1 National Library of Scotland Procurement Strategy period September 2012 September 2014 Aims This document aims to identify NLS strategy for the development and continued improvement of procurement systems, processes and procedures in support of the Scottish Government (SG) Procurement strategic objectives. These are: Capability, Competitiveness, Capturing Savings and Benefits, Coverage, Collaboration, Corporate Social Responsibility and Communications. This strategy outlines the key approaches required by NLS to achieve these procurement aims. Background Procurement is the process adopted for the purchase of goods, services and works from external suppliers. The procurement process begins when a need to buy something is identified and will generally end after the contract is awarded. Contract management will be carried out throughout the duration of the contract. Contract management is usually carried out by the business area for whom the contract has been awarded who in many cases will be the Delegated Procuring Officer (DPO) for that contract. What we procure and how we procure it is becoming increasingly important in our need to achieve greater efficiencies in a time of economic constraints as well as meeting the client s/user s demand for high quality and effective services. NLS, as an NDPB, also has an obligation to comply with European Union (EU) principles of transparency, equal treatment and non-discrimination, proportionality and mutual recognition, as instructed through Public Contracts (Scotland) Regulations 2012 and the EU Remedies Directive. Procurement is a devolved responsibility within NLS. DPOs authorised to procure goods, services and works need to do so within agreed policy and procedural parameters fully endorsed by NLS Executive Leadership Team (ELT). NLS procurement policy was endorsed by NLS ELT on 30 June NLS procurement policy, procedures and guidance published on the intranet reflect current public policy and guidelines as advised by Scottish Procurement & Commercial Directorate (SP&CD). SPCD Policy Handbook 1

2 Procurement principles The procurement strategy is based on a number of procurement principles as described below: The National Library of Scotland must provide value to the public. All procurement must comply with EU procurement principles of transparency, equal treatment and non-discrimination, proportionality plus mutual recognition. Clear procedures will be provided to facilitate compliant procurement. The roles of the Budget Holder and the Delegated Procuring Officer must be kept separate; Procurement contracts must be issued in writing and awarded by a DPO with a relevant Delegated Purchasing Authority (DPA); Contracts should be awarded on the basis of value for money and through genuine and effective competition Non Competitive Action (NCA) is only granted in exceptional circumstances. NLS must achieve greater value for money by collaboration with other National Collections and appropriate partners. NLS must obtain greater value for money through the use of appropriate procurement strategies. We must investigate the use of National or Sectorial Collaborative contracts before entering into a new procurement process. NLS has to achieve continuous improvement in all categories of procurement expenditure by putting in place mechanisms for the measurement of performance and by supporting these mechanisms. Procurement activity and the activity of those awarded public contracts must conform to robust ethical standards and contribute fully to sustainable development. Within the NLS, we strive to achieve value to the public and value for money. Within the overarching goal of achieving value for money there are three main pillars delivering savings and value for money, buying sustainably, improving the quality of public services and ease of access for suppliers. There are seven areas which relate to these three pillars, which will form the backbone of this strategy document: Capability Competitiveness Capturing savings and benefits Coverage Collaboration Corporate social responsibility, and Communication. 2

3 Each section of this strategy document begins with the SP&CD definition of the seven strategic objectives. For the purpose of this strategy document the Procurement and Project Unit will be referred to as the Procurement team. Capability 'To ensure that procurement activity and commercial decision-making is conducted to the highest possible standard; efforts are not duplicated; and that resources are allocated where they are most needed.' NLS Procurement team will continue to provide information to the ELT. The ELT will continue to provide support for the Procurement team, including the implementation of this strategy, by providing resource and communications as appropriate. The Procurement and Project Manager will continue to be responsible for managing procurement activity and processes within NLS. Non-conformant procurement might result in formal challenges; complaints may be brought against NLS alleging a breach of these rules. The consequences of a successful challenge may, depending on the nature of the breach, result in NLS being fined, the duration of the contract being shortened, award of damages against NLS or reputational damage. As a means of mitigating these risks NLS will provide the necessary internal or external resources and ensure that professional external expertise is sought should the need arise. NLS will continue to ensure that all DPOs are given formal authority annually, by means of a DPO letter, to procure goods, services or works prior to the commencement of a procurement process. During the period this authority will be developed to incorporate at least two levels of authority, (below 50k and above 50k) taking cognisance of the procurement route journey and associated procurement risk. Consideration will also be given as to how these authority limits can dovetail with erequest, NLS' online ordering system. NLS will aim for all DPOs to be appropriately trained in NLS procurement policy and procedures. EU procurement training will be available annually for staff within the Procurement and Estates teams as well as for DPOs planning a procurement exceeding EU thresholds. 3

4 Professional staff within the Estates team will lead on all works / construction related procurement processes. Professional staff within the IS team will assist with all information and communication technology related procurement processes. We will continue to ensure that procurement processes are reviewed annually, addressing any significant findings directly or by building into our future action and improvement plans. Forward job plans for Procurement staff will continue to reflect the procurement strategy plus the associated action and improvement plan, and will be updated annually. We aim to develop a methodology for capturing benefits and savings by 31 March We will continue to monitor procurement outcomes, produce and widely share procurement management information, including quarterly and annual Best Practise Indicators (BPIs) reported to the ELT. We will also continue to support the SP&CD work in capturing benefits and savings. The contracts database will be bedded in and developed further to Procurement and Contract Managers. We will consider the creation of a procurement ICT strategy to underpin the automation of procurement processes, and will investigate the potential for SharePoint (the system underpinning the Intranet) to support this. We have begun to address risk management during sourcing, with the Procurement team now conducting checks on supplier viability, and will continue this process ensuring all suppliers invited to participate in tenders are bona fide. We will consider formalising the processes around demand management, supplier management, and the development of commodity strategies. Competitiveness 'Scotland is seen as a good place to do business by making it as easy as possible to compete for public sector contracts, particularly for Small, Medium Enterprises (SMEs).' We will maintain our Buyers Profile on Public Contracts Scotland. We will continue to use the Quick Quote process for low value / low risk tenders, and will ensure that all contracts which fall below the EU Tender advertising threshold for goods, services and construction but are above the advertising threshold as advised in SPPN 4/2009 (or as amended) will be advertised using unless there is a strong business case against advertising. We are committed to the transparency of the procurement process and the equal treatment of all prospective suppliers within NLS procurement activity. In this respect we will adopt the standard Scottish Government Prequalification Questionnaire (SPQQ) for all advertised contracts and objectively assess the capacity of organisations and suppliers to deliver our requirements. Further, during 2012/13 we will aim to publish lists of forthcoming tenders in PCS Tender and other business journals as appropriate. We will continue to support events for suppliers wishing to understand our processes in more detail. By 31 March 2013 we aim to have processes and procedures in place to allow all tendered procurement, including works related procurement, to be tendered and evaluated on the basis of the Most Economically Advantageous Tender (MEAT). Capturing savings and benefits 'Procurement across the public sector delivers further, real and lasting benefits on the ground.' The Procurement team will continue to provide quarterly procurement management information to the ELT, and from 2012/13 onwards will show comparisons against the 4

