Implementing an Enterprise Environment: Nuts, Bolts, and Beyond Construction CPM Conference January 30, 2012

Agenda ± Enterprise System Overview ± What I Can See and Do ± Nuts and Bolts ± Rules of the Road ± Training ± People Side ± Adaptability and Flexibility ± It s a Project ± Lessons Learned and Summary

Why an Enterprise System? Move organizations and projects from this

Why an Enterprise System? To this

What is an Enterprise System? ± Reaches across an enterprise ð An entire organization ð A department ð A single project with multiple schedules ± Focuses on multiple projects ± Easily accessible to non-schedulers ± Reports via a web dashboard ± Viewable by portfolios or individual schedules -

Characteristics ± Various user types ± Dashboards ± Integrated schedules ± Portfolio reporting ± Complexity requiring simplification ± Web based

Key Takeaways ± Be prepared, enterprise systems are a different world ± New schedule roles for most team members ± People and cultural change

Agenda ± Enterprise System Overview ± What I Can See and Do ± Nuts and Bolts ± Rules of the Road ± Training ± People Side ± Adaptability and Flexibility ± It s a Project ± Lessons Learned and Summary

What I Can See and Do Licenses EPS Security Profiles OBS Project User Interface Me What I see, and What I can do WBS Dashboards

What I Can See and Do Licenses EPS Security Profiles OBS Project User Interface Me What I see, and What I can do WBS Dashboards

What I Can See and Do Licenses Licenses Security Profiles User Interface Me Dashboards

What I Can See and Do Security Profiles Licenses Security Profiles User Interface Me Dashboards

What I Can See and Do User Interfaces Licenses Security Profiles User Interface Me Dashboards

Nuts and Bolts - Dashboards Licenses Security Profiles User Interface Me Dashboards

What I Can See and Do Licenses EPS Security Profiles OBS Project User Interface Me What I see, and What I can do WBS Dashboards

What I Can See and Do - OBS OBS Me

What I Can See and Do Licenses EPS Security Profiles OBS Project User Interface Me What I see, and What I can do WBS Dashboards

What I Can See and Do WBS/Project OBS Project WBS

What I Can See and Do WBS/Project OBS Project WBS

What I Can See and Do Licenses EPS Security Profiles OBS Project User Interface Me What I see, and What I can do WBS Dashboards

What I Can See and Do - EPS OBS EPS Project WBS

What I Can See and Do - Recap Licenses EPS Security Profiles OBS Project User Interface Me What I see, and What I can do WBS Dashboards

Agenda ± Enterprise System Overview ± What I Can See and Do ± Nuts and Bolts ± Rules of the Road ± Training ± People Side ± Adaptability and Flexibility ± It s a Project ± Lessons Learned and Summary

Nuts and Bolts ± System structures ± Configurations ± Templates ± Reporting ð Dashboards (Pull) ð Client Server Reports (Push) ± Security ± Portfolio ± Simplify the complex

Nuts and Bolts System Structures ± Enterprise Project Structure ± Organizational Breakdown Structure ± Resource Breakdown Structure

Nuts and Bolts - Configurations ± User interfaces ± User defined fields (UDF) ± Portfolio views

Nuts and Bolts - Templates ± Project ± WBS ± Activities

Nuts and Bolts - Reporting ± Sources ð Dashboards (Pull) ð Client server (Push)

Nuts and Bolts - Security ± Global and Project ± Licenses ± Web user interface

Nuts and Bolts - Portfolios

Nuts and Bolts Simplify the Complex ± This is a complex world ± Our focus is to simplify it ± Good systems are ð Easy to use ð Report simply ð Report accurately We do this by

Nuts and Bolts Simplify the Complex This is harder to view, read, and absorb...

Nuts and Bolts Simplify the Complex... and this is easier to absorb.

Agenda ± Enterprise System Overview ± What I Can See and Do ± Nuts and Bolts ± Rules of the Road ± Training ± People Side ± Adaptability and Flexibility ± It s a Project ± Lessons Learned and Summary

Rules of the Road ± System level ± Enterprise level ð Security ð OBS/EPS ð Portfolio ± Project level ð Individuality of different users ± Strict vs. Flexible consideration

Rule of the Road Hierarchy - Flowdown Enterprise Rules of the Road ER #1 ER #2 ER #3 ER #4 ER #5 Schedule Rules of the Road SR #1 SR #2 SR #3 SR #4 SR #5

