Welcome. For more information:

Similar documents
Report Date: March 14, 2014 Contact: Jerry Dobrovolny Contact No.: RTS No.: VanRIMS No.: Meeting Date: April 15, 2014

Supports Item No. 3 T&T Committee Agenda February 17, 2009

Deltaport Terminal Road and Rail Improvement Project

Preliminary Comment Period Summary Report

CITY OF VANCOUVER ADMINISTRATIVE REPORT. General Manager of Engineering Services in consultation with the Director of Current Planning

Permitting Decision - Fraser Surrey Docks Direct Coal Transfer Facility

CANADA TRANSPORTATION ACT REVIEW INITIAL SUBMISSION FOCUSED ON THE GRAIN INDUSTRY. Infrastructure, Efficiency, Transparency

Summary Report. Centerm Expansion Project Preliminary Comment Period: Scope of Technical and Environmental Studies January 18 February 12, 2016

Vancouver Wharves Diesel Handling Facility Expansion Project

TRAFFIC MANAGEMENT PLAN REQUIREMENTS FOR COMMERCIAL/LARGE DEVELOPMENT SITES

District of North Vancouver Construction Traffic Management Plan Guidelines

BACKGROUNDER #6: Moving Goods & Services

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

AIR ACTION PROGRAM. Overview of Port Metro Vancouver Air Initiatives. Metro Vancouver Sustainability Breakfast June 04, 2014

FEDERAL HIGHWAY ADMINISTRATION RECORD OF DECISION FOR THE LYNNWOOD LINK EXTENSION

Welcome and thank you for spending time with us today to talk about the 75 th Street Corridor Improvement Project.

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

DELTAPORT TERMINAL, ROAD AND RAIL IMPROVEMENT PROJECT Consultation Discussion Guide and Feedback Form NOVEMBER 21, 2011 JANUARY 6, 2012

Frequently Asked Questions Connecting Palo Alto

Factor Potential Effects Mitigation Measures

TOWN OF HALTON HILLS TRUCKING STRATEGY STUDY

Transportation, Mobility and Access

Request for Expression of Interest - Call to Artists. Low Level Road Project Low Level Road, North Vancouver, B.C.

SR 432 RAIL REALIGNMENT AND HIGHWAY IMPROVEMENTS PROJECT ELECTED AND AGENCY OFFICIALS PROJECT BRIEFING May 14, 2014

Completed Many Studies

A Guide to Project Review

Therefore, the Minister of Transport, pursuant to subsection 27.6(1) a of the Transportation of

There is No Need for a Second Container Terminal at Roberts Bank, B.C. June 11, 2017

To develop the new facility, the following site preparation and construction activities are planned.

MEETING CANADA S TRADE DEMAND

3.6 GROUND TRANSPORTATION

Proposed G3 Terminal Vancouver Project Update. Presented to North Shore Waterfront Liaison Committee January 14, 2016

Design-Build for Improvements to the Amherst Island Ferry Docks Public Information Centre April 2017 Please Sign In

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan.

THAT Council adopt the Congestion Management Strategy as outlined in this report

Minnesota Statewide Freight System Plan Action Agenda Development Lead Agency (MnDOT or

Re: Participation of the Vancouver Fraser Port Authority in Orientation Session #2 for the Roberts Bank Terminal 2 Project Environmental Assessment

Appendix C - Highway 400 Widening and Interchange Evaluation Summary Tables

In July 2000, City Council adopted an. Environmental Protection Program for. the City of North Vancouver.

Central San Pedro Neighborhood Council Port Committee Meeting February 19, 2014 Augie Bezmalinovich Port of Los Angeles

Port of Vancouver USA Clark College Business Advisory Committee May 9, 2017

APPENDIX 8-A. Valued Component Selection Rationale

Proposed Maplewood Marine Restoration Project Discussion guide and feedback form

WELCOME. Central Coast Terminal Development Plans. Top 5 Things to Know about the Plan

Welcome. Public Meeting. August 2, :00 to 7:00 p.m. Presentation 6:00 to 6:30 p.m.

To provide an update on the progress of the Peel Goods Movement Task Force and the Peel Goods Movement Strategic Plan.

