RESIDENTIAL BUILDING PERMIT APPLICATION

Similar documents
Transcription:

RESIDENTIAL BUILDING PERMIT APPLICATION PERMIT # THREE (3) SETS OF PLANS REQUIRED. ONE (1) SET OF DIGITAL PLANS REQUIRED FOR ALL NEW STRUCTURES WHEN COMPLETING SUBMITTAL PACKAGE, REFERENCE PERMIT PLAN REVIEW AND RESIDENTIAL PERMIT PROCEDURES ALL JOBS OVER $2,500 REQUIRE A COPY OF A RECORDED NOC A. Property Owner Name: 1. Site Address: Bonita Springs, FL ZIP: 2. Unit Number: Strap Number: -- -- -- B --. B. Company/Agent/Owner Name: C. Contractor Information: License Number: 1. Phone Number: ( ) - Email Address: D. Job Type: All Jobs over $2500.00 will require a recorded NOC at time of permit pick-up. *Nominal Wind Speed for Components and Cladding Residential* Single Family Duplex Modular Home Addition Addition/Remodel Remodel Restoration Structure Move Mobile Home ANSI Unit Mobile Home Park Model Accessory Awning/Canopy Carport Gazebo Greenhouse Glass/Utility Room Deck/Slab Detached Garage Pool Enclosure Pergola Screen Room Shed Sun Rooms Miscellaneous Garage Door Replacement Siding Fence Fence Structural Wall Other E. Risk Category: 1 2 Wind Zone: Wind Exposure: B C D F. Trades Used: Roof Electric Plumbing Mechanical Low Voltage Shutters Gas G. Scope of Work: H. Type of Construction (check one): 1A 1B 2A 2B 3A 3B 4A 4B 5A 5B I. Contract Amount: $ Total Sq footage ICC Value $ J. Mastered Plans? Yes No Master Number: K. Impact Fee Credits Yes No Credit Amount $ L. Recycling Yes No Diversion fee paid M. Demolition Involved: Yes No If Yes See DEP Notice N. *Required Documentation for New Residential Construction: 1. Proof of Water: BSU Letter Well Permit Private: 2. Proof of Sewer: BSU Letter Septic Permit Other: 3. Proof of Driveway: Bonita Springs Public Works Permit San Carlos Estates Permit 4. Development Order #: SFWD Permit #: 5. FFE Requirement (per FIRM and/or SFWMD): Residential_Building_Permit_20160802.docx 8/3/2016 1:55 PM Page 1 of 2

OWNER S SWORN STATEMENT This application is for a permit to do the work and installation indicated. No work or installation has commenced prior to the issuance of a permit and all work will be performed to meet the standards of all laws regulating construction in this jurisdiction. The foregoing information is accurate, the City has been advised of all easements on the property, and all work will be done in compliance with all applicable laws regulating construction and zoning. OWNER BUILDER STATEMENT/AFFIDAVIT FORM IS REQUIRED FOR ALL OWNER BUILDER PERMITS NOTIFICATION REQUIREMENTS FOR DEMOLITION/RENOVATION ACTIVITIES Written notification is required to be submitted to the South District Office of the Florida Department of Environmental Protection (FDEP/SD) ten (10) working days prior to the commencement of any facility demolition or regulated renovation activity All facility demolitions (even those without asbestos) require notice. Notice is also required for facility renovations impacting 260 linear ft. of RACM on pipes or 160 sq ft. on other components (35 cu. Ft. if measurements not possible.) A complete Florida Department of Environmental Protection (FDEP) Notice of Asbestos Renovation or Demolition Form 62-257.900(1) shall be mailed to: Initial FDEP/South District 2295 Victoria Ave, Ste 364 P.O. Box 2549 Fort Myers, FL 33902 Click here to download the Florida DEP Notice of Demolition or Asbestos Renovation Form. Signature: Date: Printed Name: STATE OF FLORIDA, COUNTY OF LEE Sworn to (or affirmed) and subscribed before me this day of,, by (printed name of person making statement). Personally Known: OR Produced Identification: Type Produced: (Signature of Notary Public State of Florida) (Notary Seal) (Name of Notary Printed, Typed, or Stamped) Residential_Building_Permit_20160802.docx 8/3/2016 1:55 PM Page 2 of 2

RESIDENTIAL BUILDING PERMIT PROCEDURES Community Development Dept. 9220 Bonita Beach Road, Ste. 111 Bonita Springs, FL 34135 (239) 444-6150 permitting@cityofbonitaspringscd.org THREE (3) SETS OF PLANS REQUIRED. ONE (1) SET OF DIGITAL PLANS REQUIRED FOR ALL NEW STRUCTURES ALL JOBS OVER $2,500 REQUIRE A COPY OF A RECORDED NOC NEW SINGLE FAMILY & DUPLEX RESIDENCES, ADDITIONS, ALTERATIONS, ACCESSORY BUILDINGS & DETACHED GARAGES Plans that are prepared by a Florida registered architect or engineer shall be prepared in compliance with required wind loads and must contain a statement on the plan that the building/structure has been designed according to The 2017 Florida Building Codes 6 th Edition. The following information related to wind loads shall be shown on the construction drawings: 1. Basic wind speed, mph, (m/s) 2. Wind importance factor (l) and building category 3. Wind exposure - if more than one wind exposure is used, the wind exposure and applicable wind direction shall be indicated 4. The applicable internal pressure coefficient 5. Components and Cladding. The design wind pressures in terms of psf (kn/m2), to be used for the design of exterior component and cladding materials not specifically designed by the registered design professional. 1. APPLICATION FOR PERMIT The application will not be accepted unless all paper work is complete. Required at time of application. a. Property owners name b. Strap number (17 digit # found on your tax bill or available from the Lee County Property Appraiser's Office at 2480 Thompson St. 239.339.6150) c. Job site address and directions to the job d. Type of roof, i.e. shingle, tile, metal or built-up e. Electrical amps f. Air conditioning, SEER rating, KW's and Tonnage g. Driveway permits. All residential driveways shall be consistent with Chapter 34, Division 2 Parking (City of Bonita Springs Residential Parking Ordinance). If work is to be done in a City right-of-way (R.O.W), a permit is needed from the city s Public Works department. If property is located on a county maintained road, you will need a county driveway permit. Property located in the San Carlos Estates Water Control District (SCEWCD) will require a permit from SCEWCD. All driveways on privately owned and maintained R.O.W. s will be reviewed in accordance with the City of Bonita Springs Residential Parking Ordinance. h. Contractor's license number, address, Contact person, TELEPHONE, FAX NUMBER & E-mail 2. PLOT/SITE PLAN Three (3) copies of a plot/site plan drawn to scale (1/8" = 1' minimum). The scale and north arrow must be indicated. The following items must be on your plot/site plan: a. All four lot corners, lot lines, and dimensions b. Location and name of streets or drives bordering the lot c. If there is a water body within 25 feet of your project, indicate the mean high tide line or the edge of water and label the type of water body (for example: lake, creek, canal, river, Gulf) d. The size of the existing and proposed building(s); the location of driveways; and the location of all easements on the lot e. Setbacks of the buildings (and any proposed additions thereto) from the four lot lines and other existing structures. Setbacks must be taken from the closest point of the building to the closest point of the property line f. The plans must show the roofline as well as the foundation. Rooflines may not encroach into or over easements Residential_Permitting_Procedures_20180213.docx 2/13/2018 3:50 PM Page 1 of 5

