CIC Guidelines Procurement

Similar documents
CIC Guidelines Construction Administration and Observation

CIC Guidelines Detailed Design

CIC Guidelines Preliminary Design

Structural Engineering & Civils Scope of Services

Architectural Design and Build Process. A Client Guide

STRUCTURAL ENGINEER S SERVICES SCOPE

Level 6 NVQ Diploma in Construction Site Management (Construction)

SENIOR PROJECT MANAGER

Level 6 NVQ Diploma in Construction Contracting Operations Management

MECHANICAL & ELECTRICAL ENGINEER S SERVICES SCOPE

COSCCOMO12 - SQA Unit Code FM7D 04 Obtain tenders and appoint successful contractors in construction contracting operations management

Version 1.0 / August CIC Guidelines Preface, Preamble and Glossary

APPENDIX T.2 SACPCMP The South African Council for the Project and Construction Management Professions

Level 6 NVQ Diploma in Construction Site Management (Construction)

Design Team Procedures Practice Note 1, February DESIGN TEAM PROCEDURES PRACTICE NOTE 1 (Revision 2)

JK 1. RIBA stages JK START OF MAIN CONTRACT WORKS 1. DEFINITION 2. PURPOSE 3. PROCEDURE 3.1 PROJECT MANAGEMENT TEAM ROLE

Owner's Representative Scope Matrix - D/B Rev 10/28/2013

REQUEST FOR PROPOSAL: Construction Management at Risk Services Hamilton International Air Cargo Logistics Facility. RFP Components

CASE STUDY: Ara Institute of Canterbury Kahukura Block

COSCSMO15 SQA Unit Code H99L 04 Control projects in construction management

Roles and Responsibilities

Job Title Quantity Surveyor/Estimator (Capital Programme) Job Grade This post is graded at Grade 9 Reports to Head of Development Direct Reports

Band Systems Ltd. Construction Phase Plan CDM POLICY STATEMENT

Contractors may report to this position as required by projects

SMS0045 Construction Health and Safety Policy and Procedures

QSS 0 Products and Services without Bespoke Contracts.

BALLYMUN REGENERATION LTD. INSTRUCTIONS TO TENDER FRAMEWORK AGREEMENT FOR PSDP CONSULTANT SERVICE

REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGEMENT SERVICES NOT AT RISK FOR THE. St. Charles County Ambulance District

ANNEXURE A SCOPE OF WORK FOR PROFESSIONAL SERVICES: RESTORATION OF NON PAREILLE BUILDINGS. Principal Agent and Professional Architectural Services

SCOPE OF WORK FOR PROFESSIONAL SERVICES: HET POSTHUYS ELECTRICAL UPGRADE

Registered as a Scottish Charity - No. SC Job Description. Grade 8, Salary commences 25,339 per annum

Township of Severn REQUEST FOR PROPOSAL. Architectural & Professional Services Fire Station Replacement

COSBEDMO13 - SQA Unit Code FM76 04 Manage project information and document requirements in built environment design management

QUALITY ASSURANCE REQUIREMENTS

Registered as a Scottish Charity - No. SC Job Description

RIBA Small Project Plan of Work

Member level the optimum standard is given against each activity statement

ISSUE CERTIFICATE OF PRACTICAL COMPLETION AND INITIATE HANDOVER TO UNIVERSITY

Auckland Transport HS08-01 Safety In Design

Invitation to Tender. External Audit Services. July 2015

BIDDING FOR BIM. CIF Bidding for BIM. September

Sustainability and Environment Manager

Terms of Reference for the Audit and Risk Committee (the Committee )

BUILDING CONTROL (AMENDMENT) REGULATIONS 2013

Superintendent, Construction Project Management. Position Number Community Division/Region Yellowknife Headquarters

Procedure. Work Health and Safety Contractor Management. Document number: PRO Rev no. Description Process Owner Approved for issue

COSCCOMO09 (SQA Unit Code - HA3C 04) Specify and control production documents in construction contracting operations management

Services for professional procurement. Be better informed, make better decisions. RISQS Audit Questions Network Rail On-Track Plant Operations

Invitation to Tender. Development Legal Services. August 2015

Design Management Plan

Overview COSCSMO14. Manage project processes in construction management. Manage project processes in construction management

PROJECT DESIGN GUIDE D02 COMMUNICATION PLAN

Process Map. Risk management Early contractor engagement. Collaboration Local growth Speed. Performance management. National Construction framework

DIRECTORATE OF ESTATES AND FACILITIES

PROJECT DESIGN GUIDE A00.1 COMPETENCE STATEMENT AND ASSESSMENT

RISQS Audit Protocol. Plant Operations Scheme. Document no.: RISQS-AP-004. Plant Operations Scheme

Procurement Options for NZ Construction Contracts

DIRECTORATE OF ESTATES AND FACILITIES

THE KEY ELEMENTS OF QUANTITY SURVEYING WORK

Essential Duties (Roles and Responsibilities)

MANUAL FUNDING AND DELIVERY OF GROWTH INFRASTRUCTURE VERSION:

600 - Phase C Intermediate Review Checklist for the Architect- Engineer

Casework Technical Support (Social Welfare - Project Management)

The following Standard reflects employers requirements for the skills, knowledge and behaviours expected from someone to be competent in the job role.

