Demolition Permit Application

Similar documents
Demolition Information Packet

Application Requirements for obtaining a Building Permit

KABA DEMOLITION INFORMATION PACKET

BYRON TOWNSHIP BUILDING PERMIT APPLICATION 8085 Byron Center Ave SW., Byron Center, MI /Fax

DRIVEWAYS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS) BUILDING PERMIT APPLICATION

PATIOS, STOOPS and PRIVATE WALKWAYS. This hand out is for REFERENCE ONLY. For more details see specific code sections.

Lot Size: OWNER OR LESSEE: Name: Telephone: Address: City: State: Zip: ARCHITECT OR ENGINEER: Name: Telephone: Fax #: License #:

*Note: Please contact the Soil Erosion Specialist at with questions regarding application requirements

Commercial Submittal Packet

Application for Right of Way Permit

REQUEST FOR TENDER - SERVICES RFT HOUSE DEMOLITION 7958 BEAVERDAMS RD., NIAGARA FALLS, ON.

VILLAGE OF BUFFALO GROVE

CITY OF BILLINGS BUILDING & SAFETY DIVISION

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

2013 R-1 Building Permit Package For Additions, Decks, Fences & Garages

Plainfield Township Building and Zoning Department P.O. Box 247 Hale, MI PH(989) FX(989) Authority: P.A. 230 of 1972 As Amended

Table of Contents. Section 10,010 - Demolition of Building Structures Section Includes Description of Work 1. 1.

Residential Building Permit Checklist

RESIDENTIAL BUILDING PERMIT INFORMATION

City of San Pablo Community Development Department Building Inspection Division Plan Review & Permit Requirements

Application for Building Permit St. Charles Township 1003 N. Saginaw St St. Charles, MI Phone (989) Fax (989)

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

~lamance <tount!' 9'~UUJ ;i)epwdment 124 We6t ElmStltm (j,taluun,.ncjjdli &vwfina 27253!Jefepfwae(336) :Jax(336)

Contractor Policy Manual

RESIDENTIAL BUILDING PERMIT INFORMATION

Accessory Building/Detached Building Permit

EROSION CONTROL AND GRADING PERMIT APPLICATION

SECTION UNIT PRICES. A. This Section specifies administrative and procedural requirements for the unit prices.

CITY OF FARGO SPECIFICATIONS REMOVALS

CITY OF FARGO SPECIFICATIONS REMOVALS

Dodge City s, General Information For Driveway/Sidewalk Permits, Utility Permits.

APPLICATION FOR RIGHT OF WAY PERMIT

The following materials and documents are required in order for you to obtain a Building Permit:

Wildwood Home Owners Association Architectural Review Board Guidelines

CITY OF DEARBORN COMMERCIAL BUILDING & RENOVATION PERMIT

REPORT ON RESIDENTIAL INFILL HOUSING. City of Des Peres, Missouri. By Malcolm Drummond, AICP. Gartenberg Consulting Services. Creve Coeur, Missouri

BUILDING DEPARTMEN T

C ITY OF D ARIEN Community Development Department 1702 Plainfield Road Phone: (630) Fax: (630)

Northfield Township Sanitary Sewer System 2550 Waukegan Road, Suite 100 Glenview, IL

RESIDENTIAL BUILDING PERMIT INFORMATION

PLAN CHECK GUIDELINES MULTI-FAMILY/COMMERCIAL

SECTION TRENCHING & BACKFILLING

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

CITY OF PORTLAND BUILDING PERMIT APPLICATION Date:

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

Please print or type.

COMMERCIAL OR RESIDENTIAL NEW BUILDINGS, REMODELS AND ADDITIONS

Building Permit Submittal Requirements

CITY OF SAFETY HARBOR 750 MAIN STREET, SAFETY HARBOR, FLORIDA PHONE: 727/ FAX: 727/

ADDENDUM 1. Request for Proposals City of Minot, North Dakota Structure Demolition and Site Restoration Project, # Round 3.

Rafter J Ranch. Packet for New Residential Construction Including Additions and Alterations

ENCROACHMENT/EXCAVATION PERMIT APPLICATION

LINWOOD PARK BUILDING REGULATIONS

Tilt-up structures shall encompass structures that have been constructed with concrete pre-formed construction.

