Your guide to interconnecting to the We Energies distribution system

Similar documents
Union Power Cooperative

HARNESSING THE POWER OF RENEWABLES

INTERCONNECTION PROCEDURES FOR DISTRIBUTED GENERATION

Lecture 13 Distributed Generation Rev ME 430 Thermal Systems Design

LEVEL 1 Application for Interconnection and Net Metering

SMALL GENERATION SYSTEM APPLICATION (10 kw OR LESS)

NEW JERSEY BOARD OF PUBLIC UTILITIES N.J.A.C. 14:4-9 Net Metering and Interconnection Standards for Class I Renewable Energy Systems

Long Island Power Authority Seventh Revised Leaf No. 16

effective date 1/8/01

LEVEL 2 Application For Interconnection And Net Metering

ELG4126 Distributed Generation. in Electric Power Systems

REVISION NO.: 8 EFFECTIVE: 03/26/18

SERVICE CLASSIFICATION NO. 14-RA STANDBY SERVICE

DISTRIBUTED GENERATION AND POWER QUALITY

IC Chapter 2.4. Alternate Energy Production, Cogeneration, and Small Hydro Facilities

Concerned About Power. Outages, Change? We Can Help.

(2) isolated operation with standby service provided by the Company by means of a doublethrow

DG Interconnection Procedures Collaborative. January 20, 2017

IF YOU RE THINKING ABOUT INSTALLING A RENEWABLE ENERGY GENERATION SYSTEM, MAKE SURE YOU HAVE ALL THE FACTS FIRST.

Galileo Research. Distributed Generation

ONCOR INTERCONNECTION APPLICATION AND PROCESS FOR DISTRIBUTED RESOURCES

CHOPTANK ELECTRIC COOPERATIVE, INC. P.S.C. Md. No. 3 Fifth Revised Page No. 59 COGENERATION AND SMALL POWER PRODUCTION RATE SCHEDULE X

Harnessing the power of renewables

GRENLEC s Renewable Standard Offer

An Overview of Eligible SGIP Technologies. March 10, 2010

SECTION 1: GRID-CONNECTED ENERGY STORAGE. ESE 471 Energy Storage Systems

ENERGEX Inverter Energy Systems

CUSTOMER GUIDE FOR DISTRIBUTION SYSTEM INTERCONNECTION INVERTER-BASED DISTRIBUTED RESOURCES. < 50 kw

INTERCONNECTION APPLICATION AND AGREEMENT

Long Island Power Authority Seventh Revised Leaf No. 16

SCHEDULE SS STANDBY SERVICE

Concerned About Power Outages, High Electricity Prices, And Climate Change? We Can Help.

ATTACHMENT N. Small Generator. Interconnection Procedures and Agreement. (For Generating Facilities No Larger Than 20 MW)

ORDINANCE NO The Board of Supervisors of the County of Sonoma, State of California, ordains as follows:

Harnessing the power of renewables

Smart Grid Small Generator Interconnection Procedure (SGIP) Updates. December 06, 2016

Modernization of the Power System

80th OREGON LEGISLATIVE ASSEMBLY Regular Session. House Bill 2857

130A Alternative process for wastewater system approvals. (a) Engineered Option Permit Authorized. A professional engineer licensed under

ELECTRIC SYSTEMS PROCEDURE: ES DISTRIBUTED ENERGY RESOURCES (DER)

What You Need to Know Before Requesting Interconnection

BCE Program March-2017 Electrical Power Systems Time: min Quiz 1 Model A رقم المجموعة:

Energy Storage Buildings-to- Grid Applications

Distributed Generation. Technical Requirements and Interconnection Agreements

AN ASSESSMENT OF ELECTRICAL POWER RATING AND SHAFT SPEED (RPM) OF GAS TURBINE MODEL PRODUCTION

MEETING DATE: ADOPTED ON EARTH DAY: APRIL 22, 2008 AGENDA ITEM COMMENTARY

CHAPTER SMALL POWER PRODUCTION AND COGENERATION Definitions. As used throughout this chapter, except where otherwise indicated:

Fuel cells do not depend on wind or sunshine, and generate more electricity per unit of fuel than almost any other distributed energy source.

