Traffic Management System status, fault and quality standards

Similar documents
C-Roads Platform Terms of Reference

C-Roads Platform Terms of Reference

STANDARDISATION MANDATE FORWARDED TO THE EUROPEAN STANDARDISATION BODIES IN THE FIELD OF ROAD TRANSPORT TELEMATICS

on the Competitiveness and Sustainable Growth of the Automotive Industry in the European Union (GEAR 2030)

Standardisation in last mile delivery of single items to individuals. Walter Trezek CO-Chair of the e-logistics Working Group, Ecommerce Europe

2014 Report of the. Task Force 2 on Enablers and barriers

Creation of a new CEN Technical Committee on Microbiology of the food chain

EUROPEAN COMMISSION INTERNAL MARKET AND SERVICES DIRECTORATE-GENERAL

CEN-CENELEC Contribution

EU CUSTOMS BUSINESS PROCESS MODELLING POLICY

European Technical Committees

Council of the European Union Brussels, 29 October 2015 (OR. en)

This document is a preview generated by EVS

ETUI congratulates the European Commission for the excellent Proposal

e-sens white paper D3.4 Preliminary Proposal for a governance body Instruments Deliverable 3.4, version 3

Consultation of national and European stakeholders in CEN and CENELEC

TERMS OF REFERENCE MINISTRY OF THE ENVIRONMENT AND HOUSING JUNE, 2017

The International Organization for Standardization (ISO)

Effective participation of Societal Stakeholders in Standardization

GENERAL GUIDELINES FOR THE COOPERATION BETWEEN CEN, CENELEC AND ETSI AND THE EUROPEAN COMMISSION AND THE EUROPEAN FREE TRADE ASSOCIATION

e-logistics 2018: integrated European & Global Solutions Walter Trezek: CO-Chair e-logistics WG, Chair CEN/TC331 WG2, Chair UPU CC

Commission expert group on INSPIRE Implementation and Maintenance Terms of Reference

ANNEX 3. MASP Rev v1.1. Governance Scheme

An introduction to the project, its main objectives and its methods & milestones. Presentations to EU Project Officers, 2 nd April, 2004, Brussels

Research and Innovation Roadmap Call for Tender Appendix I Statement of Work

ANNEX 3. MASP Rev v1.4. Governance Scheme

Deployment of Intelligent Transport Systems (ITS)

ERAC 1206/16 MI/evt 1 DGG 3 C

Intelligent Transport Systems Action Plan and Directive

THE MOVE TOWARDS OPEN DATA IN THE LOCAL TRANSPORT DOMAIN JUNE 2013

CIMEC C-ITS STANDARDISATION REQUIREMENTS FOR URBAN ENVIRONMENT

ECISS Internal Regulations Part 1. Organization and structure. Date:

Specifications. Tender No. VT/2012/077

COMMISSION STAFF WORKING DOCUMENT. Vademecum on European standardisation in support of Union legislation and policies PART III

TECHNICAL BOARD BT N Draft BT C155/2018. CEN/BT by correspondence. For vote Issue date:

EasyWay Project An overview

Draft Terms of Reference GEO Land Degradation Neutrality (LDN) Initiative To be adopted on 02 November 2018

ISO/IEC INTERNATIONAL STANDARD. Corporate governance of information technology. Gouvernance des technologies de l'information par l'entreprise

Public Consultation Standardisation

Hundred and Fifty-third Session. Rome, May 2014

BUSINESS PLAN CEN/TC 343 SOLID RECOVERED FUELS EXECUTIVE SUMMARY

Business Centre Client Services Manager

Final Conference June 2012, Cologne

UoD IT Job Description

COMMISSION DECISION. of on the creation of a High-Level Expert Group on Sustainable Finance in the context of the Capital Markets Union

Organisation and Structure

Clean Power for Transport. The Directive on the deployment of alternative fuels infrastructure

European Commission Introduction to the CEN Strategic Advisory Body for Occupational Health and Safety (SAB OH&S)

Date of circulation. Type of technical body proposed (TC / SC / BTTF)

