Verification and certification report form for CDM programme of activities. (version 01.0)

Size: px
Start display at page:

Download "Verification and certification report form for CDM programme of activities. (version 01.0)"

Transcription

1 Verification and certification report form for CDM programme of activities (version 01.0) CDM VERIFICATION AND CERTIFICATION & GS LEBELLING REPORT Title of the programme of activities (PoA) International Water Purification Programme UNFCCC reference number of the PoA 5962 (GS Ref 2404) Version number(s) of the PoA-DD(s) applicable to this report Version 06 Version number of the verification and certification report 2.2 Completion date of the verification and certification report 29/04/2016 Monitoring period number 1 Duration of this monitoring period Number and version number of the monitoring report to which this report applies 01/11/ /01/2015 (inclusive of both days) Monitoring report number 01 Monitoring report version number 04 Coordinating/managing entity (CME) Host Party(ies) Pure Water Ltd. Host Party(ies) of the PoA Ethiopia El Salvador Chile Egypt Kenya Gambia Madagascar Nicaragua Mexico South Africa Uganda Vietnam Iran (Islamic Republic of) Cambodia Malawi Is this a host Party to a CPA covered in this report?(yes/no) No No No No No No No No No No Yes No No No No Version 01.0 Page 1 of 47

2 Sectoral scope(s) Scope 3: Energy demand Selected methodology(ies) AMS-III.AV. Version 03 Selected standardized baseline(s) Not applicable Total estimated GHG emission reductions or net GHG removals for this monitoring period in the included CPA(s) covered in this report Total certified GHG emission reductions or net GHG removals for this monitoring period for the included CPA(s) covered in this report 30,705 tco2e 26,816 tco2e Name of DOE Earthood Services Private Limited Name, position and signature of the approver of the verification and certification report Dr. Kaviraj Singh Managing Director Version 01.0 Page 2 of 47

3 SECTION A. Executive summary Brief Summary The registered PoA targets to improve the access of clean and safe drinking water to households and communities by promoting low greenhouse gas emitting water purification technologies in the host Parties (13) included in the registered PoA. The use of low greenhouse gas emitting water purification technologies by households and communities results in reduction of use and demand of non-renewable biomass that would have been used to boil the water as a mean of water purification in the absence of the CPAs. This directly leads to reduced greenhouse gas emissions. This monitoring period includes the implementation and monitoring of two CPAs, as appropriate, as part of registered PoA within the geographical boundary of Uganda (CPA and CPA ).The 1st CPA i.e., is included under the current monitoring period but is not yet implemented. The CPAs that were included after the end of the current monitoring period were not considered as part of verification. Scope of verification: The verification is an independent and objective review and ex-post determination of the monitored reductions in GHG emissions by the DOE. The scope of this verification is limited to the implementation of registered PoA and included CPAs viz., (GS Ref. No for this CPA) and (GS Ref No for this CPA) in the monitoring period. The verification tests the data and assertions set out in the monitoring report based on the following: (i) The approved methodology AMS-III.AV. version 03 /10/ and applied tools, applied in the PoA-DD & CPA-DDs (ii) The registered PoA-DD /01/& CPA-DDs /04, 06/, monitoring plan and corresponding validation opinions /02, 05, 07/ (iii) UNFCCC criteria referred to in the Kyoto Protocol criteria and the CDM modalities and procedures as agreed in the Bonn Agreement and the Marrakech Accords (iv) The CDM Validation and Verification Standard (VVS) /17/ (v) The CDM Project Standard (PS) /18/ and Project Cycle Procedure (PCP) /19/ (vi) Standard: Sampling and surveys for CDM project activities and programme of activities /21/ (vii) Relevant decisions, guidance and clarifications of the CMP and CDM Executive Board,, Gold Standard and any other information and references relevant to the PoA s reported emission reductions The verification has considered both quantitative and qualitative aspects on stated/reported emission reductions. The monitoring report (all versions) and corresponding supporting documentation was assessed in accordance with the rules defined by UNFCCC, as appropriate to the PoA. The verification report (submitted to UNFCCC as part of RFI) has been amended to include the GS requirements and monitoring parameters applicable for projects that are registered under both CDM and GS programme. The verification is not meant to provide any consulting or recommendations to the CME/others. However, stated requests for clarifications and/or corrective actions may provide input for improvement of the monitoring activities. Verification Process: The verification process is conducted as per internal CDM Quality Manual & GS tool kit version 2.1, which includes the following steps; a) Contract with CME and appointment of verification team and technical review team (refer Section B.1 and B.2 of this report) b) Completeness check of Monitoring Report c) Publication of Monitoring Report at UNFCCC website (15 May 2015) /28/ d) Desk review (refer Section C.1 of this report) of Monitoring Report and corresponding ER sheet by verification team and planning of onsite audit (including sampling approach (refer Section C.4 of this report) to be applied) e) On site audit (refer Section C.2 of this report) (physical implementation and interview with relevant stakeholders) by verification team consistent of Team Leader and all Technical Experts, as a minimum f) Follow up activities e.g., interviews (refer Section C.3 of this report) g) Reporting and closure of findings (CARs/CLs/FARs) and preparation of draft verification report (refer Section C.5 of this report) h) Independent technical review (refer Section D of this report) of the draft verification report and final/revised documentation (e.g., Monitoring Report, corresponding ER sheet and evidences) Version 01.0 Page 3 of 47

4 i) Reporting and closure of TR comments/findings (refer Section C.5 of this report) (CARs/CLs/FARs) and final approval for the decision made (refer Section E and F of this report). j) Issuance of final verification report to contracted CME (or authorized representatives) and submission of request for issuance to GS, as appropriate. Verification : Based on the outcome of the verification process of the registered PoA International Water Purification Programme and its 02 CPAs ( and ) for the monitoring period 01/11/ /01/2015 we confirm that the implementation of referenced registered PoA is complying with applicable CDM and GS Toolkit rules and regulations as stated in the Monitoring Report (final) Version 04 dated 06/01/2016. The GHG emission reductions were calculated correctly on the basis of the approved baseline and monitoring methodology AMS-III.AV. Version 03 and the monitoring plan contained in the registered PoA DD Version 6 dated 02/10/2012. Earthood Services Private Limited is able to certify that the emission reductions from the registered GS (GS#2404) & CDM PoA UN#5962 International Water Purification Programme in Uganda during the period 01/11/ /01/2015 (including both days) amount to 26,816 tco2e. Therefore, this is being submitted for request for issuance, as per GS procedures. SECTION B. Verification team, technical reviewer and approver B.1. No. Verification team members Role Last name First name Affiliation (e.g. name of central or other office of DOE or outsourced entity) Type of resource Desk review Involvement in 1. Team Leader IR Gautam Ashok Kumar Central Office Y Y Y Y 2. Technical IR Gautam Ashok Kumar Central Office Y Y Y Y Expert TA Local Expert EI Khaukha Julius Sam External N Y Y N B.2. Technical reviewer and approver of the verification and certification report No. Role Type of resourc e Last name First name Affiliation (e.g. name of central or other office of DOE or outsourced entity) 1. Technical reviewer IR Mahawar Abhishek Central Office 2. Technical Expert EI Sharma Ashu Central Office TA Approver IR Singh Kaviraj Central Office On-site inspection Interview(s) Verification findings SECTION C. C.1. Desk review The desk review involves; A review of the data and information presented to verify their completeness; A review of the monitoring plan, the monitoring methodology including applicable tool(s) and, where applicable, the applied standardized baseline, paying particular attention to the frequency of measurements, the quality of metering equipment including calibration requirements, and the quality assurance and quality control procedures; A review of calculations and assumptions made in determining the GHG data and emission reductions; Version 01.0 Page 4 of 47

5 An evaluation of data management and the quality assurance and quality control system in the context of their influence on the generation and reporting of emission reductions; A review of data and information presented for sustainable development parameters The list of documents/evidences reviewed during the verification is provided under Appendix 3 of this report. C.2. On-site inspection Duration of on-site inspection: 04/06/015 to 05/06/2015 No. Activity performed on-site Site location Date Team member 1. Opening Meeting/Introduction Kampala, 01/06/2015 Ashok Kumar Gautam Uganda 2. Desk Review Mbale, Uganda 02/06/2015 Ashok Kumar Gautam to 03/06/ Physical site visit : Households visited (implementation of PoA) Mbale, Uganda 04/06/015 to 05/06/2015 Ashok Kumar Gautam, Julius Sam Khaukha 4. Review of information flows for generating, aggregating and reporting the monitoring parameters 5. Cross check between information provided in the monitoring report and data from other sources such as plant logbooks, inventories, purchase records or similar data sources; 6. A check of the monitoring equipment including calibration performance and observations of monitoring practices against the applicable requirements Mbale, Uganda Mbale, Uganda Mbale, Uganda 04/06/015 to 05/06/ /06/015 to 05/06/ /06/015 to 05/06/2015 Ashok Kumar Gautam Ashok Kumar Gautam, Julius Sam Khaukha Ashok Kumar Gautam, Julius Sam Khaukha 7. identification of quality control and quality assurance procedures in place to prevent or identify and correct any errors or omissions in the reported monitoring parameters Mbale, Uganda 04/06/015 to 05/06/2015 Ashok Kumar Gautam, Julius Sam Khaukha Version 01.0 Page 5 of 47