ENERGY SOLUTIONS and DISTRIBUTED POWER GENERATION. g Energy Solutions - DG WMEA Tucson Conference

Non Registered Embedded Generation Information Pack

Experimental Advanced Renewable Program (EARP) Anaerobic Digester. David Ronk

Part 1 Introduction and Overview

Member Considerations for Adding Solar PV/Distributed Generation

Generating Your Own Power On-Site Distributed g g Generation & the Interconnection Process

Outline of the Revised Renewable Energy Act

Massachusetts Clean Energy Center Request for Proposals (RFP): Moon Island Engineering Design Consultant

DISTRIBUTED GENERATION INTERCONNECTION PROCEDURES. June 21, 2011

Addition to Section 4 - Special Use Regulations

Business Programs: Commercial and Industrial Renewable Energy Loan Program. Technical Application and Instructions

Grid Integration of Renewable Energy. Robert S. Kaneshiro, P.E. Operations Assistant Superintendent Hawaii Electric Light Company (HELCO)

Focus on Energy s Biogas Feasibility Study Grants for Anaerobic Pretreatment and Anaerobic Digester Facilities

CERTS Microgrids. Tom Jahns Professor, University of Wisconsin-Madison. LPPC Rates Roundtable May 21, 2013

New York Independent System Operator System Reliability Impact Study Criteria and Procedures

BGE Smart Energy Savers Program Combined Heat and Power Program Manual

SPRINT CENTURION SM TECHNICAL ASSISTANCE SERVICE PRODUCT ANNEX

Technology Overview. Jimmy Salasovich, NREL October 28 th 31 st, 2013

APPLICATION FOR COMBINED HEAT AND POWER INCENTIVES

Town of Lyme Renewable Energy Law

CUSTOMER GUIDE FOR THE INTERCONNECTION DISTRIBUTED RESOURCES TO THE PUBLIC SERVICE COMPANY OF OKLAHOMA DISTRIBUTION SYSTEM

Business Practice Energy Imbalance Market (EIM BP) Revision Number: Revision Date: November 30July 29, 2015

Get Connected: Distributed Generation

TARIFF FOR WHOLESALE TRANSMISSION SERVICE SHARYLAND UTILITIES, L.P. SHARYLAND UTILITIES, L.P North Akard Dallas, Texas 75201

Cost Development Guidelines

Electricity Supply Agreement

Distributed Generation (DG) Connection Standard

Virtual Power Plant Simulation

RATE 665 RENEWABLE FEED-IN TARIFF

Small Generator Interconnection Procedures (SGIP) (For Generating Facilities No Larger Than 20 MW)

TRI-COUNTY RURAL ELECTRIC COOPERATIVE, INC. Policy Bulletin No Appendix A SAFETY & INTERCONNECTION REQUIREMENTS FOR ALTERNATE ENERGY PRODUCTION

TONGA POWER LIMITED REQUEST FOR PROPOSALS INDEPENDENT POWER PRODUCERS. for SOLAR PHOTOVOLTAIC GENERATION 5 APRIL, 2018 RFP - TPL SOLAR IPP

Rules and Procedures for Determination of Generating Capability

Distributed Renewable Energy Generation Interconnection Policy

Energy from Renewable Sources Act

Dated: April 16, 2002

(Draft Captive and Renewable Energy Generating Plants) Regulations

SMALL GENERATOR INTERCONNECTION PROCEDURES (SGIP) (For Generating Facilities No Larger Than 20 MW)

CALL FOR COMBINED HEAT AND POWER (CHP) PROJECTS. Program Guide

Delaware Electric Cooperative. Renewable Resource Program

TOWNSHIP OF WEYMOUTH ATLANTIC COUNTY NEW JERSEY ORDINANCE NO

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

DISTRIBUTED ENERGY RESOURCE INTERCONNECTION PROCESS REQUIREMENTS

Independent Power Production Policy

SOUTHERN MARYLAND ELECTRIC COOPERATIVE, INC.

