QM-01 Quality Manual Rev J Released 12/12/2017

Size: px
Start display at page:

Download "QM-01 Quality Manual Rev J Released 12/12/2017"

Transcription

1 Released 12/12/ Introduction This Quality Manual contains the following information: Background in the Composites Industry Organizational Chart Quality Policy Quality Objectives Scope of the Quality Management System (QMS) Quality Process Relationship Map How AS9100 D Requirements are Met 2.0 Table of Contents 1.0 INTRODUCTION TABLE OF CONTENTS BACKGROUND IN THE COMPOSITES INDUSTRY ORGANIZATIONAL CHART QUALITY POLICY QUALITY OBJECTIVES SCOPE OF THE QMS PROCESS INTERACTION MAP HOW RADIUS MEETS AS9100 D REQUIREMENTS... 7 Printed 1/11/2018 Page 1 of 18

2 3.0 Background in the Aerospace Composites Industry has been a unique resource in the aerospace composites industry since Our goal is to see our customers profitably manufacture net-shape composite parts through the utilization of advanced closed mold technology. Radius Customers Include: Airbus Albany Engineered Composites Bell Helicopter Boeing Defense and Space Group Boeing Commercial Airplane Group Boeing Helicopters Northrop-Grumman Lockheed Martin Sonaca Group Spirit Aerosystems United Technologies Aeronautical Systems Supported CAD Platforms Include: Mechanical: SolidWorks NX I-DEAS CATIA Controls: SolidWorks Electrical e-plan AutoCAD Electrical Printed 1/11/2018 Page 2 of 18

3 4.0 Organizational Chart Printed 1/11/2018 Page 3 of 18

4 5.0 Quality Policy (Rev B) Radius is dedicated to providing innovative integrated composites manufacturing equipment and services. We commit to our customers satisfaction and repeat business by quickly responding to their needs with superior solutions and ongoing support services. We will continually evolve our QMS by measuring and analyzing our results and applying lessons learned to the refinement of our company s processes. 6.0 Quality Objectives (Rev E) Radius is dedicated to achieve and maintain a high level of customer satisfaction. This is accomplished by committing to Radius Quality Objectives, as established by Top Management: Meeting or exceeding committed ship dates of Workcells, Injection Systems, and Tooling projects at least 95% of the time Meeting or exceeding expectations on all customer provided scorecards Providing product that does not require a warranty claim within one year of product acceptance by the customer Any failure to achieve these objectives will be documented, tracked, and resolved in accordance with Radius Corrective Action process (see 9.15). 7.0 Scope of the QMS This QMS, which complies with the requirements of AS9100 D, is designed to support Radius ability to consistently provide products that meet customer (and applicable statutory/regulatory) requirements. It establishes the steps taken by Radius to continually improve customer satisfaction and internal processes. It also defines controls for the prevention and early detection of nonconforming products as well as how Corrective Actions are effectively implemented and assessed to resolve issues as they arise. Within the scope of this QMS, Radius provides the following equipment and services: Engineering, Design, Analysis, and Manufacturing Process Development Services Tooling Design and Fabrication Manufacturing Workcells, including Resin Transfer Molding (RTM) & Same Qualified Resin Transfer Molding (SQRTM) Presses Resin Injection Systems Technology Transfer and Customer Support Printed 1/11/2018 Page 4 of 18

5 Radius has determined that the following interested parties are relevant to its QMS: Customers Employees Radius Management Suppliers Radius Board of Directors Radius takes into consideration both internal and external issues, as well as the requirements of interested parties, when assessing the effectiveness of the QMS, determining any changes to be made, and assessing actions necessary to ensure the steady, incremental growth of the organization. Radius maintains a register of these issues, which serve as an input to Management Review where appropriate. Outsourced QMS Processes: Radius outsources the following QMS processes when necessary: Remote Server Back-up (Controlled by RQP-001) Inspection & Product Testing (Controlled byrqp-009) Product Shipment (Controlled by RQP-009) Manufacture of Tooling (Controlled by RQP-012) Equipment Calibration (Controlled by RQP-013) Printed 1/11/2018 Page 5 of 18

6 8.0 Process Interaction Map Printed 1/11/2018 Page 6 of 18 Support Processes

7 9.0 How Radius Meets AS9100 D Requirements 9.1 Planning It is the responsibility of Top Management to ensure that Radius Quality Management System (QMS) is maintained and that changes to the QMS are planned. Radius maintains a log of internal and external issues identified through planning, the risks and opportunities identified for those issues, and the requirements of Interested Parties. These issues, risks, and opportunities are monitored and reviewed periodically during Management Review to determine what, if any actions are required to meet the requirements of interested parties. 9.2 Awareness All Radius employees contribute to the effectiveness of the QMS by following procedures, sharing knowledge, resolving issues as they arise and looking for opportunities for continuous improvement initiatives. Improvements to the QMS can create numerous benefits, including improved efficiency, increased customer satisfaction, financial stability and boosts to employee morale. Radius ensures that all employees are aware of their contribution to the effectiveness of the QMS, the benefits of improved performance, implications of not conforming to QMS requirements, their contribution to product conformity and safety, and the importance of ethical behavior through the following methods: o All new hires receive an overview of company policies, employee benefits, a facility walk-through with an emphasis on safety, and an overview of the QMS, including the Quality Policy and Objectives o All employees are provided an Employee Handbook which outlines Radius Mission Statement, the Employee Code of Ethics and Conduct, Radius Core Values, Workplace Policies, and methods of communication within the organization. It also communicates to employees the purpose and benefits of our QMS o Employees learn and periodically review the Radius Quality Procedures (RQPs), which define how employees contribute to specific processes within the QMS o Company meetings are held on a periodic basis to update employees on company performance, project status, and upcoming events o Employment Reviews are held annually to review employee contributions to the QMS and address any implications of not conforming with QMS requirements o Ongoing training is offered as needed to address specific areas where there are opportunities to increase or enhance awareness Printed 1/11/2018 Page 7 of 18

8 o Departmental meetings are held as needed to reinforce employee awareness Information (this Quality Manual, applicable RQPs and the Employee Handbook) is reviewed at least annually by each employee to ensure that awareness is maintained. Radius ensures that all employees are notified of changes to the QMS through notifications or formal training meetings, whichever is more suitable to the change. 9.3 Communication Radius Top Management ensures that communication regarding the effectiveness of the QMS is distributed throughout the organization through the following methods: o Company Meetings o Departmental Meetings o Ongoing Training o communication o One-on-one Coaching Radius has established processes for communicating with customers and external providers. These processes are contained in RQP-007 Contract Review, RQP-009 Procurement, and RQP-014 Customer Satisfaction. 9.4 Organizational Knowledge Radius has determined the knowledge necessary for the effective implementation of the QMS. This knowledge is maintained in the following formats, as applicable: o Radius Quality Manual (QM) o Radius Quality Procedures (RQPs) o Work Instructions o Training Modules o Checklists and Records (e.g. Project Plans, Production Control Documents, Nonconformity Reports) o Trip Reports (e.g. from visits to customers) o Logs Radius also maintains a log of historical information, which includes: o Lessons learned on projects (what went well, what did not) o Customer feedback and suggestions o Significant warranty claims/corrective actions o The results of Continual Improvement Initiatives When changes are required to address new requirements or trends, Radius uses its existing knowledge to determine what additional knowledge is necessary and how to acquire it. Common sources for new knowledge include but are not limited to: o Industry communications and publications Printed 1/11/2018 Page 8 of 18

