1 WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY 600 Fifth Street, NW, Washington, DC AMENDMENT OF SOLICITATION / MODIFICATION OF CONTRACT 1. AMENDMENT/MODIFICATION 2. EFFECTIVE DATE Amendment 001 March 24, ISSUED BY PURCHASING SECTION 4. ADMINISTERED BY (If other than block 3) Felicia Walker, Fwalker1@wmata.com (202) Department of Procurement 5. CONTRACTOR NAME AND ADDRESS 6. FORM TYPE (Check only one) AMENDMENT OF SOLICITATION NO. FQ (Street, city, county, state, and Zip Code) DATE March 24, 2016 (See block 7) MODIFICATION OF CONTRACT/ORDER NO. DATE (See block 9) 7. THIS BLOCK APPLIES ONLY TO AMENDMENTS OF SOLICITATIONS The above numbered solicitation is amended as set forth in block 10. The hour and date specified for receipt of Offers is extended, is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation, or as amended, by one of the following methods; (a) By signing and returning 1 copy of this amendment; (b) by acknowledging receipt of this amendment on each copy of the offer submitted; or (c) by separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE ISSUING OFFICE PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If, by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided such telegram makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified. 8. ACCOUNTING AND APPROPRIATION DATA (If required) 9. THIS BLOCK APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS (a) This Change Order is issued pursuant to The Changes set forth in block 10 are made to the above numbered contract/order. (b) The above numbered contract/order is modified to reflect the administrative changes (such as changes in paying office, appropriation data, etc.) set forth in block 10. (c) This Supplemental Agreement is entered into pursuant to authority of It modifies the above numbered contract as set forth in block DESCRIPTION OF AMENDMENT/MODIFICATION a. This amendment is hereby issued to provide responses to questions issued. b. The proposal closing date of March 30, 2016 at 2:00 p.m. remains unchanged. c. Except as provided herein, all terms and conditions of FQ remains unchanged. 11. CONTRACTOR/OFFEROR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPY TO ISSUING OFFICE. CONTRACTOR/OFFEROR IS NOT REQUIRED TO SIGN THIS DOCUMENT 12. NAME OF CONTRACTOR/OFFICE 15. WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY BY BY Felicia Walker (Signature of person authorized to sign) (Signature of Contracting Officer) 13. NAME AND TITLE OF SIGNER (Type or print) 14. DATE SIGNED 16. NAME OF CONTRACTING OFFICER (Type or print) 17. DATE SIGNED Felicia Walker, CPPB March 24, 2016

2 1. Our firm is a Small Business Enterprise (SBE) and is also classified as a Disadvantaged Business Enterprise (DBE) because we are a minority owned business. Are we able to partner with our Microsoft SharePoint technical partner who is not a DBE, but is classified as a Small Business Enterprise to fulfill the requirements for this contract? 2. Will WMATA allow for some of the work to be performed remotely? 3. Does WMATA have all of the source code for the custom applications deployed on SharePoint? 4. Do you have developers on staff that would retool your custom applications if given guidance are how to retool them for Office 365, SharePoint 2013 or Hybrid? 5. In regards to the above referenced RFP, would you consider a hosted SharePoint solution? 6. We understand the DBE goal for this RFP is 29%. As this number is considered a goal, are we obligated to include exactly 29% of DBE services, or do we need to satisfy the original standard of no less than 10% DBE participation? No. Your firm is required to be a WMATA Certified DBE in order to participate as a DBE on a WMATA Solicitation. No. WMATA can offer assistance, but full redevelopment of the custom application is not desired. We will consider a hosted solution. However, the required analysis should be the determining factor on the hosted solution. All firms are obligated to include exactly 29% of DBE services. 7. WMATA is suggesting a hybrid SharePoint. They are mentioning an environment where they would like to have SP on site as well as cloud. We need to understand the rationale behind this approach to align our solution. There are 3 different hybrid topologies. Once we understand their rationale, we can suggest appropriate hybrid topology 8. Documentum Is there an integration through the Documentum-SharePoint connector? Is migration of Documentum content and workflows into new SharePoint included in the scope? If not, is that a possibility? Why to maintain two content management systems? 9. For each integration [PeopleSoft, Trapeze, Cognos and Maximo], we need to understand the type of integration, scope and functional of integration. For example, is SharePoint used to just display the logistical data from Trapeze or are there hybrid workflows that extend into Trapeze? 10. WMATA s SMS seems to have robust dashboards and reporting. We presume the dashboards are COGNOS web parts? If not, please let us know how they are developed/implemented. How many dashboards are deployed? How many reports? Any custom reports? This will determine the complexity and efforts for migration. Cognos Dashboards 1. FRMS - integrated using SharePoint webarts We currently have 2 web applications configured in our environment. One web application hosts our intranet (metroweb). The other web application hosts our safety applications (SMS). The SMS applications have been developed using a large quantity of custom.net code. Yes there is a Documentum integration. We maintain two content management systems due to the large number of files and space limitation for SharePoint content database. PeopleSoft, Trapeze and Maximo integrations are used to display logistical data. Data from each of these external systems are download to the staging environment every night. The application then points to the staging environment instead of hitting the external source directly. SSRS Reports. We have around 50 SSRS custom reports. These reports work in conjunction with our Safety Data Mart.

3 2. Safety Dashboards - integrated using SharePoint webarts 3. Safety Observation System Dashboard Direct link to Cognos 4. Chief Safety Officer Dashboard Direct link to Cognos 11. Are SMS and Metroweb collection of more than two sites? Besides these applications, are there any other team sites, personal sites, collaboration sites, or any other sites? 12. How granular is the security within SharePoint? How many roles are there? In our portal we have six site collections. Each site collection has a separate content database. 1. Incidents and Accidents 2. EMIH and SOS 3. Hazard 4. ERM 5. CAD RMS 6. Fatigue We use six roles. One that is custom coded which is Contribute without delete. 13. How many workflows are there? Are the workflow out-ofthe-box workflows or customized ones? If customized, was SharePoint Designer used to develop them or custom code? We have three custom workflows developed in.net. 14. How many lists and libraries? There are 102 Lists and over 100 libraries. 15. Any custom web-parts? Are these custom web-parts thirdparty web parts or home-grown? Some web parts are third party others are custom developed. 16. How complex is the Search implemented? Search uses out of the box features but covers multiple content search quires. 17. If we can bid for this opportunity and is this RFP is open for international vendors? 18. WMATA expects vendor s local presence and is mandatory? 19. WMATA accepts if vendor provide references from private sector clients. The RFP is open to all qualified firms. 20. Do we need any registration process to follow for bidding? Please refer to the solicitation. 21. WMATA wishes to upgrade its current SharePoint 2010 platform to a current collaborative and cost effective platform, utilizing its current licensing agreements. Approximately 12,000. The solution may be a combination of both SharePoint 2013 (on-site) and Office 365 (cloud), based on analysis of services, security, and cost. Q: Is WMATA currently licensed for Office 365? How many users currently have licensing?

