USING WSUD TO RESOLVE COMPETING OBJECTIVES: A CASE STUDY OF A SUSTAINABLE INDUSTRIAL DEVELOPMENT. Abstract

Similar documents
Exfiltration Stormwater Treatment Systems Versatile WSUD Devices Authors: Mal Brown #, Mark Liebman #, Alison Dunphy *, Simon

RE: AGL Energy Limited Newcastle Gas Storage Facility Storm Water Management Peer Review Part 1: Design Modelling

Stormwater design considerations

Shelbyville, Kentucky Stormwater Best Management Practices (BMPs) Stormwater Pollution Treatment Practices (Structural) DRAFT

Sustainable management of Christchurch's waterways and wetlands using stormwater soakage disposal

CENTRALIZED BMPS TYPICALLY PUBLICLY OWNED & MAINTAINED BMPS, TREATING A LARGE (>20 ACRES) URBAN DRAINAGE WITH MULTIPLE LAND

The impacts of paved surfaces on urban allotments can be reduced by: limiting the area of paved surfaces

Points. To encourage and recognise the minimisation of peak stormwater flows and the protection of receiving waters from pollutants.

The MASMA and Sustainable Drainage Systems

The Role of Pervious Paving in Meeting the Requirements of the Auckland Unitary Plan

Water Sensitive Urban Design. Engineering procedures for stormwater management in Tasmania

Chapter 10 Infiltration Measures

MODEL STORMWATER MANAGEMENT GUIDELINES FOR INFRASTRUCTURE NEW DEVELOPMENT AND REDEVELOPMENT

Fact Sheet: How does stormwater biofiltration work?

Practices that capture and temporarily store the WQ v before allowing it to infiltrate into the soil.

ORDINANCE # 854. Stormwater Management / Operation and Maintenance Requirements

Our Eastern Shore Groundwater Part IV Groundwater Quality on the Eastern Shore: How safe is our groundwater and are there ways we can protect it?

Innovation In Stormwater Management

Infiltration Trench Factsheet

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

WATER SENSITIVE URBAN DESIGN TECHNICAL DESIGN GUIDELINES FINAL

TABLE B.3 - STORMWATER BMP POLLUTANT REMOVAL EFFICIENCIES

Armstrong Creek West Precinct. Review of Stormwater Management Strategy

A Case for the Design and Modeling of BMP Infiltration and LID Techniques. By: Bob Murdock

Taking the pain out of the treatment train: continuous simulation modelling for integrated water management

Planning Considerations for Stormwater Management in Alberta. R. D. (Rick) Carnduff, M. Eng., P. Eng. February 20, 2013.

CHAPTER 7: guidance. categories: Pollutant Removal. Jordan Lake watershed) Cisterns. Bioretention Areas. Green Roofs. Dry. Proprietary Devices

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

Stormwater BMP Maintenance

INFILTRATION DEVICES

BUREAU OF CLEAN WATER

EnviroModule TM 2. modular underground tank systems. rainwater harvesting infiltration on-site detention bio-remediation filtration

Section 1 - Introduction

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

GROUND WATER. Practice Note # water. sensitive. urban. design \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \

County Government Center Parking Lot Green Streets Urban Retrofit

MODEL STORMWATER MANAGEMENT GUIDELINES FOR ULTRA-URBAN REDEVELOPMENT

Ayrburn Farm Development Infrastructure Assessment Report

4. Ponds and infiltration BMPs can achieve 60 to 100% removal efficiencies for sediment.

Suggested Stormwater Management Practices For Individual House Lots

Inflow pipe. Drain. Drain

Class V Well Definition

Masters Geelong Stormwater Management Plan

Stormwater Control Plan for Post Construction Requirements Exhibit 4

3.11 Sand Filter Basin

Scientific overview: Water quality functions of coastal buffers

HANDBOOK ON DRAINAGE DESIGN GUIDELINES

The Process for Designing for Shallow Groundwater. and Small Rainfall Event Management in Urban. Developments