9 o o Externally provided training Consultants 9.5 Product Safety Radius uses risk management to ensure that safety critical items identified during Design & Development are manufactured in such a way that will meet customer requirements while ensuring the safety of employees and endusers. It is the responsibility of Managers and Radius Stewards to identify and manage risks to safety as they occur throughout product realization. Where appropriate, Radius will develop and administer specific safety training. 9.6 Control of Documented Information (RQP-001) Radius stores QMS documents electronically in the Product Data Management (PDM) system, a file configuration management database. When a document is not suited for storage in the PDM, Radius ensures that the document is maintained in a safe, suitable location. The following documented information is controlled: o Organizational knowledge (e.g. Quality Manual, Radius Quality Procedures [RQPs], intellectual property, training materials, forms, lessons learned) o External information (e.g. standards, specifications, statutory/regulatory requirements, customer provided documents) o o Evidence of conformity (e.g. records) Information reflecting organizational intellectual property (e.g. Computer-aided Design [CAD] models, drawings, product specifications, and other project documentation) Electronic data integrity is maintained via a planned back-up program with backed-up data being stored both on and off-site. This plan is managed by a third party IT support vendor and overseen by Radius IT Coordinator. Records are maintained in the PDM (unless otherwise specified) and access is limited to personnel with the appropriate privileges as assigned by the PDM administrator. Radius maintains QMS records for at least 7 years unless otherwise stated or required. When applicable, control of records requirements are flowed-down to suppliers. 9.7 Contract Review (RQP-007) Prior to responding to any request for proposal, Radius considers internal resources and customer needs in an effort to determine: o Radius ability to meet all technical requirements Printed 1/11/2018 Page 9 of 18

10 o Requirements not stated or known by the customer, but necessary for the specified or intended use of the finished product (Radius will propose that these additional requirements be added to the Statement of Work). o Operational risks of the project such as new technology, cost, and short delivery schedules o Project scope, milestones, deliverables, payments, and schedules o Any related statutory, regulatory, and industrial standard requirements o Compliance requirements for all applicable export regulations (ITAR, EAR) o Ability to supply product installation and field service to meet the customer s requirements Radius evaluates technical and financial risks inherent in the project to determine who within the organization must approve a proposal. Once approvals are obtained, Radius will send a quote to the customer for their review and approval. When a customer submits a PO, Radius again assesses the current workload and available resources to determine if the customer s proposed delivery date is achievable and will communicate with the customer accordingly. When changes to a PO are necessary (both at the onset of the project and throughout product realization), Radius will determine if any cost or on-time delivery implications exist, and if so, make arrangements with the customer to amend the PO. 9.8 Design & Development (RQP-008) At the onset of a project, Radius compiles a Project Plan that contains the following: o Key project information o Budget and schedule milestones o Risks and applicable mitigation activities o Project related action items Radius develops a schedule containing all project stages. This schedule is reviewed on a regular basis throughout the duration of the project. A Design Requirements Record is compiled, wherein the Project Manager categorizes requirements by type and determines what, if any, verification/ validation activities should occur for each requirement. Reviews are conducted throughout the design & development process to ensure that design and product safety requirements are met and authorization to proceed to the next stage is obtained and documented. Using the project plan and schedule for guidance, the Project Manager will conduct design reviews as required. Results from these design reviews are recorded and maintained. Radius coordinates the input of the project s Bill of Materials (BOM) into Radius Enterprise Resource Planning system. The BOM (or portions of it) are released to purchasing for procurement in accordance with the project s build schedule. Printed 1/11/2018 Page 10 of 18

11 Prior to the commencement of manufacturing, Radius will generate a Production Control Document (PCD) with the following information, as applicable: o A list of reference documents (e.g. drawings, work instructions) approved for use by production personnel o The current revision of each document o A schedule category for each assembly (to aid in the development of the production sequence) o A table defining which assemblies require in-process testing o A link to post-production testing requirements Work instructions may be created to provide specific details regarding the sequence, techniques, and equipment to be used to complete a production step when this information is not reasonably determinable from an assembly drawing. Design requirements that necessitate post-production testing to prove that customer requirements have been met are listed in a Product Testing Requirements Record for later use. 9.9 Product Configuration Management (RQP 006) When a part, assembly, or drawing is approved and released for the first time, its revision level is automatically set to A. Each time a design-related document is revised, reapproved, and rereleased, the PDM system will automatically increment the revision level to the next letter in the alphabet. Revision levels of drawings and assemblies are traceable in the PDM throughout product realization. Drawing revisions are tracked on Purchase Orders (POs), and assembly revisions are tracked on PCDs. Design changes may result from customer requests or internal design evolution/refinement. When a design change results in a departure from customer requirements or otherwise requires customer acknowledgement, the PM (or appropriate delegate) formally notifies the customer in writing and obtains authorization from the customer before the change can be implemented. This authorization is then retained and all changes for a project are listed in the Project Plan. For customer requested configuration changes resulting in a significant deviation from previously agreed-to schedule/costs, Radius will request a revised PO or some other written statement from the customer acknowledging their responsibility for the change. When a change to a part, assembly, or other product configuration information has been initiated, configuration changes must be documented with an Engineering Change Notice to ensure that all necessary parties (both internally and externally) are notified. Printed 1/11/2018 Page 11 of 18

12 9.10 Procurement (RQP-009) Radius maintains an Approved Supplier List (ASL) of vendors who have been approved to supply goods and services. Radius requests that new suppliers complete a self-evaluation prior to being added to the ASL. Self-evaluations are requested every three years thereafter. Radius assigns an initial risk rating to all suppliers based on the supplier s scope of anticipated work, the importance of the supplier to achieving product conformity, and any certifications they may hold. Suppliers deemed high risk will receive extra scrutiny when determining whether or not and when a Purchase Order (PO) will be issued to them. Supplier performance (including on-time delivery and quality) is evaluated on a monthly basis, and suppliers are assigned a risk rating of Low or High. If a supplier s risk rating is High for any reason, Radius may remove the supplier from the ASL. Radius will notify suppliers on a periodic basis if their performance does not meet Radius requirements. If a supplier does not adequately respond to a Supplier Corrective Action Request, or if their performance does not begin to improve, Radius may remove them from the ASL or change their approval status. Radius reviews POs for accuracy prior to submitting them to the supplier. If prudent and reasonable, Radius may outsource inspection activities to suppliers. In these cases, suppliers will be expected to provide confirmation that part(s) meet PO requirements (e.g. in the form of test data). Radius will review inspection documentation prior to receipt of the item(s). Control of work transfers is controlled via the procurement process, specifically with the issuance of POs with stated requirements, and subsequent incoming inspection of the completed work. Radius takes the following steps to prevent counterfeit parts: o Maintains and monitors an ASL on a monthly basis o Flows down a requirement to all suppliers that they are responsible for taking the necessary steps to prevent the introduction of counterfeit parts into the supply chain o Requires test data, material certifications and/or Certificates of Authenticity to certify that the product provided meets specification, if deemed critical during design reviews o Ensures that the appropriate employees are trained on counterfeit part awareness Printed 1/11/2018 Page 12 of 18

