PMU WATSAN FBIH 9/22/2010

Similar documents
1. SOURCES OF NATIONAL LEGISLATION (PRIMARY AND SECONDARY LEGISLATION)

PROJECT INFORMATION FORM Part A - General information

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES (WATER AND WASTEWATER)

PROJECT INFORMATION FORM - WATER Part A General Information

PROJECT INFORMATION FORM Part A - General information

Construction of first wastewater treatment plant in Kosovo: an EU pilot project

Ex-ante Evaluation - 1 -

Ministry of Regional Development and Infrastructure of Georgia United Water Supply Company of Georgia

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

SECTOR ASSESSMENT: WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES. 1. Sector Performance, Problems, and Opportunities

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

Investing in Sustainable cities. Water Management in urban areas: Yangon s case

CDIA SAM SON CITY. Pre-feasibility Studies: Sam Son Water Supply and Wastewater Treatment facilities

National Water Demand Management Policy

Small Waste Water Treatment Plants WWTP. Technical aspects and cost estimation of pilot plants. Indira Sulejmanagić Sanja Bosiljčić Pandur

SECTOR ASSESSMENT: WATER AND SANITATION. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES

CARTAGENA, COLOMBIA. Case Study (Water) Project Summary:

Capital Facilities Element

CSP Baseline Assessment

East Asia Urban Sanitation Review

Water, Wastewater and Stormwater 2017 Budget 2018 Plan

Financing possibilities in accordance with the WFD and cost recovery for water services in Hungary Judit Rákosi, ÖKO Inc. Budapest

Governance and Water Resource Planning in Denmark iwater, Barcelona, November 16 th 2016

Viet Nam: Central Region Small and Medium Towns Development Project

PL Tourism development Sandomierz

2018 Water and Wastewater Budget Summary

Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Public Disclosure Authorized. Report No.

CERTIFICATION AND FINANCING PROPOSAL

IPA National Programme 2010 part II Bosnia and Herzegovina Fiche 1 Environment

Japanese ODA Loan. Ex-Ante evaluation

Business Plan Summary

STANDARD SUMMARY PROJECT FICHE

Current Status of Waterworks in Spain. Francesc Hernández-Sancho Águeda Bellver-Domingo

A 25 Year Strategic Plan

ECONOMIC ANALYSIS: PROJECT LOAN

NWWEC AND WWC FOR AHWAZ, SHIRAZ, MAZANDARAN AND

Innovative Mobile Payment and Metering Mechanism

Water resources management in Denmark

RIJEKA AGGLOMERATION Improvement of Water and Wastewater Infrastructure

DIRECTIONS OF DEVELOPMENT IN THE FIELD OF WATER AND ENVIRONMENTAL SANITATION

Current and Future Challenges of Water Environment and Wastewater Management in Myanmar

IPA National Programme 2009 part I Bosnia and Herzegovina Fiche 4 - "Environment"

Selected examples of WBIF projects

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1

Proposal by Lithuania for deletion of the Hot Spot No. 41 Šiauliai WWTP

CBA Forum meeting on Environment sectors

CERTIFICATION AND FINANCING PROPOSAL

GIZ Nexus related activities in the Water sector

Municipal Service Review

CRIS Number: 2002/

Ex-ante Evaluation (for Japanese ODA Loan)

Ex-ante Evaluation - 1 -

Water / Wastewater Fund

The Market For Small-Scale Piped Water Systems In Kenya SSAWA. Market Brief

EU funding in water sector Latvia results, lessons learned, future. B.Gulbe, CEO, Latvian water and wastewater works association

PROJECT INFORMATION FORM Part A - General information Please read the attached guidance before filling in the form

The EU bank Europe s long term financing partner since 1958 Around 90% of lending is within the EU, 10% outside Shareholders: 28 EU Member States

Now Available. Report on WATER IN INDIA India Infrastructure Research.