Application for Commercial Plan Review and Building Permit. Address:

EXCAVATION PERMIT CHECKLIST

BUILDING PERMIT APPLICATION

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

Accessory Dwelling Unit Permit Submittal Requirement Checklist (Corte Madera Municipal Code Section 18.31)

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

ALL WATER CONNECTION CHARGES SHALL BE PAID PRIOR TO ISSUANCE OF A BUILDING PERMIT.

Section 403. DRAINAGE STRUCTURES

LakeRidge Subdivision Design / Architectural Standards

LOT GRADING GUIDELINES FOR LOW DENSITY RESIDENTIAL PROPERTIES

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS SECTION 00005B TABLE OF CONTENTS ***CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS***

GRADING & DRAINAGE PERMIT SOIL EROSION AND SEDIMENTATION CONTROL PERMIT PROGRAM OVERVIEW

RESIDENTIAL BUILDING PERMIT INFORMATION

Greene County Demolition and Clean-Up Plan for FEMA Flood Buy Out Properties NYCDEP Properties

SECTION 13 - EXISTING FACILITIES TABLE OF CONTENTS

ROAD CUT PERMIT APPLICATION & INSTRUCTIONS

CITY STATE ZIP CODE TELEPHONE NUMBER (include area code) B. Owner or Lessee

CITY OF LAWRENCE RESIDENTIAL DRIVEWAY PERMIT CHAPTER 16, ARTICLE 3, ADOPTED BY THE CITY COMMISSION ON JULY 10, 1996.

Construction Specification for General Excavation

Single Family Residential Construction Erosion/Sediment Control Standards

PLANNING AND ZONING COMMISSION APPLICATION FOR IMPROVEMENT PLAT APPROVAL

CLAY TOWNSHIP BUILDING DEPARTMENT

CITY OF ALBANY Public Works Department ADDENDUM #1 ST CROCKER LANE RECONSTRUCTION

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

C. Type of Selective Demolition Work: Demolition requires the selective removal and subsequent off-site disposal of:

SWIMMING POOL PERMIT AND INSPECTION REQUIREMENTS

1420 Miner Street Des Plaines, IL P: desplaines.org COMMERCIAL STRUCTURES (INCLUDING ALTERATIONS AND ADDITIONS)

Building Permit Package

DRIVEWAYS & APRONS & CURB CUTS (INCLUDING DRIVEWAY EXTENSIONS)

Everett Water Department Rules. & Regulations. Notification Page 2. Public Water Mains Page 2. Private Water Mains Page 2. Water Conservation Page 3

DEMOLITION OF BUILDING STRUCTURES. C. Protection of Public and Private Utilities

BUILDING PERMIT CHECKLIST FOR THE TOWN OF GRAND LAKE

FDOT REF. ITEM DESCRIPTION

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

THE ANTICIPATED SEQUENCE OF EVENTS ARE AS FOLLOWS, BUT THE CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS

1. Complete Building Permit Application forms on page 2. Include septic system design approval from the Washington County Health Department.

Sierra Highlands Community Association

TOWN OF ECKVILLE BYLAW 638/02 BUILDING PERMIT BYLAW

ARTICLE 1. FIRE LIMITS AND BUILDING REGULATIONS

QUOTE Quote Process City Of Taylor

This brochure has been prepared by the Village to:

CITY OF VINE GROVE BUILDING PERMIT APPLICATION

Transcription:

Demolition Permit Application 2012 Michigan Building Code 2015 Michigan Residential Code City of Jackson 161 W. Michigan Avenue Jackson, MI 49201 (517) 788-4012 www.cityofjackson.org Project Information Job Location Address: Zoning District: #of Units: Property Use: Permit to Demolish: (enter structure type to be demolished: House, Garage, Accessory Structure, etc.) Identification Owner or Lessee Name Address City State ZIP Code Telephone Number Contractor (if Homeowner is doing the construction, enter Homeowner in the contractor information space) Name Address City State ZIP Code Telephone Number Contractor License Number Expiration Date Cell Phone Number E-mail Address Applicant Signature Section 23a of the state construction code act of 1972, 1972 PA 230, MCL 125.1523A, prohibits a person from conspiring to circumvent the licensing requirements of this state relating to persons who are to perform work on a residential building or a residential structure. Violators of Section 23a are subjected to civil fines. Signature of Licensee or Homeowner Date S:\Building Inspection\Permits\Permit application with changes\demo Permit Application.docx (Rev 2/2016)

