Aims, objectives and achievements Regional Seminar Tartu 23-24 of March 2011 Lennart Hallgren Project Manager 1

The Project: Baltic Biogas Bus is a part of the solution A project to stimulate the use of biogas as fuel for city buses aiming to reduce environmental impact. 2

BBB is a part of the EU Climate Change Strategy Extended use of Biogas buses in public transport will - lower emissions - improve urban air quality - strengthen the role of public transport - create energy autonomy Photo: SL/Mikael Hedlund 11-04-06 3

Goals and budget Generate regional strategies for biogas bus operations Developments in production, distribution and operations Disseminate biogas potential A Pan-Baltic project within the Baltic Sea Region Programme 20072012 Period: 2009 2012. Budget: 4,2 MEUR. Financing: Partly by the EU fund (ERDF) 4

12 partners around the Baltic Sea SL, Stockholm Public Transport, Sweden Biogas East, Energy Agency Malardalen Ruter, Public Transport for Oslo and Akershus, Norway HOG Energy, the fuel interest organisation for Bergen region Hordaland County Council, Skyss VTT Technical Research Centre, Finland Tartu city, Estonia Riga City, Latvia Buses of Kaunas city, Kauno Autobusai, Lithuania MTI, Motor Transport Institute, Poland ATI erc Education, Research and Furtherance of Cooperations, Germany ITC Innovations and Trendcenter 5

A project with several steps For efficient use of biogas buses we work with: WP3 Policies & Strategies WP4 Biogas Supply WP5 Distribution and bus depots WP6 Biogas buses WP2 Communication 11-04-06 6

Some results Strategies and policies (WP3) - Strategies introduce Biogas buses - Oslo, 14 buses, Ruter - Stockholm, 160 buses, SL - Bergen, 70 buses, HOG & Skyss - Traffic plan, Tartu City - LCCA analysis, VTT - Biogas market - Regulations affecting Intro. Biogas - Internat. Seminar S:t Petersburg - Discussions with decision makers in Germany and Poland, ATI, MTI

11-04-06 8

Some results Strategies and policies (WP3) - Strategies introduce Biogas buses - Oslo, 14 buses, Ruter - Stockholm, 160 buses, SL - Bergen, 70 buses, HOG & Skyss - Traffic plan, Tartu City - LCCA analysis, VTT - Biogas market - Regulations affecting Intro. Biogas - Internat. Seminar S:t Petersburg - Discussions with decision makers in Germany and Poland, ATI, MTI

Biogas buses in Bergen

Process framework 1) Understanding the decision making process 2) Goal and goal scenarios 3) Insight and documentation 4) Communication 5) Creating and developing alliances 11

Conclusion from HOG Energi s work in Bergen Decision from Hordaland County Council: 75 new gas buses to be purchased in Bergen Climate Plan for Hordaland county states that use of biogas and other renewable energy sources will be increased towards 2020. Biogas will be a priority in public transportation Decision from Bergen City Council: Produced biogas from Rådalen production facility shall be used in the public transport sector 12

Some results Strategies and policies (WP3) - Strategies introduce Biogas buses - Oslo, 14 buses, Ruter - Stockholm, 160 buses, SL - Bergen, 70 buses, HOG & Skyss - Traffic plan, Tartu City - LCCA analysis, VTT - Biogas market - Regulations affecting Intro. Biogas - Internat. Seminar S:t Petersburg - Discussions with decision makers in Germany and Poland, ATI, MTI

Strategies for Tartu City Transport development plan 2012-2020 Research for potential biogas production, distribution and usage Feasibility study of biogas buses Awareness, dissemination of the potential for sustainable city transports and biogas 14

Life cycle costs analysis Bus usage Biogas Generation Upgrading Distribution 20 km Refilling 2 50 buses Biogas -investment ~5 M -specific cost 21 c/km - investment ~2 M - specific cost 7 c/km - by vehicle CBG 3 c/km - investment ~2.4 M - specific cost 18 c/km - investment ~270 k - specific cost 70 c/km cumulative 21 c/km cumulative 28 c/km cumulative 31 c/km cumulative 49 c/km cumulative 119 c/km Diesel Diesel production, refining, distribution and refilling specific cost 45 c/km - investment ~230 k - specific cost 59 c/km cumulative 104 c/km Cost of biomethane as fuel approx. 14 % higher than diesel, immature market