13 9.11 Production & Service Management (RQP-010) Radius ensures adequate resources (e.g. personnel, space, tools, and equipment) are available to support anticipated production activities. Radius uses a Production Control Document (PCD) to ensure that production activities are carried out in a controlled manner, and that in-process inspection activities are conducted at the appropriate time. Radius uses controlled measuring equipment to confirm that specified requirements have been met. Foreign object detection and removal is part of the inspection processes, which ensures that nonessential items have been removed from the work area, and that machine or equipment components are uncontaminated. Changes to production sequences and processes must be appropriately authorized and documented. Radius develops Standard Manufacturing Procedures to validate special processes for production when the resulting output cannot be verified by subsequent monitoring and measurement. Employees must receive training on these processes before they are approved to conduct them without supervision Radius ensures finished products are packaged to protect against physical damage during storage and shipment, or per customer requirements. In determining the extent of post-delivery activities, Radius will consider the following, as appropriate: o Statutory and regulatory requirements o The intended use of the product/service and any potential undesired consequences, as identified through risk management activities o Customer requirements, as determined in RQP-007 Contract Review o The need to collect and analyze in-service data related to product performance and reliability o The need to control, update, and provide product use and maintenance manuals o The need for offsite work (e.g. installation) o Ongoing support (e.g. training, warranty claims, replacement parts, etc.) Warranty concerns are handled in accordance with Radius Warranty Terms as noted in Radius proposal Quality Assurance (RQP-003) Radius ensures that procured products conform to stated specifications and that customer requirements are successfully fulfilled by conducting the following activities: o Incoming inspection o Supplier inspection o In-process verification/validation o Post production testing o Outgoing inspection of spare parts orders Printed 1/11/2018 Page 13 of 18

14 Incoming inspections, in-process verification/validation testing, post production testing, and outgoing inspection of spare parts orders are conducted by approved personnel. Employees conducting incoming inspections are trained on suspect counterfeit part awareness When inspection activities are not outsourced to the supplier, appropriate activities will be conducted by approved personnel at Radius or at the supplier s site to ensure that products meet stated criteria Calibrated measuring equipment is used to conduct inspections and the result of this testing is recorded Risk Management (RQP-011) When planning for the QMS, Radius considers internal and external factors and interested parties that have a stake in how effectively the QMS operates. Information on the context of the organization and interested parties is reviewed during Management Review Meetings (see 9.13). Radius evaluates project risks prior to contract acceptance to determine if and how risks can be mitigated, and whether they will be accepted. Once a project is underway, Radius will determine (on an ongoing basis) risks to budget, schedule, resources, technical performance, and the achievement of customer requirements. These risks are documented, along with any measures taken to mitigate them. At each phase of Design & Development, the Risk Management Plan is evaluated for adequacy, and authorization is required to proceed to the next phase. At the conclusion of production/product testing, Radius determines if the Risk Management Plan has been sufficiently implemented prior to authorizing a product s release to a customer Digital Data Handling (RQP-012) Radius ensures that digital datasets specifically related to design are appropriately identified, maintained, and secure. Customer requirements for handling digital datasets, when not met directly by Radius, will be flowed down to approved suppliers. Radius uses customer approved secure data transfer methods for the exchange of datasets where required. Where required, Radius contracts tooling production and product inspection to approved suppliers. Printed 1/11/2018 Page 14 of 18

15 9.15 Control of Measuring Equipment (RQP-013) Measuring equipment (ME) intended for use during incoming/in-process inspections and post-production testing are calibrated and protected from damage. Controlled ME is stored in the Controlled Tool Cabinet (CTC) when possible, or in the area of the facility in which it is used most frequently (if it is not feasible to store it in the CTC). When necessary, calibration of controlled ME is outsourced to an accredited organization using measurement standards traceable to international or national measurement standards. When conducted internally, calibration of controlled ME is done using measurement standards traceable to international or national measurement standards, when possible. When equipment is determined to be out of calibration, Radius will conduct an investigation to determine if the device was used in previous inspection or verification activities and take actions commensurate with the effect the defective equipment has had on a product s conformity to customer requirements Customer Satisfaction (RQP-014) Radius monitors Quality Objectives and core process metrics on a monthly basis. Failure to achieve a Quality Objective will be documented, tracked, and resolved per Radius Corrective Action Process (see 9.15). When a core process metric misses a predetermined target, the process owner will take action as appropriate. For customers who do not provide a formal scorecard, Radius will attempt to gather feedback on their perception of the conformity of products/services provided by Radius, and any suggestions for improvement. Significant efforts to improve customer satisfaction will be documented as a Continual Improvement Initiative. Management Review meetings serve to determine if actions taken to address customer concerns have been effective Resource Management (RQP-005) Human Resources (HR) Radius mission is to employ people in a safe, creative, and fun environment Radius provides suitable resources to ensure the effective planning and implementation of the QMS. HR and Management actively work together to ensure that employees are competent. Management conducts annual performance reviews for each eligible employee, and ensures that training is provided when necessary. Printed 1/11/2018 Page 15 of 18

16 Work Environment and Infrastructure Radius Top Management ensures that appropriate resources are provided for the maintenance of a safe and suitable work environment. Radius has identified qualified Stewards for each functional area within the Radius facility. Stewards conduct safety assessments of each area at least once quarterly and are responsible for notifying management of any concerns with work environment and infrastructure that they discover, including those that are brought to them by employees working in the area for which they are responsible. Radius has established a Preventive Maintenance Plan and reviews it regularly to ensure equipment remains in good working order. Radius maintains a register of customer property, and will notify the customer when property is lost or damaged while it is under Radius control Management Review (RQP-004) Management Review meetings are held at least twice yearly. These meetings serve as a formal venue to review all aspects of the QMS, including the need for changes and the overall effectiveness of Radius quality processes. The following inputs are considered for inclusion in each Management Review meeting: o The status of actions from previous reviews o o Internal and external changes to the QMS Performance and effectiveness of the QMS, including the following: Customer satisfaction and input from relevant interested parties Quality Objectives and whether they have been met Process performance and product conformity Nonconformities and Corrective Actions Monitoring and measurement results Audit results (internal and external) Supplier performance On-time delivery performance o Adequacy of resources o Effectiveness of actions taken to address risks/opportunities o Opportunities for improvement Outputs from Management Review include decisions and action items related to: o Opportunities for improvement o The need for changes to the QMS o Resource needs o Risks identified during the review Significant efforts to improve the effectiveness of the QMS are documented as Continual Improvement Initiatives. Printed 1/11/2018 Page 16 of 18