Improving Water Quality Through Total Water Cycle Management

BMP #: Water Quality Inserts

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session

ENGINEERED SOLUTIONS. low impact development application guide

3F. Hydrology and Water Quality

Buffer Zone = Area of Undisturbed Vegetation

The SuDS Manual Frequently asked questions

Lesson W9 Wastewater and CSOs

Infiltration Guidelines

15A NCAC 02H.1005 STORMWATER REQUIREMENTS: COASTAL COUNTIES

MS4 Programs: Quality, the Other Stormwater Q. Dan Bounds, PE, D.WRE IAFSM March 9, 2017

County Government Center Parking Lot Green Streets Urban Retrofit

Concurrent Session B: LID Design Specifications (Chapter 4 in Draft Manual)

PART HYDRAULIC, WATER QUALITY AND ENGINEERING. > Stormwater Management Plan prepared by Cardno > Electrical Report prepared by Cardno

4.8. Subsurface Infiltration

STORMWATER BED LOAD AND GROSS POLLUTANT EXPORT RATES AND THEIR IMPLICATIONS FOR TREATMENT DEVICES

Filter media for stormwater treatment and recycling: the influence of hydraulic properties of flow on pollutant removal

CITY UTILITIES DESIGN STANDARDS MANUAL

E. STORMWATER MANAGEMENT

4.8. Subsurface Infiltration

WSUD On-site Detention in xprafts 2013

Sustainability Criteria for the Design of Stormwater Drainage Systems for the 21 st Century

Best Management Practices for Stormwater Quality Treatment in Urban Settings. Lower Mississippi River WMO September 2017

How Climate Change Impacts Urban Runoff and Water Quality Design

Shirley E. Clark, Ph.D., P.E. October 5, /30/2012

Introduction to Stormwater Treatment Practices

Rainwater management for urban drainage, groundwater recharge and storage

IRP5 Workshop Knowledge-based water sensitive city solutions for groundwater impacted developments

Paraprofessional Training Session 1

CITY OF MONTCLAIR Montclair Civic Center 5111 Benito Street Montclair, CA 91763

Water sensitive urban design. Developing design objectives for urban development in South East Queensland

SUPPORTING DOCUMENT STORMWATER BEST MANAGEMENT PRACTICE (BMP) INFEASIBILITY WORKSHEET FOR ON-SITE STORMWATER MANAGEMENT

Modelling and sizing evapotranspiration fields to manage urban. stormwater excess: reducing surface runoff volume

What Does It All Mean? CWA? Sara Esposito, P.E. DNREC Division of Watershed Stewardship

BMP 6.4.4: Infiltration Trench

Wetland Design Manual. Supporting document: Wetland form and function

Sydney Ports Corporation Port Botany Expansion Terminal Stormwater Management System

Stormwater Management Plan - Phase 1

Municipal Stormwater Ordinances Summary Table

WATER SENSITIVE URBAN DESIGN - A STORMWATER MANAGEMENT PERSPECTIVE by

Draft Greater Sydney Region Plan

Stormwater Management Fact Sheet: Porous Pavement

City of Texarkana, Arkansas. Storm Water Pollution

Design Example Residential Subdivision

HANDBOOK OF DRAINAGE DESIGN CRITERIA Lake Macquarie City Council

Sustainable Drainage Systems (SUDS)

ROOF AND PROPERTY DRAINAGE

Permeable Pavement: A New Chapter

WELCOME. Eastern Subwatersheds Stormwater Management Retrofit Study. Online Information Session #2 June 15 to July 13, 2018

Hoosier Creek Watershed All of Ely drains into Hoosier Creek, which runs north to south along the west side of Ely. Hoosier Creek, Hydrologic Unit Cod

Boise City Public Works General Drainage Plan Review Requirements Checklist

Transcription:

USING WSUD TO RESOLVE COMPETING OBJECTIVES: A CASE STUDY OF A SUSTAINABLE INDUSTRIAL DEVELOPMENT R Wiese 1 M Brown 1,M Liebman 1 1 STORM_CONSULTING, rod@stormconsulting.com.au Abstract Located within the Hunter River floodplain at Heatherbrae and overlying the Tomago sand bed drinking water aquifer, the development of the Kinross Business Park was frustrated by numerous environmental constraints for many years. This site was constrained by the sensitive underlying shallow aquifer, a sensitive receiving water and by the need to maintain floodplain storage and peak flows. Being a sandy site, the pre-development hydrological regime was one of infiltration. Runoff, it was predicted, would have occurred from this sandy site less frequently than once in ten years. It was not considered possible to develop this site using conventional drainage systems. However, the careful, well-planned application of water sensitive urban design has enabled each of the constraints to be overcome. Introduction Kinross Business and Industrial Park is a 30Ha brownfield industrial development located in the Heatherbrae industrial area on the eastern edge of Raymond Terrace, New South Wales (Figure 1). The development overlies the Tomago sand beds which are a drinking water aquifer under the management of Hunter Water. Soils on site are all sands with the aquifer generally at 2m below the soil surface. The pre-development hydrological regime was one of infiltration with surface flows predicted to occur once in tens years. Any surface flows drain over very flat land to Windeyers Creek, a tributary of the Hunter River. Development of the site beyond the existing Weathertex factory commenced in 2006. The site: Kinross Business and Industrial Park Stage 1 Figure 1. Site location

Planning context NSW Government officers initially preferred the site to be fully sealed preventing any infiltration of stormwater and therefore reducing the risk of contamination of the drinking water aquifer. Their preferred solution was to prevent infiltration and direct surface water from roads and lots to wetlands for water quality treatment prior to discharging to Windeyers Creek. A site specific Development Control Plan (DCP LD13 Development Guidelines - Water Quality - Kinross Industrial Estate, Heatherbrae April 2003) applies to the site with a key provision: The stormwater management strategy for the DCP area shall allow for no infiltration of subdivision stormwater (lots and roads) at source points, through conveyance or through end of pipe controls. Discharge shall be to Windeyers Creek. Any variation to this principle will require significant justification and endorsement from the Department of Land and Water Conservation Its purpose is; to maintain the water quality of the groundwater area within the Tomago Catchment due to its use for drinking water. The Development Control Plan further requires that development applications for individual allotments must include a Stormwater Management Plan (SMP) to demonstrate compliance with water quality objectives (Table 1). Table 1: DCP water quality objectives Pollutants Coarse Fine Total Phosphorus Total Nitrogen Litter Hydrocarbons Competing objectives Retention Criteria 80% of average annual load for particles less than or equal to 0.5mm 50% of average annual load for particles less than or equal to 0.1mm 45% of average annual pollutant load 45% of average annual pollutant load 70% of average annual litter load greater? 90% of average annual pollutant load The NSW Government s proposed solution of site sealing and traditional drainage was difficult to achieve in a physical sense. The flat site made it difficult to achieve the required pipe grades. Sealing the proposed industrial estate and consequently maximising the rate and volume of runoff conflicted with other key objectives for the site such as the need to protect Windeyers Creek from excessive site runoff. Council s main objective was to ensure that flooding or environmental harm was not caused as a result of the proposed development. To achieve this aim and be consistent with the State Governments proposed solution, it was necessary to detain peak flows for all storms up to the 100 year ARI to similar of the pre-developed state. The infiltration rate into the sand is very high (180 to 3600mm/hour). Because of such high infiltration rates, the site generates very

little runoff in its undeveloped state. Maintaining these near zero runoff characteristics postdevelopment, where a large proportion of the surface is covered by impervious surfaces required substantial detention capacity with a significant land take thus making development extremely difficult and likely unfeasible. The creation of extensive areas of imperviousness reduces site infiltration. Although the concept was to protect the aquifer, implementing the NSW Government s proposed solution would likely compromise the recharge potential of Tomago aquifer. STORM s team realised that the proposed solution was creating too many conflicts, and so began to investigate alternative approaches and to convince Government officers of their benefits. The approach developed was to maintain the existing hydrological regime of this site by firstly treating and polishing the stormwater and then continuing to allow infiltration of treated stormwater into the aquifer below. The notion of treating industrial area runoff to a suitable level for release by infiltration into a drinking water aquifer became the key issue to resolve in achieving approval of the entire development. Water Sensitive Urban Design strategy WSUD solution concept The adopted solution was to implement Water Sensitive Urban design (WSUD) by maintaining the existing hydrological regime by firstly treating the stormwater (including nutrient removal) and then infiltrating treated stormwater for all events up to the 1 in 100 year ARI. The design philosophy employs an integrated treatment train approach for water quantity and quality management. The WSUD system for Kinross Business & Industrial Park can be broken down into three sub-systems: Roof-water system this is a system to manage runoff from all roof areas within each Lot by storing and then infiltrating the excess Hardstand runoff system this is a system separate from the roof water system designed to treat runoff from all ground areas within each Lot prior to infiltration in the vegetated easements Road runoff system this is a system to treat all road runoff external of the lots prior to infiltration. The WSUD strategy protects the underlying drinking water aquifer and conserves and reuses stormwater. It protects the receiving waters and is designed to limit the 1:100 year postdevelopment flow to less than that which occurred prior to development. WSUD system components and configuration Rain and stormwater from each of the three sub-systems is treated in a treatment train employing a number of components. Beginning independently, the Hard Stand and Road sub-systems link towards the end of each system. The Roof-Water sub-system is independent of the other two. The components of each of the WSUD sub-systems are shown in Figure 2. Figures 3, 4 and 5 show the configuration of sub-system components.