g. The plans must indicate the required finished floor elevation consistent with the approved local development order, South Florida Water Management District, and as required by the FEMA FIRM. h. Drainage plan: per LDC 4-2224: Clearing, grading or filling of land. The drainage plan shall be consistent with the approved local development order (DO) and/or South Florida Water Management District permit if located within an approved development. The drainage plan shall include the DO approved drainage cross-section depicting the drainage. If not in an approved development, please show high points and low points on site plan and how site will drain with indicating runoff directions. 3. COASTAL ZONE a. If the property is located within a coastal zone area, a certified sealed survey indicating both Coastal Construction Zone lines, the Flood Zone requirement for the zone, and existing elevation of grade must be submitted with the application b. If the property is located on a BARRIER ISLAND, a registered Florida architect or engineer must seal the construction drawings and the certified survey must address the COASTAL CONSTRUCTION ZONE in addition to flood zone c. A certified elevation certificate will be required indicating the Flood Elevation prior to tie beam inspection on CBS structures or framing inspection on wood structures NOTE: This form must be completed by your surveyor and returned to the Building Division with the Building Permit number listed on the form 4. SURVEY A foundation/spot survey must be submitted prior to receiving any inspection above the foundation or first finished floor within 10 days of slab inspection. 5. MASTERED BUILDINGS If you are planning on purchasing a garage, gazebo, pole barn, shed or utility building from a local distributor, please check with them to see what brands and model numbers are mastered with the City of Bonita Springs Community Development or the State of Florida. If the particular model that you want to buy is not mastered with the City of Bonita Springs Community Development Department or the State of Florida, the plans will have to be sealed. (See #5 Construction Details) 6. CONSTRUCTION DETAIL (BLUEPRINTS) Plans that are prepared by a Florida registered architect or engineer shall be prepared in compliance with required wind loads and must contain a statement on the plan that the building/structure has been designed according to the 2014 Florida Building Codes 5 th Edition. The following information related to wind loads shall be shown on the construction drawings: 1. Basic wind speed, mph, (m/s) 2. Wind importance factor (l) and building category 3. Wind exposure - if more than one wind exposure is used, the wind exposure and applicable wind direction shall be indicated 4. The applicable internal pressure coefficient 5. Components and Cladding. The design wind pressures in terms of psf (kn/m2), to be used for the design of exterior component and cladding materials not specifically designed by the registered design professional If the construction is located in a coastal area specific to the limitations under the Land Development Code, Chapter 7, Article II, Division 2, Sea Turtles; also the Code of Ordinances, Chapter 24, Floods, the architect or engineer shall provide a statement of compliance with those applicable code sections Plans should be submitted on standardized sheets drawn to scale (1/8" or 3/32" = 1' is acceptable). Three (3) sets of construction drawings must be submitted. The plans must bear the following specific information: 1. Elevation for front, rear, right and left sides. 2. Foundation plans. 3. Floor plans. If an addition or enclosure, floor plans must identify rooms adjacent to the addition/enclosure as well as means of ingress/egress. 4. Lateral breakdown (typical wall section from roofing through to foundation and Flood Elevation). 5. Duplex must have a tenant separation wall of UL Design or equal. 6. Location of electric and plumbing. 7. Conventional roof framing layout. If trusses, include engineered truss layout from truss manufacturer. 8. If living area, three sets of 2014 energy calculations will be required. Residential_Permitting_Procedures_20180213.docx 2/13/2018 3:50 PM Page 2 of 5

