Plant Quality Control. Plan

Similar documents
OMT Asphalt Plant Inspection Checklist

Warm Mix Asphalt (WMA)

Warm Mix Asphalt (WMA)

PROJECT OFFICE MANUAL. The Department reserves the right to review any design through plant production, prior to using the design for Department work.

PROJECT OFFICE MANUAL. The Department reserves the right to review any design through plant production, prior to using the design for Department work.

Warm Mix Asphalt (WMA)

SPECIFICATION FOR QUALITY ASSURANCE FOR HOT MIX ASPHALT

Dryer Drum Plant Certification Report

S-26 (2360) PLANT MIXED ASPHALT PAVEMENT (LOCAL AGENCY) (2013 version )

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

Asphalt Technology Division

Warm Mix Asphalt (WMA) Guide Specification for Highway Construction

BITUMINOUS CONCRETE SURFACES

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PREQUALIFIED AGGREGATE SUPPLIER PROGRAM. April 15, 2016

SECTION 402 PLANT MIX BITUMINOUS SURFACE LEVELING

Regional Engineers. Jack A. Elston

ROARING FORK & EAGLE VALLEY (RFEV) SECTION 4 ASPHALT MIXTURE REQUIRMENTS

Regional Engineers. Maureen M. Addis. Special Provision for Hot-Mix Asphalt Pay for Performance Using Percent Within Limits Jobsite Sampling

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION

MATERIALS DIVISION MEMORANDUM SIGNATURE:

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1069 PRE-QUALIFIED AGGREGATE SUPPLIER PROGRAM. April 18, 2008

Recovery of Asphalt from Solution Using the Rotary Evaporator. Materials Finer than 75 µm (No. 200) Sieve in Mineral Aggregates by Washing

SUPERPAVE. SUperior PERforming Asphalt PAVEments. History of Hveem Mix Design

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SUPERPAVE HOT MIX ASPHALT PERCENT WITHIN LIMITS

SUPERPAVE. SUperior PERforming Asphalt PAVEments. History of Hveem Mix Design

Mix Design & Production Control Recertification. Quality Control / Quality Assurance

ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR ACCEPTANCE OF HOT MIXED ASPHALT

4-07 Asphalt Treated Permeable Base (ATPB)

Asphalt Binder. Sampling and Material Quality Issues

Material Test Framework for Warm Mix Asphalt Trials

NCAT Report MOISTURE RESISTANCE OF SULFUR-MODIFIED WARM MIX. Nam Tran Adam J. Taylor. August 2011

Draft Special Provision for. Asphalt Treated Permeable Base

Reclaimed Asphalt Pavement (RAP)

Standard Test Procedures Manual

2003 SPECIFICATIONS SECTION 301 DIVISION 300 BASES AND GRANULAR SURFACES

Aggregate Testing Recertification. Quality Control / Quality Assurance

Increasing the Percentage of Recycled Hot Mix Asphalt. Rebecca McDaniel, NCSC Aggregate for a More Sustainable Environment, TRB January 11, 2009

Item 20 ASPHALT PAVEMENT MATERIALS

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR SUPERPAVE HOT MIX ASPHALT PERCENT WITHIN LIMITS

2015 ACEC HMA Update. Kevin Kennedy HMA Operations Engineer Michigan Department of Transportation

Cindy LaFleur Callanan Industries & Tilcon NY, Oldcastle Materials Companies

asphalt (PWMA) processes in accordance with these Specifications. PWMA processes include organic 9

May 2004 Asphalt Pavements 400-i. Table of Contents 401 HOT-MIX ASPHALT PAVEMENT DESCRIPTION OF WORK

11 PLANT MIX BITUMINOUS BASE AND PAVEMENT

This special provision should be inserted in all HMA contracts, including those using the I-FIT test.

