1 The New Purchasing System Review Presented by J.A. White & Associates, Inc. Date 17 October 2012
2 We re drowning in information and starving for knowledge. -Rutherford D. Rodgers 2
3 Goal of This Session Our Session Me Our Workshop You Course Materials 3 For Desktop Use
4 Topics This Presentation Will Discuss: Contractor Purchasing System Reviews (CPSR) New CPSR Guidelines issued by DCMA New Subcontract file documentation requirements How to prepare today for a Government review tomorrow Compliance with Public Laws, FAR and DFARS flow-down How to obtain Reps and Certs from your subcontractors Cost and Price Analysis of subcontract proposals Documenting negotiations with suppliers 4
5 Reference Materials FAR Parts 2, 15, 44, and 52 5
6 Unit 1 Topic Overview of Subcontracting Overview of Contractors Purchasing System Review 6
7 Contractual Relationships Subcontract/Purchase Order establishes relationship between prime and subcontractor Protects the rights of primes and the Government 7
8 FAR Applicability FAR speaks to contracting officers first, then to contractors mainly from the Government s point of view. Rarely does it speak to contractors relative to subcontracting guidance. 8
9 Contractual Relationships Subcontract Management tools used in Risk Management: Advance Notification/Consent Debarment Process Small Business Subcontracting Programs Flow-downs Contractors Purchasing System Review (CPSR) 9
10 Risk Management Tools Prime Contract Statement of Work Clauses Subcontract Process RFP SOW Selection of Subcontract Type Clauses (Truth In Negotiations Act/Cost Accounting Standards) 10
11 What is a CPSR? An enterprise-wide audit that: Measures how efficiently and effectively a contractor spends Government funds and; Evaluates compliance with Government Subcontracting policies, regulations and laws. 11
12 CPSR The Customer s Review Contractor s Government Business Volume Exceeds $25 Million (Excluding Competitive FFP, Competitive FFP/EPA Contracts and Commercial Item Acquisitions) Whenever an Administrative Contracting Officer or Procuring Contracting Officer specifies 12
13 CPSR The Customer s Review The CPSR ultimately provides the Administrative Contracting Officer with the insight required to determine if a contractor s purchasing system approval should be granted, withheld or withdrawn. 13
14 Contract Business System Rules Requirements of contractor business systems only apply to new contracts containing the DFAR Clauses ( and ) These clauses became effective on May 2011 DFARS , which empowers the Government to withhold payments, only apply to contracts that are also subject to CAS The final rules implementing this requirement states that contractor business systems are indicative of contractor responsibility and can be used to discern eligibility for contract awards. The 5 percent withholding is not the only remedy available to DoD. DCAA's assessments of contractor business systems aren't necessarily final. Contractors are allowed to challenge assessments of their business systems. 14
15 Scope of CPSR 15 Procurement Responsibility Certifications Sourcing and Pricing Negotiations Vendor Rating System Defense Priorities Allocation System (DPAS) Requisition Process Reps and Certs Flow downs
16 CPSR Risk Assessment: Basis for Selection CPSR Approval History Identified by PCO or ACO Increased Sales to Government Growth Pre-Award Surveys Major Programs/High Visibility Other Audits Self Assessment Activities 16
17 CPSR: Identification of Risk Factors Signs of a Weak Purchasing System Identified During Self Assessments: Inadequate Procurement Lead Time Violation of Public Laws No or Poorly Written or Implemented Policies No or Weak File Documentation Lack of Upper Management Commitment to Compliance with Procurement Regulations 17
18 Opportunities for Success or Failure 98% of firms will not pass their initial CPSR 18
19 Impact of an Unsuccessful CPSR on Contractors: Losing The Competitive Marketing Advantage and Cash Flow Impact Source Selection Implications Past Performance Implications Losing a Competitive Proposal Loss of Revenue Withhold of Payments 19
20 Impact of an Unsuccessful CPSR on Contractors: Long-Term External Compliance Oversight Impact Defense Contract Audit Agency or Inspector General s (and Other Audit Agencies) Alerted Other Audits Will Follow Possible Negative Press 20
21 Impact of an Unsuccessful CPSR on Contractors: Procedural Burdens with Project Management Impact Increase Administrative Contracting Officer Surveillance Delay in Placing Orders Increase Administrative Expenses Delayed Billings and Collections 21
22 Impact of an Unsuccessful CPSR on Contractors: Costly Internal Compliance Impact Implement Corrective Actions Change Processes Change Culture Implement Training Program Prepare for Follow-Up Audit 22
23 Impact of an Unsuccessful CPSR on the Government: Administrative/Procedural Burden Review and Approve Corrective Action Plan Review Subcontracts Initiate Additional Audits Conduct Follow-up Review 23