9. Indicate the state of Florida approval numbers for the windows, shutters, doors, garage doors and/or overhead doors. 10. If construction requires sprinklers, plans must show compliance with State of Florida Administrative Code 61G15-32 7. PUBLIC WATER/SEWER (SFR & DUPLEX ONLY): If construction is located on private or public water and sewer, a letter must be submitted from the appropriate utility company verifying availability to the site at the time of submittal of application. 8. SEPTIC (SFR, DUPLEX, ADDITIONS, SANITARY FACILITIES): If construction is located on SEPTIC SYSTEM, applicant must apply for his Septic Permit at the Health Department prior to the submittal of the building permit. A copy of the paid receipt is required at submittal of building permit. If Septic is existing, you will need a letter from the Health Dept. stating it will be sufficient for size of dwelling at the time of submittal. (2295 Victoria Avenue 239.690.2100) 9. WELL (SFR & DUPLEX ONLY): If property requires a well, a WELL affidavit must be signed and notarized at time of application of building permit. The Well permit must be obtained and inspection finaled before Certificate of Occupancy. If the well is existing, a letter from Lee County Natural Resources will be required at time of application stating compliance. 239.479.8114 10. ENERGY CALCULATIONS (SFR, DUPLEX, AND/OR ALL LIVING AREA ADDITIONS): Three (3) copies of the 2017 energy calculations and one (1) cover sheet (copy of 1st page of energy calcs) must be submitted with your application. 11. OWNER-BUILDER DECLARATION OF SELF-USE (on back of application): An owner-builder must sign a declaration of self-use. He/She must be able to do all the work himself or hire licensed contractors. 12. NOTICE OF COMMENCEMENT (if construction value is $2500 or more): A Notice of Commencement must be recorded prior to issuance of the building permit. A copy of the recorded Notice of Commencement is required at issuance of your building permit. 13. BUILDING ADDENDUM (if owner is not the builder): Addendum on back of application must be completed. 14. FLOODWAY IMPACT LETTER (IF APPLICABLE) 15. DRAINAGE: A COPY OF THE SITE FILL GRADING PLAN MUST ACCOMPANY THE PERMIT APPLICATION. The plan must be consistent with the approved local development order, South Florida Water Management District, and as required by the FEMA FIRM. 16. DRIVEWAYS, LANDSCAPING & IRRIGATION (DUPLEX): Permits for a duplex (two family or single family attached), and not in a subdivision subject to a current (active) Development Order, will be required to comply with the Land Development Code, paved driveways, landscapes and irrigation. BLUEPRINT PROCEDURE 1. Blueprints should be submitted in sets of three (3) & folded. 2. The following items should be stapled on the left hand side of each set of plans in the following order: 1 st Plot plan (if separate) 2 nd Energy calculations 3 rd Truss/ Roof Layout 4 th Window/ Door Cut Sheets or Schedule 5 th Shutter Cut Sheets or Schedule 6 th Site Drainage Plan 3. The Permit Technicians will attach all other pertinent information to the check off sheet. Please have this information stapled together in the following manner: 1 st Recorded Warranty Deed (if applicable) 2 nd Water/Sewer letters or Septic/Well Information 3 rd Sealed survey (if applicable) 4 th Floodway Impact Letter (if applicable) 5 th Energy calculation cover sheet Residential_Permitting_Procedures_20180213.docx 2/13/2018 3:50 PM Page 3 of 5

FOR YOUR INFORMATION 1. WHO CAN PICK UP THE BUILDING PERMIT? The Contractor, an authorized agent or the contractor of the property owner in the presence of the Building Official or designee, must sign the application. Owner-builders must personally appear and sign for their permits. The only exception to this is with a legal, recorded, Power of Attorney. NOTE: Contractors must be licensed and registered with City of Bonita Springs Building Division. 2. REVIEW PROCESS TIME: The review process for a complete and accurate application is anticipated to be between 5 to 7 working days. 3. REJECTED PLANS: Plans will be rejected if all required paper work is not complete. Customer will be notified in writing, by phone or email. 4. RE-SUBMITTING REJECTED PLANS: Once the plans have been corrected, re-submittal of rejected plans must be made at the Permit Intake Counter and will be processed through the normal procedure time. 5. HOW WILL I KNOW WHEN MY PERMIT IS READY? Applicants will be notified by phone or email when the permit is approved. At that time you will be given the required fees due and any other paperwork we may need. Recycling may apply in accordance with Chapter 32, Article II of the City s Code of Ordinances. 6. CHANGES TO THE APPROVED PLANS (REVISIONS): Any filed changes of outlets or fixtures, non-structural or structural changes must be submitted to the Permit Intake Counter for processing. If the original plans were sealed by an architect or engineer, the revisions must also be sealed. These must be submitted in plan form of three (3) copies and approved, prior to commencement of work. 7. POSTING THE PERMIT: Permits must be posted at eye-level, visible from the road and protected from the weather. There must also be a set of the approved plans on the job at the time of inspection(s). 8. INSPECTIONS & RE-INSPECTION FEES: You must call for inspections. Please call 239.444.6170 to schedule an inspection by 6pm the day prior. When an inspection has failed, a fee will be charged for all recalls and turn-downs. Fees are $50.00 per re-inspection. 9. SANITARY FACILITIES (PORTA JOHN): Upon issuance of a building permit, and before the footing inspection is performed, the job site must have sanitary facilities and a trash retainer. 10. ADDITIONAL PERMITS (if required): Plumbing, Electrical, Air Conditioning, Roofing, Lawn Sprinkler system, Pools (including above-ground), Spas, Enclosures, Fences, Solar, Fire Sprinklers or Alarm Systems. 11. TERMITE CERTIFICATES: A Certificate for Termite Treatment is required on the permit board pursuant to Florida Building Code, Section R.318. 12. ELEVATION CERTIFICATES: Every building that is required to meet flood elevation must have an Elevation Certificate marked Building Under Construction before further inspections can be done above the slab (or horizontal member in V-Zones). A finished construction elevation certificate is required before the 106 Final Building. The STRAP NUMBER will be 17 digits and is used to identify the land although the owners may change. The strap number is in the upper left hand of your tax bill or you can obtain it from the County Property Appraiser by calling their office at 239-339-6150. 13. GARBAGE (Lee County Ordinance 95-19): No Certificate of Occupancy can be issued on Residential units of four (4) or less until payment of Solid waste fees has been received. 14. CERTIFICATE OF OCCUPANCY: The building may not be occupied until the final inspection has been completed and a Certificate of Occupancy is issued, at which time the power company will be notified to connect permanent power. Violators will be cited and temporary power will be disconnected. Residential_Permitting_Procedures_20180213.docx 2/13/2018 3:50 PM Page 4 of 5