4 22. Is WMATA open to all options (Fully on premise, hybrid, fully in the cloud)? Or is there other considerations to be aware of that may limit which options are available to WMATA? 23. It has upgraded to SharePoint 2010, expanded its safety system (Safety Measurement System) and its intranet (Metroweb) capabilities, and has developed limited integration with Documentum. SharePoint, via system development, has points of integration with various systems throughout the organization, including PeopleSoft, Trapeze, Cognos, and Maximo. 24. Can more details be shared on the SMS design, architecture, and capabilities? How is the application deployed to the current SharePoint 2010 farm? 25. What type of integration is currently taking place with Documentum? Is this integration desired to be preserved/enhanced? 26. What type of integration is currently taking place with PeopleSoft? Is this integration desired to be preserved/enhanced? 27. What type of integration is currently taking place with Cognos? Is this integration desired to be preserved/enhanced? 28. What type of integration is currently taking place with Maximo? Is this integration desired to be preserved/enhanced? 29. Can a more detailed breakdown of the number of servers and this OS/SharePoint/SQL version be provided for review? 30. Are WMATA s SharePoint and SQL servers physical or virtual? 31. What type of storage (brand name and type of connectivity) is being used to host SharePoint data? 32. Do the two site collections host both the Safety Management System (SMS) and Metroweb intranet? Due to its custom application, WMATA understands that the solution may be hybrid. It is currently an in-house product with primary and secondary locations. The WMATA SharePoint environment current consists of two MOSS servers, an App server, a reports server, a BizTalk servers, and five database servers per location. This architecture must be analyzed for and recommendations made for optimum performance. Please refer to the Solicitation. Please refer to the Solicitation. Push to a Datamart. Please refer to the Solicitation. The WMATA SharePoint environment current consists of two MOSS servers, an App server, a reports server, a BizTalk servers, and five database servers per location. This architecture must be analyzed for and recommendations made for optimum performance. Virtual. Routing through ISA server. One is SMS and the other is Metroweb. 33. How many subsites exist in each site collection? SMS is nominal. 34. Does this include the rebuild of SMS in the new environment? 35. What is the expectation for the upgrade evaluation site for Metroweb? WMATA does not wish to rebuild SMS, however, it does expect to provide some development support for compatibility. Evaluation criteria are established in the statement of work.

5 36. Does the development of infrastructure include the installation and base configuration of the server operating system (i.e. Windows Server)? WMATA will furnish licensing for on-premise servers. 37. What version of Active Directory is WMATA running? WMATA is currently running 2008, upgrading 2012 R Is there currently any federation or other integration It is federated. between WMATA s Active Directory and Office 365? Similarly, is there any other directory services integration that might affect the integration with Office 365? 39. What WMATA standards and polices does the solution need to be in compliance with? 40. What services levels are the target-state SharePoint solution required to meet? More specifically, what are the RPO (Recovery Point Objectives), RTO (Recovery Time Objectives), and availability levels the target solution needs to adhere to? 41. How is high availability and disaster recovery being provided for SharePoint currently? 42. System training of new environments for both on-site and cloud-based servers and services, and system monitoring for Production Support Team. Servers vulnerability compliance, user security, and segregation of environments. WMATA is expecting 99.9% availability with zero data loss for the hosted portion of the solution. SharePoint is currently highly available via load-balancing across two geographies and mirroring As per the statement of work, system administration and AvePoint public sector training. Is there any training requirements for training the end users or will this be supported by the Production support team? 43. Is WMATA looking for training only, or for training to be part of a sustainable adoption program to promote the successful transition and adoption of the new system? 44. Infrastructure requirements document, which will contain the purpose, goals and objects and documented processes, functions, and other requirements that the project will fulfill. WMATA is looking for a proposal to best fulfill the requirement. AvePoint Public Sector and IBM EndPoint Manager. Q: What operational monitoring and systems management tools are currently in place at WMATA? 45. Implementation Plan a detailed implementation will be executed and managed, as well as contingencies and rollbacks. WMATA adheres to a CCB process. Furthermore this project will adhere to a defined change process to address changes to requirements and the plan. Q: What change management practices are in place that the implementation will need to adhere to? 46. When are WMATA s change windows, in other words, what restrictions are in place as to when changes can be applied to WMATA s production and pre-production environments? The SharePoint environment is subject to a monthly maintenance window, in which server and system patches are installed. This change occurs over the weekend.

6 47. Completed Migration, to include establishment of required Development, QA, Production, and Recovery environments, as well as tested High Availability and Disaster Recovery solutions, as well as configuration and reconfiguration of the AvePoint Public Sector for full utilization. However, as described earlier, offeror analysis should determine the appropriate recommendation for how to deploy. Q: Does this include the development and deployment of the SMS application and an updated Metoweb deployment? 48. Where are the primary and secondary data centers located? 49. What type of network connection is established between the two datacenters? 50. Does WMATA do, or contract, custom SharePoint development? 51. Is WMATA using externalization technologies (i.e. RBS or EBS) with SharePoint? 52. Are there any business-significant events (i.e. year end, shutdown s, change freezes, vacation periods, other IT projects, etc.) that the SharePoint upgrade needs to accommodate? 53. What are WMATA s standard working hours, and can upgrade activities occur during these times? 54. Has WMATA considered SharePoint 2016? If no, is WMATA open to considering SharePoint 2016? If yes, was there a specific reason why SharePoint 2016 wasn t selected as the target platform? 55. In your experience, what is the typical packaging format of the solution being proposed? How have other RFP responses in the past incorporated the % of DBE participation requirement into their proposals? 56. We understand the DBE goal for this RFP is 29%. As this number is considered a goal, are we obligated to include exactly 29% of DBE services, or do we need to satisfy the original standard of no less than 10% DBE participation? 57. What do you consider to be the top three critical success factors for this project? i.e., at the end of project delivery, Due to the sensitivity of the organization, this information will not be revealed at this time. Traffic is routed through an ISA server. No. just those listed above. In most cases, no. However, as WMATA is a public-serving entity, it is subject public events that may impact delivery dates. Upgrades and deliverables must occur during non-working hours. WMATA adheres to the standard working day for administrative services, but operates 24 hours a day. The upgrade must occur during non-working hours, based on the need of the Authority, WMATA will work with the offeror to determine the best window for delivery. The vendor may propose SharePoint 2016, but must justify the proposed solution. That question cannot be addresses at this time. You need to include exactly 29% of DBE Services. Evaluation criteria are indicated in the Statement of Work.

7 how will we know that we ve jointly delivered success to your constituents? 58. What qualifications are you looking for in an implementation partner? For example, we have multiple Microsoft Gold and Silver Competencies; will the proposal scoring take our credentials into account? 59. Do you have any Microsoft Software Assurance vouchers that might be applied to a pre-contract strategic and planning engagement? 60. Are you anticipating a mix of on-site and remote project delivery? In our experience, we generally find it useful to be onsite during discovery meetings, installations, etc. however we can keep project and communication costs down by utilizing remote delivery for parts of the project? 61. Implementation decisions related to the design and development of software solutions can vary widely depending on project budget. Our firm has delivered successful projects across various budget ranges. To help us best meet the goals of your solicitation, can you please approximate a budget range for this project? For example is the anticipated budget range: a. Less than $100,000 b. $100,000 $150,000 c. $150,000 $200,000 d. $200,000 $250,000 e. $250,000 - $350,000 f. $350,000 - $500,000 g. $500, Is Active Directory properly configured with the fields, users, groups, permissions and roles anticipated to be used in the new solution? Evaluation criteria are indicated in the Statement of Work. Costs are based in the proposed solution. This information cannot be disclosed. Active Directory is properly configured to WMATA standards. 63. What, if any, consideration has been given to SharePoint 2016, Windows Server 2016, and related vnext software (e.g. have you considered going straight to SP2016)? 64. Regarding your current use of SharePoint: a. For what workloads are you currently using SharePoint (e.g. collaboration portals, document management, intranet/extranet, ECM or ERM, workflow/process automation, BI, etc.)? b. What, if any, problems or dissatisfaction have you experienced with SharePoint? c. On a scale from 1 to 5 where 1 represents no custom branding and 5 represents a completely custom branded implementation, how would you rank your current implementation? Vendor may propose the version of SharePoint deem appropriate for the solution. a. SharePoint is currently used collaboration, inranet, workflow automation, document management and custom applications. b. Optimum performance; scalability. c. This question is subjective. d. System administration, development, database development and administration.