24 CPSR Audit Team 2 analysts from Defense Contract Management Agency (DCMA) 2 weeks on site Other analysts from DCMA and Defense Contract Audit Agency (DCAA) will review other functions - Engineering Property Small Business Inventory Control/Receiving, Inspection/QA Accounting Estimating ACO Participates in the Review Reviews are presented to in internal Board 24
25 Unit 2 Topic Source Selection Documentation 25
26 The Source Selection T Sourcing Factors Competitive Sourcing Single Sourcing Sole Sourcing Pricing Factors Competitive Pricing Competitive Pricing or Price Analysis Price Analysis or Competitive Pricing 26
27 Non-competitive Source Justification Required in accordance with: FAR The Contractor shall select subcontractors (including suppliers) on a competitive basis to the maximum practical extent consistent with the objectives and requirements of the contract. Must be signed and dated by requestor prior to award 27
28 Non-Competitive Source Justification Typical conditions where by single and sole source buys are justified include: Only One Responsible Source Unusual and Compelling Urgency Industrial Mobilization (R&D, etc.) Customer Directed National Security Public Interest Management Directed Economically Justified (Cost to qualify new source outweigh savings) Follow-on Procurement 28
29 Team Sourcing Documentation Document the Team Source Selection Decision Focus on Team Competitiveness Document Sole Source Team Members 29
30 Bridging the Documentation Gap Source Justifications Proposal Analyses Negotiations 30
31 Price Analysis Unit 3 Topic 31
32 Why Perform Proposal Analyses? Contracting Officers (buyer) shall purchase supplies and services from responsible sources at fair and reasonable prices (FAR ). Price and/or cost analyses are used to assist in the determination of the fair and reasonableness of prices and costs. 32
33 Price Analysis Price Analysis is the process of examining/evaluating a price without evaluating its separate cost elements and proposed profit. Price Analysis shall be used when cost or pricing data are not required. 33
34 Comparisons in Price Analysis Should-pay price is the price that you would expect to pay. Comparability is the quality or state of being comparable 34
35 Price Analysis- Comparison Process Select Price for Comparison Identify Factors that Effect Comparability Prices for Comparison Other Proposed Prices Commercial Prices Previously-Proposed Prices, Subcontract Prices Parametric Estimates Independent Estimates Determine Effect of Identified Factors Adjust Prices for Comparison Compare 35 Offered Prices with Adjusted Prices Quantitative Techniques to Adjust Prices Index Numbers Trend Analysis Price-Volume Analysis Graphic Analysis Learning Curve
36 Information sources Conduct Market Research Market Research Tools: Internet Industry/Government Publications Industry Contacts Trade Shows GSA 36
37 Price Analysis Documentation Background/Situation Analysis Explanation/Discussion of Method of Analysis/ Basis of Award Conclusion Signature/Date Attachments as Required 37
38 Price Analysis: Documentation Concepts Some form of price analysis in all orders Amount of detail in the analysis is relative to the dollar value complexity and circumstances SCA/Buyer knowledge is not acceptable Include previous Price Analysis and other objective evidence, as required 38
39 File Documentation Unit 4 Topic 39
40 Procurement Process Timeline PR Source Justification RFP/RFQ/RFI Proposal /Quote Price Analysis & Tech Evaluation Negotiations ACO/PCO Consent Debarment Verification Certifications PO/SubK 40
41 Multi-year Subcontracts The Contractor must consider the total potential value of a subcontract when documenting a multi-year subcontract Total potential value includes: Subcontract ceiling amount Current funding amount All Options (price and unpriced) 41
42 Split awards Avoid splitting awards to circumvent FAR requirements If it can not be avoided, use sound judgment when deciding whether to split awards. Document the decision to split awards. 42
43 Documentation Tips Provide the proper title to a document Example 1: Source Justification not Justification for Other than Full and Open Competition Example 2: Price Analysis not Price/Cost Analysis Example 3: Source Justification not Single/Sole Source Justification Example 4: Price Analysis not Price Justification 43
44 General Documentation Issues All documents Memos to file, price analysis, procurement summaries, source justifications, etc Must be properly signed, dated, and contain clear and concise information. Must Tell The Story! 44
45 For Additional Information Jeffery A. White, C.P.M., President J.A. White & Associates, Inc Garner Lane, Suite 104 Columbia, SC (fax) 45 Jeff Rankin, Vice President of Operations J.A. White & Associates, Inc Wisconsin Ave. N.W. Suite 440 Washington, DC (office DC) (office MD) (mobile)
How to Perform Effective Price Analyses on Subcontractors. Jeffery A. White, C.P.M J.A. White & Associates, Inc.
How to Perform Effective Price Analyses on Subcontractors Jeffery A. White, C.P.M J.A. White & Associates, Inc. Pricing Wisdom A cynic is a man who knows the price of everything and the value of nothing.
