PRELIMINARY DRAFT ENVIRONMENTAL COMPLIANCE MONITORING PLAN BLUE LAKE HYDROELECTRIC PROJECT EXPANSION. FERC No. P-2230.

Similar documents
DRAFT FISHERIES MONITORING PLAN. BLUE LAKE HYDROELECTRIC PROJECT EXPANSION FERC No SITKA, ALASKA. Prepared By: City and Borough of Sitka

FINAL WILDLIFE and VEGETATION RESOURCES STUDY PLAN. Blue Lake Hydroelectric Project FERC No Expansion. Prepared by:

DRAFT HAZARDOUS SUBSTANCES CONTROL PLAN BLUE LAKE HYDROELECTRIC PROJECT EXPANSION. FERC No. P Prepared By:

Decision Notice and Finding of No Significant. Blue Lake Hydroelectric Project Expansion

Soils Study. Swan Lake Hydroelectric Project (FERC Project No. 2911) June Long View Associates, Inc. Ridgefield, Washington

EXECUTIVE SUMMARY. Consultative Committee Report Jordan River Water Use Plan

Subject: October and November Fish Kill Incidents, Article 406

If you have any questions on the OCMP, please do not hesitate to contact me at (425) or Keith Binkley at (425)

DEAD RIVER DEAD RIVER HYDROELECTRIC PROJECT (P-10855)

Hydropower Project License Summary KERN RIVER, CA KERN CANYON HYDROELECTRIC PROJECT (P-178) This summary was produced by the

REVISED FINAL WATER QUALITY MONITORING PLAN. In response to 4e Condition 19 and Articles 409 and 410. FERC Order Issuing Amendment

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

Chapter 3 Other Stakeholders Duties

WEST ROSEBUD CREEK, MONTANA

Final Tailrace Water Temperature Monitoring and Enhancement Plan for

September 5, 2005 Operating Procedures for The Relicensing of the Saluda Hydroelectric Project FERC Projects 516

2017 Archaeology Audit Program Procedure Manual. April 2017

Kilarc-Cow Creek Hydroelectric Project Decommissioning FERC Project No Draft License Surrender Application. September 9-10, 2008

CHINA EASTERN AIRLINES CORPORATION LIMITED

Environmental Scientist Series Specification (Established July 22, 1981)

Blue Lake Hydroelectric Project (FERC No. 2230) Expansion Environmental Analysis

FINAL TIMBER REMOVAL and MANAGEMENT PLAN BLUE LAKE HYDROELECTRIC PROJECT (FERC NO. 2230) EXPANSION. Prepared By: Dean Orbison


ADMINISTRATIVE DIRECTIVE #CS-04

Avista Dam Relicensing Factsheet Commenting on the Draft License Application

ONTONAGON RIVER BOND FALLS HYDROELECTRIC PROJECT (P-1864)

AEA - Kodiak Electric Association Terror Lake Hydroelectric Facility Expansion

hydroelectric projects.

134 FERC 61,195 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

Hydropower Project Summary SULTAN RIVER, WA HENRY M JACKSON HYDROELECTRIC PROJECT (P-2157) This summary was produced by the

Public Notice of Application for Permit

GENERAL SPECIFICATION FOR ENVIRONMENTAL PROTECTION FOR CONSTRUCTION IN AND AROUND WATERBODIES AND ON WATERBODY BANKS

Issues in Klamath River Dam Relicensing

Under Section 113 of the Environmental Protection and Enhancement Act

CLEAN WATER ACT 401 WATER QUALITY CERTIFICATION APPLICATION FORM

General Engagement Plan Briefing Compliance Audits & Spot Checks

Hydropower Project License Summary YADKIN AND PEE DEE RIVERS, NORTH CAROLINA YADKIN-PEE DEE HYDROELECTRIC PROJECT (P-2206)