6 C.3. Interviews CDM-PoA-VCR-FORM C.3.1. Interview with PP/CME/CPA Implementers No. Interviewee Date Subject Team member Last name First name Affiliation 1. Hilda Nazala EA 04/06/2015 Water Quality Ashok K Gautam Julius Khaukha 2. Simon Namasobo EA 04/06/2015 Implementation, Records Ashok K Gautam Julius Khaukha 3. Ocama Andrew EA 04/06/ /06/2015 Operation and Management Ashok K Gautam Julius Khaukha 4. Irene Neumbe EA 04/06/2015 Operation and Management Ashok K Gautam Julius Khaukha 5. Andrew Talisuna EA 04/06/2015 Implementation, Records Ashok K Gautam Julius Khaukha 6. Werikhs Susan EA 04/06/2015 Implementation Ashok K Gautam Julius Khaukha 7. Richard Kibuuk EA 04/06/2015 Operation and Management Ashok K Gautam Julius Khaukha 8. Osterwalder Lars PWL 04/06/ /06/2015 Monitoring, Survey, Database Ashok K Gautam Julius Khaukha C.3.2. Type of questions asked by Team member No. Questions asked by Team member Nature of Responses Received to Local Stakeholders 1. Was Community Education Meeting (CEM) conducted in your area for benefits of using water purifier? Yes (=Positive) No (=Negative) 2. Was content of CEM explained in local language? Yes (=Positive) No (=Negative) 3. Was content of CEM beneficial/useful? Yes (=Positive) No (=Negative) 4. Were people employed (part time or full time) from your community? 5. Did CPA implementer responded promptly in distress times e.g., non functioning of dispensers or accidental breakage? Can t Say(=Neutral) Yes (=Positive) No (=Negative) Can t Say(=Neutral) Yes (=Positive) No (=Negative) 6. Were there no or negligible instances of water borne diseases associated with chlorinated water? 7. Were you aware of the continuous input/grievance mechanism in place? Yes (=Positive) No (=Negative) Yes (=Positive) No (=Negative) C.3.3. Interview with Local Stakeholders No. Interviewee Date Mode (In Last name First name Affiliation Person)/Subject 1. Wakida Hellen Promoter* 05/06/2015 Dispenser Usage 2. Yokolamu Mwanika Promoter 05/06/2015 Dispenser Usage 3. Asinasi Katoko Promoter 05/06/2015 Dispenser Usage 4. Wilson Nmungha District 05/06/2015 Existence of Health SDW in CPA Inspector 0002 * a total of 28 dispensers were visited by verification team. The above table is indicative only. Feedback (Positive / Negative / Neutral) Positive for all Questions Positive for all Questions Positive for all Questions Positive for all Questions Version 01.0 Page 6 of 47

7 C.4. Sampling approach CME s sampling approach: As indicated in Section G.3 of the monitoring report, three parameters were quantified through surveys i.e., Water quality, Drink% and Refill%. The sampling design was implemented in line with the validated CPA DD Section D.7.2. In the current monitoring period a single CPA has been monitored i.e., CPA 2, as the other included CPA 1 is not yet implemented. The CME has applied clustered sampling approach for the water quality monitoring, multi-stage sampling approach for Drink% and simple random sampling approach for Refill%. As this monitoring report refers to a single CPA with a monitoring period of less than a year, a 90/10 confidence/precision requirement has been fulfilled. The complete details of CME s sampling is included under Section G.3 of the monitoring report. DOE s sampling approach: In order to meet the requirements of paragraph 21 and 22 of Standard for Sampling and surveys for CDM project activities and programmes of activities, Version 04.1 /21/, the verification team applied acceptance sampling in the verification (in accordance with para 24). The verification team selected random sample of CME s sampled records, checked the the acceptability (or otherwise) of the data for each such record with CME s sample records, and then based on the number of records where there is agreement, determined if the CME s sample records meet the requirements. The verification team determined the sample size for acceptance sampling by evaluating the following, using its own professional judgment and guidance in the Standard Sampling and surveys for CDM project activities and programme of activities version 04.1 /21/: The proportion of discrepancies between the CME s data and verification team s (field or onsite inspection results) data that can be considered acceptable. This is referred to as the AQL (Acceptable Quality Level): 1.0% was considered in this verification. The proportion of discrepancies between the CME s data and verification team s (field or onsite inspection results) data that would be considered unacceptable. This is the UQL (Unacceptable Quality Level): 20% was considered in this verification. The producer risk and consumer risk: 10% was considered for both. Considering the above input values, a sample size of 18 was required as per Table 1 in the referred Standard. Accordingly, Acceptance number (c) thus determined for the sample size is 1. A sample size of 18 meets the criteria. Therefore, the verification team considered and visited 28 samples (in place of 18 that would have met the criteria) for DOE s field survey during site visit and observed that all the water purifiers checked were in operation and were found consistent with the functional status reported by the CME s samples record. The actual number of functional dispensers was reported by CME as 91.2%, which is based on regular physical check at the time of chlorine delivery to that dispenser. This parameter is based on actual physical inspection of all dispensers on rotational basis and is not based on any survey. Only one dispenser was not found operational at the time of site visit due to physical damage to the dispenser case (a plastic enclosure that houses the dispenser module delivering measured chlorine). Based on the interview of the promoters and checking the physical/operational status of dispenser during the on-site audit, it was concluded that the damage occurred a day or two before the site visit and therefore it was accepted. In all, the overall functionality rate reported by the CME is conservative as compared to what was witnessed (only 1 dispenser was not operational out of 28 visited by the verification team) by the verification team and therefore accepted. Furthermore, one discrepancy was allowed as per AQL and UQL specified to the CME prior to onsite inspection. In the same manner, Refill% and Drink% were also covered during the DOE field survey and found to be consistent with the CME s reported sampling results and were therefore accepted. However, for Water Quality, the verification relied on the test results that were archived by the CME (and Evidence Action) and were found consistent. Thus, CME s set of records has been accepted in line with para 28 of the sampling standard, version Version 01.0 Page 7 of 47

8 C.5. CDM-PoA-VCR-FORM Clarification requests, corrective action requests and forward action requests raised Areas of verification findings No. of CL No. of CAR No. of FAR General Compliance of the monitoring report with the monitoring NA CAR#02, NA report form CAR#03 Remaining forward action requests from validation and/or NA NA NA previous verification Specific-case CPA(s) considered for verification and NA NA NA covered in this report Programme of activities Compliance of the programme implementation with the CL#01 NA NA registered PoA-DD Implementation and operation of the management system NA CAR#10, NA CAR#11, CAR#12 Post-registration changes NA NA NA Temporary deviations from the registered NA NA NA monitoring plan, monitoring methodology or standardized baseline Corrections NA NA NA Inclusion of a monitoring plan in a registered PoA- NA NA NA DD (including its generic CPA-DD(s)) Permanent changes to the monitoring plan as NA NA NA described in the registered PoA-DD, applied methodology, or applied standardized baseline Changes to the programme design of the NA NA NA registered PoA-DD (including corresponding changes to project design of the generic CPA- DD(s)) and updates to the eligibility criteria for inclusion of specific-case CPAs in the PoA Types of changes specific to afforestation and reforestation activities NA NA NA Component project activity(ies) NA NA NA Compliance of the CPA implementation with the included CL#01 CAR#04 NA CPA design document CAR#14 Post-registration changes NA NA NA Temporary deviations from registered monitoring NA NA NA plan, applied methodology or applied standardized baseline Corrections NA NA NA Changes to the start date of the crediting period NA NA NA Inclusion of a monitoring plan to an included CPA- NA NA NA DD Permanent changes to the monitoring plan as NA NA NA described in the included CPA-DD, applied methodology, or applied standardized baseline Changes to the programme design of the included NA NA NA CPA-DD Types of changes specific to afforestation and reforestation component project activities NA NA NA Compliance of the monitoring plan with the monitoring NA CAR#08, FAR#15 methodology including applicable tool and standardized baseline CAR#09 Compliance of monitoring activities with the registered monitoring plan NA NA NA Data and parameters fixed ex ante or at renewal NA CAR#06 NA of crediting period Data and parameters monitored NA CAR#04, CAR#05, CAR#06, NA Version 01.0 Page 8 of 47

9 CAR#09, CAR#10, CAR#12 Implementation of sampling plan NA CAR#07, NA CAR#11 Compliance with the calibration frequency requirements NA NA NA for measuring instruments Assessment of data and calculation of emission reductions NA NA NA or net removals Calculation of baseline GHG emissions or NA NA NA baseline net GHG removals by sinks Calculation of project GHG emissions or actual net NA CAR#13 NA GHG removals by sinks Calculation of leakage GHG emissions NA NA NA Summary of calculation of GHG emission NA NA NA reductions or net GHG removals by sinks Comparison of actual GHG emission reductions or NA NA NA net GHG removals by sinks with estimates in included specific-case CPA Remarks on difference from estimated value in NA NA NA registered PDD Others (please specify) NA NA NA Total SECTION D. Internal quality control The draft verification report that is prepared by verification team is reviewed by an independent technical review team (one or more members) to confirm if the internal procedures established and implemented by Earthood Services Private Limited were duly complied with and whether such opinion/conclusion were reached in an objective manner that complies with the applicable CDM rules/requirements. The technical review team is collectively required to possess the technical expertise of all the technical area/sectoral scope the project activity relates to. All team members of technical review team are independent of the verification team. During the technical review process additional findings may be identified or the closed out findings may be opened, which needs to be satisfactorily resolved before the request for issuance is submitted to UNFCCC. The independent technical reviewer may either approve the report as such or reject/return the same in such case providing the comments/findings/issues that needs to be resolved by the verification team. The decision taken by the Technical Reviewer is final and is authorized by the Managing Director on behalf of Earthood Services Private Limited. SECTION E. Verification opinion Earthood Services Private Limited (ESPL), contracted by Pure Water Ltd. (the CME for the PoA), has performed the first independent verification of the emission reductions for the registered GS# 2404 & CDM PoA 5962 International Water Purification Programme in Uganda for the monitoring period 01/11/ /01/2015 as reported in the Monitoring Report (public) Version 01.1 dated 21/05/2015. The CME is responsible for the collection of data in accordance with the monitoring plan and the reporting of GHG emissions reductions from the PoA. This verification report covers CPAs ( , ), which were included at the UNFCCC webpage at the end of the current monitoring period. A single monitoring report has been prepared by the CME for the same in which implementation of all referred CPAs are included, as appropriate. ESPL confirms that the monitoring system is in place and the emission reductions are calculated without material misstatements. This verification report has been prepared using the latest available template specified by UNFCCC and complies with the instructions to follow as per para 406 and 407 of CDM VVS Version 9. The verification activities were conducted in accordance with ESPL s CDM Quality Manual System as per the steps indicated under Section A of this report. The verification process has resulted in conclusion that the included CPA confirm to the PoA DD as well as comply with applicable CDM rules and regulations and in Version 01.0 Page 9 of 47

