Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement

Similar documents
CITY OF MOUNT DORA LIFT STATION CHAINLINK FENCE AND GATE SPECIFICATIONS

ITEM 555 CHAIN LINK FENCING

SECTION CHAIN LINK FENCES AND GATES (GALVANIZED) A. Fence framework, fabric, gates, and accessories.

SECTION CHAIN LINK FENCING

TITLE: CAMP JOHNSON OVERPASS / HWY 17 BYPASS SECURITY FENCE UPGRADES

A. Product Data shall be provided for each type of product indicated.

CITY OF FRIENDSWOOD TECHNICAL SPECIFICATIONS DOCUMENT 00085B ADDENDUM ADDENDUM NO. 1

SECTION CHAIN-LINK FENCES AND GATES 02821/1

SECTION 1208 CHAIN LINK FENCING DESCRIPTION

SECTION CHAIN LINK FENCES

SECTION CHAIN LINK FENCES AND GATES (PARK)

SECTION CHAIN LINK FENCING

SECTION CHAIN LINK FENCES AND GATES

A NEW PRE-K BUILDING FOR BIG SPRING LAKE KINDERGARTEN SCHOOL FOR THE ALBERTVILLE CITY BOARD OF EDUCATION ALBERTVILLE, ALABAMA

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

CHAIN LINK FENCES AND GATES

Bear Exhibit Fence Upgrades. The following modifications are hereby made part of the contract documents:

CHAIN LINK FENCES AND GATES

SECTION CHAIN LINK FENCES AND GATES

Special Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:

MERCHANTS METALS. A. ASTM F552 Standard Terminology Relating to Chain Link Fencing

SECTION CHAIN LINK FENCES AND GATES

CONSTRUCTION SPECIFICATION FOR CHAIN LINK FENCE

A. ASTM A121 Specification for Metallic-Coated Carbon Steel Barbed Wire. B. ASTM A392 Specification for Zinc-Coated Steel Chain-Link Fence Fabric

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

ANTI RAM SECURITY CHAIN LINK FENCE - 4, MPH SECTION

SECTION ORNAMENTAL WELDED STEEL FENCING

SECTION 410 FENCES All materials shall be new and without flaws or defects of any type GENERAL

SECTION CHAIN LINK FENCES AND GATES

Invitation to Bid MHM

SECTION ORNAMENTAL ALUMINUM FENCING

CW 3550 Chain Link and Drift Control Fence TABLE OF CONTENTS

SECTION FENCING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

AMERICAN SAMOA POWER AUTHORITY Materials Management Office INVITATION FOR BIDS ( IFB ) EAST SIDE WELLS-BOOSTERS SECURITY FENCE REPLACEMENT

Houston Community College 3200 Main Parking Garage November 15, 2010 Houston Community College

MO: Tl RSA: 1406B

MATERIAL SPECIFICATION FOR CHAIN-LINK FENCE COMPONENTS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION 1043 FENCE MATERIAL

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, EDITION 2007

1. Fence and gate posts, rails, and fittings. 2. Chain-link fabric, reinforcements, and attachments.

DENVER PUBLIC SCHOOLS DESIGN AND CONSTRUCTION STANDARDS This Standard is for guidance only. SECTION CHAIN LINK FENCING

Advisory Circular PAGECONTROLCHART. Remove Pages Dated II Inscr t Pages Dated l/2/ thru 258-l 7/6/ l/2/90

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

SECTION NON-STRUCTURAL METAL FRAMING

A. Coordinate chain link fence & gate work with work before and after. See especially: 1. Bollards on worksite that are more than 10 ft from fence.

SECTION NON-STRUCTURAL METAL FRAMING

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY PIPE HANGERS, Section PIPE HANGERS, SUPPORTS, AND RESTRAINTS

PROJECT MANUAL FENCING FOR PEPSI WATER TANK & ROCKTOWN WATER TANK FOR TOWN OF KINGSTREE KINGSTREE, SOUTH CAROLINA

UNIFIED FACILITIES GUIDE SPECIFICATIONS

UNIFIED FACILITIES GUIDE SPECIFICATIONS

1. Include plans, elevations, sections, details, and attachments to other work.

CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE

UFGS (August 2010) UNIFIED FACILITIES GUIDE SPECIFICATIONS

SECTION ACCORDION FOLDING PARTITIONS

SECTION ALUMINUM HANDRAIL SYSTEMS

TOWN OF OSOYOOS PERIMETER FENCING OSOYOOS LANDFILL

Invitation to Bid # CC Project Title: High Zone 5.0 Million Gallon Reinforced Concrete Culinary Water Tank Project No.