5 2011/12 baseline information. To assist the Contract Manager manage the expenditure against the contract award value for individual contracts, we aim to have contract and supplier management information covering spend and commitment readily available by 31 March In addition we aim to review and improve our processes and procedures for measuring engagement with SMEs. As a first step, by end of September 2012 actual spend achieved with SMEs and engagement with SMEs throughout the procurement process will be included in the quarterly BPIs. Similarly during 2012/13 the Procurement team will look at a means of reporting cash and non cash savings made through the use of direct procurement. Consideration will be given to developing the Contracts Database to allow high-level recording and reporting of supplier performance. This would enable DPOs to review the past performance of suppliers prior to any procurement process. With regards to overall procurement capability, NLS' aim is to achieve around 45% in the 2012 PCA Lite, and moving forward aim to achieve at least Improved' status in all sections, resulting in an 'Improved' status overall. NLS will introduce appropriate processes and procedures that will aim to increase NLS contracted spend from 63% at 31 March 2012 to 70% by 31 March 2013 and 90% in longer term. Coverage 'Improved procurement has the widest possible coverage across the Scottish public sector.' We will continue to promote available contracts to procurement users, and highlight and explain procurement processes via our Intranet pages and through our training programme. We will consider formalising the procedures for dealing with maverick and off-contract spend following the bedding in of formal and consistent procurement processes across the organisation. NLS Procurement team will continue to review all suppliers invited to tender, ensuring sourced suppliers are fit for purpose. By 31 September 2012 we will have a live central database of all awarded contracts with planned renewal dates. We intend for this database to cover initially over 70% (by 31 March 2013) and then at least 90% of NLS procurement spend in longer term. In the longer term consideration will be given to adopting PCS Tender for sophisticated route 2 and 3 procurements. We will look at processes and procedures for introducing, where appropriate, the five step plan produced by SP&CD for Contract and Supplier Management. In addition we will consider adopting a balanced scorecard approach from the SG procurement journey for Library key suppliers, with a more simplified approach for low value / low risk procurement. Collaboration 'The Public Sector is working collaboratively, ensuring that effort is not duplicated, that best practice is shared and we learn from each other.' We will continue to work with colleagues in SP&CD, National Institution s Shared Services Group and Procurement Cluster Group to deliver procurement efficiencies through collaboration and sharing best practise. We will continue to analyse spend in order to review opportunities to collaborate with local partners. 5

6 NLS will remain fully engaged with the collaborative efforts of SPCD and representatives from NLS will participate in National Forums and User Intelligence Groups, where appropriate. We will continue to monitor our usage of applicable Centre of Expertise contracts and aim to increase this where appropriate. We aim to participate in more than 75% of such appropriate contracts by 31 March NLS will continue to develop local collaborative procurement with members of National Institutions Shared Services and / or Procurement Cluster Group covering but not exclusive to the following: NLS / NROS - Archival Boxboard NLS NGS HR Shared Services Systems NLS / NGS Internal audit consultancy services. NLS will continue to work with the Scottish Digital Library Consortium. Corporate social responsibility 'Procurement activity and the activity of those awarded public contracts conforms to robust ethical standards and contributes fully to sustainable development.' NLS will ensure that its standard Terms and Conditions (T&Cs) of contract for goods, services and non works consultants are reviewed and updated during the first half of 2012/13 to ensure compliance with changes to legislation in particular the Bribery Act and The Library Bill. Thereafter consideration will be given to developing robust T&Cs for non routine IS procurement. For the time being and until advised otherwise GC Works suite of contracts will be the standard form of contract for works and works consultant procurement. However within the period consideration will be given to adopting NEC 3. NLS Procurement team will develop its policies to reflect the public policy sustainability agenda, in so far as permitted by statute. During the period of this strategy document, NLS will review the current sustainability policy and consider introducing the Marrakech Approach to Sustainable Public Procurement into current procurement processes and procedures, where appropriate, and produce an achievable sustainable procurement delivery plan. In addition we will reassess ourselves against the flexible framework within the Scottish Sustainable Procurement Action Plan, and prepare our own action and improvement plan aiming to achieve level 2 compliance by 31 March 2013 with level 3 by 2014/15 and level 5 in longer term The commitment of NLS to the discharge of its Corporate Social Responsibility (CSR) will be incorporated into NLS procurement processes. The three main strands are Social, Economic and Environmental. NLS will ensure that DPOs are aware of specific policy advice on how environmental and equal opportunities criteria can be incorporated within tender selection criteria, as well as in contracts specifications and within major projects. We will review our policies and procedures against the Procurement Reform Bill when it becomes an Act of the Scottish Parliament. Our policy and procedures aim to ensure equal and transparent treatment of suppliers throughout the procurement process, and we will strive to promote the formulation of contracts that will facilitate participation by SMEs, third sector organisations and supported businesses, whilst achieving the best value for money solution. To further this aim NLS is committed to ensuring these groups understand how our tender process works, and can access opportunities to bid for low value contracts. 6