Pilot Asphalt Specification Review Technician Duties. November 20 th, 2015 Chris Abadie Materials Engineer Administrator District 61 Conference Room

SEAUPG 2009 CONFERENCE-HILTON HEAD ISLAND, SOUTH CAROLINA

ITEM 342 PERMEABLE FRICTION COURSE (PFC)

District 61 Pilot Asphalt Specification Review 502 Mixture Design Changes

Bituminous PWT (Percent Within Tolerance)

WYOMING DEPARTMENT OF TRANSPORTATION. SUPPLEMENTARY SPECIFICATION FOR STRUCTURAL CONCRETE WITH QUALITY CONTROL and QUALITY ACCEPTANCE

GENERAL DEFINITIONS 2

Plant Address or Physical Location

Platinum Edition MMCD Supplemental Update Page 1 of 7

SPECIAL SPECIFICATION 3402 Reflective Crack Relief Interlayer (RCRI)

2018 Asphalt Specification Update

Quality Control for Modified Asphalt Binders. NEAUPG Annual Meeting October 25, 2012 Presented By: Karissa Mooney NuStar Asphalt Refining, LLC

Calhoun County Road Department Schedule of Items (Itemized Bid Sheet)

Engineering Properties, Emissions and Performance of Warm Mix Asphalt Technologies and Best Practices

It has been revised to eliminate All Other (i.e. BAM) mixtures. This special provision should be inserted into all HMA contracts.

SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HMA MIXTURE (WITH SAMPLING BEHIND THE PAVER)

Chapter 3. Bituminous Patching Materials SECTION ACCEPTANCE OF PRE-MIX PATCH MATERIAL

SECTION 347 PORTLAND CEMENT CONCRETE CLASS 1 (NON-STRUCTURAL)

SPECIAL PROVISION TO SPECIAL SPECIFICATION Quality Control/Quality Assurance of Hot Mix Asphalt

2006 NCAT Pavement Test Track Reconstruction Plant Production of Experimental Mixes SECTION 412 TEST TRACK PAVEMENT TEST SECTIONS

Stone Matrix Asphalt Best Management Practices

SECTION BITUMINOUS CONCRETE PAVEMENT. 1. Aggregate base and subbase course; Section a. Heat Stable Anti-Stripping Additive

CATEGORY 500 PAVING HIGH FRICTION SURFACE TREATMENT

Dr. Randy West, P.E. Director

SPECIAL SPECIFICATION 3268 Dense-Graded Hot-Mix Asphalt

SCDOT QUALIFIED PRODUCTS POLICY 2

A. Provide all labor, materials, and equipment as necessary to complete all work as indicated on the Drawings and specified herein.

STUDY QUESTION ANSWERS

Quality Management System

SPECIAL SPECIFICATION 3032 Reflective Crack Relief Interlayer (RCRI)

SPECIAL SPECIFICATION 3017 Reflective Crack Relief Interlayer (RCRI)

Appendix 1 SCDOT Aggregate QC/QA Policy

Plant Certification Program. An Update on PennDOT Asphalt Specifications 2019

MEMORANDUM. Attached is a copy ofthe above Supplemental Technical Specification.

An Update of Superpave (HMA)

Quality Management System

Work shall also include preparation and protection of subgrade, subbase and leveling course specific to PHMA/PWMA.

Bituminous Percent Within Tolerance (PWT)

SPECIAL SPECIFICATION 3241 Superpave Hot Mix Asphalt Concrete Pavement (SPHMACP)

SPECIAL SPECIFICATION 3246 Fine Graded Surface Mixes (Volumetric Design Method)

Update on PennDOT Bulletin 27

TRENDS IN RAP AND RAS USE:

NCHRP Asphalt Research. April 2015

SECTION 329 PLANT MIXED SEAL COAT CONSTRUCTION

SUPPLEMENTAL SPECIFICATION HIGH PERFORMANCE CHIP SEAL

Low Emission Asphalt- Data and Lessons Learned. Northeast Asphalt User/Producer Group Annual Meeting October 9, 2008 Gregory A. Harder, P.E.

Make copies of all test results and control charts readily available to the Engineer at the project site.

Warm Mix Asphalt Corey L. Pelletier Anderson Columbia Co., Inc. Director Asphalt Technologies Inc.

