ADDENDUM NO. 5. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications.

Similar documents
Forsyth County Procurement

CITY OF PUNTA GORDA, FLORIDA

TITLE: Construction Services for the US-1 South Re-Pump and Booster Pump Station Project

C o u n t y o f F a i r f a x, V i r g i n i a

Pump Station No. 1 and Storage Tank

ASHCROFT PUMP STATIONS 2 & 3 CAPACITY IMPROVEMENTS PROJECT ACSA Project No Addendum 1 June 20, 2018

QUESTIONS & ANSWERS ITB HELEN MCCALL PARK IMPROVEMENTS

AD 1-1 ITB U CITATION BLVD./OLD KINGS ROAD TO S.R. 100 WATER MAIN

ADDENDUM NO. 2 ITB-PW-U CITY OF PALM COAST WTP 3 ELECTRICAL DISTRIBUTION FACILITIES TO SERVE WELL SITES PH 2

CHARLES COUNTY GOVERNMENT ITB NO WAKEFIELD PUMPING STATION UPGRADE

ADDENDUM NO.2 REQUEST FOR PROPOSALS FOR CITY OF PALM COAST

RFB # ADDENDUM NO. 1 ISSUED APRIL 23, 2018 PRE-BID MEETING MINUTES NEW HANOVER COUNTY LANDFILL GAS COLLECTION AND CONTROL SYSTEM CONSTRUCTION

ADDENDUM NO. 2. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications.

November 29, CITY OF PLANT CITY Purchasing Division (813)

SEMINOLE TRIBE OF FLORIDA PURCHASING DEPARTMENT RFB MABEL T FRANK WAY ROADWAY CONSTRUCTION BIG CYPRESS INDIAN RESERVATION

TO ALL HOLDERS OF PLANS AND SPECIFICATIONS:

legend. #1 is a gas relief valve? If so does Enbridge supply with station?

Addendum 1. Valve & Valve Vault Replacement. Issued June 13, 2018

ADDENDUM NO. 3 TO THE CONTRACT DOCUMENTS AND SPECIFICATIONS DATED JULY 2017 FLORIDA GOVERNMENTAL UTILITY AUTHORITY PROJECT NO.

Failure to acknowledge all addenda in the BID may cause rejection of the BID. See Instructions to Bidders.

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

Masterson 24-Inch Water Main Extension Solicitation Number: CO Job No.: ADDENDUM 2 July 3, 2018

This document shall become attached to and part of the Construction Documents for the aforementioned project.

ISSUE DATE JANUARY 1st, 2008 SECTION 5G FIBERGLASS PACKAGE LIFT STATION

Please note: Drawings M105, M109, M203, M204, M205 and M207 were attached to ADDENDUM 2 and replace the previous drawings.

CIVIC CENTER NORTH PUMP STATION AND JOHN DUCKETT PUMP STATION STANDBY GENERATOR REPLACEMENT PROJECT

PROJECT NAME: NAVAJO TRIBAL UTILITY AUTHORITY WASTEWATER TREATMENT PLANT UPGRADES

ADDENDUM #1 TO THE SPECIFICATION FOR THE CONSTRUCTION OF THE 115KV STONEBREAK RD. TRANSITION STATION THE TOWN OF MALTA AND A PORTION OF THE 115KV

ADDENDUM # 3 CITY OF CAPE CANAVERAL BID # CITY OF CAPE CANAVERAL WWTP IMPROVEMENTS FOR OXIDATION DITCH REHABILITATION June 24, 2016

NOTICE TO BIDDERS FOR THE

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

Request for Proposal # Cane Creek Park Fiber Optic Cable Upfit

OCONEE COUNTY PROCUREMENT OFFICE 415 S. PINE STREET, ROOM 100 WALHALLA, SC Robyn M. Courtright, CPPO, Procurement Director