CONSTRUCTION MANAGER

Level 3 NVQ Diploma in Controlling Lifting Operations Supervising Lifts (Construction)

DATE ADVERTISED: 05 SEPTEMBER 2017 VACANCY PROPERTIES UNIT: FACILITIES MANAGER X 3 (BUTTERWORTH, MTHATHA AND EAST LONDON)

Commercial Planning Core Competencies PLANNING CORE COMPETENCIES 2018

Promoting better business outcomes through the use of BIM and digital technologies.

Health, Safety and Wellbeing Policy

Audit report Written statement of response to the audit report from the health service CEO

External Supplier Control Obligations

Workplace Safety and Insurance Appeals Tribunal 2013 Accessibility Report

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

PLANNING AND EVALUATION PRELIMINARY DESIGN

Insurance Policy. Major Damage - 10 years. Ingress of water - 5 years. Defects in chimneys/flues - 5 years. Building Regulations defects 5 years

Construction Activity Descriptions April, 2018

VILLAGE OF VERNON HILLS REQUEST FOR PROPOSAL FOR CONSTRUCTION MANAGER AT RISK SERVICES. Part I: Proposal Information

SECTION CONTRACTOR QUALITY CONTROL

WHS Management Plans

TENDER AND EVALUATION PROCESS FOR CONTESTABLE AUGMENTATIONS

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

TENDERING #4 Tendering (CONS6811) Lara Tookey

Health and Safety Policy Standard

CLEAN WATER SERVICES AND CAROLLO ENGINEERS, INC. RECITALS. 1. District and Consultant previously entered into the Master Contract.

Performance Standards for Self-insurers

Uzbekenergo: Talimarjan Thermal Power Plant 2, Uzbekistan Environmental and Social Action Plan (ESAP)

G , Request for Proposal Land Survey

Work Health and Safety Management Systems and Auditing Guidelines

In total, nine bidders submitted a PQQ response and five were successfully taken forward to the Invitation to Tender stage.

MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING

Roles and Responsibilities

Memorandum of Understanding

SPIRE HEALTHCARE GROUP PLC (THE COMPANY) AUDIT AND RISK COMMITTEE - TERMS OF REFERENCE

Building Standards Customer Journey

Planning Construction Procurement. A guide to developing your procurement strategy

QUALIFICATION MATRIX ADDENDUM:

Nelson Hospital Redevelopment. Proposed Approach to Business Case Development

Estimating specialism core competencies

Expression of Interest (EOI) Briefing

Transcription:

Version 1.0 / August 2016 Stage 6 of 8

Approval: Of previous stage design documentation, updated programme and cost plan. List matters from previous stage to be addressed in current stage. Documentation: From previous stage that forms the basis of the ongoing design. Approvals and Inputs Two clicks: Deliverable required and party(ies) responsible. One click: Party(ies) required to input, assist, and coordinate. Health and Safety Health and Safety at Work Design (HSD): Update report to reasonably address Health and Safety issues during occupation, use, maintenance, construction, demolition or disposal. Include Subcontractor design. Health and Safety at Work Construction (HSW): Update report to reasonably address Health and Safety issues during construction. Health and Safety at Work: Workshop and coordinate H&S report with team. Existing Conditions/Materials: existing risks, finalise assessment and actions. Existing Conditions/Materials: Verify and advise risks closed out. Welfare Facilities: Include in tender adequate welfare facilities for the construction personal and site visitors. Public Safety: Include in Tender to provide plan to reasonably manage risk to the public during construction. Contract Work Programme: Include in tender to provide Plan to proactively manage Health and Safety in construction risks. Issue s: By discipline, for the to issue to tenderers/contractor, including separate/nominated/(sub)contractors. (specify) Spec 2 of 6