More informationCPSR Expectations Before, During and After Review
CPSR Expectations Before, During and After Review Breakout Session #: C04 Andrew C. Obermeyer, Director, Business Operations Center, Defense Contract Management Agency Karen M. Ouellette, Procurement Analyst,
More informationCost Accounting Standards (CAS) Lee Canada. Cost Accounting Standards Act (CAS) PL
Click to view this email in a browser J.A. White & Associates, Inc, 1341 Garner Lane, Suite 104 Columbia, SC 29210 Tel: (803) 407-1399 Fax: (803) 407-0256 info@jawhite.com www.jawhite.com Cost Accounting
More informationUnderstanding Contractor Purchasing System Reviews
Understanding Contractor Purchasing System Reviews Breakout Session #A01 Andrew C. Obermeyer, Director, DCMA Business Operations Center March 12, 2015 10:45am - 12:00pm Centralized Lines of Service Business
More informationSTUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems
STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 5, Lesson 1 Cost Analysis Process, Players, and Business Systems January 2017 CON170, Unit 5 Lesson 1 Cost Analysis Process and Players
More informationContractor Estimating Systems: System Adequacy Standards and Key Compliance Issues
McKenna Government Contracts, continuing excellence in Dentons Contractor Estimating Systems: System Adequacy Standards and Key Compliance Issues Joe Martinez, Esq. Dentons US LLP Michael Steen, CPA Redstone
More informationUnderstanding the DCAA Audit Process and How to Prepare for Success
Understanding the DCAA Audit Process and How to Prepare for Success Breakout Session #: C11 Presented by: Beverly Arviso, CPA, Fellow, CPCM, CFCM Date: July 22, 2013 Time: 4:00-5:15 DCAA s Mission Compliance
More informationA cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program, if:
SECTION 7: ACQUISITION PROCEDURES SUBJECT: COST ANALYSIS PROCEDURE 7.4.2 POLICY: A cost analysis is required for any negotiated (non competitive) contract procurement on behalf of any University program,
More informationForward Pricing Proposal- Labor Categories. Next Slide
Forward Pricing Proposal- Labor Categories Table of Contents Risk Assessment Research and Planning Initial Discussion with Contractor s Representative and Request for Information Preliminary Analytical
More informationSubcontractor and Vendor Kickbacks. Next Slide
Subcontractor and Vendor Kickbacks Table of Contents Risk Assessment Research and Planning Preliminary Analytical Procedures Entrance Conference Audit Team Brainstorming for Fraud Risk Assessment Results
More informationMake or Buy Decisions in a Proposal Audit. Next Slide
Make or Buy Decisions in a Proposal Audit Table of Contents Risk Assessment Research and Planning Risk Assessment Initial Review of Proposal Risk Assessment Coordination with the PCO and ACO Preliminary
More informationCost & Price Analyses Documenting Your Contract Files
Cost & Price Analyses Documenting Your Contract Files Presenter: Jo Cunningham, Distinguished Member of Laboratory Staff, Sandia National Laboratories Insert Photo Here Session 2, 1:00pm-2:00pm Eastern
More informationThis policy will outline the requirements for competitive bids on goods and services purchased by the College.
Policy Name: Procurement Sole Source/Competitive Bid Policy Updated/Reviewed: August 10, 2017 Effective Date: November 15, 2010 Office with Primary Responsibility: Procurement Services Offices with Secondary
More informationBest Practices in Dealing with the DCAA
Best Practices in Dealing with the DCAA Bag Lunch Webinar December 7, 2016 1 Presenter: Paul H. Calabrese Rubino & Company, CPAs & Consultants Senior Manager Tel: 301-214-4137 pcalabrese@rubino.com www.linkedin.com/pub/paul-calabrese/20/293/645/
More informationHow to Prepare a DCAA Compliant Cost or Price Proposal. Bag Lunch Webinar November 17, 2016
How to Prepare a DCAA Compliant Cost or Price Proposal Bag Lunch Webinar November 17, 2016 Presenter: Paul H. Calabrese Rubino & Company, CPAs & Consultants Senior Manager Tel: 301 214 4137 pcalabrese@rubino.com
More informationDefective Pricing- Material Pricing Deficiencies. Next Slide
Defective Pricing- Material Pricing Deficiencies Table of Contents Risk Assessment Research and Planning Risk Assessment - Initial Data Obtained from Contractor Risk Assessment Overrun or Underrun Analysis
More informationEffective Date: January, 2007 Last Reviewed Date: September, 2016 Last Revised Date: October, 2016 Next Review Date: April 2018
Section: Finance and Administration Number: 12.20.PP.v7 Subject: Goods and Services Procurement (including consulting services) Policy and Procedure Associated Document Form Number: 12.20.F Effective Date:
More informationPROSPECTIVE OFFEROR TO: PREAWARD SURVEYS. Defense Contract Management Agency WHAT YOU NEED TO KNOW
PROSPECTIVE OFFEROR TO: S GUIDE PREAWARD SURVEYS Defense Contract Management Agency WHAT YOU NEED TO KNOW INTRODUCTION Congratulations on your selection as a prospective defense supplier! You re well on
More informationOrganizational Alignment for Contracting/Subcontracting:
Breakout Session #: G17 Organizational Alignment for Contracting/Subcontracting: Optimizing Performance and Managing Performance Risk Presented by: The Subcontract Management Institute (ScMI ) Date: Wednesday,
