Title: In-House Green Building Certification Supporting Documentation Issued by: Sustainability Department (Green Building Department)

Similar documents
CE Option 1 and 2 - Provide the pre-development site run -off rate (cfs) CE Option 1 and 2 - Provide the pre-development site run -off quantity (cf)

L E E D S C O R E C A R D ( B U I L D I N G D E S I G N & C O N S T R U C T I O N )

Appendix C APPLICATION #: ADDRESS: CITY OF SANTA CRUZ GREEN BUILDING PROGRAM GREEN POINTS CHECK LIST FOR NON-RESIDENTIAL BUILDINGS

Allowance Table for: General:

LEED Application Guide for Multiple Buildings and On Campus Building Projects

LEED 2009 Core and Shell, Commercial Project Summary and Checklist New Construction

Sustainable Design A DIVISION OF SHIVE-HATTERY

LEED 2009 for New Construction and Major Renovations

Green Buildings, and LEED Certification. By Mohammad Tassi, BME, MEM, LEED AP, CxA, USGBC Faculty Sustainability & LEED Consultant

LEED 2009 for Commercial Interiors. Presented by: Colleen McCafferty LEED AP Roselia Harris LEED AP

The Application of LEED Green Building Rating System in Indonesia

Prerequisite. prerequisite.

LEED BUDGET IMPACTS. LEED Architectural Credits

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods

LEED New Construction v.2.2 semi BLANK Study Guide Credit Number Credit Name Intent and Implementation Code or Standards Extra Credit Sub.

LEED-CI ANALYSIS 1 LANDMARK SQUARE STAMFORD, CT

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT

LEED-CI ANALYSIS 6 LANDMARK SQUARE STAMFORD, CT

LEED-CI ANALYSIS 4 LANDMARK SQUARE STAMFORD, CT

500 WEST PUTNAM AVENUE GREENWICH, CT

Above: Northwest corner Below: Southwest corner

LEED-CI ANALYSIS 115 STEVENS AVENUE VALHALLA, NY

Bim Kendall House, Haub School of Environment and Natural Resources

LEED Project Delivery Process Manual Appendices

Duke Sustainability Sands Parking Garage

LEED-CI ANALYSIS 140 GRAND STREET WHITE PLAINS, NY

How to Interpret this Report

NPS Project Sustainability Checklist Building Projects (For New Construction or Major Renovation)

Genentech Building 20 Office LEED-CI Gold XL CONSTRUCTION

SECTION SUSTAINABILITY CERTIFICATION REQUIREMENTS LEED NC V3

Prerequisites must be achieved. Non-compliant prerequisites must be resolved before a certification can be awarded.

ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations

University of Hawaii Law School Honolulu, HI. Preliminary LEED Goals Report 10/4/2007

ASHRAE/USGBC/IES Standard What Does It Mean for Commissioning Providers?

HPBS [ HIGH PERFORMANCE BUILDING STANDARD]

LEED REQUIREMENTS. Source reference: Supplemental Guidance to the Minimum Program Requirements (MPR), Rev. 2, 9/1/2011

LEED CERTIFICATION PROJECT REVIEW REPORT

Special Mention, Architecture + Sustainability

ACADIA GATEWAY LEED NC 2.2 LEED Credit Summary Issued: January 22, 2009

Exemplary Performance

EnviroLube LEED Point Contribution

Introduction to LEED v4 Lyle Scott May 22, 2014

CITY COUNCIL AGENDA REPORT

THERMA-FUSER VARIABLE AIR VOLUME DIFFUSER SYSTEMS

Sustainable Sites (SS): where the building is located matters. SSc1 Site Selection

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA

Projected actual points. Responsible for UNC -- Project name. Remarks

STADIUM. ZONING COMMISSION District of Columbia. Case No ZONING COMMISSION District of Columbia CASE NO EXHIBIT DeletedNO.

