Chapter CONSTRUCTION SITE EROSION CONTROL

Similar documents
Chapter 34 Index. Article V Violations And Penalties Misdemeanor Injunction Civil Damages...

CHAPTER 4 - EROSION & SEDIMENT CONTROL AND STORMWATER MANAGEMENT ORDINANCE OF DUBUQUE COUNTY, IOWA. Adopted March 29, 2010.

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

SUDAS Revision Submittal Form

Chapter 21 Stormwater Management Bylaw

DEPARTMENT OF ENVIRONMENTAL QUALITY WATER BUREAU PART 17. SOIL EROSION AND SEDIMENTATION CONTROL

Erosion & Sedimentation Control Policy

EROSION AND SEDIMENTATION CONTROL SECTION 1 - GENERAL 1.1 SUMMARY

CCSD#1 Stormwater Standards

Lake Elmo, MN Code of Ordinances STORM WATER AND EROSION AND SEDIMENT CONTROL

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

Town of Friday Harbor PO Box 219 / Friday Harbor / WA / (360) / fax (360) /

SACHSE EROSION CONTROL GUIDELINES

901 STORMWATER POLLUTION MANAGEMENT SECTION 901 STORMWATER POLLUTION MANAGEMENT

PERMIT APPLICATION for Part 91 SOIL EROSION AND SEDIMENTATION CONTROL

STORM WATER MANAGEMENT ORDINANCE

ORD WHEREAS, the public necessity, convenience, general welfare and good zoning practice so require;

DEVELOPMENT CODE REVISIONS CHAPTER 6 1 CASE # RESO # SECTION/DESCRIPTION DATE , 6206, 6207, /09/03

Erosion and Sediment Pollution Control Guidelines for Residential Lots with soil disturbance of less than 1 acre (see exceptions)

E & S Plan Approved. Not required but may be a municipal requirement** Not required but may be a. municipal. requirement** Not required but may be a

ARTICLE 6 EXCAVATION OF MINERAL MATERIALS

1.2 REGULATORY REQUIREMENTS

Chapter 9.37 Soil Erosion and Dust Control

North Carolina Sedimentation Control Law

Building Better Storm Water Quality

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

GRADING, EROSION AND SEDIMENTATION CONTROL

Soil Erosion and Sedimentation Control Application Packet 2011

CHAPTER 11 Grading, Erosion and Sediment Control

Module 4 Regulatory requirements for Land Disturbing Activities

CITY OF JENKS EARTH CHANGE PERMIT APPLICATION

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

MACOMB COUNTY SOIL EROSION AND SEDIMENTATION CONTROL ORDINANCE. Adopted August 16, 2007 by Resolution of the Macomb County Board of Commissioners

TOWN OF BERKLEY ARTICLE 32 STORM WATER BYLAW

FACT SHEET GENERAL KPDES PERMIT FOR STORM WATER POINT SOURCE DISCHARGES CONSTRUCTION ACTIVITIES

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

CON APPENDIX C USAG HI Storm Water Pollution Prevention Plan Content Review Checklist

Module 3. Module 3a. As of July : A lot of local ESC ordinances are out of date! Virginia Erosion & Sediment Control Program

Subject: Conservation; water resources; Lake Champlain; total maximum 5. Statement of purpose: This bill proposes to amend requirements for 7

Please print or type.

Division of Water Quality (701)

All nonmetallic mining sites subject to this chapter shall be reclaimed in conformance with the standards contained below.

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

SOIL EROSION AND SEDIMENT CONTROL

General Permit No.: OHR Page 53 of 146

SECTION V CHAPTER 12 STORMWATER POLLUTION PREVENTION POLICY

Ordinance No. 1178: DRAINAGE AND GRADING

COWLITZ COUNTY DEPARTMENT OF BUILDING AND PLANNING

EXAMPLES OF GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

York County STORMWATER LUNCH & LEARN

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

SWPPP Development. What are Storm Water Pollution Prevention Plans. Jerald S. Fifield, Ph.D., CISEC HydroDynamics Incorporated Parker, CO

CHAPTER 9: BUILDING REGULATIONS

GENERAL SOIL EROSION AND SEDIMENT CONTROL NOTES FOR HUNTERDON COUNTY, NJ

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

Storm Water Pollution Prevention Plan (SWP3) Checklist

Stormwater Management Practices and Design Manual. Clemson University

Good Housekeeping. Phones Weather related emergencies Breaks and facilities. Introductions

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Permit Application: Soil Erosion and Sediment Control Program

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

Ordinance No Lot Surface Drainage

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

Post-construction Stormwater Management Zoning (MC#1174)

Reclamation Plan for the Non-metallic Mining Site owned and operated by Birds Eye Foods, LLC.

