1 Information Technology Procurement Page 1 IOPPSS REQUEST FOR PROPOSAL «EAI (TIBCO) INTEGRATION PARTNER» IOPPSS

2 Information Technology Procurement Page 2 Aventis Pharmaceuticals Inc REQUEST FOR PROPOSAL - NUMBER THE ABOVE NUMBER MUST APPEAR ON ALL PROPOSALS AND RELATED CORRESPONDENCE. REQUEST DATE THIS IS NOT AN ORDER RESPOND NOT LATER THAN RFP DESCRIPTION: TIBCO Integration All bidders are advised that they must respond in detail to each element of this RFP in order to be considered for the award. SEND ALL CORRESPONDENCE/FAXES TO THE BUYER This request for proposal (RFP) is being provided for the purpose of obtaining bids for an EAI (TIBCO) INTEGRATION PARTNER.This RFP and your response will be the basis for and be incorporated into any resulting contract between Aventis Pharmaceuticals herein referred to as Company and the successful Supplier(s). Proposals submitted in response to the RFP shall represent a firm offer to contract on the terms and conditions described in such proposals. Each representation of fact and promise of future performance therein will be incorporated into the contract as a warranty or covenant. Any statement of fact or promise of future performance that is not intended by the Supplier as a warranty or covenant should be clearly identified. This is a request for proposal and does not commit Company to pay any costs incurred in the preparation and submission of a proposal or to procure a contract for any services, supplies or equipment. Company reserves the right to reject any proposal or part thereof without stating any reason whatsoever. Company, shall not be bound to accept the lowest proposal or even any proposal. Company reserves the right to discontinue negotiations at any time prior to the signing of a definitive contract for any or no reason. Company reserves the right to make multiple awards from the request for proposal. During the period of the bidding, your point of contact will be limited to Gary Mauro. Any contact regarding this bid with Company associates other than the buyer may be grounds to disqualify your proposal. Submit in writing via fax or any questions you may have regarding the proposal. Every effort will be made to respond to your questions within two business days of receipt. Responses to all questions will be forwarded to all bidders. Request for Proposals

3 Information Technology Procurement Page 3 Table of Contents Section A. Instructions to Bidders 4 Communications 4 Proposal Submission. 4 RFP and Selection Process 5 RFP Evaluation Criteria 5 Evaluation Process 6 Outline of System Under Investigation 6 Requirements 6 Section B Company Contract Terms and Conditions 8 Section C Functional Requirements and Specifications 9 Introduction 9 Section D EAI Strategy for Application-to-Application Interfaces 11 Objective 11 Section E Pricing Matrix 13 Competitive Pricing 13

4 Information Technology Procurement Page 4 Section A. Instructions to Bidders Communications All communication with Company is to be directed to Company Procurement (Point of Contact) as follows: Questions regarding the RFP contents may be sent to the Buyer via fax or until 2 business days prior to due date for proposals. Company will make every effort to provide a written response within 2 business days. Any verbal statements regarding this RFP by any persons other than the POC should not be relied upon. Whenever responses to inquiries would constitute a modification or addition to the original RFP, the reply will be made in the form of an addendum to the RFP, a copy of which will be forwarded to all vendors. All questions must include: Vendor s name, requester, and appropriate contact information. Clearly state the question and RFP section. Specific reference to the applicable RFP section(s). The original Response and all written copies must be signed by a person in Vendor s organization authorized to bind the company and needs to be submitted to the POC identified above. This RFP remains the property of Company at all times, and must be returned by the vendor upon request. Vendors not submitting a Response must immediately return all printed, graphic and electronic documentation to the POC. All Responses and related materials, once delivered, become the property of Company. Vendors may submit one or more alternative Responses in addition to a response conforming to the requirements specified in this RFP. Any alternative Responses must be clearly identified and separate from the original Response. Any alternatives must be prepared using the same format specified in this RFP. The vendor will assume full responsibility to demonstrate that the alternative will meet or exceed Company's expectations. Vendors are not permitted to make any public announcement or release any information regarding Company s Project initiative or evaluation process. Company may at its sole discretion and upon prior written approval, authorize vendor to issue a news release. Vendors bidding on the RFP will be required to sign a non-disclosure agreement. Proposal Submission. Your proposal will be consider responsive and complete if the following are provided: Optional Cover Letter Optional Executive Summary Response as to the acceptance or rejection in whole or in part of all Contract Terms and Conditions provided in this document. Do not sign the contract at this time. The submission of an SOW. The SOW should contain at minimum: o Detailed reconciliation of each requirement. Should reference past experiences and/or vendor methodology and/or complimentary philosophies. o o A resource plan type, number and location. Two project schedules, a near term (June 20xx to first site transition Le Trait Jan. 20xx) and longer-term balance of 20xx.