More informationPHASE 4 - Post-Award. Type of Feedback Type of Contract Feedback Category Feedback
PHASE 4 - Post-Award Type of Feedback Type of Feedback Category Feedback Commodity (Competitive) Use of the Bid Evaluation Model (BEM), when validated, is a best practice approach to evaluating competitive,
More informationSection M: Evaluation Factors for Award HQ R LRDR Section M: Evaluation Factors for Award For HQ R-0002
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 LRDR Section M: Evaluation Factors for Award For 1 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Table of
More informationSTUDENT GUIDE. CON 170 Fundamentals of Cost & Price Analysis. Unit 4, Lesson 1 Differences between Cost & Price Analysis
STUDENT GUIDE CON 170 Fundamentals of Cost & Price Analysis Unit 4, Lesson 1 Differences between Cost & Price Analysis April 2018 STUDENT PREPARATION Required Student Preparation Read FAR subpart 15.4,
More informationCounterfeit Mitigation
Counterfeit Mitigation Parts Standardization & Management Committee (PSMC) LMI Tysons, A Defense Contract Management Agency (DCMA) Technical Directorate - Engineering 25-27 April 2017 2 Agenda COUNTERFEIT
More informationJUL 14 Rev B All Paragraphs Revised
Quality Specification 102-32039 22 JUL 14 Rev B All Paragraphs Revised Counterfeit Electronic Parts Detection and Avoidance System 1. PURPOSE 1.1. Content The purpose of this document is to describe the
More informationMaterial Transfers and Material Management and Accounting System (MMAS) Next Slide
Material Transfers and Material Management and Accounting System (MMAS) Table of Contents Risk Assessment Research and Planning Preliminary Analytical Procedures Entrance Conference Audit Team Brainstorming
More informationNETWORX PROGRAM INDIVIDUAL SMALL BUSINESS SUBCONTRACTING PLAN IDIQ TASK ORDER BASED
NETWORX PROGRAM INDIVIDUAL SMALL BUSINESS SUBCONTRACTING PLAN IDIQ TASK ORDER BASED Company Name: Qwest Government Services, Inc. (QGSI) Address: 4250 N. Fairfax Drive Arlington, VA 22203 Date Submitted:
More informationRepetitive Bidding of Duplicative Material Costs. Next Slide
Repetitive Bidding of Duplicative Material Costs Table of Contents Risk Assessment Research and Planning Risk Assessment Initial Review of Subcontract Proposal Preliminary Analytical Procedures Entrance
More informationSEMINOLE COUNTY OFFICE OF MANAGEMENT AND BUDGET PURCHASING DIVISION BLANKET PURCHASE ORDER PROCESS AUDIT. March 31, 1998
SEMINOLE COUNTY OFFICE OF MANAGEMENT AND BUDGET PURCHASING DIVISION BLANKET PURCHASE ORDER PROCESS AUDIT March 31, 1998 March 31, 1998 The Honorable Randall C. Morris Chairman The Board of County Commissioners
More informationDigital Supplier Handbook
Digital Supplier Handbook Table of Contents Prospective Suppliers... 3 Current Suppliers... 3 Request for Quote... 3 Purchase Order... 4 Terms and Conditions... 5 Quality Requirements... 6 Shipping Instructions...
More informationPHASE 2 - Pre-Final Proposal Revision
Type of Feedback Type of Feedback Category Feedback, multipleaward IDIQ PHASE 2 - Pre-Final Proposal Revision ing Officer (CO) prepared a worksheet/checklist that included every requirement to be evaluated
More informationTEAMING, SUBCONTRACTING, AND JOINT VENTURES
888 17 th Street, NW, 11 th Floor Washington, DC 20006 Tel: (202) 857-1000 Fax: (202) 857-0200 TEAMING, SUBCONTRACTING, AND JOINT VENTURES 2013 NATIONAL HUBZONE CONFERENCE SEPTEMBER 10, 2013 Presented
More informationCommon Myths and Best Practices. By Gr e g o r y A. Ga r r e t t
Common Myths and Best Practices By Gr e g o r y A. Ga r r e t t 16 Contract Management October 2009 Examining 10 common myths and several best practices of risk management can help you apply an effective
More informationDAU Hot Topics Forum on: Using commercial items to increase innovation, increase competition and lower costs
DAU Hot Topics Forum on: Using commercial items to increase innovation, increase competition and lower costs John Tenaglia Deputy Director, DPAP/CPIC 19 July 17 1 Briefing Overview Status of Current Guidance
More informationJuly 30, (1) CHAPTER 5. Table of Contents
July 30, 2013 5(1) CHAPTER 5 Table of Contents Paragraph Page 5-000 Audit of Policies, Procedures, and Internal Controls Relative to Accounting and Management Systems 5-001 Scope of Chapter... 501 5-100
More informationSPROUTS Training Session: Procurement-Goods and Services Overview Reference Guide Date: June 23, 2015
1. Procurement methods at MSU A. Purchase Orders 1. A Purchase Order (PO) is a type of contract. For well-defined purchases it may be all that is required. Purchase Orders are to be completed in advance
More informationContractor Business Systems Earned Value Management, Material Management and Accounting, and Property Management
McKenna Government Contracts, continuing excellence in Dentons Contractor Business Systems Earned Value Management, Material Management and Accounting, and Property Management Michael McGuinn, Dentons
More informationBending The Cost Curve (BTCC)
Bending The Cost Curve (BTCC) A Discussion with Northrop Grumman January 2015 Catherine Rice VP Contracts, Pricing & Program Business Operations Northrop Grumman Aerospace Systems Sector Utilizing Joint
More informationRequest for Proposals (RFP) Information Technology Independent Verification and Validation RFP No IVV-B ADDENDUM NO.