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

Nortrax Section David Manchester Road, Ottawa NON-STRUCTURAL METAL FRAMING 16 May 2014 Page 1

Fence Requirements Permits and Inspections Division 151 W Church Street, Lewisville, Texas Phone: Fence Requirements

SECTION FACILITY LIGHTNING PROTECTION

REQUEST FOR BIDS Public Works Contract SPECIFICATIONS FOR FENCE REPAIRS AND REPLACEMENT

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

Automated Cantilevered Aluminum Sliding Gate

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

PLUMAS COUNTY FLOOD CONTROL & CONSERVATION DISTRICT 1834 East Main Street, Quincy, CA Telephone: (530)

PROPOSAL FOR WROUGHT IRON PERIMETER FENCE WITH GATE TO CITY OF POMONA

SECTION HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS

SECTION ROOF ACCESSORIES

SECTION CRL50 AND CRL51 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION COLD-FORMED METAL FRAMING

SECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

SEISMIC RESTRAINT SYSTEM

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

Amendment to OPSS 772 (Nov 2012) Construction Specification for Chain-Link Fence

SECTION OVERHEAD COILING DOORS

SECTION STEEL JOIST FRAMING

Essex County College - West Essex Campus Addition And Renovations dlb # / SECTION CABLE TRAYS FOR COMMUNICATIONS SYSTEMS

MATERIAL SPECIFICATION FOR STANDARD HIGHWAY FENCE COMPONENTS

ENGINEERING, CONSTRUCTION AND MATERIAL STANDARD FOR FENCING AND GATES ORIGINAL EDITION MAY. 1997

SECTION OVERHEAD COILING SHUTTERS

SECTION DETENTION WINDOW SCREENS. 1. Detention screens for interior and exterior installations at exterior windows in existing buildings.

MATERIAL SPECIFICATION FOR STANDARD HIGHWAY FENCE COMPONENTS

LRGVDC Rio Transit Center Renovation & Expansion

SECTION SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS REVISED PART 1 GENERAL 1.1 DESCRIPTION:

SECTION PRE-ENGINEERED COLD-FORMED METAL ROOF AND FLOOR TRUSSES

05510: TAPERED STEEL TROLLEY POLES AND ACCESSORIES

SECTION TOILET COMPARTMENTS

SECTION HANGERS AND SUPPORTS FOR PLUMBING

SECTION SECURITY GRILLES 670 SERIES UPCOILING SECURITY GRILLE

RR-F-191/3D 14 May SUPERCEDING RR-F-191/3C July 22, 1981 FEDERAL SPECIFICATION SHEET

DIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.

A. The work under this section consists of furnishing and installing gauge steel framing and bracing as indicated on the drawings and as specified.

1.2 ACTION AND INFORMATIONAL SUBMITTALS.1 Provide submittals in accordance with Section Submittal Procedures.

Transcription:

DATE: July 15, 2011 ADDENDUM NUMBER: 2 MODIFYING: Specifications No. 1698 PROJECT: Colorado River Aqueduct Pumping Plants 230 kv Disconnect Switches Replacement BID TIME AND DATE: 2:00 p.m., July 19, 2011 FROM: TO: THE METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA 700 North Alameda Street, Third Floor Los Angeles, California 90012 (213) 217-6515 All prospective bidders This addendum forms a part of the contract documents. Use Specifications No. 1698 as originally issued to submit bids, in conjunction with this addendum and all previously issued addenda, and acknowledge receipt of this addendum by completing Item 4 in Document 00420, Bidder's General Information, in the specifications. Failure to acknowledge this addendum will render a bid non-responsive and the bid will be rejected. This addendum consists of 4 pages of text and 6 pages of attachments. CHANGES TO SPECIFICATIONS: 1. In Section 01100, Shutdowns, Table 1, after Item 19, add the following Item 20: 20) At Eagle Mountain: Construct chain link fence in the 230 kv line reactor yard No Yes No 2. In Section 01100, Table 2, after Item 18, add the following Item 19: 19) At Gene: Construct chain link fence in the 230 kv line reactor yard No Yes No 3. Add Section 02830, Chain Link Fence and Gates, attached hereto, after Section 02680, Removal and Disposal of Quagga Mussels and Quagga Mussel-Infested Water. 4. In Section 16320, 230 kv Center Break Disconnect Switches and Ground Switches, Paragraph 1.02A, change the words This specification covers the design and manufacture of to read: This section specifies the 5. In Section 16320, delete Article 1.03 in its entirety and replace with the following: 1.03 SUBMITTALS A. Submittals shall be in accordance with the requirements of Section 01300 and this section. B. The Contractor shall submit the following: 1. Structural installation details. July 2011-1 - 1698