17 Radius Management Representative ensures that Management Review minutes are distributed among the management team, and that any relevant information is communicated throughout the organization 9.19 Internal Audit (RQP-015) Radius internal audit schedule ensures that all key processes of the QMS are audited at least once per year. Consideration is given to the status and importance of the processes to be audited as well as to the results of previous internal and/or external audits. When a process is found to be nonconforming, a Corrective Action request will be issued and that process will be re-audited within 6 months to ensure that actions taken have effectively addressed the nonconformity by preventing it from recurring Control of Nonconforming Product (RQP-016) Nonconforming Products (NCPs) detected at incoming inspection, or in the course of production/testing are marked with an NCP tag and segregated to an appropriate NCP Quarantine Area when possible. When NCPs are detected by Radius after delivery or use has started, Radius notifies the customer immediately and takes action as appropriate, determined by the effects or potential effects of the nonconformity. Nonconformities are documented and the data gathered as a result is used to analyze trends and guide process improvement efforts. Suppliers will be notified of all NCPs attributed to them, and a Supplier Corrective Action Request may be issued depending on the severity of the nonconformity and the supplier s past performance. Radius determines the appropriate correction for NCPs. Possible dispositions include repair, rework, return to supplier, scrap, use-as-is, and repurpose. Dispositions of Use-as-is and Repair are used only after authorizations are received from a qualified representative of the organization responsible for the product s design. If the nonconformity results in a departure from contractual requirements, a concession from the customer is also required. Depending on the severity of a nonconformity, formal Corrective Action may be required. Consideration will be given to how the nonconformity (NC) was detected (e.g. reported by a customer or during an audit) urgency, cost, frequency, and likelihood of the NC to recur. In the event that incoming inspections, in-process inspections or product failures indicate that a part or material may be counterfeit, Radius takes appropriate steps to prevent that part from re-entering the global supply chain and reports it to the appropriate authorities. In these cases where Corrective Action is required, Radius takes the following steps (unless the NC is attributed to a supplier): o Analyze the nonconformity to determine a root cause(s) Printed 1/11/2018 Page 17 of 18

18 o Determine action(s) to be taken to prevent it from recurring actions should be appropriate to the effects of the nonconformity o Implement (if possible) action(s) to prevent the nonconformity from recurring o Evaluate the effectiveness of those actions after at least 60 days have passed A Nonconformity Report may be authorized for closure when the following criteria have been met, as appropriate: o Disposition has been carried out o Re-inspection has occurred and nonconformity is eliminated o Suppliers have been notified and supplier Corrective Action is considered sufficient o Root causes have been analyzed and Corrective Actions have been implemented and evaluated for effectiveness 9.21 Continual Improvement (RQPs 004 & 014) Radius has implemented a Continual Improvement program for the purposes of documenting and evaluating opportunities to improve customer satisfaction and/or the effectiveness of the QMS. These opportunities occur as a result of: o Observations arising from internal/external audits o Customer suggestions or NCs resulting from customer error o Employee observations of inadequate, ineffective, or nonexistent processes Continual Improvement Initiatives are reviewed and evaluated for effectiveness during Management Review meetings (see 9.13) Spare Parts Orders (RQP-018) Radius processes customer orders for the spare parts required to maintain Radius equipment. Orders may be submitted online at shop.radius.com, by , telephone, or fax Control of Perishable Supplies (RQP-019) Radius takes care to track and maintain temperature sensitive material and time sensitive materials that may expire. Radius requires and maintains written records of customer requests to use expired materials. Printed 1/11/2018 Page 18 of 18

Reference Paragraphs. Appendix B AQS Auditor Handbook

Reference Paragraphs. Appendix B AQS Auditor Handbook Introduction Auditing is a basic tool to assess effective implementation of and conformity to Quality Management System (QMS) requirements. In addition to the determination of conformity, this handbook

More information

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK

AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK AS9100 PMA and 14 CFR 21 QUALITY HANDBOOK Origination Date: XXXX Document Identifier: Date: Document Status: Document Link: Latest Revision Date Draft, Redline, Released, Obsolete Location on Server (if

More information

Quality Systems Manual Rev. NC Issued July 9 / 2018

Quality Systems Manual Rev. NC Issued July 9 / 2018 NMT Specialized Machining Inc 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Quality Systems Manual Rev. NC Issued July 9 / 2018 Conforms to AS9100 Rev D and ISO 9001:2015 Table of Contents Introduction

More information

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual 290 Shoemaker Street Kitchener, Ontario Canada N2E 3E1 Table of Contents Introduction 5 Documentation Scheme..

More information

PRECISE INDUSTRIES INC. Quality Manual

PRECISE INDUSTRIES INC. Quality Manual PRECISE INDUSTRIES INC Revision N Issued July 5, 2017 Conforms to AS9100 Rev. D and ISO 9001:2015 Copyright Year2017 [PRECISE INDUSTRIES INC]; all rights reserved. This document may contain proprietary

More information

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK

ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK ISO 9001 PMA and 14 CFR 21 QUALITY POLICIES HANDBOOK Origination Date: XXXX Document Identifier: Date: Document Revision: QMS-00 QMS Quality Policies Handbook Latest Revision Date Orig Abstract: This quality

More information

QUALITY MANAGEMENT SYSTEM MANUAL

QUALITY MANAGEMENT SYSTEM MANUAL High Temp Metals, Inc. 12500 Foothill Blvd. Sylmar, CA 91342-6038 Phone: 800-500-2141 818-362-5357 FAX: 818-362-9884 Email: sales@hightempmetals.com QUALITY MANAGEMENT SYSTEM MANUAL This document is uncontrolled

More information

CAPITAL AVIONICS, INC. Quality Manual

CAPITAL AVIONICS, INC. Quality Manual CAPITAL AVIONICS, INC. Issued 31 July 2018 Conforms to ISO 9001:2015 2018 ; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval

More information

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio

FEC QUALITY MANUAL. Federal Equipment Company River Rd. Cincinnati, Ohio QMS-20 2016 FEC QUALITY MANUAL Federal Equipment Company 5298 River Rd Cincinnati, Ohio 45233 www.federalequipment.com www.fecheliports.com www.usdrillhead.com www.orionseals.com www.tkf.com REVISION:

More information

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing Supplier: Phone: Prime Contact/Title: Sales Contact/Title: Address: Fax: e-mail address e-mail address Quality Contact/Title: e-mail address 1. Type of Business: a) Number of years in business? b) Company

More information

SUPPLIER QUALITY SYSTEM SURVEY

SUPPLIER QUALITY SYSTEM SURVEY AERO BENDING USE ONLY APPROVED DISAPPROVED CONDITIONAL APPROVAL (SEE NOTES AND COMMENTS) BY: DATE: Assigned Vendor # Supplier : Facility Address: Phone: Email: Fax: Please check all that apply: Manufacturer

