Environmental Guidelines for Construction Sites

Similar documents
Practice Notes For Construction Managers PNCM 5: Environmental Management - First Issue, April 2004 (Index under: Environmental Management)

Environmental Control Plan

Water Pollution Control for Work in Sensitive Areas

Environment Management A TENANT INFORMATION HANDBOOK

Manningham Works Code of Practice

EF10 Site Environmental Audit - 1 / 8

MATRIX 1: ENVIRONMENTAL MANAGEMENT PLAN TO BE IMPLEMENTED DURING THE SITE PREPARATION AND CONSTRUCTION PHASES

Dust generation/ Air pollution. Noise and vibration. Water pollution. Drainage and sedimentation

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

left over, or an unwanted by-product, from an industrial, commercial, domestic or other activity; or

ENVIRONMENTAL GUIDANCE NOTES: CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)

APPROVED FOR ISSUANCE REFER TO ENCROACHMENT AND/OR CONSTRUCTION PERMIT AND PLAN COVER SHEET FOR SPECIAL CONDITIONS AND PERMIT NUMBERING

SECTION STORMWATER POLLUTION PREVENTION

AM-PR-003 Construction Environmental Management Plan (C-EMP)

SFG1822 AZERBAIJAN REPUBLIC MINISTRY OF TRANSPORT AZERROADSERVICE OPEN JOINT STOCK COMPANY. October Public Disclosure Authorized

Exhibit G. Construction Mitigation Plan

Mitigation Monitoring Program Campus Master Plan 2015

Environmental Management Plan

Construction Wastewater Treatment System. WF Chan Senior Officer Hong Kong Productivity Council 31 May 2018

Concrete Waste Management

Environmental Management Plan Checklist and Format

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

A. Each Contractor shall comply with the requirements outlined in these documents.

4.0 Material and Waste Controls

Storm Water Pollution and Spill Prevention Plan

Parking Area Maintenance

Environmental Conditions Laboratories (for commercial use) Group

Environmental Policy 2016

LAND DISTURBANCE PERMIT

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

ATTACHMENT C RISK LEVEL 1 REQUIREMENTS

New Administration Building

ENVIRONMENTAL MANAGEMENT PLAN

ENVIRONMENT MANAGEMENT PLAN CONSTRUCTION PHASE. suppression instead of water wherever possible. Cell)

Subsection or plan to be revised: 7-1, 7-8, , On page(s): 27-31(2006), 48-49(2003)

Management Plan: Hazardous Materials Removal & Demolition

SECTION AIR POLLUTION AND HAZARDOUS WASTE CONTROLS

Construction Management Plan (CMP) 227 Princess Highway, Dandenong

Hazardous Waste Management

SECTION DEMOLITION WASTE MANAGEMENT AND DISPOSAL

Environmental Conditions. Mushroom Farms

Construction Waste Management

GENERAL SPECIFICATION FOR THE MANAGEMENT AND DISPOSAL OF EXCESS MATERIAL

Escondido Best Management Practices (BMP s)

Construction Site Runoff (CSR) Permit Application Permit Fee $150.00

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

2010 HSC Construction Sample Answers

COUNTY: MUNICIPALITY: DPW LOCATION: STREET ADDRESS: PROPERTY OWNER: MAILING ADDRESS:

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management

Plaza and Sidewalk Cleaning

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

City of Dallas Contractor/Vendor/Consultant,

Best Management Practice (BMP) Water Quality Protection Guideline Commercial Landscaping and Lawn Care Services. Section 1.

