Building Envelope Solutions, Inc. Identifying solutions for better building performance

Similar documents
Henri Fennell, CSI/CDT ABX 2015

Gensler 2014/06/16 Hertz Global Headquarters ISSUE FOR BUILDING PERMIT Estero, Florida SECTION

SECTION SELF-ADHERING SHEET FLASHING

SECTION FLASHING AND SEALING FRAMING WITH NON-CHEMICAL TERMITE BARRIERS

Guide Specification for the OSI QUAD Window and Door Flashing System

How do you install yours?

DIVISION 7 MARFLEX 5000 FLUID APPLIED AIR & VAPOR BARRIER - 3 PART SPEC 07262

A. Section includes fluid applied, vapor permeable membrane air barriers.

INSTALLING WATER-RESISTIVE BARRIERS & FLASHING

WeatherSmart Air Barrier Installation Guide

Rain. Building Science. Rain is the largest source of moisture We need better control for better insulation and airtightness Rain penetration control

Installation Guide Sto RapidGuard

The Devil is in the Details Learning Objectives! Targets and codes have raised awareness People know you need

Dow Corning Silicone Air Barrier System. A more. energy-efficient. shade. green

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Roof

GCP APPLIED TECHNOLOGIES PERM-A-BARRIER VPL 50

SRP-AirOutshield UV Issued:

The better way to build TM. Installation Manual NAILBASE PANELS

Quality Control of Air Barriers During Construction

SECTION SUPERGREEN LAM (LIQUID-APPLIED MEMBRANE AIR/VAPOR BARRIER SYSTEM)

Evaluating effectiveness of window/wall interface details to manage rainwater Selected Results from US Window Installation Practice

Pella 250 Series. Wood Frame Construction with Vinyl Siding... V250-ID-888 Wood Frame Construction with Brick Veneer...

NOVAWRAP ASPIRE Q & A

SECTION INJECTED or CAVITY-FILL POLYURETHANE FOAM (IPF)

ELEVATION FOR DETAIL REFERENCE ONLY

HP+ Building Enclosure Systems. Affordable Solutions for Title 24 and Beyond

ZIP SYSTEM Roof & Wall SHEATHING

Evaluation Report CCMC R Surround HouseWrap - Air Barrier Material

Evolution of Wall Design for Controlling Rain Penetration

PERM-A-BARRIER NPS Detail Membrane

SECTION REFLECTIVE-FACED, MASONRY CAVITY WALL INSULATION

SECTION FLUID-APPLIED MEMBRANE AIR BARRIERS, VAPOR PERMEABLE

SECTION FLUID-APPLIED WATERPROOFING

Tech Solutions WEATHERMATE Straight Flashing. Commercial Installation Guide

PERM-A-BARRIER VPS. Product Description. Product Data Sheets. Self-adhering vapor permeable air and water barrier membrane

StoGuard Air Barrier Installation Manual

WrapShield SA Brick Tie Penetration

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

Product and System Specifications DuPont Flashing Systems

Proper Installation of Insulated Metal Wall Panels

AA Series 150mm Frame Doors (3 & 6 Panel Stacker Doors Illustrated)

HP+ Wall System X Series Technical Installation Manual

7.0 - EXAMPLE DETAILS

PART 2 - AIR BARRIERS SELF-ADHESIVE

AcroWall-ES System. Class PB Exterior Insulation and Finish System providing a primary moisture barrier. Typical Details

Pebbletex Wall System Class PB Exterior Insulation and Finish System providing a primary moisture barrier. Typical Details

8/14/2015. Course Description. Course Objectives AIR, WATER, AND MOISTURE MANAGEMENT IN LIGHT COMMERCIAL BUILDING ENVELOPES

Installation Guidelines

** NOTE TO SPECIFIER ** Delete any sections below not relevant to this project; add others as required. A. Section Mechanical Insulation.

