Oshtemo Township MUNICIPAL WATER EXTENSION. PUBLIC MEETING November 30, 2016

Similar documents
Informational Meeting: Onsite and Offsite Response Action Plans

KABA DEMOLITION INFORMATION PACKET

APPENDIX K-2 IRP SITES

Railroad TCE HSCA Site Public Hearing Warwick Township Building November 17 th, 2015

Wickes Manufacturing TCE Plume Site Mancelona, Michigan

Risk Based Corrective Action Approach. Managing Change and Superfund Delisting

CITY OF VIRGINIA BEACH LAW ENFORCEMENT TRAINING SITE VOLUNTARY REMEDIATION PROGRAM DEPARTMENT OF PUBLIC WORKS PUBLIC MEETING

CITY OF HARBOR SPRINGS WELLHEAD PROTECTION PROGRAM PLAN September 2004

Proposed Plan Closed Sanitary Landfill

Scott Kendzierski, REHS, MS Director of Environmental Health Services Health Department of Northwest Michigan

Mancelona-Cedar River TCE Plume: Frequently Asked Question #1

Construction Application for Permit (CAP) Instructions

Transmitted via . Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL

Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO

Lead and Copper Rule for Drinking Water

Fort George G. Meade. Restoration Advisory Board Meeting March 25, 2010

Program Component Considerations

CITY OF BILLINGS BUILDING & SAFETY DIVISION

Lot Size: OWNER OR LESSEE: Name: Telephone: Address: City: State: Zip: ARCHITECT OR ENGINEER: Name: Telephone: Fax #: License #:

Village of Bear Lake HIGH LEAD LEVEL INVESTIGATION MIKE SMITH

Letter Health Consultation

Severn Groundwater Investigation

3M Woodbury Disposal Site Proposed cleanup plan for PFCs

BANNOCK COUNTY PUBLIC WORKS 5500 S. 5 TH AVE POCATELLO, ID 83204

Solid Waste Technical Conference Part 115 Update

Livingston County Department of Public Health Environmental Health Division. Hydrogeologic Investigation Requirements for Land Division Developments

SITE REVIEW AND UPDATE NASCOLITE CORPORATION MILLVILLE AND VINELAND, CUMBERLAND COUNTY, NEW JERSEY CERCLIS NO. NJD

SITE REVIEW AND UPDATE WILLIAMS PROPERTY MIDDLE TOWNSHIP, CAPE MAY COUNTY, NEW JERSEY CERCLIS NO. NJD

Water Service Connection/Alteration Permit Application

537 Total Miles of Public Sanitary Sewers (separated sewers and combined sewers)

FACTS ABOUT: Former GE Power Systems Apparatus Service Center (Voluntary Cleanup Program) Site Location

Transmitted via . Mr. Nate Nemani U.S. Environmental Protection Agency Region 5 77 West Jackson Boulevard LU-9J Chicago, IL

Town of Tolland Water Supply System Application for Domestic Water Supply Service Water Service Connection/System Repair

PERMITS, ADDRESSES, AND INSPECTIONS

Environmental Overview: 39 th Avenue Greenway. What We ll Cover: Denver s Environmental Investigation Process Environmental Concerns Identified

EXHIBIT C WATER AND WASTEWATER INFRASTRUCTURE REVIEW 2016

SITE REVIEW AND UPDATE ROCKY HILL MUNICIPAL WELLS ROCKY HILL BOROUGH, SOMERSET COUNTY, NEW JERSEY CERCLIS NO. NJD

Portland Harbor in the Post-ROD World Integrating In-Water & Upland Remedies and Permitted Discharges --Legal Structure and Tools

87th Air Base Wing Joint Base McGuire-Dix-Lakehurst Public Meeting December 13, 2017 Proposed Plan McGuire Operable Unit-3

Why is protecting the groundwater so important?

MPCA has finalized site-specific water-quality criteria for PFOA and PFOS (August 2007).

Collection #432 Butterworth Landfill Files Collection 432

Instructions for Completing a Noncommunity Water Supply Permit Application

Instructions for Completing a Noncommunity Water Supply Permit Application

Utility Characteristics: 340,000 Number of Customers (approximately 2 million people) Number of Taps

INTRODUCTION. 1 Proposed Plan for the Former Lee Field Naval Air Station Landfill Area 2 Site

PROPOSED PLAN OF REMEDIAL ACTION. 560 Terminal Avenue New Castle, DE

CHAPTER SEVEN: UTILITIES

PUTNAM COUNTY COMPREHENSIVE PLAN EXHIBIT DD INFRASTRUCTURE ELEMENT

EPA REGION 6 U.S. CONGRESSIONAL DISTRICT 4 AIR FORCE PLANT 4 FORT WORTH, TARRANT COUNTY, TEXAS. EPA ID# TXD Site ID:

Wetland Permit Application

City of Evanston STORMWATER MANAGEMENT PLAN February 2018

Hazardous Waste Program Overview and Update. Steve Sturgess, Program Director October 18, 2016

