SYSTEMATIC APPROACH FOR DECOMMISSIONING PLANNING AND ESTIMATING

Similar documents
DESIGNING AND IMPLEMENTING A LIFE-CYCLE COST MODEL FOR FIRST-OF- A-KIND BUILDING DECOMMISSIONING

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA. Factors Impacting Decommissioning Costs 13576

2.0 SCHEDULE DEVELOPMENT

Comparison of estimated and actual decommissioning cost of José Cabrera NPP

EPRI Research and Development Projects for NPP Decommissioning

TROJAN DECOMMISSIONING STATUS. OPUC Meeting March 8, 2005 (draft)

Decommissioning Studies for the Oskarshamn and Forsmark Nuclear Power Plants in Sweden

Zion Project Overview S. Chris Baker VP EH&S

Project vs Operation. Project Constraints. Pankaj Sharma, Pankaj Sharma,

Introduction. Status of Worldwide Nuclear Power Plants*

Power Reactor Decommissioning: U.S. Perspective on Regulatory Insights and Challenges

Your Partner for Successful D&D PROVEN PROGRAMS EFFECTIVE TRANSITION WORLD-CLASS PERFORMANCE

San Onofre Unit 1 Decommissioning

CHAPTER 1 INTRODUCTION

Use of PSA to Support the Safety Management of Nuclear Power Plants

Maria Taranger Foto: Kävlinge Municipality

PROMASTAR Instructor led Professional Training Services Primavera Accredited/Certified Class Courses

Testimony On 2016 SONGS 1 Decommissioning Cost Estimate

PLANNING FOR THE EARLY RETIREMENT OF THE OYSTER CREEK NUCLEAR GENERATING STATION ENGINEERING ISSUES

Westinghouse Waste Simulation and Optimization Software Tool 13493

ICFD Session 2, Cost Estimation Stockholm, Sweden - 21 September 2016 Michael Lackey P.E. Vice President - Nuclear Operations

PMP Exam Preparation Course Project Time Management

Identification Selection Definition Execution. Schedule.

DECOMMISSIONING LESSONS LEARNED AT YANKEE ROWE. M. S. Terrell, D. McGee, Duke Engineering and Services (USA)

Ageing Management and Development of a Programme for Long Term Operation of Nuclear Power Plants

2014 Decommissioning Cost Analysis of the San Onofre Nuclear Generating Station Units 2 & 3

PROJECT PLANNING AND SCHEDULING

State of the Nuclear Industry Decontamination & Decommissioning Are We Ready. April 25, Presented by: Michael Frediani

PROCESS SIMULATION AS APPLIED TO TRANSURANIC WASTE MANAGEMENT

The 9 knowledge Areas and the 42 Processes Based on the PMBoK 4th

FULLY INTEGRATED SCHEDULE FOR A REACTOR DECOMMISSIONING PROJECT. G. Cross, BNFL Inc.

Guten Tag. (good day)

WM2014 Conference, March 2 6, 2014, Phoenix, Arizona, USA

Primavera Training - P6 Basic Course (102)

Project Management Concepts, Tools & Techniques

The Electric Power Research Institute (EPRI) is the

Considerations for Disposition of Dry Cask Storage System Materials at End of Storage System Life

S T A T E O F M I C H I G A N BEFORE THE MICHIGAN PUBLIC SERVICE COMMISSION DIRECT TESTIMONY THOMAS S. LAGUARDIA ON BEHALF OF CONSUMERS ENERGY COMPANY

Project Management Auditing Guide

during Normal Operations

International Structure for Decommissioning Costing (ISDC) ISDC Costing Methodology, Principles. CERREX Costing Software for Research Reactors

S z5a MPC&D July 31, U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C

Project Time Management

Program Lifecycle Methodology Version 1.7

Decommissioning Planning

FUSRAP COST TO COMPLETE. Kate Peterson U.S. Army Corps of Engineers HTRW CX, Omaha District Omaha, NE 68144

Schedule Module Exploration Systems Engineering, version 1.0

U.S. NUCLEAR POWER PLANT DECOMMISSIONING

P6 Instructors Sample Presentation

Capacity building supporting long-range sustainable nuclear energy system planning

Low-Level Waste and Radiation Management

Identify Risks. 3. Emergent Identification: There should be provision to identify risks at any time during the project.