8 d. What SharePoint skills do you currently have in house in terms of: i. SharePoint Administration ii. Maintenance iii. Content Owner/Authorship iv. Development (C#, PowerShell, etc.) 65. How many SharePoint environments should be considered for the purposes of our proposal (e.g. Dev, QA, Staging, Production)? 66. What third party products, if any, are currently used with SharePoint for: a. Scan/Capture b. Records Management c. Digital Signatures d. Workflow e. General web parts (e.g. Bamboo) 67. Migrations and upgrades are often referred to synonymously however, they are distinctly different processes. A SharePoint upgrade is the process of updating the software version with a newer version and attaching the content databases to the new environment. A migration often involves replicating data and processes on an entirely different platform. Microsoft has provided the following guidelines to determine the best approach. Development, Testing and Production. Avepoint Public Sector. WMATA is looking for an upgrade. We are currently on the 2010 version. A SharePoint Upgrade is recommended when: Existing farm is SharePoint 2007 or higher Existing taxonomy is well-formed Site collections and content databases are properly architected Content is properly distributed and folder structures are not too shallow Site templates used include Team Site, Document Center or Records Center Migrating from a given version of SharePoint to a newer version of SharePoint A SharePoint Migration is recommended when: The source document repository is not SharePoint or is not SharePoint 2007 or higher Taxonomy / information architecture needs to be redesigned Content is improperly distributed (e.g. folder structures too shallow) 68. Does the current implementation include: a. Farm-level Solutions; if so, please provide details: b. For the Customizations that involve custom code (e.g. C# or JavaScript development) please indicate: a. SMS is a.net based solution. b. i. SMS is stored on a Team Foundation Server. b. ii Remediation of code must be analyzed to determine effort and cost. c. AvePoint Public Sector. d. No. Current toolsets are expected to be utilized.

9 i. If the source code is under source control (e.g. Team Foundation Server) ii. Will internal staff be responsible for remediation, as needed, related to any custom components c. Third party products and if so, which ones? i. Do you know if all 3rd party components are SharePoint 2013 compatible? d. Is the chosen vendor expected to upgrade these components to the latest version? e. Use of SharePoint Workspaces? F. Remote Blob Storage? g. Workflows that need to be migrated and if so: i. Were they created with SharePoint Designer or out of the box workflows? If not, what tools were used to create the workflows? e. Non-applicable. f. No. g. i. Workflows were created using Virtual Studio. ii. Migration of workflows will be proposed by the vendor. iii. Aside from SMS, workflows remain simple. iv. Due to the sensitive nature of the organization, system diagrams will not be provided until award. h. Non-applicable. i. ii. Please refer to the Solicitation iii. Please refer to the solicitation iv. Push to Datamart v. Please refer to the solicitation j. ii. How to plan to migrate workflows? iii. How complex at the workflows on a continuum from very simple OOTB workflows to very complex, parallel workflows with numerous steps? iv. Can you provide details (e.g. flow diagrams) regarding all workflows that were implemented in the current solution? h. MySites and to what extent have they been customized? i. For any of the above, is the chosen vendor/tool expected to support or replace/redevelop these components in the new environment? I. Can you please describe the level of the current Integrations (e.g. hyperlinks only, document-level integration, unidirectional/read only, bidirectional data updates, functional integration): i. Documentum: ii. PeopleSoft: iii. Trapeze: iv. Cognos: v. Maximo: vi. Any others? J. Is your intent with this RFP to achieve the same level of integration to these system as what you currently have? 69. In our experience, deployment is sometimes done in a non-standard/unsupported way (i.e. files copied directly to the SharePoint servers). This kind of customization is not handled via the standard SharePoint upgrade procedures and as such, requires additional discovery and remediation. To your knowledge, were standard/supported deployment mechanisms used at all times in the current implementation? No.

10 70. What, if any, consideration has been given to SharePoint Online? Is there a preference or concerns with SharePoint Online? 71. With regard to the VM/OS/SQL/SharePoint installation: a. Do you have SQL 2012 licensing and are you amenable to using SQL 2012 as the database for the solution? b. Do you require that SQL be installed in an Always-On, High-Availability configuration? c. Can we assume that you will: i. Configure the required VMs and install the O/S? ii. Install and configure SQL Server (note: High- Availability configuration may require our assistance if you have not done it before) 72. Can you please provide information/estimates for the following: d. Number of digital documents in SharePoint and approximate breakdown of their respective types (PDF, Office documents, CAD drawings, etc.) e. Number of Pictures and/or Video and breakdown of their respective types (WMV, etc.) f. Approximate average and combined size (in GB) of all documents including multimedia files 73. Is branding consistent across all departments, sites, subsites, etc. in the current solution? WMATA will consider all options that meet the submission criteria. a. Yes b. The solution must provide 99.9% availability c. WMATA will provide servers for parts of the solution on premise. This information will be determined during the analysis phase. 74. What is the level of custom branding in the existing SharePoint environment? g. How many custom Master Pages and CSS does the current solution employ? h. How many custom site templates does the current solution employ? i. Is there a desire to keep existing branding 75. How many custom page layouts does the current implementation employ and how many do you expect will be needed in the new implementation? 76. We sell Premium Design Themes for SharePoint 2013 with ~20 different designs to choose from, all of which come with multiple Master pages, CSS, and various page layouts. All templates employ the latest-greatest adaptive and responsive design technologies and we provide customization to your specific needs. Would you consider this option versus reimplementation of the current branding? 77. Do you already own any SharePoint migration products and if so, which one(s)? WMATA uses one custom brand set. (4) Four. No. No.

11 78. On a scale from 1 to 5 were 1 represents little to no Information Architecture and 5 represents a comprehensive Information Architecture including all necessary custom Content Types and Term-Sets to fully support your SharePoint implementation in areas such as search, workflow, records management (i.e. retention policies), etc., how would you rank your current Information Architecture? 79. What is your vision for the number of support hours per month and Service Level Agreement (e.g. coverage hours and turn-around time)? 80. Do you have internal resources to handle Level-1 support (e.g. training questions, hardware or network problems, etc.)? 81. As an environmentally-friendly / Green company, we strive to reduce our consumption of paper; to that end, can respondents submit proposals electronically via in lieu of hardcopy proposals? 82. Can you share the complete SharePoint architecture for your Development, QA and Production environments including Servers and Services? 83. In terms of integration with 3rd party systems, is SharePoint used as a consumer or provider? This question is subjective. As required. Please submit the proposal in one (1) original and (3) copies along with 2 USB Flash Drives. The WMATA SharePoint environment currently consist of two Moss servers, an App server, a reports servers, a BizTalk server and five database servers per location. This architecture must be analyzed for and recommendations made for optimum performance. Provider, however, a suite of custom applications has been developed in the platform. a. If used as a consumer then which holds true for usage: web services, custom code, BCS or any other EAI tools? 84. Have you used custom workflows? a. Yes, approximately ten. a. If yes, how many? b. A suite of custom applications has been developed. b. What is the level of complexity? c. See above. c. Are there any with custom server-side code? d. WMATA uses virtual studio. d. Do you use any tools like K2 or Nintex or custom e. Farm solution workflows using.net and SPD? e. Is the custom solution a sandbox or farm solution? 85. Have you used InfoPath forms? Info path is rarely used. Info Path is rarely used. a. If yes, how many? b. What is the level of complexity? c. Were they used with code, without code, added custom code? 86. What reporting tool or tools are used for SharePoint SSRS is used a little. WMATA uses Cognos as its primary reporting reporting? platform. 87. Does WMATA currently utilize Office 365? WMATA has a small group of Office 365 users. 88. Does WMATA currently utilize Azure (AD, or otherwise)? 89. Is SharePoint accessed by any external users? 90. Does SharePoint access other internal systems? Yes, as described in the Statement of Work. 91. What are the disaster recovery requirements? WMATA requires 99.9% uptime per the Statement of Work. a. Is Office 365 replication sufficient? b. Uptime SLA Is the Office 365 SLA sufficient?