STATEMENTS OF QUALIFICATIONS ARE DUE NO LATER THAN 5:00 P.M. FRIDAY, JUNE 23, 2017

Dear Ms. Bose, Thank you for the opportunity to comment on the application by Juneau Hydropower Inc. for a

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

BAKER RIVER PROJECT DRAFT WATER QUALITY MONITORING PLAN

CONNECTING. Big Chino Valley Pumped Storage Project. Energy Infrastructure

DOMINION VIRGINIA POWER / NORTH CAROLINA POWER WITHIN DAY PEAKING PLAN LICENSE ARTICLE 414 Roanoke Rapids and Gaston FERC Project Number 2009

City and Borough of Sitka

9.0 Environmental Protection Program

Subject: Technical Memorandum Number 2 Noxious Weed Surveys

MONONGAHELA RIVER, WV

Midpeninsula Regional Open Space District

Vegetation Cover Type Mapping Study Plan for Energy Northwest's Packwood Lake Hydroelectric Project FERC No Lewis County, Washington

House Bill 4086 Ordered by the House February 21 Including House Amendments dated February 21

Hydropower Project License Summary CHIPPEWA RIVER, WI JIM FALLS HYDROELECTRIC PROJECT (P ) This summary was produced by the

Takatz Lake Project - Alaska

COPY. Land Use Plan to be amended. Port Water proposed.

9 ENVIRONMENTAL MANAGEMENT PLAN 9.1 OVERVIEW AND SCOPE Introduction

Three copies (one original and two copies) of your completed NOI should be submitted to:

2.1.1 Traffic Noise Analysis

Model Riparian Buffer Ordinance.

ADMINISTRATIVE INTERNAL AUDIT Board of Trustees Approval: 03/10/2004 CHAPTER 1 Date of Last Cabinet Review: 04/07/2017 POLICY 3.

IRVINE UNIFIED SCHOOL DISTRICT RESOLUTION NO

ATTACHMENT D SCOPE OF SERVICES

Step 1. Determine if a Small Utility GESC Permit is Applicable and if a Project Specific GESC Plan is Required.

Summary of Relief Sought by Transpower New Zealand Limited

CHAPTER 8410 BOARD OF WATER AND SOIL RESOURCES METROPOLITAN WATER MANAGEMENT

Town of Bennington, Vermont Pleasant Street and School Street Sidewalk Installation STP EH08(11)

Programmatic Environmental Impact Statement (EIS) for Lower Green River Corridor Plan Request for Proposals:

Before we get to the E&SC

Public Notice of Application for Permit

ARTICLE 14: ADMINISTRATION

LAND 2 Multiple Use Opportunity Assessment

Notice of Intent to Accept Proposals, Select Lessee(s), and Contract for Pumped-Storage

Request for Proposal Scope Development Guide. Asotin County Geomorphic Assessment. and. Conceptual Restoration Plan

Town of Poughkeepsie BUILDING DEPARTMENT 1 OVEROCKER ROAD POUGHKEEPSIE, NY12603 (845)

CHAPTER 6 - How to Prepare a SWPPP

Appalachian Power Company Claytor Hydroelectric Project FERC No Debris Management Plan

San Antonio Water System Standard Specifications for Construction

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT USDA FOREST SERVICE TONGASS NATIONAL FOREST ADMIRAL TV ISLAND

Draft Decision Memo OHV Trails 22 and 42 Reroute Project

Corporate Compliance Plan

ENVIRONMENTAL COMPLIANCE MONITORING PLAN TULE WIND PROJECT CACA for the CALIFORNIA DESERT DISTRICT EL CENTRO FIELD OFFICE

Battle Creek Salmon and Steelhead Restoration Project January 2017

Alaska Sustainable Salmon Fund Statement of Work Revision #2: Extend end date to 6/30/16; change principal investigator and co-principal investigator

Public Notice of Application for Permit

Perchlorate BMP Regulations R TITLE 22 EMERGENCY REGULATIONS Perchlorate Best Management Practices DEPARTMENT REFERENCE NUMBER: R

Amaila Hydropower ESIA Update Section 7

CON APPENDIX F USAG HI Corrective Procedures for Construction Storm Water Inspections

The International Convention on the Control of Harmful Anti- Fouling Systems on Ships

401 Water Quality Certification Process for Federal Energy Regulatory Commission (FERC) Hydro Relicensing

The Caltrans Contract Manager will assign specific projects to the Consultant through the issuance of Task Orders.

PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2014 ANNUAL REPORT

TITLE 9. ENVIRONMENT STATE WATER CONTROL BOARD

Hydropower Project License Summary PIT RIVER, CA PIT 1 HYDROELECTRIC PROJECT (P-2687) Pit River below Pit 1 Powerhouse

Oregon Revised Statute to

Natural Community Conservation Planning Act California Fish and Game Code Section

PROGRAMMATIC AGREEMENT AND HISTORIC PROPERTIES MANAGEMENT PLAN 2015 ANNUAL REPORT

Public Notice of Application for Permit

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

United States Society on Dams (USSD)

FEDERAL ENERGY REGULATORY COMMISSION WASHINGTON, D. C November 27, 2013

INJURY AND ILLNESS PREVENTION PROGRAM. Adopted June 25, 1991 by Board Resolution 91-95

INSTRUCTIONS TO BIDDERS

Transcription:

PRELIMINARY DRAFT ENVIRONMENTAL COMPLIANCE MONITORING PLAN BLUE LAKE HYDROELECTRIC PROJECT EXPANSION FERC No. P-2230 Prepared By: City and Borough of Sitka Electric Department Sitka, Alaska May, 2011

INTRODUCTION and BACKGROUND The City and Borough of Sitka, Alaska ("City"), owns and operates the Blue Lake Hydroelectric Project ("Project, FERC No. 2230) located near Sitka, Alaska. The 6.5 megawatt project is located approximately 5 miles southeast of Sitka. For the past 3 years, the City has conducted engineering and environmental studies to support issuance of a capacity related amendment to the Project's FERC license to modify the Project including but not limited to the following: Raise the Project dam by as much as 83 feet to increase reservoir capacity and generating head; Construct a new and larger powerhouse and install new turbine generators; Construct a new surge chamber near the powerhouse; and Construct a new water intake in Blue Lake at a different location from the existing intake. NEED for THIS DRAFT PLAN The City submitted Draft and Final Amendment Applications (the DAA and FAA, respectively) to the Federal Energy Regulatory Commission (FERC) in Washington D.C. In response to the FAA, the FERC sent the following request for additional information, necessary before the Commission could continue with its issuance of the requested amendment: "Your application does not describe any proposed protection, mitigation and enhancement (PM&E) measures that may be needed to mitigate the project effects. Please provide the details of any PM&E measure that may be needed for (1) wetland affected by the proposed project; (2) salmonid species (pink, chum, and coho salmon) and their essential fish habitat identified in Sawmill Creek that my be affect by the proposed project; and (3) any other environmental resources including fish, wildlife, water quality, and vegetation affected by the proposed project. All PM&E measures should be developed in consultation with federal and state resource agencies. Your filing should include documentation consultation including agency comments and recommendations and your response to any recommendations." To respond to the Schedule B item, the City has prepared drafts related to certain PM&E measures, according to those normally required by consulting state and federal resource agencies during construction of recent hydro projects in southeast Alaska. In all cases involving significant construction, Stakeholders required an Environmental Compliance Monitor (ECM) to oversee compliance with other plans and procedures. This plan uses language from recent, accepted plans as the basis for early review. Draft Environmental Compliance Monitoring Plan 2 Blue Lake Hydroelectric Project