Addendum Number 2 2. Detailed installation drawings for each switch or insulator installation including but not limited to: a. Operator mounting and clearance b. Auxiliary switch installation and wiring c. Vertical operating pipe and bearing support details d. Horizontal linkage installation details between phases e. Horizontal linkage installation details for ground switches f. Structural support details attaching switch base to existing lattice structure with bracing g. Bolting and/or welding details for all connection points h. Standoff insulator mounting details C. Operations and Maintenance Manual: The Contractor shall submit O&M Manual in accordance with Section 01730. 6. In Section 16320, delete subparagraph 2.03C.1 and replace with the following: 1. The switch bases shall be structural steel, hot dip galvanized. All base mounting holes shall be drilled prior to galvanizing process. 7. In Section 16320, in Article 2.07, change paragraph number 1 to read: A 8. In Section 16320, at the end of Paragraph 2.07A as amended, add the following Paragraph 2.07B: B. Special Tools 1. If special tools are required to maintain, disassemble, or assemble the disconnect switches, the Contractor shall furnish four sets of those tools to Metropolitan, one each delivered to Gene, Iron Mountain, Eagle Mountain, and Hinds Pumping Plants. 9. In Section 16320, delete Article 3.01 in its entirety and replace with the following: 3.01 INSTALLATION A. Equipment shall be installed in accordance with approved submittal drawings, manufacturers recommendations, and these specifications. 10. In Section 16320, to the end of Part 3, add the following Article 3.03: 3.03 FIELD DATA GATHERING A. The contract documents include existing structure information. The Contractor shall perform field data gathering for the specific switch to be installed. 11. In Section 16401 Overhead Electric Line Construction, (as issued in Addendum 1), at the end of Paragraph 3.06D, add the following Paragraph 3.06E: E. Overhead Ground Wire 1. An overhead ground wire shall be provided along the length of the temporary bypass 230 kv line at Eagle Mountain Pumping Plant. The ground wire shall be located above the line conductor, attached to the top of the transmission pole, and connected to the existing transmission line overhead ground wire. The ground wires shall be grounded at each pole through a low resistance path. Ground wires shall be high strength galvanized stranded steel wire 7/16-inch in diameter. The Contractor shall furnish and install hardware for attachment of the ground wire to the top of the H-frame poles and for connection to existing ground wires on existing transmission lines. The Contractor shall submit design for attachment of ground wire and connection to existing transmission line overhead ground wire for approval by the Engineer. July 2011-2 - 1698

CHANGES TO DRAWINGS: Addendum Number 2 12. Metropolitan has made changes to the following drawings without issuing revised drawings at this time; however, Metropolitan will issue revised drawings showing these changes after the contract is awarded. Reference No. Sheet No. Drawing No. Description of Changes 1. E-1 B-137632 Add the following to the drawing: NOTES: 1. INSTALL CHAIN LINK FENCE IN THE EXISTING LINE REACTOR YARD, IN ACCORDANCE WITH SECTION 02830. 2. E-40 B-137668 Add the following to the drawing: NOTES: 1. INSTALL CHAIN LINK FENCE IN THE EXISTING LINE REACTOR YARD, IN ACCORDANCE WITH SECTION 02830. 3. E-105 B-137796 In Section 1 (Grids B-1 and C-1), draw a ground wire on top of each pole and add a leader line pointing to the ground wires with the callout APPROXIMATE LOCATION OF GROUND WIRES ONLY. SEE SECTION 16401. 4. E-105 B-137796 In Section 2 (Grids B-5 and C-5), draw a ground wire on top of each pole and add a leader line pointing to the ground wires with the callout APPROXIMATE LOCATION OF GROUND WIRES ONLY. SEE SECTION 16401. 5. S-1 B-137778 After Note 7, add the following Note 8: 6. S-2 through S-6 B-137779 through B-137783 8. THE CONTRACTOR SHALL VERIFY ALL EQUIPMENT SUPPORT AND INSTALLATION DETAILS WITH APPROVED VENDOR DRAWINGS PRIOR TO FABRICATION After Note 2, add the following Note 3: 3. THE CONTRACTOR SHALL VERIFY ALL EQUIPMENT SUPPORT AND INSTALLATION DETAILS WITH APPROVED VENDOR DRAWINGS PRIOR TO FABRICATION 7. S-3 B-137780 In Sections A (Grid B-1) and C (Grid I-1), add a leader line pointing to the switch bases with the callout SEE NOTE 4 8. S-3 B-137780 After Note 3 (as amended by this addendum), add the following Note 4: 4. SWITCH BASE DESIGN SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. ACTUAL DESIGN MAY DIFFER AND SHALL BE PER THE SWITCH MANUFACTURER. July 2011-3 - 1698

