COMPANY CIVIL CONSTRUCTION PROFILE

Similar documents
QUALITY INTEGRATED ENGINEERING SERVICES to the energy sector

Enwon (Australia) Pty Ltd

HUGHS LIMITADA- SHEQ HSE RESPONSIBILITIES

Table of Contents. Project Agreement Schedule 14

QUALIFICATION HANDBOOK

Asset integrity Fabric maintenance Environmental services E&I services Mechanical services

Security Operations. BS EN ISO 9001: 2008 Issue 1.2: 21/10/2016. Quality Manual. Managing Director. Controlled / Uncontrolled when printed

Bowmer. & Kirkland. Kirkland. & Accommodation. Health & Safety Policy.

Main Categories of Personnel We Provide. Technical Staffing. Introduction

Pre-Qualification Questionnaire

Modern Slavery Act 2015 Transparency Statement April 2017 to March 2018

MAALIM AL-TAALUQ FOR GENERAL TRADE AND CONTRACTING COMPANY

Band Systems Ltd. Construction Phase Plan CDM POLICY STATEMENT

YOUR SINGLE-SOURCE INDUSTRIAL SERVICE PROVIDER

Specialist Surfacing Contractor Car Parks Surfacing, Access Ramps

STATEMENT OF QUALIFICATIONS. Pre-qualification Submissions For. Environmental Consulting Services On. Alberta Transportation Projects

CHAS Assessment Standards

Process solutions since 1925

COMPANY PROFILE. Version: 1.0 ORIGINAL. Page 1 of 17

Verify Category A Audit Content

A multidisciplinary engineering company

LEGIONELLA CONTROL ASSOCIATION STATEMENT OF COMPLIANCE

QUALITY MANUAL 1.0 INTRODUCTION POLICY AND OBJECTIVES DEFINITIONS SCOPE QUALITY SYSTEM... 3

INTEGRATED MANAGEMENT SYSTEM

ASSET MANAGEMENT SERVICES

Effective competence assurance management is as easy as itb. competence assurance

Annual Surveillance Audit Report

Contractor and Supplier Expectations

Quality Manual. Print Name Title Date Prepared by L Naughton QA Consultant 9 th April 09. Reviewed by Bernard Lennon Fire and Safety Officer

Construction Solutions Made Simple

PROJECT DESIGN GUIDE A00.1 COMPETENCE STATEMENT AND ASSESSMENT

QUALITY SYSTEM MANUAL

OWNER USER INTEGRITY MANAGEMENT SYSTEM WRITTEN DESCRIPTION CHECKLIST AB-512(b)

2 ConocoPhillips Health, Safety and Environmental Management System

Health & Safety Policy Statement Organisation & Responsibilities

DOCUMENT CONTROL INFORMATION

January 2014 COMPANY PRESENTATION

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /11/2011 PAGE 1 OF 6 SUBCONTRACTOR/SUPPLIER QUALIFICATION

Environmental Aspects - Gaining Control by Environmental Assurance

EHQMS Manual & Policy Document

Health & Safety Plan DEMOLITION WORKS: No 2 Substation

The Leading Global Stockholder and Supplier Pipes, Fittings & Flanges

HSE INTEGRATED MANAGEMENT SYSTEM MANUAL & QUALITY POLICY

BS EN ISO 9001:2008/CYS EN ISO 9001:2008. Quality Manual DECLARATION. This Quality Manual is the property of CYBARCO LTD

Legionella Procedure. Document Control. Date of next Review. Revision No. Publication on Web Site. Date Document Reviewed. Summary of main changes

ISO 9001:2015 ISO 14001:2015 OHSAS

OPTUS SUPPLIER WORK HEALTH & SAFETY POLICY

Contents Certification, Training, Competency & Manning Introduction Certification and Competency Requirements...

May 14, 2013 ORGANIZATION OF OPERATION AND POSSIBILITIES FOR STAFFING THE BELENE NPP

2017 COMPANY PROFILE

Contents. Who we are. Pg. 2.. History Pg. 3.. Our Services Pg. 4,5 & 6.. Our Partnerships Pg. 7.. Where we Work Pg. 8.. Our Customer Focus Pg. 9..

Eur Ing Ian Hogarth CEng CIWE CEWE EWIE FWeldI Compliance Verification Engineer for TWI Certification Ltd.