INVESTMENT PROCESS IN THE CONSTRUCTION OF HYDROELECTRIC POWER PLANTS IN BULGARIA. GENERAL LEGAL FRAMEWORK. DEVELOPMENT PROSPECTS

SECTOR ASSESSMENT (SUMMARY): 1 WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES

Annex C 1. OBJECTIVES AND DESCRIPTION OF PROJECTS

OVERVIEW CAPACITY & CONDITION

Sector policy of Water resources management in Republic of Macedonia

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

EF.DEL/39/07 21 May 2007

STUDY ON THE BEST ADMINISTRATIVE POSITIONING OF THE REGULATORY BODY IN THE PROCESS OF TARIFF SETTING OF COMMUNAL AFFAIRS OF WATER SUPPLY AND

Standard Summary Project Fiche IPA 2008 centralised National and CBC Programmes Upgrading of Environmental Infrastructure

Exploring implications of urban growth scenarios and investments for water supply, sanitation, wastewater generation and use in Accra, Ghana

SECTOR ASSESSMENT (SUMMARY): WATER AND OTHER URBAN INFRASTRUCTURE AND SERVICES 1 Sector Road Map

WHEREAS, the Board has previously so adopted a wastewater supply system comprehensive plan, and

Ex-ante Evaluation - 1 -

Wastewater Treatment Works and Collections System Annual Report Year 2005 General Information

What is a stormwater utility fee?

1(14) London group Viveka Palm Marianne Eriksson

PL Water Supply and Waste Water Collecting System Lomza

Case Study on the Right to Water and Sanitation in Romania

Republic of Albania. UKT Tirana Water - Project Implementation Support & Supervision Services - Terms of Reference

PROJECT INFORMATION FORM Part A - General information

Additional Information Requirements for Wastewater Treatment Projects

Japanese ODA. Ex-ante Evaluation

IS THE TARIFF STRUCTURE CONTRIBUTING TO THE EFFICIENT USE OF DOMESTIC WATER IN SPAIN?

SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE. Afghanistan Urban Water Sector Project

INTEGRATED SAFEGUARDS DATASHEET APPRAISAL STAGE

Manualul National al Operatorilor de Apa si Canalizare

GEORGE MUNICIPALITY. Annual Water Services Development Plan Performance - and Water Services Audit Report FY: 2016/2017.

Indicator Fact Sheet (WEU16) Urban waste water treatment

Technical Expert for Waste Water Treatment Feasibility Study

PPPs in Moldova: North Moldova Water Project

PUBLIC BRIEF. - Program: Sanitation and Hygiene Initiative for Towns - (SHIFT) in South West Sri Lanka - SRI LANKA -

UNSD Water Data Collection. Workshop on Environment Statistics (Addis Ababa, July 2007)

City of Markham 2017 Proposed Water/Wastewater Rates

Ex post evaluation report

Preliminary Design Report: Prices Subdivision Drainage Improvements & Wastewater Servicing

Lecture note. Water demand management. September 2002 revised February Tue Kell Nielsen

Waste and water regulation of tariffs in Sweden

Europe s water in figures

24.LESOTHO Background Coverage

The Role of Regulator EWRA in Urban Water Management

Transcription:

WATER AND SANITATION PROJECT FEDERATION BIH Questionnaire for potential participating municipalities PMU WATSAN FBIH 9/22/2010

Introduction Water and Sanitation Federation BiH Project The Financing Contract for Water and Sanitation in Federation of BiH project was initialed in March 2008 by the EIB representatives and BiH representatives - The Ministry of Finance and Treasury of BiH (MFT BiH), the Federal Ministry of Finance (FMF) and the Federal Ministry of Agriculture, Water Management and Forestry (MAWF) - and signed in two steps: by the Borrower (minister of MFT BiH) and Entity (Ministers of FMF and FMAWF) in Sarajevo on 15 July 2008 and the EIB representatives in Luxembourg on 18 August 2008. Pursuant to the Contract, the Federation of BiH (FBiH) undertakes to implement the Project consisting of investment schemes to be carried out by the municipalities included into the Project within the FBiH through the FMAWF and FMF using the loan funds in the amount of EUR 60 million and the equal amount of own contribution of the municipalities involved, which according to the Contract total 121.3 million EUR. Key goals of this loan arrangement are focused on providing support for the improvement of current living conditions of the population, securing adequate hygienic conditions in water supply and sanitation and the implementation of environmental protection measures in compliance with the obligations of the EU accession and harmonization with the EU legislation, in particular with the Water Framework Directive, Drinking Water Directive and the Urban Waste Water Directive. The purpose of the Project is to use the resources (EIB loan, grants and own funds of the municipalities) to ensure the implementation of measures contributing to the improvement of infrastructure and provision of services aimed at adequate (both in terms of quality and quantity) water supply and waste water treatment in the municipalities included in the Project. Loan funds under the Contract shall be used for financing of various activities related to the implementation of schemes in municipalities/towns within the Federation of BiH, to be defined in Project description broken down by technical components in each individual subsidiary agreement, such as: - development of studies (feasibility study, environmental impact assessment), preliminary designs and/or main designs; - reconstruction and rehabilitation, upgrading of existing or construction of new facilities in: water resource infrastructure water supply systems drinking water treatment facilities waste water collection systems waste water treatment plants - measures to increase efficiency, reduction of losses, water and energy savings; - supervision; - technical assistance. 2 P a g e