Residential and Farm Customer Guide


Distributed Energy Resources

Transcription:

Your guide to interconnecting to the We Energies distribution system

We appreciate the opportunity to serve you. This booklet provides some basic information about connecting customer generation systems, such as wind turbines, solar photovoltaic systems, microturbines or fuel cells, to the We Energies distribution system. This process is called interconnection and must be conducted in a manner that protects our customers and employees from risks that could result from improper installation of customer generation. It also is our intent to conduct such interconnections in a way that is cost-effective and timely for our customers. This brochure provides a broad overview of the necessary steps and requirements to interconnect customer generation. In all cases, the customer and installer are responsible for following the interconnection rules of the Public Service Commission of Wisconsin (PSCW) and for meeting all We Energies tariff requirements. For more information about interconnecting customer generation to the We Energies distribution system, call us at (800) 714-7777 ext. 7700 or visit our Web site at www.we-energies.com/cg/.

Customer Generation A number of options exist for customers to purchase their own on-site electricity generating systems. Customers who wish to install their own small-scale sources of generation that connect to the We Energies distribution system need to comply with Wisconsin Administrative Code Rules, Chapter PSC 119 (PSC 119), for interconnecting distributed generation (DG) facilities. These rules apply when owners of DG facilities with a capacity of 15 megawatts (MW) or less seek to interconnect to a public utility s electric distribution system like We Energies. This document will guide you through the steps and procedures necessary to interconnect a DG facility to the We Energies electric distribution system. We Energies is committed to making the interconnection as simple for customers as possible. At the same time, we must protect the reliability of our distribution system and the safety of our customers and field personnel who potentially could be injured by customer generating equipment. 1

Responsibilities 2 Your responsibilities You and your contractor or installer are responsible for coordination of the design, installation, operation and maintenance of any customer generation system you install and for conforming with the requirements of We Energies tariffs and rules, and applicable governmental laws and regulations (local, state and federal). These requirements are designed to protect distribution system facilities; avoid electrical interference problems; ensure the safety of customers, electric provider employees and the general public; and maintain overall system reliability. You are required by law to maintain liability insurance (equal to or greater than the amounts indicated in PSC 119) or to prove financial responsibility by another means agreeable to We Energies. You are required to notify us if a material modification is made to your generation equipment at any time during or after the installation process. A material modification is any modification that changes the maximum electrical output of a customer generation facility or changes the interconnection equipment, including: (a) Changing from certified to noncertified devices. (b) Replacing a component with a component of different functionality or UL listing. You also are responsible for the proper installation, operation and maintenance of the specified protective devices. Finally, you shall obtain, at your expense, any and all authorizations, permits and licenses required for the construction and operation of your generating facilities. Our responsibilities We Energies is responsible for promptly carrying out the steps listed in this brochure and for meeting all required steps and timelines in order to process your interconnection application. We Energies has designated a primary contact to assist you with any questions or information you need to complete your interconnection. Primary contact information can be found on the PSCW Web site at: http://psc.wi.gov/electric/cases/ electgen/dgprocedure.htm as well as on our Web site at: www.weenergies.com/cg/. You also can call us at (800) 714-7777 ext. 7700.