PWR Steam Generator Management

Perspective of Decommissioning Worldwide in View of Metrological Needs

Spent Fuel Safety Studies and Analyses

Experience from Fukushima 1F-3 Spent Fuel Removal System Project John Hubball Westinghouse Electric Company

Stress tests specifications Proposal by the WENRA Task Force 21 April 2011

Design-Build Surgical Center Program Management

Status of Decommissioning Preparation for Kori #1

Fatigue Monitoring for Demonstrating Fatigue Design Basis Compliance

Best practices for preparing vessel internals segmentation projects

IAEA Activities Related to Clearance and Exemption

INFORMATION SHEET. COORDINATED RESEARCH PROJECT No T MANAGEMENT OF SEVERELY DAMAGED SPENT FUEL AND CORIUM

Nuclear-renewable hybrid energy systems for non-electric applications

RIVER PROTECTION PROJECT WASTE TREATMENT PLANT CONCEPT AND APPROACH. M. J. Lawrence, British Nuclear Fuels Ltd., Inc.

IAEA Safety Standards for Research Reactors

Characterization Surveys and Early Site Investigations. Tom Hansen, CHP, PMP Ameriphysics, LLC

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

White Paper. Duration Estimating

Mathematical Modelling of Regional Fuel Cycle Centres

Dr. Martin Sonnenkalb & Dr. Manfred Mertins GRS Cologne. Severe Accident Mitigation in German NPP - Status and Future Activities -

OVER VIEW OF ACCIDENT OF FUKUSHIMA DAI-ICHI NPSs AND FUTURE PLANNING TOWARD D&D

Connoisseur Solutions Project Scope Management

Strategic Planning in the Integrated Program

Scheduling 2 Day Structure

Association for Project Management 2008

Small modular reactors deployment and their applications for embarking countries

DECOMMISSIONING OF NUCLEAR FACILITIES IN UKRAINE

ANALYSIS OF PARAMETRIC AND DATABASE DRIVEN COST ESTIMATES IN THE TRANSIT INDUSTRY

SOLUTIONS. Role of Radioactive Waste Management in D&D. Colin Austin (Senior Vice President, International Business)

Ignalina NPP. Ignalina NPP decommissioning activities are co-financed by European Union

IAEA activities related to construction and risk management

DRAFT IMPLEMENTING DECREE. of 2016

IAEA Safety Standards for Research Reactors

Professional Training Services

Guidelines for the review of accident management programmes in nuclear power plants

Decommissioning of Nuclear Facilities - Regulatory Requirements -

Applicability of EPRI Decommissioning Pre-Planning Manual to International Decommissioning Projects

EPRI Utility Requirement Document

NUREG-1549: Decision Methods for Dose Assessment to Comply With Radiological Criteria for License Termination

Decommissioning and Dismantling at CEA. Program, challenges and feedback experience

Proven Project Risk Management Techniques for Increased Project and Organizational Success

CASE STUDY. WITNESS Modeling is key to securing contracts worth billions of dollars for EnergySolutions in Used Nuclear Fuel Recycling Facility Design

Characterization and Clearance of m/s Sigyn

PMP EXAMINATION PREP CHAPTER 6 SCHEDULE MANAGEMENT. PMP Exam Prep

FATIGUE MONITORING FOR DEMONSTRATING FATIGUE DESIGN BASIS COMPLIANCE

Risk Informed Safety Margin Characterization for Effective Long Term Nuclear Power Plant Safety Management

ICEM DEVELOPMENT OF THE ENVI SIMULATOR TO ESTIMATE KOREAN SNF FLOW AND ITS COST

Report on Waste Burial Charges

PMP Exam Preparation Course Project Scope Management

Transcription:

ABSTRACT SYSTEMATIC APPROACH FOR DECOMMISSIONING PLANNING AND ESTIMATING A. Scott Dam, P. E. JUPITER Corporation 2730 University Boulevard West, Suite 900 Wheaton, MD 20702 Nuclear facility decommissioning, satisfactorily completed at the lowest cost, relies on a systematic approach to the planning, estimating, and documenting the work. High quality information is needed to properly perform the planning and estimating. A systematic approach to collecting and maintaining the needed information is recommended using a knowledgebase system for information management. A systematic approach is also recommended to develop the decommissioning plan, cost estimate and schedule. A probabilistic project cost and schedule risk analysis is included as part of the planning process. The entire effort is performed by a experienced team of decommissioning planners, cost estimators, schedulers, and facilityknowledgeable owner representatives. The plant data, work plans, cost and schedule are entered into a knowledgebase. This systematic approach has been used successfully for decommissioning planning and cost estimating for a commercial nuclear power plant. Elements of this approach have been used for numerous cost estimates and estimate reviews. The plan and estimate in the knowledgebase should be a living document, updated periodically, to support decommissioning fund provisioning, with the plan ready for use when the need arises. INTRODUCTION Nuclear facility and power plant owners are facing an increasing challenge for protecting their business operations and investment. They must know the true future cost for decommissioning and must be ready to execute decommissioning when the facility is shutdown. For power plants no longer in the rate base, the responsibility is now on the owner and not the ratepayer (public). In the past, decommissioning estimates were produced to meet NRC and/or Public Utility Commission (PUC) regulatory requirements. However, the estimates were not necessarily done as one would if a decommissioning project was contemplated in the near future. To ensure that the estimate is based on the approach that may be taken for decommissioning, management needs to ensure that the team does not just prepare an estimate but performs preliminary decommissioning planning as part of preparing the estimate. The plant owner, as part of the team, needs to validate the technical basis for the plan/estimate. There are many factors that affect the decommissioning plan/estimate to be considered during and subsequent to the planning and estimating effort. A plant owner needs to ensure that the estimate is kept current through 1