LEED Application Guide for Multiple Buildings and On-Campus Building Projects

Update on LEED v3. All projects registered after June 26, 2009 must be under the guidelines of LEEDv3. A LEEDv3 summary of changes:

Decatur Fire Station No. 2

CONTENTS. 71 Section 01352, #7 (Life Cycle Cost and Life Cycle Assessment) 2/1/12 Modified entire section 72 Section 01352, #8 (Sustainability

SACRAMENTO County New Animal Care Facility LEED Elements

LEED Leadership in Energy and Environmental Design

The USGBC booklet, LEED for Existing Buildings: Operations

Environmental Principles

10. LEED RATING EVALUATION

APPENDIX 01: SAMPLE PRODUCT SUBMITTAL FORM (3 pages) URBAN ARTS ARCHITECTURE Abbott St, Vancouver, BC V6B 2K4 (604)

Client Procedure for Green Building Submissions During EHS-NOC Building Completion Certificate (NOC-BCC) (Projects following LEED)

Research Analysis: Building Envelope and LEED Credits Introduction


- AIA Honor Award for Interior Architecture - ALA/IIDA Library Interior Design Awards: Best

LEED for Commercial Interiors

What s New in LEED O+M v4: Get Ready for the Future! A Presentation by The Sustainability Experts Leonardo Academy At NFMT Las Vegas

LEED EB:OM Credit Catagories

Green Building Rating System For Commercial Interiors

2011 Enterprise Green Communities Criteria Checklist

LEED And Your Indoor Environment

Version 2. LEED Project Final LEED v2 Review TM. How to Interpret this Report. Final Rating is Certified. LEED Certification 2/5/2007

Fernow Hall LEED FOR NEW CONSTRUCTION & MAJOR RENOVATIONS (V2009) LEED Certification Review Report

Federal Requirements Complete

Green Buildings at Harvard

LEED LEED LEED. Earth Tech, Inc. Earth Tech, Inc. A Firm With Experience. A Firm With Experience. Operational Efficiencies & Resources Preservation

COUNTY OF SACRAMENTO DEPARTMENT OF COMMUNITY DEVELOPMENT BUILDING PERMITS & INSPECTION DIVISION

LEED : What is it and what does it mean for Synthetic Turf? Patrick Maguire, LEED AP President Activitas Inc.

California State University, Sacramento February 24, 2010

GREEN BUILDING GUIDELINES

2016 LEED Equivalency Analysis for Stanford Campus

CALGREEN NON-RESIDENTIAL BUILDING Checklist

Errata Sheet. LEED for Schools Reference Guide First Edition for the document titled:

LEED, Green Mark, Green Building Index

A PRACTICAL GUIDE TO SAN FRANCISCO'S GREEN BUILDING ORDINANCE

Note year for Reference as Specified in the LEED V Manual.

30% 85% 37% PROJECT HIGHLIGHTS LEED Facts. Lecture Hall BioLabs Building

Chapter 8: Indoor Environmental Quality

UBC Residential Environmental Assessment Program

Ecole Connaught Community School Welcomes. CaGBC Sask Chapter Members & Colleagues

City of Millbrae 2016 CALIFORNIA GREEN BUILDING CODE CHECKLIST FOR NEW NONRESIDENTIAL BUILDINGS

Green Globes NC Criteria Comparison to LEED 2009 and LEED v4

SSV NAVIGATING BAY AREA WATER: EMERGING TECHNOLOGY SOLUTIONS. May 31, 2018

Green Building Rating System For Commercial Interiors

GUIDELINES ON ENERGY CONSERVATION IN SEZs

Understanding the 2010 California Green Building Standards Code

Review. Setting the Stage

Green Building Rating System For Commercial Interiors. Version 2

ELG4126 Sustainable Development for Electrical Engineers

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

Jim Sinopoli, PE, RCDD, LEED AP Managing Principal Smart Buildings, LLC

HOW TO SELL RES-PROJECTS IN ROMANIA

GREEN BUILDING REQUIREMENTS

Transcription:

Guideline No.: GB/007 Issue Date: 1/04/2013 Title: In-House Green Building Certification Supporting Documentation Issued by: Sustainability Department (Green Building Department) Introduction This document is being issued by EHS Sustainability department in the interest of the stakeholders so that all the collective efforts put in the project can be collated and made part of In-House Certification Submissions. Most importantly this document is to provide the stakeholders with a broad perspective of the type of evidence EHS Sustainability Department expects in the process of review of the submissions for the certifications Scope This general guideline is applicable to all the stakeholders involved in the Green building projects within Dubai World business units under the Ports, Customs and Free Zone Corporation (PCFC) that have opted to seek EHS Certification for the Green Building Projects Aim The aim of this document is to highlight the importance of supporting documentation and evidence in order to establish the fulfillment of a credit / sustainability initiative in the project. It is important that the project stakeholders comprising the client, consultant, green building specialist and others together are able to demonstrate the compliance to the Regulation and its requirements in a clear and consistent manner. This entails supporting documentation comprising calculations, reports, photographs etc. depending on the nature of the credit. Sections This guideline is given in the form of a table listing the documentation required as evidence to support the compliance of the credit. Revision: 00 April 2013 Page 1 of 14