PLOT AND DRAINAGE PLAN The following items must be on your plot and drainage plan: 1. Plot plan must be drawn to scale (1/8" = 1', 1" = 10', 1" = 20', 1" = 30', and 1" = 60') or if the lot is square or rectangular, the dimensions may add up to the lot width and depth. Label the location of streets bordering your property. 2. All setbacks to structure and additions must be shown. Setbacks will be taken from the closest point of the building to the closest point of the property line. It helps to show the roof line as well as the foundation since the roof lines are not allowed to encroach easements. 3. If there is a water body within 25 feet of your project, please indicate the mean high tide line or the edge of water and label the type of water body (for example: lake, creek, canal, river, Gulf). 4. The bottom right figure is an example of a drainage cross section. All singlefamily homes, additions, and/or accessory structures, such as pools located within an approved development that received a local Development Order, shall demonstrate compliance with the approved drainage plan for that development. Drainage cross sections shall be reflected on the drainage plan to demonstrate consistency with development order. *** Setback or lot size information can be obtained through Community Development Planning and Zoning Division by calling 239.444.6166. Please have your strap number available. Please note that the following items will also be requested for Site Plan Review: Addition of gutters may be required to directly flow drainage Existing and proposed grades are required to ensure proper drainage Residential_Permitting_Procedures_20180213.docx 2/13/2018 3:50 PM Page 5 of 5

RESIDENTIAL BUILDING PLAN REVIEW CHECKLIST PERMIT # THREE (3) SETS OF PLANS REQUIRED. ONE (1) SET OF DIGITAL PLANS REQUIRED FOR ALL NEW STRUCTURES Plans Examiner: Date: Owner: Permit #: Contractor: Phone #: Design Professional Architect / Engineer: Survey 1. Y N N/A Is a specific purpose survey submitted? 2. Y N N/A Is correct flood zone shown? 3. Y N N/A Are existing grade elevations shown for structures located in an A or V zone? 4. Y N N/A On lots in multiple flood zones, all flood zone lines indicated? 5. Y N N/A Is property in a flood way? 6. Y N N/A Is flood way line shown? Site Plan 1. Y N N/A Is site plan submitted? 2. Y N N/A Is North arrow shown? 3. Y N N/A Is lot width and length shown? 4. Y N N/A Is structure shown on site plan with all setback dimensions? 5. Y N N/A Does structure layout match the floor plan? 6. Y N N/A Are drainage/storm water run-off requirements noted on the Drainage Plan? 7. Y N N/A Is the finished floor elevation shown consistent with the DO and/or FEMA? 8. Y N N/A Are all easements shown? 9. Y N N/A Is proposed driveway shown? 10. Y N N/A Is landscape and irrigation layout shown? 11. Y N N/A Is well and/or septic tank and drain field location shown? 12. Y N N/A Is L.P. gas tank and size shown 13. Y N N/A Does AC or pool equipment encroach into setbacks or easement? Structure Code Compliance 1. Y N N/A Are plans sealed by architect/engineer and/or contractor? 2. Y N N/A Are structural calculations submitted? 3. Y N N/A Is correct wind speed shown? 4. Y N N/A Is exposure category shown? 5. Y N N/A Is importance factor shown? 6. Y N N/A Are pressures for wind loading on components and cladding shown? 7. Y N N/A Does structure meet requirements of FBC Table 503 for number of stories and allowable area? 8. Y N N/A Does structure meet Fire Resistance Ratings of FBC Table 503 for structural elements? Residential_Plan_Review_Checklist_20160707.docx 8/5/2016 11:45 AM Page 1 of 6

Structure Code Compliance (continued) 9. Y N N/A Are plans designed per SSTD10-99? a. Y N N/A Are all appropriate charts and tables shown? b. Y N N/A Are all appropriate requirements circled or highlighted? 10. Y N N/A Are plans designed per Guide to concrete Masonry Residential Construction in High Winds Areas? a. Y N N/A Are all appropriate charts and tables shown? b. Y N N/A Are all appropriate requirements circled or highlighted? 11. Y N N/A Are plans designed per WPPC Guide to Wood Construction in High Winds Areas? a. Y N N/A Are all appropriate charts and tables shown? b. Y N N/A Are all appropriate requirements circled or highlighted? 12. Y N N/A Are plans designed per AF & PA Wood Frame Construction Manual for One- and Two-Family Dwellings, High Wind Edition? a. Y N N/A Are all appropriate charts and tables shown? b. Y N N/A Are all appropriate requirements circled or highlighted? Energy Code Information 1. Y N N/A Is the current energy code form completed properly and signed; correct climate zone and correct jurisdiction? 2. Y N N/A Does conditioned square feet area on plans match square feet shown on energy forms? 3. Y N N/A Is the R value between common walls shown? 4. Y N N/A Is the R value for added insulation on exterior walls shown? 5. Y N N/A Is the R value for ceiling shown? 6. Y N N/A Is the R value for raised floors shown? 7. Y N N/A Are Energy Credits claimed? a. Y N N/A Attic radiant barrier credit b. Y N N/A White roof credit c. Y N N/A Programmable Thermostat credit Foundation Plan 1. Y N N/A Are all footings shown, including interior bearing walls, column pads and concentrated loads? 2. Y N N/A Are all locations of vertical reinforcements and anchor bolts shown? a. Are all elevation changes in slab shown? 3. Y N N/A Is minimum concrete PSI shown? 4. Y N N/A Is slab reinforcement shown? a. Y N N/A Wire mesh size and gauge? b. Y N N/A Fibermesh reinforcement? 5. Y N N/A Is vapor barrier, minimum 6 mil. shown? 6. Y N N/A Is minimum slab on grade thickness shown? 7. Y N N/A Is type of soil treatment for termites shown? 8. Y N N/A Is perimeter slab reinforcement shown? 9. Y N N/A Do plans show bottom of foundation minimum of 12 below finish grade? 8 above FF 10. Y N N/A Do plans show concrete footings have a specified compressive strength of not less than 2500 PSI at 28 days? 11. Y N N/A If pile foundation shown, is Sealed Soil Report submitted? Residential_Plan_Review_Checklist_20160707.docx 8/5/2016 11:45 AM Page 2 of 6