Deadline for tenders: 22 September 2016

GRI Greenhouse Gas (GHG) Emissions Working Group

Third Report from Portugal

A. Project Title : Strengthening human resources, legal frameworks and institutional capacities to implement the Nagoya Protocol

Working Group Common Operating Guidelines

Work package AP200 - Research of relevant standardization areas

POSITION DESCRIPTION

INTERNAL AUDIT DIVISION REPORT 2017/022. Audit of knowledge and records management at the United Nations Framework Convention on Climate Change

Call for Applications for the constitution of a Panel of External Experts for the assessments of Urban Innovative Actions in the framework of the 2

Business Plan for the CEN Workshop on ebusiness in the textile, clothing and footwear sectors (WS/eBIZ)

GRI Governance and Remuneration Working Group

APPENDIX O CONTRACTOR ROLES, RESPONSIBILITIES AND MINIMUM QUALIFICATIONS

18 Jan 2015 Editorial amendments 27 Jan 2017

Economic and Social Council 13 July 2017

Pillar II. Institutional Framework and Management Capacity

Framework for the deployment of ITS in Europe State of Play

Council of the European Union Brussels, 7 June 2016 (OR. en) Mr Jeppe TRANHOLM-MIKKELSEN, Secretary-General of the Council of the European Union

EXTERNAL EVALUATION OF THE EUROPEAN UNION AGENCY FOR FUNDAMENTAL RIGHTS DRAFT TECHNICAL SPECIFICATIONS

Dissemination level Public

For vote Issue date: According to IR2 Clause Deadline:

Cross-Community Engagement Group on Internet Governance (CCEG IG)

APPLICATION OF THE KING IV TM PRINCIPLES

Working Group Common Operating Guidelines

TAP TSI Update and Masterplanning. Brussels 26 January TAF/ TAP Masterplanning kick-off 1

ERAC 1204/17 MI/evt 1 DGG 3 C

REVISED RESOLUTION OF THE COUNCIL ON A NEW GOVERNANCE STRUCTURE FOR THE ORGANISATION

RDA Secretary General Recruitment

EU Rural Networks Strategic Framework and governance bodies

DS3 System Services Project Plan Detailed Design and Implementation Phase

Ο ΡΟΛΟΣ ΤΗΣ ΤΥΠΟΠΟΙΗΣΗΣ ΓΙΑ ΤΗ ΔΙΑΣΥΝΔΕΣΗ ΕΡΕΥΝΑΣ ΚΑΙ ΑΓΟΡΑΣ THE ROLE OF STANDARDS FOR BRIDGING RESEARCH AND MARKETS

Foreword by the ANEC President

CCAMLR Secretariat Strategic Plan

VIRGINIA CENTRAL REGION ITS ARCHITECTURE IMPLEMENTATION PLAN

CSA Security as a Service Working Group Charter

A Review of RFID ISO Standards & CEN TC225 Developments. Paul Chartier Principal, Praxis Consultants Chair, CEN TC225 RFID Ad Hoc October 2007

EUROPEAN COMMISSION DIRECTORATE-GENERAL FOR MOBILITY AND TRANSPORT M I N U T E S

TAF1(2004)02 18 January 2005 Page 1 of 18. CEN/ISSS Workshop TAF. Business Plan

The Organisation of Nuclear Installations ENSI-G07. Guideline for Swiss Nuclear Installations. July 2013 Edition

SCHEDULE [NUMBER NAME OF WORK UNIT/WORK PACKAGE] TO THE IN-KIND CONTRIBUTION AGREEMENT SIGNED BETWEEN ESS AND PARTNER ON DATE

COMPARISON CHART OF CWG-IG CHARTER AND REVISED CCWG-IG CHARTER

Guidance on project management

COMMISSION DECISION. of

Industry Engagement in Training Package Development. Discussion Paper Towards a Contestable Model

SFIA Accredited Consultant

CAPITAL DELIVERY HUB. Programme Manager Education Construction. Permanent Placement Package to 67,000. Background

The role of standardisation in EU legislation more opportunities ahead? 10 November 2013

Clean Power for Transport. Implementaton of Directive 2014/94/EU on the deployment of alternative fuels infrastructure

Policy framework for the deployment of ITS in Europe

Adviser and Team Leader (IT Systems)

VISION To make Sydney and NSW one of the world s most successful tourism and events destinations.