Addendum Number 2 Reference No. Sheet No. Drawing No. Description of Changes 9. S-6 B-137783 In Sections C (Grid K-2) and F (Grid K-6), add a leader line pointing to the switch bases with the callout SEE NOTE 4 10. S-6 B-137783 After Note 3 (as amended by this addendum), add the following Note 4: 4. SWITCH BASE DESIGN SHOWN FOR ILLUSTRATIVE PURPOSES ONLY. ACTUAL DESIGN MAY DIFFER AND SHALL BE PER THE SWITCH MANUFACTURER. 11. S-7 B-137784 After Note 4, add the following Note 5: QUESTIONS AND CLARIFICATIONS: 5. THE CONTRACTOR SHALL VERIFY ALL EQUIPMENT SUPPORT AND INSTALLATION DETAILS WITH APPROVED VENDOR DRAWINGS PRIOR TO FABRICATION. Requests for clarification of details on the drawings or of provisions of the specifications have been identified. The questions with the appropriate Metropolitan responses are as follows: (1) Question: Ref. Section 16320, subparagraph 1.03A.2.h Standoff insulator mounting details: Will it be the switch manufacturer s responsibility to supply these steel components with the switch or just the design drawings? Answer: It shall be the Contractor s responsibility to comply with the requirements of the specifications including furnishing of steel components and providing design drawings for submittals, which show the standoff insulator mounting details. (2) Question: Ref. Section 16320, Paragraph 2.03C - Switch Bases: The specification calls for double channel bases but the drawings call for double channel bases with HSS tubular steel inside to the double channel bases that is welded and, in some cases, also bolted. Please reference Sheet S-3, Details A and C and Sheet S-6, Sections C and F. Are the switch bases required to have the double channels and the square tubular steel as shown on the drawing or just the double channels as written in the specifications? Answer: The switch bases shall be in accordance with the switch manufacturer s design. Refer to Changes to Drawings in this addendum. (3) Question: Sheets S-1 through S-6 show supporting steel components (channels & square tube) beneath the switch base that shows it to be welded to the switch base on Sheet S-3, Sections A and C. Is this to be provided as shown on the drawing by the switch manufacturer or welded in the field? Answer: The structural supports for the switches shall be as shown on drawings and as specified. Whether this is assembled in the shop or in the field is to be determined by the Contractor. END OF ADDENDUM July 2011-4 - 1698