UTILITIES COMMISSION CITY OF NEW SMYRNA BEACH, FLORIDA 200 CANAL STREET P.O. BOX 100 NEW SMYRNA BEACH, FL

ADDENDUM #4. Lanier Filter Plant Ozone System Safety Improvements BL079-14

SECTION MEASUREMENT AND PAYMENT

SAN ANTONIO WATER SYSTEM C5 & C28 SEWER PROJECT PHASE 3 SAWS PROJECT NO SOLICITATION NO. CO ADDENDUM-6

ADDENDUM #1. The following sheets have been revised and are being reissued as part of this addendum:

CITY OF VENICE PROCUREMENT- FINANCE DEPARTMENT 401 W. VENICE AVE. - ROOM # 204 VENICE, FL (941) FAX (941) ADDENDUM NO.

SECTION UTILITY POLYETHYLENE CONTAINMENT PIPE SYSTEMS

JANUARY 25, 2016 ADDENDUM NO. 3 FOR. ORD Baggage Service Road Retaining Wall Repair

ADDENDUM NO. 3. Please make note of the following clarifications:

TWIN VALLEY PUMP STATION IMPROVEMENTS - CITY OF FARMINGTON FARMINGTON, MI 48335

NOTICE TO BIDDERS FOR THE

SECTION HIGH DENSITY POLYETHYLENE PIPE AND FITTINGS (PRESSURE PIPE)

CITY OF GLENDORA COUNTRY CLUB RESERVOIR IMPROVEMENTS PLAN NO REQUEST FOR INFORMATION (RFI) LOG RFI # DATE SHEET # RFI RESPONSE DATE

DUCTILE IRON PIPE AND FITTINGS

Invitation to Bid # CC Project Title: High Zone 5.0 Million Gallon Reinforced Concrete Culinary Water Tank Project No.

SUBJECT: ADDENDUM No. 1 FILE: Finished Water Pump Station Electrification Phase 2 WT7074

SUBJECT: ITB , Oxford Road Complete Street Improvements Project ADDENDUM #1

RIVER OAKS PUMP STATION RENOVATIONS/MODIFICATIONS, PHASE II for the LAFAYETTE CONSOLIDATED GOVERNMENT LAFAYETTE, LOUISIANA (DS&A #4628.

Avenue 52/Grapefruit Boulevard Railroad Grade Separation Project PRE-BID REQUEST FOR INFORMATION

Port KC RFP NORTHLAND PARK BUILDING V

CHARLES COUNTY GOVERNMENT ITB NO MATTAWOMAN WATER RECLAMATION FACILITY (MWRF) PRIMARY CLARIFIER NO. 1 IMPROVEMENTS

NOTICE TO OFFERORS ADDENDUM NO. 1 WASTE COLLECTION SITE DEVELOPMENT PLAN FOR THE COUNTY OF SHENANDOAH

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER SS BID PROPOSAL

SUM i) Carry out calibration of 100,000 litres day tank. ii) Pipes, valves and other fittings connection to fuel offloading SUM

The Metropolitan Sewer District of Greater Cincinnati

MRI Chiller Installation Guidelines

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.

Ohio Department of Transportation - Prebid Questions

East Wenatchee Water District Supplemental Provisions to the 2012 WSDOT/APWA Standard Specifications

DISTRICT OF TOFINO BARRS MOUNTIAN RESERVOIR REPLACEMENT PROJECT. Attached, please find Addendum # 1 for the above noted project.

SAN ANTONIO WATER SYSTEM University Pump Station Improvements Project SAWS Job No Solicitation No. B DD

CUYAHOGA COUNTY, OHIO ADDENDUM NUMBER 1, APRIL 25, 2018 FOR THE CITY OF BRECKSVILLE,

CITY OF PLACERVILLE, CALIFORNIA DEVELOPMENT SERVICES DEPARTMENT ENGINEERING DIVISION

SANTEE LAKES GENERAL STORE, ADMINISTRATION BUILDING & TEEN CENTER (JN ) ADDENDUM NO. 2

IN2 Sleeves and Sleeve Seals for Electrical Raceways and Cabling

SPECIAL SPECIFICATION 3504 Septic Tank System

Ohio Department of Transportation - Prebid Questions

CITY OF CHESAPEAKE INVITATION FOR BID ADDENDUM NO. 1. Battlefield Golf Club Water Project, Centerville Turnpike

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst, MA 01003

ADDENDUM NO. 1 FOR CITY OF CUMMING 900-HP RAW WATER INTAKE PUMP. ADDENDUM DATE: February 10, BID DATE: February 15, 2017, 11:30 a.m.

