August, 2009

Popula)on: 86.21 millions people GDP 2008: 1477717 billions VND GDP growth: 4.59 % ( first 9 months of 2009 ) Q1: 3.11%; Q2: 4.46%; Q3: 5.76% GDP by sector: Agriculture 22.1%, Industry 39.73%, service 38.17% Vietnam s import turn over of the 9 first months 2009: $ 48.28 billions (year on year decrease of 25.2%). Vietnam s export turn over of the 9 first months 2009 : $ 41.7 billions (year on year decrease of 14.3%). (Source: Vietnam s General Sta:s:c Office, Ministry of Planning and Investment s Report) Saigon Newport Holding Company 2

Visit http://www.weforum.org/ for more informations. 3

Country LPI Customs Infrastruc Internatio ture nal shipments (1 is the lowest score, 5 is the highest) Logistics competen ce Tracking & tracing Domestic logistics costs Timelines s Malaysia 3.48 3.36 3.33 3.36 3.4 3.51 3.13 3.95 China 3.32 2.99 3.2 3.31 3.4 3.37 2.97 3.68 Thailand 3.31 3.03 3.16 3.24 3.31 3.25 3.21 3.91 Indonesia 3.01 2.73 2.83 3.05 2.9 3.3 2.84 3.28 Vietnam 2.89 2.89 2.5 3 2.8 2.9 3.3 3.22 Philippines 2.69 2.64 2.26 2.77 2.65 2.65 3.27 3.14 East Asia & Pacific (regio nal average) 2.58 2.41 2.37 2.64 2.54 2.53 3.04 3.01 Cambodia 2.5 2.19 2.3 2.47 2.47 2.53 3.21 3.05 Lao PDR 2.25 2.08 2 2.4 2.29 1.89 2.13 2.83 Mongolia 2.08 2 1.92 2.5 1.8 2 3 2.25 Myanmar 1.86 2.07 1.69 1.73 2 1.57 2.92 2.08 (Visit www.worldbank.org/lpi for more informa)ons) Saigon Newport Holding Company 4

Key figure about Transporta:on competence 42.5 % Total Governed by the Government Source: General Sta:s:cs Office Divided by Governed by the Ci)es/Provinces Governed by the districts Road (Km) 151632 14933 32726 103973 Asphalted 64413 13829 22582 28002 Paved road 6797 265 709 5823 Gravelled road 36240 461 5737 30042 Pathway 44182 378 3698 40106 Waterway (Km) 37312 8505 11096 17711 Load<50 tons 21263 1081 5981 14201 Load: 51 100 tons 6200 1526 2864 1810 Load: 101 500 tons 6557 3081 1982 1494 Load: 501 1000 tons 1762 1417 139 206 Load>1001 tons 1530 1400 130 Bridge Quan)ty 28161 3070 7758 17333 Length (m) 642606 132587 200806 309213 Saigon Newport Holding Company 5

Currently no real highway/expressway. Only 42,5% is covered with asphalt. Conges)ons in the rush hour in the ci)es. Saigon Newport Holding Company 6

Project Selected Expressway and Road projects Project Value (US$mn) Company name(s) Timeframe Status Hanoi Lao Cai Expressway 1,249 Vietnam Expressway Corp. 2008 2012 Construc)on underway Hanoi Haiphong Highway 1,450 Transporta:on Consulta:on and Design Company 2006 2011 Construc:on underway since Apr 2009 Lang Hoa Lac Highway (30km) 331 Vinaconex 2005 2009 88% completed Dinh Vu Lach Huyen na na na Plan approve in Aug 2009 Upgrading Na)onal Road 25 (Gia Lai Phu Yen) 129 Vietnam Expressway Corp. 2010? At planning stage 700km road linking locali)es in the central region and Tay Nguyen 222 na 2006 2010 Work underway Construc)on works on a 6.9km road linking the Mau Than area and Tra Noc airport 56.4 Hau Giang Construc)on Corp. 2007 2009 Complete in 2009 HCMC Trung Luong (62km) 630 PMU My Thuan 2004 2009 Expected to complete in 2009

Highway project: new construc:on project Length: 72km, width: 34m ~ 06 lanes (phase 1: 48km), (phase 2: 24km) Enlargement project of the exis:ng Na:onal Road No. 51 BOT project. Length: 73.6km, width: 32.9m ~ 6 lanes Schedule: The start of construc)on ceremony held on August 2 nd 2009. Road No. 965 : enlargement project Length: 8.48km; width: 32m ~ 4 lanes Schedule: construc)on started in Oct. 2008; completed in 0ct. 2010 Ho Chi Minh city Long Thanh Dau Giay highway Length: 55 km. Width: 36m ~ 06 lanes Start: 3rd Oct 2009; completed )me : 2012. Railway ( Bien hoa Vung Tau): new construc:on project Length: 100km; width: 1.435m (2 lanes); parallel to Na)onal Road No. 51 Saigon Newport Holding Company