10 accordance with applied monitoring methodology AMS-III.AV. Version 03. There were no issues that were raised as FAR during validation, which required further attention from the verification team. As a result, it is confirmed that the emission reductions from the GS#2404 & CDM PoA 5962 International Water Purification Programme are correctly reported in the Monitoring Report (final) Version 04 dated 06/01/2016 /13/ and corresponding ER sheet /15/ for the monitoring period 01/11/ /01/2015 (including both days) amount as 26,816 tco2e. Therefore, this will be submitted as part of request for issuance as per CDM PCP Version 9 /19/. SECTION F. Certification statement ESPL s verification approach is based on the understanding of the risks associated with reporting of GHG emission data and the controls in place to mitigate these. ESPL planned and performed the verification by obtaining evidences and other information and explanations that ESPL considered necessary to give reasonable assurance that reported GHG emission reductions are fairly stated. In our opinion the GHG emissions reductions reported for the PoA for the period 01/11/ /01/2015 are fairly stated in the Monitoring Report (final) Version 04 dated 06/01/2016 /13/. ESPL, based on outcome of verification activities, certify in writing that, during the monitoring period 01/11/ /01/2015 (including both days), the registered CDM PoA International Water Purification Programme and all of the included CDM CPAs ( , ) in the registered CDM PoA achieved the verified amount of 26,816 tco2e reductions in anthropogenic emissions by sources of greenhouse gases that would not have occurred in the absence of the CPAs. The verified amount of emission reductions is stated below as per each CPAs and as per commitment period; Emission Reductions (Amount) in this monitoring period CPAs (included in this Up to 31/12/ /01/2013 onwards request) (1 st commitment period) Nil Not implemented Nil 26,816 tco2e Total Nil 26,816 tco2e SECTION G. Verification findings General G.1. Compliance of the monitoring report with the monitoring report form The verification team has compared the monitoring report with a valid applicable monitoring report form. CAR#02, CAR#03 The verification team confirms that the monitoring report has been appropriately prepared using the applicable monitoring report form, and that all sections are complete. G.2. Remaining forward action requests from validation and/or previous verification This is 1 st verification of the PoA. There were no FARs from validation that needs to be closed during this verification. The validation report /02/ of PoA DD and validation report /05,07/ for specific case CPA DDs /04, 06/ were checked by the verification team. Version 01.0 Page 10 of 47

11 G.3. CDM-PoA-VCR-FORM Specific-case CPA(s) considered for verification and covered in this report Reference number of the specific-case CPA included in the PoA as of the end of this monitoring period Is the specificcase CPA considered for this verification? (yes/no) Yes Yes Version number of the registered PoA- DD to which the specific-case CPA complies with Version 06,dated 02/07/2014 Version 06,dated 02/07/2014 Confirmation that a request for issuance including the specificcase CPA has been published for the previous monitoring period (Y/N) NA. This is the first verification period. NA. This is the first verification period. SECTION H. Verification findings Programme of activities H.1. Compliance of the programme implementation with the registered programme design document The introduction of low greenhouse gas emitting water purification systems to provide clean drinking water to low income households. The PoA serves as an open platform for various water treatment technologies which are eligible under the methodology AMS-III.AV. The PoA is coordinated by a coordinating/managing entity (CME) based in Switzerland. The small scale CDM Programme Activities (hereafter referred as CPAs) are implemented by various local actors. The activities under registered PoA may be located under several host Parties as included in the registered PoA DD. As part of this PoA, all water purification systems distributed, sold or installed are low greenhouse gas emitting. The water purification technologies may include water filters (e.g. membrane, activated carbon, ceramic filters), solar energy powered UV (ultraviolet) disinfection devices, solar disinfection techniques, photocatalytic disinfection equipment, pasteurization appliances, chemical disinfection methods (eg. chlorination), combined treatment approaches (eg. Flocculation plus disinfection). The management system has been implemented as described in the validated PoA-DD ( Operational and management plan ) and in accordance with applicable provisions on the implementation of the management system in the Project Standard. The PoA is managed by the CME (Pure Water Ltd.) with CPA Managers responsible for the coordination with the CPA Implementers (CPA 1: Water School Uganda, CPA 2: Evidence Action). At the end of the current monitoring period, two CPAs were included in the registered PoA i.e., and The CME has informed that CPA 1 ( ) has not been implemented as yet. However, CPA 2 ( ) has been completely implemented with a total of 1,150 chlorine dispensers. The overall responsibility of implementation and operation is with CME (PWL), which was also evident during the site visit. This is consistent with PoA DD /01/. This monitoring period includes the implementation and monitoring of two CPAs as part of registered PoA (at the end of the current monitoring period) within Uganda. The implementation of all CPAs, as referenced above, are within the geographical boundary of the PoA DD (Section A.4.1), which constitutes the physical boundary as well. As part of CPA 2, the first water purifier was installed on 08/04/2013, which is consistent with the CPA DD (page 2) and is after the date 29/07/2011 specified in registered PoA DD (page 9). The total number of water purifier were installed at the end of the current monitoring period as per specific case CPA DD were verified as under; Version 01.0 Page 11 of 47

12 CPA Water Purifier installed (Actual) Estimated (Maximum) ,000 (year 1) 6,000 (max) ,150 1,152 (year 1) 1,302 (max) CDM-PoA-VCR-FORM Date of first distribution/ installation Not yet. No GDM filter installed/distributed yet. 08/04/2013. The first chlorine dispenser was installed. Therefore, the quantity, specification and target group of the water purifiers were found consistent with the PoA DD /01/ and respective CPA DD /06/. Further, based on the review of installation records /27/, physical observations and interview conducted during the site visit, the verification team found that the actual implementation on ground of the PoA is consistent with PoA DD and respective CPA DD /06/. CL#01 The verification team confirms that the physical features of the implementation were in accordance with the registered PoA DD /01/. The CPA 1 has not yet been implemented, whereas, the implementation of CPA 2 is complete. The actual water purifiers installed as part of CPA 2 is within the estimated quantity given in the respective specific case CPA DD /06/. The actual operation is in line to registered PoA DD /01/. No information with regard to data and variables was identified that may surpass the estimated quantity of ERs in the respective CPA DDs. The emission reductions achieved for each specific case CPA DD were within the estimated quantity in the registered CPA DD. H.2. Implementation and operation of the management system Based on the interview of CME representative and monitoring team during the site visit, it was confirmed that the CME has organized an appropriate management and operational system for implementation, monitoring and reporting functions. PWL has a PoA Manager who is supported by CPA Manager in the host Party (Uganda). The host Party CPA manager overlooks the representatives from CPA implementers. Considering only CPA 2 has been implemented in the current monitoring period, it was verified by the verification team that Evidence Action, which acts as CPA implementer for CPA 2, is managing the implementation of water purifiers (chlorine dispensers), monitoring (field surveys, physical check and spot checks). The actual records (hard copies) are retained by Evidence Action and provided to CME. The verification team reviewed various records (as part of verification), which were kept in order by Evidence Action viz., Installation Records /27/, Carbon Rights Waiver Records /26/, ODK Raw Records /25/, Survey Records /29/, Community Meeting Records /30/, Village Community Sensitization Records /36/ and Chlorine Delivery Records /31/ among others. CME, i.e., PWL was also found to have direct access to ODK Raw Records, Survey Records (ODK based) and indirect access to all other records, mentioned above, maintained by CPA implementer. CME is responsible for QA/QC of the data, analysis and reporting into the monitoring report. For survey data, a monitoring team has been organized by the CME consisting of trained monitoring staff, who conducted the monitoring and surveys. The organizational structure and roles and responsibilities for monitoring are in line with the situation on the ground as observed during the site visit, and the structure is considered appropriate. CAR#10, CAR#11, CAR#12 The verification team assessed the management systems in place to implement the monitoring of the PoA. This included the roles and responsibilities, data collection, Version 01.0 Page 12 of 47

13 transfer and aggregation procedures, data storage and archiving for the monitoring system. The roles and responsibilities data collection transfer and aggregation procedures, data storage and archiving for the monitoring system have been provided in the MR /13/. The verification team confirms that the monitoring management system of the PoA is in place with the responsibilities properly identified and established. H.3. Post-registration changes H.3.1. Temporary deviations from the registered monitoring plan, monitoring methodology or standardized baseline No deviations were identified during the current monitoring period. H.3.2. Corrections No corrections were identified during the current monitoring period. H.3.3. Inclusion of a monitoring plan in a registered PoA-DD (including its generic CPA- DD(s)) Not applicable. H.3.4. Permanent changes to the monitoring plan as described in the registered PoA-DD, applied methodology, or applied standardized baseline No permanent changes were identified during the current monitoring period. H.3.5. Changes to the programme design of the registered PoA-DD (including corresponding changes to project design of the generic CPA-DD(s)) and updates to the eligibility criteria for inclusion of specific-case CPAs in the PoA No such changes were identified during the current monitoring period. However, at the time of resubmission of the verification report and approved PRC vide reference number PRC was observed with regard to inclusion of two additional host Parties viz., Cambodia and Malawi. The aforesaid PRC was approved on 5 Nov 2015 by CDM EB as checked from However, the approved PRC neither affects the current monitoring period verified (as it does not include the CPAs from additional host Parties) nor it was available at the time of initial submission of request for issuance. Therefore, the erstwhile registered PoA DD has been referred for the verification of the current monitoring period. H.3.6. Types of changes specific to afforestation and reforestation activities Not applicable. SECTION I. Verification findings Component project activity(ies) I.1. Compliance of the CPA implementation with the included CPA design document There are 02 specific CPAs ( and ) that were included in the registered PoA at the end of the current monitoring period. The implementation and operation status of each CPA has been verified as follows: (also referred to as CPA 1): It consists of the distribution and installation of Gravity-Driven ultrafiltration membranes (GDM) in Buikwe District, Uganda. However, as referenced under Section H.1, CPA 1 has not been implemented as yet. The CME has indicated that once the funds are secured, the efforts would be made to implement the CPA (also referred to as CPA 2): The CPA 2 consists of the distribution and installation of chlorine dispensers ( dispensers ) in Eastern Uganda. The CPA seeks to further the access of households and communities to safe drinking water, using a low greenhouse gas emitting water purification technology, chlorine dispensers. The CPA reduces the Version 01.0 Page 13 of 47