JSP Construction Ltd CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN City Road Cardiff CF24 3BJ

E3072 v2. GEF Large City Congestion and Carbon Reduction Project. Environment Management Plan. Public Disclosure Authorized

Contract No. HY/2012/08 TUEN MUN CHEK LAP KOK LINK Northern Connection Sub-sea Tunnel Section

Pollution prevention (land and water)

THE HONG KONG POLYTECHNIC UNIVERSITY ENVIRONMENTAL POLICY

SITE ENVIRONMENTAL MANAGEMENT PLAN VIKING WIND FARM TECHNICAL SCHEDULE 2 POLLUTION PREVENTION PLAN

City of Dallas Contractor/Vendor/Consultant,

3.02 SPECIFICATION FOR NON HAZARDOUS WASTE COLLECTION AND DISPOSAL - SKIPS

Air Pollution Control Ordinance (Cap. 311)

Pollution Prevention: Private, commercial and military airfields.


GENERAL NOTES REQUIRED NOTES ON ALL PLANS

DOORNVALLEI EXT 5 & 6

GENERAL SPECIFICATION FOR THE MANAGEMENT OF EXCESS MATERIALS

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

6.1 Introduction to Wastewater Issues

DEMOLITION TRADE SPECIFICATION

Construction Safety Guidelines -31 Demolition DEM MO OLITION Rev 00 December 2013 Page 1 of 14

For a complete list of all BMP categories, see Stormwater: Best Management Practices Index.

Stormwater Pollution Prevention Plan (SWPPP) For Single Family Residential Construction within a larger plan of development

Sand Interceptor Sector Control Policy For Automotive Shops, Car Washes, & Facilities with Significant Potential for Sand or Inert Debris Discharge

Home Remodeling Projects

Paving and Grinding Operations

6.0 CONSTRUCTION PROGRAMME

Overburden dumps are stacked separately as per the guidelines and the same will be used for backfilling in mined out area.

The applicant has estimated a total of vehicle movements per day.

SECTION 11 PART I STORMWATER QUALITY PROTECTION Definitions / Acronyms 11-3 PART 1 CONSTRUCTION PRACTICES

SUMMARY OF COMMENTS/RECOMMENDATIONS

Alberta Transportation The City of Edmonton The City of Calgary

Matrix of Environmental Management Plan, Rehabilitation of Lehumo Lake Embankments

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

The Hong Kong Polytechnic University Facilities Management Office

MASTERSPEC TECHNICAL SPECIFICATIONS DIVISION 01 GENERAL REQUIREMENTS SECTION CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

2010 California Green Building Standards Code. Residential and Non-Residential Development

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

Intermodal Logistics Centre at Enfield Environmental Assessment CHAPTER 21 ENVIRONMENTAL MANAGEMENT AND MITIGATION

4.0 ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES. Negative or adverse impacts during the construction phase are:

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

Storm Water Run-off. Applicability. Background Storm water run-off from paved parking areas, Existing Federal and State Laws

Environmental Bill of Rights Draft Version DRAFT - For Consultation Purposes Only Ministry of the Environment

Concrete Waste Management WM-8

POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN

LIFELINE ROAD NETWORK IMPROVEMENT PROJECT ENVIRONMENTAL MANAGEMENT PLAN FOR SMALL SCALE ROAD REHABILITATION

Fuel For Thought... How to Reduce Wastes at Your Shop

Transcription:

Inspection Items Guidelines Remarks 1) Air Pollution Control 1a) Notification to EPD before Work Commencement If the work is classified as notifiable work such as site formation, reclamation, building demolition, tunnel construction, foundation/ superstructure work and roads construction, it should be carried out with prior notification to EPD through central processing of the Building Department. 1b) Dusty Materials Stockpiles on dump trucks or within site area should be covered by impervious sheeting or sprayed with water regularly during dry weather. The stockpiles shall be handled with great care to avoid dust emission. Stockpiles shall not be stored outside the construction site. It is encouraged to reuse the treated wastewater for dust suppression Every stock of more than 20 bags of cement shall be covered entirely by impervious sheeting or placed in an area sheltered on the top and the 3 sides; 1c) Hoarding along Site Boundaries Hoarding / Fencing of not less than 2.4m high from ground level shall be provided along the entire length of the site boundary except for a site entrance/exit. * Exclude road excavation 1 9 September 2013