AFRRCS Agency Handbook

Transcription:

Introduction PUBLIC CALL FOR TENDER PROJECT TEAM EXPERTS for the execution of the work called for in the proposed Specific Agreement SA/CEN/GROW/EFTA/546/2016-08 Traffic Management System status, fault and quality standards Following the acceptance by the European Commission of a proposal from CEN, as prepared by the CEN/TC 278 Secretariat, funding is available for establishing a team of paid experts. Recruiting these experts has been delegated by the CEN Secretary General to the secretariat of CEN/TC 278, held by NEN. Task of the project team The project team is tasked with the preparation of the following deliverable(s): A CEN technical Specification: Intelligent transport systems Status, fault and quality requirements Contractual details The proposed Project plan is attached. The project plan describes in detail what is expected from the project team, the work plan and milestones and the expertise required for the execution of the task(s). The experts selected will sign an Agreement with NEN. Applicants should be forewarned that the elapsed time between completion of the deliverables and NEN being in a position to issue the payment is at least five months. This will be partly overcome by the fact that CEN and the European Commission have agreed on the following payment steps: Step 0: Pre-financing (25 % of the total budget) - following signature of the Agreement with NEN Step 1: Interim payment 1 - subject to the approval of the interim report by the European Commission and EFTA Step 2: Final payment 2 - subject to the approval of the final report by the European Commission and EFTA Selection procedure Applicants will be selected by a selection committee, which is composed of: the Chair of CEN/TC 278 Intelligent transport systems the Convenor of CEN/TC 278/WG 17 Urban-ITS the Secretary of CEN/TC 278 Intelligent transport systems a representative from the CEN Central Management Centre 1 Up to 75% of the total budget, reflecting the actual number of man-days spent. 2 Up to 100% of the total budget, reflecting the actual number of man-days spent.

Experts will be selected ensuring an equal representation of sectors, countries and skills, as well as the expected chemistry within the project team. Additionally the selection will be based on the principle of best value for money, considering the day rate of the expert and the number of days the expert requires to execute the work. The report of the selection committee on the selection of the experts will be submitted for approval to the European Commission and EFTA prior to the contracting of the experts. Application procedure Applications should be submitted using the attached application form (word format) by 28-02-2017. Applications received after the deadline will not be taken into consideration. I'm looking forward to receiving your application. Yours sincerely, Maarten Peelen Secretary of CEN/TC 278

SA 2016-08 Project plan 1 CONTEXT Two documents provide the context for this proposal: (1) Standardisation request to the European standardisation organisations as regards Intelligent Transport Systems (ITS) in urban areas. Ref Standardisation Request M/546 (Published February 2016). (2) Recommendations of CEN TC278 PT1701: Technical Report: Intelligent transport systems: Standards and actions necessary to enable urban infrastructure coordination to support Urban-ITS. http://media.wix.com/ugd/a7dbd0_8cc42a2831df44f6a2e040f65036579c.pdf This project proposal is designed to meet PT 1701 High Level Recommendation HLRd: D 1701-HLRd Traffic Management System status, fault and quality standards The task of PT1701 was to identify gaps and overlaps in ITS standards that may be needed by Urban Administrations to assist them to implement Urban-ITS. The PT was further charged to outreach into the Urban Administration community and EC Urban-ITS related projects community to identify the scope and issues relating to its work, and subsequently, to validate its interim findings. The project team itself comprised 11 persons comprising: Urban Administrations; practitioners and advisers to Urban Administrations; professional standards developers; ITS industry; automotive industry. As part of its work, the PT created and examined 95 use cases for ITS deployment in the Traffic Management, Multimodal Information Systems and Urban Logistics domains. In addition more than140 projects/reports studied for relevance and content. These were used to create 103 interim recommendations for standards related activities that could usefully help to expedite the speedy deployment of Urban ITS. These recommendations were included in the interim report produced by the PT in January 2016 and were used as the core of the extensive programme of outreach activities it carried out, contacting some 116 urban authority/related organisations. A list of outreach contacts can be found in Annex P of the Final Report of PT1701. The PT organised an open workshop that was held on 11/12 February 2016, and as a result of the discussions at that meeting and based on early feedback from Urban Administrations, the content of the Interim Report was extensively revised, including a significant consolidation of the recommendations, and the summary report and executive summary significantly rewritten to focus on the issues as identified by the Urban Administrations. The PT1701 final report referenced above consolidates the recommendations supported by outreach feedback and provides 8 high level recommendations for support under the CID Ref Standardisation Request M/546. This has been accepted by CEN TC278, and, more significantly, by the European Commission, and represents the key recommendations for support under the mandate Ref Standardisation Request M/546. 1