Changes to Air Quality

The Port of Vancouver Sustainability Plan. Presentation to AAPA June 2006

PORT MASTER PLAN AMENDMENT NO. 26 LA WATERFRONT LAND USE ADDITIONS, MINOR FILLS, AND NEW HARBORS

Highland Gate Developments Inc. (SUB ) Construction Impact Mitigation Plan No. 1 (Phase 1 Site Alteration Works) February 2017.

Building a Sustainable Gateway Reducing GHGs moving to Carbon Neutral

Metro North Transmission Project Project Update October 2017

New. Stations. Public Information Centre

BHP Potash Export Facility at Fraser Surrey Docks Input Consideration Report Application Review Public Comment Period

Significant prevention measures in place for each LNG carrier *

Phase 1, SR 509 Completion Project NEPA Re evaluation

Congestion Management Strategy

Torbram Road Improvements From Queen Street East to Bovaird Drive

McLoughlin Point Wastewater Treatment Plant. CRD Contract No: CAWTP Submittal No: AGJV-PLAN-022. McLoughlin Point Traffic Management Plan

GULF COAST RAIL DISTRICT VISION FOR REGIONAL RAIL

Welcome! Contact Information

transportation BUSINESS PLAN

About the Proposed Project

ALBION FLATS DEVELOPMENT EXISTING TRAFFIC CONDITIONS AND POTENTIAL IMPACTS

Once known as warehousing and distribution, the process

Connecting Albertans with Each Other and the World: A Long-Term Transportation Strategy for Alberta

Transit Service Guidelines

SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT

CONTAINER PORT GOALS 10-2

Appendix C Presentation Slides with Script

NEPA and Design Public Hearings

Bonnie Doon Grade Separation

Public Open House. Proposed Liberty Village Natural Gas Pipeline Project. Please sign-in at the registration table upon arrival

Benefit Cost Analysis Narrative

Community Conversations for the I-35 Ramp Metering Project Begin This Month

SR 432 GRADE CROSSING PROJECT. April 28, 2015

Transportation BUSINESS PLAN ACCOUNTABILITY STATEMENT

Peterborough County Road Safety Audit Guideline Pilot

Ministry of Highways and Infrastructure. Plan for saskatchewan.ca

Environmental Analysis, Chapter 4 Consequences, and Mitigation

Innovations in Urban Freight. Commercial Challenges for the Port of Seattle February 6, 2011

PUBLIC IMPACT MITIGATION PLAN

Leaside to Main Infrastructure Refurbishment Project Strengthening the transmission system in your neighbourhood

Patrick Prescott, Community Development Director By: David L. Kriske, Assistant Community Development Director

Conceptual Design Report

DORAN STREET AND BROADWAY/BRAZIL SAFETY AND ACCESS PROJECT PROJECT STUDY REPORT (EQUIVALENT) Appendix H Preliminary Environmental Evaluation

Development Next to Freight Rail Corridors Policy

Cargill. North Vancouver Grain Terminal Power System Upgrade

5.0 PRELIMINARY ENVIRONMENTAL REVIEW

Millennium Line Broadway Extension

BA Blacktop Ltd. An ISO 9001:2008 registered

Code of Construction Practice Part B: Site Specific Requirements

City of Prince George July 2016

INTELLIGENT TRANSPORTATION SYSTEMS APPENDIX

EXECUTIVE SUMMARY. Figure 1 - Rail Deck Park Study Area. Executive Summary Rail Deck Park Engineering & Costing Study Report Page 1 of 10

Hastings District Council. Whakatu Arterial Link Traffic Management Plan

Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion Tunnel

Exhibit G. Construction Mitigation Plan

Transcription:

Welcome Thank you for attending Port Metro Vancouver s open house about the South Shore Corridor Project. The purpose of this open house is to: Share project information Answer your questions and hear your perspectives on the project Provide information on next steps Please take some time to view the display boards, speak with members of the Port Metro Vancouver South Shore Corridor project team, and complete a feedback form. For more information: Web: www.portmetrovancouver.com Tel: 604.665.9066 E-mail: public_affairs@portmetrovancouver.com (Please indicate SSCP in the subject line)