periodic reviews and updates to support regulatory and company budget reviews. As plant modifications and operational activities can affect the decommissioning plan and estimate, the plant owner needs to track impact of such modifications and operations on the estimate. Due to many uncertainties, multiple scenarios should be evaluated and risk analyses performed as part of the planning and estimating. For these reasons and since the decommissioning may be done some long time in the future, a systematic approach to planning, estimating, updating, tracking, and documenting the planning and estimating work is needed to ensure it is understood, retrievable, and ready for use. A SYSTEMATIC APPROACH TO PLANNING AND ESTIMATING A systematic approach is required to perform the decommissioning planning and cost estimating effort. A recommended approach is depicted in Figure 1. This approach covers all aspects of decommissioning planning and estimating: Define Requirements & Constraints Prepare Basic Approach and Guidelines Prepare Overall Decommissioning Schedule Estimate Costs Perform Risk Analysis Evaluate Risks Perform Scenario and Sensitivity Analyses Report Results Utilize Knowledgebase to Support Analysis and Document Results Provide Inputs to Knowledgebase from Industry and Plant Data 2001 A. Scott Dam Fig. 1. Systematic Approach to Decommissioning 2 Planning and Estimating

This recommended, systematic approach was developed by the author and utilizes integrated software systems such as XtremePM TM, Primavera Project Planner (P3) or MS Project, MS Access, and At-Risk. The planning and estimating is performed by a small, knowledgeable team with owner representatives participating in key activities such as the risk workshop, which is described later in this paper. Define Requirements & Constraints Using the systematic approach, the first step is to develop the requirements and constraints for the decommissioning program. Requirements and constraints to be considered include the following: Decommissioning fund status Decommissioning method DECON, SAFSTOR Planned Shutdown Date Purpose & management expectations Site conditions & space considerations End state desired full or partial site release Site type one or more units Extent of plant and site contamination Site release or cleanup levels, site-specific analysis Waste storage Labor agreements Waste disposal availability Spent fuel storage capacity (full-core off-load) Staff experience in D&D Prepare Basic Approach and Guidelines Within the constraints identified, prepare a general approach for the planning including identifying the expected timing, whether the final site cleanup will be prompt or delayed. Also, include in the basic approach the planned performing organization for the work, a decommissioning contractor or an internal organization (self-performing / contract management approach). As part of determining the approach, the owner should validate assumptions made in topics such as site release criteria, removal date for spent fuel, and future availability of lowlevel waste disposal. Prepare Overall Decommissioning Schedule The second, iterative step is to prepare an overall schedule for the decommissioning using work breakdown structure (WBS) tasks and milestones with MS Project or P3. This information is loaded into the database (e.g. XtremePM TM ) and forms the WBS for the cost estimate, or Estimate Breakdown Structure (EBS). The scheduling should be done as a phased effort with 3