Conclusion This guideline provides a broad framework of the documentation involved in actual implementation of the green building principles and is intended purely to familiarize the client and the other stakeholders on the need to adequately demonstrate the compliance through several mechanisms. The table attached below is not meant to serve as an exhaustive and all inclusive list encompassing all the aspects of sustainability. While this serves to throw light on the basic requirements, the stakeholders can exercise their option and judgment in including other forms of evidence that they feel are crucial in demonstrating the compliance. This guideline does not bind EHS in limiting its response to the elements of the table. EHS has the right to ask additional information / clarification/documentation that it may feel essential prior to fulfillment of the requirements and award of the credit. Should you need any assistance please do not hesitate to contact the department. Revision: 00 April 2013 Page 2 of 14

SUSTAINABLE SITE Construction Activity Pollution Prevention SS P1 Document Erosion and sedimentation Plan prepared and implemented on site Training session photographs by contractors for the workers Erosion and sedimentation plan (ESC) implementation photos in site Drawings documenting Erosion and sedimentation plan (ESC) measures Site Selection Density Development (DD) & Community Connectivity (CC) Brown Field Redevelopmen t Alternative Transportation - Public Transportation Alternative Transportation - Bicycle SSC1 SSC2 - Option1 - DD SSC2 - Option 2 - CC SS C3 SS C4.1 SS C4.2 Undertaking letter from client on confirming the site does not meet prohibited criteria Narrative If there are any special circumstances Site location plan with density boundary Project site detailed area statement List of site and building areas within the radius (calculated with density radius formula) Site location plan with 1/2 mile radius Project site detailed area statement List of services available inside the radius (at least 10 basic services) Relevant Photographs Undertaking letter from client confirming the development as brown field Narrative providing details of contamination & strategies followed for remediation Site photographs showing the implementation of remediation if available Site location drawing showing the nearest rail or bus stops List of Rail or bus stops and their distance to the site Site photographs showing locations of Rail or Bus stops Calculations for Full time equivalent occupancy and transient occupancy As-Built showing Bicycle racks, showers and changing Revision: 00 April 2013 Page 3 of 14

storage and changing rooms Alternative Transportation - Low- Emission & Fuel Efficient Vehicles Alternative Transportation - Parking Capacity Site Development - Protect or Restore Habitat Site Development - Maximize Open Space SS C4.3 SS C4.4 SS C5.1 SS C5.2 Document rooms Calculations for satisfying the quantity of bicycle racks, showers & changing rooms Site photographs showing Bicycle racks. Calculations for Full time equivalent occupancy and parking capacity Site photographs showing locations of preferred parking spaces and recharging station As-Built showing locations of preferred parking spaces and recharging station Confirmation of the alternate fuel type Calculations for Full time equivalent, total parking capacity and confirmation path of compliance Option 1 (Non Residential) Evidence confirming that parking capacity provided is below the code requirement Option 1 (Non Residential) Evidence confirming preferred parking for carpools & van pools for 5% of the parking spaces Option 3: Narrative from client for carpool program and confirmation about no new parking. Option 4: Confirmation of "No New Parking Spaces" through letter / photos as applicable. Project site area statement shown in the drawing and the building foot print area Narrative on approach to satisfy the credit For Greenfield Sites: Drawing showing the boundaries of disturbance For Developed Sites: Area of the site that is restored along with the landscape plan Site photographs for restored areas Project site area statement including building footprint area along with landscape drawings and Narrative Calculations of area of open space required by code and area of open space actually provided Site photographs if completed and applicable Storm water SS C6.1 Calculation for pre development site run off rate & quantity Revision: 00 April 2013 Page 4 of 14

Design - Quantity control Document Calculation for post development site run off rate & quantity Narrative on storm water management strategies and percentage of rainfall each measure would be able to handle. Site photographs of strategies handled for storm water management List of Non-structural best management practices, narrative and percentage annual rainfall treated List of structural controls, pollutant removal by each control & percentage annual rainfall treated Site photographs of structural and non-structural best management practices followed Heat Island Effect - Non - Roof Heat Island Effect - Roof SS C7.1 SS C7.2 As-Built drawings highlighting paving materials, landscape shading & covered parking with SRI 29 cover Option 1: SRI's for each paving material and total area of site hardscape area, area of hardscape to be shaded, area of installed SRI materials and area of open grid pavement Option 2: Total no. of parking spaces provided on site and total no. of covered parking spaces. Material data sheets of the products / Material conforming the SRI values Site photographs of the paving material, covered car parks, etc., as relevant to the credit Option 1: Total area of SRI compliant roofing, listing of roofing materials & corresponding SRI values. Option 2: Total area of installed green roof system ( E.g.: Vegetated roof) Option 3: Combination of area with green roof system and area with installed SRI roofing Site photographs of the roof showing the SRI reflective coating and/or vegetated roof Material data sheets of the products / materials conforming the SRI values Revision: 00 April 2013 Page 5 of 14