Comply: Proactively with H&S Plan, Project Execution Plan, BIM Management Plan, and others as required. Quality Assurance: Update project-specific QA plan. Undertake work in accordance with. Contractor Quality Assurance: Contractor to provide and update as necessary after review and comment by Team. Attend: To correspondence and at meetings. Resources: Align internal resources with programme requirements, update design programme if required. Documentation Register: Prepare and progressively update. Value Management: Integrate accepted VM items identified during procurement process. Seismic Design: Include requirements for Contractor design of seismic restraints. Construction methodology: Include construction methodology in tender documentation. Buildability: Highlight significant or unusual buildability in tender documentation. Contract Documents: Update documents to incorporate tender clarifications. s' Work: Highlight requirements in tender documents. For Construction Documents: Update to 'For Construction' status and issue. Contractor/Subcontractor design: Include in tender performance specifications. Warranties: Include schedule in tender information. : Content and timing per PEP H&S, programme, progress, cost, risk, non-conformances, etc.) (specify) General Draw Spec/ BIM: Develop and agree strategies and objectives. BIM Execution Plan (BEP): Review construction phase BEP aligned with design BEP. Technology and systems: Validate, establish connection to CDE, confirm communications protocols for construction stage team. BIM meetings: Chair. Coordination: Confirm level of coordination clash resolution required during construction design stage. Brief Contractor: On overall design BIM strategy and outputs. (specify) Draw Environmentally Sustainable Design (ESD) ESD: Define and monitor Contractor input required in procurement documentation. 3 of 6

Compliance: Issue resource consent including conditions to tenderers/contractor. Compliance: Integrate resource and building consent requirements into tender documents. Consultant Engagement Construction: Engage for site observation role per consent conditions. Building Consent Processing: Answer queries arising from application, provide further information if requested. Building Consent: Receive consent documents and distribute. (specify) Compliance Management Health and Safety: Monitor H&S plan/register incorporating both HSD and HSAW matters. Include construction H&S matters. Legal Advice: Consult with 's legal advisor (if required). Project Programme: Update high level design, procurement and delivery and milestones. Review progress. Design Programme: Update and align with the construction programme. Include dates and scope of all deliverables. Tenderer's Programme: Review against project programme and revise as necessary. Project Execution Plan: Implement plan, track performance of team, including construction matters arising. Team: Document scope of work to be undertaken by Design Build. Novation: Manage novation of consultants. Consultant Engagement - Construction: Engage for site observation role per consent conditions. Commissioning: Identify and report all commissioning requirements and activities including need for independent commissioning. Commissioning: Consider and prepare schedule of items. Insurances: Review and agree required project Insurances (PI, PL, construction, etc.) Consultant Payments: Review and certify claims. PCG/ Meetings: Facilitate, chair, note, minute, attend. Design Meetings: Facilitate, chair, note, minute, attend. Stakeholders and User Groups: construction with Base Build and mitigate effects on programme and scope. Tenants: tenders with tenant requirements. Risk: Update schedule. Apply risk/opportunities management principles. Budget: Manage the cost consultant to provide estimates/reports. of Quantities: Discuss requirement for with and instruct cost planner accordingly. Discuss requirement for schedule to form part of contract. Value Management: Value initiatives arising from procurement - facilitate, chair, issue notes, minute, attend. Authorities: Liaise with and coordinate inputs for inspections and compliance. Contractor : Prepare procurement documentation. Form of Construction contract: Agreed and prepared. Special Conditions: Incorporate into procurement documentation. Certify 4 of 6

Insurances, Bonds, Liquidated Damages: Review details in tenders. Nominated/ subcontractors and suppliers: Review and agree required with. Collate Tender: Contract and design information from all disciplines, include Contractor BIM requirements. Call Tenders: Issue invitation letter and tender documents to selected tenderers. Tender: Monitor process. Respond to tender queries. Issue Notices to Tenderers, as required. Check tenders: For compliance with tender documents, Heath and Safety, programme, resource, subcontractors proposed, tags, etc., analyse with, QS and Design Team. Tender Interviews: Arrange, chair, minute, notate, distribute. Tender : Prepare including recommendation. Notify Tenderers: Successful and unsuccessful. Pre-Construction meeting: Arrange with TA. Construction Contract: Compile, arrange signing, issue. Elements not covered: In this stage. Include provisional and prime cost sums, supply items, contingency in tender. Approve Design: Matters raised during tender for inclusion in Construction. Provide deliverables: From this stage for commencement of next stage. (specify) Management (continued) Cost Feasibility: Update the project feasibility/viability business case. Elements not covered: List and recommend inclusion as provisional or prime cost sums. Recommend contingency. Finalise and incorporate. Confirm supply items. : Cost matters, including alternatives, with other disciplines. Prepare of Quantities: And compare with the approved cost plan. Tenderers' of Quantities: Compare prices with QS schedule and pricing. Prepare tender estimate. Prepare tender report. (specify) 5 of 6

/Geotechnical Brief: Document importance levels, seismic requirements, design loads and building movements, geotechnical issues, etc. Erection/construction: Review Contractor construction methodology and inspection schedules. Draw/Spec (specify) Building Services Note: Activities in this section may apply to all services disciplines Authorities/Utilities: Assist with utility procurement and liaise with local authorities. Equipment: Review selections and technical submissions. (specify) 6 of 6