Fee Schedule Application Fee (Non-Refundable) $ 90.00 Accessory Structure/Porches $ 100.00 Shed $100.00 Garage $ 150.00 Single Family Dwelling $ 200.00 Industrial, Commercial, Mixed Use, or Multi-Family Structure Minimum $ 400.00 plus $.05 per square foot for buildings larger than 2,000 square foot gross floor area Review Hazardous Material and Abatement Reports $ 75.00 Additional Inspections (each) $ 60.00 Request to Extend a Permit $ 60.00 Investigation Fee for beginning work without a permit (Fee reduced to $110 provided permit is secured the same day the investigation was conducted) $ 220.00 Total Permit Fee: **Office Use Only** =========================================================== Property in Historic District: HDC Approval: Yes No Yes No (Signature of Building Official) S:\Building Inspection\Permits\Permit application with changes\demo Permit Application.docx (Rev 2/2016)

Neighborhood & Economic Operations Building a Stronger Jackson 161 W. Michigan Avenue Jackson, MI 49201-1303 Facsimile 866-971-2151 Administrative Services (517) 788-4060 Building Inspection (517) 788-4012 Rehabilitation Services & Information (517) 788-4070 Notice to Demolition Contractors and Homeowners It is the responsibility of the demolition permit holder to submit required documentation and schedule required inspections for each demolition and site restoration activity indicated on the attached form. Permit holders must call for inspections at least four (4) hours in advance of required inspections and must not continue demolition or site restoration activities beyond the required documentation or inspection until authorized by the City. If demolition or site restoration activities continue prior to submittal of required documentation or approval of required inspections, the contractor or homeowner must excavate, remove, uncover, or take whatever action is necessary for the City to conduct the required inspection at no additional cost to the City. Main office- 517-788-4012 Brian Taylor, 517-795-9902

Sec. 5-3. - Demolition of structures. The purpose of this section is to provide a clean, level, seeded, buildable site at the conclusion of the demolition process by or on behalf of a private or public interest. Whenever a structure is demolished or removed, the person, firm, or corporation commencing such demolition or removal must do all of the following: (1) Prior to commencing demolition. a. Submit a completed demolition permit application and pay appropriate fees for all activity related to the demolition process including, but not limited to, hazardous material assessment, hazardous material abatement, and demolition. b. Arrange for proper abandonment of all utility services. c. Conduct a hazardous material assessment and provide a report in accordance with state and federal regulations to the Department of Community Development. d. Abate hazardous materials in accordance with local, state, and federal regulations and the hazardous material assessment report. e. Provide a bill of lading for disposal of hazardous material in an approved landfill. f. Request and confirm a site evaluation by Miss Dig. Provide a copy of the Miss Dig report number and site evaluation to the Department of Community Development before mobilizing equipment on site. g. Install appropriate storm water inlet filters on storm drain inlets at the demolition site and the first two (2) storm drain inlets downstream of the demolition site or as directed by the Department of Community Development. h. Coordinate the closure of any public street with the Department of Public Works if directed by the Department of Community Development. i. Verify existing condition of streets, sidewalks, curbs, fences, and other infrastructure and site improvements with the Department of Community Development and provide photographs of all damages that exist prior to mobilizing equipment on-site. j. Install safety measures to limit access to the demolition site if required by the Department of Community Development,. k. Install soil erosion control measures as site conditions warrant when directed by the Department of Community Development. (2) During demolition. a. Terminate existing sanitary and storm sewer lateral(s) at the property line closest to the connection to the sewer main. Ensure a watertight termination(s) and record the location(s) with triangulation measurements on the demolition permit checklist. b. Terminate existing water line(s) at the curb stop(s). Ensure a watertight termination and record the location(s) with triangulation measurements on the demolition permit checklist. c. Remove and replace sidewalk section(s) required to terminate waterlines at the curb stop. All backfill material must be granular, class 2 sand, compacted to 95% density. Contractor must request and verify inspection by the Department of Community Development prior to backfilling. d. Water down all structures during demolition and demolition debris during loading into trucks for removal from site, to the satisfaction of the Department of Community Development using a minimum three (3) inch hose. Provide a water truck or contact the City Water Department (517-768-6107) for a metered connection to a City fire hydrant. e. Demolish the entire structure including all appurtenances attached thereto. f. Remove all footings, foundations, basement walls, and basement floors.