One of the main findings from the work of PT1701 and highlighted in its final report is that there are a number of major gaps that will weaken the ability of Urban Administrations to implement urban- ITS efficiently, and in some aspects, gaps may prevent its introduction unless faced and provided as a matter of urgency. There are, additionally, a number of highly desirable aspects that could much better assist Urban Administrations to implement Urban-ITS, and a number of aspects of lower priority that need to be addressed at some point in time. Key issues identified by Urban Administrations as identified barriers to implementation of Urban ITS, where standards are needed to remove/reduce the barrier to the implementation of urban-its are identified as follows: a) Awareness of what is available b) Location referencing c) Avoiding vendor lock-in (Mixed Vendor Environment) d) Standards for New Modes and new measures e) Data exchange/data management f) Immaturity of some concepts 2 OBJECTIVES AND IMPACT 2.1 Objectives The objective of this study is to identify the standards and actions necessary to enable urban infrastructure coordination to support the deployment of Urban-ITS. In particular, the study will concentrate on what is relevant to PT 1701 High Level Recommendation HLRd: Traffic Management System status, fault and quality standards 2.2 Relevance The COMMISSION IMPLEMENTING DECISION on a standardisation request to the European standardisation organisations as regards Intelligent Transport Systems (ITS) in urban areas in support of Directive 2010/40/EU of the European Parliament and of the Council of 7 July 2010 on the framework for the deployment of Intelligent Transport Systems in the field of road transport and for interfaces with other modes of transport requires that: The requested European standards and European standardisation deliverables shall be developed to be compliant with data availability, access, quality, reliability and accuracy. The management of traffic is clearly central to the role of the Urban Administration and one of the key pillars of Urban-ITS. ITS exists in an area of constantly and rapidly evolving technology, and is often at the forefront of technological innovation. As more solutions and tools are developed, the variety and amount of data (static, dynamic, floating, etc.) is constantly increasing. A trend towards open data, and in some circumstances, open access, is enhancing the scope and quality of the accessible data, as well as enabling the development of new mobility services, and travel or traffic applications. The Urban Administration also has another master, and that is the central government of the Nation State. This will impose the result of various political decisions that it has made, primarily regarding the quality and extent of services provided by Urban Administrations. The Urban Administration therefore has also to protect its political masters by ensuring that the will of the central government national legislation and regulation- is also maintained. Mutual dependency means that no single party can dominate and exercise overall control. Structural consultation platforms are necessary in which agreements can be made, for example, about standardisation and data availability and quality. Providing data for quality-of-service (QoS) analyses and processes may take place, based on data collected about the effects of traffic management strategies in combating and reducing the impact of 2