Foundation Plan (continued) 12. Y N N/A Does plan indicate No Wood Grade Stakes Permitted? Typical Wall Section 1. Y N N/A Is finished grade shown? 2. Y N N/A Is minimum floor elevation shown? a. Y N N/A Minimum 8 above adjacent grade? b. Y N N/A Drainage Plan submitted? c. Y N N/A Flood protection elevation? d. Y N N/A Base flood elevation? 3. Y N N/A Is minimum footing depth beneath finished grade shown 4. Y N N/A Are all footing sizes shown? 5. Y N N/A Are all horizontal reinforcements shown? 6. Y N N/A Is vertical reinforcement shown? 7. Y N N/A Are minimum 3 x 4 clean-out and inspection openings shown? 8. Masonry Construction a. Y N N/A Is exterior wall finish shown? b. Y N N/A Is interior furring shown? c. Y N N/A Is exterior wall insulation shown? d. Y N N/A Is interior wall finish shown? 9. Wood Frame Construction a. Y N N/A Are stud sizes, spacing, grades, and lumber species shown? b. Y N N/A Is exterior sheathing (type and thickness) shown? c. Y N N/A Are nailing requirements (size and spacing) shown? d. Y N N/A Is exterior wall finish shown? e. Y N N/A Is interior wall finish shown? f. Y N N/A Is wall insulation shown? g. Y N N/A Is minimum clearance between wood siding and finished grade shown? h. Y N N/A Are shear wall segments shown? i. Y N N/A Type of hold-downs specified? 10. Y N N/A Are ceiling heights shown? 11. Y N N/A Are all hurricane anchorage and hold-downs specified and labeled? 12. Y N N/A Thickness of ceiling drywall? 13. Y N N/A Are insulation baffles shown? 14. Roof Framing a. Y N N/A Are engineered trusses shown? i. Y N N/A Show uplifts greater than 1000 lbs. ii. Y N N/A Show gravity loads greater than 5000 lbs. b. Y N N/A Are conventional frame rafters used? i. Y N N/A Rafters size shown? ii. Y N N/A Species of lumber shown? iii. Y N N/A Grade of lumber shown? c. Y N N/A Type of roof sheathing shown? i. Y N N/A Thickness of roof sheathing shown? ii. Y N N/A Grade of roof sheathing shown? iii. Y N N/A Nailing pattern of roof sheathing shown? d. Y N N/A Weight of dry-in felt shown? Residential_Plan_Review_Checklist_20160707.docx 8/5/2016 11:45 AM Page 3 of 6

Typical Wall Section (continued) e. Y N N/A Type of roof cover shown? i. Y N N/A Attachment asphalt/fiberglass shingles shown? ii. Y N N/A Attachment of tile roof shown? iii. Y N N/A Other roof covering and attachments shown? f. Y N N/A Length of roof overhang shown? g. Y N N/A Attic ventilation shown? h. Y N N/A Type of soffit and fascia shown? i. Y N N/A Type and gauge of eave metal shown? j. Y N N/A Location, type and thickness of flashing shown? k. Y N N/A Type and gauge of eave metal shown? 15. Y N N/A Is anchorage of veneer shown? Floor Plan 1. Y N N/A Does square footage on plan match square footage shown on application? If NO, measure all areas under roof from exterior wall to exterior wall and adjust square footage accordingly. Add/Subtract To/From living or habitable area. Add/Subtract To/From non-living or non-habitable area. 2. Y N N/A Are all room dimensions shown? 3. Y N N/A Are all doors and windows sizes shown? a. Y N N/A Required egress door must have 32 clear opening b. Y N N/A Cannot egress through garage 4. Y N N/A Are all emergency egress openings shown? 5. Y N N/A Is required tempered glass shown at all hazardous locations? 6. Y N N/A Are all vertical reinforcements shown? 7. Y N N/A Are all shear wall segments shown? 8. Y N N/A Are all hold-down and hurricane anchorages shown? 9. Y N N/A Is required attic access shown? 10. Y N N/A Are all plumbing fixtures shown? a. Y N N/A Is water heater size shown? b. Y N N/A Are all electrical fixtures shown? 11. Y N N/A Is arc fault circuit interrupter shown for bedrooms? 12. Y N N/A Are all mechanical fixtures shown? a. Y N N/A Is air handler and condenser location shown? b. Y N N/A Are exhaust fans shown? 13. Y N N/A Are all smoke detectors shown? a. Y N N/A Are all smoke detectors Carbon Monoxide Detectors? 14. Y N N/A Does one (1) bathroom on the first habitable floor level have a 29 net clear door opening and handicap accessible route? 15. Y N N/A Does bedroom open directly into garage? 16. Y N N/A Does the number of bedrooms shown on plans match the number of bedrooms shown on the application? 17. Y N N/A Is designer s name and address shown on plans? 18. Y N N/A Do egress doors and landings comply with FBC? 19. Y N N/A Are habitable rooms shown with the minimum light and ventilation requirements? 20. Y N N/A Are garage doors, windows and other openings shown as meeting wind load requirements for components and cladding? a. Y N N/A Show required positive and negative pressures for all openings Residential_Plan_Review_Checklist_20160707.docx 8/5/2016 11:45 AM Page 4 of 6