Derlin Construction Limited QUALITY POLICY MANUAL ISO 9001:2008

Contractor Pre-qualification profile and Questionnaire

Risk Oversight and Management

PRE-QUALIFICATION FORM GREEN BUILDING CONSULTANT / SPECIALIST

COMPANY PRESENTATION

Supplier Competence / Resource Questionnaire

Polaris Engineering. Excellence in service. Every time

INTRODUCTION. List of Figures. List of Tables

On Escape Bangladesh Limited

Contract Quality Requirements Manual SLM Issue 3

Service Suppliers Engaged in Renewal Survey Examination of Mooring Chain Intended for Mobile Offshore Units

Saudi Work Bases SWB is one of the emerging multi-disciplined contractors in the Saudi Arabia. SWB offers clients a complete, onestop solution to

Analysis of ISO 9001:2015 against the ICoCA Certification Assessment Framework

Building Control (Amendment) Regulations MBCA Guidance Document

Contractor Guidance. Five or more employees. Health and Safety

SAHARA Petrochemicals Company. Part I

Upstream Midstream Downstream

Position Description

AECON POWERS THE INDUSTRY

RAE Offshore PO Box 4930, Sheffield S8 2JU Office: Portergate, 257 ecclesall Rd, Sheffield, United Kingdom, S11 8nx Telephone: +44 (0)

Just around the corner. at 490 locations worldwide.

GALAXY ENERGY GENERAL CONTRACTING LLC COMPANY PROFILE

Oman LNG L.L.C. Pre-Qualification of Tenderers QEN Supply and Installation of Ambient Air Quality Monitoring Station

Oman LNG LLC. Pre-Qualification Questionnaire. QEN EPC to Construct Car Parking Sheds with Solar Photovoltaic Panels

BS2482 TIMBER BOARDS ASSESSMENT REPORT. Assessment Summary

CE marking is regarded as a passport for products to enter and circulate freely within the 30 counties forming part of the EEA.

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

Deep Panuke. 01U 9 Oct. 08 Issued for Use C. Hewitt J Gillis R. MacQueen Rev Date Reason for Issue Prepared Checked Approved Title

Phoenix Energy Holdings Gas Ltd Health & Safety Policy

REGULATION REGARDING EQUIPMENT PROCUREMENT PROCESS AND APPROVAL OF MANUFACTURERS FOR NUCLEAR FACILITIES

Connecticut Valve & Fitting Co.

CUSTOMER SERVICES YOUR PARTNERSHIP WITH THE WORLD LEADER IN INDUSTRIAL GASES

ISO INTERNATIONAL STANDARD. Quality requirements for fusion welding of metallic materials Part 3: Standard quality requirements

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

QSS 0 Products and Services without Bespoke Contracts.

Quality Policy and Practice. November 2015

Contractor Guidance. Less than five employees. Health and Safety

HSES-SP Management in Contracts. HSE Prequal Questionnaire for Bidders.

WHS Change Management

EA-7/04 Legal Compliance as a part of accredited ISO 14001: 2004 certification

Ace Computers Corporate Environmental Policy - 7/2012. ACE COMPUTERS Corporate Environmental Policy Statement

Level 5 NVQ Diploma in Controlling Lifting Operations Planning Lifts (Construction)

National self-insurer OHS management system audit tool. Version 3

CONSULTING OFFICE OF MORRIS S. FARKAS PROFESSIONAL SAFETY ENGINEER

PRE-QUALIFICATION FORM ENVIRONMENTAL CONSULTANT PART A. EHS Health, Safety and Fire Protection Regulations and Standards

Company Registration No: VAT Registration No: Thames Road, Crayford, Kent. DA1 4QH. Telephone No:

RSPH Level 4 Certificate in Asbestos Laboratory and Project Management

CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM

Transcription:

MQS LTD COMPANY CIVIL CONSTRUCTION PROFILE 76, Babek Avenue Baku AZ 00 30, Phone: (+ 99412) 570 14 04, 570 06 96, 570 09 07, 570 07 37 www.mqs.az Page 1 of 23

Contents 1 Contact Details 2 About the Company 3 The Vision 4 Range of Services 5 List of Major Projects 6 HSE Policy 7 QA/QC Policy 8 Photos Page 2 of 23

1. Contact Details Head Office (Baku, ) Branch Office (Tbilisi, Georgia) 33A, Babek Avenue Agmaneshenebeli Avenue 12,, Tbilisi Georgia, Telephone No. (+ 99412) 570 11 05, 570 03 15, Telephone No. (+ 995) 32 596246 570 11 06 Fax No. (+ 99412) 570 12 17 Fax No. (+ 995) 32 596247 Email: office@mqs.az Email: info@mqs.ge Web Site www.mqs.az Web Site www.mqs.az Contacts: Contacts: Elnar Allahverdiyev Deputy General Director John Pipe Operations Manager Page 3 of 23