Date: 13/04/2015 1:14:38 PM

General Water Bid Items Item No.

Re: T.4992 Westminster Hwy from Gilley Rd to #23591 Westminster Hwy Road Construction Addendum No. 1

SPECIAL SPECIFICATION 6666 Charter Communications System

THIS ADDENDUM IS FOR THE PURPOSE OF MAKING THE FOLLOWING CHANGES OR CLARIFICATIONS:

City of San Juan Bautista Well 6 Project ADDENDUM No. 1 July 6, 2018

MRI Chiller Installation Guidelines

The following clarifications, changes, additions, and/or deletions are hereby made part of the Contract Documents

JOB BB0414 PORTER RD. HWY. 112/71B WIDENING & INTCHNG. IMPVTS. (S) AUGUST 10, 2016

Energy Transfer Station Installation Only, Carleton to Sexton District Energy

EDS Upgrades and CBRA Improvements. Addendum No. 2 DATE OF ADDENDUM: 08/17/2016

BRYANS ROAD WELL NO. 7 WELL PUMP HOUSE AND CIVIL SITE DESIGN & WATER TOWER NO. 6 WATERLINE EXTENSION AND CIVIL SITE DESIGN

RFI REPLY. Project: Palm Coast Readiness Center Date: 07/22/16 Flagler County, Florida Comm. No.: 09005

CITY OF PORTSMOUTH, NEW HAMPSHIRE GREENLAND WELL PUMP STATION REPLACEMENT ADDENDUM NO. 1

Via Internet Posting 14 pages

IN2 Sleeves and Sleeve Seals for Communications Pathways and Cabling

Bid Tabulation Report 2011 Pump Station Rehabilitations

CITY OF PANAMA CITY BEACH WWTF INFLUENT SCREENS REPLACEMENT April 14, 2017

March 6, Subject: Addendum No. 2 Invitation for Bid No Toyota Park Transit Center Phase II. Ladies and Gentlemen:

November 19, REVISED Bid Opening Date: December 4, 2018

ELECTRICAL SAFETY Information Bulletin

ADVERTISEMENT FOR BIDS

ADDENDUM NO. 1 TO THE TENDER DOCUMENTS FOR THE CORPORATION OF THE CITY OF PENTICTON 2015 Capital Works 2015-Tender-02

BID PROPOSAL PROPOSAL OF, a Corporation organized and existing under the laws of the State of. a Partnership consisting of

RFB Waco City Hall Chiller Replacement. Date: 3/20/2018 RFP No: Commodity: Waco City Hall Chiller Replacement

ADDENDUM NO. 2 MBR TREATMENT FACILITY UPGRADE REVISIONS TO CONTRACT DOCUMENTS

TECHNICAL SPECIFICATIONS SOUTH MARTIN REGIONAL UTILITY

Transcription:

ADDENDUM NO. 5 ITB-CD-CME-16-10 Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2 ISSUE DATE: August 22, 2016 DUE DATE: August 25, 2016 @ 2:00 p.m. SUBJECT: Addendum No. 5 INTENT: This addendum is issued prior to the date bids are due in order to incorporate the following clarifications, additions, omissions, deletions, or changes into the Contract Documents. Except as hereinafter specified, the work shall be in accordance with the drawings and specifications. Bidders are to use the changed quantities of the items listed in this addendum in their proposals, and it shall become a part of the Contract Documents when construction is executed. Bidders are reminded that this addendum must be noted on the Official City Acknowledgment Form when they submit their proposal. A signed copy of the addendum must also be included with the bid submittal. 1. STATEMENTS A. All of the telemetry equipment for this project is hereby removed. This includes the following material: i. Remote Telemetry Unit ii. Radio iii. Antenna Tower Any and all buried conduit from the RTU cabinet to the antenna tower location shall be installed, brought above grade and capped. The Sensus ACT-PAK transmitter shall also be installed. B. Per the EPA, portable/trailer-mounted generators must meet the EPA Tier 4 emission requirements, which will take effect in 2017. In the interim, there are manufacturers that have Tier 4 final certified engines, or Tier 4 Interim Compliant Engines or Tier 3 Flex Credit Engines. The engine for the portable generator must be one of the previously mentioned, and must also have a 48-hour sub-base fuel tank and an aluminum enclosure. Anything else is not acceptable. Location of the control panel and electrical connections is not an issue. Section 16215 has been revised to reflect the above. 2. PROJECT MANUAL A. Section 16215 i. The following paragraphs have been revised: 1.01-A; 1.02-B; 1.02-D; 1.02-F; 1.04-A. Delete this Section in its entirety and substitute a new 16215-R section, which is attached and made part of this Addendum. 3. QUESTIONS & RESPONSES A. Question: Bid form page 00200-12 requires listing the manufacturer used for PVC pipe in section 15063. After reading 15063 we found that there are four different types of PVC listed with different manufacturers named (DR18, SDR21, SCH 40 & SCH 80). Which PVC pipe type is listed on the bid form? Response: DR18. Page 1 of 4 ITB-CD-CME-16-10 Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2

B. Question: Are there geotechnical reports available? They are listed in the table of contents but we are unable to find them. Same question for Permits. Response: The geotechnical report and FDEP permit were included within Addendum #3. C. Question: Can you furnish contact information for KW Controls, Inc. Response: Since all of the telemetry has been removed, other than the Sensus flow transmitter and buried conduit, this question does not require an answer. D. Question: Air release valve located at STA 228+60 is does not appear to be at a high point in the line segment. Can this air release be relocated further downstream (Approx. STA 224+40), or should another air release be installed? Response: Bid the project with the air release valve as shown. Any change in location will be made with the Contractor awarded the project. E. Question: Should there be an Air release valve located between STA 235+60, and STA 233+40? Response: Possibly; however, bid the project as designed. F. Question: Is there a local water source for Hydrostatic testing, pigging, and flushing of the pipeline? If there is, where is it located? Response: This question was addressed in Addendum #3. G. Question: A 12 valve is shown at STA 232+45 on piping profile, but not on the Plan view. Is this valve to be included? Response: Yes. The 12 valve will be placed to the east of the 12 6 tee. H. Question: Can well reports, including inner and outer casing material (i.e. DR) be provided? Response: Well completion reports were provided in Addendum #3. The 12 Certa-Lok SDR 17 casing ID is 11.04. I. Question: Please confirm Non-permanent O-Rings are to be fitted in the Certa-lok Pump column couplers. Response: Yes. Non-permanent O-rings will be used in the column couplers. J. Question: Please confirm method of connection for the plain ends of the 8 /6 stainless pipe at the well cap, and the 8 /6 Certa-lok male x PE adapter. Response: The callouts on the drawing are correct. K. Question: The capacities, and discharge size of Grudfos pumps noted for use in the well table on Drawing C-25 appear to be slightly lower than the capacities specified in section 11211. Will the pumps in the well table on Drawing C-25 be acceptable? Response: Yes. L. Question: Components of the well cap that penetrate the base plate (8 SS pipe, 2 SS vent, and 1 ½ SS cable entry) will not fit in the well as shown on Drawing C-25. Please review and confirm wellhead configuration. Response: As part of this addendum, the column pipe for the submersible pumps has been changed to 6 ; this should now provide adequate space to install the miscellaneous small pipe. Page 2 of 4 ITB-CD-CME-16-10 Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2