major activities identified. The schedule should be arranged with a logical work flow, considering the ability to move spent fuel into a wet or dry storage facility or off-site. Options in the schedule should be identified. The team should analyze the high-risk items, such as the spent fuel and large component removal approaches. EPRI decommissioning project has been preparing guidance documents to help the planning and scheduling activities. Lessons learned from other decommissioning projects should be incorporated into the planning. Estimate Costs The cost estimate is prepared using standard tasks as the basis, developed from R.S. Means & Co. and industry data, which are frequently updated. The standard tasks are modified for special conditions. Guidelines for this estimating approach can be found in various references, including an older report from the former Atomic Industrial Forum (now Nuclear Energy Institute) (1) that still provides useful reference information. The labor and material cost rates are updated using Means and industry data mentioned above. Use of a purchased software system such as the XtremePM system is recommended as it can include standard tasks as part of its base and can integrate Means data for other tasks. It is set up to use special conditions modifiers. If a previous estimate has been performed and there have been no major changes in the plant design, levels of contamination, etc., that previous estimate can be used as the basis for quantities, presuming it provided breakdowns for by plant areas. Typically decommissioning is done by areas and not by systems. Before a previous estimate is just used as is and just escalated, the planning basis assumptions, approach, etc. need to be carefully evaluated. If the plant data is out of date due to modifications or if there is a concern about the validity of the estimate, new material takeoffs should be made and a bottoms-up estimate prepared. Note that the material removal portion of the estimate is only about one third of the total estimate, with spent fuel and waste disposal and site labor accounting for the other two thirds of the estimate. As part of the cost estimate a waste processing and disposal model (using the by-product operations portion of XtremePM ). Once the base estimate is prepared (prior to risk contingency being added), the NRC formula (2) should be reviewed as a comparison for power reactors. Table I is an example of a cost estimate summary work sheet for a large BWR. The costs are developed for each EBS 4

WBS Table I. Cost Estimate Work Sheet Typical Large BWR Decommissioning Summary Cost Estimate Activity Decon Remove Pack Ship Bury Other Total 1999 $000 US Total Cost $17,041 $65,596 $7,821 $4,204 $49,432 $204,797 $348,891 1 Planning $2,206 $6,674 $625 $559 $3,488 $47,397 $60,949 1.1 Planning and Site Preparation $2,681 $2,681 1.2 Additional Costs $1,418 $5,680 $427 $495 $1,189 $13,552 $22,761 1.3 Period 1 Undistributed Costs $788 $994 $198 $64 $2,299 $25,031 $29,374 1.4 Staff Costs $6,133 $6,133 2 Decommissioning $11,591 $41,482 $7,140 $3,643 $45,732 $101,961 $211,549 2.1 Nuclear Steam Supply System Removal $1,154 $7,033 $1,429 $1,496 $22,936 $824 $34,872 2.2 Removal of Major Equipment $605 $122 $51 $459 $7,865 $9,102 2.3 Disposal of Plant Systems $2,462 $16,665 $1,682 $785 $6,313 $5,924 $33,831 2.4 Decontamination of Site Buildings $4,927 $2,496 $3,505 $1,184 $13,142 $6,127 $31,381 2.5 Period 2 Additional Costs $7,232 $7,232 2.6 Period 2 Undistributed Costs $3,048 $14,683 $402 $127 $2,882 $39,717 $60,859 2.7 Staff Costs $34,272 $34,272 3 ISFSI $3,244 $783 $56 $2 $212 $49,366 $53,663 3.1 ISFSI Capital Expenditure $40,055 $40,055 3.2 ISFSI Site Restoration $3,244 $783 $56 $2 $212 $250 $4,547 3.3 Period 3 Undistributed Costs $8,536 $8,536 3.4 Period 3 Staff Costs $525 $525 4 Site Restoration $16,657 $6,073 $22,730 4.1 Demolition of Remaining Site Buildings $11,511 $11,511 4.2 Site Closeout Activities $2,318 $2,318 4.3 Period 4 Undistribute Costs $2,828 $4,885 $7,713 4.4 Staff Costs $1,188 $1,188 item and rolled up to the summary level shown in the table. The costs are categorized by general types of activities shown decon, remove, pack, ship, bury, other and by phases. Note that these values do not include a classical estimated percentage contingency. A risk contingency is calculated as described later. Perform Risk Analysis Table I. Cost Estimate Work Sheet Once the basic costs are developed, a probabilistic risk analysis is performed to determine the risk contingency to be added to the estimate. The first step is to develop the list of risks and cost impacts. A risk workshop is convened to develop the risks with participation by the plant owner. In the workshop, the workshop participants use their experience and the project plans to identify potential risks, such as increased costs for waste disposal, delays in receipt of regulatory approvals, and schedule delays due to equipment breakdowns. Potential activities with a high risk include spent fuel removal and reactor vessel removal and disposal. Typically, a workshop identifies about 60 to 100 risks for a large decommissioning project. During the workshop risks are categorized by potential for occurrence (low through high), impact (cost or time in actual values or level low through high), and EBS elements affected. Some specific cost analysis may be needed to determine the potential cost impact. This data is entered into a database. The cost and risk data is evaluated by Monte Carlo simulations. A good software program for performing this analysis is AtRisk with the database in MS Excel. The program is run to generate the confidence curves on the estimate. Figure 2 shows a typical confidence curve. 5

