UPCOMING DESIGN & CONSTRUCTION PROJECTS 3 rd Quarter 2018 Rev 2 (Project & Construction Management)

DESIGN PHASE PROJECTS

BCT - Building Program Development and Design for Maintenance and Administration Buildings Complex EXISTING ADMIN BUILDING EXISTING M&R BUILDING Development of a building program for the future Administration and Maintenance Buildings Complex at Barbours Cut Terminal. Design Time Frame NIGP Codes Small Business Opportunities PHA Contact 4th Qtr. 2018 1st Qtr. 2019 Consultants 96258 90714 92533 Contractors 90924 91438 90976 91450 91316 91468 91360 91430 Utility Systems Electrical Work Plumbing HVAC Building Fixtures & Finishes Photography Jessica Shambra 713-670-2527 jshambra@poha.com

CONSTRUCTION PHASE PROJECTS

Barbours Cut - Expansion of Gate Facilities This design objective is to increase the gate capacity to handle anticipated future growth at this terminal. 4th Quarter 2019 90976 91438 91316 28500 91430 91461 Site Preparation Demolition Earthwork Rohit Saxena 713-670-2663 rsaxena@poha.com

Barbours Cut - Rehabilitation of Wharf 3 The wharf will be upgraded in order to support 100 feet gauge dock cranes and to accommodate larger ships. This project consists of the upgrade of 1000 feet of wharf, a new stevedore support building, structural elements, high mast pole lighting, and electrical infrastructure required to power three new dock cranes. 4th Qtr. 2018 1st Qtr. 2020 90976 91430 91438 91479 90976 91223 91485 90924 Material Testing Surveying Storm Water Controls Photography Chain Link Fence Security Electrical Signs and Paint Striping Bill Aguirre 713-670-2484 baguirre@poha.com

Barbours Cut - Construct Electrical and Telecommunications Infrastructure in Container Yards 4, 5 and 6 The project consists of the installation of concrete duct banks, high voltage and fiber optics cables and equipment from the 12.47 kv switchyard on the west end of the terminal along the container yards 4, 5 and 6 to the C6 Admin building and ending at wharf 3. 1st Qtr. 2019 1st Qtr. 2020 21018 28058 28029 65979 91430 91438 Concrete work 15 kv cables Storm Water Controls Fiber optics cables Security Electrical Telecomm equipment Bill Aguirre 713-670-2484 baguirre@poha.com

BCT - Rehabilitation of Container Yard C1N and C2N The scope of work includes the construction of approximately 20 acres of concrete pavement for storage of containers as well as traffic lanes to maintain circulation into and around storage areas. 1st Qtr. 2019 2nd Qtr. 2020 91360 91327 90976 Demolition Concrete Grading Excavation Ural Thompson 713-670-2813 uthompson@poha.com

Bayport and Barbours Cut - Annual Pavement Replacement 2019 This is a one year contract concrete and asphaltic replacement at two Terminals, Barbours Cut and Bayport. The work will consist of removing damaged and or deteriorating pavement in 2019. 1st Qtr. 2019-4th. Qtr. 2019 91327 Concrete placement Saw-cutting Excavation Concrete Traffic Barriers Barbara H. Smith 713-670-2483 bhsmith@poha.com

Bayport and Barbours Cut - Annual Wharf Crane & RTG Crane Painting - 2019 This project will consist of blasting, priming and painting the wharf cranes and RTG cranes on an "as needed" basis. 1st Qtr. 2019-4th. Qtr. 2019 91484 91461 92900 Photography Fuel Supplier Portable Toilets Ural Thompson 713-670-2813 uthompson@poha.com

Barbours Cut and Bayport - Annual Fender System Maintenance - 2019 This project includes surface preparation, repair and replacement of various fender system elements at Barbours Cut and Bayport Terminals in 2019. 1st Qtr. 2019-4th Qtr. 2019 91223 Metal Fabrication Storm Water Controls Photography Barbara H. Smith 713-670-2483 bhsmith@poha.com

Bayport - Construct Rail Spur (3.1-7509 PTRA Track South Bayport) Construction of approximately 6500 track feet of rail at the Bayport Terminal. This rail will cross State Highway (SH) 146 and connect the existing rail from Strang Rail line to within 900 feet of the Container Freight Station (CFS) Road in the Bayport Intermodal Facility. This project will also include clearing, grubbing, drainage, rail crossings, signalization, and perhaps a sound wall, if required. 4th Qtr. 2018 4th Qtr. 2019 91223 90976 96148 Clearing Brush Storm Water Controls Flagman Traffic Controls Surveying Photography Material Testing Rail Roads Barbara H. Smith 713-670-2483 bhsmith@poha.com

Bayport - Construct Electrical and Telecommunication Infrastructure under Port Road and ExxonMobil Corridor Install 600 LF Electrical Duct Bank under Port Road 1st Qtr. 2019 2nd Qtr. 2020 238910 237130 423610 Site Preparation Power and Communication Line Construction Electrical Apparatus and Equipment Barbara H. Smith 713-670-2483 bhsmith@poha.com