Document Light Pollution Reduction SS C8 WATER EFFICIENCY Water use Reduction: 20% & 30% Water Efficient landscaping: Reduce by 50% & No potable water use WE P1 & WE C3 WE C1.1 & 1.2 Project internal and external lighting drawings As-Built drawings or narrative explaining that light does not pass through windows As-Built drawings showing automatic controls installation locations Detailed lighting power density (LPD) tables in comparison with ISENA RP-33 Confirmation on site zone classifications Detailed lighting simulation showing the lumen calculation on the external & boundary of the building Site photographs exhibiting the implemented of the credit on site Narrative explaining the compliance towards the credit featuring the avoidance of internal and external light pollution Calculations showing the full time equivalent occupants and transient occupants Calculation showing the water usage for design case (both flow & flush fixtures) Calculation showing the water usage for base line case (both flow & flush fixtures) Final calculation showing quantity of non-potable water supply Narrative or undertaking of the annual water reduction achieved in the project as applicable Approved Material data sheets (duly approved by the GB consultant) mentioning the flows of the various flow and flush fixtures used Photographs Narrative of various local plant species, density, micro climate factor & Type of irrigation Site plan showing the landscaped areas Calculations showing the baseline Total Water Applied (TWA) and design case TWA and percentage of potable water use reduction for irrigation complying the credit Revision: 00 April 2013 Page 6 of 14

Innovative Wastewater Technologies WE C2 Document requirement Approved Material datasheets of fixtures (duly approved by the GB consultant) for compliance to requirements As-Built Plumbing drawings Calculations showing the full time equivalent occupants and transient occupants Calculated baseline water usage for sewage conveyance Calculated design case water usage for sewage conveyance Total quantity of Non potable water utilized Approved Material datasheets of fixtures (duly approved by the GB consultant) mentioning the flows of the various flush fixtures used Material data sheets of STP if used Annual quantity of waste water treated Narrative on the compliance towards the credit ENERGY & ATMOSPHERE Fundamental Commissionin g of Building Energy Systems EA P1 Letter of Commissioning Authority where relevant and applicable Finalized Owner's project requirements OPR Finalized Basis of Design BOD Evidence to support that commissioning requirements are incorporated into the construction documents Evidence to indicate development of the commissioning plan for the project Evidence for implementing the commissioning plan Evidence for verifying the installation of the systems to be commissioned. Evidence for verifying the performance of installation of the systems to be commissioned. Narrative of the systems that were installed and commissioned Summary of the commissioning report Minimum EA P2, EA Energy modelling report prepared by GB consultant Revision: 00 April 2013 Page 7 of 14

Energy Performance & Optimize Energy Performance Fundamental Refrigerant management Onsite Renewable Energy C1 EA P3 EA C2 EAP3 Document complying the requirement of the credit Energy modelling Software output U Values and the sectional details of Walls, Roof, Glass. Skylight, etc., which is incorporated in the heat load estimate, energy modelling report and actual project. Approved Material datasheets of KEY envelope materials (duly approved by the GB consultant) for compliance to thermal requirements (U values, SC) Approved Material datasheets showing EER of the AC Equipment & COP values of central plant (duly approved by the GB consultant ) Demonstrate prescriptive compliance path with Advanced Energy guide using Option-1 or 2 or 3 if applicable Demonstrate prescriptive compliance path with Advanced buildings Core Performance Guide if applicable Confirmation on the Refrigerant being used for the project Narrative Percentage calculations of the proposed renewable energy used in the project Material Datasheets for the renewable system installed for the project As built for the Renewable system Installed Narrative of the renewable energy sources used in single or combination to offset the annual electrical energy consumption i.e. solar PV / Solar Thermal / Wind etc. As Built drawings solar PV / Solar Thermal/others Evidence for having carried out Commissioning design review prior to mid-construction documents. Evidence -Reviewing contractor submittals applicable to systems being commissioned. Evidence - Development of Systems Manual for the commissioned systems Narrative of the results of design review of systems manual Proof of Training session for the facility management team on the MEP systems for O&M phase. Plan and checklists for the follow-up review Revision: 00 April 2013 Page 8 of 14