12 92. Do you have users that need SharePoint training? Training is addressed in the Statement of Work. a. If yes, how many? b. What style of training will be required (e.g. manuals vs. classes)? 93. Will you accept revisions to the general terms and No, the general terms and conditions are non-negotiable. conditions from any vendor?? 94. What is your exact definition of bound vs. unbound in Bound meaning put together in a binder. the proposal format? 95. Will you accept revisions to the insurance terms from any No, the Insurance requirements are non-negotiable. vendor 96. What is the expected Proposal Format for the original Bound meaning put together in a binder. Volume III Contractual (Bound or Unbound)? 97. Is this a continuation of existing work or totally new This is new work. work and contract? 98. If existing, who is the incumbent and the current contract Non-applicable. number? 99. Is any or all of WMATA currently on the Office 365 WMATA has a very limited scope within Office365. platform? If so, what edition/plan? 100. The 99.9% uptime requirement is dependent on Caveats must be clearly stated and accepted. variables not within the scope of this effort. Is it understood that those caveats must be included in the proposal for compliance protection? 101. Can the proposal due date be extended by a week or so? The proposal due date is currently March 30, P.M In regards to the above referenced RFP, would you We will consider a hosted solution. However, the required analysis consider a hosted SharePoint solution? should be the determining factor on the hosted solution.

ADDENDUM #1 RP Provision of Gwinnett County s Migration from SharePoint 2010 to SharePoint 2016 Project

ADDENDUM #1 RP Provision of Gwinnett County s Migration from SharePoint 2010 to SharePoint 2016 Project November 6, 2018 ADDENDUM #1 RP024-18 Provision of Gwinnett County s Migration from SharePoint 2010 to SharePoint 2016 Project Change: Proposals will be received until 2:50 p.m. local time on November

More information

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY SOLICITATION, OFFER AND AWARD CONTINUATION SHEET

WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY SOLICITATION, OFFER AND AWARD CONTINUATION SHEET WASHINGTON METROPOLITAN AREA TRANSIT AUTHORITY SOLICITATION, OFFER AND AWARD CONTINUATION SHEET THE UNDERSIGNED ACKNOWLEDGES RECEIPT OF THE FOLLOWING AMENDMENTS TO SOLICITATION RFP CQ18136/AMB Amendment

More information

Q & A Lacombe County EDRMS Development and Implementation RFP

Q & A Lacombe County EDRMS Development and Implementation RFP Q & A Lacombe County EDRMS Development and Implementation RFP As stated in Section 1.9 of the Lacombe County EDRMS Development and Implementation RFP, the question period closed on June 6, 2017 at 4:30

More information

COURSE 20332B: ADVANCED SOLUTIONS OF MICROSOFT SHAREPOINT SERVER 2013

COURSE 20332B: ADVANCED SOLUTIONS OF MICROSOFT SHAREPOINT SERVER 2013 ABOUT THIS COURSE This five-day course examines how to plan, configure, and manage a Microsoft SharePoint Server 2013 environment. Special areas of focus include implementing high availability, disaster

More information

Course 20332A Advanced Solutions of Microsoft SharePoint Server 2013 Course Duration: 5 days Course Type: Instructor-Led/Classroom

Course 20332A Advanced Solutions of Microsoft SharePoint Server 2013 Course Duration: 5 days Course Type: Instructor-Led/Classroom Course 20332A Advanced Solutions of Microsoft SharePoint Server 2013 Course Duration: 5 days Course Type: Instructor-Led/Classroom Course Overview This five-day course examines how to plan, configure,

More information

Advanced Solutions of Microsoft SharePoint Server 2013

Advanced Solutions of Microsoft SharePoint Server 2013 20332 - Advanced Solutions of Microsoft SharePoint Server 2013 Duration: 5 days Course Price: $2,975 Software Assurance Eligible Course Description Course Overview This five-day training course examines

More information

SharePoint 2013 On-Premise or Online What is the way to follow? Mayo 2015

SharePoint 2013 On-Premise or Online What is the way to follow? Mayo 2015 SharePoint 2013 On-Premise or Online What is the way to follow? Mayo 2015 About me Raul Colonia Consultor SharePoint Jefe de I+D+i y Comercial en Dainko 14 años de experiencia raulcolonia@dainko.com On-Premise

More information

20332B: Advanced Solutions of Microsoft SharePoint Server 2013

20332B: Advanced Solutions of Microsoft SharePoint Server 2013 20332B: Advanced Solutions of Microsoft SharePoint Course Details Course Code: Duration: Notes: 20332B 5 days This course syllabus should be used to determine whether the course is appropriate for the

More information

QUESTIONS & RESPONSES #1-4 - ALL INCLUSIVE

QUESTIONS & RESPONSES #1-4 - ALL INCLUSIVE S & RESPONSES #1-4 - ALL INCLUSIVE RFP / TITLE 070943 MICROSOFT SHAREPOINT UPGRADE AND ON-CALL SUPPORT CONTACT Heather Shadko, Procurement EMAIL procurement@portoftacoma.com PHONE 253-428-8697 SUBMITTAL

More information

Exam /Course 20332B Advanced Solutions of Microsoft SharePoint Server 2013

Exam /Course 20332B Advanced Solutions of Microsoft SharePoint Server 2013 Exam 70-332/Course 20332B Advanced Solutions of Microsoft SharePoint Server 2013 Prerequisites Before attending this course, students must have: Completed Course 20331: Core Solutions of Microsoft SharePoint

More information

Course Content Advanced Solutions of Microsoft SharePoint Server Course ID#: W Hours: 35. Course Description:

Course Content Advanced Solutions of Microsoft SharePoint Server Course ID#: W Hours: 35. Course Description: Course Content Course Description: This course examines how to plan, configure, and manage a environment. Special areas of focus include implementing high availability, disaster recovery, service application

More information

Implementing Microsoft Azure Infrastructure Solutions

Implementing Microsoft Azure Infrastructure Solutions Implementing Microsoft Azure Infrastructure Solutions Course # Exam: Prerequisites Technology: Delivery Method: Length: 20533 70-533 20532 Microsoft Products Instructor-led (classroom) 5 Days Overview

More information

SharePoint Server 2010 Enterprise Content Management

SharePoint Server 2010 Enterprise Content Management SharePoint Server 2010 Enterprise Content Management Kitta, Todd ISBN-13: 9780470584651 Table of Contents INTRODUCTION xxix PART I: INTRODUCTION TO ENTERPRISE CONTENT MANAGEMENT CHAPTER 1: WHAT IS ENTERPRISE

More information

ADDENDUM #1 FOR RFP PC#703 Enterprise Content Management

ADDENDUM #1 FOR RFP PC#703 Enterprise Content Management HOUSING AUTHORITY OF THE COUNTY OF SAN BERNARDINO PROCUREMENT AND CONTRACTS DEPARTMENT 715 E. BRIER DRIVE, SAN BERNARDINO, CA 92408 (909) 890-0644 FAX (909) 890-2349 http://www.hacsb.com/procurement ADDENDUM

More information

RFP Operations Services Ref. #: UNDP/BMS/OIMT/RFP/2016/001. Questions and Answers Round 1 19 September 2016

RFP Operations Services Ref. #: UNDP/BMS/OIMT/RFP/2016/001. Questions and Answers Round 1 19 September 2016 RFP Operations Services Ref. #: UNDP/BMS/OIMT/RFP/2016/001 Questions and Answers Round 1 19 September 2016 1. Throughout the RFP, there is reference to a TOR which provides requirements for which the contractor

More information

Microsoft Dynamics 365 for Finance and Operations. Microsoft Dynamics AX. Service description. Version 4 July 2017

Microsoft Dynamics 365 for Finance and Operations. Microsoft Dynamics AX. Service description. Version 4 July 2017 Microsoft Dynamics AX Microsoft Dynamics 365 for Finance and Operations Version 4 July 2017 1 Overview... 03 2 Service model... 05 Performance... 08 Service operations... 10 Onboarding and implementation...