congestion, whether a regular occurrence or due to incidents and/or specific events. The purpose of the initial data collection and consolidation is not carrying the actual quality-of-service information, but only the input data from which such indicators can be computed. The PT1701 pre-study identified the following gaps in respect of data availability, access, quality, reliability and accuracy in the Traffic Management (TM) domain: H.3.3.2 TM-0002a Gaps TM real-time field data capture Comprehensive TM-system reference model (architecture). Comprehensive traffic data standard for urban traffic control & management and TM quality assurance. Comprehensive system status and fault messages standard for urban TM infrastructure (preferable subsystems in the field level). H.3.3.5 TM-0004 Gaps TM Real-time Data Processing Standards (incl. standards for quality assurance) for aggregated and vehicle type classified data traffic volume, occupancy rates, average speed Standards (incl. standards for quality assurance) for operational data and information. H.3.3.6 TM-0005 Gaps TM Traffic Condition calculation and Event/Incident detection Standards (incl. standards for quality assurance) for traffic condition (LoS), travel times and events. The PT1701 Pre-study also identified a requirement for: Operational message management: Acquisition, visualization, storing (if necessary also archiving) and documentation of technical error and operational system status messages at a central location/database of urban traffic management, provision of appropriate data services for other services and for a centrally organized fault clearance management, (and which provides interfaces to the inter-urban road operator and to public and private traffic and traveller information service providers). The analysis of PT1701 largely stems from identified TM Use Cases. Many of the gaps from the Use Cases, and hence the recommendations, are focused on data exchange, and this covers a broad spectrum of functions, including the traditional synchronised and adaptive control of traffic signals, but also integration of a growing range of traffic sensors and even simple functions, like how to put information on message signs and deliver automated fault reporting. This area also includes identifying gaps in DATEX II to ensure it can continue to provide the necessary high level data exchange for all Traffic Management functions. PT1701 has proposed D 1701-HLRd Traffic Management System status, fault and quality standards A quality or performance criteria standard (service level agreements in terms of ITS performance e.g. availability, timeliness of data transactions Rc_TM04 or key performance indicators in terms of safety, efficiency and environmental impact) for the validation and assessment of traffic management services from suppliers. (H.4) 3

Rc_TM08 System status and fault messages (particularly for the sub-systems in the field level), in order to support system monitoring and (semi-automated) fault clearance. (H.4) Which it elaborated as D 1701-HLRd Traffic Management System status, fault and quality standards (PT Final Report Section H.4). A quality or performance criteria standard (service level agreements in terms of ITS performance e.g. availability, timeliness of data transactions or key performance indicators in terms of safety, efficiency and environmental impact) for the validation and assessment of traffic management services from suppliers. System status and fault messages (particularly for the sub-systems in the field level), in order to support system monitoring and (semi-automated) fault clearance. (PT estimate 170 mandays: 130k Team of 3-4) (Subsequently revised to Team of 4 : 180 days) While the interim recommendations TM04 and TM08 were originated within the Interim Report of the project team, the importance and significance of these proposals were elevated to be one of the priority recommendations as a result of outreach feedback. Section P of the PT1701 Final Report details TM04 as: traffic management Rc_TM04- A quality or performance criteria standard (service level agreements in terms of ITS performance e.g. availability, timeliness of data transactions or key performance indicators in terms of safety, efficiency and environmental impact) for the validation and assessment of traffic management services from suppliers. (H.4) TM-0009 15% of all outreach responses from Urban Administrations supported/highlighted this recommendation. In addition, 2 of them ranked this recommendation their highest priority. Outreach Comments: a) We would welcome the development of such criteria to make future procurements more competitive and easier to evaluate and subsequently monitor the performance of contract delivery. b) In order to come to large scale deployment, CBA s are needed. This recommendation would help to do this in a transparent and standardized way (Note the comment does not define CBA) Section P of the PT1701 Final Report details TM04 as traffic management Rc_TM08- System status and fault messages (particularly for the subsystems in the field level), in order to support system monitoring and (semi-automated) fault clearance.. (H.4) TM- 0002a Again 15 % of outreach respondents, all Urban Administrations, supported/highlighted this recommendation. 4

