642638 cc. Haisla Nation Fort St. John, BC V1J4M6

PATH- Wfioldornd'.i'o.it'Burnnbv'iCAD-GIS'.CIInntU-NG Cnnndn'Kltlmot\99 PROJECTS'13-UW17-0183\0? PRODUCTIONS 70 Envlrnnmnntnl nnrt Gnolnchnlcnl 0rilHnq'MXD\Rnport\S9'Flq LEGEND LNG CANADA PROJECT AREA LOCATION OF PROPOSED STREAM CROSSINGS f " 1 BCGS 20K GRID CLIENT LNG CANADA CONSULTANT YYYY-MM-DD 2015-06-22 ( W Golder Associates 0 1,000 2,000 1:60,000 METRES REFERENCE(S) 1. ORTHOPHOTOGRAPH BY MCELHANNEY (JULY 2012); USED WITH PERMISSION 2. INSET MAP LAYER CREDIT: WORLD IMAGERY, ESRI. 3. BCGS GRID OBTAINED FROM THE GOVERNMENT OF BC. 4. DATUM: NAD83. PROJECTION: UTM ZONE 9. PROJECT LNG CANADA LIQUEFIED NATURAL GAS FACILITY KITIMAT, BC, CANADA TITLE DESIGNED DC 2015 GEOTECHNICAL AND GEO-ENVIRONMENTAL INVESTIGATION PREPARED DS PROPOSED STREAM CROSSING LOCATION INSIDE BCGS 1031.007 REVIEWED KLN PROJECT NO. CONTROL REV. FIGURE APPROVED DN 13-1447-0183 3120 A -J 96 4 2 6?! 0

WGtSiNADA TERMINAL STREAM CROSSING #3 (BEAVER CREEK MAIN CHANNEL) STEEL GIRDER CLEAR SPAN BRIDGE WITH LOG CRIB ABUTMENTS N-5985882 E-520468 STREAM CROSSING #2 (SIDE CHANNEL ON EAST SIDE OF BEAVER CREEK) STEEL GIRDER CLEAR SPAN BRIDGE WITH LOG CRIB ABUTMENTS N-5985888 E-520546 STREAM CROSSING #1 (SEASONALLY-WETTED BACKCHANNEL OF BEAVER CREEK) WOOD BOX CULVERT N-5985774 E-520452 lbv'cad-gis'cllonl\lng LEGEND PROPERTY BOUNDARY EXISTING ACCESS ROUTE ACCESS ROUTE, RE-SURFACING REQ'D. ( ) PROPOSED STREAM CROSSING CLIENT LNG CANADA CONSULTANT STREAM ------ FLOOD CHANNEL WETLAND WATER BODY FLOW DIRECTION YYYY-MM-DD 2015-06-24 DESIGNED PREPARED DS Golder REVIEWED Vfcir Associates KLN APPROVED DC DN 0 150 300 i- " 1 i J 1:8,000 METRES 1 PROJECT PLAN NOTES 5 1. FIELD SURVEY CONDUCTED APRIL 13-18 AND MAY 13-15 2015 2. BCGS MAPSHEET 1031.007 REFERENCES 1. ORTHOPHOTOGRAPH BY MCELHANNEY (JULY 2012); USED WITH PERMISSION 2. INSET MAP LAYER CREDIT: WORLD IMAGERY, ESRI. 3. PROPERTY BOUNDARIES AND BCGS GRID OBTAINED FROM PROVINCE OF BC (DL = DISTRICT LOT ) 4. HYDROLOGY FEATURES DEVELOPED BY GOLDER, BASED ON FIELD WORK 5. DATUM: NAD83. PROJECTION: UTM ZONE 9. PROJECT LNG CANADA LIQUEFIED NATURAL GAS FACILITY KITIMAT, BC, CANADA TITLE PROPOSED STREAM CROSSINGS, PROJECT PLAN MAP PROJECT NO. CONTROL REV FIGURE l 13-1447-0183 3120 A O ; 9 6 4 2 6 3 8 IF THIS MEASUREMENT DOES NOT MATCH WHAT IS SHOWN, THE SHEET SIZE HAS BEEN MODIFIED FROM: ANSI A o