More information

CHICAGO ZOOLOGICAL SOCIETY REQUEST FOR PROPOSAL (RFP) FOR SHAREPOINT/ INTRANET DEVELOPMENT & SUPPORT

CHICAGO ZOOLOGICAL SOCIETY REQUEST FOR PROPOSAL (RFP) FOR SHAREPOINT/ INTRANET DEVELOPMENT & SUPPORT CHICAGO ZOOLOGICAL SOCIETY REQUEST FOR PROPOSAL (RFP) FOR SHAREPOINT/ INTRANET DEVELOPMENT & SUPPORT The Chicago Zoological Society is soliciting proposals to provide architectural, design, implementation

More information

Implementing Microsoft Azure Infrastructure Solutions 20533B; 5 Days, Instructor-led

Implementing Microsoft Azure Infrastructure Solutions 20533B; 5 Days, Instructor-led Lincoln Land Community College Capital City Training Center 130 West Mason Springfield, IL 62702 217-782-7436 www.llcc.edu/cctc Implementing Microsoft Azure Infrastructure Solutions 20533B; 5 Days, Instructor-led

More information

The SharePoint Workflow Conundrum

The SharePoint Workflow Conundrum SharePoint Workflow Conundrum Author: Geoff Evelyn The SharePoint Workflow Conundrum An examination of the workflow provisions around SharePoint, Office365, Windows Azure and what implications there are

More information

North Carolina Department of Agriculture and Consumer Services Purchasing

North Carolina Department of Agriculture and Consumer Services Purchasing North Carolina Department of Agriculture and Consumer Services Purchasing IMPORTANT ADDENDUM June 4, 2018 FAILURE TO RETURN THIS BID ADDENDUM IN ACCORDANCE WITH INSTRUCTIONS SHALL SUBJECT YOUR BID TO REJECTION.

More information

Running Effective Projects In Office 365. September 19, 2015

Running Effective Projects In Office 365. September 19, 2015 Running Effective Projects In Office 365 September 19, 2015 Peter Carson President, Envision IT SharePoint MVP Partner Seller, Microsoft Canada peter.carson@extranetusermanager.com http://blog.petercarson.ca

More information

Expert Reference Series of White Papers. Microsoft Service Manager Simplified

Expert Reference Series of White Papers. Microsoft Service Manager Simplified Expert Reference Series of White Papers Microsoft Service Manager Simplified 1-800-COURSES www.globalknowledge.com Microsoft Service Manager Simplified Randy Muller, MCT, MCT Regional Lead, MCSE, CEH Introduction

More information

IMPLEMENTING MICROSOFT AZURE INFRASTRUCTURE SOLUTIONS

IMPLEMENTING MICROSOFT AZURE INFRASTRUCTURE SOLUTIONS IMPLEMENTING MICROSOFT AZURE INFRASTRUCTURE SOLUTIONS Course Duration: 5 Days About this course This course is aimed at experienced IT professionals who currently administer their on-premise infrastructure.

More information

CHAPTER 1: ARCHITECTURAL OVERVIEW OF SHAREPOINT

CHAPTER 1: ARCHITECTURAL OVERVIEW OF SHAREPOINT INTRODUCTION xxvii CHAPTER 1: ARCHITECTURAL OVERVIEW OF SHAREPOINT 2013 1 What s New from an Architectural Perspective? 2 On-Premise Server Farm Architecture 3 Web Server Tier 4 Application Server Tier

More information

REVISED 5 NOVEMBER 2018 SERVICE DEFINITIONS

REVISED 5 NOVEMBER 2018 SERVICE DEFINITIONS REVISED 5 NOVEMBER 2018 Table of Contents Service Definitions Workspace ONE Use Case Services Horizon Cloud Service on Microsoft Azure Use Case Services Recovery Services GUIDE 2 VMware Workspace ONE Cloud-Based

More information

QUESTION AGENCY RESPONSE RFP REFERENCE. Estimated amount of 40% is rarely accessed. 2 Environments, Test and Production

QUESTION AGENCY RESPONSE RFP REFERENCE. Estimated amount of 40% is rarely accessed. 2 Environments, Test and Production New York State Housing Finance Agency and State of New York Mortgage Agency Request for Proposals for Temporary Electronic Records Management System Solution QUESTIONS AND ANSWERS: Round 4 dated 11/9/2017

More information

AVEPOINT CLIENT SERVICES

AVEPOINT CLIENT SERVICES Services Catalog AVEPOINT CLIENT SERVICES AvePoint s Client Services teams provide world-class business and technical experts required to fully maximize your enterprise-wide collaboration technology investments.

More information

Microsoft FastTrack For Azure Service Level Description

Microsoft FastTrack For Azure Service Level Description ef Microsoft FastTrack For Azure Service Level Description 2017 Microsoft. All rights reserved. 1 Contents Microsoft FastTrack for Azure... 3 Eligible Solutions... 3 FastTrack for Azure Process Overview...

More information

This course provides students with the knowledge and skills to monitor and operate a private cloud.

This course provides students with the knowledge and skills to monitor and operate a private cloud. MOC 20246C: Monitoring and Operating a Private Cloud Course Overview This course provides students with the knowledge and skills to monitor and operate a private cloud. Course Introduction Course Introduction

More information

COURSE OUTLINE MOC 20332: ADVANCED SOLUTIONS OF MICROSOFT SHAREPOINT SERVER 2013 MODULE 1: UNDERSTANDING THE SHAREPOINT SERVER 2013 ARCHITECTURE

COURSE OUTLINE MOC 20332: ADVANCED SOLUTIONS OF MICROSOFT SHAREPOINT SERVER 2013 MODULE 1: UNDERSTANDING THE SHAREPOINT SERVER 2013 ARCHITECTURE COURSE OUTLINE MOC 20332: ADVANCED SOLUTIONS OF MICROSOFT SHAREPOINT SERVER 2013 MODULE 1: UNDERSTANDING THE SHAREPOINT SERVER 2013 ARCHITECTURE This module introduces the architectural features that underpin

More information

Request for Proposal

Request for Proposal intranet Request for Proposal (rfp) 1981 Blake Street Denver, CO80202 Request for Proposal Intranet Consultation and Implementation POSTED: Wednesday, June 17th PROPOSALS DUE: Wednesday, July 15th overview

More information

Effectively and efficiently migrating to SharePoint

Effectively and efficiently migrating to SharePoint Effectively and efficiently migrating to SharePoint McGladrey overview Fifth largest U.S. provider of assurance, tax and consulting services Over $1.28 billion in revenue 75 offices and 6,500 employees

More information

Addendum I to Intranet Redesign

Addendum I to Intranet Redesign Purchasing Department (O) 864.299.4000 (F) 864.277.5852 561 Mauldin Rd. Greenville, SC 29607 www.rewaonline.org Addendum I to Intranet Redesign Posting Date: January 19, 2018 In published Request for Proposal

More information

IT Service Management with System Center Service Manager

IT Service Management with System Center Service Manager IT Service Management with System Center Service Manager Course 10965C - Five days - Instructor-led - Hands-on Introduction This five day course will provide students with the key knowledge required to

More information

Managed Services. Managed Services. Choices that work for you PEOPLESOFT ORACLE CLOUD JD EDWARDS E-BUSINESS SUITE.

