Projects and Investment Need - Asian Highway. 7~9 October, 2013 Dinker Sharma Nepal

Similar documents
Food and Nutrition Security in Nepal: Status, Trends and Challenges

NEPAL FLOOD-2017 SITUATION REPORT

3 Classification of post items to the letters according to their size (Conv., art. 14; Regs., art. RL 121.2) -

Food Security Bulletin

Agriculture and Nutrition Global Learning and Evidence Exchange (AgN-GLEE)

NEWSLETTER Vol. 2, Issue 1, OCT - DEC 2016

NEPAL FLOOD-2017 SITUATION REPORT

Boigas: : Rural House Hold Energy Supply A Nepal Case Study

Crop Situation Update

Situation summary. Nepal Food Security Bulletin. Food Security Overview. Issue 34, February Figure 1. Percentage of population food insecure*

JICA s Assistance for Disaster Risk Reduction and Reconstruction

Crop Situation Update Joint Assessment Mission of 2013 Summer Crops and Outlook of 2013/14 Winter Crops

Geographical heterogeneity and inequality of access to improved drinking water supply and sanitation in Nepal

Using Lessons Learned from Earlier Nutrition Efforts in Nepal to Design a Multi-Platform at National Scale Integrated Nutrition Project

REDD-Forestry and Climate Change Cell. Terms of Reference for

NGO Federation of Nepal Kathmandu, Nepal

A multi-sectoral approach to nutrition: Assessing USAID s progress

LSMS data quality. in Maoist influenced areas of Nepal

List of Banks and Financial Institutions As of Mid April, 2018 (Licensed by NRB) (Rs. in Crore)

List of Banks and Financial Institutions As of Mid October, 2017 (Licensed by NRB) (Rs. in Crore)

List of Banks and Financial Institutions As of Mid April, 2018 (Licensed by NRB) (Rs. in Crore)

Can hydropower drive green economy for Nepal: A review

A study of. Technical Education and Vocational Training Programs in Nepal

Child Nutrition and Local Food Prices in Nepal. Ganesh Thapa Consultant International Food Policy Research Institute Kathmandu Nepal

Bag Digester Test of a light Biogas Plant for Nepal

SESSION TWO RELEVANCE OF BIOGAS TECHNOLOGY TO NEPAL

Technical Report Series GO Master Sampling Frames

Nepal: Reproductive Health Commodity Pricing Survey

Grant Assistance Report

Food Insecurity and Vulnerability in Nepal: Profiles of Seven Vulnerable Groups

Quality analysis of marketed seeds of some crops in Nepal

ERMC COMPANY PROFILE. (Environment & Resource Management Consultant) (An ISO 9001:2008 Certified Company)

Nepal. National Action Plan. Zero Hunger Challenge ( ) Ministry of Agricultural Development Singhadurbar, Kathmandu, Nepal

Small Hydro Development Opportunities and Present Status in Nepal

Food Insecurity and Vulnerability in Nepal: Profiles of Seven Vulnerable Groups

ICRISAT International Crops Research Institute for the Semi-Arid Tropics Patancheru , Andhra Pradesh, India

Terai flood update and prioritization

Road Transport Facilitation along the AH Corridors in South Asia Country Presentation: Nepal

Poverty Alleviation Fund (PAF) Program Implementation Status (as of 14 March 2007) Demand-Driven Community Proposals and Direct Funding

Crop Situation Update

Poverty Alleviation Fund (PAF) Program Implementation Status (as of 14 June 2007) Demand-Driven Community Proposals and Direct Funding

Annual Progress Report

An Impact Assessment of Participatory Crop Improvement in the Low-altitude Regions of Nepal

Food Security Bulletin

Identification of a POPs Hotspot Examination of DDT and Lindane (BHC) Residues in Potato and Farm Soil

Mapping Nutrition Innovation Lab Research: How does it all fit together? Patrick Webb

Poverty Alleviation Fund (PAF) Program Implementation Status (as of 16 July 2011 and FY 2010/11 )

NEPAL: Update no. 6: Koirala s visit ends up as an "agenda free trip":

Status of Dry Ports Development in Nepal

Crop and Food Security Assessment

NEPAL Date released: 28 August 2017

Status of Dry Ports Development in NEPAL

LESSONS LEARNED FROM PERFORMANCE OF BUILDINGS DURING THE SEPTEMBER 18, 2011 EARTHQUAKE IN NEPAL

Contract farming for commercializing Nepalese agriculture

Sushila Chatterjee Nepali s (PhD) Profile

Food Security Bulletin - 18

Poverty Alleviation Fund (PAF) Program Implementation Status (as of 15 July FY 2011/12 )

3 Maoists killed in security action 4 Maoists killed in security operation Veterinary doctor among 3 killed in Bardiya

Emergency appeal Nepal: Floods and Landslides

NEPAL Flood August 2017

Trend analysis of oilseed crop cultivation and constraints of commercialization in Nepal Reecha Acharya BSc.Ag, AFU