14 use and demand of non-renewable biomass that would have been used to boil the water as a mean of water purification in the absence of the CPA. The CPA is undertaken by the coordinating/managing entity (CME) of the PoA, Pure Water Ltd., and implemented on a voluntary basis by Evidence Action. The distribution of chlorine dispensers commenced on 08/04/2013 and were completed on 10/04/2014. The installation dates were also inscribed on the base of pole. In all, 1,150 dispensers were installed as part of this CPA. This was verified from the installation records /27/ and ODK Raw Records /25/ during the physical site visit. In addition to this, the verification team also checked the community education meeting attendance records /30/ that would ensure that these used by the beneficiaries in an optimal and desired manner. The installed dispenser at project site is looked after by Promoters who remain connected with the Evidence Action with regard to the sustained supplies of the chlorine. The dispensers are distinguished based on the unique Water Point ID and the casing of each dispenser, which is a bar code. The Water Point ID may not be changed as it represents an identified dispenser location. However, the dispenser ID (barcode) may get replaced occasionally in situations of physical damage etc. A picture is presented below as an example (dispenser ID). The type of chlorine dispensers found installed were consistent with the registered CPA-DD /06/. The final MR /13/ includes complete description of the implementing partners, locations, and implementation status, which is consistent with the observations and interviews during the site visit as well as review of the installation records (physical and electronic). CL#01, CAR#04, CAR#14 The verification team is of the opinion that physical features of the CPA 2 have been implemented in accordance with the registered CPA-DD /06/, whereas CPA 1 has not yet been implemented. It is also confirmed, through the physical site visit and review of the supporting documentation that physical features of the component CPA have been implemented in accordance with the CPA DD /06/. The CPA 2 was also found to be completely operational in line with the CPA-DD. The information provided in the relevant sections of the monitoring report are appropriately described for the implementation and operational status of the PoA. I.2. Post-registration changes I.2.1. Temporary deviations from registered monitoring plan, applied methodology or applied standardized baseline No deviations were identified during the current monitoring period. I.2.2. Corrections No corrections were identified during the current monitoring period. Version 01.0 Page 14 of 47

15 I.2.3. Changes to the start date of the crediting period No change to the start date of crediting period. CDM-PoA-VCR-FORM I.2.4. Inclusion of a monitoring plan to an included CPA-DD Not applicable. I.2.5. Permanent changes to the monitoring plan as described in the included CPA-DD, applied methodology, or applied standardized baseline No such changes were identified during the current monitoring period. I.2.6. Changes to the programme design of the included CPA-DD No such changes were identified during the current monitoring period. I.2.7. Types of changes specific to afforestation and reforestation component project activities Not applicable. I.3. Compliance of monitoring plan with the monitoring methodology including applicable tool and standardized baseline The monitoring plan as contained in CPA DD /06/ was reviewed against the monitoring requirements of the applied methodology AMS-III.AV version 03 /10/ as well as PoA DD /01/. Based on this review it was found the monitoring plan contained in the CPA DD includes all the required parameters to be monitored in the context of the CPA design and description and allows proper determination of emission reductions in accordance with PoA DD /01/ and applied methodology AMS-III.AV version 03 /10/. CAR#08, CAR#09, FAR#15 The monitoring plan is in accordance with the approved methodology, AMS-III.AV version 03 /10/, that is included in CPA DD /06/. I.4. Compliance of monitoring activities with the registered monitoring plan I.4.1. Data and parameters fixed ex ante or at renewal of crediting period Emission factor as per AMS-I.E procedures when NRB is displaced or the emission factor of the fossil fuel substituted, EF projected_fossilfuel, tco2/tj The value of this parameter is considered as 81.6.This was checked with the registered PoA DD /01/ (page 34) and registered CPA-DD /06/. Specific heat of water, WH, kj/l C Final temperature, T f, C No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction calculations spreadsheet /15/ are consistent with the registered PoA-DD /01/ and CPA-DD /06/. The applied value is correct and justified. The value of this parameter is considered as This was checked with the registered PoA DD (page 34) and registered CPA-DD /06/. No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction calculations spreadsheet /15/ are consistent with the registered PoA-DD /01/ and CPA-DD /06/. The values were found consistent with applied methodology AMS- III.AV. Version 3 /10/. The applied value is correct and justified. The value of this parameter is considered as 100. This was checked with the registered PoA DD (page 34) and registered CPA-DD /06/ No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction Version 01.0 Page 15 of 47

16 Initial temperature, T i, C CDM-PoA-VCR-FORM calculations spreadsheet /15/ are consistent with the registered PoA-DD and CPA- DD /06/. The values were found consistent with applied methodology AMS-III.AV. Version 3 /10/. The applied value is correct and justified. The value of this parameter is considered as 20. This was checked with the registered PoA DD (page 34) and registered CPA-DD /06/. No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction calculations spreadsheet /15/ are consistent with the registered PoA-DD and CPA- DD /06/. The values were found consistent with applied methodology AMS-III.AV. Version 3 /10/. The applied value is correct and justified. Latent heat of water evaporation, WHE, kj/l The value of this parameter is considered as 2,260. This was checked with the registered PoA DD (page 35) and registered CPA-DD /06/ No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction calculations spreadsheet /15/ are consistent with the registered PoA-DD and CPA- DD /06/. The values were found consistent with applied methodology AMS-III.AV. Version 3 /10/. The applied value is correct and justified. Efficiency of water boiling system being replaced, η wb, % Non renewable biomass factor, f NRB, % The value of this parameter is considered as This was checked with the registered CPA-DD (page 23) /06/. No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction calculations spreadsheet /15/ are consistent with the registered CPA-DD /06/. The applied value is correct and justified. The value of this parameter is considered as 82. This was checked with the registered CPA-DD (page 24) /06/. No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction calculations spreadsheet /15/ are consistent with the registered CPA-DD /06/. The applied value is correct and justified. Capacity of the water purification equipment, L P, Liters/refill The value of this parameter is considered as 32,971. This was checked with the registered CPA-DD (page 24) /06/. No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction calculations spreadsheet /15/ are consistent with the registered CPA-DD /06/. The applied value is correct and justified. Number of persons supplied with purified water from each of the functional project appliances, POP P, (No unit) The value of this parameter is considered as 301. This was checked with the registered CPA-DD (page 25) /06/. No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction calculations spreadsheet /15/ are consistent with the registered CPA-DD /06/. The applied value is correct and justified. Average volume of drinking water per person per day, DW POP, (Liters/person/day) The value of this parameter is considered as 3.5. This was checked with the registered CPA-DD (page 25) /06/. No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction Version 01.0 Page 16 of 47

17 calculations spreadsheet /15/ are consistent with the registered CPA-DD /06/. The applied value is correct and justified. Fractional increase in NRB usage by households outside the project boundary, Leakage, (No Unit) The value of this parameter is considered as This was checked with the registered PoA DD (page 38) and registered CPA-DD (page 27) for CPA DD/06/. No finding was raised. The values in the monitoring report /13/ and corresponding emission reduction calculations spreadsheet /15/ are consistent with the registered PoA-DD and CPA- DD /06/. The applied value is correct and justified. Proportion of total population attended by the project that is serviced at households/buildings where water boiling would have been the purification practice, POP Boiling, (No Unit) There is no value reported for this parameter. This parameter is suitable only for those CPAs wherein Case 2 is being applied. The CPA 0002 is validated as per Case 1. This was checked with the registered PoA DD (page 37) and registered CPA-DD (page 26) for CPA DD/06/. CAR#06 The parameter is not applicable for CPA 0002, which is appropriate and justified. Ex-ante determined parameters for the project emissions from fossil fuel combustion, (No Unit) The value reported for this parameter is 0. This parameter is suitable only for those CPAs where water purification technologies consume fossil fuels. The description of CPA 0002 confirms that chlorine dispensers that are being distributed, which does not involve any fossil fuel usage during their operation. This was checked with the registered PoA DD (page 38) and registered CPA-DD (page 26) for CPA DD/06/. CAR#06 The parameter is not applicable for CPA 0002, which is appropriate and justified. Ex-ante determined parameters for the project emissions from electricity combustion, (No Unit) The value reported for this parameter is 0. This parameter is suitable only for those CPAs where water purification technologies consume electricity. The description of CPA 0002 confirms that chlorine dispensers that are being distributed, which does not involve any electricity consumption during their operation. This was checked with the registered PoA DD (page 38) and registered CPA-DD (page 26) for CPA DD/06/. CAR#06 The parameter is not applicable for CPA 0002, which is appropriate and justified. Version 01.0 Page 17 of 47

18 I.4.2. Data and parameters monitored Quantity of purified water in year y, QPW y, Liters Criteria/Requirements Measuring /Reading /Recording frequency Is measuring and reporting frequency in accordance with the monitoring plan and monitoring methodology? (Yes / No) Monitoring equipment Calibration frequency /interval Assessment/Observation Calculated as per registered CPA DD (page 31) /06/ and a single value is given for the monitoring period. Yes. Taking note of the length of current monitoring period, CME has reported a consolidated value for same period. Not applicable Not applicable How were the values in the monitoring report verified? If applicable, has the reported data been cross-checked with other available data? Does the data management ensure correct transfer of data and reporting of emission reductions and are necessary QA/QC processes in place? The values reported in the final MR /13/ (and corresponding ER sheet /15/) were calculated as per expression given in the registered CPA DD /06/ (page 31), reproduced below; QPWy = LP * Ny * Refill# * Refill% * Drink% LP is an ex ante parameters while others are already monitored parameters verified separately in this report. The calculations were found correct. The verified value for water purifiers (chlorine dispensers) sold/distributed under each CPA at the end of the current monitoring period is presented below; CPA QPWy Not implemented ,686,160 Total 136,686,160 Yes. The information provided in the monitoring report has been crosschecked with the cap value for the parameter determined as 219,919,179 L, which is clearly a larger value than the monitored value. The cross check value has been determined based on 384,885 L/year per person per dispenser multiplied by 1,049 dispensers (Ny). The value is calculated value and calculations were found correct. Version 01.0 Page 18 of 47