Loca:ons of Ports and ICDs in the South Focal Economic Area SP-PSA Bien Hoa ICD TSM, TNM, PL, PL VICT SPCT

Road and Bridge Development Projects

Saigon Newport Holding Company 11

13

Airport Construc:on Projects Project Project Value Company name(s) Timeframe Status Likely to be partly Long Thanh Int' Airport 4500 mil US$ Central Airport Authority 2005 2015 opera:onal by 2015 Quang Ninh Int' Airport 200 mil US$ Hoang Gia Int' Corp. na FS being carried out Upgrading Cam Ranh Airport in Khanh Hoa to an Int' Airport 188 mil US$ Vietnam Airlines, BIDV 2005 2025 Seeking funding Da Nang Airport Passenger Terminal Upgrading the Lien Khuong Airport Can Tho Int' Airport 160 mil US$ 68 mil US$ Louis Berger Group, Airport Consultants B.V and Na)onal Construc)on Consultants 2007 2010 Construc)on underway Southern Airport Authority and Lam Dong Authority 2006 2025 Development plan finalised 50 mil US$ Airport Construc)on Company and Cienco 6 2005 2008 Recently operated Modernisa)on of Rach Gia Airport 34.6 mil US$ Mekong Delta Province, the Southern Airports Authority 2006 2025 Master plan declared Upgrading the Phu Bai Airport (Thua Thien Hue) na na na Plans approved Saigon Newport Holding Company 14

15

Project Construc)on for a 1,630 km North South railway link 33,000 880km extra rail route 30,000 Rail Construc:on Project Value (US$mn) Company name(s) Timeframe Status Vietnam Railway Corpora)on (VRC) 2007 2015 Currently underway Vietnam Railway Corpora)on (VRC) 2010 2015 At designing stage Construc:on of a double track rail line between Hanoi and the Ha Tinh province 9,200 10,100 Korean Int' Coopera:on Agency (Koica) na FS being carried out Construc:on for a 15.2km underground railway in Hanoi 1,200 na 2007 2014 Plans approved Construc:on of railway link links with Cambodia and Laos 527.5 Vietnam Railway Dept, China Mechanical Equipment Import Export Corp. and China Railway Construc:on Corp. na At designing stage Saigon My Tho Railway 444.7 Construc)on of railway lines connec)ng HCMC and the Binh Phuoc province 438 Vietnam Railway Corpora:on (VRC) 2010 2015 At designing stage Na)onal Machinery Imp Exp Corp. and Railway Construc)on Corp. na At planning stage Upgrading of 1,000km railway sec)on linking Vinh city to Nha Trang City 243 HCMC Can Tho Express Railway 4,000 Dak Nong Di An Vung Tau na Vietnam Railway Corpora)on (VRC) 2006 2010 Currently underway The Transport Engineering and Design Inc. South 2009 2020 Plan proposed Vietnam Railway Corpora:on (VRC) 2010 2015 At designing stage

Saigon Newport Holding Company 18

19

Source: VPA Saigon Newport Holding Company 20

Cai Lan port Cam Pha Town Hai Phong City Tan Cang-128 ICD Do Son Town Lach Huyen South Do Son Bach Long Vy

Location Hai Phong City (22km away from the city center; easily approachable to the Gulf of Tokin) Transportation infrastructure Inland road: existing Road No. 353 (6km) Railway: not linked to the port Inland waterway: mainly through the channel of Van Uc River ; linked to Northern Provinces by Thai Binh River, Luoc River & Red River. Airway: 15km away from Kien An Military Airport & Cat Bi Airport by road Transportation development projects: Hanoi-Hai Phong Highway: length: 106km; width: 70m (6 lanes) ~ 120km/h; construction started Feb. 2009 & completed Nov. 2011 Hanoi-Hai Phong Railway: 106km Other infrastructure Electricity network: 110KV & 35KV (existing) Water supply system: 5,000m3/day Communication system: available

Phase I ( 2010-2012) Phase II (2012-2015) Phase III (2015-2020) Phase IV (After 2020) Area 10.4 ha 52 ha 129 ha 423.4 ha No of berths Berth length 2 300m 5 1,400 m 2,945m 9,198m Channel length 4km 6.2 km 11.5km 11.5km Channel width 110m 150m 150m 200m Chart datum -5.5 m -6.8m -11.9m -13.4m Dredging 15m 15m 15m 15m Vessel capacity 10,000 DWT 15,000 DWT 50,000 DWT 100,000 DWT Estimated volume p.a 1mil tons 10 mil tons 30 mil tons 50.5 mil tons Schedule Feasibility study completed in 2008. Project documents now reviewed by Royal Haskoning (Holland) Construction to begin in 2010.

Loca)on: Dam Mon, Van Phong Bay, Van Ninh District, Khanh Hoa Province. Developer: Vinalines Started construc)on on Oct 31 st, 2009. 1 st place (2010 2015) Total area: 118 125 ha Total berth length: 1680 2260 m 2 nd phase (up to 2020) Total area: 405 ha Total berth length: 4450 5170 m Saigon Newport Holding Company 24