WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, Binding Open Season

Similar documents
Open Season Notice of Available and Expansion Firm Capacity on El Paso Natural Gas Company, L.L.C. (EPNG)

Cheyenne Connector Binding Open Season

LOCKRIDGE TO WAHA PROJECT NOTICE OF BINDING OPEN SEASON

El Paso Natural Gas Company Binding Open Season. Delaware Basin to Waha

Notice Text. Notice 17238/Previous Notice 17236

TransCanada PipeLines Limited and ANR Pipeline Company Joliet XPress Project Binding Open Season May 16, 2018 through June 15, 2018

BINDING OPEN SEASON Rockies Express Pipeline Cheyenne Hub Enhancement

Issued February 21, Haynesville Global Access Pipeline LLC. Notice of Non-Binding Open Season

Horizon Pipeline Company, L.L.C. First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS

FERC GAS TARIFF. First Revised Volume No. 1 NORTHERN BORDER PIPELINE COMPANY. Filed with. Federal Energy Regulatory Commission

FERC GAS TARIFF. Second Revised Volume No. 1 CROSSROADS PIPELINE COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

Texas Eastern Appalachiaa to Market Expansion Project (TEAM

Foothills Pipe Lines Ltd.

FERC GAS TARIFF. First Revised Volume No. 1 MILLENNIUM PIPELINE COMPANY, L.L.C. FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

Foothills Pipe Lines Ltd.

Issued March 21, Permian Global Access Pipeline LLC. Notice of Non-Binding Open Season

OPEN SEASON

Vector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE

FERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH

Transportation. Tariff. Vector Pipeline Limited Partnership

ALLIANCE PIPELINE LIMITED PARTNERSHIP by its General Partner, ALLIANCE PIPELINE LTD. ( Alliance Canada or Alliance )

TransCanada s GTN System Notice of Available Multi-Month Parking Service. November 17, 2009

Table of Contents. Trailblazer Pipeline Company LLC 6th Revised Volume No. 1. Rate Schedules. Rate Schedule FTS. Rate Schedule ITS.

NOTICE OF NON-BINDING OPEN SEASON AG LINE EXPANSION PROJECT

FERC NGA GAS TARIFF. THIRD REVISED VOLUME NO. 1 (Superseding Second Revised Volume No. 1) SEA ROBIN PIPELINE COMPANY, LLC.

CORNERSTONE PIPELINE & UTICA BUILD-OUT PROJECTS

Kinder Morgan Louisiana Pipeline LLC First Revised Sheet No First Revised Volume No. 1 Original Sheet No. 100 GENERAL TERMS AND CONDITIONS

Permian to Katy Pipeline. Non-Binding Open Season

Rate Schedule FT Firm Transportation Service

RATE SCHEDULE IT-S INTERRUPTIBLE - ACCESS TO STORAGE

Dominion Energy Transmission, Inc. FERC Gas Tariff Tariff Record No. 20. Fifth Revised Volume No. 1 Version TARIFF RATE SCHEDULES

Table of Contents/Section Index With Links

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1

OPERATING STATEMENT NORTHERN ILLINOIS GAS COMPANY D/B/A NICOR GAS COMPANY ( NICOR GAS COMPANY ) FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

6th Revised Volume No. 1 Section Version: TABLE OF CONTENTS

FERC GAS TARIFF VOLUME NO. 1 KO TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

OPEN SEASON. I. The BKEP Condensate Pipeline Project

Open Season Guidelines

INFORMATION MEMORANDUM AND BINDING OPEN SEASON NOTICE

MISO MODULE B FERC Electric Tariff TRANSMISSION SERVICE MODULES Effective On: November 19, 2013

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1 CENTRAL KENTUCKY TRANSMISSION COMPANY FILED WITH THE FEDERAL ENERGY REGULATORY COMMISSION

Table of Contents. Great Lakes Gas Transmission Limited Partnership. Third Revised Volume No. 1. Third Revised Volume No. 1 1 TABLE OF CONTENTS

EXTENDED OPEN SEASON FOR INTERIM CAPACITY Ruby Pipeline Project

Magnum Gas Storage, LLC

Sheet No. 5 - Currently Effective Rates - Rate Schedules FTS and ITS. Sheet No. 6 - Statement of Negotiated Rate Transactions

Northeast Energy Direct

Statement of Nature, Reasons, and Basis for Proposed Changes

STATE OF MISSOURI, PUBLIC SERVICE COMMISSION P.S.C. MO. No. 2 1 ST Revised Sheet No. 33 Canceling P.S.C. MO. No. 2 Original Sheet No.