More information

AERO GEAR, INC. SUPPLIER QUALITY MANUAL

AERO GEAR, INC. SUPPLIER QUALITY MANUAL AERO GEAR, INC. SUPPLIER QUALITY MANUAL REVISION HISTORY REVISION EFFECTIVE DATE SUMMARY OF CHANGES A 30-JAN-1998 Original Issue B 17-OCT-2002 Added note re: subcontractors may not subcontract to another

More information

EVANS CAPACITOR COMPANY

EVANS CAPACITOR COMPANY DISTRIBUTION LIST: Location Book # Quality Manager 0001 President 0002 CEO 0003 Engineering Manager 0004 Production Manager 0005 Office Manager 0006 Page 1 of 33 REV A 11/18/03 TABLE OF CONTENTS Page Distribution

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual ISO9001:2008 Prepared By: Date: 06/28/2013 President Approved by: Date: 06/28/2013 Quality Assurance Manager Introduction Cal-Tron Corp has developed and implemented a Quality Management

More information

Quality System Manual - Section 00

Quality System Manual - Section 00 Quality System Manual - Section 00 INDEX AND REVISION STATUS Issued by: Quality Assurance Eff. Date: 06/10/2014 Rev.: A Pg. 1 of 4 QUALITY SYSTEM MANUAL SECTION 0 - INDEX AND REVISION STATUS SECTION 1

More information

UNCONTROLLED DOCUMENT

UNCONTROLLED DOCUMENT Rheem Manufacturing Company Fort Smith, Arkansas Original Release: 4/06/09 Revision Date: 10/25/16 Quality Management System D. Presley 05 1 of 1 Manual Contents A. Johnson 10/25/16 0 Section Title Revision

More information

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to:

4. RELATED DOCUMENTS AND FORMS 4.1. AS ISO Cambridge Valley Machining, Inc. QMS procedures, including, but not limited to: Approved By: Purchasing Manager Candice Lane (signature on file) Date: 5/26/17 Approved By: Process Owner James D. Moore (signature on file) Date: 5/26/17 1. PURPOSE 1.1. To define Cambridge Valley Machining,

More information

Quality Manual ISO 9001:2008 ISO 9001:2015

Quality Manual ISO 9001:2008 ISO 9001:2015 Quality Manual ISO 9001:2008 ISO 9001:2015 SAE CIRCUITS, INC. 4820 63 rd Street Suite 100 Boulder, CO 80301 USA www.saecircuits.com Table of Contents 1. Company Information 3 2. QMS Scope and Exclusions

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 1 of 15 QUALITY SYSTEM MANUAL TITLE: QUALITY SYSTEM MANUAL Page 2 of 15 Index PARAGRAPH TITLE... PAGE 1.0 GENERAL INFORMATION... 3 2.0 DEFINITIONS... 5 3.0 RELATED DOCUMENTS...

More information

CORPORATE QUALITY MANUAL

CORPORATE QUALITY MANUAL Corporate Quality Manual Preface The following Corporate Quality Manual is written within the framework of the ISO 9001:2008 Quality System by the employees of CyberOptics. CyberOptics recognizes the importance

More information

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig

QUALITY MANUAL. Origination Date: XXXX. Latest Revision Date. Revision Orig QUALITY MANUAL Origination Date: XXXX Document Identifier: Date: Document Status: Latest Revision Date Revision Orig Abstract: This document describes the tailored quality management system for the build

More information

Quality Manual. Wilson-Hurd Manufacturing Company. Electronic Control Products (ECP) 311 Winton Street Wausau, WI 54402

Quality Manual. Wilson-Hurd Manufacturing Company. Electronic Control Products (ECP) 311 Winton Street Wausau, WI 54402 Quality Manual Wilson-Hurd Manufacturing Company Electronic Control Products (ECP) 311 Winton Street Wausau, WI 54402 Core Products (CORE) 202 S. Johnston St. Berlin, WI 54293 Rev. Date: 15 February 2017

More information

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14

Quality Manual. Specification No.: Q Revision 07 Page 1 of 14 Page 1 of 14 Quality Manual This Quality Manual provides the overall quality strategy and objectives of Pyramid Semiconductor s quality system. It is based on the requirements of ISO 9000. This manual

More information

PCA ELECTRONICS, INC. Quality Manual

PCA ELECTRONICS, INC. Quality Manual PCA ELECTRONICS, INC. Conforms to ISO 9001:2015 (c) 2018 PCA Electronics, Inc.; all rights reserved. This document may contain proprietary information and may only be released to third parties with approval

More information

SHELTON INDUSTRIAL PATTERN INC.

SHELTON INDUSTRIAL PATTERN INC. Defintions: Seller : Supplier of materials, parts and or services that support production Supplies : materials, parts that support production FOD : Foreign Object Debri / Damage 1. Quality Management System

More information

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017 Company: Prepared By: Date: Changes from previous version highlighted in yellow. Paragraph Element Objective Evidence 2.1 Objective of Quality Assurance Program 2.2 Applicability and Scope 2.3 QA Program

More information

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy QM001 Page 1 of 19 Quality Manual QM001 Page 2 of 19 Table of Contents Page Company Profile 4 Approval 4 Revision History 4 Distribution List 4 1.0 Scope 5 Section 2: Normative Reference 6 2.0 Quality

More information

QUALITY POLICIES HANDBOOK

QUALITY POLICIES HANDBOOK QUALITY POLICIES HANDBOOK Origination Date: (mo/yr) Document Identifier: Date: Document Status: Document Link: Latest Revision Date Draft, Redline, Released, Obsolete Location on Server (if used) Abstract:

More information

QUALITY SYSTEM MANUAL

QUALITY SYSTEM MANUAL QUALITY SYSTEM MANUAL This Manual is a Proprietary Document and any Unauthorized Reproduction is prohibited. ISSUE DATE July 26, 2012 AUTHORIZED BY: Quality Management Representative Eric Hoff Managing

More information

Quality Commitment. Quality Management System Manual

Quality Commitment. Quality Management System Manual Quality Commitment Quality Management System Manual This printed copy is uncontrolled Page 1 of 30 Thor Machining Quality Management System Manual Section 1 TABLE OF CONTENTS Page # 1 Introduction 5 2

More information

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM

QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001 QUALITY MANAGEMENT SYSTEM APPROVED BY: JOSE ALBERTO APPROVED ON: 08/10/2017 Rev.: 1 M001 QUALITY MANAGEMENT SYSTEM PAGE: 1 of 20 TABLE OF CONTENTS SECTION TITLE PAGE Table of Contents

More information

Eagle Machining, Inc.

Eagle Machining, Inc. Quality Control Manual REVISIONS DATE DESCRIPTION REVIEWED APPROVED REVISION 01/29/2010 Modification/Formatting JV, HL, DN JV Rev. A 01/26/2014 Updated company information JV, HL JV Rev. B Table of Contents...