Request for Proposals (RFP) Information Technology Independent Verification and Validation ADDENDUM NO. 2 Questions and Answers RFP Amendments September 2015 Contained herein are the responses to the questions
More informationProcurement Manual. Page 1
Procurement Manual Page 1 A Note from the Procurement and Travel Services Department This manual is designed for GW staff and faculty involved in requesting, ordering, receiving, and/or paying for goods
More informationCharges to sponsored projects are classified as either non-salary or salary.
EXPENDITURE APPROVAL AND CONTROL INITIATING CHARGES TO SPONSORED PROJECTS Charges to sponsored projects are classified as either non-salary or salary. Non-salary charges are initiated via: 1. Pcard; 2.
More informationDelivering End-to-End Supply Chain Excellence
Delivering End-to-End Supply Chain Excellence -The DCMA Perspective- Ms. Marie A. Greening Director, Operations and Aeronautical Systems Divisions 19 March 2009 DCMA Mission We provide Contract Administration
More informationCompetitive Bid and Competitive Bid Exception Procedure
Approval Date: June 21, 2010 Most Recent Editorial Date: October 25, 2017 Parent Policy: Supply of Goods and Services Policy Competitive Bid and Competitive Bid Exception Procedure Office of Administrative
More informationRecent Changes in Definitions and Determinations of Commerciality: How They Can Affect Your Products and Services Sold to the Federal Government
Recent Changes in Definitions and Determinations of Commerciality: How They Can Affect Your Products and Services Sold to the Federal Government Presented by Darrell Hineman, CPA, CFE, Director Donald
More informationUNIVERSITY HOSPITAL POLICY
UNIVERSITY HOSPITAL POLICY SUBJECT: Responsible Executive: SUPPLY CHAIN MANAGEMENT Executive Director for Supply Chain Management TITLE: Responsible Office: WAIVER OF BIDS Supply Chain Management CODING:
More informationMaterials Management and Accounting System Compliance Statement
Compliance Statement Materials Management and Accounting System Compliance Statement Infor LN Materials Management and Accounting System Compliance Statement The Defense Federal Acquisition Regulation
More informationCOMMUNITY LIVING BRANT POLICY AND PROCEDURE MANUAL
PAGE 1 of 7 FILE UNDER SECTION: 4 EFFECTIVE DATE: January 2012 REVISION DATE: APPROVAL DATE: January 2012 POLICY: This Policy includes the requirements that are set out in the Broader Public Sector (BPS)
More informationInspector General FOR OFFICIAL USE ONLY
Report No. DODIG-2014-088 Inspector General U.S. Department of Defense JULY 3, 2014 Defense Logistics Agency Aviation Potentially Overpaid Bell Helicopter for Sole-Source Commercial Spare Parts INTEGRITY
More informationThe following commercial specification is an original Parachute Industry Association specification.
13 September 2008 The following commercial specification is an original Parachute Industry Association specification. REPORTING AND VERIFICATION OF BERRY COMPLIANCE AS RELATED TO TEXTILE PRODUCTS Background:
More informationConnoisseur Solutions Project Procurement Management
Project Procurement Management Project Procurement Management Processes necessary to purchase or acquire products, services or results needed from outside the project team. Procurement Management Processes
More informationInternational Subawards
International Subawards Alternatives to Cost Reimbursable Subrecipient Agreements Presentation for the Federal Demonstration Partnership International Subawards Subcommittee 11 January 2008 David Brady,
More informationDEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION. Government Purchase Cards
DEPARTMENT OF DEFENSE Defense Contract Management Agency INSTRUCTION Government Purchase Cards Contracts Directorate DCMA-INST 117 CPR: DCMA-AQ Validated current, March 10, 2014 1. PURPOSE. This Instruction:
More informationSEC ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY.