Revised January buildingscience.com. Water Management Details. Housewraps/Flashings/Windows buildingscience.com

Incorporating Insulating Sheathing into the Design of the Thermal and Moisture Management System of the Building Enclosure

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

Architectural Roof Products Guide Specifications

AA Series 90mm Frame Windows (Operated Casement Window Illustrated)

MAKE ROOFS LAST LONGER

Pol-E-Base Modified Bitumen Roof System

Integrated Air & Water Barrier Systems

RevealShield SA Penetrations

SECTION FLUID-APPLIED WEATHER AND AIR BARRIER SYSTEM FOR VENTILATED CAVITY

VAPROLIQUI-FLASH. Liquid Applied Waterproof Flashing Material INSTALLATION INSTRUCTIONS

SC-01 Cross-Section. Cement Board Substrate Master Wall Mesh and Base Coat Superior Finish

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

Master Specification WALLTITE Eco v.3 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1

Boston Society of Architects Building Envelope Committee 52 Broad Street Boston, MA 02109

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

SECTION SELF-ADHERED WATER-RESISTIVE ROOF UNDERLAYMENT

KNIGHT WALL SYSTEMS GUIDE DETAILS:

Master Specification ENERTITE by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1

FMA_AAMA_WDMA Installation Committee Update FMA Conference May 8, Naples, FL. Jim Katsaros FMA_AAMA_WDMA Installation Committee

Boundaries and Barriers

Master Specification WALLTITE ECO v.2 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION Page 1

SINGLE FAMILY USER S BULLETIN FOR INSTALLATION OF DUPONT WEATHERIZATION SYSTEMS PRODUCTS

Architectural Roof Products Guide Specifications

FlashGard/Termination Bar Minus Brick Wrap. FlashGard/Termination Bar With Brick Wrap. FlashGard Tape Detail Minus Brick Wrap

R E S I D E N T I A L B U I L D E R S R E F E R E N C E G U I D E

DuPont Tyvek Air Barrier Installation Guidelines. Canadian Version. Version 2

Henri Fennell, CSI/CDT ABX 2015

Building Science Control Layer Glossary. Façade Visible exterior face of a building, usually vertical or nearly so, but imprecisely used.

GAF EnergyGuard Polyiso Wall Sheathing

WALL SYSTEMS ( Ref: The Building Illustrated, Ching, Francis DK )

Perm-A-Barrier NPS (Non Permeable Sheet)

Magnum Board Coatings

SECTION FLUID APPLIED VAPOR PERMEABLE AIR BARRIER MEMBRANE

UNDERSTANDING DIFFICULT CRITICAL TRANSITIONS OF AVB SYSTEMS

Ultra Wall System. CAD Detail Sets

STRATUM GUARD I AND II An Exterior Insulation and Finish System with Drainage DSC106C. Stratum Guard I and II System Installation Details

Building Envelope Enclosures That Work, What Owners Want!

Master Specification WALLTITE ECO v.2 by BASF Canada Inc. Section SPRAY POLYURETHANE FOAM INSULATION/AIR BARRIER SYSTEM Page 1

SECTION MODIFIED BITUMINOUS MEMBRANE ROOFING Peel & Seal

NOVABRIK MORTARLESS CONCRETE BRICK VENEER SPECIFICATION. MASTERFORMAT SECTION (Mortarless Concrete Brick Veneer)

KNIGHT WALL SYSTEMS GUIDE DETAILS:

The Air Barrier Pre-Installation Meeting

WEB BASED APPLICATION SPECIFIC INSTALLATION INSTRUCTIONS

New Air and Vapor Barrier Technologies

A. Supplier Qualifications: The ACRYSHIELD SPF Roofing System, as supplied by National Coatings Corporation, is approved for use on the project.