More information

DOCUMENT CONTROL INFORMATION

DOCUMENT CONTROL INFORMATION DOCUMENT CONTROL INFORMATION System: Document Title: Document Status: Quality Manual Approved 5 11/5/2014 Current Document Revision Details Formal review. Added section 2, 3. Revised section 5.5.2, 6.2,

More information

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people. Title: AS9100D Quality Manual Revision Date.: 05/04/2018 Page 1 of 22 The Quality Policy of Monroe Engineering is defined in the following statement: Monroe Engineering is committed to customer satisfaction;

More information

PRINTED COPY IS NOT CONTROLLED

PRINTED COPY IS NOT CONTROLLED Quality Manual We Deliver Quality on Time Form 1217 (01.16.2018) Rev. 12 SOR Inc. sorinc.com SOR QUALITY MANUAL Page 1 of 18 Table of Contents Quality Manual 8701-001 Revision 12 Introduction....4 1.0

More information

Reliance Aerospace Solutions

Reliance Aerospace Solutions Reliance Aerospace Solutions Quality Manual The information contained in this document is the property of Reliance Aerospace Solutions, a division of Reliance Steel & Aluminum Company This manual is a

More information

AS 9100 Rev C Quality Systems Manual AS-050C-QM

AS 9100 Rev C Quality Systems Manual AS-050C-QM AS 9100 Rev C Quality Systems Manual AS-050C-QM Innovative Control Systems, Inc. 10801 N. 24 th Ave. Suite 101-103 Phoenix, AZ 85029 U.S.A. www.icsaero.com +01-602-861-6984 VOICE +01-602-588-9440 FAX Table

More information

Quality Management System Manual

Quality Management System Manual SpecSys, Inc. recognizes its responsibility as a provider of quality products and services. To this end, SpecSys, Inc. has documented, implemented and maintains a System that complies with ISO 9001 2000.

More information

Quality Management System Manual

Quality Management System Manual This Page 1 of 47 of the Quality Management System Manual If issued as a controlled copy, the serial number of this copy is Quality Management System Manual Certified to AS9100 Revision C Printed copies

More information

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip UHV SPUTTERING INC Page 1 of 18 ECO REVISION HISTORY ECO# REVISION DATE MGR QA 1001 A 2/25/2008 R.Clement J.Haislip 1017 B 6/17/2008 T.Finneran J.Haislip 1071 C 1/13/2011 R.Clement J.Haislip 1078 D 5/15/2013

More information

Price Electronics,LLC Quality Assurance Manual

Price Electronics,LLC Quality Assurance Manual Price Electronics,LLC QUALITY POLICY INTRODUCTION The purpose of this manual is to document the company s quality system, to instruct and guide employees whose actions affect product quality and to inform

More information

Business Management System Manual Conforms to ISO 9001:2015 Table of Contents

Business Management System Manual Conforms to ISO 9001:2015 Table of Contents Table of Contents 1.0 Welcome to Crystalfontz... 3 2.0 About the Crystalfontz Business Systems Manual... 4 3.0 Terms and Conditions... 5 4.0 Context of the Organization... 6 4.1. Understanding the Organization

More information

Connecticut Valve & Fitting Co.

Connecticut Valve & Fitting Co. Connecticut Valve & Fitting Co. 120 Long Hill Cross Road Shelton, CT 06484 Phone 203.929.6341 Fax 203.929.1831 Revision 03 Date of Revision 12/14/2010 Quality Manual Approved by: Greg Hines (President)

More information

Wilson-Hurd ATF Quality Manual

Wilson-Hurd ATF Quality Manual Wilson-Hurd ATF Quality Manual Wilson-Hurd Manufacturing Company Advanced Technical Facility (ATF) 311 Winton Street Wausau, WI 54403 Rev. Date: 04 May 2017 Pete Dehne Vice President, Operations Table

More information

TURBO MACH A DIVISION OF VT SAA

TURBO MACH A DIVISION OF VT SAA TERMS AND CONDITIONS PAGE: 1 OF 5 1. PURPOSE To define specific terms and conditions for the purchase of product, materials and services. 2. SCOPE All products, materials and services purchased for use

More information

9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation.

9001:2015. Quality Manual 9001:2015. Engineering Value through Quality and Innovation. Quality Manual 9001:2015 9001:2015 Suburban Manufacturing, Inc. encourages comments from customers, suppliers, employees and friends in order to improve our business and its performance. Information contained

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL Marshall Precision Manufacturing Inc. 7885 AL Highway 69 Guntersville, Alabama 35976 QUALITY ASSURANCE MANUAL DOCUMENT NUMBER QM-1000 REVISION: I (02/07/2018) CONTROLLED DOCUMENT Approved By: President

More information

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard. Quality Manual This manual complies with the requirements of the ISO 9001:2015 International Standard. Northeast Power Systems, Inc. 66 Carey Road Queensbury, New York 12804 Quality Manual Rev 0 Printed

More information

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By Conforms to ISO 9001:2015 Revision history Revision Date Record of Changes Approved By 0.0 [Date of Issue] Initial Issue Control of hardcopy versions The digital version of this document is

More information

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C 1 of 29 Quality Manual Multilayer Prototypes Compliant to ISO 9001-2008 / AS9100 Rev C This Quality Manual sets forth the quality system policies and Defines compliance with the ISO 9001-2008 SAE AS 9100

More information

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R. ISO 9001 The Standard Illustrations The International Standard for Quality Management Systems Year 2000 Edition Leland R. Beaumont ISO 9001, The Standard Illustrations Figures excerpted from ISO 9001,

More information

Quality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard

Quality Manual. This manual has been written to the ISO 9001:2000 International Quality Standard Sceptre CNC Machining Inc. Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Sceptre CNC Machining Inc. Unit 401 1485 Coast Meridian Road Port Coquitlam, B.C.

More information

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED Page 2 of 18 REVISION HISTORY DATE CHANGE DESCRIPTION 10/11/06 Original release 10/21/09 Revised to ISO9001:2008

More information

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL AERO SUPPLY USA 21941 US HWY 19 NORTH Clearwater, FL. 33765 USA P.(727) 754-4915 F.(727) 754-4920 Website: www.aerosupplyusa.com Email: sales@aerosupplyusa.com QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

More information

Quality Manual Revision: C Effective: 03/01/10

Quality Manual Revision: C Effective: 03/01/10 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

Business Management System Manual

Business Management System Manual Page 1 of 21 Business Management System Manual Introduction Burns Engineering has made the Strategic Business Decision to develop and implement an effective Business Management Systems (BMS) to serve our

More information

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

14620 Henry Road Houston, Texas PH: FX: WEB:  QUALITY MANUAL 14620 Henry Road Houston, Texas 77060 PH: 281-447-3980 FX: 281-447-3988 WEB: www.texasinternational.com QUALITY MANUAL ISO 9001:2008 API Spec Q1, 9th Edition API Spec 8C 5 Th Edition MANUAL NUMBER: Electronic

More information

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

Proprietary Document Disclosure Restricted To Employees and Authorized Holders Revision Level: A Page 1 o f 33 Revision Level: A Page 2 o f 33 (This page left blank intentionally.) Revision Level: A Page 3 o f 33 S i g n a t u r e P a g e Reviewed By Management Representative: 1