7 Community benefit clauses will be incorporated into tendered contracts where appropriate. We will consider utilising the SG collaborative framework for supported factories and businesses currently out to tender, once awarded. All of NLS procurement processes will be fully documented and will provide an audit trail that will act as the basis for providing debriefing on procurement selection likely procurement challenges, for answering of any enquiries under the Freedom of Information Scotland Act (FOISA) and for the provision of feedback to suppliers. Communications - 'Greater awareness of how procurement and commercial decision making contributes to public services making the best use of public money and on helping the Scottish Government achieve its overarching purpose of sustainable economic growth.' NLS Procurement team is committed to ensuring the policies and procedures for procurement are updated regularly in line with guidance issued by SP&CD and that this information is quickly and effectively disseminated to NLS DPOs by means of: Updates to the Procurement Intranet Specific DPO training in NLS procurement processes and procedures Regular review and update of the Route 1 checklist Introduction of an evaluation checklist Regular review and update of NLS procurement calendar Introduction of procurement times lines for planning purposes. Updating lessons log on a regular basis. The Procurement team within NLS will use customer feedback to improve its performance. We aim to continue to conduct customer satisfaction surveys annually, as we have in 2011 and Additionally we aim to continue to collect feedback informally and on an on-going basis, act on this feedback by incorporating it into our action plans, and keeping our customers informed of progress. Timescales It is the aim of NLS to address the majority of these issues by 31 December An action, improvement and progress plan (A&IP) will be produced on formal endorsement of this procurement strategy by the ELT. The A&IP will be updated quarterly and available for review by the ELT. Exclusions Purchases from Collection Development Funds Due to their unique nature, the majority of collection items cannot be purchased via standard procurement routes and are therefore currently outside the remit of this strategy document. However during the period consideration will be given to their inclusion. Duncan Campbell Deputy Chief Executive Date 13 September

8 Appendix A Summary of Targets Capability 1. Develop a methodology for capturing savings and benefits 31 March 2013 Competitiveness 1. Aim to have processes and procedures in place to allow all tendered procurement, including works related procurement, to be tendered and evaluated on the basis of most economically advantageous tender (MEAT) 31 March We will aim to publish lists of forthcoming tenders in PCS and other business journals as appropriate During 2012/13. Capturing Savings and Benefits 1. Procurement Team will continue to provide quarterly procurement management information to ELT Quarterly during 2012/2013 and 2013/14 2. To assist the Contract Manager manage the expenditure against the contract award value for individual contracts, we aim to have contract and supplier management information covering spend and commitment readily available by 31 March Introduce measurement of engagement with SMEs in to quarterly BPIs September Investigate means of reporting cash and non-cash savings through the use of direct procurement 5. Aim to achieve 45% in the 2012 PCA Lite 6. Introduce appropriate processes and procedures that will aim to increase NLS contracted spend to 70% 31 March 2012 and 90% in the longer term. Coverage 1. Live central database of all awarded contracts with planned renewal dates 30 September Data base to cover over 70% of NLS procurement spend 31 March 2013 Collaboration 1. Aim to participate in more than 75% of Centres of Expertise contracts 31 March 2013 Corporate & Social Responsibility 1. Review NLS standard T&Cs for compliance with legislative changes 30 September Reassess NLS against SSPAP flexible framework wit action plan to achieve level 2 compliance 31 March

9 Communication 1. Complete an annual assessment survey during 2013/14 and 2014/15 2. Produce quarterly updates to the action and improvement plans during 2012/13 and 2014/15 3. Majority of issues, tasks and targets identified in procurement strategy to be addressed by 31 December

Contents Contact details

Contents Contact details Procurement Strategy - Period December 2016 December 2018 Contents 1.0 Introduction / Executive Summary... 2 2.0 Procurement Vision and Mission Statement... 2 3.0 Strategic rationale / context... 2 3.1

More information

Procurement Strategy and Action Plan. Financial Year

Procurement Strategy and Action Plan. Financial Year Procurement Strategy and Action Plan Financial Year 2018-2019 Status Final Owner Procurement Source location Procurement website Consultation APUC Endorsed Audit Committee 11 June 2018 Publication 1 August

More information

Procurement Strategy

Procurement Strategy Procurement Strategy 2017-2020 POLICY AND PROCEDURE Procurement Strategy DATE OF FIRST ISSUE December 2014 ISSUE NUMBER 2 APPROVING BODY Board of Management DATE OF APPROVAL March 2017 RESPONSIBLE PERSON

More information

Procurement Policy. Policy Valid From 2 February Last Review date

Procurement Policy. Policy Valid From 2 February Last Review date Procurement Policy Policy Valid From 2 February 2016 Last Review date Next Review Date 2 February 2019 Contents Policy Statement Definition Commitment Appendix 1 Procurement Thresholds & Timescales 1 Policy

More information

- Details of the item to be procured and whether it is for works, services or goods;

- Details of the item to be procured and whether it is for works, services or goods; Procurement Policy 1. INTRODUCTION The policy is designed to ensure we comply with the relevant legislation, regulations and guidance which regulate our procurement activities. We will ensure our procurement

More information

Procurement Policy. Prepared By. Nick Ronan, Development Director. Date of Last Review November Date of Current Review March 2016

Procurement Policy. Prepared By. Nick Ronan, Development Director. Date of Last Review November Date of Current Review March 2016 Procurement Policy Prepared By Nick Ronan, Development Director Date of Last Review November 2012 Date of Current Review March 2016 Date of Next Review March 2019 Reviewed By Board 1. INTRODUCTION 1.1

More information

NHS Highland. Procurement Strategy

NHS Highland. Procurement Strategy NHS Highland Procurement Strategy 2016-21 NHS Highland Procurement Strategy 2016-21 1 Introduction Recognising that effective and efficient procurement will positively support the Board in achieving its

More information

Procurement Policy. November Also available in large print (16pt) and electronic format. Ask Student Services for details.

Procurement Policy. November Also available in large print (16pt) and electronic format. Ask Student Services for details. Procurement Policy November 2016 Also available in large print (16pt) and electronic format. Ask Student Services for details. www.perth.uhi.ac.uk Perth College is a registered Scottish charity, number

More information

Procurement Policy. Approved on: 17 November 2012 Senior Management Team

Procurement Policy. Approved on: 17 November 2012 Senior Management Team Procurement Policy Approved on: 17 November 2012 Senior Management Team BIELD HOUSING & CARE. Registered Office: 79 Hopetoun Street. Edinburgh. EH7 4QF Tel: 0131 273 4000. Fax: 0131 557 6327. info@bield.co.uk.

More information

PROCUREMENT POLICY. Director of Finance Head of Financial Services. The Intranet version of this document is the only version that is maintained.