While in both cases 15% may not initially seem to be a significantly high %, outreach feedback was generally made to highlight areas of concern, i.e. there was no feedback which addressed each and every recommendation. The respondents just commented on the (usually one or two) areas of importance to them. In this context 15% response support for this recommendation (out of 103 recommendations) represents a very high level of interest and support. 2.3 Indicators Effectiveness Project progress in relation to the schedule specified in this proposal Target In time Minimum In time Stakeholder Engagement The PT1701 Recommendations were developed as a result of Phase 1: Expert study and outreach to known subject area experts/practitioners. Phase 2: Outreach feedback to proposed recommendations, especially from Urban Administrations Phase 3 consolidation, association and amalgamation See PT1701 Final report http://media.wix.com/ugd/a7dbd0_8cc42a2831df44f6a2e040f6503 6579c.pdf Outreach feedback that shaped the PT1701 final deliverable came from 116 urban authority/related outreach direct contacts CEN/TC 278, ISO/TC 204 ISO/ TC 211 ETSI ITS POLIS TISA DATEX II Minimum from 3 different stakeholder groups. The modus operandi of CEN, based upon a network of national standardisation bodies, is geared towards involving all parties concerned Dissemination results Provide project overview on CEN/TC 278 website: www.tc 278.eu The deliverable will be disseminated to the CEN/TC 278 members at three occasions (Working Draft, TC review and Formal Vote) and at WG level more frequently. Participation in TC 278 and at WG level is open to any interested party. 2.4 Impact Project overview + updates 3 2 Project overview The project will assist Urban Administrations to reliably and swiftly introduce/support for Urban-ITS services within their domain with the ability to rely on: Traffic Management System status, fault and quality standards 5

2.5 SMEs, consumer organization and environmental and societal stakeholder representation (Art.17(4) (b) of standardization regulation No 1025/2012) example Annex III organisations (ECOS, ETUI, ANEC, SBS) The modus operandi of CEN, based upon a network of national standardisation bodies, is geared towards involving all parties concerned, including SMEs and societal stakeholders. The following European stakeholder organizations are members of CEN/TC 278 ANEC, the European Consumer Voice in Standardization ECOS, the European Environmental Citizens Organization for Standardisation SBS, Small Business Standards As members of CEN/TC 278 they can participate in CEN/TC 278 and its Working Group activities and have access to all CEN/TC 278 documents. 3 of the tasks 3.1 Introduction The tasks for this PT will be (in respect of Status, fault and quality requirements) to develop a: TECHNICAL SPECIFICATION Intelligent transport systems Status, fault and quality requirements 3.2 Scope a) A Technical Specification for quality or performance criteria (service level agreements in terms of ITS performance e.g. availability, timeliness of data transactions or key performance indicators in terms of safety, efficiency and environmental impact) for the validation and assessment of traffic management services from suppliers; and b) System status and fault messages (particularly for the sub-systems in the field level), in order to support system monitoring and (semi-automated) fault clearance.. 3.3 Workplan & Milestones The work plan is as follows: 0 Signature of contract between CEN and the EC Start (s) 1 Consultation or Public Call for tender and signed contract to start work S+3 2 Kick-off meeting & Work plan for the Project Team S+5 3 First draft ready for TC review S+15 Interim report S+17 4 End of TC review S+17 5 Ready for Formal Vote S+19 6 Start Formal Vote S+22 7 End Formal Vote S+25 6

8 Publication S+28 Final Report S+30 3.4 Deliverables 3.4.1 Interim report (S+17months) An interim report in the form of a progress report describing the work performed so far and a first draft of the deliverables. Delivered at the stage that the first working draft is available. 3.4.2 Final report (S+30 months) A final report for all tasks containing the reference of the TS published (published, CEN stage code 60.60). 4 EXECUTION OF THE DIFFERENT TASKS 4.1 Organisation & relationship CEN/TC 278 (NEN) CEC/TC 278/WG 17 Urban-ITS Project team(s) The work plan of the Project Team will be aligned with the standardization process in CEN. The Project Team will co-ordinate the time schedule with the timing of TC 278/WG 17 Urban-ITS and provide deliverables in due time before their meetings. The work plan of the Project Team will give room for the given commenting and voting process within TC 278.Regular status reports will be provided to WG17 for information and seeking assistance on issues where required. The Project Team will consider and take due account of inputs from the members of WG17. 4.2 Subcontracting to external organizations 4.2.1 Motivation for hiring experts The drafting of the documents requires specialized expertise which is not available to standardization managers as permanently employed by CEN and its member NEN. This is the justification for the Commission financial support. To employ such specialized experts by a CEN member would be expensive and not economically viable considering the very specific area of specialization that is required for the execution of this contract. To engage the services of the appropriate specialist experts from the market is more costeffective. This sub-contracting also enables the quick availability of the drafts to enter the consensus building and validation processes, which are CEN s core business. 7