SEC. 813. ESTABLISHMENT OF PANEL ON CONTRACTING INTEGRITY. (a) Establishment- (1) IN GENERAL- The Secretary of Defense shall establish a panel to be known as the `Panel on Contracting Integrity'. (2) COMPOSITION-
More informationGovWin IQ Federal Solutions Overview
GovWin IQ Federal Solutions Overview Find and Win More Federal Contracts deltek.com/govwiniq Know more. Do more. Win more. 4 The Federal Market Opportunity 5 GovWin IQ Federal Solutions Help Grow Your
More informationImproper Billing of Costs on Progress Payments 1
Improper Billing of Costs on Progress Payments 1 1 Progress payments are not interim vouchers or invoices that the government pays based on the allowable costs incurred and charged to the contract. Instead,
More informationCost and Pricing Overview
DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY Cost and Pricing Overview WARFIGHTER FIRST PEOPLE & CULTURE STRATEGIC ENGAGEMENT FINANCIAL STEWARDSHIP PROCESS EXCELLENCE 1 Agenda Better
More informationAPPLYING FOR ARCHITECT-ENGINEERING (A-E) CONTRACTS AT NAVFAC PACIFIC. Department of the Navy NAVFAC Pacific A-E Contracts II Branch
APPLYING FOR ARCHITECT-ENGINEERING (A-E) CONTRACTS AT NAVFAC PACIFIC Department of the Navy NAVFAC Pacific A-E Contracts II Branch A-E Federal Contracting Laws & Regulations Brooks Act (P.L. 92-582 (40
More informationPROCEDURE CITY OF GRANDE PRAIRIE PURPOSE SCOPE PROHIBITIONS:
CITY OF GRANDE PRAIRIE PROCEDURE PROCEDURE NO: 310-2 PAGE: 1 OF 6 TITLE: Request for Quotation POLICY: 310 Purchasing Policy SECTION: APPROVAL DATE: APPROVED BY: City Manager REVISION DATE: DEPARTMENT:
More informationGENERAL SERVICES ADMINISTRATION 8(a) STARS II Government Wide Acquisition Contract (GWAC) Contract Year: August 31, 2012 through August 30, 2013
GENERAL SERVICES ADMINISTRATION 8(a) STARS II Wide Acquisition Contract (GWAC) Contract Year: August 31, 2012 through August 30, 2013 1050 Connecticut Ave., N.W., Suite 1000 Washington, D.C. 20036 Contact:
More informationAudit of Executive Compensation
5-803.1 Audit of Executive Compensation a. The contractor's executive compensation system should be evaluated separately, even if the contractor does not have a separate pay structure for executives. FAR
More informationDepartment of Defense. Guidebook for Acquiring Commercial Items
Office of the Secretary of Defense Acquisition, Technology, and Logistics (Acquisition Initiatives) Department of Defense Guidebook for Acquiring Commercial Items PART A: COMMERCIAL ITEM DETERMINATION
More informationMaster Document Audit Program. Version 4.28, dated March 2018 B-1 Planning Considerations
Activity Code 17100 B-1 Planning Considerations Termination, Fixed Inventory Basis Type of Service - Attestation Examination Engagement Audit Specific Independence Determination Members of the audit team
More informationRequest for Proposal For: 2018 American Bar Association Temporary Services
Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet
More informationThe PM's Role in Capturing, Bidding, and Winning Performance-Based Contracts
The PM's Role in Capturing, Bidding, and Winning Performance-Based Contracts P R E S E N T E D BY: D R. J O H N G. P I C A R E L L I, P R E S I D E N T B U S I N E S S D E V E LO P M E N T A S S O C I
More informationCOMMERCIAL ITEM CONTRACTING AND GSA FEDERAL SUPPLY SCHEDULES. Lorraine Campos Addie Cliffe Nkechi Kanu
COMMERCIAL ITEM CONTRACTING AND GSA FEDERAL SUPPLY SCHEDULES Lorraine Campos Addie Cliffe Nkechi Kanu 90 Overview Commercial item contracting Policy considerations and shifts over time Commercial item
More informationCompetitive Tendering & Procurement Policy
Competitive Tendering & Procurement Policy Date Published 1 st June 2016 Version 1 Approved Date 9 th June 2016 Review Cycle Annually Review Date June 2017 Learning together; to be the best we can be 1.