Fig. 2. Risk Confidence Curve Fig. 2. Risk Confidence Curve Evaluate Risks The team reviews the risks and makes adjustments depending on severity and overall impact. Both cost and schedule impacts should be evaluated. As part of the risk generation process, potential mitigation measures should be identified. The analysis is usually performed assuming that the measures are not effective. However, certain risks may completely overwhelm the analysis. These should be removed and handled separately and discussed with management. Assumptions that lead to high risks should also be reviewed. Actions to reduce or further quantify risks should be considered. Perform Scenario and Sensitivity Analyses Identify alternative scenarios for further evaluation. For example, if an assumption is made on disposal availability and costs, an alternate assumption could be made and the analysis re-run. Another key factor is spent fuel removal from the site. The basic assumptions may be altered and additional scenarios performed. Results should be kept in a usable and retrievable form for the future by providing the backup data and estimates in a XtremePM TM file. 6

Utilize Knowledgebase to Support Analysis and Document Results To ensure that plant data is available for use in the planning and estimating process, use a knowledgebase with ability to share with others, e.g., Owners Group or other company projects. One knowledgebase system useful for decommissioning planning and estimating is XtremePM developed by Merrimac Corporation of Cherry Hill, New Jersey. This system provides the tools to implement a total project (or program) virtual work environment and includes modules for cost estimating, facility structure, work breakdown, processing & operations, performance monitoring and reporting, administration - security, HR, and library (relational reference information: diagrams, drawings, specs, photos, videos, characterization maps). Figure 3 shows the elements of the XtremePM system and how they fit together into an integrated system. Fig. 3. Fig. XtremePM 3. XtremePM Knowledgebase System System Concept Concept Diagram Diagram 7

The system is set up to interrelate the data for all the activities, including updating for lessons learned and evaluating scenarios. The system is a LAN-based client-server with distributed input (PC) and uses Visual FoxPro as the database system. The system is set up to interrelate the data for all the activities, including updating for lessons learned and evaluating scenarios. The system is a LAN-based client-server with distributed input (PC) and uses Visual FoxPro software. Figure 4 is a schematic flow diagram for the system. <--- Feedback Loop PROJECT Define Project Parameters Building Facility Model Drawings Standard Task Library Photos Album Videos Characterization Map Reference Documents Estimate Breakdown Structure (EBS) Work Planning Work Breakdown Structure (WBS) Operational Experiences Tracking By-Products Operations Operational Reports Lessons Learned Data for Future Projects Fig. 4. XtremePM System Flow Diagram Report Results The results of the planning and cost estimating should be accumulated into a report for management. The entire database and analysis would be available as part of the complete planning effort. In addition to reporting for management, the results should be share in public 8

forums, as appropriate depending on the competitive situation. Current plant owners are learning from each other on how best to perform planning and actual decommissioning. It is also important to ensure that commonly owned operations use common system and share data and experiences. EXPERIENCE Elements of this systematic approach have been used on a number of projects over the past three years for a variety of plants and facilities. A small BWR decommissioning project utilized moat of the elements of this process and is utilizing XtremePM for records management and data collection Two large plant (1 PWR, 1 BWR) decommissioning planning projects used the systematic approach and XtremePM cost estimating system, waste processing system, and database management For a large number of plants the cost & risk analysis methodology and described were used for evaluation and updating of cost estimates Experience with the system has generally been very good, depending on the interest, dedication, and training of the users. On the two decommissioning cost estimating projects the use of this system saved time and cost over conventional estimating approaches. In one case the effort was about 20% of the cost using a conventional estimating method and allowed alternatives to be evaluated with very high quality documentation. SUMMARY A systematic approach to decommissioning planning and cost estimating is necessary to ensure a complete and usable plan and estimate. By utilizing available software systems the effort can be reduced with improvements in data availability and retrievability overall, as summarized below Transportable knowledgebase system allows easy updating / modification / scenarios & risk assessment Analysis results in real baseline D&D budget, defendable, and usable for the future project Methodology for planning & cost estimating which captures experience and proven approach Knowledgebase available for sharing and future use This approach is recommended for any group, owners or consultants, performing decommissioning planning and estimating work. REFERENCES 1. Guidelines for Producing Commercial Nuclear Power Plant Decommissioning Cost Estimates, National Environmental Studies Project, Atomic Industrial Forum, Inc., AIF/NESP-036, May 1986. 2. Reporting and Recordkeeping for Decommissioning Planning, Title 10, U.S. Code of Federal Regulations, Part 50, Section 75 (10 CFR 50.75) 9