The management and administration of the consensus building and validation process with the aim to publish the end results as a standards deliverable is the responsibility of the CEN National Standards Body, in this case NEN. CEN has a standard methodology to select specialized experts for a so called Project Teams. Project Team experts are selected via a consultation or Public Call for tender. A balanced composition of the different stakeholders (e.g. in terms of expertise) is preferred. For the Project Teams in relation to this Grant, experts should have specific expertise and knowledge, which will be the main criterion for their selection and which is described in detail below.7.6.2 Expertise required 4.2.1.1 Project team size and composition A project team of 4 persons, comprising expertise in the needs of urban administration management of traffic systems status, fault and quality management, and knowledge of requirements for standardization. 4.2.1.2 Expert TMSS 1: Project Coordinator and Editor. Experience: Detailed knowledge of CEN Standardization system and editing requirements; General knowledge of ITS applications and Urban-ITS in particular. Detailed knowledge of PT1701 work and report. Tasks: Project Management, coordination, editorial input to specifications, editing, management and production of deliverable. Research into area where further investigation/research is needed. Administrative support to PT. Expert TMSS 1: Project team leader The PT leader is responsible for the formal reporting to NEN, for moderating the work in the PT in order to achieve reasonable consensus inside the PT, and act as the interface to the parent body CEN/ TC 278/WG 17 and liaises with other external groups. project management (timeframe, indicators etc.); organise and manage the project team, organize and chair physical and e-meetings Responsible for development, progress, Coordination of the deliverable Detailed knowledge of CEN Standardisation system, plus a general knowledge of the range of services that ITS can provide and the applications these provision needs, with a particular emphasis on Urban-ITS and a detailed knowledge of the PT1701 work and its final report. Standardisation Team experience (preferably standardisation team leadership expertise). Practical working knowledge of Traffic Management system status and quality control. Research into area where further investigation/ research is needed. Expert TMSS 2: Expert in OCA/OCIT traffic management systems. Input in respect of traffic management systems, Detailed knowledge of OCA/OCIT traffic management algorithms and methods of operation, particularly procedures and protocols.; General knowledge of ITS OCA/OCIT TM, technical input to specifications, systems and Urban-ITS in particular. Knowledge of evolution/migration strategy from current OCA/OCIT commercial products and services currently available. to developed system status, fault and quality Detailed knowledge of PT1701 work and report. standards 8

Expert TMSS 3: Expert in UTMC traffic management systems. Input in respect of traffic management systems, Detailed knowledge of UTMC traffic management algorithms and methods of operation particularly procedures and protocols. General knowledge of ITS UTMC TM, technical input to specifications, systems and Urban-ITS in particular. Knowledge of evolution/migration strategy from current UMTC to commercial products and services currently available. developed system status, fault and quality standards Detailed knowledge of PT1701 work and report. Expert TMSS 4: Expert in urban administration procedures. Input in respect of Urban Administration Detailed knowledge of application of traffic requirements to developed system status, fault and management procedures and protocols within an quality standards Urban Administration (current or recent personal experience within a UA.), plus a general knowledge of ITS and Urban-ITS in particular. Knowledge of the work and report produced by PT1701 is also required. Expert TMSS 5: Expert in urban administration procedures Input in respect of Urban Administration requirements to developed system status, fault and quality standards The role 'Editor' will be carried out by one of the above mentioned experts. Detailed knowledge of application of traffic management procedures and protocols within an Urban Administration (current or recent personal experience within a UA.), plus a general knowledge of ITS and Urban-ITS in particular. Knowledge of the work and report produced by PT1701 is also required. Editor TMSS Developing, revising and editing TMSS deliverables (probably around 100-150 pages) Detailed knowledge of CEN deliverables development rules, structure and procedures. MS WORD & MS OFFICE Apps. 4.2.2 Travel requirement It is anticipated that much of the work can be undertaken individually and shared electronically. With a small group of 5, Skype/GoToMeeting can be used. Probably 3-5 physical meetings will be required (to be agreed/decided by PT members amongst themselves). NOTE The travel budget will be part of the man-day tariff. 9