Questionnaire First step towards inclusion in the Project Purpose of the Questionnaire is to provide information and assess the following: municipal needs for new infrastructure development any possible minimal-risk investment components that are ready for immediate financing any potential scope for promoting particular European policy areas such as water and energy efficiency, climate change mitigation/adaptation needs for the Feasibility Studies or similar strategic document and to contribute to scoping such a study (if one is suggested, there will be a follow-up scoping mission) need for technical documentation (preliminary design, detailed design, concept solutions) potential benefits that will arise by project implementation potential environmental risks that will arise by project implementation and need for the mitigation measures Questionnaire is divided into four parts PART 1 Background information on water supply and waste water system PART 2 Proposed project scheme for financing PART 3 Financing and implementation capabilities PART 4 General performance and physical indicators IMPORTANT In order to fill this Questionnaire in successful manner we strongly advise to involve representatives from the different municipal departments and utility company departments, notably Mayor assistant for financing Mayor assistant for infrastructure and urban development Utility company director/deputy Contact person: Alen Robović PMU Technica expert E - mail address: alen.rob@bih.net.ba Tel: +387 61 211 285 Fax: +387 33 205 620 Ms. Alma Imamović, Transitional PMU Manager Address: E - mail address: sektorvoda@fmpvs.gov.ba Tel: +387 33 233 802 / 226 849 Fax: +387 33 205 620 3 P a g e

BASIC INFORMATION Name of scheme/project: Scheme Identification Code (IC): Location: Contact person: Can contact person communicate in English: Address: Telephone no: Fax: E-mail: Form filled in by: Date: Signature: 4 P a g e

PART 1 - Background information on water supply and waste water system 1.1 Description of existing situation and reasons for wanting to undertake the scheme, including description of deficiencies/risks in water supply/wastewater/environment. In particular, highlight any known health issue to be addressed by the project or known potential impact /risk to water supplies 1.2 Institutional and legal framework (administration, ownership and operation of water infrastructure, existing facilities). In particular, are water services a dedicated utility or are they part of multi-utility? 1.3 Phasing and links to plans/programmes; is the scheme/project part of a succession of interventions. 1.4 Is there any existing or potential inter-municipal/cantonal cooperation regarding water or wastewater services, such as regional water supply system or cooperation with other municipalities? In particular, are there ideas, possibilities for connection to water/wastewater systems in other municipalities? 1.5 Current/envisaged involvement with other donors/agencies/international financing institutions. 1.6 Other ongoing projects in water and environment. 1.7 State the primary source of drinking water. If wells, please state the depth of wells. 1.8 State the river-basin/sub river basin to which the project area belongs and the name of the recipient s water entity. Also state if the area is karstic. 5 P a g e