PART 1 GENERAL 1.01 SCOPE OF WORK SECTION 02830 CHAIN LINK FENCE AND GATES A. The scope of work under this section includes the construction of chain-link fences to bisect the existing Gene Pumping Plant and Eagle Mountain Pumping Plant 230 kv Line Reactor Yards. The fencing shall be located approximately midway between the bank 1 and bank 2 line reactors. The exact location will be as determined by the Engineer. The fence at Gene Pumping Plant shall be approximately 75 feet in length and the fence at Eagle Mountain Pumping Plant shall be approximately 98 feet in length. 1.02 REFERENCES A. General 1. The publications listed below form a part of this specification to the extent referenced. 2. Where a date is given for reference standards, the edition of that date shall be used. Where no date is given for reference standards, the latest edition available on the date of the Notice Inviting Bids shall be used. B. American Society for Testing and Materials (ASTM) 1. ASTM A121, Standard Specification for Zinc-Coated (Galvanized) Steel Barbed Wire 2. ASTM A392, Standard Specification for Zinc-Coated Steel Chain-Link Fence Fabric 3. ASTM A817, Standard Specification for Metallic-Coated Steel Wire for Chain-Link Fence Fabric 4. ASTM A824, Standard Specification for Metallic-Coated Steel Marcelled Tension Wire for Use with Chain Link Fence 5. ASTM F567, Standard Practice for Installation of Chain-Link Fence 6. ASTM F626, Standard Specification for Fence Fittings 7. ASTM F669, Standard Specification for Strength Requirements of Metal Posts and Rails for Industrial Chain Link Fence 8. ASTM F900, Standard Specification for Industrial and Commercial Swing Gates 9. ASTM F1083, Standard Specification for Pipe, Steel, Hot-Dipped Zinc-Coated (Galvanized) Welded, for Fence Structures 10. ASTM F1184, Standard Specification for Industrial and Commercial Horizontal Slide Gates 1.03 SUBMITTALS PART 2 A. Shop Drawings: Shop drawings and installation drawings shall be submitted for the Engineer's review prior to fabrication and delivery. These drawings shall provide a fully dimensioned fence layout with detailed information and specifications for materials and finishes. B. Material Samples: Upon request by the Engineer, samples (approximately 12 inches square or 12 inches long) of posts, rails, braces, fabric, wire, ties, and fittings shall be submitted. C. Test Reports and Certifications: Certifications that zinc-coated barbed wire and chain link fence fabric are in accordance with ASTM A121, ASTM A392, and ASTM A824 shall be submitted. D. Manufacturer's Instructions: Manufacturer's printed instructions for the installation, operation, and maintenance of gates, gate operators, gate controls, latches, and other fence appurtenances shall be submitted. PRODUCTS 2.01 MATERIALS A. Materials shall be new and products of recognized, reputable manufacturers. Used, rerolled, or regalvanized materials are not acceptable. July 14, 2011 02830-1 1698 (construction contract) Addendum 2

Chain Link Fence and Gates 2.02 FABRIC A. Chain link fabric shall be in accordance with ASTM A392. Fence fabric shall be manufactured from zinc-coated steel wire helically wound and interwoven to produce a continuous mesh without knots or ties. B. Steel wire shall be in accordance with ASTM A817, Type II, galvanized, Class 1. C. Zinc-Coated Fabric: Zinc shall be coated onto the steel wire before weaving into fabric. The weight of the zinc coating on the wire shall be not less than 1.2 ounces per square foot in accordance with ASTM A392 for Class 1 zinc coating. D. Fabric Height: The height of fabric shall be the overall dimension from the ends of the selvages. E. Fabric shall be 11-gauge (0.120-inch diameter) for fences 60 inches or less in height and 9-gauge (0.148-inch diameter) for fences 72 inches and over in height. F. Fabric 60 inches or less in height shall be furnished with knuckling on both selvages. Fabric 72 inches and over in height shall have knuckling on 1 selvage and twisting on the other. G. Mesh and Diamond Count: Mesh size for all fabric heights shall be 2 inches. Diamond count shall be in accordance with ASTM A392. 2.03 POSTS AND RAILS A. Posts and rails shall be pipe, roll-formed steel, or hot-rolled shapes in accordance with ASTM F669 for heavy industrial fence. B. Posts and rails shall each be 1 piece, with no circumferential welds. C. Sizes shall be as shown on the drawings. D. Surfaces of posts and rails shall be hot-dipped galvanized and shall match the chain link fence to be furnished. Pipe shall be in accordance with ASTM F1083, Schedule 40. 2.04 CONCRETE FOOTINGS FOR POSTS A. Posts and the lower end of all post braces shall be set in concrete in accordance with Section 03300, Class A. 2.05 FITTINGS A. Galvanized fittings shall be in accordance with ASTM F626. B. Post tops, extension arms, stretcher bars, and other fittings and hardware shall be steel, malleable iron, or wrought iron and shall be galvanized in accordance with ASTM F626. C. Surfaces of fittings shall be galvanized and shall match the chain link fence to be furnished. 2.06 TENSION WIRE A. Wire shall be zinc-coated (galvanized) and shall be in accordance with ASTM A824 for Type II wire with Class 2 coating. 2.07 STRETCHER BARS A. Stretcher bars shall be 1-piece galvanized steel lengths equal to the full height of the fabric with a minimum cross section of 3/16 inch by 3/4 inch. One stretcher bar shall be provided for each gate and end post and 2 stretcher bars shall be provided for each corner and pull post. Stretcher bar bands shall be heavy-pressed steel, spaced not over 15 inches on center to secure stretcher bars to tubular end, corner, pull, and gate posts. 2.08 BRACES A. Brace pipe shall be galvanized and of the same material as the top rail. Brace pipe shall be installed 12 below the top of fence and extend from the terminal post to the adjacent line post. Braces shall be securely fastened to the posts by heavy-pressed steel and malleable fittings, then securely trussed from line post to base of terminal post with a 3/8-inch truss rod and tightener. 2.09 GATES A. Gates shall be swing or sliding type as shown on the drawings, complete with latches, stops, keepers, and hinges or rollers and roller tracks. 1698 02830-2 July 14, 2011 Addendum 2 (construction contract)