About Port Metro Vancouver Port Metro Vancouver is the most diversified port in North America and a major economic engine for Canada, trading $75 billion in goods with more than 130 economies Port activities generate: Jobs 129,500 each year. Positioned on the southwest coast of British Columbia, Port Metro Vancouver covers more than 600 kilometres of shoreline and operates across five business sectors: automobiles, breakbulk, bulk, container and cruise. Gross Domestic Product (GDP) Economic output Wages $10.5 billion $22 billion $6.1 billion BreakBULK Automobiles Containers BULK Cruise

About Port Metro Vancouver s South Shore Port Metro Vancouver s south shore represents a vibrant and unique area of Vancouver where industry, commercial businesses and residents coexist. A number of challenges currently exist along the south shore, affecting the reliability of movement of cargo and people. The south shore handles cruise, container and grain operations. It is also a busy area for local business operations, including concrete and rendering industries. Columbia Containers smit Marine Ocean Fisheries commissioner Street Wall Street undeveloped Industrial port land Viterra (cascadia) Centerm/ DP World Ballantyne SRY Alliance Grain Terminal Vanterm / Global containers terminal West coast Reduction Viterra (Pacific Elevators) Marco versacold STorage and distribution Lafarge Wall Street commissioner Street McGill Street New brighton Park Lantic Rogers Sugar c e n t e n n i a l R o a d Stewart Street Powell Street Dundas Street Heatley Avenue Clark Drive victoria drive Nanaimo Street Renfrew Street

Why Are These Improvements Needed? With growing competition from other North American west coast ports and increasing demand from exporters, importers and shipping lines for more reliable, efficient and low-cost service, improvements are needed to maintain port competitiveness and sustain Canada s growth and prosperity. Current challenges: Constrained rail and road corridor 14 at-grade rail crossings, leading to conflicts between rail and road traffic Limited access and staging areas for trucks leading to congestion on and off port lands Outdated infrastructure and technology that no longer meet the needs of a growing port

Project Considerations Port Metro Vancouver s south shore corridor represents a vibrant and unique area of Vancouver where industry, commercial businesses and residents coexist. While the project is designed to enhance port operations and provide for future rail capacity improvements as international trade continues to grow, it will also address long-standing challenges facing the local community. Preliminary consultation with funding partners, governments, tenants, and adjacent residents and businesses has identified a number of interests. The project has been designed to address these considerations, with a particular focus on areas of mutual interest. RESIDENTS Noise from rail car switching Dust and light impacts Increased number of trucks on local streets Potential impacts to viewscapes BUSINESS Increased number of trucks on local streets Reliable access for customers and deliveries Support local business and protect industrial land base Construction-related impacts Areas of Mutual Interest Minimize effects of increased trade on surrounding neighbourhoods Reduce congestion within the port Reduce port-related traffic on local streets Minimize traffic impacts during construction Protect industrial land base GOVERNMENTS & FUNDING PARTNERS Respect existing government controls and procedures Fiscal and environmental responsibility Promote Asia-Pacific trade and the economy TENANTS Protect industrial land base Improve rail access and capacity Provide safe, reliable access for workers Appropriate use of project funding Construction-related impacts

The South Shore Corridor Project (Updated) Bound by Heatley Avenue and McGill Street along the south shore of Burrard Inlet, the South Shore corridor is critical for goods entering the South Shore Trade Area. The South Shore Corridor Project is designed to: Reduce road/rail conflicts Facilitate long-term rail capacity improvements Improve transportation access Improve safety and reliability for businesses operating within the port Reduce effects of port activities on neighbouring communities, as appropriate COMMISSIONER 6 3 5 COMMISSIONER WALL ST. McGILL ST. 4C 6 4A C E N T E N N I A L 4B STEWART 1 2 DUNDAS ST. HEATLEY AVE. POWELL ST. CLARK DR. VICTORIA DR. NANAIMO ST. HASTINGS ST. RENFREW ST. 1 A new Stewart Street Elevated Road between Clark Dr. and Victoria Dr. This new road provides an alternate route for through-traffic, significantly reducing congestion along Stewart St. and improving travel time reliability. 2 A new Pedestrian Overpass at Victoria Drive, providing safe access for port workers over the rail tracks at Victoria Dr. The overpass will reduce train switching noise in this location. 3 Realigned Commissioner Street to facilitate long-term improvements to rail capacity and reduce train-related noise. 4 Intersection and Roadway Improvements on Stewart St., Centennial Rd. and Commissioner St. to better manage truck access and egress at: 4A - Heatley Ave., 4B - Clark Dr., 4C - McGill St. 5 Reconfigured New Brighton Road to provide access to port land for potential truck staging to manage traffic flow and reduce corridor-wide congestion. Access to New Brighton Park remains unchanged. 6 Corridor-wide Improvements including upgraded signage, installation of Intelligent Transportation Systems (ITS) and fibre optic cable upgrades.