Floor Plan (continued) 21. Y N N/A Does floor plan show fireplace? a. Y N N/A Does masonry fireplace have a detailed cross-sectional detail? b. Y N N/A Does pre-fabricated fireplace have copy of the manufacturer s specifications? c. Y N N/A Are hearth sizes, locations, and details shown? d. Y N N/A Are mantel sizes, locations, and details shown? 22. Y N N/A Are stair details shown? a. Y N N/A Is minimum stair width shown? b. Y N N/A Are tread and riser sizes shown? c. Y N N/A Do spiral stairways comply with FBC Residential? d. Y N N/A Are required landings shown? e. Y N N/A Are handrail height, spacing and grasp ability details shown? f. Y N N/A Is required headroom clearance shown? g. Y N N/A Are guardrail height, spacing and details shown? 23. Y N N/A If floor plan shows mixed construction, are mixed construction details shown? (May require engineering) 24. Y N N/A If required, are tenant separations shown? a. Y N N/A Duplex b. Y N N/A Townhouse 25. Y N N/A Are all columns and beams shown for porches and lanais? a. Y N N/A Are column types, sizes, spans and anchorages shown? b. Y N N/A Are beam types, sizes, spans and anchorages shown? 26. Y N N/A Are all lintel and beam details shown? 27. Y N N/A Are engineering details provided for butt glass? Truss/Rafter Plan 1. Y N N/A Are engineered truss plans provided showing loads, uplifts and required connections? a. Y N N/A Show uplifts greater than 1000 lbs b. Y N N/A Show gravity loads greater than 5000 lbs 2. Y N N/A Are all header, beams, girders and interior bearing walls shown? 3. Framed Roof a. Y N N/A Is rafter plan shown including sizes, spacing, and species? b. Y N N/A Is ceiling joist plan shown including sizes, spacing, and species grade of lumber, spans, and connections? c. Y N N/A Are collar ties shown including size, spacing, species, grade of lumber and connections? d. Y N N/A Is ridge beam shown including sizes, species, and grade of lumber? 4. Y N N/A Is roof sheathing indicated showing type, thickness and nailing pattern? Floor Framing 1. Y N N/A Is engineered floor truss plan provided showing loads, uplifts and connections? 2. Y N N/A Is joist plan provided showing size, spacing, span, species, grade of lumber and connections? 3. Y N N/A Is floor sheathing indicated showing type, thickness and nailing pattern? Elevations: 1. Y N N/A Does plan show four (4) elevations? 2. Y N N/A Are attic ventilation requirements shown? Residential_Plan_Review_Checklist_20160707.docx 8/5/2016 11:45 AM Page 5 of 6

Elevations (continued) 3. Y N N/A Are roof pitch and overhangs shown? 4. Y N N/A Is chimney height and location shown? 5. Y N N/A Is cricket shown? 6. Y N N/A Are all lanai/porch details shown? 7. Y N N/A Does plan show solid blocking required for ridge vents? 8. Y N N/A Are condensate lines and roof down spouts shown to discharge minimum one (1) foot away from structure for protection against decay and termites? 9. Y N N/A Are gutters, down spouts and splash blocks shown? 10. Y N N/A Roof overhang cannot extend closer than five (5) foot to property line and no overhang allowed with a zero (0) foot lot line. Structural/Details 1. Y N N/A Is basic wind speed shown? 2. Y N N/A Are gable end bracing details shown? 3. Y N N/A Are roof sheathing nailing zones shown? 4. Y N N/A Are protection of opening details shown? 5. Y N N/A Is importance factor shown? 6. Y N N/A Is structure designed to withstand interior pressures? 7. Y N N/A Is exposure category shown? 8. Y N N/A Are wind pressure for components and cladding shown? 9. Y N N/A Are exterior windows and glass doors shown as approved by independent testing laboratory and do they bear a label by AAMA or WDMA or other approved label? 10. Y N N/A Are window and door installation and buck details shown? 11. Y N N/A Are mullion installation details and design criteria shown? 12. Y N N/A Are garage door positive and negative wind pressures shown as meeting requirements of 1.5x pressure? 13. Y N N/A Are garage door manufacturer s installation details provided? 14. Y N N/A All windows, doors, sliding glass doors, garage doors and skylight details must be on plan page. Show manufacturer, product approval, design pressures and installation details. 15. Y N N/A Is engineering provided for Butt Glass Installation? a. Y N N/A Is engineering current? b. Y N N/A Is sealed copy on file? Residential_Plan_Review_Checklist_20160707.docx 8/5/2016 11:45 AM Page 6 of 6

SHUTTER / WINDOW / DOOR PERMIT APPLICATION PERMIT # Community Development Dept. 9220 Bonita Beach Road, Ste. 111 Bonita Springs, FL 34135 (239) 444-6150 permitting@cityofbonitaspringscd.org RESIDENTIAL COMMERCIAL Property Owner: STRAP #: Job Address: Contractor Business Name/Applicant Name: License #: Phone #: Email: Construction Value: Electric Required: No Yes, an Electric Subcontractor Permit Request is required. Description of Work: If construction value exceeds $2500 a Building Permit Addendum and Notice of Commencement will be required. A condo association letter must be submitted if the windows / shutters are being installed on a condo. SHUTTERS APPLICATION must include a completed shutter protection worksheet for the type of covering that will be used. You may obtain a copy of the shutter worksheet online at: http://cityofbonitaspringscd.org/building-general/. WINDOWS / DOORS APPLICATION Note: If the window / door replacement is not size for size please submit a residential building permit. Type Number Expiration Date FL# or NOA Yes No FL# or NOA Yes No FL# or NOA Yes No FL# or NOA Yes No FL# or NOA Yes No FL# or NOA Yes No Note: SHGC value must be less than or equal to 0.25. Impact Resistant? SHGC U-Factor Affected Opening Number (s) on the Floor Plan Select one of the following: (compliance with tables R301.2 (2) and R301.2 (3) of the 6th Edition (2017) FL Building Code) Provide Individual Calculations Provide Individual Engineering Comply with the following Window and Door Pressure Calculations (only for window replacements <= 60ft high) HOUSE HEIGHT 150 WIND EXP B 160 WIND EXP B 160 WIND EXP D 170 WIND EXP D House < 30 +24.3 +27.6 +45.9 +56.2-32.5-37 -61.4-71.7 House 30 45 +27.2 +30.9 +49.2 +61.3-36.4-41.4-65.8-76.8 House 45 60 +29.6 +33.7 +51.7 +64.4-36.6-45.1-69.2-80.7 ShutterWindowDoor_20180215.docx 2/15/2018 4:10 PM Page 1 of 2