PROCUREMENT POLICY. Director of Finance Head of Financial Services. The Intranet version of this document is the only version that is maintained. PROCUREMENT POLICY Document Summary To ensure the Trust s approach to Purchasing, Supply and Distribution provides the maximum benefit in both cost and service to the Trust. DOCUMENT NUMBER POL/002/043

More information

Procurement Strategy and Action Plan

Procurement Strategy and Action Plan Strategy and Action Plan 2016-2021 1. Context The University of Aberdeen s Strategic Plan contains a vision to transform the world with greater knowledge and learning and to be one of the world s top seats

More information

Annual Procurement Report 2016/17

Annual Procurement Report 2016/17 Annual Procurement Report 2016/17 Publication date: 12 September 2017 Publication code (leave blank Comms will complete this) Page 1 of 15 Annual Procurement Report 2016/17 Prepared by: Gillian Berry,

More information

Procurement Strategy Approved: 7 December 2016 Review Date: March 2018

Procurement Strategy Approved: 7 December 2016 Review Date: March 2018 Procurement Strategy Approved: 7 December 2016 Review Date: March 2018 If you have difficulty with sight, or if you require a translated copy of this policy, we would be pleased to provide the information

More information

Annual Procurement Report 2017/18. Prepared by: Gillian Berry, Senior Accountant Contact:

Annual Procurement Report 2017/18. Prepared by: Gillian Berry, Senior Accountant Contact: Annual Procurement Report 2017/18 Prepared by: Gillian Berry, Senior Accountant Contact: 01382 207140 Approved by: Board: 18 December 2018 1 Contents 1.0 Introduction 1.1 About the Care Inspectorate 2.0

More information

Edinburgh Region Procurement Team (ERPT) Procurement Strategy: January 2017 July 2018

Edinburgh Region Procurement Team (ERPT) Procurement Strategy: January 2017 July 2018 Edinburgh Region Procurement Team (ERPT) Procurement Strategy: January 2017 July 2018 Institutional Membership Status Version 1.0 Owner Andrew Foulner, CPO, ERPT Source location Procurement website Publication

More information

European Maritime and Fisheries Fund Competitive Tendering and Public Procurement. Technical Guidance Notes

European Maritime and Fisheries Fund Competitive Tendering and Public Procurement. Technical Guidance Notes Welsh Government Rural Communities Rural Development Programme 2014-2020 European Maritime and Fisheries Fund 2014-2020 Competitive Tendering and Public Procurement Technical Guidance Notes Crown Copyright

More information

National Galleries of Scotland. Procurement Policy September 2016

National Galleries of Scotland. Procurement Policy September 2016 National Galleries of Scotland Procurement Policy September 2016 1 Table of Contents 1. Purpose and Scope of Policy... 3 2. Policy Statement on the Procurement of Goods and Services by NGS... 3 3. Key

More information

E 4 ISSUE/REVISION LAST MODIFIED 26 November 2012 DATE PRINTED

E 4 ISSUE/REVISION LAST MODIFIED 26 November 2012 DATE PRINTED THE UNIVERSITY of EDINBURGH Estates & Buildings ESTATE DEVELOPMENT E 4 ISSUE/REVISION LAST MODIFIED 26 November 2012 DATE PRINTED RIBA stage E E4 PREPARE PQQ FOR CONTRACT WORKS (OJEU & NON OJEU) 1. DEFINITION

More information

A simple Procurement Process Flow diagram is shown in Appendix 1 and should be considered when carrying out spend.

A simple Procurement Process Flow diagram is shown in Appendix 1 and should be considered when carrying out spend. Scottish Canals Procurement Policy Introduction The Scottish Canals Procurement Policy supports the Scottish Canals Procurement Strategy and sets out the method of delivery of the day-to-day procurement

More information

PLEASE ASK A MEMBER OF STAFF IF YOU WOULD LIKE A VERSION IN A DIFFERENT FORMAT

PLEASE ASK A MEMBER OF STAFF IF YOU WOULD LIKE A VERSION IN A DIFFERENT FORMAT Procurement Policy AS WITH ALL OF THE ASSOCIATION S POLICIES & PROCEDURES, THIS DOCUMENT, IN FULL AND IN PART, IS AVAILABLE IN SUMMARY, ON TAPE, IN BRAILLE, AND IN TRANSLATION INTO MOST OTHER LANGUAGES.

More information

Procurement Policy and Procedures

Procurement Policy and Procedures Procurement Policy and Procedures Document Ref: PP001 version 2 Publication Date: February 2018 Review Date: 12 months (January 2019) Author: F Ward, Head of Procurement Part 1: Purpose and Scope of Activity

More information

Procurement Strategy Version 08 October Reference Version 08

Procurement Strategy Version 08 October Reference Version 08 Strategy 2016-2020 Version 08 October 2016 Reference Version 08 Issue date October 2016 Review date October 2018 Introduction At Red Kite, achieving value for money in delivering our corporate vision is

More information

Glasgow Life Procurement Annual Report

Glasgow Life Procurement Annual Report 1 Glasgow Life Procurement Annual Report 2016-2017 1. Introduction This Annual Report provides an account of Glasgow Life s procurement activity for 2016/17. 2. Background and key statistics The Scottish

More information

OFFICIAL. Date 18 April 2018 Pacific Quay, Glasgow General Data Protection Regulation (GDPR) Police Scotland Preparedness Item Number 11.

OFFICIAL. Date 18 April 2018 Pacific Quay, Glasgow General Data Protection Regulation (GDPR) Police Scotland Preparedness Item Number 11. Meeting Date Location Pacific Quay, Glasgow Title of Paper General Data Protection Regulation (GDPR) Police Scotland Preparedness Item Number 11.2 Presented By ACC Alan Speirs Recommendation to Members

More information

Procurement Policy. Department Owner. Finance & Resources (National) Section Owner. Procurement. Approver. E-ACT Audit & Risk Committee

Procurement Policy. Department Owner. Finance & Resources (National) Section Owner. Procurement. Approver. E-ACT Audit & Risk Committee Procurement Policy Department Owner Section Owner Approver Finance & Resources (National) Procurement E-ACT Audit & Risk Committee Date Approved July 2015 Review Date July 2017 E-ACT Procurement Guidelines

More information

PROCUREMENT AND TENDERING PROCEDURES POLICY 2018

PROCUREMENT AND TENDERING PROCEDURES POLICY 2018 PROCUREMENT AND TENDERING PROCEDURES POLICY 2018 1. Purpose of Document This document has been produced to help define and explain each individual s responsibilities in relation to Weymouth BID s procurement

More information

Parliamentary Procurement Rules

Parliamentary Procurement Rules Parliamentary Procurement Rules Document Revision History and Key Facts Version Issue date Policy owner Date of next review Comments/ brief description of main changes in this revision 001 01/01/15 PPCS

More information

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it.