19 In case project participants have temporarily not monitored the parameter, has either i) a deviation been approved by the CDM EB or ii) has the parameter been estimated as stipulated by Appendix 1 to the CDM Project Standard? Not applicable CDM-PoA-VCR-FORM No finding was raised. The parameter has been monitored appropriately, in accordance with the registered monitoring plan (as per measurement methods and procedures to be applied) and applied methodology. The monitoring results were recorded consistently as per the approved frequency in the monitoring plan. Number of functional chlorine dispensers in monitoring period, N y Criteria/Requirements Assessment/Observation Measuring /Reading /Recording frequency Is measuring and reporting frequency in accordance with the monitoring plan and monitoring methodology? (Yes / No) Monitoring equipment Calibration frequency /interval: How were the values in the monitoring report verified? If applicable, has the reported data been cross-checked with other available data? The monitoring frequency is at least once every two years in the CPA DD (page 32). Further, physical inspection of all dispenser is required at least every six months. Yes. The monitoring period for CPA 2 is slightly more than 6 months (17 Jul 2014 to 31/01/2015) and is therefore appropriate. Not applicable Not applicable Ny was determined by multiplying the total number of installed dispensers by the fraction of functional dispensers at the cutoff date (31/01/2015). The total of installed dispensers i.e., 1,150 was verified from the ODK Raw Records /25/. The functionality dispensers were considered in which chlorine was dispensed out when spot checked. The overall % of operational dispensers was found to be 91.2% based on physical spot check /29, 31/ carried out by the monitoring staff of all the installed dispensers. The verified values are in included in the final Monitoring Report /13/ and corresponding ER sheet. The installation records /27/ were randomly checked by the verification team and were found acceptable. The results are reproducible in the corresponding ER sheet of final Monitoring Report. The verification team randomly selected 28 samples for DOE s field survey and found that all the operational status of the dispensers were consistent with the CME s Version 01.0 Page 19 of 47

International Water Purification Programme

International Water Purification Programme GOLD STANDARD FINAL VERIFICATION /CERTIFICATION REPORT International Water Purification Programme Report No.: EC09(B)2016006 Report Date: 13/03/2018 China Classification Society Certification Company 40,

More information

Verification and certification report form for GS project activities. (Version 01.0)

Verification and certification report form for GS project activities. (Version 01.0) Verification and certification report form for GS project activities (Version 01.0) VERICATION AND CERTIFICATION REPORT Title of the project activity Reference number of the project activity 15 MW Solar

More information

PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST

PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST PROGRAMME OF ACTIVITIES (POA) REQUEST FOR REGISTRATION - INFORMATION AND REPORTING CHECK CHECKLIST PCP : Clean development mechanism project cycle procedure (version 02.0), EB 66, annex 64, 2 March 2012.

More information

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following:

Registration - Information and reporting checklist (Version 2.0) The main changes between version 1.0 and version 2.0 are the following: Registration - Information and reporting checklist (Version 2.0) Version 1.0 of the information and reporting checklist was published in June 2010. The enclosed version 2.0 of this checklist represents

More information

Draft Small-scale Methodology AMS-III.AV: Low greenhouse gas emitting safe drinking water production systems

Draft Small-scale Methodology AMS-III.AV: Low greenhouse gas emitting safe drinking water production systems CLEAN DEVELOPMENT MECHANISM CDM-SSCWG40-A04 Draft Small-scale Methodology AMS-III.AV: Low greenhouse gas emitting safe drinking water production Sectoral scope(s): 03 COVER NOTE 1. Procedural background

More information

Verification and certification report form for CDM programme of activities. (version 01.0)

Verification and certification report form for CDM programme of activities. (version 01.0) Verification and certification report form for CDM programme of activities (version 01.0) VERICATION AND CERTIFICATION REPORT Title of the programme of activities (PoA) Sichuan Rural Poor-Household Biogas

More information

How to Select a DOE and preparation for validation and verification Presentation Report

How to Select a DOE and preparation for validation and verification Presentation Report How to Select a DOE and preparation for validation and verification Presentation Report Introduction to DOE s The two key functions of DOEs are: Validation: assessing whether a project proposal meets the

More information

Verification and certification report form for CDM project activities. (Version 01.0)

Verification and certification report form for CDM project activities. (Version 01.0) Verification and certification report form for CDM project activities (Version 01.0) Complete this form in accordance with the Attachment: Instructions for filling out the verification and certification

More information

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION...

Annex 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01.2) CONTENTS ABBREVIATIONS... 3 I. INTRODUCTION... Page 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL (Version 01.2) CONTENTS Paragraphs Page ABBREVIATIONS... 3 I. INTRODUCTION... 1 5 4 A. Updates to the Manual... 6 4 II. TERMS FOR VALIDATING

More information

Version 03.2 Page 1 of 22

Version 03.2 Page 1 of 22 Monitoring report form (Version 03.2) CONSOLIDATED MONITORING REPORT Title of the Programme of Activities Improved Cook Stoves for East Africa (ICSEA) Reference number of the Programme of 7014 Activities

More information

Amendments to PS, VVS and PCP based on CMP10 decisions

Amendments to PS, VVS and PCP based on CMP10 decisions Amendments to PS, VVS and PCP based on CMP10 decisions CDM EB 82 Geneva, Switzerland, 1620 February 2015 UNFCCC Secretariat SDM programme Procedural background CMP at its tenth session endorsed the development

More information

ANNEX AN THE GOLD STANDARD MICRO-PROGRAMME OF ACTIVITIES DESIGN DOCUMENT TEMPLATE

ANNEX AN THE GOLD STANDARD MICRO-PROGRAMME OF ACTIVITIES DESIGN DOCUMENT TEMPLATE ANNEX AN THE GOLD STANDARD MICRO-PROGRAMME OF ACTIVITIES DESIGN DOCUMENT TEMPLATE CONTENTS A. General description of micro-scale programme of activities B. Duration of the micro-scale programme of activities

More information

CDM Module 1. Introduction to Programmatic CDM (PoA) Lesson 2. How does the Programmatic CDM Work? Select Next to begin. Menu November 2011.

CDM Module 1. Introduction to Programmatic CDM (PoA) Lesson 2. How does the Programmatic CDM Work? Select Next to begin. Menu November 2011. CDM Module 1 Introduction to Programmatic CDM (PoA) Lesson 2 How does the Programmatic CDM Work? November 2011 Select Next to begin Next> Lesson Partners and Collaborators How does the Programmatic CDM

More information

PART I. Programme of activities (PoA)

PART I. Programme of activities (PoA) F-CDM-PoA-DD Programme design document form for CDM programmes of activities (Version 03.0) PART I. Programme of activities (PoA) SECTION A. General description of PoA A.1. Title of the PoA A.2. Purpose

More information

COMPONENT PROJECT ACTIVITIES DESIGN DOCUMENT (CPA-DD)

COMPONENT PROJECT ACTIVITIES DESIGN DOCUMENT (CPA-DD) CDM Executive Board Page 1 COMPONENT PROJECT ACTIVITY DESIGN DOCUMENT FORM FOR AFFORESTATION AND REFORESTATION COMPONENT PROJECT ACTIVITIES (F-CDM-AR-CPA-DD) Version 02.1 COMPONENT PROJECT ACTIVITIES DESIGN

More information

Version 01.0 Page 1 of 21

Version 01.0 Page 1 of 21 Monitoring report form for CDM programme of activities (version 01.0) CDM-PoA-MR-FORM Complete this form in accordance with the Attachment Instructions for filling out the monitoring report form for CDM

More information

Background information on existing PoA regulations

Background information on existing PoA regulations Agenda item 5(a) Review of the modalities and procedures of the clean development mechanism Background information on existing PoA regulations SBI 42 Bonn, Germany, 1 11 June 2015 Definition of PoA A voluntary

More information

VERIFICATION & CERTIFICATION REPORT For the CDM-GS Project Activity

VERIFICATION & CERTIFICATION REPORT For the CDM-GS Project Activity VERIFICATION & CERTIFICATION REPORT For the CDM-GS Project Activity Accion Fraterna Biogas CDM project for rural communities in Anantapur, Andhra Pradesh In India GS REF. NO. 980 CDM REF. NO. 3779 1 st

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SSC A/R (CDM-PoA-DD-SSC-AR) - Version 01. CDM Executive Board Page 1 Page 1 CLEAN DEVELOPMENT MECHANISM PROGRAMME OF ACTIVITIES DESIGN DOCUMENT FORM FOR SMALL-SCALE AFFORESTATION AND REFORESTATION PROJECT ACTIVITIES (CDM-PoA-DD-SSC-AR) (Version 01) CONTENTS A. General description

More information

Validation of CDM Projects Real life examples of what a DOE looks for

Validation of CDM Projects Real life examples of what a DOE looks for Validation of CDM Projects Real life examples of what a DOE looks for Jonathan Avis, CDM Business Manager ERM Certification and Verification Services 2nd Floor, Exchequer Court 33 St Mary Axe London EC3A

More information

CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS

CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS CDM Executive Board page 1 CLEAN DEVELOPMENT MECHANISM PROGRAM ACTIVITY DESIGN DOCUMENT FORM (CDM-CPA-DD) Version 01 CONTENTS A. General description of CDM programme activity (CPA) B. Eligibility of CPA