Chain Link Fence and Gates PART 3 B. Gate frames shall be galvanized and shall match the adjoining chain link fabric to be furnished. Pipe shall be in accordance with ASTM F1083. C. Single or double swing type gates, gate posts, and accessories shall be in accordance with ASTM F900. D. Gate fabric shall be the same type as used in the fence construction. The fabric shall be attached securely to the gate frame at intervals not exceeding 15 inches. E. Gate latches, stops, and keepers shall be provided for all gates. Latches shall be arranged for locking with padlocks. F. Vehicle gates shall be provided with keepers that automatically engage the gate leaf and hold it in the OPEN position until manually released. G. Gate and members shall be extended in height to accommodate barbed wire. EXECUTION 3.01 INSTALLATION A. Chain link fence fabric, post bracing, top rail, tension wire, and barbed wire shall be installed in accordance with ASTM F567 except as modified in this section. B. Fencing shall be erected in straight lines between angle points by skilled mechanics experienced in this type of construction and in accordance with the manufacturer's printed recommendations as approved by the Engineer. C. Post holes shall be a minimum depth of 38 inches below finished grade. Holes for posts shall be 12 inches minimum in diameter. Holes for gate, corner, and pull posts shall be 16 inches in diameter and a minimum of 4 feet in depth. Depth of post holes shall be increased by 3 inches for each foot of fence height over 6 feet. D. Posts shall be spaced not more than 10 feet on centers and in true lines. E. Holes shall be filled with concrete to extend around posts to a point 1 inch minimum above finished grade. The top surface shall have a crowned water-shedding finish. F. A minimum of 7 days shall elapse after placing the concrete footings before the fence fabric is fastened to the posts. Chain link fabric shall be fastened to end posts with stretcher bars and clamps, and to line posts and top rail with wire or bands, at approximately 14-inch centers and 24-inch centers, respectively. G. Three strands of barbed wire shall be installed on the brackets and shall be tightened and secured at each bracket. H. The centerline of fence braces shall be 12 inches below the top of the fabric. Gate posts shall be braced diagonally to adjacent line posts to ensure stability. I. Gates shall be hung and hardware shall be adjusted so that gates operate satisfactorily from the OPEN or CLOSED position. J. Changes in direction of the fence line where the horizontal angle is 15 degrees or more shall be considered as corners and corner posts shall be installed. K. Changes in the grade where the vertical angle exceeds 5 percent shall have slope posts installed at the point of change. L. Between posts, the chain link fabric shall be fastened to a top and bottom tension wire of not lighter than 7-gauge galvanized, coil spring steel of good commercial quality. M. Tie wire shall not be lighter than 9-gauge galvanized steel wire. The use of approved galvanized steel bands will be permitted in lieu of tie wires for fastening the chain-link fabric to the posts and gate frames. 3.02 ADDITIONAL INSTALLATION REQUIREMENTS A. The line reactor yard fence shall be 8 feet high, without extension arms or barbed wire, constructed in accordance with details and notes in Appendix A attached to the end of this section. B. New fence work shall include the installation of perimeter grounding and connection of new fence to grounding in accordance with Section 16450. July 14, 2011 02830-3 1698 (construction contract) Addendum 2

Chain Link Fence and Gates C. Fence grounding shall consist of bare copper 350 KCMIL ground conductors installed parallel to and 3 feet offset from one side of the fence, installed 18 inches below finished grade. New ground conductors shall be connected to the existing ground grid per Detail 2A in Appendix B attached to the end of this section. D. The new fence shall be connected to new ground conductors at 15 feet minimum intervals and in accordance with Detail 7 of Appendix B. END OF SECTION 1698 02830-4 July 14, 2011 Addendum 2 (construction contract)

02830 - APPENDIX A

02830 - APPENDIX B