Enhanced Refrigerant management Measurement and Verification EA C4 EA C5 Document Calculations for Ozone depleting Potential (ODP) Calculations for Global Warming Potential (GWP) Material data sheets of the refrigerant Confirmation of the IPMVP option as applicable for the project M & V plan for the project Metering Schedule for facilitating the M & V. Narrative mentioning the follow up actions during the M&V implementation of 1 year post occupancy period Overall strategy Letter of commitment. understanding from the client Green Power EA C6 MATERIALS & RESOURCES Storage and collection of Recyclables Building Reuse - 75% & 95% of existing walls, floors & Roof MR P1 MR Cr 1.1,1.2 Undertaking letter from the client for recycling of the waste generated. As - Built Drawing showing the area allocated for the recycling with the kinds of waste to be recycled Narrative of the waste recycling program (operative phase) by the client Relevant site photographs Narrative confirming whether the project is strictly a renovation or renovation with addition and optional addition of how the phases of construction from the existing towards the proposed renovation or renovation with addition Tabulation of existing and reused areas (sq.) of each structural/ envelope element like steel, concrete, bricks, part of walls, part of roofs, etc., Narrative confirming whether the project is strictly a renovation or renovation with addition Building Reuse - 50% of interior nonstructural MR C 1.3 Tabulation of existing and reused areas (sq.ft) of each elements non-structural interior element like doors, windows, etc., Construction MR C Construction Waste Management Plan (CWMP) with Revision: 00 April 2013 Page 9 of 14

Waste Management 50% & 75% divert from disposal Material Reuse - 5%&10% Recycled Content - 10% & 20% ( Post consumer + 1/2 Preconsumer) Regional Materials - 10% & 20%, Extracted, Processed & manufactured regionally Document 2.1,2.2 description and format of tables which that was used for monitoring the waste management during construction. Duly filled tables of weekly or monthly for various kinds of waste generated and diverted from disposal. Finalised summary to demonstrate the compliance to the credit. Site photographs taken during construction waste management Construction Waste Management Plan (CWMP) training photos and attendance sheets where applicable and relevant Receipts from the receiving agent to whom the waste is sent for recycling or further processing Total project material cost with classifications for major materials like steel, cement, bricks, gypsum boards, etc., MR C 3.1, List of reused or salvaged materials and their 3.2 corresponding costs Percentage calculations based on cost for the total use of salvaged/reused material. Final summary MR C 4.1, 4.2 MR C 5.1, 5.2 Total project material cost with classifications for major materials like steel, cement, bricks, gypsum boards, etc., (or total project cost*45% default materials value) Table of each material including description of the material, the manufacture, the product cost, the pre consumer and/or post-consumer recycled content % and source of the data. Final Summary Letters from manufacturers mentioning the percentage of the recycle content Optional narrative on the project relevant to this credit Total project material cost with classifications for major materials like steel, cement, bricks, gypsum boards, etc., (or total project cost*45% default materials value) Complete regional material calculation table including manufacturer, total product cost, percentage of product by weight that meets both extraction and manufacture criteria, distance from extractions/harvest/recovery site and project site; distance between manufacturing location and project site. Final Summary Letters from manufacturers mentioning the distance Revision: 00 April 2013 Page 10 of 14

Rapidly Renewable materials MR C 6 Certified Wood MR C 7 INDOOR ENVIRONMENTAL CONTROL Minimum IAQ Performance Environmental Tobacco Smoke Control EQ P 1 EQ P 2 Document between manufacturing location and project site. Optional narrative on the project relevant to this credit Total project material cost with classifications for major materials like steel, cement, bricks, gypsum boards, etc., (or total project cost*45% default materials value) Table mentioning each product name of each tracked material, manufacturer, total product cost for each traced material, percentage of product by weight of the tracked material. Letters from manufacturers mentioning about the rapidly renewable materials List of items claimed as FSC certified, including product type, manufacturer and COC certificate number. Calculation showing the percentage of the wood based materials involving FSC certified wood. Optional narrative on the project relevant to this credit Design narrative describing the ventilation design for the project For mechanically ventilated building: Fresh air calculation sheet confirming that the ventilation is designed as per ASHRAE 62.1-2007 sections 4 through 7 For Naturally ventilated Building: As-Built Drawings confirming window openings meet the requirement as per ASHRAE Correlation between the calculated fresh air quantity and the fresh air equipment Site photograph of Natural and Mechanical Ventilation units Undertaking letter from client for declaring the project as Non-smoking zone As-Built Drawing showing the locations of Non-smoking signage's and designated smoking zone as per regulations if any Site photographs showing "No Smoking" Sign Board Details of the door blower test undertaken with Revision: 00 April 2013 Page 11 of 14