Procurement Policy. Education is for improving lives and for leaving your community and world better than you found it. Procurement Policy Education is for improving lives and for leaving your community and world better than you found it. Review date: April 2020 Page 1 of 13 Contents 1. Introduction... 3 2. Principles...

More information

Procurement Strategy

Procurement Strategy Procurement Strategy Contents Introduction... 2 Objectives... 2 Our Key Procurement Principles... 3 The Procurement Process... 4 Sustainable Procurement... 5 1 P a g e Introduction Procurement is defined

More information

Sanctuary Group: Sanctuary Group is a trading name of Sanctuary Housing Association, an exempt charity, and all of its subsidiaries.

Sanctuary Group: Sanctuary Group is a trading name of Sanctuary Housing Association, an exempt charity, and all of its subsidiaries. Title: Procurement Strategy Business Function: All Functions across Author(s): Group Procurement Other Contributors: Legal Services Authorised by: Sanctuary Scotland Board Chief Financial Officer : is

More information

PROCUREMENT STRATEGY

PROCUREMENT STRATEGY PROCUREMENT STRATEGY 2018 2023 Approved on: 22 March 2018 Effective from: 1 April 2018 Strategy Owner Department of Finance and ICT Author Mandy Shepherd, Procurement Manager Version Number 1.0 Approved

More information

Competitive Tendering Policy. Pate s Grammar School

Competitive Tendering Policy. Pate s Grammar School Competitive Tendering Policy Pate s Grammar School Approved by: Finance & Facilities Committee Date: May 2018 Last reviewed: May 2018 Next review due by: May 2020 Contents 1. Aims... 1 2. Legislation and

More information

2. What is the aim, objective or purpose of the policy, procedure, service or function?

2. What is the aim, objective or purpose of the policy, procedure, service or function? Equalities Impact Assessment (EIA) Purchasing Services Purchasing Processes A.Policy/practice details 1. Title of Policy/Practice University of Bath Purchasing Processes 2. What is the aim, objective or

More information

Procurement Policy Approved May 2017

Procurement Policy Approved May 2017 Procurement Policy Approved May 2017 Contents 1. Background 3 2. Aim 3 3. Scope 4 4. Objectives 4 5. Policy Responsibility 4 6. Review 5 7. Linkages (to other Policies) 5 8. Procurement Approach 5 9. Procurement

More information

Final Business and Regulatory Impact Assessment

Final Business and Regulatory Impact Assessment Final Business and Regulatory Impact Assessment Title of Proposal Final Business and Regulatory Impact Assessment (BRIA) associated with proposed changes to the public procurement rules in Scotland. 1.

More information

Author(s): Procurement Manager & Head of Corporate Services Procurement and Contract Rules

Author(s): Procurement Manager & Head of Corporate Services Procurement and Contract Rules Author(s): Procurement Manager & Head of Corporate Services Procurement and Contract Rules Approved by: Audit & Ethics Committee Date: 23 February 2018 Next Review: vember 2019 1 Contents 1. Introduction...

More information

Procurement Policy & Procedures

Procurement Policy & Procedures Procurement Policy & Procedures 1 Introduction 2 Objectives 3 Organisation 4 Authority 5 Procurement Procedures 6 EU Procurement Regulations 7 General Principles of Procurement 8 Reporting & Information

More information

Parliamentary Procurement Rules

Parliamentary Procurement Rules Parliamentary Procurement Rules Document Revision History and Key Facts Version Issue date Policy owner Date of next review Comments/ brief description of main changes in this revision 001 01/01/15 PPCS

More information

University Procurement **INSERT DATE**

University Procurement **INSERT DATE** University Procurement **INSERT DATE** Procurement in the University of Strathclyde Fiona Hughes, Head of Procurement, Sharon Griffin, Procurement Manager, Lauren Leitch Category Manager What We Will Cover

More information

PROCUREMENT STRATEGY &

PROCUREMENT STRATEGY & THENUE HOUSING ASSOCIATION PROCUREMENT STRATEGY 2016-17 & 2017-18 1. BACKGROUND Under the terms of the Procurement Reform (Scotland) Act 2014 a contracting authority which is likely to spend in excess

More information

JOB DESCRIPTION. Job title. Senior Procurement Manager. 2-year fixed term contract. Band 2. 52,312-64,208 per annum. Main purpose of the job:

JOB DESCRIPTION. Job title. Senior Procurement Manager. 2-year fixed term contract. Band 2. 52,312-64,208 per annum. Main purpose of the job: JOB DESCRIPTION Job title Senior Procurement Manager 2-year fixed term contract Band 2 52,312-64,208 per annum Main purpose of the job: The Finance and Procurement Team provides a full range of finance

More information

Procurement Strategy. Procurement Strategy

Procurement Strategy. Procurement Strategy Strategy Published on RCH Website 16 th December 2016 Contents 1. Background and purpose... 3 2. Executive Summary... 4 3. Key Context... 5 4. Vision... 6 5. Strategy Rationale & core principles... 7 6.

More information

Brooke Weston Trust. Trust Handbook: Policies and Procedures. Procurement Policy. Associated Policies Charging and Remissions

Brooke Weston Trust. Trust Handbook: Policies and Procedures. Procurement Policy. Associated Policies Charging and Remissions Title Procurement Policy Associated Policies Charging and Remissions REVIEWED: NEXT REVIEW: 1. Policy statement 1.1 This policy (Policy) sets out the rules by which The Brooke Weston Trust (the Trust)

More information

NOT PROTECTIVELY MARKED. HM Inspectorate of Constabulary in Scotland. Inspection Framework. Version 1.0 (September 2014)

NOT PROTECTIVELY MARKED. HM Inspectorate of Constabulary in Scotland. Inspection Framework. Version 1.0 (September 2014) HM Inspectorate of Constabulary in Scotland Inspection Framework Version 1.0 (September 2014) Improving Policing across Scotland Introduction I am pleased to introduce the new HMICS Inspection Framework.