TRANSPORTATION SERVICE RATE SCHEDULE LVFRT

February 10, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Open Season Market-Based Storage in the Heart of the PA Marcellus Shale Region

1.0.0 Rate Schedule GPS Gas Parking Service GT&C Section 7. Operational Balancing Agreements

February 28, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

RATE SCHEDULE 291-T ALL CUSTOMERS TRANSPORT ONLY (5,000 Dth but less than 30,000 Dth annually)

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

DECLARATION OF AUTHORITY. This DECLARATION OF AUTHORITY ( Declaration ) is a declaration and certification made on by and between the following:

April 25, 2016 to May 23, 2016

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: May 1, 2018 Service Agreement No.

Agency Agreement. Both will be signed by EEC and one will be returned to you.

March 31, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Northern Illinois Gas Company d/b/a Nicor Gas Company

Carlton Resolution Frequently Asked Questions

MISO Module E Capacity Transaction Confirmation Version 1.0 October 20, 2008

Colorado Interstate Gas Company, L.L.C. Non-binding Open Season Soliciting Interest in DJ Expansion Capacity of up to 1.2 Bcf/day

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.

Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

Columbia Gas Transmission, LLC Section Original Volume No. 1.1 Version Non-Conforming Service Agreement No

GENERAL SERVICE GAS SCHEDULE C

November 20, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: December 1, 2016 Service Agreement No.

Table of Contents Original Sheet No. 0 6 Original Sheet No. 1 7 First Revised Sheet No. 2 8 Original Sheet No. 3 9 First Revised Sheet No.

ENERGY IMBALANCE MARKET BUSINESS PRACTICE ( EIM BP ) TABLE OF CONTENTS 1. Introduction 2. Communication with the PSEI EIM Entity 3.

August 20 th, 2018 Notice of Non-Binding Open Season. CJ Express Pipeline. Midcoast Energy, LLC An affiliate of ArcLight Capital, LLC

Northern Illinois Gas Company d/b/a Nicor Gas Company I1l.C.C. No Gas 7th Revised Sheet No (Canceling 5th Revised Sheet No.75.8, Effective

Columbia Gas Transmission, LLC Section Non-Conforming Service Agreement No Virginia Natural Gas, Inc.

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

June 25, Ms. Kimberly D. Bose, Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C

NORTHWEST NATURAL GAS COMPANY P.U.C. Or. 25 Original Sheet 32-1

Trailblazer Pipeline Company LLC Docket No. RP Exhibit No. TPC-0080

SOUTHERN LNG SERVICE REQUEST FORM

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC.

Rider 16 Supplier Aggregation Service. (Continued From Sheet No. 75.4)

New carrier setup checklist

Columbia Gas Transmission, LLC FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: October 25, 2018 Service Agreement No.

Request for Proposals Gravel Crushing 2017

144 FERC 61,130 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

2017 Renewable Energy Sale - Request for Offers Solicitation Protocol

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 20, DUE DATE: January 11, 2019.

Columbia Gulf Transmission Company FERC NGA Gas Tariff Baseline Tariffs Proposed Effective Date: November 1, 2012 Service Agreement No.

CONTRACT FOR STORAGE OF FROZEN SEMEN

Columbia Gas Transmission, LLC. Fourth Revised Volume No. 1 Version TABLE OF CONTENTS TO GENERAL TERMS AND CONDITIONS

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017

Network Integration Transmission Service Agreement (NITSA) and Network Operating Agreement (NOA)

October 2010 Open Season Defining the Future of Natural Gas Storage

SHELL PIPELINE COMPANY LP

FIRM TRANSPORTATION SERVICE AGREEMENT Rate Schedule KRF-1 CONTRACT NO. 1662

PUBLIC WORKS REQUEST FOR QUOTATIONS TOPSOIL SUPPLY

RATE SCHEDULE FT-R FIRM TRANSPORTATION - RECEIPT

Iroquois. Capacity Release. Training Guide

Transcription:

WBI Energy Wind Ridge Pipeline, LLC Wind Ridge Pipeline Project Sale of Long Term Firm Capacity Commencing October 10, 2014 Binding Open Season WBI Energy Wind Ridge Pipeline, LLC announces a Binding Open Season for the sale of long term, firm natural gas transportation capacity on Wind Ridge Pipeline. Project Overview WBI Energy Wind Ridge Pipeline, LLC (WBI Energy Wind Ridge) is soliciting additional commitments for firm natural gas transportation capacity on the Wind Ridge Pipeline. The Wind Ridge Pipeline will create new, firm natural gas transportation capacity from a new interconnect with Northern Border Pipeline Company in McIntosh County, North Dakota to a new fertilizer production facility being constructed near Spiritwood, North Dakota. Wind Ridge Pipeline will also connect with WBI Energy Transmission, Inc. s natural gas transmission system near Spiritwood, North Dakota. A map showing the proposed route for Wind Ridge Pipeline is attached. The initial design of Wind Ridge Pipeline includes approximately 96 miles of new, high pressure steel pipeline and various measurement and interconnection facilities. The pipeline project, as designed to meet the needs of the new fertilizer production facility, consists of a 16-inch diameter pipeline. Based on this initial design, Wind Ridge Pipeline will have a capacity of approximately 90,000 equivalent dekatherms per day (dkt/day). The Wind Ridge Pipeline project can be redesigned to create approximately 50,000 dkt/day of additional firm transportation capacity by increasing the diameter of the pipeline. WBI Energy Wind Ridge is soliciting interest in this additional 50,000 dkt/day of firm capacity through this Open Season. Although WBI Energy Wind Ridge does not currently have a FERC Gas Tariff, WBI Energy Wind Ridge anticipates such FERC Gas Tariff will be substantially similar to WBI Energy Transmission, Inc. s FERC Gas Tariff, Third Revised Volume No. 1. The targeted in-service date of Wind Ridge Pipeline is January 2017. Length of Open Season The Open Season will commence on October 10, 2014 and conclude at 4:00 PM Central Time on October 31, 2014. The Open Season is available to any party. All related Precedent Agreements must be executed no later than November 21, 2014, unless WBI Energy Wind Ridge agrees, in its sole discretion, to extend such deadline. Page 1

Capacity WBI Energy Wind Ridge is offering for sale approximately 50,000 dkt/day of additional new firm transportation capacity for delivery of natural gas to new delivery locations along the Wind Ridge Pipeline route, as well as a new interconnect with WBI Energy Transmission, Inc. s natural gas transmission system near Spiritwood, North Dakota. Constraints may limit WBI Energy Wind Ridge s ability to accept certain delivery locations requested. Pursuant to a separate Open Season, WBI Energy Transmission, Inc. is proposing construction of certain facilities to expand pipeline capacity for receipt of natural gas from a proposed interconnection with Wind Ridge Pipeline to delivery locations in its Sheyenne Sub-system in eastern North Dakota. Bids Shippers have the option of requesting to pay a project recourse rate or a mutually agreeable negotiated rate for the firm transportation capacity associated with this Open Season. The project recourse rate is estimated to be $0.59 per dekatherm on a 100% load factor basis based on the current project cost and volume estimates. Such project recourse rate will be revised based upon final costs and volumes. Both the project recourse rate and the negotiated rate options will be subject to all applicable surcharges and fuel, lost and unaccounted for gas and electric power charges as such may be in effect from time to time. During this Open Season, both the contract term and rates are negotiable. It is projected that a minimum term of ten (10) years from commencement of service may be necessary to support the capital expenditures required to increase the capacity on the Wind Ridge Pipeline. Awarding Capacity In order to respond to this Open Season, shippers must complete an Open Season Bid Sheet that includes the delivery location(s), quantity requested, length of term and desired rate. Capacity on Wind Ridge Pipeline will be awarded to potential shippers based upon the highest net present value per unit of demand to the lowest net present value per unit of demand. WBI Energy Wind Ridge reserves the right to aggregate transportation requests from potential shippers to generate the highest net present value per unit of demand to WBI Energy Wind Ridge. A shipper requesting a negotiated rate which exceeds the project recourse rate shall be treated as if the negotiated rate is equal to the project recourse rate for such service. Any Page 2