Managed Services. Managed Services. Choices that work for you PEOPLESOFT ORACLE CLOUD JD EDWARDS E-BUSINESS SUITE. Choices that work for you PEOPLESOFT ORACLE CLOUD JD EDWARDS E-BUSINESS SUITE Pricing Models At SmartERP, we realize that every organization is different with a unique set of requirements. Depending on

More information

Course Outline (10996A)

Course Outline (10996A) Course Outline (10996A) Module 1: Overview of System Center 2016 In this module, you will learn about the different components in System Center 2016 including how they are placed within the architecture.

More information

Implementing Microsoft Azure Infrastructure Solutions

Implementing Microsoft Azure Infrastructure Solutions Implementing Microsoft Azure Infrastructure Solutions Duration: 5 Days Course Code: 20533C About this Course: This course is intended for IT professionals who are familiar with managing on-premises IT

More information

MS Integrating On-Premises Core Infrastructure with Microsoft Azure

MS Integrating On-Premises Core Infrastructure with Microsoft Azure MS-10992 Integrating On-Premises Core Infrastructure with Microsoft Azure COURSE OVERVIEW: This three-day instructor-led course covers a range of components, including Azure Compute, Azure Storage, and

More information

Carahsoft End-User Computing Solutions Services

Carahsoft End-User Computing Solutions Services Carahsoft End-User Computing Solutions Services Service Description Horizon View Managed Services Gold Package Managed Services Packages Options # of Desktops to be Managed Desktop Type Duration of Services

More information

Cloud & Datacenter Monitoring with System Center Operations Manager

Cloud & Datacenter Monitoring with System Center Operations Manager Cloud & Datacenter Monitoring with System Center Operations Manager Course 10964B - Five days - Instructor-led - Hands-on Introduction This five-day course will provide students with the key knowledge

More information

REQUEST FOR PROPOSAL (RFP) Records Management. In SharePoint

REQUEST FOR PROPOSAL (RFP) Records Management. In SharePoint REQUEST FOR PROPOSAL (RFP) For Washington County, Minnesota Records Management In SharePoint May 22, 2018 Table of Contents Notice of Request for Proposal 3 A. Introduction and Background 1. Project Overview.

More information

IT Service Management with System Center Service Manager

IT Service Management with System Center Service Manager IT Service Management with System Center Service Manager Course # Exam: Prerequisites Technology: Delivery Method: Length: 10965 Microsoft System Center Service Manager Instructor-led (classroom) 5 Days

More information

IT Service Management with System Center Service Manager

IT Service Management with System Center Service Manager IT Service Management with System Center Service Manager 10965C; 5 Days, Instructor-led Course Description This five-day course will provide students with the key knowledge required to deploy and configure

More information

"Charting the Course... MOC D: IT Service Management with System Center Service Manager. Course Summary

Charting the Course... MOC D: IT Service Management with System Center Service Manager. Course Summary with System Center Service Description Course Summary This five-day course will provide students with the key knowledge required to deploy and configure System Center 2016 Service. Using hands-on labs,

More information

Planning for Success: Architecture, and Design

Planning for Success: Architecture, and Design Planning for Success: SharePoint Governance, Architecture, and Design 1 Dan Holme Director of Training & Consulting Intelliem, Inc. www.intelliem.com danh@intelliem.com BEST PRACTICES RESOURCE CENTER http://go.microsoft.com/fwlink/?linkid=125981

More information

20332B: Advanced Solutions of Microsoft SharePoint Server 2013

20332B: Advanced Solutions of Microsoft SharePoint Server 2013 20332B: Advanced Solutions of Microsoft SharePoint Server 2013 Course Overview This course examines how to plan, configure, and manage a Microsoft SharePoint Server 2013 environment. Special areas of focus

More information

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES J 1 7 2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO.(If applicable)

More information

Virtual Desktop Computing Solution Request for Proposal (RFP), Addendum 1 October 22 nd, 2012

Virtual Desktop Computing Solution Request for Proposal (RFP), Addendum 1 October 22 nd, 2012 Question 1: Are the 3 identified hardware suggestions (HP/IBM/Cisco) the only hardware platforms requested at this time? Or can another product be represented? Answer 1: Respondents must comply with the

More information

1. EDM OVERVIEW. 1.1 EDM Objectives. 1.2 System. 1.3 Implementations

1. EDM OVERVIEW. 1.1 EDM Objectives. 1.2 System. 1.3 Implementations 1. EDM OVERVIEW The DC Water Enterprise Document Management (EDM) System based on the Open Text Content Lifecycle Management (Livelink) Suite (Version: 10.5.0 in Windows 2012 OS) provides robust lifecycle

More information

PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM REQUEST FOR PROPOSALS

PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM REQUEST FOR PROPOSALS 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 PLATTE RIVER RECOVERY IMPLEMENTATION PROGRAM REQUEST FOR PROPOSALS SUBJECT: P17-025:

More information

Request for Information 18-RFP-004-LAJ WOTC Application Management System. Questions and Answers

Request for Information 18-RFP-004-LAJ WOTC Application Management System. Questions and Answers Request for Information 18-RFP-004-LAJ WOTC Application Management System Questions and Answers The Department s responses to timely submitted questions are provided below: Question Number 1. All 2. All

More information

AvePoint Online Services vs Office 365 Sites, Files, s, and Groups Backup, Management and Archiving

AvePoint Online Services vs Office 365 Sites, Files,  s, and Groups Backup, Management and Archiving AvePoint Online Services vs Office 365 Sites, Files, Emails, and Groups Backup, Management and Archiving Overview: AvePoint Online Services is a multi-tenant Software-as-a-Service (SaaS) offering from

More information

10965D: IT Service Management with System Center Service Manager

10965D: IT Service Management with System Center Service Manager 10965D: IT Service Management with System Center Service Duration: 5 days; Instructor-led WHAT YOU LEARN This five-day course will provide students with the key knowledge required to deploy and configure

More information

Advanced Solutions of Microsoft SharePoint Server 2013

Advanced Solutions of Microsoft SharePoint Server 2013 Advanced Solutions of Microsoft SharePoint Server 2013 Course: 20332 Course Details Audience(s): IT Professional(s) Technology: Duration: Microsoft SharePoint Server 40 Hours ABOUT THIS COURSE This forty

More information

Microsoft Course Schedule Jan - Jun 2018

Microsoft Course Schedule Jan - Jun 2018 Microsoft Course Schedule Jan - Jun All in One Place For Ultimate Professional Development Opportunities Recent Recognition and Awards from Partners By Numbers: Delivering Market Value Choose from over

More information

20332: Advanced Solutions of Microsoft SharePoint Server 2013

20332: Advanced Solutions of Microsoft SharePoint Server 2013 To register or for more information call our office (208) 898-9036 or email register@leapfoxlearning.com 20332: Advanced Solutions of Microsoft SharePoint Server 2013 Duration: 5 Days Course Outline Module