EXISTING PLAN REQUIREMENTS Below is language from a recent FERC license in southeast Alaska describing plan requirements and describing ECM duties: At minimum, the plan shall include: (1) provisions to employ a qualified environmental compliance monitor to be on-site during construction with authority to: (a) ensure strict compliance with the conditions of this license, (b) cease work and change orders in the field, as deemed necessary, and (c) make pertinent and necessary field notes on monitoring compliance by the licensee; (2) the position description of the compliance monitor, including qualifications, duties, and responsibilities; (3) provisions to hold a meeting between the licensee and the U.S. Forest Service (Forest Service), National Marine Fishery Service (NMFS), U.S. Fish & Wildlife Service (FWS), and Alaska Department of Fish & Game (ADF&G) once annually for each year of compliance monitoring to: (a) review and evaluate the results of all compliance monitoring activities and reports, (b) make necessary adjustments of compliance monitoring to meet resource needs, and (c) decide on continuation of compliance monitoring; and (4) a provision to file with the Commission by December 31 of each year of compliance monitoring, a report that summarizes the past year s compliance monitoring activities and any planned future monitoring activities. The licensee shall prepare the plan after consultation with the Forest Service, NMFS, FWS, and ADF&G. The licensee shall include with the plan, documentation of consultation and copies of comments and recommendations on the completed plan after it has been prepared and provided to the agencies, and specific descriptions of how the agencies comments are accommodated by the plan PROPOSED PLAN ELEMENTS The City has adopted language from the existing plan in the following text: EMPLOYMENT OF ENVIRONMENTAL MONITOR Authority The ECM will have the authority to: Issue stop work orders to the Contractor if the ECM observes construction activity that is not in compliance with the approved environmental plans and is causing or is likely to cause an adverse impact. Stop work orders will be issued for all noncompliance violations pertaining to fish, wildlife, habitat, water quality, toxic substances and erosion control. If there are questions or concerns, the ECM will be consulted prior to beginning the activity. Stop work orders will remain in effect until the issue is resolved in accordance with plans and permits. The ECM will report minor violations, judged not significant enough to warrant stop work orders, immediately to the Contractor and weekly to the resource agencies. Repeated minor Draft Environmental Compliance Monitoring Plan 3 Blue Lake Hydroelectric Project

Term of Duty violations of approved environmental plans or permits will also be sufficient cause to issue a stop work order. Stop work orders will be applicable to those parts of the construction not in compliance with plans or permits and also to those construction activities closely related to the non-compliance problem. Stop work orders, along with a summary of the incident and remedial actions or resolution, shall be reported weekly to the resource agencies. Issue change orders to the Contractor if the ECM observes that the provisions of the approved environmental plans or permits are less than required to protect the intended resources. A change order is required to adequately define a modification to the Environmental Plans developed and approved under the stipulations of the (permits):. Change orders would be authorized only after consideration and evaluations of the effectiveness of measures in the Plans. Any change orders, along with a summary of the incident and remedial actions or resolution, will be reported to the resource agencies or any oversight team representing the resource agencies. The ECM would report potential violations of environmental laws, other than AS 16.05, to the appropriate agency(ies) However, the ECM does not represent or act for any specific agency, but represents all resource agencies and the licensee. The ECM will be available for on-site inspection during all periods when construction of a landdisturbing nature is taking place that had the potential to affect water quality of surface waters in the project area. Prior to and during construction, the Contractor will inform the ECM of the schedule for construction activities so that the ECM can schedule inspections. Qualifications QUALIFICATIONS, DUTIES, AND RESPONSIBILITIES The ECM will have the following qualifications: Knowledge of environmental laws (statutes and regulations) in the State of Alaska. Experience with field construction techniques and environmental oversight. A thorough and current knowledge of sediment and erosion control techniques, water quality testing, and sound construction practices. Able to identify historical/cultural resources (USFS will train, if necessary). Duties and Responsibilities The duties and responsibilities of the ECM will be as follows: Draft Environmental Compliance Monitoring Plan 4 Blue Lake Hydroelectric Project