PART 2 Proposed project scheme for financing 2.1 Describe the purpose of the project, what benefits should be expected 2.2 Describe technical components of the project, including key dimensions, capacities and materials. Attach table with key physical indicators (length of pipes, diameters, number of pumping stations, installed power, capacity of water treatment plant and similar) 2.3 Please provide a plan showing the scheme layout, indicating existing and proposed key water and waste water infrastructure water/wastewater mains, pumping stations, treatment plants etc. 2.4 For networks, what is the total unit water demand per inhabitant (including uses such as garden watering etc.) used for sizing pipes. 2.5 What technical documentation for the proposed investment Scheme exists. Is it still valid or it is outdated, is there need for the revision. Stated who prepared and when existing technical documentation Navesti da li postoji tehnička dokumentacija za predloženi investicijski projekt. Da li je još uvijek valjana ili je zastarjela, da li postoji potreba za njenom revizijom? Navesti ko ju je izradio i kada! 2.6 Option analysis; please describe what alternative solutions have been considered to the proposed technical solutions, if any. Why were they discarded? Impacts, risks, permitting issues 2.7 Please explain briefly the any potential negative effects that the scheme may have on the environment (construction phase / operation phase). 2.8 Is an Environmental Impact Assessment required under law? 2.9 Is the there any flooding experience/risk of flooding at important installations? 2.10 Are there any areas of nature conservation interest in the vicinity or downstream (nature reserves, area with special wildlife/natural features)?. Will they be affected? 2.11 Main industrial enterprises operating in the area. What industries have operated in the past? 2.12 What type of sewage sludge management/facility is in use (if any)? 2.13 What permits if any are already obtain (urban approval, water approval, and construction permit). Are there any obstacles and/or risks for the Municipality to obtain all needed permits? 6 P a g e

2.14 Land ownership and property issues. Are they resolved, if not when municipality intend to resolved those issues, is there any obstacles or hidden risks. 7 P a g e

PART 3 Financing and implementation capabilities 8 P a g e

Financial Balance of Municipality 3.1 Provide summary breakdown of Municipal Budget 3.2 What are average annual investment from the municipal budget in water and waste water infrastructure? 3.3 Describe types and amounts of existing significant loans/debt 3.4 Estimate your current loan capacity, what size of loan municipality is capable to tka in line with BiH legislation (Loan on Public Debth) 3.5 What size of loan Municipality is willing to take in order to finance proposed investment Scheme Investment Scheme Cost 3.6 Investment cost estimate (2008 price levels) ITEM Detailed design COST (EURO) Construction works Supervision Land purchase Other items Price variations (% inflation) VAT 1) Total 1) Note (Please explain the VAT procedures and percentage) 9 P a g e

3.7 Investment cost indicators Population affected, new construction Population affected, reconstruction cost/inhabitant of scheme Cost/inhabitant of scheme in areas of new construction (Euro/inhabitant) Cost/inhabitant of scheme in areas of reconstruction (Euro/inhabitant) Water Supply Wastewater 3.8 Planned implementation period 3.9 Expected financing and expenditure schedule (Euro) Year Total Year 1 Year 2 Year 3 Year 4 Year 5 Total Cost (Euro) Municipality contribution *(Euro) Other own/cantonal/national contribution (Euro)** Loan through the project (Euro) * - This item include Municipal own contribution from the budget ** - This Item include grant component provided for the project participating municipalities, size of the grants is proportinal to the size of the Loan and app is 22% of the Loan size Responsibilities for preparation/implementation 3.10 State which agencies/organisations will be responsible for scheme preparation and design/tender documents, contract management, supervision of works as well as final operation and maintenance of the infrastructure? 3.11 Describe the value and type of contract (Design-Build/Works/Supply) and manner of tendering envisaged for each component (local, international) tendering procedure(s) 10 P a g e

Financial Balance of Utility Company 3.12 Water Tariff in 2009 Present Current tariff composition Water component Wastewater component Abstraction tax Pollution tax Development tax (if relevant) VAT TOTAL COMBINED TARIFF Also, describe planned increase of tariffs over the next few years. 3.13 Provide summary breakdown of budget for the utility, showing different sources of income and operational and capital expenditure, including o o o o Total water revenues Total wastewater revenues Total non-water related income (multiutility / other business activities like construction). Please state sources of income. Transfer from municipality or other sources Total annual billed water volume (m3) Total annual water/wastewater billed value (Euro) Total annual water/wastewater revenues collected (Euro) 2007 2008 20009 3.14 Operation and maintenance costs: Total annual operating and maintenance costs (Euro) Cost of energy consumption Operating and maintenance costs per m 3 of produced water / treated wastewater (Euro) Present Expected after scheme implementation Water Wastewater Water Wastewater 3.15 What is the staffing dedicated to providing water and wastewater services (man years, where staff is shared with other communal services). 11 P a g e