5 Information Technology Procurement Page 5 o Costs. All labor costs/ rates are to be inclusive of all expenses. Aventis will not pay for expenses separately Reason why the vendor should be selected and/or vendor s strengths Acceptance or rejection of each Functional and Specification Requirement Pricing as requested. RFP and Selection Process Distribute RFP to select number of potential bidders RFP response (approximately 2 to 3 weeks) Evaluation of RFP responses by Company (approximately 1 week) Selection of desired Vendor and contract negotiations (approximately 1 week) Contract approval and award (approximately 1 week) Note: Company reserves the right to reject all proposal or decline to award any contract at Company s sole discretion. RFP Evaluation Criteria The competency, experience and background of vendors will be considered in evaluating the Responses. Company reserves the right to withhold all information used in conducting the evaluation. Proposals will be evaluated based on many factors including, but not limited to, vendor s ability to effectively deliver the product and/or services as well as the vendor s financial stability and organization and support structure. Order of criteria does not indicate level of importance. In addition, any other relevant criteria at the sole discretion and determination of Company may be used. Some of the business factors to be reviewed include (not in any order of preference). Vendor business and financial stability (# of years in business and relative growth) Number of TIBCO installations installed by Vendor Vendor s rights to the products offered (was software developed by Vendor? If not by who and what is the relationship?) Vendor s ability to provide and warrant the products and services proposed Vendor References (three is sufficient including phone and contact information) Up front pricing, support pricing and (Company) perceived ability to work through contract terms and conditions with Vendor Vendor details such as ownership, capital structure, profit record, turnover, number of staff, number of installations, etc. Number of established users of the product Reference sites using the recommended solution. Vendors should be specific when reference sites use products that are similar but not identical or when used in a different technical environment. Product information including software release plans and historical frequency of releases since product introduction. User group information, contacts for officers, meeting minutes and major product improvements based on User Group requirements

6 Information Technology Procurement Page 6 Evaluation Process Following the receipt of the Statement of Work, (SOW), it may be necessary to schedule additional communication sessions (tele - video - face-to-face) in order to clarify details. This is expected and acceptable. The initiation of these sessions will be the responsibility of those vendors that submit a SOW. Outline of System Under Investigation As stated in the Introduction, the IOPPSS project is the initial pilot of TIBCO Active Enterprise for Aventis. Aventis is taking the opportunity of this pilot to not only develop a specific EAI solution based on approved requirements but also is intended to leverage to-be developed methodologies, standards and guidelines for future EAI applications, and to develop the core competencies within the global shared service team for the technical administration and configuration of Tibco in alignment with the defined strategy (see section D). The vendor s contribution is expected to be a combination of standard/methodology EAI development, (partnering with established Aventis EAI processes) and full life cycle development (prototype, testing, installation) involvement with emphasis on knowledge transfer to those selected Aventis technicians who will join the IOPPSS development team and infrastructure shared services teams. Overall project management and document methodology will be the responsibility of Aventis. Any project methodology introduced by the vendor should support the Aventis Summit Ascendant methodology, which will be the dominant approach. Requirements General Requirements All communication and documentation is expected to be English. In support of IOPPSS EAI development, a physical vendor presence is expected in Kansas City from a period roughly from July 20xx through Dec. 20xx followed by a similar presence in Europe (Frankfurt) for the balance of the assignment. Some international travel is anticipated during site transition (roll-out). Process/Project Requirements Participation in the design and development of EAI standards that will enable effective EAI deployment post and concurrent with IOPPSS. Participating with Aventis IOPPSS technical infrastructureteam and Aventis global Tibco competency center regarding the design and deployment of technical platform solutions that support IOPPSS platform requirements in North America, Europe and Japan and allow for future extensibility throughout the enterprise. In additional to integration with Aventis Global I/T, dialog will also be expected between the vendor and TIBCO as well as IBM infrastructure. Knowledge transfer to the Aventis Tibco competency center regarding the technical configuration and administration of Tibco at an enterprise level. Interested vendors are expected to provide on-the-job TIBCO development and technical administrative training (TIBCO Active Enterprise) during initial development (Summer Fall of 20xx) and at the initial two transition sites (Le Trait France, Dagenham - UK).