Review and be familiar with the approved environmental plans, permits, and the proposed construction. Observe all construction and provide guidance to the Contractor to ensure that all activities are planned, conducted, and maintained in compliance with approved environmental plans and all permits; and to monitor maintenance effectiveness, and functionality of the mitigation measures and permit stipulations. Meet with the Contractor, the Licensee/Permittee, and the agencies to discuss compliance issues, including attending the monthly construction meetings held by the Contractor. Report all violations to the Contractor's construction superintendent and require immediate remedial action. The ECM shall maintain a written log of all violations, including all pertinent information. All violations shall be reported, in writing, to the appropriate resource agencies in a weekly report, and a copy of this report will always be given to the Contractor. Issue stop work orders to the Contractor as necessary to ensure compliance with all environmental plans and permits, but for minor violations, judged not significant enough to warrant stop work orders, immediately notify the Contractor to modify compliance methods. On a weekly basis, issue a report to the resource agencies, copying the Contractor, with information about any stop work orders. Issue change orders to the Contractor as necessary to comply with the intent of all environmental plans and permits; and will be noted in the weekly report to the agencies. Specific agency notification, related to the specific type of change order, will occur at time of evaluation of change work order, if deemed necessary by the ECM. Make and keep diligent field notes regarding observations, discussions with the Contractor, compliance issues, recommendations, diagrams, and photographs. Prepare a monthly report detailing all violations, incidences, situations, and other activities relative to environmental plans and permit compliance. The monthly report shall be completed and made available to the public, the agencies, and the Contractor by the 5th of the month following the month the report covers. The ECM shall be the main point of contact for agency personnel on matters concerning construction compliance, site conditions, and inspections. The ECM should make all reasonable efforts to accommodate agency requests for inspections on-site. Weekly reports should also include any incidental observations of fish or wildlife, their location, number, behavior and any apparent effects the project construction may be having on them. Draft Environmental Compliance Monitoring Plan 5 Blue Lake Hydroelectric Project

COMMUNICATIONS Materials to be Provided to Environmental Compliance Monitor The ECM will be provided with the following documents before construction begins: Erosion and Sediment Control Plan; Heritage Resource Protection; Solid Waste and Waste Water Plan; Hazardous Substance Plan; Compliance Monitoring Plan; Bear Safety Plan; Design Drawings and Specifications; Construction Schedule; Copies of All Permits, including periodic updates; and A contacts list providing names and phone numbers of relevant agency, Licensee/Permittee, and the Contractor personnel, including periodic updates. Pre-Construction Meeting A meeting will be held in Sitka prior to the start of construction to be attended by the ECM, other Licensee/Permittee representatives, the Contractor's construction superintendent and other senior Contractor representatives, and, at their discretion agency personnel. The meeting will be held to acquaint all of the parties with each other and with the proposed construction and to provide a forum for discussing the respective expectations for the construction and compliance monitoring. The ECM will prepare meeting notes that will be shared with all attendees. Weekly Meetings The ECM will meet on a regular weekly basis with the Contractor's construction superintendent to discuss compliance-monitoring issues. If the ECM is unable to attend, he/she may attend via teleconference. The ECM will prepare notes of the weekly meetings or phone conversations and include, as necessary, in the monthly reports. Annual Meeting The Licensee/Permittee will arrange for an annual meeting at a time and location suitable to all participating parties to: Review and evaluate results of all monitoring activities during the relevant time period; Make necessary adjustments to the construction and/or monitoring programs; and, Decide on the need for continuation of monitoring. Draft Environmental Compliance Monitoring Plan 6 Blue Lake Hydroelectric Project

The ECM will record or otherwise transcribe the meeting and distribute draft meeting minutes to the attendees and other participating parties on request. Other Communications It is the intent of the Licensee/Permittee that there be open, respectful, and cooperative communication between the ECM, the Licensee/Permittee, and the Contractor's personnel on a routine basis. The Licensee/Permittee believes such a relationship between all of the parties will minimize construction difficulties and environmental impacts. Draft Environmental Compliance Monitoring Plan 7 Blue Lake Hydroelectric Project