Memo. To: From: cc: For further assistance please contact Ben Ruzowicz, GSWCC Technical Specialist at (706)

DESIGN GRADING AND EROSION CONTROL A. Slope Criteria

APPENDIX I. Plan Reviewer Checklist

State of Georgia Department of Natural Resources Environmental Protection Division

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT WATER DIVISION - WATER QUALITY PROGRAM ADMINISTRATIVE CODE

CORNERSTONE RIVER VALLEY VILLAGE FILING NO. 1 STORMWATER MANAGEMENT PLAN

Surface Water and Non-Wetland Surface Waters Delineation and Classification pursuant Chapter F.A.C.

SECTION 17.1 STORMWATER MANAGEMENT AND EROSION CONTROL

Permit Section Ohio EPA Permit Change or Addition Model Ordinance Section to be Changed

STORMWATER DISCHARGES ASSOCIATED WITH CONSTRUCTION ACTIVITY

NDDOT Erosion & Sediment Control Construction Course

TOWN OF BETHLEHEM SWPPP APPLICATION REVIEW CHECKLIST

VIRGINIA POLLUTION ABATEMENT (VPA) PERMIT APPLICATION. FORM B - ANIMAL FEEDING OPERATIONS (AFOs)

ORDINANCE NO. 33 (2000) MANURE MANAGEMENT ORDINANCE

Ordinance No NOW THEREFORE, be it hereby ordained by the Glasgow City Council as follows:

DIVISION VII SOIL EROSION AND SEDIMENTATION CONTROL

Roscommon County Soil Erosion and Sedimentation Control (SESC) Program Guide

AN ACT to renumber (1); to renumber and amend (3) and

WOODFORD COUNTY, ILLINOIS EROSION, SEDIMENT AND STORM WATER CONTROL ORDINANCE

PART 3 STORM WATER TECHNICAL MANUAL

REDWOOD COUNTY ZONING ORDINANCE SECTION 17 FEEDLOT REGULATIONS SUBDIVISION 3. CONDITIONAL USE PERMITS 4

DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES DIVISION OF WATER QUALITY FACT SHEET

JEFFERSON COUNTY STORM WATER MANAGEMENT

Single Family Residential Construction Erosion/Sediment Control Standards

Design and Construction of Local Public and Private Sewers and Ancillary Facilities

CITY OF DURANGO Stormwater Quality Permit FACT SHEET - CONSTRUCTION

PRELIMINARY DRAFT RULE LANGUAGE 8/28/2014 MNDNR SILICA SAND RECLAMATION Reclamation Plan Requirements

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

CHARLES SOIL CONSERVATION DISTRICT COMPLIANCE AGREEMENT FOR THE STANDARD EROSION AND SEDIMENT CONTROL PLAN FOR FOREST HARVEST OPERATIONS

Performance Standards Compliance Checklist

Typical Local Erosion Control Requirements (Storm Water Management Authority, Inc.)

COBBETTS POND WATERSHED PROTECTION ORDINANCE SECTION 1: WATERSHED PROTECTION ORDINANCE 1.1 Authority and Statement of Intent a. Pursuant to RSA 674:

Before we get to the E&SC

KANKAKEE COUNTY PLANNING DEPARTMENT APPLICATION FOR CLASS I & II GRADING AND DRAINAGE/STOMRWATER PERMIT APPLICATION

Transcription:

Chapter 19.30 CONSTRUCTION SITE EROSION CONTROL Sections: 19.30.010 When required. 19.30.020 Definitions. 19.30.030 Technical Standards 19.30.040 Erosion and sediment control performance standards for all sites. 19.30.050 Erosion and sediment control plans. 19.30.060 Additional performance standards. 19.30.070 Permitting Requirements, Procedures, and Fees. 19.30.080 Inspections. 19.30.090 Enforcement, 19.30.100 Appeals, 19.30.010 When Required. All construction sites are subject to this ordinance, except as noted in s. 19.30.010 B. A. Additional Performance Standards. Additional performance standards defined in s. 19.30.060 are applicable to construction sites if they include any of the following: 1. Are part of a site plan required by chapter 18.45.020; or 2. Land disturbance activity of an area of 15,000 square feet or more of land; or 3. Land disturbance activity on a slope in excess of 20%; or 4. Land disturbance activity that creates a slope in excess of 20% with a vertical elevation change greater than 10 feet from existing ground; 5. Land disturbance activity that modifies an existing drainage way, or 6. Land disturbance activity that fills a closed depression. B. Exemptions. This ordinance does not apply to the following: 1. A construction project that is exempted by federal statutes or regulations from the requirement to have a National Pollutant Discharge Elimination System permit issued under chapter 40, Code of Federal Regulations, part 122, for land disturbing construction activity. 2. A project for which the City Engineer has performed a preliminary review of the land disturbing activity and determined that the activity may be exempted from some, or all of the requirements of this ordinance. 3. One and two family home construction, which is currently covered by the Uniform Dwelling Code, unless the land disturbance involves and activity described in s 19.30.010 A (3)(4)(5) or (6). 19.30.020 Definitions. In this chapter: A. Best Management Practice or BMP means the structural or non-structural measures, practices, techniques, or devices employed to avoid or minimize soil, sediment, or pollutants carried in runoff to waters of the state. B. Construction site means an area upon which one or more land disturbing construction activities occur. Including areas that are part of a larger common plan of development or sale where multiple separate and distinct land disturbing activities may be taking place at different times on different schedules but under one plan. C. Design Storm means a hypothetical discrete rainstorm characterized by a specific duration, temporal distribution, rainfall intensity, return frequency and total depth of rainfall.

D. Drainage Way means an area where runoff from adjacent areas either collects or passes through the site, regardless of whether the runoff is from private, public property or road right-of-way. A drainage way under this section may be natural or constructed. E. Erosion means the process by which the land s surface is worn away by the action of wind, water, ice, or gravity. F. Erosion and sediment control plan means a comprehensive plan developed to address pollution caused by erosion and sedimentation of soil particles or rock fragments during construction. G. Final stabilization means that all land disturbing construction activities at the construction site have been completed and that a uniform perennial vegetative cover has been established, with a density of at least 70 percent of the cover, for the unpaved areas and areas not covered by permanent structures, or that employ equivalent permanent stabilization measures. H. Land disturbing activity means any man-made alteration of the land surface resulting in a change in the topography or existing vegetative or non-vegetative soil cover, that may result in runoff and lead to an increase in soil erosion and movement of sediment into waters of the state. Land disturbing construction activity includes clearing and grubbing, demolition, excavating, pit trench dewatering, filling, and grading activities. I. "Landowner" means any person holding fee title, an easement or other interest in property, which allows the person to undertake cropping, livestock management, land disturbing construction activity or maintenance of storm water BMPs on the property. J. Maximum extent practicable means a level of implementing best management practices in order to achieve a performance standard different from the performance standard specified in this chapter which takes into account the best available technology, cost effectiveness, and other competing issues such as human safety and welfare, endangered and threatened resources, historic properties and geographic features. MEP allows flexibility in the way to meet the performance standards and may vary based on the performance standards and site conditions. MEP applies only when the responsible party has demonstrated to the City Engineer s satisfaction hat a performance standard is not achievable and that a lower level of performance is appropriate. K. Performance standard means a narrative or measurable number specifying the minimum acceptable outcome for a facility or practice. L. Permit means a written authorization made by the City Engineer to the applicant to conduct land disturbing construction activity or to discharge post-construction runoff to waters of the state. M. Responsible party means the landowner or any other entity performing services to meet the requirements of this ordinance through a contract or other agreement. N. Runoff means storm water or precipitation including rain, snow or ice melt, or similar water that moves on the land surface via sheet or channelized flow. O. Sediment means settleable solid material that is transported by runoff, suspended within runoff or deposited by runoff away from its original location. P. Site means the entire area included in the legal description of the land on which the land disturbing construction activity is proposed in the permit application. Q. "Technical standard" means a document that specifies design, predicted performance and operation and maintenance specifications for a material, device or method. R. Waters of the state includes those portions of Lake Michigan and Lake Superior within the boundaries of this state, and all lakes, bays, rivers, streams, springs, ponds, wells, impounding reservoirs, marshes, watercourses, drainage systems and other surface water or groundwater, natural or artificial, public or private, within this state or its jurisdiction. 19.30.030 Technical Standards. All BMPs required for compliance with this ordinance shall meet design criteria, standards and specifications based on any of the following: A. Design guidance and technical standards identified or developed by the Wisconsin Department of Natural Resources under subchapter V of chapter NR 151, Wis. Adm. Code. B. Soil loss prediction tools (such as the Universal Soil Loss Equation (USLE)) when using an appropriate rainfall or runoff factor (also referred to as the R factor) or an appropriate design storm and precipitation distribution, and when considering the geographic location of the site and the period of disturbance. C. Technical standards and methods approved by the City Engineer.