More information

Implementing Microsoft Azure Infrastructure Solutions

Implementing Microsoft Azure Infrastructure Solutions Course 20533C: Implementing Microsoft Azure Infrastructure Solutions Course Outline Module 1: Introduction to Azure This module introduces cloud solutions in general and then focuses on the services that

More information

We empower users through nifty solutions

We empower users through nifty solutions We empower users through nifty solutions 2 CONTENTS 1 About NIFTIT page 04 2 What We Do page 06 3 SharePoint Services page 08 4 Client Projects page 12 5 Our Partners page 19 6 Events page 20 7 The Team

More information

AVANTUS TRAINING PTE LTD

AVANTUS TRAINING PTE LTD [MS10979]: Microsoft Azure Fundamentals Length : 2 Days Audience(s) : IT Professionals Level : 100 Technology : Azure Delivery Method : Instructor-led (Classroom) Course Overview This course provides the

More information

: Integrating MDM and Cloud Services with System Center Configuration Manager

: Integrating MDM and Cloud Services with System Center Configuration Manager 20703-2: Integrating MDM and Cloud Services with System Center Configuration Manager Overview This is a three-day Instructor Led Training (ILT) course that describes mobile device management (MDM) technologies

More information

Purchasing Services SVC East Fowler Avenue Tampa, Florida (813)

Purchasing Services SVC East Fowler Avenue Tampa, Florida (813) Purchasing Services SVC 1073 4202 East Fowler Avenue Tampa, Florida 33620 (813) 974-2481 Web Address: http://www.usf.edu/business-finance/purchasing/staff-procedures/index.aspx February 14, 2018 Invitation

More information

RFI Content Management System Tools Questions & Answers

RFI Content Management System Tools Questions & Answers RFI 180030 Content Management Tools Questions & Answers Question Answer 1 We are concerned that we will not have enough resources at this point in the year to present a demonstration on the 18th of December.

More information

20246D: Monitoring and Operating a Private Cloud

20246D: Monitoring and Operating a Private Cloud 20246D: Monitoring and Operating a Private Cloud Course Details Course Code: Duration: Notes: 20246D 5 days This course syllabus should be used to determine whether the course is appropriate for the students,

More information

SSRS and Izenda: Comparing an Enterprise Reporting Tool and an Embedded BI Platform. 1

SSRS and Izenda: Comparing an Enterprise Reporting Tool and an Embedded BI Platform. 1 SSRS and Izenda: Comparing an Enterprise Reporting Tool and an Embedded BI Platform 1 www.izenda.com Introduction The reporting tools that come with the relational database management system your organization

More information

NTT DATA Service Description

NTT DATA Service Description NTT DATA Service Description NTT DATA Managed Services for Microsoft Azure Site Introduction NTT DATA is pleased to provide NTT DATA Managed Services for Microsoft Azure Site (the Service(s) ) in accordance

More information

CRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST

CRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST Request for Quote CRISP Azure Migration Consulting Services Friday, July 7th, 2017 All responses due no later than Friday, July 21 st, at 5pm EST 1 Request for Quote RFQ TO ALL RESPONDERS CRISP Azure Migration

More information

Commvault XaaS Solutions for Service Providers

Commvault XaaS Solutions for Service Providers Commvault XaaS Solutions for Service Providers DELIVERING AN EASILY SCALABLE, FEATURE RICH MULTI-TENNANT SOLUTION KEY BENEFITS Lower Infrastructure Costs Commvault software s singular platform shares heterogeneous

More information

Microsoft SharePoint Server 2010 Training Course Catalogue. Learning Solutions

Microsoft SharePoint Server 2010 Training Course Catalogue. Learning Solutions Training Course Catalogue Learning Solutions Learning & Development CONTENTS Overview Welcome to the Training Courses Catalogue section. Here you will find the full range of Official 2010 courses. If there

More information

Clean Inventory Data Contract Overview for Customers

Clean Inventory Data Contract Overview for Customers Clean Inventory Data Contract Overview for Customers This document provides an overview of the Clean Inventory Data Contract (CIDC), which is an Excel workbook that consolidates and formats your Microsoft

More information

RFP No C020 Employee Engagement and Inclusion Survey Program for the Metropolitan Washington Airports Authority

RFP No C020 Employee Engagement and Inclusion Survey Program for the Metropolitan Washington Airports Authority Questions and Answers RFP No. 1-14-C020 Employee Engagement and Inclusion Survey Program for the Metropolitan Washington Airports Authority Notice: Questions may have been edited for clarity and relevance.

More information

Administering Microsoft System Center Configuration Manager and Cloud Services Integration (beta) (703)

Administering Microsoft System Center Configuration Manager and Cloud Services Integration (beta) (703) Administering Microsoft System Center Configuration Manager and Cloud Services Integration (beta) (703) Configure and Maintain a Configuration Manager Management Infrastructure Configure the management

More information

Upgrading Dynamics AX to Dynamics 365 for Finance and Operations (AX7) Frequently Asked Questions (FAQs)

Upgrading Dynamics AX to Dynamics 365 for Finance and Operations (AX7) Frequently Asked Questions (FAQs) Upgrading Dynamics AX to Dynamics 365 for Finance and Operations (AX7) Frequently Asked Questions (FAQs) This document was developed to answer frequently asked questions related to upgrading from Dynamics

More information

10965D: IT Service Management with System Center Service Manager

10965D: IT Service Management with System Center Service Manager 10965D: IT Service Management with System Center Service Course Details Course Code: Duration: Notes: 10965D 5 days Elements of this syllabus are subject to change. About this course This five-day course

More information

RFP NO A CONTRACT FOR THE PROCUREMENT AND INSTALLATION OF AN ENTERPRISE RESOURCE PLANNING SYSTEM PART V. EVALUATION CRITERIA AND PROCESS

RFP NO A CONTRACT FOR THE PROCUREMENT AND INSTALLATION OF AN ENTERPRISE RESOURCE PLANNING SYSTEM PART V. EVALUATION CRITERIA AND PROCESS 1.0 OVERALL PROPOSER EVALUATION CRITERIA 1.1 OVERALL PROPOSER EVALUATION AND CRITERIA The evaluation committee will select a best solution based on a weighted scoring system. The following table presents

More information

Migrating Enterprise Applications to the Cloud. Cloud Expo West 2011 Tuesday, November 8th

Migrating Enterprise Applications to the Cloud. Cloud Expo West 2011 Tuesday, November 8th Migrating Enterprise Applications to the Cloud Cloud Expo West 2011 Tuesday, November 8th About Me Michael S. Collier National Architect, Windows Azure michael.collier@neudesic.com @Michael Collier www.michaelscollier.com

More information

Addendum #1 BID NO.: RFP

Addendum #1 BID NO.: RFP FLORIDA DEPARTMENT OF EDUCATION BUREAU OF CONTRACTS, GRANTS AND PROCUREMENT MANAGEMENT SERVICES 325 West Gaines Street 332 Turlington Building Tallahassee, Florida 32399-0400 Addendum #1 BID NO.: RFP 2014-05

More information

Tips and Tricks to SharePoint Migration

Tips and Tricks to SharePoint Migration 30 May 2015 Tips and Tricks to SharePoint Migration Mike Maadarani Thanks to our Sponsors! Platinum: Gold: Silver: Raffle: More Fun Stuff Raffle: Please join us in the Atrium at 5:15 PM for the raffle.