ELEVATION FOR DETAIL REFERENCE ONLY

DuPont. Tyvek Sheathing Membrane Installation Guidelines. Version 2. Canadian Version

P.O. Box 1528 Mount Airy, NC InsulStar

AIR BARRIER SYSTEMS VAPOR-PERMEABLE AND NON-PERMEABLE. Sealed, Smart, and Sustainable WATERPROOFING & BUILDING PRODUCTS COMMERCIAL PRODUCT

Boston Society of Architects Building Envelope Committee 52 Broad Street Boston, MA 02109

Transcription:

Building Envelope Solutions, Inc. Identifying solutions for better building performance SUPERGREEN LAM TM (Liquid-applied Membrane) Background of the development of SUPERGREEN LAM TM : Spray-applied polyurethane foam (SPF) is fast becoming the preferred high-performance insulation system for cavity-wall construction. Historically, SPF has been used in combination with peel-and-stick membrane (aka SRAB) to provide a complete building envelope (insulation, vapor retarder, drainage plane, and air barrier) in rain screen and other exterior insulation system applications. Building Envelope Solutions, Inc. (BES) began installing the SPF-A/V Barrier cavity-wall system in the US in 1994. To our knowledge, the system had only been used in Canada at that time. An installation in Burlington, VT, designed by a Canadian architectural firm, led to our first project. The performance of this system was obviously far superior when compared to interior insulation installed in typical metal-framed commercial and institutional buildings. After receiving training provided by one of the major Canadian manufacturers and successfully completing our first project, we began to promote this system here in the US. Because this was a new technology to most architectural firms in the US, BES developed several AIA presentations introducing the approach and received approval for AIA/CES credit. The general presentation (AIA/CES 701) talks about the technical and practical reasons for using the system vs. other methods. The Details presentation (AIA/CES 702) addresses how to design, specify, and detail cost-effective, high-performance projects using this approach. The Construction Phase presentation (AIA/CES 703) addresses the construction and quality assurance protocols for this system. (See our introduction at http://www.foam-tech.com/services/courses/courses.htm.) After installing the system for a number of years, it became clear that the peel-and-stick membranes, while performing a necessary function, were the weak link in the system. In addition to quality assurance problems, the high labor costs and seasonal weather-related limitations of these types of installations had to be addressed for this system to be a successful alternative to previously used cavity - wall systems. This need led BES to the development of SUPERGREEN LAM TM (liquid applied membrane or LAM) in 2005. This unique material is a proprietary (patent-pending) product that has better physical properties than peel-and-stick sheet goods. It is designed to expand slightly during processing to fill or bridge gaps reliably. Most single-coat, spray-applied coatings run into cracks before they cure, leaving an incomplete air and water barrier. Peel-and-stick membranes can be effective in simple, relatively flat applications, but become more and more difficult to install as three-dimensional applications increase in complexity. Quality assurance testing indicates that these conditions are problematic when trying to achieve high-performance air and vapor barrier installations, and are not reliable when used as pan flashings and other complex, water-management applications. LAM offers efficient sequencing as it is installed at the same time as the SPF. It can be left exposed indefinitely. Peel-and-stick cannot. Installation is not hampered by cold, and installation at ambient and substrate temperatures from -20 to www.buildingenvelopesolutions.com Email: info@buildingenvelopesolutions.com

- 2-300 degrees is possible. It cures rapidly, has no VOCs, and is odorless. LAM is waterproof, airtight, and exhibits low vapor transmission. It has a Class 1 fire rating. The following pictures demonstrate the problems that can occur in sheet membrane installations that must be installed on difficult substrates, on complex, structural bracket shapes, in bad weather, and that may remain exposed to the sun for months before being covered by exterior cladding and trim. Lap seams must be primed, shingled, and rolled to assure a complete seal and watershedding capabilities. Lap seams are difficult to properly form and seal at inside corners and tend to be rounded, leaving openings that can leak air and water. Inside three-dimensional corners are complex and require additional sealants that may not be durable. Note that a wood stop has been added after the fact to allow the membrane to be used as a pan flashing. This required another layer of membrane that was difficult to lap up and under the side/jamb membrane to properly shingle the installation.

- 3 - Some membrane products will not stay fully adhered when exposed to the sun for even relatively short periods during normal construction schedules. When additional layers of membrane are required, they are often difficult to adhere. They create too much buildup in corners, often reducing shim space tolerances at windows.