More information

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev -

Osprey Technologies, LLC. Quality Manual ISO9001:2008 Rev - February 8, 2015 1 Osprey Technologies, LLC Quality Manual ISO9001:2008 Rev - February 8, 2015 Released by Dave Crockett President 6100 S. Maple Avenue, Suite 117 Tempe, AZ 85283 www.osprey-tech.com February

More information

QUALITY POLICY MANUAL

QUALITY POLICY MANUAL C. L. HANN INDUSTRIES, INC. 1020 TIMOTHY DR. SAN JOSE CA 95133 QUALITY POLICY MANUAL Quality Policy Manual Rev. 1 8.18.97 MISSION STATEMENT C. L. Hann Industries, Inc. is designed to meet the precision

More information

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A

Product Realization. Ameritube LLC 1000 N. Hwy 77, Hillsboro TX Revision Level: Procedure No. A 5/8/2012 Page No. 1 of 32 Date Description Of Change Signature Rev. Level 5/8/2012 New Document Jeremy Wilson Procedure pproval: Company Title: Date: Quality Manager 5/8/2012 5/8/2012 Page No. 2 of 32

More information

SUPPLIER QUALITY MANUAL

SUPPLIER QUALITY MANUAL Work Instruction Standard Locknut, LLC Supplier Quality Manual Doc. No. SQM-01 Page 1 of 11 Initial Date 11/1/2009 Rev. 4 Prepared By Dwight Beaty Revised By Shannon Smith Rev. Date 9/12/12 Approvals Purchasing

More information

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE

QP Supplier Quality Requirements Manual. Purchasing. Dearborn Inc. Revision: E Page 1 of PURPOSE Page 1 of 8 1.0 PURPOSE 1.1 The purpose of this manual is to have a single document which conveys the minimum quality requirements and manufacturing practices expected of suppliers for value added products

More information

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS

ANCHOR ISO9001:2008 RPR-004 MARINE SERVICES REQUIRED PROCEDURE NON-CONFORMING PRODUCTS CONTROL OF NON-CONFORMING PRODUCTS (8.3) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: ALL ALL RELEASE DATE: Revision Approval: J.BENTINK Signature: Date: 20/02/17

More information

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0)

Percival Aviation Limited 15 Barnes Wallis Road, Segensworth, Hampshire, PO15 5TT, UK Tel: + 44 (0) TABLE OF CONTENTS INTRODUCTION... 4 1. Purpose... 4 2. Scope... 4 3. References... 4 4 Terminology and Definitions... 5 4.1.1 Subcontractor... 5 4.1.2 Significant Subcontractor... 5 4.1.3 Manufacturers...

More information

Vendor Qualification Survey

Vendor Qualification Survey 1200 West 96 th St Minneapolis, MN 55431 Ph: 952-888-7900 Fax: 952-888-2719 Vendor Qualification Survey Vendor Information Company Name: Date: Address: City: Phone Number: email address: Product or Service

More information

Supplier Quality Manual

Supplier Quality Manual 2711 St. Etienne Blvd, Windsor, Ontario N8W 5B1 Page 1 of 9 Document control revision history Page Reason for change Rev. Reviewer Release Date All New Document A M. Schuurman 11/13/2018 Page 2 of 9 1.0

More information

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler. Polycraft, Inc. QM - 10 Title: Polycraft, Inc. Quality Manual Copy Approval: D. Wheeler This Quality Manual is the sole property of Polycraft, Inc. and intended for exclusive use by the organization. This

More information

Business Management System: Manual 00-BMS-001

Business Management System: Manual 00-BMS-001 Business Management System: Manual 00-BMS-001 Preface This manual defines the Business Management System (BMS) established by GM Nameplate. The BMS is comprised of the processes needed to support GM Nameplate

More information

Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11

Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11 Quality Assurance Procedure Issued: 15NOV2017 Page 1 of 11 1.0 Purpose To ensure that Fleet Canada states applicable requirements for purchased products on purchase orders and applicable documents. Requirements

More information

QUALITY ASSURANCE MANUAL

QUALITY ASSURANCE MANUAL Earle M. Jorgensen Company QUALITY ASSURANCE MANUAL Revision 7, February 19 th, 2018 If Printed - Uncontrolled Copy This manual was re-written for Transition to the ISO9001:2015 Standard. All manuals generated

More information

Supplier Quality System Survey

Supplier Quality System Survey Supplier Division Address Date: Quality Contact: Reports to: Title: Title: Phone Fax e-mail Plant size (ft 2 ): Union: Contract expires: Total Employment: Direct Labor: Shifts: QA employees: This report

More information

QUALITY MANUAL. Conforming To AS9100D and ISO9001:2015. QM-001 Page 0 of 36 Revision 24:

QUALITY MANUAL. Conforming To AS9100D and ISO9001:2015. QM-001 Page 0 of 36 Revision 24: QUALITY MANUAL Conforming To AS9100D and ISO9001:2015 QM-001 Page 0 of 36 Revision 24: 2018-03-09 Contents I. FOREWORD... 3 II. INTRODUCTION... 3 1 SCOPE... 4 1.1 SCOPE STATEMENT... 4 1.2 FACILITIES WITHIN

More information

Beaver Machine. Quality Manual

Beaver Machine. Quality Manual Beaver Machine Quality Manual This manual has been written to the ISO 9001:2000 International Quality Standard Beaver Machine Inc. 5273 Hanson Court Minneapolis, MN 55429 763-535-2204 www.beavermachine.com

More information

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL Revision: 6 Date 05/18/09 EPICOR, INCORPORATED 1414 E. Linden Avenue P.O. Box 1608 Linden, NJ. 07036-0006 Tel. 1-908-925-0800 Fax 1-908-925-7795 Table of Contents:

More information

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3

Quality Manual TABLE OF CONTENTS APPROVAL SIGNATURE PAGE AMENDMENT RECORD SCOPE EXCLUSIONS 2.1 3 TABLE OF CONTENTS DESCRIPTION SECTION PAGE INTRODUCTION 1.0 1 APPROVAL SIGNATURE PAGE 1.1 1 AMENDMENT RECORD 1.2 2 SCOPE 2.0 3 EXCLUSIONS 2.1 3 CORPORATE POLICY 3.0 3 QUALITY MANAGEMENT SYSTEM 4.0 4 GENERAL

More information

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION

ANCHOR ISO9001:2008 RPR-007 MARINE SERVICES ADDITIONAL PROCEDURE PRODUCT REALISATION PRODUCT REALISATION Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: RELEASE DATE: ALL NEW DOCUMENT A J.BENTINK 5/08/2016 Revision Approval: J.BENTINK Signature:

More information

A Division of Research Products Corporation

A Division of Research Products Corporation A Division of Research Products Corporation Quality Manual ISO 9001:2008 Table of Contents Page Number Approvals 2 Table of Contents 3 Revision History 4 Distribution List - Controlled Copies 5 Introduction,

More information

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS Project Procedure INTERNAL QUALITY AUDITS 09/21/2012 PAGE 1 OF 8 1.0 PURPOSE The purpose of this procedure is to establish the requirements for a comprehensive system of planned and documented internal

More information

IBS Electronics, Inc.