Bayport - 138Kv Substation Security The project includes the installation of five surveillance cameras, 300 feet of new fencing, underground conduits, two poles, two manual gates and access control equipment for doors. 1st Qtr. 2019 2nd Qtr. 2019 99050 99022 92037 28755 83883 91484 Surveillance cameras Network Switches UPS Card access Fencing Bill Aguirre 713-670-2484 baguirre@poha.com

Install Fender System at Wharf Nos. 1 & 2 at CARE Terminal Project will remove the existing fenders and install new fenders at Wharf 1 & 2 at the CARE Terminal. 2nd Qtr. 2019 3rd Qtr. 2019 91484 91223 91438 Fender Replacement Pile Diving Jessica Shambra 713-670-2527 jshambra@poha.com

Industrial Park East - Annual Pavement, Drainage and Dust Control 2019 Dust Suppression, road patching and paving 1st Qtr. 2019-4th Qtr. 2019 237310 238910 Highway, Street, Bridge Construction Site Clearing Ural Thompson 713-670-2813 uthompson@poha.com

JacintoPort Repair of Deck & Back Up Pavement on Wharf Nos. 1, 2 & 3 This project consists of repairing existing holes in the deck at JacintoPort Terminal. 4th Qtr. 2018 1st Qtr. 2019 90976 91223 91430 Structural Concrete Repair Steel Rebar Concrete Forming Jessica Shambra 713-670-2527 jshambra@poha.com

Manchester - Rehabilitation and Repair of Wharf 2 Structural concrete repair, fender replacement, pile replacement, and geotechnical rehabilitation. Design Time Frame NIGP Codes Small Business Opportunities PHA Contact 2nd Qtr. 2019 2nd Qtr. 2020 Consultants 96258 92533 Contractors 91484 91223 91438 90976 91430 Structural Concrete Repair Fender Replacement Pile Driving Steel Rebar Concrete forming Striping Photography Eddy Kharrazi 713-670-2544 ekharrazi@poha.com

Rehabilitation of Transit Shed Floor at Wharf No. 46 at Turning Basin Terminal Repair of top floor slab of the transit shed. 4th Qtr. 2018 2nd Qtr. 2019 91360 91430 Concrete and Rebar Excavation Barbara H. Smith 713-670-2483 bhsmith@poha.com

Drainage System at Volkswagen Yard at Turning Basin Terminal PROJECT 2 PROJECT 1 Improvement of existing drainage system tied to IH-610 feeder road at the Volkswagen yard at the Turning Basin terminal. Project 1: TxDot construction of drainage improvements to the 610 feeder road. (Procured by TxDot) Project 2: PHA construction of drainage improvements to the Volkswagen Yard. Project 2 Construction Time Frame Project 2 NIGP Codes Project 2 Small Business Opportunities PHA Contact 4th Qtr. 2018-1st Qtr. 2019 91360 91223 Storm Drainage Structures Grading Concrete Barbara H. Smith 713-670-2483 bhsmith@poha.com

Turning Basin North - Wharf 11, 12 and 13 Damage Repair This project consists of repairing damage to piles, shear walls and structural members of the wharfs. 4th Qtr. 2018 1st Qtr. 2019 91484 91223 91438 90976 91430 Structural Concrete repair Steel Rebar Concrete forming Striping Photography Eddy Kharrazi 713-670-2544 ekharrazi@poha.com

Turning Basin North - Splash Zone Painting 2018 Painting and preservation of splash zone area. 4th Qtr. 2018 91484 91461 91484 Water blasting Painting Sandblasting Ural Thompson 713-670-2813 uthompson@poha.com

Turning Basin - Transit Sheds 30-31 - Roof Repair Roof removal and replacement for Transit Sheds 30/31 1st Qtr. 2019 2nd Qtr. 2019 91473 90976 92678 Roofing Site Clearing Waste and Remediation Ural Thompson 713-670-2813 uthompson@poha.com

Turning Basin - Bi-Annual Rail and Switch Replacement - 2019 Repairs or replaces rail and rail switches throughout the Turning Basin Terminal 1st Qtr. 2019-4th Qtr. 2020 90976 92900 91223 92533 Rail and Ballast Concrete and Rebar Rail Switches Drainage Barbara H. Smith 713-670-2483 bhsmith@poha.com

Turning Basin - Rehabilitation and Repair of Wharf 9 Structural concrete repair, fender replacement, and geotechnical rehabilitation. 1st Qtr. 2019-1st Qtr. 2020 91484 91223 91438 90976 91430 Structural Concrete Repair Fender Replacement Pile Driving Steel Rebar Concrete forming Striping Photography Eddy Kharrazi 713-670-2544 ekharrazi@poha.com

Turning Basin - Annual Concrete Replacement 2019 This is a one year contract of concrete replacement at Turning Basin Terminal. The work will consist of removing damaged and or deteriorating concrete pavement in 2019. 1st Qtr. 2019-4th Qtr. 2019 91327 Concrete Excavation Saw-cutting Concrete Traffic Barriers Barbara H. Smith 713-670-2483 bhsmith@poha.com

Woodhouse - Water and Sewer line Replacement This project work will consist of furnishing and installing approximately 5,000 linear feet of 6 to 8 water main and 2,000 linear feet of sewage force main and a duplex sewage pump station. 4th Qtr. 2018-2nd. Qtr. 2019 91360 91223 Underground utilities installation Barbara H. Smith 713-670-2483 bhsmith@poha.com