shipper requesting the project recourse rate has the same right to capacity as a shipper willing to pay a negotiated rate higher than such project recourse rate. Where a negotiated rate is less than the project recourse rate, the negotiated rate shall be evaluated based on such lower rate and shall be afforded a correspondingly lower priority than higher bids, including bids submitted at the project recourse rate. Within the subset of negotiated rate bids, where one negotiated rate is less than another negotiated rate, the lower negotiated rate shall be evaluated based on such lower rate and shall be afforded a correspondingly lower priority than the higher negotiated rate. In no event shall WBI Energy Wind Ridge be required to accept a bid which provides a rate below the project recourse rate. In the event a request specifies a term greater than twenty (20) years in length, the term portion of the net present value calculation will be limited to twenty (20) years. In the case of insufficient capacity to satisfy identical successful requests, WBI Energy Wind Ridge shall allocate available capacity pro rata based upon the total capacity requested by each successful potential shipper to the total capacity requested by all successful potential shippers. Once capacity is awarded, WBI Energy Wind Ridge will require successful shippers to execute a Precedent Agreement. Successful shippers will also be required to provide evidence of creditworthiness satisfactory to WBI Energy Wind Ridge. When executed by both parties, a Precedent Agreement will set forth the terms and conditions under which the shipper and WBI Energy Wind Ridge will execute a firm transportation service agreement. All transported volumes for the entire term of the firm transportation service agreements will be subject to all applicable surcharges and any applicable fuel, lost and unaccounted for gas and electric power charges as such may be in effect from time to time. The Precedent Agreements, when fully executed by both the shipper and WBI Energy Wind Ridge, will constitute a binding agreement. However, WBI Energy Wind Ridge will in no way be obligated to execute the Precedent Agreements. If WBI Energy Wind Ridge notifies a shipper in writing of its election not to execute a Precedent Agreement, then the shipper will be relieved of its obligation. In the event the capacity is not fully subscribed through this Open Season process, the capacity will be sold on a first-come, first-served basis. All transportation services proposed as part of this Open Season are expressly subject to WBI Energy Wind Ridge s receipt of all regulatory approvals required to effectuate the services hereunder in form and substance satisfactory to WBI Energy Wind Ridge. WBI Energy Wind Ridge reserves the right to reject any bid, revise the scope of the proposed project in any way, and, consistent with applicable regulations, to modify, extend or terminate this Open Season process at any time. Interested parties must complete the attached Open Season Bid Sheet and e-mail it to mark.anderson@wbienergy.com, fax it to WBI Energy Wind Ridge at (701) 530-1698 or Page 3

mail it (to ensure receipt by WBI Energy Wind Ridge prior to the end of the Open Season) to WBI Energy Wind Ridge Pipeline, LLC, Market Services Department, P.O. Box 5601, Bismarck, ND 58506-5601. We urge you to respond promptly to this Open Season. If you have any questions please contact: Rob Johnson Telephone: (701) 530-1622 E-mail: rob.johnson@wbienergy.com or Mark Anderson Telephone: (701) 530-1623 E-mail: mark.anderson@wbienergy.com Page 4

Wind Ridge Pipeline Project Open Season Bid Sheet Shipper Name: Contact Person: Mailing Address: Phone: Fax: E-Mail: Primary Receipt and Delivery Location(s): Receipt Location Delivery Location MDDQ (equivalent dkt/day) Northern Border Pipeline Northern Border Pipeline Total Maximum Daily Delivery Quantity (MDDQ) Requested: (equivalent dkt/day) Length of Term: (years following the in-service date of the facilities) Rates (choose one): Project Recourse Rate Negotiated Rate (as follows) MDDQ Reservation Charge (rate per equivalent dkt per month): Commodity Charge (rate per dkt): Note: Both the project recourse rate and the negotiated rate options will be subject to all applicable surcharges and fuel, lost and unaccounted for gas and electric power charges as such may be in effect from time to time. Signed By: Name: Title: Date: By submitting this Wind Ridge Pipeline Project Open Season Bid Sheet, shipper hereby agrees to enter into good faith negotiations with the objective of entering into a binding Precedent Agreement with WBI Energy Wind Ridge in accordance with the terms set forth herein. Page 5

Wind Ridge Pipeline Project Overview Map Page 6