IBS Electronics, Inc. ******************************* *** Quality Policy Manual ISO9001:2015 Uncontrolled When Printed 3506-D W. Lake Center Dr. Santa Ana, Ca 92704 U.S.A. 714.751.6633 800.527.2888 714.751.8159 FAX. E-mail:

More information

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10 QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL Revision 10 Page: 1 of 54 TABLE OF CONTENTS 1. DOCUMENT REVISION HISTORY... 5 2. INTRODUCTION... 6 2.1 Purpose... 6 2.2 Scope... 7 Figure 1: Sequence and Interaction

More information

Objective Evidence Record (OER)

Objective Evidence Record (OER) This material is derived from SAE AS9101D, which is copyrighted intellectual property of SAE international. SAE is not responsible for outcomes resulting from use of this material. APPENDIX A OBJECTIVE

More information

Machined Integrations, LLC

Machined Integrations, LLC QUALITY MANUAL Machined Integrations, LLC ISO9001: 2008 Electronically Controlled by Quality Representative, Rev2, January 2014 Page 2 of 25 TABLE OF CONTENTS SECTION ELEMENT PAGE No A Revision and Approval

More information

Quality Systems Manual

Quality Systems Manual Quality Systems Manual ( Documented Information ) ISO9001:2015 1 of 11 pages EFFECTIVE DATE: March 29, 2017 REV. H Prepared By: Date: March 29, 2017 President Approved by: Date: March 29, 2017 QA Manager

More information

Supplier Quality Manual

Supplier Quality Manual Supplier Quality Manual 1 1. Introduction Scope Purpose Application Implementation 2. Purchasing Expectations Terms and Conditions Engineering / Technical Support Customer Support Resources Pricing Consistent

More information

HM Dunn AeroSystems Purchase Order Quality Clauses

HM Dunn AeroSystems Purchase Order Quality Clauses HM Dunn AeroSystems Purchase Order Quality Clauses applies to all divisions of HM Dunn AeroSystems, which include Apex Engineering International (AEI) and HM Dunn Companies. Approved Processing Sources

More information

QUALITY MANUAL. Conforming To AS9120B and ISO9001:2015. QM-001 Page 0 of 32 Revision 22:

QUALITY MANUAL. Conforming To AS9120B and ISO9001:2015. QM-001 Page 0 of 32 Revision 22: QUALITY MANUAL Conforming To AS9120B and ISO9001:2015 QM-001 Page 0 of 32 Revision 22: 2017-08-29 Contents... 0 I. FOREWORD... 3 II. INTRODUCTION... 3 1 SCOPE... 3 1.1 SCOPE STATEMENT... 3 1.2 FACILITIES

More information

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100

PRECISION MACHINE INC. Quality Commitment. Quality Management System Manual AS9100 N&P PRECISION MACHINE INC Quality Commitment Quality Management System Manual AS9100 This printed copy is uncontrolled Page 1 of 44 Revision B N&P Precision Machine, Inc. Quality Management System Manual

More information

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein.

Definitions contained in the above mentioned Specifications and Industry Standards are applicable herein. 1. SCOPE Quality Specification TEC-1019 12 Jul 11 Rev C All Paragraphs Revised Global Quality Management System Supplement for the Aerospace Industry Model, AS 9100 (C) 1.1. Content This specification

More information

ANCHOR ISO9001:2008 RPR-006 MARINE SERVICES REQUIRED PROCEDURE PREVENTATIVE ACTION

ANCHOR ISO9001:2008 RPR-006 MARINE SERVICES REQUIRED PROCEDURE PREVENTATIVE ACTION CONTROL OF CORRECTIVE ACTION (8.5.3) Document Control Revision History PAGE REASON FOR CHANGE REV. REVIEWER / AUTHORISED BY: RELEASE DATE: ALL NEW DOCUMENT A J.BENTINK 21/03/2013 ALL REVIEW No Change 14-15

More information

CMI Guidance Document

CMI Guidance Document CMI Guidance Document for Product Quality Plan Requirements Reference CMI-GD-PQP This document has been produced by the Administration Department of CertMark International (CMI). For technical information

More information

SUPPLIER SURVEY FORM Instructions

SUPPLIER SURVEY FORM Instructions SUPPLIER SURVEY FORM Instructions 1. The following Supplier Survey was developed by Vishay Measurements Group, Inc. to assess and document the capability of its supplier base. 2. The Supplier Survey is

More information

ISO 9001:2008 Quality Management System QMS Manual

ISO 9001:2008 Quality Management System QMS Manual 2501 Kutztown Road Reading, PA, 19605 Tel. 610-929-3330 Fax 610-921-6861 ISO 9001:2008 Quality Management System QMS Manual The information contained in this document is Fidelity Technologies Corporation

More information

Medical QMS Quality Manual

Medical QMS Quality Manual SECTION 1: SIGNATURE PAGE Medical QMS Quality Manual APPROVALS: (Approvals are electronically recorded in the eqms.) CEO/President California Division: Bruce Cleckley President Washington Division: Brad

More information

UPPLIER ANUAL. Issued: 01 Aug 13

UPPLIER ANUAL. Issued: 01 Aug 13 UPPLIER ANUAL Issued: 01 Aug 13 Table of Contents Our Company 3 Our Vision 3 Scope and Purpose 4 Responsibilities 4 General Expectations and Requirements 5 Supplier Quality Management System 6 Supplier

More information

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24 Quality Manual Page 1 of 24 ISO 9001:2015 Standard to Quality Manual Section Matrix ISO 9001:2015 Quality Manual Section 1 Scope 1 Scope 1.1 General 4 Context of the organization 4 Quality management system

More information

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100)

Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100) Effective Date: 04/07/2014 AJR1: Quality Management Systems - Requirements for Aviation, Space and Defense Organizations (AS9100) During the performance of this Contract/Purchase Order (C/PO), the seller

More information

INS QA Programme Requirements

INS QA Programme Requirements Specification Date: 20/3/17 INS QA Programme Requirements UNCONTROLLED WHEN PRINTED Author: J Cooch AUTHORISATION Date: 20/3/17 A Brown Owner: J Cooch (Signature) N.B. only required for hard copy If issued

More information

Lobo Ventures Ltd. Precision Mold & Tool Government Division Warfield San Antonio, TX, 78216

Lobo Ventures Ltd. Precision Mold & Tool Government Division Warfield San Antonio, TX, 78216 Effective date: 03/27/2018 Page 1 of 31 Lobo Ventures Ltd. Precision Mold & Tool Government Division 12027 Warfield San Antonio, TX, 78216 QUALITY MANUAL AS9100 Rev. D Effective date: 03/27/2018 Page

More information

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA Page 1 of 42 VERTECHS ENTERPRISES, INC. Dba LUCHNER TOOL ENGINEERING 10051 OLD GROVE RD. SAN DIEGO, CA 92131 Ph No. 1-858-578-3900. Fax No. 1-858-578-2910 Reviewed and Approved By: Geosef (Joey) Straza

More information