- 4 - It is difficult and expensive to install sheet goods successfully on complex structural members like these granite cladding brackets. These sketch details shows how complex it can be to make airtight and watertight connections at brackets like these with peel-and-stick membranes. LAM would require only a single application step after the SPF has been installed.

- 5 - It is virtually impossible to successfully wrap carrying brackets that support relieving and window support angles with sheet goods. Complex quick turns and attachment hardware pose a significant challenge for peel-and-stick membrane installers.

- 6 - Membranes that are supposed to be fully adhered to substrates to avoid water and air infiltration are difficult to install on wet, dirty, and uneven substrates. Water and air can penetrate under these flashings. Terminations at changes in wall construction types are prone to water penetration where sheet goods end. In this detail, water can run off the end of the through-wall base flashing and under the adjacent curtain wall onto the floor beyond.

- 7 - SUPERGREEN LAM TM easily conforms to complex shapes, and eliminates the need to make complex three-dimensional water-shedding lap seams. This allows for greatly improved productivity, thus reducing costs dramatically. In this retrofit situation, peel-andstick membrane previously installed on the inner half of this window jamb is rolled up, making a radiused corner that may interfere with the window installation. LAM makes a tight inside corner on the outer half. The bank of windows on the right would take about four man-hours to install with LAM, while peel-and-stick would require at least twenty. This series shows how a window opening is masked with plastic before the SPF and LAM installations. After the SPF is installed, it is trimmed flush with the face of the stops. Finally, LAM is installed around the opening to provide a continuous air and Web: water www.foam-tech.com barrier from the SPF to the inside of the window location on the jamb stops.

- 8 - Complex window head at insulated overhang. Transition from an SPF cavitywall system to a roof overhang. LAM allows air and watertight connections to difficult substrates at this expansion joint that occurs where a school Example addition of complex meets existing window brick sill location. construction. One of the advantages of LAM is that it can be easily repaired. Surface applications bond well to original LAM surfaces, maintaining drainage plane and A/V barrier continuity.

- 9 - In this project, a sill had to be moved down after the SPF and LAM work had been completed. After the window framing had been relocated, the cuts were sealed with foam sealant and caulk, then the surfaces prepared, and the LAM reapplied. LAM is a tough, durable coating that is flexible and stronger than peel-and-stick membranes. It can be left exposed indefinitely, often being used as a complete finish for roofs and process equipment. Installation is not hampered by cold installations are possible at ambient and substrate temperatures from 20F to 300F degrees. It cures rapidly, has no VOCs, and is odorless. SUPERGREEN LAM TM is waterproof, airtight, and exhibits very low vapor transmission properties. It has a Class 1 fire rating. These above-ground storage tanks contain fuel oil that must be maintained at 120 degrees in order for the fuel to be pumped to the boilers inside the adjacent building. Phone (802) The 333-4333 tanks were Fax (802) insulated 333-4346 with 6 of SPF to conserve energy and then coated with SUPERGREEN LAM to protect the foam from the elements.

- 10 - Technical and Material Comparisons Physical properties: In-place thickness: 30 to 60 mils Tensile Strength: 600 to 4,200 psi Elongation: 450 to 600% Tack free: 1-3 minutes Initial cure: 60 minutes Full cure: 1-7 days Advantages vs. peel-and-stick membranes: Lower cost. Efficient sequencing - installed at the same time as the SPF, not between the backup wall sheathing and the brick ties. Fast and reliable installation. No seams to prime and roll down. Expanding product allows the material to continuously cover uneven substrates and fill and bridge gaps like membrane, but in a faster, one-step process. Can be left exposed indefinitely (peel-and-stick cannot). Year-round installation. Can be effectively installed at ambient and substrate temperatures from -20 to 300 F. Easy to repair by recoating with large-scale production or small-scale portable equipment. Can be used to protect open-cell (soft) foam to create fast and effective expansion, control, and deflection joints in the SPF or other cavity-wall systems. General Advantages: Rapid cure, no VOCs, odorless. High abrasion resistance. Available in both bulk and touch-up size systems. Waterproof, airtight, and low vapor transmission. Easy to detail and specify. Class 1 fire rating.

- 11 -