More information

VERIFICATION REPORT «CEP CARBON EMISSIONS PARTNERS S.A.» VERIFICATION OF THE IMPLEMENTATION OF THE ENERGY EFFICIENCY

VERIFICATION REPORT «CEP CARBON EMISSIONS PARTNERS S.A.» VERIFICATION OF THE IMPLEMENTATION OF THE ENERGY EFFICIENCY «CEP CARBON EMISSIONS PARTNERS S.A.» VERIFICATION OF THE IMPLEMENTATION OF THE ENERGY EFFICIENCY MEASURES AND REDUCTION OF GREENHOUSE GAS EMISSIONS INTO THE ATMOSPHERE AT STATE ENTERPRISE SELIDOVUGOL INITIAL

More information

THE GOLD STANDARD PROGRAMME OF ACTIVITIES GUIDANCE DOCUMENT

THE GOLD STANDARD PROGRAMME OF ACTIVITIES GUIDANCE DOCUMENT THE GOLD STANDARD PROGRAMME OF ACTIVITIES GUIDANCE DOCUMENT This document provides detailed instructions and guidance on the steps to be followed for the development of Gold Standard Programme of Activities

More information

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe

Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe CDM Project Cycle Capacity Building Workshop on Development of CDM Activities and NAMA for Public And Private Sector In Zimbabwe Nyanga, Zimbabwe 24 25 August 2016 UNFCCC Secretariat UNFCCC RCC UNFCCC

More information

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT

VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT VERIFICATION REPORT YUNNAN MANGLI HYDROPOWER PROJECT Document Prepared By: Bureau Veritas Certification Holding SAS Report No.BVC/China-VR/7066/2012 Project Title Version Report ID Yunnan Mangli Hydropower

More information

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited

Validation Report. Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Validation Report Kalpataru Energy Venture Pvt. Ltd. Validation of the Biomass Power Project at Kalpataru Energy Venture Private Limited Report No. 806970, Revision 01 2006, April 12 TÜV ndustrie Service

More information

Version 03.1 Page 1 of 19

Version 03.1 Page 1 of 19 Monitoring report form (Version 03.1) Monitoring report Title of the project activity Efficient Wood Fuel Stove-Cooking-Sets, Lesotho Reference number of the project activity 5482 Version number of the

More information

VERIFICATION REPORT for the Gold Standard Program of Activity

VERIFICATION REPORT for the Gold Standard Program of Activity VERIFICATION REPORT for the Gold Standard Program of Activity Man and Man Enterprise GS1385 Man and Man Enterprise Improved Cooking Stoves Programme in Ghana GS1385 Man and Man Enterprise Improved Cooking

More information

UNFCCC/CCNUCC DRAFT STANDARD FOR THE DEVELOPMENT OF ELIGIBILITY CRITERIA FOR THE INCLUSION OF A PROJECT ACTIVITY AS A CPA UNDER THE POA. I.

UNFCCC/CCNUCC DRAFT STANDARD FOR THE DEVELOPMENT OF ELIGIBILITY CRITERIA FOR THE INCLUSION OF A PROJECT ACTIVITY AS A CPA UNDER THE POA. I. Page 1 STANDARD FOR THE DEVELOPMENT OF ELIGIBILITY CRITERIA FOR THE INCLUSION OF A PROJECT ACTIVITY AS A CPA UNDER THE POA I. Background 1. In decision 3/CMP.1 paragraph 4, Parties requested the clean

More information

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION

Annex 3 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL. (Version 01) CONTENTS I. INTRODUCTION page 1 CLEAN DEVELOPMENT MECHANISM VALIDATION AND VERIFICATION MANUAL (Version 01) CONTENTS Paragraphs Page ABBREVIATIONS... 4 I. INTRODUCTION... 1 5 5 A. Updates to the Manual... 6 4 II. TERMS FOR VALIDATING

More information

VERIFICATION REPORT for the Gold Standard Program of Activity

VERIFICATION REPORT for the Gold Standard Program of Activity VERIFICATION REPORT for the Gold Standard Program of Activity Man and Man Enterprise GS1385 Man and Man Enterprise Improved Cooking Stoves Programme in Ghana GS1385 Man and Man Enterprise Improved Cooking

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) CDM Executive Board Page 1 PROGRAMME DESIGN DOCUMENT FORM FOR SMALL-SCALE CDM PROGRAMMES OF ACTIVITIES (F-CDM-SSC-PoA-DD) Version 02.0 PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) PART I. Programme

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) CDM Executive Board Page 1 PROGRAMME DESIGN DOCUMENT FORM FOR SMALL-SCALE CDM PROGRAMMES OF ACTIVITIES (F-CDM-SSC-PoA-DD) Version 02.0 PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) PART I. Programme

More information

CPA VALIDATION REPORT

CPA VALIDATION REPORT CPA VALIDATION REPORT ALTERNATIVE ENERGY PROMOTION CENTRE (AEPC) CPA TITLE: NEPAL BIOGAS SUPPORT PROGRAM - CPA 4: 19,970 DIGESTERS POA TITLE: NEPAL BIOGAS SUPPORT PROGRAM (UNFCCC Ref No. 9572) REPORT NO.

More information

VERIFICATION REPORT VEJO GUSIS,UAB

VERIFICATION REPORT VEJO GUSIS,UAB VEJO GUSIS,UAB VERIFICATION OF THE LIEPYNES WIND POWER PARK JOINT IMPLEMENTATION PROJECT MONITORING PERIOD: 1 JANUARY 2012 TO 31 OCTOBER 2012 REPORT NO. LITHUANIA-VER/0075/2012 REVISION NO. 01 BUREAU VERITAS

More information

Validation report form for CDM programme of activities. (version 01.0)

Validation report form for CDM programme of activities. (version 01.0) Validation report form for CDM programme of activities (version 01.0) Complete this form in accordance with the attachment: Instructions for filling out the validation report form for CDM programme of

More information

CLEAN DEVELOPMENT MECHANISM CDM-EB07-A04-GLOS. Glossary CDM terms. Version 07.0

CLEAN DEVELOPMENT MECHANISM CDM-EB07-A04-GLOS. Glossary CDM terms. Version 07.0 CLEAN DEVELOPMENT MECHANISM CDM-EB07-A04-GLOS Glossary CDM terms TABLE OF CONTENTS Page 1. BACKGROUND... 3 2. SCOPE... 3 3. ACRONYMS AND ABBREVIATIONS USED IN THE GLOSSARY... 3 4. INTERPRETATION... 4 5.

More information

VERIFICATION AND CERTIFICATION REPORT

VERIFICATION AND CERTIFICATION REPORT VERIFICATION AND CERTIFICATION REPORT Datang Zhangzhou Wind Power Co., Ltd Fujian Zhangpu Liuao 45MW Wind Power Project SGS Climate Change Programme SGS United Kingdom Ltd SGS House 217-221 London Road

More information

GS Validation Report

GS Validation Report Effective Date : 02/03/2015 GS Validation Report PoA Title Orb Energy Solar Program in India VPA Title Orb Energy Solar Program in India VPA01 For Orb Energy Private Limited Report No. GS.VAL.15.22 Earthood

More information

Clean Development Mechanism. Lessons learned and future directions. Martin Hession CDM Executive Board

Clean Development Mechanism. Lessons learned and future directions. Martin Hession CDM Executive Board Clean Development Mechanism Programmes of Activities (PoAs) Lessons learned and future directions Martin Hession CDM Executive Board CHALLENGES Climate Markets International Cooperation Don t like Not

More information

VERIFICATION REPORT 1 st Periodic Verification for the CDM Project Activity

VERIFICATION REPORT 1 st Periodic Verification for the CDM Project Activity VERIFICATION REPORT 1 st Periodic Verification for the CDM Project Activity Efficient Wood Fuel Stove- Cooking-Sets, Lesotho (UNFCCC Reference Number: 5482) in Lesotho Report No. 01 997 9105073326-1 ST

More information

Risk Based Verification Cambodia cook stove project

Risk Based Verification Cambodia cook stove project Risk Based Verification Cambodia cook stove project Chee.Keong.Lai@dnv.com www.dnv.com/certification/climatechange Contents 1. Introduction of Det Norske Veritas AS 2. Risk Based Validation/Verification

More information

Version 03.0 Page 1 of 38

Version 03.0 Page 1 of 38 Programme design document form for small-scale CDM programmes of activities (Version 03.0) CDM-SSC-PoA-DD-FORM Complete this form in accordance with the Attachment Instructions for filling out the programme

More information

VALIDATION AND VERIFICATION REPORT FOR SOLAR GROUPED PROJECT BY ACME GROUP (EKIESL-VCS-AUG-16-01)

VALIDATION AND VERIFICATION REPORT FOR SOLAR GROUPED PROJECT BY ACME GROUP (EKIESL-VCS-AUG-16-01) VALIDATION AND VERIFICATION REPORT FOR SOLAR GROUPED PROJECT BY ACME GROUP (EKIESL-VCS-AUG-16-01) Document Prepared by: Carbon Check (India) Private Ltd. Project Title Report Title Solar Grouped project

More information

VALIDATION REPORT RENEWAL OF CREDITING PERIOD

VALIDATION REPORT RENEWAL OF CREDITING PERIOD VALIDATION REPORT RENEWAL OF CREDITING PERIOD Kanfeng 15MW Hydropower Station Project, Min County, Dingxi City Prefecture, Gansu province, China REPORT NO. CDM-0111-RCP1 No distribution without permission

More information

Monitoring report form (Version 05.1)

Monitoring report form (Version 05.1) Monitoring report form (Version 05.1) MONITORING REPORT Title of the project activity CECIC Zhangbei Dayangzhuang Wind Farm Project UNFCCC reference number of the project activity 1855 Version number of

More information

FIRST ASSESSMENT REPORT FOR THE REVISIONS TO AMS-III.BC TO INCLUDE MOBILE MACHINERY

FIRST ASSESSMENT REPORT FOR THE REVISIONS TO AMS-III.BC TO INCLUDE MOBILE MACHINERY FIRST ASSESSMENT REPORT FOR THE REVISIONS TO AMS-III.BC TO INCLUDE MOBILE MACHINERY Document Prepared By Stantec Consulting Ltd. Methodology Element Title Revisions to AMS-III.BC to Include Mobile Machinery