More informationREFERENCES Overview Quality Assurance Engineering Program...5
TABLE OF CONTENTS REFERENCES... 4 CHAPTER 1 QAE GUIDANCE OVERVIEW 1.1. Overview... 5 1.2. Quality Assurance Engineering Program...5 CHAPTER 2 QAE MANAGEMENT STRUCTURE 2.1. Heads of DCMA QA-HQ and Operations...6
More informationThe DCARC UNCLASSIFIED UNCLASSIFIED. DCARC Helpdesk Jen Horner (253) x1. Software and Web Development
The DCARC Dr. Richard Burke Deputy Director of Cost Assessment Mr. Michael W. Augustus DCARC Director CSDR Operations Jim Manzo (571) 372-4266 Linnay Franklin (571)372-4269 IT Support John McGahan (253)564-1979
More informationAudit Report 2016-A-0002 City of Delray Beach Purchasing
PALM BEACH COUNTY John A. Carey Inspector General Inspector General Accredited Enhancing Public Trust in Government Redacted Audit Report 2016-A-0002 City of Delray Beach Purchasing March 2, 2016 Insight
More informationDefense Procurement & Acquisition Policy Acquisition Exchange Program. Project Description #1
Defense Procurement & Acquisition Policy Acquisition Exchange Program Project Description #1 Opportunity: Contract Policy & International Contracting Projects Organization: DPAP/CPIC Target Grade: GS-11
More informationLfl CY) The. DoD Contractor. Risk Assessment Guide ~DTICO ,-CTE. 89 OC OBTt
Lfl CY) The DoD Contractor Risk Assessment Guide ~DTICO,-CTE 14 89 OC OBTt 9881 1 DOD CONTRACTOR RISK ASSESSMENT GUIDE AND PROGRAM TABLE OF CONTENTS, OVERVIEW.............. *...... PROGRAM RESPONSIBILITIES..-
More informationUser Frequently Asked Questions (FAQ)
User Frequently Asked Questions (FAQ) UQ1 What are the benefits of using ESI? UQ2 How is DoD ESI pricing different than GSA pricing? UQ3 How do you pick the product or product lines that are offered by
More informationREQUEST FOR QUOTES (RFQ) # Issue Date: December 5, 2017
REQUEST FOR QUOTES (RFQ) #2017-25 Issue Date: December 5, 2017 Procurement & Contract Services Klamath Falls: Wilsonville: 541.885.1133 (office) 503.821.1266 (office) 3201 Campus Dr. 27500 SW Parkway Ave.
More informationDCMA INSTRUCTION 2501 CONTRACT MAINTENANCE
DCMA INSTRUCTION 2501 CONTRACT MAINTENANCE Office of Primary Responsibility: Contract Maintenance Capability Effective: August 14, 2017 Releasability: Cleared for public release New Issuance Incorporates:
More informationPrice Analysis and Reasonable Pricing. government contracting
Price Analysis and Reasonable Pricing 1 Bill Walter, CPA Managing Director DHG GovCon Advisory Bill.Walter@dhgllp.com 1410 Spring Hill Road, Suite 500 Tysons, VA 22102 (703) 970.0509 Steve Masiello Partner
More informationIn the Red Zone: What s In and What s Out Under Recent Regulatory Changes September 21, 2016
In the Red Zone: What s In and What s Out Under Recent Regulatory Changes September 21, 2016 Terence Murphy (757) 624.3139 tmurphy@kaufcan.com Page 1 Important Note The contents of this presentation are
More informationCOMPLIANCE WITH THIS PUBLICATION IS MANDATORY
Template modified: 27 May 1997 14:30 BY ORDER OF THE SECRETARY OF THE AIR FORCE AIR FORCE INSTRUCTION 63-501 31 MAY 1994 Certified Current 4 November 2009 Acquisition AIR FORCE ACQUISITION QUALITY PROGRAM
More informationProcurement Policy. (June 11, 2015)
Procurement Policy (June 11, 2015) Table of Contents 1. PURPOSE AND OVERVIEW... 4 1.1. About MPAC... 4 1.2. Purpose... 4 1.3. Procurement Governance... 4 2. SCOPE AND APPLICATION... 4 2.1. Scope... 4 3.
More informationB.H. Aircraft Company, Inc.
United States Government Accountability Office Washington, DC 20548 Comptroller General of the United States Decision Matter of: File: B.H. Aircraft Company, Inc. Date: July 25, 2005 Daniel V. Kearns for
More informationManager, Sourcing Supply and Contracts, Grid Projects Approved By:
Procurement Policy ISSUE DETAILS Effective Date: 1 Policy Owner: Chief Executive Officer Written By: Manager, Sourcing Supply and Contracts, Grid Projects Approved By: Transpower Board of Directors Minute
More informationOPERS PROCUREMENT POLICY AND PROCEDURES MANUAL
OPERS PROCUREMENT POLICY AND PROCEDURES MANUAL Revised/Effective 05/01/17 Effective 06/01/11 OPERS Procurement Policy and Procedures Manual Page 1 OPERS PROCUREMENT POLICY AND PROCEDURES MANUAL ACKNOWLEDGEMENT
More informationComprehensive List of Fraud Indicators
Comprehensive List of Fraud Indicators This document provides links to our contract audit resources. The scenarios are grouped by audit type, but the issues presented could be applicable to other audits
More informationCh 7 - Account for Differences
Ch 7 - Account for Differences 7.0 - Chapter Introduction 7.1 - Identifying Vendor-Related Differences o 7.1.1 - Responsibility o 7.1.2 - Understanding Of Requirements o 7.1.3 - Technology o 7.1.4 - Efficiency
More informationMaster Document Master Document. Version 4.28, dated December 2017 B-1 Planning Considerations
Activity Code 17100 B-1 Planning Considerations Termination, Total Cost Basis Type of Service - Attestation Examination Engagement Audit Specific Independence Determination Members of the audit team and
More informationPURCHASING PROCESS & GUIDELINES
PURCHASING PROCESS & GUIDELINES Policy Id: Bus.001 Purchasing Process and Guidelines Contact: Last Modified: July 2013 CONTENTS: Policy Statement 1 Related Documents 1 Contacts 1 Policy 3 Overview 3 Requisition
More informationA REPORT FROM THE OFFICE OF INTERNAL AUDIT
A REPORT FROM THE OFFICE OF INTERNAL AUDIT PRESENTED TO THE CITY COUNCIL CITY OF BOISE, IDAHO AUDIT / TASK: #12-08S1, Purchasing Compliance AUDIT CLIENT: Purchasing / Cross-Functional REPORT DATE: August
More informationLakehurst Small Business Roundtable General Meeting May/10/2016
Lakehurst Small Business Roundtable General Meeting May/10/2016 Corporate Overview Owned by the Delaware Nation Headquartered in Oklahoma 300+ Employees and growing SDB Native American Tribally Owned 8(a)
More informationEvaluating Request for Proposal (RFP) Responses. Presented By: Department of General Services Bureau of Procurement
Evaluating Request for Proposal (RFP) Responses Presented By: Department of General Services Bureau of Procurement Rev. June, 2014 Agenda What is a Request for Proposal (RFP)? Evaluator Roles & Responsibilities
More informationUncompensated Overtime. Next Slide
Uncompensated Overtime Table of Contents Risk Assessment Research and Planning Risk Assessment Labor System Entrance Conference Preliminary Analytical Procedures Audit Team Brainstorming for Fraud Risk
More informationSample Result Statement Listing To achieve the company s Strategic Objective.