1d) Roads Paved and/or Sprayed with water Main haul road (i.e. any road within the site having a vehicle passing rate higher than 4 in any 30 minutes) shall be kept clear of dusty materials; and/or Main haul road shall be sprayed thoroughly with water so as to maintain the entire road surface wet. It is encouraged to reuse the treated wastewater for wheel washing 1e) Wheel Washing Facilities Wheel washing facilities include high pressure water jets, wheel washing bays, tyre wheel machine together with paved road in between the facilities and the exit. It is encouraged to reuse the treated wastewater for wheel washing Performance assessment criteria/ indicators should include traceable records of routine maintenance, availability of water supply and chemical for regular desilting. 1f) Dust Suppression during pneumatic Drilling or Rock Breaking Ongoing water spraying and/or application of dust screen/enclosure should be applied during pneumatic percussive piling/rock breaking. 1g) Dark smoke controlled from plant Duration black smoke emission, darkness of smoke and the application of exhaust treatment facility (e.g. particulate trap) should be considered in performance *1 CDM(R&M) -Performance Report : Assessment Standards *1 CDM(R&M) -Performance Report : Assessment Standards 2 9 September 2013

assessment. 1h) Use of Materials containing Volatile Organic Carbon Use of VOC containing substances shall comply with the legislative requirements. Water-based paint should be used where applicable. Low-VOC content solvent shall be used over high-voc where applicable. 1i) Open Burning Open burning is prohibited. 2) Water Pollution Control 2a) Valid License for Water Discharge Valid licenses should be obtained to cover all discharge points if effluent is discharged from site to public drains. * Wastewater treatment system such as sedimentation tank should be available for treating the muddy water before discharge. * The wastewater treatment system should be properly maintained. * The discharge should comply with the discharge requirements in the license and the monitoring records should be kept. Treated wastewater can be reused for dust suppression. 2b) Measures to direct Effluent to Silt Removal Facilities Bunds or U-channels should be built along site perimeter/within site area to direct effluent. 2c) Septic Tanks Where foul water cannot be directed to foul sewer, septic tanks or chemical toilets should be # Regulations 6.11 3 9 September 2013

3) Noise Control 3a) Valid CNP (Construction Noise Permit) for Work during Restricted Hours employed. Any work to be carried out during restricted hours (means the time between 1900 0700 hours and any time on a general holiday, including Sunday) must have a valid CNP. * If work is carried out during restricted hours, it should comply with CNP conditions 3b) NEL (Noise Emission Label) for Compressors & Hand-held Breakers Valid NEL is required for using air compressors ( 500kPa) or hand-held breakers (including pneumatic, hydraulic and electric) (>10kg). NEL shall be displayed onto the equipment. 3c) Engine covers kept close during operation During operation, the engine covers of generators, air compressors and/or other powered mechanical equipment (PME) should be closed. 3d) Quality Powered Mechanical Equipment (QPME) QPME is equipment that is recognized by EPD as notably quieter, more environmentally friendly and efficient.. It is encouraged to use QPME (with QPME label) as practicable to reduce noise impact during the construction work. 3e) Scheduling of noisy works Noisy works should be scheduled 4 9 September 2013

as practicable and possible to minimize the impact to nearby noise sensitive receivers such as classrooms, offices, residences. Noisy works during examination should be avoided. It is encouraged to use noise barrier to reduce noise impact where applicable. 4) Storage of Chemicals and Dangerous Goods 4a) Chemicals and Chemical Waste Storage All chemicals and chemical wastes shall be properly stored, handled and labeled with details of the chemical composition and safety handling information. Chemical wastes shall be stored separately with clear signage indicating Chemical Waste and to be collected by licensed chemical waste collector for proper disposal. The trip ticket records of chemical waste disposal should be maintained to demonstrate chemical wastes are properly disposed. Incompatible chemicals and chemical wastes shall not be stored together. Contractors shall be responsible to arrange the removal of the chemical wastes generated from construction site. 4b) Storage of DG The storage of DGs should comply 5 9 September 2013