Kinross Business & Industrial Park WSUD system Allotment Stormwater Off Allotment Stormwater ROOF-WATER Rainwater Tanks to reduce the volume of runoff and to reduce load that would otherwise enter the roof infiltration trench. They are plumbed into buildings for toilet flushing, irrigation of lots, vehicle washing, etc. Infiltration /seepage trench - to drain tank overflows, ultimately recharging the groundwater aquifer HARDSTAND RUNOFF On-site runoff collection system kerb and gutter, pits and pipes designed for a minimum 1in 10 ARI storm event Oil/grease separator Small CDS units collect litter, debris and coarse HydroCon infiltration trench collects and infiltrates stormwater flows generated from hardstand areas. The permeable concrete HydroCon pipe located within the trench allows water to permeate through the walls of the pipe and seep into the trench. The pipe provides significant stormwater treatment including capture of metals, Phosphorus and fine s ROAD RUNOFF SYSTEM EnviroPod pit baskets to capture litter and coarse. Flows are directed into a cleanable 200-micron filter bag (0.16m 3 capacity approx.). Overflows can bypass the basket Oil/grease separator CDS units collect litter, debris and coarse Pits connected to a bioretention trench/grassed swale located behind the kerb on each side of the road End-of-system bioretention basins to infiltrate surcharged flows from lots and road bioretention trenches/grassed swales Figure 2. WSUD sub-system and their components which comprise the Kinross WSUD treatment train. Major flow path to Windeyers Ck and infiltration areas in easements Road treatment system gross pollutant capture, hydrocon pipe & infiltration Figure 3. Location of road runoff treatment system and major overland path

Figure 4. Lot treatment system for hardstand runoff (similar configuration used on roads) Figure 5. Roof water system of allotments WSUD system performance Hydrology Design Storms The following objectives were adopted in the design of system components. gravel trenches - 1 year ARI storm events HydroCon pipes - 1 in 3 month ARI storm event The lot based infiltration trench - no overflow in a 5 year ARI storm event. Peak Flows The proposed road drainage system has been designed to infiltrate the whole of the 100 year ARI.

The pre-development flows are not exceeded. The post development flows achieve effective treatment and infiltration to replenish Tomago aquifer (Table 2). Table 2: Comparison of pre- and post-100 year ARI peak flows Storm duration Pre-development peak flow rate (m 3 /s) Post-development peak flow rate (m 3 /s) 1hr 1.650 0.985 2hr 1.901 1.633 6hr 1.027 1.609 12hr 0.927 1.231 24hr 0.696 1.127 Maximum 1.901 1.633 Water Quality Lot-based system Estimated performance of the lot-based system proposed for Kinross Industrial and Business Park is summarised in Table 3. Table 3: Estimated pollutant retention percentages from the Lot-based stormwater system components Pollutant Sediment Phosphorus Nitrogen Visible Oils/Grease Sediment and Oil Trap HydroCon pipe system Sand media surrounding pipe Council SMP requirement Total Retention 100% coarse 80% of fine 50% of ave ann load for particles 0.1mm Up to 80% of fine 20% to 30% on attached particles 50% of remaining Phosphorus Minimal adsorption by sand 20% to 30% on attached particles No retention Up to 45% retention of TN 45% 45% > 50% 45% The HydroCon treatment system confers the following water quality benefits: 100% of visible & treat min 90% of flow 90% average annual pollutant load 100% of visible & treat min 90% of flow The ph of water in the pipes is altered by the alkalinity of the pipes themselves. This facilitates the settling of pollutants from the water column. The velocity of flow through the pipe wall is so low that velocities inside the pipe are also very low. This enhances the settlement process described above as well as allowing for the settlement of very fine particles inside the pipe. Water passing through the pipe wall experiences an adsorption process via anionic exchange facilitating the adsorption of Phosphorus and metals. The HydroCon pipes are also predicted to remove close to all including very fine particles and 99% of metals. The pipes will not remove Nitrogen other than that associated with s that are removed. Nitrogen levels on this industrial estate are not expected to be high and Nitrogen removal will occur in the sand media that surrounds the pipe and as it