Page 18 President Sample Result Statement Listing To achieve the company s Strategic Objective. Manager, New Business Ventures To assist in achieving the company s Strategic Objective by providing management
More informationTeaming Arrangements For Federal Contracts. May 6, 2015
Teaming Arrangements For Federal Contracts May 6, 2015 INTRODUCTION Shannon Edie President & Senior Consultant shannon@holomuaconsulting.com Daphne Tong-Pave Vice President & Senior Consultant daphne@holomuaconsulting.com
More informationSupplier Ethics and Compliance Webinar
Supplier Ethics and Compliance Webinar March 29, 2017 Chuck Neff, Director of Compliance Newport News Shipbuilding Huntington Ingalls Industries, Inc. Agenda 2 Why? Present Responsibility Assessment Engagement
More informationAcquisition Planning
Acquisition Planning Take your hands off the keyboard. Before you start any writing, ask yourself the following question..? DOES YOUR ENTIRE TEAM KNOW AND CLEARLY HAVE A VISION OF WHAT IT IS YOU ARE BUYING
More informationBusiness Opportunities. and Insurance Board. with the Workplace Safety. Becoming a WSIB Supplier
Business Opportunities with the Workplace Safety and Insurance Board Becoming a WSIB Supplier Business Opportunities with the Workplace Safety and Insurance Board If you are interested in becoming a WSIB
More informationDefense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Acquisition Strategy
Defense Microelectronics Activity (DMEA) Advanced Technology Support Program IV (ATSP4) Acquisition Strategy DMEA/MEEB 18 March 2014 ATSP 4 03/18/2014 Page-1 Acquisition Strategy Agenda ATSP Unique Features
More informationTHE INS AND OUTS OF JOINT VENTURE AND MENTOR-PROTÉGÉ AGREEMENTS WHAT YOU NEED TO KNOW TO EFFECTIVELY STRUCTURE YOUR RELATIONSHIPS
888 17 th St., NW, 11 th Floor Washington, DC 20006 Tel: (202) 857-1000 Fax: (202) 857-0200 THE INS AND OUTS OF JOINT VENTURE AND MENTOR-PROTÉGÉ AGREEMENTS WHAT YOU NEED TO KNOW TO EFFECTIVELY STRUCTURE
More informationReining in Maverick Spend. 3 Ways to Save Costs and Improve Compliance with e-procurement
3 Ways to Save Costs and Improve Compliance with e-procurement Contents The Need to Eliminate Rogue Spending Exists for all Businesses...3 Leveraging Technology to Improve Visibility...5 Integrate your
More informationFunding for BI: It s All About ROI, ROI, ROI
Innovation in Action: BI Strategies Series December 2009 Funding for BI: It s All About ROI, ROI, ROI Author: Dave Kasabian from Pervasive Performance Group 2 Consider breaking the benefit into smaller
More informationCIPS Exam Report for Learner Community:
CIPS Exam Report for Learner Community: Qualification: Diploma in Procurement and Supply Unit: D2: Business Needs in Procurement and Supply Exam series: November 2016 Question 1 Learning Outcome 1 Q1(a)
More informationPROCUREMENT AND SUPPLY SERVICES A QUICK GUIDE
PROCUREMENT AND SUPPLY SERVICES A QUICK GUIDE January 2018 To Our Customers: We provide this informational manual for faculty and staff as a ready reference for those who are directly and indirectly responsible
More information1.0 BASIS OF ESTIMATE (BOE) HOW TO
1.0 BASIS OF ESTIMATE (BOE) HOW TO 1.1 Definition A Basis of Estimate (BOE) is a document that identifies the logic, data, methodology and calculations used to estimate the resources required to perform
More information