Victoria Drive Pedestrian Overpass (Updated) A new overpass of the rail tracks at Victoria Drive will provide safe and reliable access for port workers and reduce train switching and noise in this area. Current Challenges: Pedestrian safety and access reliability challenges, particularly when trains occupy the tracks Limited ability to assemble longer trains, which results in noise from rail car switching as trains are pulled apart to ensure that the crossing is not blocked before after Currently, employees accessing the port through Victoria Drive must cross at-grade rail tracks, causing safety and accessibility challenges in this area. Artist rendering of the new victoria drive pedestrian overpass, looking north (New stewart street elevated road in background).

Construction Management (Updated) Port Metro Vancouver is committed to minimizing delays and congestion for port users and the community during construction. While most construction activities will be restricted to port lands, there may be times when minor, temporary changes will be required on local streets near port access gates. Construction Activities: Key construction activities include: - Installation of large steel beams - Road works associated with alterations to Stewart and Commissioner Streets, the Commissioner Street port access gate, and the reconfiguration of existing McGill Street access ramp Traffic Management Measures: Maintain access to private properties throughout construction Limited road closures to install steel beams with dates and times communicated well in advance Maintain emergency access at all times Monitor and proactively respond to congestion within and near the port Port Metro Vancouver will make best efforts to ensure that construction timing is consistent with City of Vancouver noise bylaws Any work that is required to take place outside of the main working hours will be planned and communicated to stakeholders and local residents in advance Best practices will be used to minimize construction noise Keeping You Informed: Port Metro Vancouver is committed to timely and effective communication about construction activities, including: Public information website Opt-in traffic advisory emails Changeable message signs at approaches to the Heatley Avenue and McGill Street port entrances Register to receive project updates at the open house or email public_affairs@portmetrovancouver.com with SSCP in the subject line.

Stewart Street Elevated Road (Clark Drive to Victoria Drive) A new, elevated road over Stewart Street between Clark Drive and Victoria Drive will provide an alternate route for through-traffic, significantly reducing congestion along Stewart Street and improving travel time reliability. Current Challenges: Truck traffic is subject to significant delays along Stewart Street due to 14 at-grade rail crossings. Congestion along Stewart Street can result in back-ups onto city streets as a result of a constrained transportation corridor. Truck braking and engine accelerating creates noise for nearby residents. BEFORE After Artist rendering of the new stewart street elevated road Looking west from cannery row.

Traffic Flow Improvements (Updated) Consultation in fall 2011 identified existing truck traffic and congestion as a key concern and proposed projectrelated traffic improvements as a primary potential benefit by making the port s internal road system more efficient. These improvements are designed to reduce the effects of port operations on local streets as port traffic continues to grow. Without these improvements, congestion is predicted to increase. Heatley Avenue - Centennial Road at Ballantyne Pier Clark Drive Widen Centennial Road to allow uninterrupted traffic flow to/from Heatley Avenue and to/from Ballantyne Cruise terminal Overall project improvements will help minimize congestion on port roads that have a tendency to back up onto city streets during rail switches Retain Heatley Avenue as the main access for smaller vehicles, as well as commercial vehicles of non-semitrailer configuration McGill Street Corridor-Wide Amend the layout of the right turn lane into the port to improve safety Alter the existing roadside barrier to make it safer for trucks accessing the port Intersection improvements at Commissioner Street Access to New Brighton Park is unchanged New electronic message boards on the approaches to port accesses and throughout port roads, providing real-time incident management and traffic congestion reduction Realign Commissioner Street to provide improved lane width and allow for future rail capacity improvements Consideration for truck staging areas to manage traffic flow and reduce corridor-wide congestion