More information

NHS Highland Sustainable Procurement Strategy

NHS Highland Sustainable Procurement Strategy NHS Highland Sustainable Procurement Strategy 2015-16 1 NHS Highland Sustainable Procurement Policy 2015-16 CONTENTS 1. Introduction Page 3 2. Executive Summary Page 3 3. Policy Scope Page 4 4. Policy

More information

Procurement & Probity Policy (v3.0)

Procurement & Probity Policy (v3.0) Procurement & Probity Policy (v3.0) VERSION HISTORY Rev No. Date Revision Description Approval 1.0 2 March 2015 Amalgamation of Procurement Policy and probity procedures to create new Policy. 2.0 23 June

More information

Guidance to support delivery of the Living Wage Commitment to Care at Home and Housing Support

Guidance to support delivery of the Living Wage Commitment to Care at Home and Housing Support Guidance to support delivery of the Living Wage Commitment to Care at Home and Housing Support 1. Introduction This guidance is a tripartite document informed and agreed by Scottish Government, COSLA,

More information

MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING

MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING MG ALBA PROCUREMENT POLICY AND SCHEME OF TENDERING 1 PROCUREMENT POLICY 1 Purpose and Compliance 1.1 The purpose of this Procurement Policy and Scheme of Tendering is to set clear rules for the procurement

More information

Procurement Policy. Date: September 2016 Version: Final Author: Fiona Ward (Head of Procurement)

Procurement Policy. Date: September 2016 Version: Final Author: Fiona Ward (Head of Procurement) Procurement Policy Date: September 2016 Version: Final Author: Fiona Ward (Head of Procurement) 1. Purpose and Application This Procurement Policy applies to and binds all Directors, Managers and Employees

More information

Corporate Procurement Policy

Corporate Procurement Policy Corporate Procurement Policy Director Responsible Author Gordon Laidlaw (Finance & IT) Roy Aitken (Procurement Manager) Date October 2015 Version Number 2 Approved by Board Dec 2015 Review Date Nov 2018

More information

MARCH 2018 CITY OF HOBART PROCUREMENT STRATEGY

MARCH 2018 CITY OF HOBART PROCUREMENT STRATEGY MARCH 2018 CITY OF HOBART PROCUREMENT STRATEGY 2018 22 2 City of Hobart Transport Strategy 2018 30 Consultation Paper 1: Freight, Port and Air TABLE OF CONTENTS INTRODUCTION 5 PURPOSE 6 OUTCOMES 7 OUR

More information

1.3 If further guidance is required staff should contact the Head of Strategic Procurement.

1.3 If further guidance is required staff should contact the Head of Strategic Procurement. Procurement Policy 1. Introduction 1.1 The University has a devolved procurement structure and this document is intended to give clear guidance to staff in teaching and central service departments who

More information

PROCUREMENT POLICY. Revision Revision Date Owner Reference Comment 00 September Procurement

PROCUREMENT POLICY. Revision Revision Date Owner Reference Comment 00 September Procurement PROCUREMENT POLICY Revision Revision Date Owner Reference Comment 00 September 2011 Procurement FIN-POL-003 Format Revised / Bribery Act 01 January 2012 Procurement FIN-POL-003 OJEU / DCMS amends / change

More information

SRUC Procurement Strategy and Action Plan

SRUC Procurement Strategy and Action Plan SRUC Procurement Strategy and ction Plan In accordance with the Procurement Reform (Scotland) ct 2014 (the ct), Sections 8 and 15, this strategy aligns with SRUC s Strategic Plan 2018-2023 and describes

More information

GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY

GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY GLASGOW WEST HOUSING ASSOCIATION PROCUREMENT STRATEGY 2016-2020 Glasgow West Housing Association Limited Registered with The Scottish Housing Regulator HEP126 Registered under the Co-operative and Community

More information

RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2)

RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2) CARDIFF COUNCIL CYNGOR CAERDYDD CABINET MEETING: 27 JULY 2017 RE-PROCUREMENT OF THE COLLABORATIVE SOUTH EAST WALES HIGHWAYS AND CIVILS CONSTRUCTION FRAMEWORK (SEWHIGHWAYS2) REPORT OF CORPORATE DIRECTOR

More information

Ensuring full compliance with policy & practice by staff and suppliers. Equality Analysis Report Template (2014)

Ensuring full compliance with policy & practice by staff and suppliers. Equality Analysis Report Template (2014) Equality Analysis Procurement Ensuring full compliance with policy & practice by staff and suppliers 1 Title of policy Procurement Policy Equality Analysis Report Template (2014) 2 Who does the policy,

More information

SRUC PROCUREMENT: SUSTAINABLE PROCUREMENT STRATEGY. Andrew Tennant Senior Procurement Manager

SRUC PROCUREMENT: SUSTAINABLE PROCUREMENT STRATEGY. Andrew Tennant Senior Procurement Manager SRUC PROCUREMENT: SUSTAINABLE PROCUREMENT STRATEGY Andrew Tennant Senior Procurement Manager March 2016 Leading the way in Agriculture and Rural Research, Education and Consulting 1 Contents Item Page

More information

CORPORATE PROCUREMENT POLICY (2018) The Association purchases goods and commissions services amounting to several millions of pounds each year.

CORPORATE PROCUREMENT POLICY (2018) The Association purchases goods and commissions services amounting to several millions of pounds each year. 1.0 INTRODUCTION 2.0 AIM CORPORATE PROCUREMENT POLICY (2018) The Association purchases goods and commissions services amounting to several millions of pounds each year. This policy sets out the procurement

More information

PROCUREMENT PROCEDURES

PROCUREMENT PROCEDURES PROCUREMENT PROCEDURES DECEMBER 2016 1.0 Introduction. 1.1 Bangor University buys a wide range of works, services, goods and utilities, with expenditure ranging from large construction and refurbishment

More information

Procurement Policy. Policy Objectives

Procurement Policy. Policy Objectives Procurement Policy Policy Type: Council Policy Policy Owner: Director Corporate Services Policy No. CP- 023 Last Review Date: 20 November 2018 Policy Objectives The objectives of this Policy are to ensure

More information

Contract Management arrangements - Procurement Policy update

Contract Management arrangements - Procurement Policy update Agenda item: 13 Report title: Report by: Action: Contract Management arrangements - Procurement Policy update Gordon Duffus, Head of Procurement, Resources and Quality Assurance, gordon.duffus@gmc-uk.org,