PART 4 General performance and physical indicators 12 P a g e

4.1 Summary indicators Parameter Before the project Expected after the project GENERAL Population of service area (i.e. area under the utility's jurisdiction) peoples Number of settlements Population of largest settlement/town Is the scheme part of a regional water project? Is an EIA required? PHYSICAL INDICATORS Length of water mains to be constructed (excl. service pipes) m Length of sewers to be constructed (excl. service pipes) Drinking water treatment capacity Wastewater treatment capacity Unit yes/no yes/no m person equivalent person equivalent DESIGN INDICATORS Per capita water demand used for design of new drinking water treatment l/cap/day- Per capita waste water generation used for design of new wastewater treatment Resident population immediately affected by waste supply components Resident population immediately affected by waste water components WATER SERVICE INDICATORS Population coverage (resident population with piped water supply) % Total water production (consumption + non-revenue water) Domestic consumption Non domestic consumption (commercial, institutional etc.) Average domestic consumption Is supply discontinuous to any area for any part of the year? l/cap/day peoples peoples m3/year m3/year m3/year L/person/day Metered customers % yes/no 13 P a g e

Parameter Parameter Expected after the Before the project Parameter project Parameter Before Parameter Unit the project Resident population served by WWTP % Treated wastewater in WWTP % - preliminary treatment % - primary treatment % - secondary treatment % - tertiary treatment % PHYSICAL EFFICIENCY INDICATORS Network water losses m3/conn/year FINANCIAL & MANAGERIAL INDICATORS Project cost for water supply components EUR Project cost for waste water components EUR Collection Rate (Value of bills collected per year / value of bills emitted) % Average water charges for direct consumption (ex. VAT/taxes) EUR/m3 Average wastewater charges for direct consumption (ex. VAT/taxes) EUR/m3 Expected aft project 14 P a g e

4.2 Service and Project Area (to the extent that the information is available, otherwise provide estimate and indicate with *) Total population of the administrative area (municipality) Physical area of administrative area (municipality) Population of largest town included in the scheme Average household size in municipality Average household income per month Number of towns/villages included in the scheme Number of people affected by the scheme Number of people supplied with piped water supply from the central system Number of people supplied with pipe water supply in the administrative area (municipality), including decentralised systems Is supply discontinuous to any area for any part of the year? If so, when and how many hours of supply are provided? Length of central system water supply network (excluding service pipes) Number of water supply connections Number of water supply connections that are metered Number of people with piped waste water collection Number of households with piped waste water collection Number of people using septic tanks Number of households using septic tanks 15 P a g e

Served Population Total Water Production Consumption, Domestic Consumption, Other Network leakage Number of pipe bursts 4.3 Water Balance for 2009 (to the extent that the information is available, otherwise provide estimate and indicate with *) Groundwater Abstraction (m3/day) Spring/Source Abstraction (m3/day) Surface Water Abstraction from River/Lake (m3/day) Produced amount of drinking water (m3/day) Type/level of drinking water treatment Amount of water pumped into the distribution network (m3/day) Amount of water gravity fed into the distribution network (m3/day) Metered legal consumption (m3/day) Un-metered legal consumption, approximately (m3/day) Total billed consumption (m3/day) Domestic Commercial Other Wastewater collected (m3/day) Wastewater treated (m3/day) Type/level of current wastewater treatment Mention types of industrial waste water discharged into system and level of pre-treatment Per capita domestic consumption (liters / person /day) Night time flow into distribution network (m3/hour) (measured approx 0400-0500 in the early morning) Estimated leakage from network of water pumped into network (m3/day) Estimated infiltration into sewers from groundwater/surface (m3/day) Number of network bursts per year - 4.4 Trends for last 5 years Year 2005 2006 2007 2008 2009 - - - - - 16 P a g e

17 P a g e