ROLE OF NATURAL PRODUCTS IN RESOURCE MANAGEMENT, POVERTY ALLEVIATION, AND GOOD GOVERNANCE

BENGAL FLORICAN CONSERVATION ACTION PLAN

NEPAL CLOSURE REPORT 000

FORWARD Nepal. Annual Report 2012/13 (2069/70)

CHAPTER ONE CHAPTER TWO CHAPTER THREE Annex 1 Annex 2 Annex 3 Annex 4

FNCCI BALANCED ECONOMIC GROWTH ONE. District Product. Local Employment Income Generation & Food Security

Heifer International Nepal 1. Heifer International NEpal Annual report

WATER SERVICE PROVIDERS

ACKNOWLEDGEMENTS. The authors

PROCUREMENT PLAN. Advance Contracting: Yes

LI-BIRD, Pokhara based NGO. Established: Oct Governed by Executive Board headed by chairperson Executed by Management Team headed by ED

Civil Society: Mutual Accountability Project. Strengthening the Enabling Environment for Civil Society and Media Organizations in Nepal

Status of Development of Dry Ports in Nepal

National Pollution Control Strategy and Action Plan (NPCSAP), Nepal

Presentation from Nepal UNESCAP_Kazakhstan, Dec 2017 Aman Chitrakar Devi Prasad Sharma

Crop Situation Update

Annual Report 2014/ /72. FORWARD Nepal

REQUEST FOR PROPOSAL Environmental Compliance and Management Technical Support

NEPAL ELECTRICITY AUTHORITY POWER TRADE DEPARTMENT IPPs' Hydro Power Projects (Operation)

Oct. 1, 2013 For Immediate Release CONTACT: In Atlanta, Deborah Hakes ; In Kathmandu, David Hamilton

WASH in health care facilities Post- Earthquake and Longer- term Sustainability. Nepal

Assessment of Economic Viability of Wind Energy in Nepal: A Case Study of Ten Sites

Københavns Universitet

Value Chain Analysis-Chyuri Herbal Soap

Editorial. Mr. Omkar Raj Pandey Coordinator Publication and documentation Section. iii

Capacity Assessment of Water Supply System Managed by NWSC, WSMB and KUKL

SUSTAINABILITY AND EXIT STRATEGY OF CDP

The World Bank Nepal Agriculture and Food Security Project (P128905)

Good Afternoon & Namaste!

Alliance Nepal Alliance for Social Mobilization (P.) Ltd. Annual Report 2012

The Political Economy of Cardamom Farming in Eastern Nepal: Crop Disease, Coping Strategies, and Institutional Innovation

Final List if Life Members (2073/11/18)

NAMASKAR and Good Morning from the country of Mt. Everest and Buddha

Variety Development Cost versus Variety Adoption in Major Cereals in Nepal

2. Andhikhola Hydro Electric & Rural Electrification Project (5.1MW):

ANDHIKHOLA HYDRO ELECTRIC & RURAL ELECTRIFICATION PROJECT (5.LMW):

Urban Housing Reconstruction Status Paper

Mainstreaming Biodiversity and Ecosystem Services into Community Forestry in Nepal. Newsletter September 2017

MAINSTREAMING SDGs IN NATIONAL POLICIES: THE CASE OF TRANSPORT SECTOR IN NEPAL 11

Transcription:

Projects and Investment Need - Asian Highway 7~9 October, 2013 Dinker Sharma Nepal

Development Activities Government Investments

Total Length = 1765 km AH 2 Total Length - 1027

North South Road Corridor

Commercial Corridors Corridors yet to be taken up: Suryabinayak-Dhulikhel Birgunj-Pathalaiya gs;f Nepalgunj Kohalpur 22 km

;8s ljefu Bridge Improvement and Maintenance Project Bridges under the Strategic Road Networks = 102 nos under construction Bridges under the Local Road Networks = 273 nos under construction New Bridges under survey and design = 400 nos

Kailali Doti Bajhang Bajura Darchula Achham Baitadi Kanchanpur Dadeldhura Doti Division Baitadi Division Mahendra Nagar Division Dolpa Humla Mugu Dang Rukum Jumla Rolpa Surkhet Banke Salyan Jajarkot Bardiya Kalikot Dailekh Pyuthan Surkhet Division Nepalgunj Division Dang Division Devisthan Division Gorkha Mustang Kaski Myagdi Manang Palpa Baglung Lamjung Gulmi Tanahun Nawalparasi Kapilbastu Syangja Rupandehi Parbat Arghakhanchi Palpa Division Shivpur Division Butwal Division Damouli Division Pokhara Division Sindhuli Bara Chitwan Dolakha Parsa Kavr e Dhading Makwanpur Rasuwa Sarlahi Sindhupalchok Dhanusa Nuwakot Ramechhap Raut ahat Mahott ari Lalitpur Nuwakot Division Kathmandu Division Lalitpur Division Bhaktapur Division Charikot Division Hetauda Division Janakpur Division Chitwan Division Ilam Taplejung Solukhumbu Jhapa Udaypur Morang Sankhuwasabha Bhojpur Saptari Siraha Khotang Sunsari Pancht har Dhankuta Terhathum Jhapa Division Ilam Division Morang Division Dhankuta Division Lahan Division Maintenance Activities