Greenhouse gas emissions Well-to-wheel, according to the RES directive Specific emissions of well-to-wheel chain for natural gas, diesel and biomethane made from different substrates 3000 2500 g CO2eq/km 2000 TTW 1500 WTT 1000 500 0 Municipal waste WTT = Well-to-tank = from biogas generation to refilling TTW = Tank-to-wheel = from bus usage Wet manure Dry manure Natural gas Diesel

How to start a Biogas Market for traffic operators? Studies of biogas possibilities in the Stockholm region Co-operation between biogas producers and distributers Contracts Operation Legal agreements Procurment 17

Some results Supply of Biogas (WP4) - Potential of biogas in the Baltic Sea region - Landfill study, a general calc. model - Biogas with Hydrogen (ATI) - Supply and demand in eastern Sweden - Baltic Biogas Foresight (MTI) Biogas is the only commercially available 2nd generation bio fuel Photo: SL/Jan E Svensson 18

Aim of Study Develop a knowledge base on biogas infrastructure in BSR countries in a manner that is useful to identify the influence that existing and planned infrastructure have on introduction of biogas as a transport fuel in BSR countries. Objectives Study biogas infrastructure overview Map biogas production and distribution Analyze the influence of infrastructure on introducing biogas as a vehicle fuel Discuss barriers and opportunities to promote biogas 09-11-2010

Germany Major biogas plants and natural gas grids Number of Plants Approx. 4480 Installed capacity 1,374 Ktoe Potential 11,450+ Ktoe 09-11-2010

Estonia Major biogas plants and natural gas grids Number of Plants 8 Installed capacity 5+ Ktoe Potential 350+ Ktoe 09-11-2010

Per capita biogas production (kg of oil equivalent) 09-11-2010

Biogas upgrading plants in BSR countries Country plants Utilization 39 82% vehicle fuel 18% gas grid Norway 3 66% vehicle fuel 34% gas grid Finland 1 pilot plant 100% vehicle fuel 35 9% vehicle fuel 91 % gas grid Sweden Germany 09-11-2010

Gas filling stations in BSR countries 09-11-2010

Landfill Gas Landfill gas production Waste management sector and transport sector cooperation Biogas systems New upgrading technique Biogas transport, storage and fuelling 25

Production potential for biogas in eastern part of Sweden Draft Study compiles results from earlier reports Biogas Potential; apr. 15 TWh/year Current production; apr. 0,5 TWh/year 26

Biogas potential for Public Transport in Stockholm, 2010-2020. Study with references to earlier studies Definitions to separate SL potential from the Regional potential Production stability Economy 27

Some results Biogas distribution (WP5) - Regional distribution planning Biogas is the only commercially available 2nd generation bio fuel - Fuelling systems, SL - Design bus depots for biogas - Biogas Cartridge systems, ATI - CNG filling station and bus depot in Tartu, feasibility study - Feasibility study, Rzeszow Photo: SL/Jan E Svensson 28

Integrated regional distribution infrastructure planning Demonstrate distribution planning with Stockholm region as case study Distribution techniques: pipeline network, compressed gas in bottles and liquefied gas distribution. Comparison between different distribution techniques based on technical, economical and environmental comparisons 29

Future gas grid distribution of biogas in Stockholm 30

Analyse fuelling system alternatives Build up of a biogas fuelling system Fuelling systems compared by costs, safety, fuelling time and environment aspects for Fast filling Slow filling SL s bus depots and fuelling systems Operational experiences 31

Fuelling systems for biogas Fast fuelling dispenser Slow fuelling by ramp 32

Design for new bus depots and adapt existing depots for biogas buses Design of new bus depots Which existing depots are most suitable to convert to biogas? Design of new depots and adapt existing depots Mobile modular fuelling station (Investment) 33

Gubbängen Bus Depot 34

Some results Communication & dissemination - (WP2) - Show rooms, folder, posters.. - Events/Regional seminars Tartu, Launch Event, Dec 2009 Oslo March 2010 Kaunas Sept 2010 Rostock Oct 2010 Uppsala Nov 2010 S:t Petersburg - Nov 2010 Riga Dec 2010 Tartu March 2011

Our core messages Biogas is almost 100 percent renewable Biogas is a very efficient fuel Biogas will improve urban air quality Biogas is produced locally, improves energy autonomy 36