2. About the Company Overview MQS is a limited liability company registered in in 1998. MQS was originally the base of the Central Operating Laboratory for welding and testing for the Caucuses Energy Installation Trust. MQS was founded to ensure that the valuable work experience acquired during the life of the COL was not lost. The COL was actively involved in the construction of large-scale power stations and nuclear power plants throughout all the territories of the former Soviet Union. The main areas of MQS operations today are oil, gas, Construction, petrochemical renewable energy projects, roads, and accommodation modules in the Caspian region which includes Design, Construction, and Procurement and operations. The "Customer Satisfaction" and "Business Excellency" strategy of the Company allows growth through various partnerships and shared resource management. The main purpose of establishing this policy is to meet and exceed clients expectations and requirements through provision of flexible, high quality and cost-effective services. MQS is a flexible and customer focused company and has a policy of continuous improvement. In order to offer a complete service to customers, MQS owns fabrication facilities, Construction Laboratory, Construction Equipment s and Machineries etc. which has been refurbished to international standards. HSE It is the policy of MQS to promote the occupational health and safety of all its employees and to comply with the requirements of the UK Health & Safety at Work Act 1974 and the Management of Health & Safety at Work Regulations 1999. To ensure compliance MQS has developed a Safety Management System that meets or exceeds all the requirements of both HASAWA and HASAWR. The complete SMS is available for inspection on request. MQS has achieved accreditation by ABS for OHSAS 18001-1999. Page 4 of 23

Quality MQS recognizes that it must provide a quality of service that meets or exceeds clients expectations. To meet this objective MQS has developed a QMS that meets the requirements of BS EN ISO 9000 1994 and accreditation to ISO 9001-2008 has been achieved for our NDT activities by Moody International & ABS Baku Branch and for the fabrication business by ABS Houston. The MQS QMS is available for inspection on request. MQS is already in possession of ABS Service Provider accreditation for NDT services and hold several State Licenses for inspection services and for radioactive isotope importation, storage and transportation. Copies of all these documents are available for inspection on request. In addition to the above MQS has the Accreditation Certificate from State Committee for standardization, Metrology and Patent of Republic of for Testing of Quality Characteristics of soils and Concrete Mix. Language All safety, quality and project documentation is produced in English & Azeri languages. A large number of employees have good English language skills and training programs are in place to teach English to as many employees as possible. Training MQS is committed to ensuring that all its employees are trained in all the latest inspection and Construction techniques and have extensive training facilities in house. All the MQS installation workforces hold current offshore medical and survival certification. Page 5 of 23

3. The Vision The MQS vision for the future is to provide as complete a service as possible for the oil & gas and non-oil & gas sectors, Construction sectors within the Caspian region, electro power and energy sites. To achieve this goal MQS are entering alliances with stockholders and suppliers of complementary services. MQS have already reached advanced stages of negotiation with several companies with the intent of putting alliance agreements in place. These additional services include non-welded pipework, non-ferrous pipe-work, in-situ pipe-work repairs, specialist construction equipment, Civil Constructions works, Roads and Bridges, Hydro electrical Structures, Tunnels, High rise Buildings, Sewage treatment Plants, accommodation Buildings and cathodic protection to name a few. Details of these alliances, when signed, will be included in the Company Capability Statement. Page 6 of 23

4. Range of Services. The MQS Construction Service offers clients a wide ranging service like: 1. Road Works, 2. Pipe Line Works 3. Excavation Works. 4. Water Supply and Sewage Systems. 5. Hydro technical Structures. 6. Manufacture and Installation of Hydro electrical Equipment s. 7. Buildings, 8. Engineering (Sister Concern Company AES) 9. Procurement 10. Project Management. 11. Civil Laboratory Examinations 12. Heavy Machinery and car servicing, repairs and Rentals. MQS has a Garage area has a territory in excess of 3000 metres² and is fully equipped with modern plants and computer system for all kind of heavy machinery and cars repair works. MQS has the heavy machinery on hand for rental purposes, such as: Mobile Crane Bulldozers, Low Beds Excavators, Off-road Kamas s Hydro Winches, Tractor Units Forklifts, Pick Ups. MQS employs skilled, competent supervision and trades personnel who are all fully qualified to the required standards. All personnel qualifications including offshore survival and medical certification are available for inspection if required. All MQS facilities have main security entrances manned 24 hours a day, 7 days a week and equipped with video control system, a formal registration system and safety induction training for all visitors is in force. To maintain continuity of supply, all MQS facilities have standby power generation facilities to cover all its electrical requirements. Page 7 of 23