More information

Small-scale Methodology Energy efficiency measures in thermal applications of non-renewable biomass

Small-scale Methodology Energy efficiency measures in thermal applications of non-renewable biomass CLEAN DEVELOPMENT MECHANISM Small-scale Methodology Energy efficiency measures in thermal applications of non-renewable biomass Sectoral scope(s):03 TABLE OF CONTENTS Page 1. INTRODUCTION... 3 2. SCOPE,

More information

CDM Validation Report

CDM Validation Report Project Title Qinghai Jingneng Ge'ermu Solar PV Power Project ERM CVS Project Reference Client Name 2401.v1 Qinghai Jingneng Construction Investment Co., Ltd. Client Address Floor 3, Jingfa Building, Kunlun

More information

YAPRAK WEIR AND HEPP

YAPRAK WEIR AND HEPP YAPRAK WEIR AND HEPP Document Prepared By: KBS Certification Services Pvt. Ltd. Project Title Yaprak Weir and HEPP Version 01.1 Report ID VCS.15.VER.005 Report Title Client Pages 19 Date of Issue Prepared

More information

UNFCCC/CCNUCC. CDM Executive Board PROPOSED NEW BASELINE AND MONITORING METHODOLOGY FOR A/R (CDM-AR-NM) Version 04

UNFCCC/CCNUCC. CDM Executive Board PROPOSED NEW BASELINE AND MONITORING METHODOLOGY FOR A/R (CDM-AR-NM) Version 04 CLEAN DEVELOPMENT MECHANISM FOR A/R (CDM-AR-NM) (Version 04 TABLE OF CONTENTS SECTION I. SOURCE, DEFINITIONS AND APPLICABILITY 2 1. Sources 2 2. Selected baseline approach from paragraph 22 of the A/R

More information

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5

REPORT OF THE SEVENTH MEETING OF THE EXECUTIVE BOARD Annex 5 - 1 - Annex 5 Appendix A 1 to the simplified modalities and procedures for small-scale CDM project activities CLEAN DEVELOPMENT MECHANISM SIMPLIFIED PROJECT DESIGN DOCUMENT FOR SMALL SCALE PROJECT ACTIVITIES

More information

Draft revision of the Sampling Guidelines and development of technology specific eligibility criteria for PoAs

Draft revision of the Sampling Guidelines and development of technology specific eligibility criteria for PoAs 9th CDM Roundtable Draft revision of the Sampling Guidelines and development of technology specific eligibility criteria for PoAs Bonn, Germany, 23 August 2013 UNFCCC Secretariat SDM programme Content

More information

THE GOLD STANDARD POA RULES AND GUIDANCE ANNEX F (GSV2.2)

THE GOLD STANDARD POA RULES AND GUIDANCE ANNEX F (GSV2.2) THE GOLD STANDARD POA RULES AND GUIDANCE ANNEX F (GSV2.2) Unless otherwise specified in this document, Gold Standard PoAs follow the rules for CDM PoAs 1 PoA Eligibility Where a group of project activities

More information

VERIFICATION REPORT RENERGA,UAB

VERIFICATION REPORT RENERGA,UAB RENERGA,UAB VERIFICATION OF THE BENAICIAI WIND POWER PROJECT MONITORING PERIOD: 01 JANUARY 2012 TO 31 OCTOBER 2012 REPORT NO. LITHUANIA-VER/0071/2012 REVISION NO. 01 Report Template Revision 4, 13/07/2011

More information

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE

VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E) REVISION NO. 03 GHG CERTIFICATION OFFICE VERIFICATION REPORT PA KHOANG HYDROPOWER PROJECT REPORT NO. GHGCC(E)12-004 REVISION NO. 03 GHG CERTIFICATION OFFICE KOREA ENERGY MANAGEMENT CORPORATION Date of first issue: Project No.: 19/06/2012 GHGCC(E)12-004

More information

Draft Small-scale Methodology AMS-II.G: Energy efficiency measures in thermal applications of non-renewable biomass

Draft Small-scale Methodology AMS-II.G: Energy efficiency measures in thermal applications of non-renewable biomass CLEAN DEVELOPMENT MECHANISM CDM-SSCWG42-A04 Draft Small-scale Methodology AMS-II.G: Energy efficiency measures in thermal applications of non-renewable Sectoral scope(s):03 COVER NOTE 1. Procedural background

More information

Performance assessment report validation (Version 01.1)

Performance assessment report validation (Version 01.1) Performance assessment report validation (Version 01.1) SECTION 1: GENERAL INFORMATION Entity name: UNFCCC entity ref.no.: Site Visit made by the CDM-AT: Address of the site(s) visited: Scope(s) of accreditation

More information

The Project Design Document

The Project Design Document Downloaded from orbit.dtu.dk on: Feb 11, 2018 The Project Design Document Olsen, Karen Holm Publication date: 2012 Link back to DTU Orbit Citation (APA): Olsen, K. H. (2012). The Project Design Document

More information

Verification and certification report form for CDM project activities. (Version 01.0)

Verification and certification report form for CDM project activities. (Version 01.0) Verification and certification report form for CDM project activities (Version 01.0) Title of the project activity VERICATION AND CERTIFICATION REPORT CYY Biopower Wastewater treatment plant including

More information

JCM Validation Report Form. Introduction of Solar PV System at shopping mall in Ho Chi Minh Reference number

JCM Validation Report Form. Introduction of Solar PV System at shopping mall in Ho Chi Minh Reference number JCM Validation Report Form A. Summary of validation A.1. General Information Title of the project Introduction of Solar PV System at shopping mall in Ho Chi Minh Reference number VN007 Third-party entity

More information

Version 03.0 Page 1 of 50

Version 03.0 Page 1 of 50 Programme design document form for small-scale CDM programmes of activities (Version 03.0) Complete this form in accordance with the Attachment Instructions for filling out the programme design document

More information

VERIFICATION REPORT OF INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT

VERIFICATION REPORT OF INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT VERIFICATION REPORT OF INNER MONGOLIA HANGJIN YIHEWUSU WIND POWER PROJECT Document Prepared By China Environmental United Certification Centre Co., Ltd. Project Title Inner Mongolia Hangjin Yihewusu Wind

More information

Version 01.0 Page 1 of 22

Version 01.0 Page 1 of 22 Verification and certification report form for GS project activities VERICATION AND CERTIFICATION REPORT Title the project activity GS Reference number the project activity Kar-demir Bozyaka RES 12 MW

More information

GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS

GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS GUIDELINES FOR COMPLETING THE FORM FOR SUBMISSION OF BUNDLED SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-BUNDLE) (Version 01) CONTENTS I. Information note on bundling of Small-Scale project activities

More information

Determination Report

Determination Report Determination Report Determination of the Pilot programmatic Joint Implementation project in North Rhine- Westphalia (JIM.NRW) JI Program of Activities in Germany (Track 1) Report No. 987901 2007-11-14

More information

VERIFICATION REPORT UNITED CARBON FINANCE

VERIFICATION REPORT UNITED CARBON FINANCE UNITED CARBON FINANCE LTD. VERIFICATION OF THE WASTE HEAPS DISMANTLING BY TEMP LTD-A IN UKRAINE FORTH PERIODIC FOR THE PERIOD 01/08/2012 30/11/2012 REPORT NO. UKRAINE-VER/0822/2012 REVISION NO. 02 BUREAU

More information

CDM. Name of submitter: Klaus Oppermann. Affiliated organization of the submitter (if any): The World Bank

CDM. Name of submitter: Klaus Oppermann. Affiliated organization of the submitter (if any): The World Bank Name of submitter: Klaus Oppermann Affiliated organization of the submitter (if any): The World Bank Contact email of submitter: koppermann@worldbank.org Date: 23 Jan 2013 Increasing regional distribution

More information

Monitoring report form for CDM programme of activities (version 01.0) MONITORING REPORT

Monitoring report form for CDM programme of activities (version 01.0) MONITORING REPORT Monitoring report form for CDM programme of activities (version 01.0) Complete this form in accordance with the Attachment Instructions for filling out the monitoring report form for CDM programme of activities

More information

Monitoring report form for CDM programme of activities (version 01.0) MONITORING REPORT

Monitoring report form for CDM programme of activities (version 01.0) MONITORING REPORT Monitoring report form for CDM programme of activities (version 01.0) Complete this form in accordance with the Attachment Instructions for filling out the monitoring report form for CDM programme of activities

More information

Validation Report. Matrix Power Pvt. Ltd. (MPPL)

Validation Report. Matrix Power Pvt. Ltd. (MPPL) Validation Report Matrix Power Pvt. Ltd. (MPPL) Validation of the 4.5 MW Biomass (Agricultural Residues) Based Power Generation Unit of M/s Matrix Power Pvt. Ltd. (MPPL) project Report No. 6589 Revision

More information

Methodology report template for the data collection

Methodology report template for the data collection EUROPEAN COMMISSION DIRECTORATE-GENERAL CLIMATE ACTION Directorate B - European and International Carbon Markets Methodology report template for the data collection & dd dd dddd CONTENTS 1 INTRODUCTION...3

More information

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD)

PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) CDM Executive Board Page 1 PROGRAMME DESIGN DOCUMENT FORM FOR CDM PROGRAMMES OF ACTIVITIES (F-CDM-PoA-DD) Version 02.0 PROGRAMME OF ACTIVITIES DESIGN DOCUMENT (PoA-DD) PART I. Programme of activities (PoA)

More information

Validation Report, Cover Letter and Statement of Assurance

Validation Report, Cover Letter and Statement of Assurance B.C. Ministry of Environment Climate Investment Branch Validation Report, Cover Letter and Statement of Assurance Page 1 of 19 KPMG Performance Registrar Inc. Box 10426, 777 Dunsmuir Street Vancouver BC

More information

Annex 33 IMPLEMENTATION PLAN FOR THE CLEAN DEVELOPMENT MECHANISM PROJECT STANDARD, VALIDATION AND VERIFICATION STANDARD AND PROJECT CYCLE PROCEDURE