FLOOR PLANS: All applications must include three (3) copies of the floor plan indicating all openings which will be affected by shutter/ window installation and the expected means of escape (egress). The affected openings must be numbered in accordance with this application and/or the shutter worksheet. If electric shutters are installed a separate electric sub-permit will be required. ENGINEERING: If the product does not have an active FL# or NOA# it must be submitted with three copies of engineered details showing compliance with the 6th Edition (2017) Florida Building Code. THIS PERMIT IS VOID IF THE FIRST INSPECTION IS NOT MADE WITHIN SIX (6) MONTHS FROM THE DATE ISSUED OR IF NO INSPECTION HAS BEEN MADE FOR A PERIOD OF SIX (6) MONTHS FROM THE MOST RECENTLY PASSED INSPECTION. THE PERMIT IS VOID IF THE ZONING CLASSIFICATION IS VIOLATED. APPLICANT AGREES TO COMPLY WITH THE SANITARY REGULATIONS AND UNDERSTANDS THAT THE PROPOSED STRUCTURE MAY NOT BE USED OR OCCUPIED UNTIL AN APPROVED CERTIFICATE OF OCCUPANCY IS ISSUED. APPLICANT FURTHER UNDERSTANDS THAT FAILURE TO OBTAIN PERMIT OR MISREPRESENTATION OF THE IMPROVEMENTS IS A MISDEMEANOR AND UPON CONVICTION, APPLICANT CAN BE PUNISHED AS PROVIDED BY THE LAW. FAILURE TO COMPLY WITH THE MECHANICS LIEN LAW CAN RESULT IN THE PROPERTY OWNER PAYING TWICE FOR IMPROVEMENTS. I HEREBY CERTIFY THAT TO THE BEST OF MY KNOWLEDGE, THE INFORMATION SUBMITTED FOR THIS PERMIT IS TRUE & CORRECT, & COMPLIES WITH DEED OF RESTRICTIONS. Authorization Signature: Date: Signature: Date: Printed Name: STATE OF FLORIDA, COUNTY OF LEE Sworn to (or affirmed) and subscribed before me this day of,, by (printed name of person making statement). Personally Known: OR Produced Identification: Type Produced: (Signature of Notary Public State of Florida) (Notary Seal) (Name of Notary Printed, Typed, or Stamped) ShutterWindowDoor_20180215.docx 2/15/2018 4:10 PM Page 2 of 2

STORM / ACCORDION PANELS AND PLYWOOD PROTECTION SHUTTER APPLICATION WORKSHEET PERMIT # MANUFACTURER: FL#(S) MUST INDENTIFY THE EXACT ITEM TO BE USED: FL#: FL# Exp. Date: TYPE: STORM PANEL ACCORDIAN PANEL PLYWOOD ATTACHING TO: CBS CONSTRUCTION WOOD CONSTRUCTION METAL FRAME CONSTRUCTION EXPOSURE CATEGORY: B D WIND ZONE: 140 MPH 150 MPH 160 MPH 170 MPH OPENING# OPENING WIDTH OPENING HEIGHT SPAN OF PANELS HEADER TRACK REQUIRES BUILD OUT SILL TRACK FASTERNER TYPE FASTER O/C SPACING YOU MUST SUPPLY APPLICABLE ENGINEERING AND FLORIDA PRODUCT APPROVAL (FL#) DOCUMENTATION IN THE FIELD WHICH CORRESPONDS TO THE INFORMATION PROVIDED ON THIS SHEET. AUTHORIZED SIGNER / OWNER: DATE: ShutterWorksheet_Protection_20160808.docx 8/8/2016 10:28 AM Page 1 of 2

ROLL UP PROTECTION SHUTTER APPLICATION WORKSHEET PERMIT # MANUFACTURER: FL#(S) MUST IDENTIFY THE EXACT ITEM TO BE USED: FL#: FL# Exp. Date: TYPE: ALUMINUM SCREEN ATTACHING TO: CBS CONSTRUCTION WOOD CONSTRUCTION METAL FRAME CONSTRUCTION EXPOSURE CATEGORY: B D WIND ZONE: 140 MPH 150 MPH 160 MPH 170 MPH OPENING# OPENING WIDTH OPENING HEIGHT SLAT / SPAN OF SHUTTER # OF STORM BARS REQUIRED SIZE OF STORM BAR HEADER SIZE INCHES SIDE GUIDE O.C. IN SPACING SIZE OF MULLION (4 x 4, 4 x 6, etc.) YOU MUST SUPPLY APPLICABLE ENGINEERING AND FLORIDA PRODUCT APPROVAL (FL#) DOCUMENTATION IN THE FIELD WHICH CORRESPONDS TO THE INFORMATION PROVIDED ON THIS SHEET. AUTHORIZED SIGNER / OWNER: DATE: ShutterWorksheet_Protection_20160808.docx 8/8/2016 10:28 AM Page 2 of 2

BLOWER DOOR TESTING NOTICE Community Development Dept. 9220 Bonita Beach Road, Ste. 111 Bonita Springs, FL 34135 (239) 444-6150 permitting@cityofbonitaspringscd.org RE: Building Conditioned Volume* added/included on plans. Applies to 1 & 2 Family Dwellings, Townhouses, Group R-2, R-3 and R-4 buildings three stories or less in height. Effective Date: 7/1/17 (Permit Application Date) Code Sections: FBC Energy Conservation R101.4.9, R402.4.1.2 2016 Glitch R101.4.9 Blower door testing. The mandatory blower door testing for residential buildings or dwelling units as contained in section R402.4.1.2 of the Florida Building Code, 6th Edition (2017) Energy Conservation, shall not take effect until July 1, 2017, and shall not apply to construction permitted before July 1, 2017. FBC, Energy R402.4.1.2 Blower Door Air Infiltration IRC Climate Zone 2 Max ACH 7 (7/1/16 Glitch) Calculation CFM(50) x 60/Conditioned Volume = ACH(50) 2016 Glitch R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2 (includes IRC), and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weather stripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open; 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers, if installed at the time of the test, shall be fully open. REQUIREMENT: In order to verify the certified numbers and calculations in the required Blower Door (air infiltration) test reports, the Conditioned Volume must be indicated on the submitted plans. The volume is a required variable in the equation used in the required calculation to determine the ACH air changes per hour. Without the volume being known the certification cannot be accurately verified. NOTE: *Unvented Attic included in Conditioned Volume. BuildingPermit_NoticeBuildingVolume_20180213.docx 2/13/2018 3:32 PM Page 1 of 1