More information

Community Benefit in Procurement Network. 2 nd December 2015

Community Benefit in Procurement Network. 2 nd December 2015 Community Benefit in Procurement Network 2 nd December 2015 Agenda Introduction PR(S)A update Jo Mitchell Sustainable Procurement Barbara Morton Third Sector Reporting Stuart Calderwood Service Contracts

More information

Procurement framework for managing Commissioning changes

Procurement framework for managing Commissioning changes Procurement framework for managing Commissioning changes 1. Introduction This framework sets out NHS Kernow s management of major changes to the commissioning of services. Applying a consist approach for

More information

239 Purchasing V4 Current

239 Purchasing V4 Current 239 Purchasing V4 Current 1 PURPOSE This policy provides a best practice approach to purchasing for the City of Busselton (the City ). It also ensures compliance with the Local Government Act 1995 ( the

More information

OFFICIAL. Scottish Police Authority Board. Meeting. Case: Paper by Interim Chief Officer and Accountable Officer Reference B 08.

OFFICIAL. Scottish Police Authority Board. Meeting. Case: Paper by Interim Chief Officer and Accountable Officer Reference B 08. Agenda Item 8 Meeting Scottish Police Authority Board Meeting Date Location Stirling Court Hotel, Stirling Title of Paper Digital Data & ICT Outline Business Case: Paper by Interim Chief Officer and Accountable

More information

Community Benefit Clauses

Community Benefit Clauses Developing Markets for Third Sector Providers Programme Community Benefit Clauses Frequently Asked Questions Community Benefit Clauses in Procurement 1. When do the EU procurement rules apply? Over the

More information

Humber Education Trust. Procurement Policy

Humber Education Trust. Procurement Policy Humber Education Trust Created By: Approved By: Adnan Bashir Bramhope Associates Limited Version: 1.1 Created on: 31 January 2017 Amended on: Next review date: Contents Policy Statement Page 3 Policy Scope

More information

APUC Strategy 2015 to 2018

APUC Strategy 2015 to 2018 APUC Strategy 2015 to 2018 The Core Vision and Mission of APUC is To maximise the value of Scotland s investment in further and higher education by working in partnership with institutions to support and

More information

Procurement Systems Report

Procurement Systems Report Procurement Systems Report Internal Audit Final Follow-up Report March 2017 1 Contents 1. Background page 3 2. Purpose of this report - page 3 3. Executive Summary page 4 4. Summary of Findings page 5

More information

Finance Process Document - Procurement Control

Finance Process Document - Procurement Control PURPOSE This document identifies the process for the procurement of goods and services in the University of Limerick in accordance with the universities procurement policy. It applies to the management

More information

Internal Audit. Procurement. October 2018

Internal Audit. Procurement. October 2018 Internal Audit Procurement October 2018 Internal Audit assessment: Objective Objective Objective Objective Objective One Two Three Four Five Significant Timetable Date closing meeting held: 11 September

More information

DOING BUSINESS WITH NHS EDUCATION FOR SCOTLAND

DOING BUSINESS WITH NHS EDUCATION FOR SCOTLAND DOING BUSINESS WITH NHS EDUCATION FOR SCOTLAND A SUPPLIER S GUIDE Quality Education for a Healthier Scotland V3 Produced by: The NES Procurement Team commissioning@nes.scot.nhs.uk April 2010 INDEX 1. Introduction

More information

Key messages. Improving public sector purchasing

Key messages. Improving public sector purchasing Key messages Improving public sector purchasing Prepared for the Auditor General for Scotland and the Accounts Commission July 2009 Auditor General for Scotland The Auditor General for Scotland is the

More information

A quick guide to. school food procurement

A quick guide to. school food procurement A quick guide to school food procurement Contents Page Why is good procurement important? 3 Good procurement in practice 4 Procurement decision tree 5 What are my options? 8 Pros and cons 9 How do I decide?

More information

How to develop strategies to introduce Sustainable Procurement Policies in Governmental Institutions

How to develop strategies to introduce Sustainable Procurement Policies in Governmental Institutions 2nd International Seminar of Sustainable Public Procurement How to develop strategies to introduce Sustainable Procurement Policies in Governmental Institutions Barbara Morton Director, Sustainable Procurement

More information

LONDON BOROUGH OF BARNET CODE OF CORPORATE GOVERNANCE

LONDON BOROUGH OF BARNET CODE OF CORPORATE GOVERNANCE 1. INTRODUCTION LONDON BOROUGH OF BARNET CODE OF CORPORATE GOVERNANCE 1.1 As with all Local Authorities, the council operates through a governance framework. This is an inter-related system that brings

More information

Competitive Tendering and Procurement Policy

Competitive Tendering and Procurement Policy Competitive Tendering and Procurement Policy STATUS: Required by Academies Financial Handbook DATE ISSUED: February 2018 REVIEW DATE: February 2020 APPROVED BY: APPROVAL DATE: Board of Trustees 21 February

More information

Darlington Building Society Group Conduct Risk Policy

Darlington Building Society Group Conduct Risk Policy Darlington Building Society Group Conduct Risk Policy 1. INTRODUCTION 1.1 This policy is intended to represent the Group s policy for managing retail conduct risk. 1.2 Retail conduct risk has been defined

More information

Level 4 NVQ Diploma in Customer Service. Qualification Specification

Level 4 NVQ Diploma in Customer Service. Qualification Specification Qualification Specification ProQual 2017 Contents Page Introduction 3 Qualification profile 3 Qualification structure 4 Centre requirements 6 Support for candidates 6 Assessment 6 Internal quality assurance

More information

Local Government Reform Consultation on Policy Proposals Consultation Response: Early Years the organisation for young children

Local Government Reform Consultation on Policy Proposals Consultation Response: Early Years the organisation for young children Policy and Legislation Unit Local Government Policy Division Department of the Environment 8 th Floor, Goodwood House 44-58 May Street, BT1 4NN 08/03/2011 Local Government Reform Consultation on Policy

More information

NHSScotland Procurement Review

NHSScotland Procurement Review NHSScotland Procurement Review Project Initiation Document QuEST Portfolio Office Contents 1. Document Control 3 1.1 Programme Details 3 1.2 Version Control 3 2. Purpose of the Document 4 3. Context and