General interconnection process The steps summarized below are required by state law to interconnect to the We Energies distribution system. Please consult references one and two on page six of this booklet or actual state law and associated guidelines. STEP 1 Starting the interconnection process Your role: Contact us by calling (800) 714-7777 ext. 7700 to inform us that you wish to interconnect an electric generating system to the We Energies distribution system. Our role: We will respond to your request within five working days and furnish you with all materials necessary to complete your interconnection application. All documents, forms and applications also can be found on our Web site at www.weenergies.com/cg/. STEP 2 Completing the interconnection application Your role: Complete and submit the Standard Application Form to We Energies by mailing it to the name and address indicated on the form. STEP 3 Application review Our role: Within 10 working days of receiving a new or revised application, we will notify you whether the application is complete. If the application is incomplete, you will be asked to resubmit it with the needed corrections. STEP 4 Determine if engineering review is necessary Our role: When it is concluded that your application is complete, we will determine whether an engineering review is needed. If an engineering review is necessary, we will notify you within 10 working days and state the cost of that review. Note: If we deem that an engineering review is not needed, go directly to step 10 - you will not need to complete steps five through nine. 3

General interconnection process STEP 5 Engineering review is needed Our role: Upon receiving written notification from the applicant to proceed and upon receipt of applicable payment, we will complete an engineering review and notify you of the results. STEP 6 Need for a distribution system study Our role: If the engineering review determines that a distribution system study is necessary, we will include a written cost estimate in the review summary. STEP 7 Completion of distribution system study Our role: Upon receiving written notification to proceed and payment of the applicable fee, we will conduct the distribution system study. This study is to assess the level of impact your DG system will have once connected to our grid. We will provide you with the study results. STEP 8 Notification of construction or modification costs Our role: We will notify you of the results of the distribution system study and of the costs associated with any construction or modifications to our grid. Your role: You will provide a written agreement to pay for work related to the interconnection modifications. STEP 9 Installation of customer generation Your role: You will submit payment for the required upgrade of our distribution system. You will install your generating equipment within a timeframe that is mutually agreed upon by you and We Energies. You will notify us when project construction is complete. Our role: Upon receipt of payment from you, We Energies will perform all work needed to upgrade our distribution system to accommodate your generating equipment. 4

General interconnection process STEP 10 System testing Your role: You are required to notify us of the completed installation and give us the opportunity to witness or verify the system testing. You also are required to provide us with the results of any tests. Our role: Upon receiving notification that an installation is complete, we will do one (or more) of the following: > Witness commissioning tests. > Perform an anti-islanding test or verify the protective equipment settings at our expense. Or > Waive our right, in writing, to witness or verify the commissioning tests. STEP 11 Testing approval/rejection Our role: We will notify you of our approval or rejection of the interconnection. If approved, we will provide a written statement of final acceptance and cost reconciliation. If we do not approve the interconnection, you may take corrective action and ask that we reexamine your interconnection request. STEP 12 Interconnection agreement Your role: Upon receipt of interconnection approval notice, a standard interconnection agreement shall be signed by the applicant and We Energies before parallel operation commences. If you intend to sell energy to us, you also must execute a Surplus Energy Agreement with us. When these forms are completed and signed by both parties, you may begin operation of your generating equipment. Detailed guide on distributed generation interconnection The Wisconsin Distributed Generation Interconnection Guidelines will help explain the PSC 119 rules and how these rules are expected to be implemented by both the utility and the customer. We Energies highly recommends that any customer interested in pursuing interconnection read these rules and guidelines before beginning the interconnection process. 5

References Summary References A list of documents and other references you ll need is provided below. You can receive copies of the latest versions of these documents from We Energies by calling (800) 714-7777 ext. 7700, or by visiting our Web site at www.we-energies.com/cg/. 1. Wisconsin Administrative Code Chapter PSC 119 Rules for Interconnecting Distributed Generation Facilities http://psc.wi.gov/electric/cases/electgen/dgprocedure.htm 2. Wisconsin Distributed Generation Interconnection Guidelines (guide to the rules and diagrams of interconnections) http://www.wisconsindr.org/wi_interconnectionguidelines.pdf 3. Standard Application Form for DG facilities PSC Form 6027 and 6028 http://psc.wi.gov/electric/cases/electgen/electgenforms.htm 4. Standard Interconnection Agreement for DG facilities PSC Form 6029 and 6030 http://psc.wi.gov/electric/cases/electgen/electgenforms.htm 5. We Energies CG Wisconsin Electric Power Company Tariff pages http://we-energies.com/pdfs/etariffs/wisconsin/ elecrateswi131_144.pdf Summary Properly designed and applied customer generating systems provide an alternative means of generation to help meet the nation s future electricity needs. We Energies encourages and supports customers who wish to explore their own generating projects. If you are considering installing a generating facility, please contact We Energies at (800) 714-7777 ext. 7700, Monday through Friday, between 8 a.m. and 5 p.m. Central time. You will be referred to a service manager or an energy services consultant who can answer your questions and help you plan your project. 6