Other Traffic Management Measures (Updated) A number of broader traffic management measures will be implemented in the South Shore Trade Area. These include: COMMISSIONER 1. 30km/hr speed limit for commercial trucks McGILL north of Broadway on Nanaimo and Renfrew STEWART Streets as well as turn restrictions for portbound container trucks (see map) EAST HASTINGS 2. Truck Licensing Decal Program All container trucks accessing port container terminals must hold a valid TLS licence. The Decal Program helps ensure the integrity of the program NANAIMO RENFREW by streamlining inspections and improving enforcement. EAST BROADWAY 3. Truck Container Efficiency Pilot Program Using GPS technology, Port Metro Vancouver is working with trucking companies and MAIN KNIGHT terminal operators to: a. Track and communicate congestion and route information to vehicle operators in EAST 41st AVENUE real-time b. Respond to incidents more quickly and effectively, including diverting traffic when required EAST 49th AVENUE DESIGNATED TRUCK ROUTE Trucks 30 KM/HR c. Validate arrival and departure times to more effectively manage queuing and wait time at terminals Port Metro Vancouver works closely with the City of Vancouver to mitigate the impacts of port bound trucks in local communities

Project Timeline Development of the South Shore Corridor Project includes community and stakeholder engagement to ensure that all interested parties are informed about the project and have opportunities to provide input. If you would like to be kept informed as the project moves forward, we encourage you to sign up to receive project updates by emailing a request to: public_affairs@portmetrovancouver.com (Please indicate SSCP in the subject line). 2011 2012 OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE JULY AUGUST Stakeholder and Community Engagement Open House Summary Report Project Update Open House Summary Report Environmental Assessment Complete Construction Commences (completion March 2014) ONGOING TECHNICAL/ENGINEERING WORK COMMUNITY ENGAGEMENT

Environmental Assessment (Updated) Port Metro Vancouver is responsible for the administration, management and control of land and water within its jurisdiction. In exercising this mandate, the Port strives to ensure that new developments meet or exceed applicable standards and minimize environmental and community impacts. As part of planning for the project, Port Metro Vancouver has undertaken environmental studies in a number of areas. These studies were recently completed and the results are being incorporated into project planning and designs. The following table provides an overview of the environmental assessment for the project, including findings and next steps: Area Noise Air Quality Marine/ Aquatic Wildlife Soil and Groundwater considerations Potential for existing noise profile changes as a result of elevated road, intersection modifications and general growth in trade over time. Potential for local air quality changes with a focus on particulate matter. The project will not affect any fish habitat and therefore no detailed assessment required. Mitigation and monitoring as required will be in place during construction to ensure no direct or indirect impact on marine aquatic environment. There are no known wildlife resources at risk in the project area and therefore no detailed assessment is required. An Eagles nest is present on the corridor, however it is located 100m from the closest approach of the construction footprint and the eagles using that nest have shown great tolerance for construction activity in the past. Potential for contaminated soil and/or groundwater to be encountered during construction. STatus/results Overall, noise impacts due to road or rail activity as a result of the project are low. However, because the location of the road will change, noise levels at specific locations are also expected to change and some people may notice a difference. In the short term, the project will help to reduce rail noise such as rail car switching and shunting, audio signals when crossings are blocked as well as less engine braking from trucks as a result of improved free flow traffic and the removal of the stop sign. Minimal change in air quality is expected as a result of the project. Over time, technological improvements have the potential to improve air quality even with anticipated growth.this is in part because trucks will no longer be idling due to long delays, and in part because even though truck and rail traffic will grow, older vehicles will be phased out with newer, more efficient and lower emitting trucks, rail and marine vessels. Every five years a detailed Port Air Emissions inventory is conducted in partnership with regional authorities to track changes in Air Quality and guide mitigation programs. No detailed assessment required. Preliminary review concluded that if construction is conducted outside of nesting period, no long-term effects on wildlife are expected. A Soil and Groundwater Management Plan will be developed and will include provisions for appropriate disposal of material, as necessary.