Investment Needs Asian Highway 2

Brahmadev Mandi Mahendra Nagar Widening of Bridges along Pathlaiya Dhalkebar Section on AH 2 Gadda Chawki Kakarbhitta AH 2

Project Title: Widening of Bridges along Dhalkebar Pathalaiya Section of AH 2. Short Description: Dhalkebar Pathlaiya Section of AH 2 lies on the mid region of the County. This section is about 110 km in length. A number of bridges (67 numbers) along this section is of single lane and has almost completed its life cycle (more than 50 years old) and is in need for replacement. The length of bridges range from 11.3m to 363.50m (total length = 4116). These bridges need to be updated to AH 2 standard. Proposed Financing Modality: This Project require budgetary resources and the Government is interested to seek support from the Donor for implementation Project Feasibility Indicators: Feasibility need to be conducted. Project Technical Specification: Bridges of 2 lane standard necessary. Comments: The proposed Project could be suitable on a Public Private Partnership basis by raising toll along the section. However, detailed feasibility need to be carried out. The cost of bridges of total length 4116m could be approximately US$ 500 million.

Asian Highway 42

Brahmadev Mandi AH 42 Gadda Chawki Kakarbhitta Kathmandu Terai Fast Track Road

Project Title: Pathlaiya Nijgadh Kathmandu (Fast Track Project) Short Description: The Government proposed a first expressway to a four lane standard of 76 km along Nijgadh-Kathmandu Section on a PPP modality. The Concessionaire responsible for getting the Contract also was to build an additional two lane road about 18 km from Pathlaiya to Nijgadh along the AH 2. This route is also likely to serve as a transit route between the two neighboring countries China and India. Proposed Financing Modality: Estimated cost - Nijgadh to Kathmandu: US$ 818.66 million and Pathlaiya to Nijgadh: US$ 24.86 million Project Feasibility Indicators: Economic and Financial Analyses: Based on the preliminary costs the Economic Rate of Return (EIRR) of the four lane option is 30.92 percent. The financing plan for the project is not yet decided but, assuming that the project would be fully funded by an international loan (approximating a BOT operation), then the Financial Rate of Return (FIRR), using the suggested tolls is 14.6 percent pre-tax, about 13.6 percent after normal business taxes, and 12.9 percent if income tax is levied. Expected Timeframe for Implementation: Concession period of 30 years including construction period of 5 years proposed. Type of Project Proposal: PPP basis on Built - Operate Transfer (BOT) modality. Project Technical Specification: Four lane road of length 76 km from Nijgadh to Kathmandu. There are seven major bridges with overall lengths over 250m, main span lengths of up to 136 m, and heights ranging from 50 to 100m. Tunnel of length 1.35 km. To meet Asian Highway Standard - Primary Classification Additional two lane of standard same as AH 2 along Pathlaiya Nijgadh section which is along the AH2 highway. 9. Contracting Agency: Request for Proposal has been solicited. Latest information as of 20 September, 2013 No RFP has been received. Comments: This section of road if implemented will act an as alternate to AH 42 and shorten the road length from 240 km to 120 km. It is likely to act as a backbone for development activities as it will drastically shorten the distance from Birganj (India Border) to Kodari (China Border). RFP had been solicited two times but there was no response from any Companies, although during short listing a number of Companies showed interest and were short listed. The Government is now looking for support from the Donor for implementation of this project.

Brahmadev Mandi Improvement of Thankot Naubise Section 2 lane AH 42 Gadda Chawki Kakarbhitta Kathmandu Terai Fast Track Road

Project Title: Alternate to Thankot Naubise Section Sitapaila Dharke Road (AH 42) Short Description: The Section between Thankot to Naubise is very congested due to heavy traffic flowing on both sides. A need has been felt to have an alternate connecting AH 42 from Sitapaila and meeting at Dharke on AH 42. One way traffic in each direction is likely to ease traffic congestion and reduce long hours of waiting for traffic clearance thus reducing costs in vehicle operation. Proposed Financing Modality: Feasibility Study is in progress from support from Kuwaiti fund Grant TA No: 303. A Grant allocation of 2 million Kuwait Dinar (KD) that is approximately US$ 875,000, has been allocated towards this study. Project Feasibility Indicators: Previous Study by JICA in 2002 indicated that the project is feasible. Following are indicators: EIRR: 18.1, NPV: 19.1 million US$ at discount rate of 12%, B/C ratio: 1.5 Project Technical Specification: JICA study proposed 2 lanes (7 m width) and a tunnel length of 0.7 km. A bridge of 50 m is also proposed at Dharke. Total Lenth of road 21.4 km. The present study is to propose two lane standards as per existing AH 42. Comments: This Project is very important from the perspective that it will ease the traffic congestion existing at the moment along the Naubise Thankot section of AH 42. Long hours of waiting will be avoided resulting more efficiency and savings in economy. This could be a possible PPP project.

Thank You for Your Attention