7 Information Technology Procurement Page 7 Interested vendors are expected to recommend, as appropriate, an effective formal TIBCO training plan identifying appropriately timed, cost effective TIBCO course utilization. It is expected that on-site vendor involvement will assist in limiting or eliminating the costs and schedule impacts of formal TIBCO coursetraining. Interested vendors should provide a summary of any experiences concerning EAI development within a regulated industry. Past experiences with CFR-Part 11 guidelines should be noted. Training. Development Requirements Interested vendors are expected to organize a pilot EAI solution based on the approved IOPPSS Application mapping requirements in an effort to demonstrate a quick fully functional closed loop solution that can be studied and copied. This is expected early in the development engagement. The entire IOPPSS phase one project, (all sites) anticipates the development of individual EAI publish/subscribe system events. These will be limited to A-to-A EAI transmissions. Interested vendors will be responsible for the configuration, testing and installation of the initial set (French site Le Trait total number 15 18) of IOPPSS EAI application map transactions with the expectation that other site development is shared and eventually accomplished by Aventis technicians. Full knowledge transfer is expected at the end of the two-year engagement. The specification document (IOPPSS Application Mapping) is available for review upon request.

8 Information Technology Procurement Page 8 Section B Company Contract Terms and Conditions

9 Information Technology Procurement Page 9 Section C Functional Requirements and Specifications Introduction Aventis Industrial Operations has initiated a two year systems project, (IOPPSS), that has the objective of designing, developing, validating and installing a common Globally-configured version of the application systems of a Data Analysis Tool, EBRS and LIMS at each of 5 key sites (Phase 1) and to connect them to the site ERP system and key process PLCs and DCS. These common systems will allow each site to collect, store and analyze processing data from its key manufacturing and packaging work centers and replace or enhance current manual processes. TIBCO s Active Enterprise, (the Aventis global IT EAI standard), has been selected as the software that will satisfy the required transactional data sharing between the system components of an IOPPSS plant installation. IOPPSS in partnership with Aventis Global IT is pursuing a minimum two-year relationship with an experience EAI integration partner to assist in: The definition and development of a functional architecture that will satisfy the IOPPSS phase 1 site rollout and create a framework from which concurrent and future EAI applications can be based. The definition of the technical architecture that will enable EAI to be managed and deployed on a global scale. The software configuration (development) of the TIBCO Active Enterprise in response to the IOPPSS interfaces requirements (Application Map Transactions). TIBCO knowledge transfer that will enable Aventis to function independent from integration partner assistance by the end of the two-year assignment. The IOPPSS project should be viewed as the initial EAI TIBCO pilot from which Aventis expertise and investment can be leverage for any number of future EAI applications. That being stated, the majority of this RFP references the IOPPSS pilot with the expectation that design expertise provided by the integration partner will also aid in the continued deployment of EAI TIBCO technologies beyond IOPPSS. Regarding IOPPSS, the system components that EAI will be asked to communicate with (Application to Application) include: Electronic Batch Record System (EBRs) An application that will be used to electronically document (and in some cases control) the manufacturing and packaging process. The electronic records and related electronic signatures will be compliant with internal, external and regulatory requirements. Laboratory Information Management system (LIMS) - An application for planning, scheduling, processing and documenting relevant lab inspections for various types of materials, (raw materials, packaging materials, intermediates, drug substances and finished drug products), IPC's, stability studies, microbiological monitoring, controlling laboratory testing and collecting and storing analytical data including the storage of the related analytical results. Interface with Enterprise Resource Planning (ERP) systems such as SAP R/3 or PRIZEM for: Financial reporting, Production Planning, Distribution, Human Resource, etc. Interface with PLCs - Programmable Logic Controllers and Distribute Control Systems used to automate key pieces of processing equipment. The 5 Phase I Sites are:

10 Information Technology Procurement Page 10 Le Trait DPO site in France (this will be the pilot site) Dagenham DPO site in United Kingdom Frankfurt DPO site in Germany Kawagoe DPO site in Japan Frankfurt API site (Insulin Plant) in Germany After IOPPSS phase I, the phase II project will be to roll out the Global configuration of the systems to other key Aventis sites (could be up to 15 additional sites). The software vendors selected for EAI involvement are: API Plants EBRS - Aspentech LIMS - SAP QM DPO Plants EBRS - ProPack Data (PMX software) LIMS - SAP AG (SAP R/3 including QM) SAP QM (Le Trait and Dagenham will get Applied Biosystems (SQL*LIMS) as they currently are not using SAP for the ERP solution. In all instances, existing ERP applications (SAP and PRIZEM) will be used for the source of planning and inventory data. Regarding the high level IOPPSS assumptions... IOPPSS will select an integration partner that has EAI expertise. IOPPSS will be responsible for overall project management. A key component of success for IOPPSS and Aventis is the delivery of EAI TIBCO knowledge transfer from both the software vendor and the integration partner. EAI development in support of IOPPSS DP phase I sites, will physically take place in Kansas City, Missouri, USA and initiation of the development engagement is expected to begin the week of June 24, 20xx. English will be used for all work and documentation. EAI development in support of the IOPPSS API phase sites, will physically take place in Frankfurt, Germany and initiation of the development engagement is expected to begin no latter than June 1, 20xx. English will be used for all work and documentation. International travel (approx. 25%) is anticipated.

11 Information Technology Procurement Page 11 Section D EAI Strategy for Application-to-Application Interfaces Objective Define elements and basic tenets that should be included in the Aventis strategy and best practices toward building an EAI A2A framework and service. Strategy elements: The Business Process Manager is a key differentiator between an EAI backbone and point-to-point interfaces. The BPM should be used to centralize the control of business processes across distributed applications and to capture information on the business process definitions. A reusable library representing integration components and shared objects will be maintained for enterprise-wide use. A conceptually centralized EAI HUB strategy will be implemented (single object library, meta data repository, Business Process Manager, etc.). But to address performance and fault tolerance multiple physical hubs will exist (linked? replicated? fault-tolerant pair? two server instance? TBD as part of initial pilot). Regardless, the management and change control will remain centralized. An EAI Shared Competency Center will be implemented to centralize interface skills to plan the design, development, and maintenance of the operating interfaces. It will also be charged with developing best practices and detailed standards. It will centralize the architecture and design skills about EAI-based interfaces in a way that optimizes the reuse of the interfaces. All new interfaces must be evaluated for implementation using the standard EAI solution (based on best practices for EAI). A heterogeneous EAI environment approach would result in lost opportunity for object reusability and business process control. Any deviation from the Tibco standard for EAI application-to-application interfaces should be strongly challenged. It is important to have a clear convergence strategy for EAI. As non-standard EAI interfaces or point-topoint interfaces are significantly reproduced or duplicated with the standard EAI solution, the nonstandard technology interfaces should be re-engineered to the standard (to optimize reusability and reduce future maintenance costs). Best practices: EAI requires the avoidance of intermediary files. To access all the necessary information used to diagnose bad transfers, EAI needs to supervise the overall interface from source to destination. Using intermediary files prevents global supervision of the interface.

12 Information Technology Procurement Page 12 EAI should be used for application-to-application interfaces. It should not be used to do very large file transfers. When determining if an extract, transform and load (ETL) tool or an enterprise application integration (EAI) technology is needed, consider whether: The profile of the workload is query-intensive (ETL) or transaction-intensive (EAI) Near real-time update is needed (EAI) A large volume of data requires transformation and moving (ETL) The application construction paradigm is that of a functional 4GL API (EAI) or data-centric paradigm such as SQL (structured query language) (ETL) Standards-based metadata is needed o If the workload is query-intensive, requiring significant data aggregation, involves moving relatively large volumes of data and invites a data-centric approach (with standards-based metadata for reuse), then an ETL tool is the technology of choice. o If the workload is transaction driven, requiring near real-time update with a programming paradigm (and metadata is relatively less important), then a message broker is a good choice. As much as possible, business rules should be maintained in one place (the application). However, since EAI supports more and more functionality, it may be appropriate to duplicate business rules in EAI. The driver will be whether the business rule spans applications and control of the business process is integrated with the business rule. Improve interfaces iteratively. The Big Bang approach does not work for interfaces. By separating out the different operations of the interface, EAI allows iteration without starting from scratch each time there is a specification change. This allows interfaces to be developed that meet the evolving needs of the enterprise and also allow parallel development of packaged applications.