19.30.040 Erosion and sediment control performance standards for all sites. A. Erosion and Sediment Control Practices. The responsible party shall implement erosion and sediment control best management practices at each site where land disturbing activity is to occur that accomplish all of the following to the maximum extent practicable: 1. Prevent tracking of sediment from the construction site; 2. Prevent discharge of sediments as part of site de-watering; 3. Protect inlets, pipes, ditches, drainage ways, and downstream waters from sediment discharged from disturbed areas. 4. Stabilize stockpiles or disturbed areas left undisturbed for more than one week. Stabilization measures may include silt fence, seeding, containment berms, covering, or other approved measures. 5. Manage the use, storage, and disposal of chemicals, cement and other compounds and materials used in construction to prevent their transport by runoff. Projects that require the placement of these materials in waters of the state, such as constructing bridge footings or BMP installations, are not prohibited by this subdivision. B. Location. The BMPs shall be located so that treatment occurs before runoff exits the site, unless an alternate location is approved by the City Engineer. C. Implementation. The BMPs shall be implemented as follows: 1. Erosion and sediment control practices shall be constructed or installed before land disturbing construction activities begin. 2. Erosion and sediment control practices shall be maintained until final stabilization. 3. Final stabilization activity shall commence when land disturbing activities cease and final grade has been reached on any portion of the site. 4. Temporary stabilization activity shall commence when land disturbing activities have temporarily ceased and will not resume for a period exceeding 14 calendar days. 5. BMPs that are no longer necessary for erosion and sediment control shall be removed by the responsible party. 19.30.050 Erosion and sediment control plan. A. The responsible party shall prepare an erosion and sediment control plan for all sites meeting one or more of the conditions specified in s. 19.30.010 A. B. The sediment control plan shall be prepared consistent with the procedures and requirements specified in the City of Eau Claire Developer s Handbook. C. The erosion and sediment control plan shall include erosion and sediment control practices at each site where land disturbing activity occurs to accomplish to the maximum extent practicable the actions listed in s. 19.30.040 A. D. The erosion and sediment control plan shall demonstrate compliance with the additional performance standards described in s. 19.30.060, as applicable. 19.30.060 Additional performance standards. A. Applicability. For sites meeting one or more of the conditions specified in s. 19.30.010 A, the responsible party shall comply with the requirements of s. 19.30.060. B. Sediment Performance Standards. The following erosion and sediment control practices shall be employed: 1. BMPs that, by design, discharge no more than 5 tons of sediment per acre per year, or to the maximum extent practicable, minimize the sediment load carried in runoff from initial grading to final stabilization. 2. Erosion and sediment control BMPs may be combined to meet the requirements of this paragraph. Credit may be given toward meeting the sediment performance standard of this paragraph for limiting the duration or area, or both, of land disturbing construction activity, or for other appropriate mechanisms. 3. Notwithstanding Subp. 1., if BMPs cannot be designed and implemented to meet the sediment performance standard, the erosion and sediment control plan shall include a written, sitespecific explanation of why the sediment performance standard cannot be met and how the sediment load will be reduced to the maximum extent practicable.