with license conditions (include types and quantities) with appropriate storage facilities. 4c) Measures to control Chemicals Spillage The containers of chemicals/chemical wastes/diesel should be placed in a area with impermeable layer and bunded (or with drip tray) to prevent spillage and leaching. * Spillage measures such as spill kits, sand bags or saw dust should be are provided for spillage during chemical handling such as oil refilling. Spilled chemicals shall be treated as chemical waste. 5) Waste Management 5a) Construction & Demolition Wastes (Inert and Non-inert) Construction and demolition wastes should be separated from general refuse and chemical wastes by on-site sorting. * Inert waste comprises of soil, concrete, reinforced concrete, asphalt, brick / sand, cement plaster / mortar, aggregate, inert building debris, and rock/rubble. Non-inert waste comprises of vegetation, timber, bamboo and etc. Inert waste should be disposed at public fills whereas non-inert waste should be disposed to landfills by licensed waste collector. Waste segregation should be conducted on site and recycling # Regulations 2.3 6 9 September 2013

should be conducted properly to recover useful items, such as paper, metals and plastics. Contractors shall be responsible to arrange the proper removal of the C&D wastes generated from construction site. Contractor should reuse the construction and demolition waste as practicable. 5b) General Refuse General refuse should be removed on a regular basis so as to avoid # Regulations 2.3 potential hazardous, hygiene problem and visual impact from wastes build up on site. Contractor shall keep the construction site tidy and free from littering. 5c) Asbestos Wastes Asbestos waste generated from # Regulations 2.3 demolition works should be handled and disposed of by EPD registered professionals. * The relevant records should be maintained to demonstrate compliance and handled by registered professionals. 6) Protection of Flora, Fauna and Historical Heritage 6a) Disturbance to Plants Do not fell any plant in the CUHK campus without permission. * The # Regulations 2.5 Contractor shall comply with instruction given by CDO/ EMO and/or consultants on trimming and transplanting of plants. 6b) Disturbance to Animals When any wild animal is found, # Regulations 2.5 7 9 September 2013

report to CDO/EMO/USO immediately. * If working nearby the living area of the wild animals, avoid using heavy equipment. * Do not attempt to catch the animals before arrival of qualified personnel to capture and remove. * Do not resume works until approval is obtained from the CDO/ EMO and/or consultants. 6c) Historical Heritage If any historical heritage is found, report to CDO/EMO/USO immediately. * Minimize disturbance to the area concerned. * Do not resume works until approval is obtained from CDO/ EMO and/or consultants. 7) Resources Conservation 7a) Equipment Shut off All equipment should be shut off when they are not in use. 7b) Water Conservation Water usage should be conserved as far as possible and water leakage shall be avoided. Recycling of treated water is encouraged for non-portable uses. 7c) Waste Minimization Contractor should adopt the waste management hierarchy (Reduce > Reuse > Recycle > Disposal) as possible, and to reduce wastage of resources through good planning and scheduling of works. Materials should be reused on site as # Regulations 2.5 8 9 September 2013

Note: # Refer to the latest version of Regulations for Contractors Working Within the University Campus practicable. Major Local Environmental Legislations include but not limit to the followings: Air Pollution Control Ordinance (Cap.311) Noise Control Ordinance (Cap.400) Water Pollution Control Ordinance (Cap.358) Waste Disposal Ordinance (Cap. 354) Hazardous Chemical Control Ordinance (Cap. 595) Ozone Protection Layer Ordinance (Cap. 403) Dumping at Sea Ordinance (Cap. 466) Environmental Impact Assessment Ordinance (Cap. 499) Buildings Energy Efficiency Ordinance (Cap. 610) Wild Animals Protection Ordinance (Cap. 170) Sewage Services Ordinance (Cap. 463) Motor Vehicle Idling (Fixed Penalty) Ordinance (Cap. 611) Factories and Industrial Undertakings Ordinance (Cap. 59) 9 9 September 2013