TABLE OF CONTENTS DIVISION II MATERIALS

SPECIAL SPECIFICATION 3269 Permeable Friction Course (PFC)

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR FURNISHING AND PLACING MARSHALL HOT MIX ASPHALT MIXTURE (WITH SAMPLING BEHIND THE PAVER)

Hot Mix Testing Recertification. Quality Control / Quality Assurance

PRODUCERS PERSPECTIVE ON WMA PRODUCTION AND PLACEMENT

Transcription:

Company Name: PLANT NUMBER: YEAR: Plant Quality Control Plan Quality Control Plan Administrator Name Contact Information Reviewed By: Reviewed Date: Approved By: Approval Date: Quality Control Plans Template 1

Quality Control Plans for Plants Template Reference: MD Standard Specifications for Construction and Materials & SPI s, Sections GP, 504, 904, 915 1. Plant Description a. Plant Type (Drum/Batch) b. Plant Address 2. Plant Laboratory a. Qualified Personnel/Contact Information/Card#/Exp. Date (Scanned Copy) b. Current OMT or AMRL approval 3. Laboratory Inspection a. Performed Every Two Years i. Certification Posted in Laboratory 4. Plant Inspection a. Performed Yearly Verified by OMT i. Certification is Posted at Plant b. Drum plant by MSMT 453 c. Batch plant by AASHTO M-156 5. Truck Scales a. Calibration Frequency b. Testing Agency - Copies on File 6. Plant Weighing/Measuring Devices a. Calibration Frequency b. Testing Agency - Copies on File 7. Aggregate Stockpiles a. Construction Method i. Separation/Labeling ii. Segregation Control iii. Moisture Control if Applicable b. Testing (Method/Frequency) 8. RAP Stockpile a. Construction Methods of Non Contaminated Stockpile b. Sampling/Approval MSMT 412 Weekly Stockpile Testing 9. Plant Mix Temperatures a. Plant Monitor/Control b. Temperature checks Quality Control Plans Template 2

10. Binder a. Storage b. Hauling c. Sampling (include location) d. Source Change Notification/Start-up Testing e. List how corrective action will be taken 11. Asphalt Mix Design a. Responsibility b. Verification c. TSR i. Test Method MSMT 410 ii. List corrective action to be taken 12. Asphalt Mix Sampling a. Test results, entered into MD Ware for pay factor evaluation, are required to be derived from samples taken from behind the paver. Data derived from plant samples must be properly labeled with the letter P, and must not be included for pay factor evaluations b. Split Samples AASHTO T-328 i. Method (Mechanical/Quartering) c. Plant Check Not for Pay d. Sampling Frequency i. Low Tonnage (< 200 Tons) ii. > 200 Tons iii. As directed by the Project Engineer 13. Mix Gradation a. Test Method 14. Asphalt Content a. Test Method Ignition Oven/Extraction 15. Maximum Specific Gravity a. Test method 16. Volumetric Properties a. Test methods 17. Mix Diagnostic and Corrective Action Plan a. Items to Address: #13-16 18. Field Density Laboratory Core Testing a. Test Method MSMT 457 b. Storage Method Quality Control Plans Template 3

c. Retention Time Until Pay Factor is Received and/or Disputes Resolved (Cores must be held for resolution) Note: Once the Pay Factor is received, any disputes must be submitted within 10 business days. 19. Records and Paperwork MD Standard Specs. 504.03 a. Maintain and make available to the Engineer upon request complete records (including hand written worksheets) of sampling, testing, actions taken to correct problems, and quality control inspection results. Provide copies of the reports when requested. Note: Records & Paperwork Retention Time - Three Years (General Provisions-7.36) b. Control charts c. Next day Production Report 20. Truck Loading a. Visible loading signs b. Loading Method 21. Tack Coat MSMT 460 Note: If not applicable, must appear in Field QC Plan a. Type(s) to be used b. Source(s) c. How will tack be delivered to plant? d. Tack storage (circulating tank, insulated tank, tanker truck at plant) e. Statement on QC Plan: Certificate of Analysis will be supplied with every new load of tack coat to SHA project. 22. Tack Coat Demo Note: If not applicable, must appear in Field QC Plan a. Statement on QC Plan: Demonstration that proper application rate of tack coat can be achieved before truck is used on SHA projects. 23. Warm Mix Capabilities (if applicable) a. Plant Approved for SHA use of WMA? b. Mixes SHA approved? YES/NO c. Type: Foamed, Additive, etc. 24. Anti-Strip ASTM D4867 (if applicable) a. Type/Brand b. Dosage Rate Quality Control Plans Template 4

It is hereby certified that the information contained in this Quality Control Plan meets the requirements of Maryland Standard Specifications. Respectfully Submitted, Company Name: Signature: First & Last Name: Q.C. Plan Administrator Quality Control Plans Template 5