C. Preventive Measures. The erosion and sediment control plan shall incorporate all of the following: 1. Maintenance of existing vegetation whenever possible, especially adjacent to surface waters. 2. Minimization of soil compaction and preservation of topsoil. 3. Minimization of land disturbing construction activity on slopes of 20 percent or more. 4. Development of spill prevention and response procedures. D. Location. The BMPs used to comply with this section shall be located so that treatment occurs before runoff exits the site. 19.30.70.1 Permitting Requirements, Procedures, and Fees. A. Permit Required. No responsible party may commence a land disturbing activity meeting one or more of the conditions specified in s. 19.30.010 without receiving prior approval of an erosion and sediment control plan for the site and a permit in the form of a Grading and Drainage Approval letter from the City Engineer. B. Permit Application and Fees. The responsible party that will undertake a land disturbing construction activity subject to this ordinance shall submit an application for a permit and an erosion and sediment control plan that meets the requirements of s. 19.30.050, and shall pay an application fee to the City. C. Permit Application Review and Approval. The City Engineer shall review any permit application that is submitted with an erosion and sediment control plan, and the required fee. The permit review and approval process shall follow the guidelines specified in the City of Eau Claire Developer s Handbook. D. Surety Bond. As a condition of approval and issuance of the permit, the City Engineer may require the applicant to deposit a surety bond or irrevocable letter of credit to guarantee a good faith execution of the approved erosion and sediment control plan and any permit conditions. E. Permit Requirements. All permits issued under this ordinance shall be subject to the conditions specified in the City of Eau Claire Developer s Handbook, and holders of permits issued under this ordinance shall be deemed to have accepted these conditions. The City Engineer may suspend or revoke a permit for violation of a permit condition, following procedures detailed in the City of Eau Claire Developer s Handbook. An action by the City Engineer to suspend or revoke this permit may be appealed in accordance with s. 19.30.100. F. Permit Conditions. Permits issued under this section may include conditions established by the City Engineer in addition to the requirements set forth in the City of Eau Claire Developer s Handbook, where needed to assure compliance with the performance standards in s. 19.30.040 or s. 19.30.060. G. Permit Duration. Permits issued under this section shall be valid from the date of issuance through the date the City Engineer notifies the responsible party that all erosion and sediment control practices have passed the final inspection required by the City of Eau Claire Developer s Handbook, unless one of the following conditions occurs: 1. work is not initiated within one year of permit issuance, or 2. work is idle for 12 consecutive months, or 3. work is not completed within 3 years of permit issuance. H. Maintenance. The responsible party throughout the duration of the construction activities shall maintain all BMPs necessary to meet the requirements of this ordinance until the site has undergone final stabilization. 19.30.080 Inspections. If land disturbing construction activities are occurring, including those not requiring a permit under this ordinance, the City Engineer may enter the land pursuant to the provisions of s. 66.0119 (1), (2), and (3), Wis. Stats. 19.30.090 Enforcement. Any land disturbing activity initiated after the effective date of this ordinance by any person, firm, association, or corporation subject to the ordinance provisions shall be deemed a violation unless conducted in accordance with the requirements of this ordinance. The City Engineer shall respond to non-compliance with this ordinance in accordance with the procedures and authorities described in the City of Eau Claire Developer s Handbook.

19.30.100 Appeals. A. Plan Commission. The Plan Commission, created pursuant to Title 18 of the City of Eau Claire ordinances pursuant to s. 62.23 (7)(e), Wis. Stats., shall hear and decide appeals where it is alleged that there is an error in any order, decision or determination made by the City Engineer in administering this ordinance. The commission shall also use the rules, procedures, duties, and powers authorized by statute in hearing and deciding appeals. Upon appeal, the commission may authorize variances from the provisions of this ordinance that are not contrary to the public interest, and where owing to special conditions a literal enforcement of the ordinance will result in unnecessary hardship. B. Who May Appeal. Appeals to the Plan Commission or may be made by any aggrieved person or by any office, department, board, or bureau of the City of Eau Claire affected by any decision of the City Engineer.