STREET STANDARDS FOR PRIVATE ROAD/STREET. Number of Travel Lanes Width of Travel Lanes Width of Right-of-Way. Subbase - Bank Run Gravel (6" minus)

OWENS CORNING COMMUNITY INFORMATION SESSION. Welcome Please Sign In

Cabot Koppers Superfund Site, Gainesville, FL

Office Hours: 9 a.m. to 5 p.m. Kristal Bachman Community Development Administrator. Jaclynn Workman Inspections Coordinator

On-Site Sewage Program & Well Program Request for Service

[THIS PAGE INTENTIONALLY LEFT BLANK]

Ringwood Mines/Landfill Superfund Site

6.12 Former UGI Columbia Manufactured Gas Plant, Columbia, Pennsylvania

W.R. Grace (Acton Plant) Superfund Site Community Update

MISSOURI DEPARTMENT OF NATURAL RESOURCES. Voluntary Cleanup for Ag-Chem Facilities Fact Sheet

Metropolitan St. Louis Sewer District PRIVATE INFILTRATION and INFLOW REDUCTION PROGRAM

City of Marshall. June 1, Dear City of Marshall Water Customers:

Demolition Permit Application

SITE REVIEW AND UPDATE DOVER MUNICIPAL WELL 4 DOVER TOWNSHIP, MORRIS COUNTY, NEW JERSEY CERCLIS NO. NJD

Dayton Bar Association

Everett Water Department Rules. & Regulations. Notification Page 2. Public Water Mains Page 2. Private Water Mains Page 2. Water Conservation Page 3

Fort George G. Meade. Proposed Plan Architect of the Capitol Site. Public Meeting August 7, 2014

Riverview Drive Sanitary Sewer and Water Main Extension Project CITY OF ANN ARBOR FILE NO

On-Site Sewage Program & Well Program Request for Service

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

Kathleen Bertuch, Central New York Regional Planning and Development Board

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

Grid Soil Sampling Outside of Source Areas

CHAPTER SEVEN: UTILITIES

PFC Contamination Update

Tonight s presentation will provide information about the status of the Luckey Site and about ongoing and future Corps activities.

WICKES MANUFACTURING TRICHLOROETHYLENE (TCE) PLUME TABLE OF CONTENTS

Lead and Public Water Supply

Health Consultation. Lakeland Groundwater Contamination Plume. City of Lakeland, Washington County, Minnesota. MPCA Site Response Number SR145

City of Flushing. Water and Sewer Rates

Demolition Information Packet

By Paul Robinson Research Director Southwest Research and Information Center PO Box 4524 Albuquerque, NM

PROPOSED PLAN for Amendment to Record of Decision

VIRGINIA POLLUTION ABATEMENT APPLICATION FORM D MUNICIPAL EFFLUENT AND BIOSOLIDS

Kalamazoo Water Quality Report

Environmental Cleanup in Oregon

City of Valdosta Land Development Regulations

Michigan Chapter of the National Association for Surface Finishing Lansing Summit. November 17, 2017 Michael McClellan, Deputy Director

CHAPTER SEVEN: UTILITIES

U.S. ENVIRONMENTAL PROTECTION AGENCY 40 CFR PART 503 STANDARDS FOR THE USE AND DISPOSAL OF SEWAGE SLUDGE

PFAS in Michigan. MWEA June 25, 2018 Michigan Department of Environmental Quality Water Resources Division

Questions and Answers. A1: The budget from the Commerce Street Plume Remedial Design Oversight grant from EPA is below:

Proposed Plan for Groundwater Cleanup

November 8, 2016 International Petroleum Environmental Conference. Tim Nickels Pastor, Behling & Wheeler, LLC

SACRAMENTO LOCAL AGENCY FORMATION COMMISSION 1112 I Street, Suite #100 Sacramento, California (916) August 3, 2005

Stormwater Management Practices and Design Manual. Clemson University

September 27, Scott Yonke Ramsey County Parks & Recreation Dept N. Van Dyke Street Maplewood, MN 55109

Transcription:

Oshtemo Township MUNICIPAL WATER EXTENSION PUBLIC MEETING November 30, 2016

PURPOSE This meeting is for residents that received letters dated November 14 from Oshtemo Township regarding a planned municipal water expansion north of West Main Street. Discuss reason, timing, and process for expansion. Share information and address questions. December 1, 2016 2

Water Extension Area December 1, 2016 3

BACKGROUND AND OVERVIEW The KLA Group is addressing historic groundwater impacts associated with the KL Avenue Landfill on West KL Avenue. The Landfill operated from about 1950 to 1979 and was designated as a Superfund Site in 1982. The KLA Group is comprised of Oshtemo Township, Kalamazoo County, the City of Kalamazoo, and The Upjohn Company. Work is being conducted under the oversight of the United States EPA with support from the Michigan DEQ. Work has included installing an impermeable cap on the landfill, an active gas collection system, monitoring hundreds of wells, and providing municipal water in affected areas. More information is available on the KLA Group website: http://westklavelandfill.com/ December 1, 2016 4