M. Question: Bid Form Page 00200-8 says Indemnification is $250.00 or 1% of the bid whichever is greater. Bid Item 28 says MAX 1% of bid. Will Bid Item 28 need to be 1% of the sum of Bid Items 1 thru 27? Same question for the Additive Alternate. Response: Both Bid Item Nos. 28 and 44 will use a maximum 1% of the Bid. N. Question: Spec 15062-3 calls for ceramic epoxy lined fittings in all applications except for potable water or reuse water. As the wells are raw water, are ceramic epoxy lined fittings required on this job or are cement mortar lined fittings acceptable? Response: Cement mortar-lined fittings are acceptable. O. Question: Sheets E4 thru E6 show directional drills for the FPL service to these well sites. Are these drills paid for under Bid Item #24A? If not, which Bid Item? Response: Yes. Bid Item #24a has been revised in Addendum #3 to include the drills for the FPL service. P. Question: We have not received the soils report yet & understand it s to come with the next addendum. Spec 02230-3.01 calls for 3 of material to be removed & replaced with compacted backfill while the clearing is being done. Since the clearing is basically done at most of the well sites, does this dirt need to be removed & replaced? Or just to the depth where organics are encountered? Or just follow the soils report recommendations? Response: The dirt at the well sites does not require removal and replacement. Removal of undesirable material and replacement with select fill will occur between STA 234+00 and STA 236+00. Q. Question: Sheet C-24, Well LW-108, has See Note 1 & See Note 4 on the Layout Plan but there are no notes. Which notes are we to reference? Response: A revised Sheet C-24 has been included with this Addendum that lists the pertinent notes for this well site. R. Question: Sheets C-20 thru C-23, Note 1 calls for a herbicide treatment per spec 02281 prior to installing the weed fabric. Is this treatment required under the well pump slabs & driveways per the spec? Response: Yes. S. Question: Please clarify depth of limerock base for asphalt open cut areas? Response: The limerock shall be 8 minimum thickness or twice the thickness of the existing base, whichever is greater. T. Question: Please clarify well site clearing. Is the contractor expected to clean all vegetation within clear limits and only clear 6 trees outside of this area? Response: Any well sites where it states to extend the cleared area, all material will be removed except trees 6 in diameter or greater. U. Question: The Plans do not have referenced notes on LW 108 site plan. Response: A revised Sheet C-24 has been included with this Addendum that lists the pertinent notes for this well site. V. Question: Will the load bank test be Resistive only or Resistive & Reactive? Response: Resistive only. Page 3 of 4 ITB-CD-CME-16-10 Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2

4. DRAWINGS Sheet No. Description C-6 Overlapping notes removed at Match Line; notes are located on Sheet 7-A. C-24 Added Notes. C-25 Revised callout for concrete pipe support. Changed pump column diameters from 8 to 6. Added 2 pipe to pump pier. Revised 8 stainless steel blind flange to 6. Revised 8 6 stainless steel tee to 6 6. Revised 8 stainless steel pipe that penetrates the base plate to 6. Added note to extend steel casing to a height that will accept the 2 pipe connection. Added note related to the reduction in the pump column size from 8 to 6. E-2 Service disconnect and internal load break switch and fuses changed to a breaker symbol. E-8 Internal load break changed to internal load breaker. Revised control transformer and where it is to be mounted. E-9 Control cabinet description revised to show 316SS and to call out inner door right hinge only. Acknowledgment: Signature and Date Printed Name and Title Company Name Attachments: Section 16215R: Standby Engine Generator Set (Trailer Mounted) Drawings: C-6; C-24; C-25; E-2; E-8; E-9 END OF ADDENDUM NO. 5 Page 4 of 4 ITB-CD-CME-16-10 Southern Well Field Expansion: Equip 5 Wells and New Raw Water Main Phase 2