Rules of the Road - Examples ± Using global activity codes ð Metrics and milestones ± Project activity codes ð Web vs. client server only ± UDFs ð Custom vs. standard use ð Standard use ± Do not overstep defined bounds

Agenda ± Enterprise System Overview ± What I Can See and Do ± Nuts and Bolts ± Rules of the Road ± Training ± People Side ± Adaptability and Flexibility ± It s a Project ± Lessons Learned and Summary

Training Program ± Easy to use and understand ± Customized to implementation ± Tailor to Roles ð Power Schedulers ð System Owner ð Project Managers ð Engineers ± Formal Training + Mentorship ± Useful for Future Reference

Training Program Example ± How to access ± How to use principal functions ± How to progress ± How to see reports ± How to analyze

Basic Training: Now You re In 1. Collapse and expand all portlets 2. Prints entire screen 3. Preferences preset 4. Logout here

Basic Training: Manipulating the Portlets P6.2Web Help Prints portlet with Microsoft like preview and set-up Refreshes portlet contents

Agenda ± Enterprise System Overview ± What I Can See and Do ± Nuts and Bolts ± Rules of the Road ± Training ± People Side ± Adaptability and Flexibility ± It s a Project ± Lessons Learned and Summary

Cultural Change Basics ± Enterprise system introduces new ways to work ± Compelling reason to change ± Must have high level sponsorship ± On-going mentorship ± People side is the most challenging ± Web vs. client server

Cultural Change - Tools ± Marketing plan ± Communications ± Ownership ± Clear role and responsibilities

Sponsorship ± From the top ± Engaged in the process ± Uses and promotes use

Agenda ± Enterprise System Overview ± What I Can See and Do ± Nuts and Bolts ± Rules of the Road ± Training ± People Side ± Adaptability and Flexibility ± It s a Project ± Lessons Learned and Summary

Adaptability and Flexibility ± Plan for change ± Simplicity allows for adaptability ± Ready for the unknown ±??

Agenda ± Enterprise System Overview ± What I Can See and Do ± Nuts and Bolts ± Rules of the Road ± Training ± People Side ± Adaptability and Flexibility ± It s a Project ± Lessons Learned and Summary

It s a Project ± Key Phases ± Schedule ± Deliverables

Key Phases ± Discovery ± Set-up and Install ± System Architecture ± Configure ± Launch and Train

Key Phases - Discovery ± What is the system ± What will system be used for ± Who will use it ± How will they use it ± What are their skill levels

Key Phases Set-up and Install ± Determine system home ± Install and confirm workability ð Internal server ð Cloud ± Test access ± Initial set-up to allow configuration

Key Phases System Architecture ± Design system to meet needs ± Test design ± Document design for future reference

Key Phases System Architecture ± The relationship of: ð What I Can See and Do ð The schedules ð Reports ð Metrics ð Etc.

Key Phases - Configure ± Implement design ð Structures ð Templates ð Reports ð Etc. ± Build test schedules ± Test ± Document

Key Phases Pilot and Test ± Core team ± Develop system to point of operation ± Limited use during pilot ± Try to break ± Fix, test, fix, test until fixed

Key Phases Launch and Train ± Plan launch / go live date ± Train at optimal time ± one-on-one as often as possible ± Provide simple reference tip sheets ± Be on call ± Types of training ð System owner ð Scheduler ð Web user

Implementation Schedule ± Sample Project Schedule ± Detailed Deliverables ± Managed as a Project

Implementation Schedule - Overall

Assessment

Implementation

Integration Concurrent with implementation design, prototype, and pilot

Training and Turnover Concurrent with implementation prototype, pilot and rollout Driver s manual follows implementation

Samples of Deliverables ± System requirements ± Design document ± As-built ± Training package ± Close-out report

Agenda ± Enterprise System Overview ± What I Can See and Do ± Nuts and Bolts ± Rules of the Road ± Training ± People Side ± Adaptability and Flexibility ± It s a Project ± Lessons Learned and Summary

Lessons Learned ± Begin With the End In Mind ± Implement an easy to use system ± Develop a good foundation the structure ± Test, Test, Test ± Don t Rush to system or schedule operations ± Be flexible ± Have a compelling reason to change ± Obtain high level sponsorship ± Address the needs of the People

Contact Information ± Barry Meyers, PMP, PSP ± Managing Director Enterprise Solutions ± Orcas Project Controls ± bmeyers@orcasprojectcontrols.com ± Stephanie Thatcher ± President ± Orcas Project Controls ± sthatcher@orcasprojectcontrols.com

www.orcasprojectcontrols.com