Impermeable Cap Being Installed on Landfill

Active Gas Collection System December 1, 2016 6

2009 Aerial Photo December 1, 2016 7

BACKGROUND AND OVERVIEW The Landfill plume is relatively stable and impacts are naturally attenuating or decreasing. However, Michigan DEQ recently issued a new state-wide drinking water criterion for 1,4-diethylene dioxide (aka 1,4-DD or 1,4-dioxane), lowering the acceptable limit from 85 parts per billion (ppb) to 7.2 ppb. 1,4-DD is the primary compound of concern currently associated with the Landfill. 1,4- DD was most commonly used in the past as a stabilizer for solvents. It is also found in cosmetics, soaps, and pesticides. It is possible to find low-levels as a result of various sources (e.g. septics, old dumps, agricultural). December 1, 2016 8

Residential Monitoring Initial Monitoring of Josiane Drive Area started in 1999 Most recent (Fall 2016) Monitoring by KLA Group included over 24 residences in the MWS Area (Thank you! - for your cooperation for access). Expanded monitoring as a result of criteria change. Next sampling event in spring (April/May) 2017 to include those sampled in fall 2016 and others in MWS expansion area that grant access. If you have a concern or desire for testing sooner please contact: Kalamazoo County Health and Community Services Jeffrey Reicherts 269-373-5336 jdreic@kalcounty.com - or KLA Group Contractor: Golder Associates Inc. Timothy Richards 770-496-1893 trichards@golder.com December 1, 2016 9

BACKGROUND AND OVERVIEW In 1992, USEPA and the KLA Group entered into a consent decree giving the Group primary responsibility for implementing remedial activities at the site. These activities are decided by EPA with public input and are set forth in the site's Record of Decision or ROD. The consent decree and ROD require that municipal water be supplied to residents within a designated area called the Groundwater Restricted Zone or GRZ. The GRZ prohibits the use of groundwater for drinking if that water does not meet Michigan drinking water criteria or is within a 1,000 foot downgradient buffer zone. December 1, 2016 10

BACKGROUND AND OVERVIEW The initial GRZ for the Landfill was established in accordance with the Kalamazoo County Sanitary Code in March of this year. GRZ is based on extensive data/testing, flow direction, buffer zone requirement, parcel boundaries and the relevant drinking water criteria. December 1, 2016 11

KL LANDFILL SITE AND CURRENT GRZ December 1, 2016 12

Municipal Water Expansion Based on groundwater monitoring data and new criteria, the GRZ will likely need to be amended (a one to two year process) to include portions of your area. The planned municipal water expansion is the first step in that process. Expansion is based on contemplated GRZ as well as engineering considerations (avoid dead end lines, etc.). Expansion Area GRZ. Properties within the municipal water expansion that have had 1,4-DD detected in their wells are encouraged to connect to the new municipal water supply in advance of the GRZ amendment. Ensures a water supply that meets State criteria. Work can be done in conjunction with water mains. The connection is at no cost to the property owner. The expansion will include fire hydrants to bring fire protection to your area. December 1, 2016 13

AREA NORTHWEST OF KL AVENUE LANDFILL December 1, 2016 14

Detail Map of MWS Expansion December 1, 2016 15

USEPA lead agency MDEQ support agency ROLES AND RESPONSIBILITIES KLA Group project coordination Supporting roles for this project: Oshtemo Township and Township Engineer resident communications, municipal water coordination and planning Kalamazoo County Health & Community Services public outreach, environmental and health City of Kalamazoo Dept. of Public Services Water Resource Division design/construction of municipal water infrastructure Golder Associates KLA Group consultants / contractors Work contractor based on competitive bid (local plumbing subcontractor) December 1, 2016 16

SCHEDULE AND PROCESS SCHEDULE: Design: September-November 2016 Bidding December 2016 January 2017 Construction of water main and pressure reducing stations to start in spring 2017 System to be completed & operational in third quarter 2017 Residential connections starting in third quarter Connections are typically a one to two day process Schedule updates will be posted on Twp. website and KLA Group website PROCESS FOR CONNECTION: Resident provided a Connection Agreement, which is voluntary at this time Connection to municipal water system is at no cost to owner (property owner is responsible for future water bills) KLA Group contractor / plumber works out specifics with property owner Includes disconnection and proper sealing/abandonment of well Owner to provide information on known subsurface features (e.g. septic, sprinkler lines, etc.). Contractor clears utilities (Miss Dig). KLA Group to restore disturbed areas to pre-existing conditions Final connection and restoration inspection December 1, 2016 17

Public Water Connection

Water Connection w/ford Meter Box

Typical Water Well

QUESTIONS? 15169640 December 1, 2016 21