More information

Terms of Reference for Mind Committees

Terms of Reference for Mind Committees Terms of Reference for Mind Committees General notes relating to all committees 1. Committee Structure 1.1. The trustees at a Council of Management meeting in accordance with its Memorandum and Articles

More information

Procurement follow-up review Betsi Cadwaladr University Health Board. Audit year: 2015 Issued: November 2015 Document reference: 437A2015

Procurement follow-up review Betsi Cadwaladr University Health Board. Audit year: 2015 Issued: November 2015 Document reference: 437A2015 Procurement follow-up review Betsi Cadwaladr University Health Board Audit year: 2015 Issued: November 2015 Document reference: 437A2015 Status of report No responsibility is taken by the Auditor General

More information

3. All Procurement activities will be guided by these Procurement Principles:

3. All Procurement activities will be guided by these Procurement Principles: Crown Estate Scotland Procurement Policy Background & Purpose 1. This Procurement Policy is designed to support delivery of Crown Estate Scotland Procurement Strategy, as approved by the Crown Estate Scotland

More information

Information Governance Policy

Information Governance Policy Information Governance Policy Owner Author Information Team Information Governance Manager Reviewed by Approved by and date Council/Committee/EMT Board - Date approved Effective from 24 April 2017 Review

More information

SECTION 17 CONTRACT PROCEDURE RULES

SECTION 17 CONTRACT PROCEDURE RULES Glossary of terms:- 17.1.1 "Tender" means a sealed bid or proposal to supply or receive goods, materials or services or for the execution of works. 17.1.2 "Contract" means any contract including a Purchase

More information

Procurement Strategy. 1 P age

Procurement Strategy. 1 P age Procurement Strategy UNIQUE REFERENCE NUMBER: GB/AC/077/V2 DOCUMENT STATUS: Approved by Audit & Governance Committee DATE ISSUED: January 2017 DATE TO BE REVIEWED: January 2020 1 P age AMENDMENT HISTORY

More information

PROCUREMENT CODE. Issue date: 20 th Sept Version V2.0. Westminster City Council Procurement Code

PROCUREMENT CODE. Issue date: 20 th Sept Version V2.0. Westminster City Council Procurement Code PROCUREMENT CODE Issue date: 20 th Sept 2017 Version V2.0 Table of Contents 1. Introduction... 3 1.1. Executive Summary... 3 2. Operating Model... 3 2.1. Responsibility & Application of the Code... 3 2.2.

More information

NOT PROTECTIVELY MARKED. Item Number 5.10 Gary Devlin, Partner, Scott- Moncrieff Recommendation to Members Members are requested to note the report.

NOT PROTECTIVELY MARKED. Item Number 5.10 Gary Devlin, Partner, Scott- Moncrieff Recommendation to Members Members are requested to note the report. NOT PROTECTIVELY MARKED Meeting Audit Committee Date 24 July 2018 Location Pacific Quay, Glasgow Title of Paper Internal Audit Annual Report Item Number 5.10 Presented By Gary Devlin, Partner, Scott- Moncrieff

More information

1.1 This document details Edinburgh College s Procurement Policy and will support the values adopted by the College by:

1.1 This document details Edinburgh College s Procurement Policy and will support the values adopted by the College by: Policy Finance 1 Issue No 1 Issue Date 01/01/13 Review Date 01/01/16 EIA Prepared by L Dunlop PROCUREMENT POLICY 1. INTRODUCTION 1.1 This document details Edinburgh College s Procurement Policy and will

More information

Public Contracts Regulations A Constructionline guide

Public Contracts Regulations A Constructionline guide Public Contracts Regulations 2015 A Constructionline guide Introduction The construction industry has a high risk and complicated procurement process. This has been recognised in a Cabinet Office guidance

More information

C22(12) COUNCIL. GOC Business Plan KPIs and Core Activity Performance Indicators. Lead responsibility: Samantha Peters Chief Executive and Registrar

C22(12) COUNCIL. GOC Business Plan KPIs and Core Activity Performance Indicators. Lead responsibility: Samantha Peters Chief Executive and Registrar C22(12) COUNCIL GOC Business Plan KPIs and Core Activity Performance Indicators Meeting: Public 25 April 2012 Lead responsibility: Samantha Peters Chief Executive and Registrar Status: for decision Contact

More information

PROCUREMENT POLICY. Revision Revision Date Owner Reference Comment 00 September 2011

PROCUREMENT POLICY. Revision Revision Date Owner Reference Comment 00 September 2011 PROCUREMENT POLICY Revision Revision Date Owner Reference Comment 00 September 2011 Procurement FIN-POL-003 Format Revised / Bribery Act 01 January 2012 Procurement FIN-POL-003 OJEU / DCMS amends / change

More information

GUIDANCE. DWP Revised SME Action Plan.

GUIDANCE. DWP Revised SME Action Plan. GUIDANCE DWP Revised SME Action Plan DWP Revised SME Action Plan Background and objectives The SME agenda is a crucial engine for the Government Growth Agenda and is also a key element of DWP s Commercial

More information

Loch Lomond & The Trossachs National Park Authority and Cairngorms National Park Authority

Loch Lomond & The Trossachs National Park Authority and Cairngorms National Park Authority Loch Lomond & The Trossachs National Park Authority and Cairngorms National Park Authority Internal audit report 2014-15 Project Management 15 January 2015 Contents This report is for: Action David Cameron

More information

Competitive Tendering Policy

Competitive Tendering Policy Competitive Tendering Policy Contents Page 1. Key Principles... 3 2. Purpose... 3 3. Key requirements of process... 3 4. Quotations and tendering... 4 5. Procedures... 4 6. Acceptance of Tender... 5 7.

More information

Planning for the future: an organisational review

Planning for the future: an organisational review Arts Council of Wales Planning for the future: an organisational review Terms of reference Arts Council of Wales is committed to making information available in large print, braille, audio and British

More information

INFORMATION GOVERNANCE STRATEGY IMPLEMENTATION PLAN

INFORMATION GOVERNANCE STRATEGY IMPLEMENTATION PLAN INFORMATION GOVERNANCE STRATEGY & IMPLEMENTATION PLAN 2015-2018 Disclaimer The latest version of this document is located on PTHB intranet. Please check the review date and if there are any doubts contact

More information