BLOWER DOOR TESTING REGISTRATION NOTICE Community Development Dept. 9220 Bonita Beach Road, Ste. 111 Bonita Springs, FL 34135 (239) 444-6150 permitting@cityofbonitaspringscd.org Mandatory Residential Air Infiltration (Blower Door) Testing begins July 1, 2017 Duct Leakage testing already required if default not used Florida Energy Conservation Building Code States: Effective July 1 st 2017; New Construction on residential buildings or dwelling units shall have mandatory Blower Door Testing performed by an Approved Individuals. Certification Reports will be accepted from the following Individuals (Blower Door and Duct Leakage): 1. Individuals defined under FS 553.993 (5) or (7) 2. *Individuals licensed under FS 489.105(3)(f), (g) or (i) 3. Must be third party individual no conflict of interest To become registered with the Building Division, you must submit: 1. proof of licensure and/or approved certification and/or approved qualification 2. proof of liability insurance 3. workman s compensation insurance or exemption 4. proof of Business Tax Receipt for the agency 5. *FS 489 licensed individuals will need to submit proof of certification from an approved organization indicating education, training, use, and evaluation of testing results for the blower door and duct testing equipment and procedures Blower Door Testing reports verifying 7 air changes per hour or less and Duct Leakage 4 CFM/100sqft or less must be submitted prior to the issuance of Certificate of Occupancy, signed by the registered, qualified individual who performed the test. Enacting code (R101.4.9 and R402.4.1.2) is found in the 2016 supplement: http://www.floridabuilding.org/fbc/thecode/2017_code_development/glitch_2016/2016_supplement_to_the_5t h_edition_2014_fbc.htm BuildingPermit_BlowerDoorRegistration.docx 5/22/2017 12:31 PM Page 1 of 1

BLOWER DOOR TESTING CERTIFICATION NOTICE Community Development Dept. 9220 Bonita Beach Road, Ste. 111 Bonita Springs, FL 34135 (239) 444-6150 permitting@cityofbonitaspringscd.org 6 TH EDITION FBC ENERGY CONSERVATION CODE R402.4.1.2 House Infiltration Test (Blower Door) Certification Prescriptive and Performance Method Date: Permit #: Lot #: Contractor: Address: Construction: New Construction Complete Existing After Addition House Infiltration Results IRC Climate Zone 2 CFM (50) = Test Date: Volume = ACH (50) = CFM (50) x 60 / Volume = Mechanical Ventilation required less than 3 ACH Passing results must be 7 ACH (50) or less Pass: Fail: FBC, Energy R402.4.1.2 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2, and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w.g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993(5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. FBC, Residential R303.4 Mechanical ventilation. Where the air infiltration rate of a dwelling unit is less than 3 air changes per hour when tested with a blower door at a pressure of 0.2 inch w.c (50 Pa) in accordance with Section R402.4.1.2 of the Florida Building Code, Energy Conservation the dwelling unit shall be provided with whole-house mechanical ventilation in accordance with Section M1507.3. Testing Company Name: Address: I hereby certify that the above House Infiltration results demonstrate compliance with 6 th Edition FBC Energy Conservation requirements in accordance with Section R402.4.1.2 Climate Zone 2. Signature: Printed Name: License/Certification #: BuildingPermit_BlowerDoorCertification_20180213.docx 2/13/2018 3:33 PM Page 1 of 1

BLOWER DOOR TEST REPORT Community Development Dept. 9220 Bonita Beach Road, Ste. 111 Bonita Springs, FL 34135 (239) 444-6150 permitting@cityofbonitaspringscd.org Permit Number: Builder Name: Job Address: City, State, Zip: 2017 Florida Building Code R402.4.2.1 Testing. The building or dwelling unit shall be tested and verified as having an air leakage rate of not exceeding 7 air changes per hour in Climate Zones 1 and 2, and 3 air changes per hour in Climate Zones 3 through 8. Testing shall be conducted with a blower door at a pressure of 0.2 inches w. g. (50 Pascals). Testing shall be conducted by either individuals as defined in Section 553.993 (5) or (7), Florida Statutes or individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or approved third party. A written report of the results of the test shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of all penetrations of the building thermal envelope. During Testing: 1. Exterior windows and doors, fireplace and stove doors shall be closed, but not sealed, beyond the intended weather-stripping or other infiltration control measures; 2. Dampers including exhaust, intake, makeup air, backdraft and flue dampers shall be closed, but not sealed beyond intended infiltration control measures; 3. Interior doors, if installed at the time of the test, shall be open; 4. Exterior doors for continuous ventilation systems and heat recovery ventilators shall be closed and sealed; 5. Heating and cooling systems, if installed at the time of the test, shall be turned off; and 6. Supply and return registers, if installed at the time of the test, shall be fully open. Envelope Leakage Test Results: CFM(50) = Volume = Pass: ACH(50) = CFM(50) X 60 / Volume = Fail: Passing results must be 7 ACH(50) or less *Note: if the report shows less than 3 air changes, mechanical ventilation will be required per Florida Building Code R303.4. I hereby certify that the above envelope leakage performance results demonstrate compliance with Florida Energy Code requirements. License/Certification Number: Date: Printed Name: Signature: BuildingPermit_BlowerDoorTestReport_20180213.docx 2/13/2018 3:27 PM Page 1 of 1