More information

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES 1 8 2. AMENDMENT/MODIFICATION NO. 0003 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

More information

MCSE: Private Cloud Training Course (System Center 2012)

MCSE: Private Cloud Training Course (System Center 2012) MCSE: Private Cloud Training Course (System Center 2012) Microsoft Course 10750 (Exam 70-246) Prerequisites MCSA: Windows Server 2012 Microsoft Course 10750 Exam 70-246 - Prerequisites Before attending

More information

COURSE OUTLINE: Course 20533C- Implementing Microsoft Azure Infrastructure Solutions

COURSE OUTLINE: Course 20533C- Implementing Microsoft Azure Infrastructure Solutions Course Name Course Duration Course Structure Course Overview 20533C-Implementing Microsoft Azure Infrastructure Solutions 5 Days Instructor-Led This course is intended for IT professionals who are familiar

More information

Implementing Microsoft Azure Infrastructure Solutions

Implementing Microsoft Azure Infrastructure Solutions Implementing Microsoft Azure Infrastructure Solutions Course 20533C Five days - Instructor-led - Hands-on Introduction This five day instructor led course is intended for IT professionals who are familiar

More information

Welcome and Intro. Mike Maadarani, Ottawa

Welcome and Intro. Mike Maadarani, Ottawa Welcome and Intro Mike Maadarani, Ottawa App Dev and Architecture for over 22 years (19 Years Microsoft, 3 Years with the Other Guys ) Business focused on Enterprise Content Management, Search, & Publishing

More information

Program Guide. Server and Cloud Enrollment (SCE)

Program Guide. Server and Cloud Enrollment (SCE) Program Guide Server and Cloud Enrollment (SCE) Contents How the Server and Cloud Enrollment Works... 3 Available Software and Cloud Services... 4 Core Infrastructure... 4 Application Platform... 4 Developer

More information

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505)

CITY OF FARMINGTON 800 Municipal Drive Farmington, NM (505) Fax (505) REQUEST FOR PROPOSALS FOR Mobile Mapping Software, RFP #18-125718 IMMEDIATE ATTENTION ADDENDUM ONE March 23, 2018 CITY OF FARMINGTON 800 Municipal Drive Farmington, NM 87401-2663 (505) 599-1373 Fax (505)

More information

DEPARTMENT OF CHILDREN AND FAMILIES. REQUEST FOR INFORMATION Contract Management System

DEPARTMENT OF CHILDREN AND FAMILIES. REQUEST FOR INFORMATION Contract Management System DEPARTMENT OF CHILDREN AND FAMILIES REQUEST FOR INFORMATION Contract Management System This is a Request for Information pursuant to Rule 60A-1.042, F.A.C., for planning purposes only. This is not a solicitation

More information

ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2014/ Date: 26 January 2015 Time: 11:00

ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2014/ Date: 26 January 2015 Time: 11:00 ROAD ACCIDENT FUND COMPULSORY BRIEFING SESSION RAF /2014/00035 Date: 26 January 2015 Time: 11:00 AGENDA Background of the RFB Purpose of the Bid Evaluation Criteria Mandatory Documents Disqualification

More information

SHARP (SharePoint Health Assessment and Recommendation Program) Author Harsh Gautam Singh

SHARP (SharePoint Health Assessment and Recommendation Program) Author Harsh Gautam Singh Whitepaper SHARP (SharePoint Health Assessment and Author Harsh Gautam Singh Contents - 1. Introduction 3 2. Maximize Your Microsoft Investment 3 3. Key Focus Areas 3.1 Features 3.2 SharePoint Products

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL COLORADO HOUSING AND FINANCE AUTHORITY REQUEST FOR PROPOSAL (RFP) COLORADO HOUSING AND FINANCE AUTHORITY 1981 BLAKE STREET DENVER, CO 80202 REQUEST FOR PROPOSAL Hyperconverged Infrastructure Solution POSTED:

More information

Microsoft Monitoring and Operating a Private Cloud

Microsoft Monitoring and Operating a Private Cloud 1800 ULEARN (853 276) www.ddls.com.au Microsoft 20246 - Monitoring and Operating a Private Cloud Length 5 days Price $4290.00 (inc GST) Version D Overview Please note: Microsoft have released a replacement

More information

NE IT Service Management with System Centre 2016

NE IT Service Management with System Centre 2016 NE-10965 IT Service Management with System Centre 2016 Summary Duration 5 Days Audience IT Professionals Level 300 Technology Microsoft System Centre 2012 Delivery Method Instructor-led (Classroom) Training

More information

TECHNICAL WHITE PAPER. Rubrik and Microsoft Azure Technology Overview and How It Works

TECHNICAL WHITE PAPER. Rubrik and Microsoft Azure Technology Overview and How It Works TECHNICAL WHITE PAPER Rubrik and Microsoft Azure Technology Overview and How It Works TABLE OF CONTENTS THE UNSTOPPABLE RISE OF CLOUD SERVICES...3 CLOUD PARADIGM INTRODUCES DIFFERENT PRINCIPLES...3 WHAT

More information

20533: Implementing Microsoft Azure Infrastructure Solutions

20533: Implementing Microsoft Azure Infrastructure Solutions Let s Reach For Excellence! TAN DUC INFORMATION TECHNOLOGY SCHOOL JSC Address: 103 Pasteur, Dist.1, HCMC Tel: 08 38245819; 38239761 Email: traincert@tdt-tanduc.com Website: www.tdt-tanduc.com; www.tanducits.com

More information

Administering System Center Configuration Manager and Intune (20696C)

Administering System Center Configuration Manager and Intune (20696C) Administering System Center Configuration Manager and Intune (20696C) Overview Get expert instruction and hands-on practice configuring and managing clients and devices by using Microsoft System Center

More information

SAP on Azure & Migration

SAP on Azure & Migration SAP on Azure & Migration Overview SAP Architecture Overview SAP on Azure TechData SAP Services Capabilities SAP on Azure rules of engagement SAP on Azure example Q&A 2 SAP Architecture Overview Quick Introduction

More information

Information Services and Technology FY Performance Plan

Information Services and Technology FY Performance Plan I. MISSION STATEMENT The Information Systems and Technology Department assists county departments in achieving their stated business goals by effectively deploying information management services and providing

More information

Windchill System Validation Technical Brief

Windchill System Validation Technical Brief Technical Brief Contents About This Document... 2 Supported Releases and Products... 2 Audience... 2 Support Policy for Enterprise Deployment Resources... 2 Challenge... 3 Solution... 3 Planning... 4 Preparing...

More information

Microsoft IT Service Management with System Center Service Manager

Microsoft IT Service Management with System Center Service Manager 1800 ULEARN (853 276) www.ddls.com.au Microsoft 10965 - IT Service Management with System Center Service Manager Length 5 days Price $4290.00 (inc GST) Version D Overview This five-day course will provide

More information

Questions and Answers No. 5 Request for Proposal MDM Systems Operations Support RFP January 29, 2016

Questions and Answers No. 5 Request for Proposal MDM Systems Operations Support RFP January 29, 2016 Questions and Answers No. 5 Request for Proposal MDM0031023850 Systems Operations Support RFP January 29, 2016 Ladies/Gentlemen: This list of questions and responses is being issued to clarify certain

More information

IT Service Management with System Center Service Manager (10965)

IT Service Management with System Center Service Manager (10965) IT Service Management with System Center Service Manager (10965) Duration: 5 Days Price: $895 Delivery Option: Attend via MOC On-Demand Students Will Learn Describing Service Manager 2016 Upgrading to

More information

SELECTION CRITERIA AND PROCESS

SELECTION CRITERIA AND PROCESS Page 12 of 49 / ATTACHEMENT 1 - ADDENDUM 3: replace pages 12-16 with the following: Super User Training Admin Training Representatives from the IT, Legal, Finance, Neighborhood Services, and Police Departments