g. Remove all debris from basements, partial basements, and foundation excavations. h. Demolish or remove all garages, sheds, and accessory or temporary structures including, but not limited to, poles, decks, fences, retaining walls, carports, pools, and play structures as directed by the Department of Community Development. i. Remove all trees and shrubs if required and directed by the Department of Community Development. j. Remove all hard surfaces including, but not limited to, concrete, masonry, asphalt, and hard packed stone or gravel, but excluding public sidewalks. Public sidewalks may be required to be replaced if hazardous conditions exist prior to demolition. k. Remove all driveway curb and gutter openings and approaches as directed by the Department of Community Development. (3) After demolition. a. Request and verify inspection by the Department of Community Development of all basement and foundation excavations prior to backfilling. b. Excavations shall be backfilled with clean fill acceptable to the Department of Community Development and compacted to 95% to prevent settling. The Department of Community Development reserves the right to require compaction testing paid by the contractor if deemed necessary. c. Water down sidewalks and streets adjacent to the demolition site at the end of each day of demolition and after loading demolition debris for removal from the site. d. Install new curb and gutter as directed by the Department of Community Development to replace the driveway curb and gutter openings ordered removed. e. Grade the site to blend smoothly with surrounding properties, public sidewalks, driveways, and curbs. Final grade shall be executed in a manner that provides a continuous smooth grade free of voids, pockets, and debris including, but not limited to, rocks, roots, plastic, wood, cement, block, brick, and steel or other construction material. Grade shall be completed so as to eliminate pooling or draining of water onto neighboring properties. Install three (3) inches of topsoil if required by the Department of Community Development. Final site restoration may include, but not be limited to, application of slow growing, climate appropriate grass seed, hydro-seed, straw, or sod, as directed by the Department of Community Development. f. Repair and reseed landscape areas on adjoining properties and the area between the curb and sidewalk damaged during demolition or removal activities consistent with item 3(e) above. g. Replace all public sidewalks, curbs, driveway approaches, and driveways on the demolition site and adjoining properties damaged during demolition or removal activities in accordance with Department of Community Development standards. h. Remove all paper, wood, rubbish, and debris from the site before final inspection. i. Provide a bill of lading for disposal of demolition debris in an approved landfill. j. Submit a completed demolition permit checklist to the Department of Community Development and Department of Engineering. (4) Exception. The Director of the Department of Community Development or the Chief Building Official may authorize a deviation from the above standards in the best interest of the City provided however that such deviation complies with the spirit and intent of this ordinance. (Ord. No. 91-6, 2, 2-12-91; Ord. No. 2010-02, 1, 1-26-10) Section 3. This Ordinance takes effect thirty (30) days from the date of adoption.

DEMOLITION AND SITE RESTORATION ACTIVITIES Pre-Demolition Miss Dig investigation number and site flagged Utilities removed Copy of NESHAP notification(s) documentation Copy of landfill manifest for disposal of hazardous material Water line or water tanker on site for demolition Proper MIOSHA equipment hats, boots, regulators Proper site protection including but not limited to barricades, rope, tape, etc. Storm sewer drain filters take photos of condition of all sidewalks, curbs, streets, fences, etc. Initial Phase of Demolition Removal of all foundations, footings, floors, etc. Sewer plugged at property line Water line capped at curb stop Excavation inspection (open hole) Backfill and compaction inspection Final Phase of Demolition Removal of hard surfaces including but not limited to concrete, asphalt, gravel, pavers Final grade before seed Seed Straw Hydro-seed or sod (if applicable) Concrete repair Curb replacement Final site

DEMOLITION CHECKLIST ADDRESS PERMIT NUMBER ISSUED TO DATE ISSUED FINALED TYPE BUILDING NUMBER OF UNITS GAS SERVICE DISCONNECTED WATER METER REMOVED ELECTRIC SERVICE DISCONNECTED SEWER LINE PLUGGED WATER SERVICE DISCONNECTED SKETCH RETURNED Contractor is responsible for confirming all utilities are disconnected before demolition. Final payment for demolition will not be made until this sketch is returned to the Department of Community Development. MEASURED DRAWING OF SEWER LINE PLUG AND WATER LINE TERMINATION LOCATIONS