Definitions Distributed generation definitions Customer generation also is referred to as distributed generation and represents an evolving and promising set of power technologies that typically has the following attributes: > Sited close to customer or located at a substation to support the electric distribution system. > Output is tailored to customer needs. > Generating capacity is between one kilowatt (kw) and 15 MW. > May be customer-, utility- or third-party owned. Distributed generation can be used to meet a variety of customers electricity needs: Primary power Supplies the majority of a customer s electricity needs and uses the local utility electrical grid to provide backup and supplemental power. Peak shaving Allows customers to reduce their electric demand charges. Peak shaving may provide a win-win for both the utility and the customer by relieving electrical system stress during periods of peak demand, and by allowing the customer to avoid on-peak demand charges and higher priced on-peak energy. Stand-alone power Provides primary electrical service for a customer without utility backup. In this case, the customer is completely isolated from the utility. Combined heat and power Involves the production of electricity and usable heat energy by an electric generating device. This can be advantageous for customers with consistent daily electricity needs that coincide with heat or steam process requirements. Larger systems are typically referred to as cogeneration. Backup power Provides electricity in case of loss of electric supply from the utility s system and may include a means of supplemental power during a momentary outage. Also called emergency or standby power. 7

Definitions 8 Distributed generation includes a variety of technology options: Wind Wind turbine generators, harnessing the energy contained in wind to turn wind turbine blades connected to a generator for the production of electricity. Solar/photovoltaic Photovoltaic materials contained in an array of solar cells convert energy from sunlight directly into electricity, typically connecting to the utility distribution system via an inverter. Biomass/agricultural digesters A anaerobic digester can be used to process farm manure through a process which converts the waste products over time into methane, which then can be combusted in one of the devices listed below. Internal combustion engines Devices much like an automotive engine, fueled with either diesel or natural gas, connected to and driving an electrical generator. Microturbines Small combustion turbines that burn natural gas to produce less than 500 kw of electric power. Simpler than internal combustion engines, they have only one moving part on a central rotating shaft that generates electricity. They are characterized by simple design, modularity and fuel flexibility. Industrial gas turbines Combustion turbines in the one to 15 MW range. Fuel cells Produce electric and thermal energy through an electrochemical process rather than by burning a fuel. Hydrogen is the basic fuel. Hydrogen can be produced from natural gas or by renewable energy resources. Stirling engines A sealed external combustion heat engine that, in theory, can provide quiet and efficient power. Energy storage devices Batteries, flywheels, compressed air, super magnetic energy or other devices that store energy for later use. They also can be the components in an uninterruptible power supply.

Selling power Notes Selling power to others Notes: It is possible for a customer that generates electricity within our service area to sell power to another utility. In that case, we may transmit or wheel the power from your facility for a fee. You will need to make separate arrangements with We Energies and the American Transmission Company to transmit power to others. We Energies would continue to supply supplementary, standby and maintenance power as required. Transmission of power over electric utility facilities from a customer generating system directly to a retail customer or to another facility owned by the generating customer is a form of retail wheeling. Retail wheeling (transmitting electricity generated by one customer to another retail customer) is not allowed in Wisconsin at this time. 9

2K6086-1487-PC For additional questions call us at (800) 714-7777 ext. 7700 Visit us at www.we-energies.com/cg/