Annex 33 IMPLEMENTATION PLAN FOR THE CLEAN DEVELOPMENT MECHANISM PROJECT STANDARD, VALIDATION AND VERIFICATION STANDARD AND PROJECT CYCLE PROCEDURE Page 1 IMPLEMENTATION PLAN FOR THE CLEAN DEVELOPMENT MECHANISM PROJECT STANDARD, VALIDATION AND VERIFICATION STANDARD AND PROJECT CYCLE PROCEDURE (Version 02.0) I. Background 1. The Executive Board of

More information

VERIFICATION REPORT FOR SATARA WIND POWER PROJECT IN MAHARASHTRA, INDIA

VERIFICATION REPORT FOR SATARA WIND POWER PROJECT IN MAHARASHTRA, INDIA VERIFICATION REPORT FOR SATARA WIND POWER PROJECT IN MAHARASHTRA, INDIA Document Prepared By: LGAI Technological Center, S.A. (Applus) Project Title Satara Wind Power Project in Maharashtra, India Version

More information

CLEAN DEVELOPMENT MECHANISM CDM-SSCWG40-A05

CLEAN DEVELOPMENT MECHANISM CDM-SSCWG40-A05 CLEAN DEVELOPMENT MECHANISM CDM-SSCWG40-A05 Questions for public inputs in relation to the top-down revision of AMS-II.G: Energy efficiency measures in thermal applications of non-renewable biomass COVER

More information

SSC CPA VALIDATION REPORT

SSC CPA VALIDATION REPORT SSC CPA VALIDATION REPORT M/S SKG SANGHA CPA Number and Title: SKG SANGHA BIODIGESTER POA GULBARGA BIODIGESTER PROJECT CPA1 PoA Title: SKG SANGHA BIODIGESTER POA Report No: 53603111-12/082- CPA 1 Date:

More information

VERIFICATION REPORT OF INNER MONGOLIA CHAO ER IMPROVED FOREST MANAGEMENT PROJECT

VERIFICATION REPORT OF INNER MONGOLIA CHAO ER IMPROVED FOREST MANAGEMENT PROJECT VERIFICATION REPORT OF INNER MONGOLIA CHAO ER IMPROVED FOREST MANAGEMENT PROJECT Document Prepared By China Environmental United Certification Center Co., Ltd. Project Title Inner Mongolia Chao er Improved

More information

CDM PoA Validation Report

CDM PoA Validation Report CDM PoA Validation Report INTERNATIONAL WATER PURIFICATION PROGRAMME GLC Report No: 180, Rev. 12 GmbH Brooktorkai 18 20457 Hamburg Germany Handelsregister Hamburg, Abt. B., Nr. 52078 GLC Report No. 180,

More information

Agriculture and the carbon market

Agriculture and the carbon market Agriculture and the carbon market Carbon Credits for Sustainable Land Use Systems (CaLas) Presented by Patrick Horka, head of PoAs, South Pole Carbon Asset Management Ltd. 15 December, 2012 Contents Basic

More information

VERIFICATION REPORT SIA VIDZEME EKO

VERIFICATION REPORT SIA VIDZEME EKO VERIFICATION REPORT SIA VIDZEME EKO VERIFICATION OF THE WASTE HEAP #1, #2, #3 AND #5 DISMANTLING OF FRUNZE MINE WITH THE AIM OF DECREASING GREENHOUSE GASES EMISSION INTO THE ATMOSPHERE INITIAL AND FIRST

More information

Monitoring and Verification Plan Graneros Plant Fuel Switching Project June Prepared by

Monitoring and Verification Plan Graneros Plant Fuel Switching Project June Prepared by Monitoring and Verification Plan Graneros Plant Fuel Switching Project June 2003 Prepared by MGM International, Inc. Ayacucho 1435, 9 B C1111AAM Buenos Aires Argentina Table of Contents 1. Introduction

More information

Gold Standard Verification Report

Gold Standard Verification Report Gold Standard Verification Report Project Title Kisumu Improved Cook Stoves ERM CVS Reference 2286.V1 Gold Standard Project Reference Number GS843 Client Name Co2balance UK Ltd Client Address 1 Discovery

More information

Decision 3/CMP.1 Modalities and procedures for a clean development mechanism as defined in Article 12 of the Kyoto Protocol

Decision 3/CMP.1 Modalities and procedures for a clean development mechanism as defined in Article 12 of the Kyoto Protocol Page 6 Decision 3/CMP.1 Modalities and procedures for a clean development mechanism as defined in Article 12 of the Kyoto Protocol The Conference of the Parties serving as the meeting of the Parties to

More information

GS VERIFICATION REPORT for the VER Project Activity

GS VERIFICATION REPORT for the VER Project Activity GS VERIFICATION REPORT for the VER Project Activity Ningxia Lingwu Baitugang 40MWp Solar PV Power Generation Project in P. R. China Report No. 01 997 9105076804 Version 02, 2014-08-26 Designated Operational

More information

Monitoring report form (Version 04.0)

Monitoring report form (Version 04.0) Monitoring report form (Version 04.0) Complete this form in accordance with the Attachment Instructions for filling out the monitoring report form at the end of this form. MONITORING REPORT Title of the

More information

Standardized Crediting Framework Rwanda Pilot Second Capacity Building Workshop

Standardized Crediting Framework Rwanda Pilot Second Capacity Building Workshop Standardized Crediting Framework Rwanda Pilot Second Capacity Building Workshop Agenda Time Description Presenter 8:30-9:00 Registration; Tea and Coffee 9:00-9:15 Welcome and Opening by REMA & World Bank

More information

Validation report form for CDM project activities. (Version 02.0)

Validation report form for CDM project activities. (Version 02.0) Validation report form for CDM project activities (Version 02.0) Complete this form in accordance with the Attachment: Instructions for filling out the validation report form for CDM project activities

More information

Lesson 1: Introduction to GHG Projects and Project Level Accounting. Page 1 Learning Objectives

Lesson 1: Introduction to GHG Projects and Project Level Accounting. Page 1 Learning Objectives Lesson 1: Introduction to GHG s and Level Accounting Page 1 Learning Objectives Upon completion of this lesson, you will be able to understand: Rationale for undertaking GHG projects Difference between

More information

Monitoring report form (Version 03.1)

Monitoring report form (Version 03.1) Monitoring report form (Version 03.1) Monitoring report Title of the project activity Xuyong Household Biogas Gold Standard VER Project Reference number of the project activity 1033 Version number of the

More information

VERIFICATION REPORT AND CERTIFICATION STATEMENT

VERIFICATION REPORT AND CERTIFICATION STATEMENT LGAI Technological Center, S.A. Ctra. Accés a la facultat de Medicina, s/n Campus UAB E 08193 Bellaterra (Barcelona) Spain Tel.: +34 935 672 008 Fax.: +34 935 672 001 www.appluscorp.com VERIFICATION REPORT

More information

GOLD STANDARD VERIFICATION REPORT

GOLD STANDARD VERIFICATION REPORT GOLD STANDARD VERIFICATION REPORT MYCLIMATE FOUNDATION ENERGY EFFICIENT CO STOVES FOR SIAYA COMMUNITIES, KENYA Monitoring Period: 2011-01-01 to 2012-07-02 (incl. both days) Report No: 8000400320-11/544

More information

Monitoring Report Gold Standard VER, version 01

Monitoring Report Gold Standard VER, version 01 Monitoring Report Gold Standard VER, version 01 Project Name: Solar and efficient stoves in southwest Madagascar Project ID: GS 464 Monitoring Period: 4 th of January 2008 to 22 nd of December 2009 Version

More information

GUIDELINES FOR COMPLETING CDM-SSC-PDD, F-CDM-SSC-Subm, F-CDM-BUNDLE

GUIDELINES FOR COMPLETING CDM-SSC-PDD, F-CDM-SSC-Subm, F-CDM-BUNDLE CDM Executive Board Version 2, page 1 GUIDELINES FOR COMPLETING THE SIMPLIFIED PROJECT DESIGN DOCUMENT (CDM-SSC-PDD), THE FORM FOR SUBMISSIONS ON METHODOLOGIES FOR SMALL-SCALE CDM PROJECT ACTIVITIES (F-CDM-SSC-Subm)

More information

SSC CPA VALIDATION REPORT

SSC CPA VALIDATION REPORT SSC CPA VALIDATION REPORT ATMOSFAIR GGMBH CPA Number and Title: CPA # 5 IMPROVED COING STOVES FOR NIGERIA PoA Title: IMPROVED COING STOVES FOR NIGERIA PROGRAMME OF ACTIVITIES (5067) Report No: 11PoA189-13/078

More information

GS-VERIFICATION & CERTIFICATION REPORT

GS-VERIFICATION & CERTIFICATION REPORT GS-VERIFICATION & CERTIFICATION REPORT GANSU ANXI WIND FARM PROJECT, 100.5 MW IN CHINA (Gold Standard Registration No. GS 554) MONITORING PERIOD: 30 December 2010 to 29 December 2011 PERRY JOHNSON REGISTRAR

More information

SSC POA VALIDATION REPORT

SSC POA VALIDATION REPORT SSC POA VALIDATION REPORT M/S SKG SANGHA SKG SANGHA BIODIGESTER POA Report No: 12/082-53603111 - PoA Date: 2012-12-31 TÜV NORD CERT GmbH JI/CDM Certification Program Langemarckstraße, 20 45141 Essen, Germany

More information

Views on the materiality standard under the clean development mechanism

Views on the materiality standard under the clean development mechanism 2 November 2011 English only UNITED NATIONS FRAMEWORK CONVENTION ON CLIMATE CHANGE Subsidiary Body for Scientific and Technological Advice Thirty-fifth session Durban, 28 November to 3 December 2011 Item

More information

Revision of PoA-related regulatory documents

Revision of PoA-related regulatory documents Paragraph 26 of the annotated agenda, Annex 6 Revision of PoA-related regulatory documents CDM EB 80 Bonn, Germany, 14 July to 18 July 2014 UNFCCC Secretariat SDM programme Background and purpose EB 78

More information