Document calculations, photographs, findings and the rectification works (where applicable) Outdoor delivery monitoring Increase Ventilation Air Const. IAQ Management - During construction Construction IAQ Management - Before Occupancy Low Emitting materials - Adhesives & Sealants, Paints & Coating Low Emitting materials - EQ C 1 EQ c 2 EQ C 3.1 EQ C 3.2 EQ C 4.1, 4.2 EQ C 4.3 As-Built Drawing showing CO2 monitoring controls Narrative of the ventilation system Photographs of the installed controls and monitoring system Fresh air calculation as per ASHRAE 62.1 and show 30% more fresh air inclusion for the project. Correlation between the calculated fresh air quantity and the fresh air equipment Narrative on the design of fresh air requirement. confirm that the design meet Carbon Trust Good Practice Guide for naturally ventilated buildings IAQ management plan - During construction Training photos of the contractors to their workers for the plan implementation Attendance sheets for various IAQ Training sessions where generated If AHU's used during construction: List of filtration media used in various areas and routine check-up evidence Site photographs taken during IAQ management plan implementation IAQ management plan - Before Occupancy Flush out procedure and calculations Site photographs of flushing Site photographs (IAQ Testing) IAQ testing results if applicable Letters from the manufacturers containing the VOC contents of adhesives, sealants, paints & coatings List of above mentioned items with their VOC along with the allowable VOC in a table. Final summary List of each carpet or cushion used in the project. As-Built Drawing mentioning the areas of usage of carpets Revision: 00 April 2013 Page 12 of 14

Carpet Systems Low Emitting materials - Composite wood & Agrifiber Indoor Chemical & Pollutant source control Controllability of Systems- Lighting Controllability of Systems- Thermal comfort Thermal Comfort - Design EQ C 4.4 EQ C 5 EQ C 6.1 EQ C 6.2 EQ C 7.1 Document and cushion. Site photographs Narrative on the carpet and cushion systems used List of each composite wood and agrifiber used in the project. Manufacturer s undertaking letter confirming product is free from urea formaldehyde Site photographs As-Built Drawing showing the provision of entry way system Datasheets of MERV 13 filters used in the projects List of MERV 13 filters used in various equipments of the project In case of chemical storage areas, drawing demonstrating separate exhaust systems and negative pressure calculations List of lighting controls in the project. As-Built Drawing mentioning the zones controlled by each lighting controller Calculations showing percentage of area covered by the lighting controls. Photographs of lighting controls List of Thermal comfort system controllers used in the project. As-Built Drawing mentioning the zones controlled by each thermal controller As-Built Drawing showing the windows used for the natural ventilation in the periphery which would comply the intent of the credit Calculations showing percentage of area covered by the Thermal comfort controls system. Photographs of Thermal comfort system control. Evidence to confirm the HVAC systems have been designed to meet the requirements of ASHRAE 55-2004 Narrative describing the method to establish thermal comfort conditions Revision: 00 April 2013 Page 13 of 14

Thermal Comfort - Verification Day lighting & Views - Daylight 75% of spaces Day lighting & Views - Views for 90% of spaces EQ C 7.2 EQ C 8.1 EQ C 8.1 Document Narrative describing the survey planned and provisions for plan of corrective actions Format of Thermal comfort survey sheet issued to the client Glazing factor calculation sheet demonstrating the overall lighting levels in the spaces Computer Simulation results, if applicable As-Built Drawings to demonstrate min illumination levels through daylight measurement method, if applicable As-Built Drawings showing the access to outdoor environment for building occupants Narrative on the compliance towards the credit compliance Innovation Design in ID C 1.1,1.2,1.3, 1.4 Submit the relevant drawing, calculation or datasheet to prove the exemplary performance for the credit applying in this category LEED Accredited Professional ID C 2 LEED AP / Equivalent certificate of the Team member responsible for administering the process of Green Building certification Revision: 00 April 2013 Page 14 of 14