5. List of Major Projects Completed and Ongoing. SL. NO. CLIENT SCOPE OF WORK START FINISH 1 BP (SANGACHAL TERMINAL) CONCRETEING WORKS FOR SPS CWAA February 11 March 11 2 BP (SANGACHAL TERMINAL) HVAC SHELTER INSTALLTION IPA 1 & IPA 2 October 11 September 12 3 BP (SANGACHAL TERMINAL) SERENJA PLANT UPGRADE April 12 March 13 4 BP (SANGACHAL TERMINAL) ROAD REPAIR WORKS June 12 November 12 5 BP (SANGACHAL TERMINAL) EOP FIRE STATION CAR PARK March 13 June 13 6 BP (SANGACHAL TERMINAL) ACG CCTV F&G PROJECT October 13 December 13 7 BP (SANGACHAL TERMINAL) FIRE HYDRANT REPAIR WORKS October 13 ONGOING 8 BP (SANGACHAL TERMINAL) HOT OIL CIRCULATION SYSTEM December 13 ONGOING 9 BP (GEORGIA) PRE FABRICATION AND CONSTRUCTION OF ACCOMMODATION FACILITIES ONHOLD Page 8 of 23

6. HSE Policy Statement. MQS are committed to providing a proactive and dynamic engineering support service to the offshore / onshore oil and gas industry worldwide. Through commitment to the requirements of their HSE Management System MQS are dedicated to the protection and maintenance of Health, Safety and the Environment as a primary business objective. The safety of personnel is fundamental to the success of MQS s business and projects. All tasks undertaken will be assessed for risk and those risks removed or mitigated by the use of physical or procedural measures. By setting targets for performance MQS will measure the effectiveness of the HSEMS and act upon feedback to continually improve the system and its implementation. A positive safety culture will be encouraged where all involved parties will be empowered to comment and set HSE objectives with the support and leadership of senior management. The MQS HSE Management System has been audited by ABS and in March 2005 the certificate for OHSAS 18001-1999 was awarded to the Company for all operations. MQS s suppliers and sub-contractors will be subjected to thorough examination to ensure that their HSE systems, performance and culture meet similar standards. MQS will comply with all applicable legislation and industry standards. MQS ensures that this policy is understood, implemented and maintained at all levels in the organization through the systematic implementation of the HSE Management System. Rasim Mammedov General Director Page 9 of 23

Page 10 of 23

7. Quality Assurance. The object of the management of MQS is satisfy in all aspects the requirements of its customer s orders and specifications, and meet or exceed the expectations and needs. This shall be achieved by the preparation and implementation of this quality policy and documented standards to ensure that consistent and informed control of activities is established and maintained. MQS shall ensure that all management and personnel are fully conversant with these quality objectives through ongoing training and education, and that the policy is implemented and maintained at all levels throughout MQS. Compliance with the policies and procedures as described in the Quality Manual and Procedures Manuals shall be considered mandatory requirements of all personnel engaged by MQS and it is the responsibility of each individual to comply with the elements appropriate to their role within that Company. It is acknowledge by the Company that its continued success is dependent upon the requirement to provide consistent quality within all MQS s activities, and all personnel are not only required to be constantly aware of the quality requirement of MQS, but are also actively encouraged to contribute to the continued development of the quality culture. It is the policy of MQS to organize, develop and apply its quality management systems in a manner which meets the requirements of BS EN ISO 9001: 2008 and to continuously improve its method and practices. The policy of MQS is to supply quality products and services to its internal and external customers, which are free of defects and on time, every time. The MQS Director has responsibility and the authority to ensure implementation of the MQS Quality Manual and the authority to appoint a quality representative to act as the management representative on his behalf. Rasim Mammadov General Director Page 11 of 23

Page 12 of 23

Page 13 of 23

8. Photos. 1. OWNED CONSTRUCTION LABORATORY FACILITIES 2. COMPLETED PROEJCTS 3. OWNED EQUIPMENT AND MACHINERY. (Find the Attachment No.1) 1. OWNED CONSTRUCTION LABORATORY FACILITES MQS has own laboratory for different type of testing as mentioned below: Soil compaction test CBR test Proctor test Concrete Slump test Compressive strength cube test Sieve Analysis test. Page 14 of 23

CBR TEST EQUIPMENT CONCRETE CUBE TESTING SIEVE ANALYSIS CONCRETE AND ASPHALT TERMOMETER Page 15 of 23

OVEN FOR DRYING WET SOILD SAMPLE SOIL FOR PROCTOR TEST SAMPLE BOXES FOR PROCTOR TEST DRY SAMPLE FOR CBR TESTING Page 16 of 23

CBR TESTING UNDER PRESSURE DRYING WET SOIL SAMPLES IN OPEN AIR AUTOMATIC RESULT EQUIPMENT COMPACTION TEST EQUIPMENT Page 17 of 23

SAMPLE BOXES FOR CONCRETE CUBE TEST TANK FOR CONCRETE SAMPLES EQUIPMENT FOR VIBRATION OF READY CONCRETE MIX CONE TEST EQUIPMENT Page 18 of 23

2. COMPLETED PROJECTS ROAD WORKS Page 19 of 23

CONCRETE WORKS Page 20 of 23

Page 21 of 23

CAR PRAK CONCRETE WORKS Page 22 of 23

ROOF REPLACEMENT WORKS Page 23 of 23