percolates to the aquifer below. A minimum buffer of 1m of sand is to be maintained in each location on this site to buffer the aquifer and remove residual nitrogen from the flow. Modelling of a sand filter constructed at Kiama and designed by STORM with a 1m depth of sand was predicted to remove greater than 45% of the nitrogen from the water column (STORM, 2002). Monitoring results from a sand filter treating stormwater in Kiama supports this retention rate (Dunphy et al, 2005). Road runoff system Table 4 details the expected performance of the proposed combined bioretention and HydroCon pipe system. The proposed system will enable compliance with Council s SMP requirements with Windeyers Creek and the Tomago drinking water aquifer significantly benefiting from the adoption of an infiltration approach. Table 4: Estimated pollutant retention percentages from the road stormwater system components Pollutant Sediment Phosphorus Nitrogen Visible Oils/Grease Bioretention system HydroCon pipe system Sand media surrounding pipe Council SMP requirement Total Retention 100% coarse 80% of fine 50% of ave ann load for particles 0.1mm Up to 80% of fine Facilitation of approval 20% to 30% on attached particles 50% of remaining Phosphorus Minimal adsorption by sand 20% to 30% on attached particles No retention 45% retention of total nitrogen. 45% 45% > 50% 45% 100% visible & treat min 90% of flow 90% average annual pollutant load 100% of visible & treat min 90% of flow Since this type of stormwater treatment system had never been previously implemented, considerable effort and resources were invested into demonstrating to NSW Government and Council officers that the WSUD strategy would protect the underlying Tomago drinking water aquifer. To facilitate demonstrating the effectiveness of the WSUD strategy, the site developer invested in an Australian Research Council (ARC) trial which was realised by way of designing and constructing a pilot scale system within the grounds of the Weathertex factory site. ARC research project partners from University of Technology Sydney monitored this project (Dunphy et al 2005). Conclusions The WSUD strategy implemented at Kinross Industrial and Business Park demonstrates how a carefully designed and constructed WSUD strategy was able to resolve several competing environmental and physical site constraints. The adopted WSUD strategy represents a significant departure from the Government recommended approach of a traditional sealed development with detention and wetland treatment. It relies on roof water reuse and high levels of pre-treatment in a WSUD treatment train prior to infiltration to the drinking water

aquifer below. The ultimate approval of the WSUD strategy was facilitated by the results of a pilot scale research trial. References Port Stephens Shire Council (2003): Development Control Plan LD13 Development Guidelines - Water Quality - Kinross Industrial Estate, Heatherbrae, April 2003. STORM CONSULTING 2002: Hindmarsh Park Sand Filter Design Report Prepared for: The Stormwater Trust and Kiama Council, Sydney; STORM CONSULTING Pty Ltd, 2002 Dunphy et al (2005): Confined Water Sensitive Urban Design (WSUD) Stormwater Filtration/Infiltration Systems for Australian Conditions; 10th International Conference on Urban Drainage, Copenhagen/Denmark, 21-26 August 2005; A. Dunphy & S. Beecham (Faculty of Engineering, University of Technology Sydney), C. Jones (Kiama Municipal Council), A. Collins (Hornsby Shire Council), M. Liebman (Storm Consulting Pty. Ltd.), J. Wells (HydroCon Australasia Pty. Ltd.), P. Michael (Residual Pty. Ltd.).