13 Information Technology Procurement Page 13 Section E Pricing Matrix Competitive Pricing Suppliers are expected to provide their best and most competitive pricing NOW. This is not a request for budget purposes and represents a significant opportunity for a supplier to develop a strategic business with AVENTIS. AVENTIS intends to award a contract based on proposals submitted as a result of this RFP. Suppliers will not get another chance! Please provide pricing by job description that includes expenses. Please provide a breakdown by expected hours to be worked on the project by job description

ENTERPRISE CONTRACT AND PROCUREMENT SERVICES STATEMENT OF WORK (SOW) FOR. Metadata Software RFO

ENTERPRISE CONTRACT AND PROCUREMENT SERVICES STATEMENT OF WORK (SOW) FOR. Metadata Software RFO ENTERPRISE CONTRACT AND PROCUREMENT SERVICES STATEMENT OF WORK (SOW) FOR Metadata Software RFO 52900-3-2000115870 The Vendor must submit Responses and direct inquiries to the sole point of contact: Thomas

More information

Invitation for Bid - Standard Office Furniture / Task Chair

Invitation for Bid - Standard Office Furniture / Task Chair Invitation for Bid - Bid#2016-09-001 Instructions to Bidders 1. General Information Rice University is issuing this Invitation for Bid (IFB) for the procurement of goods and/or trade services as described

More information

Invitation to Negotiate (ITN) Statewide Travel Management System ITN No D. Questions and Answers ITN Amendments

Invitation to Negotiate (ITN) Statewide Travel Management System ITN No D. Questions and Answers ITN Amendments Invitation to Negotiate (ITN) ADDENDUM NO. 1 Questions and Answers ITN Amendments September 2016 Contained herein are the responses to the questions submitted to the Department of Management Services (Department).

More information

CRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST

CRISP Azure Migration Consulting Services. All responses due no later than Friday, July 21 st, at 5pm EST Request for Quote CRISP Azure Migration Consulting Services Friday, July 7th, 2017 All responses due no later than Friday, July 21 st, at 5pm EST 1 Request for Quote RFQ TO ALL RESPONDERS CRISP Azure Migration

More information

1 August 2018 RFQ No11543 REQUEST FOR QUOTATION (RFQ)

1 August 2018 RFQ No11543 REQUEST FOR QUOTATION (RFQ) 1 August 2018 RFQ No11543 REQUEST FOR QUOTATION (RFQ) RFQ Description : Server Operating Systems Upgrade Closing Date and Time : 08 August 2018 Briefing Session Date and Time Site Inspection : N/A : N/A

More information

RFP Solicitation Number: BOSS-RFQ TRVL Date: 20 September Request for Proposal: Travel Services

RFP Solicitation Number: BOSS-RFQ TRVL Date: 20 September Request for Proposal: Travel Services RFP Solicitation Number: BOSS-RFQ-005-2018-TRVL Date: 20 September 2018 Request for Proposal: Travel Services Table of Contents 1 INTRODUCTION 2 1.1 Purpose 2 1.2 Background 2 2 PROPOSAL PREPARATION INSTRUCTIONS

More information

SAP Fieldglass White Paper ESSENTIAL QUESTIONS TO INCLUDE IN A VENDOR MANAGEMENT SYSTEM RFP

SAP Fieldglass White Paper ESSENTIAL QUESTIONS TO INCLUDE IN A VENDOR MANAGEMENT SYSTEM RFP SAP Fieldglass White Paper ESSENTIAL QUESTIONS TO INCLUDE IN A VENDOR MANAGEMENT SYSTEM RFP UNDERSTANDING EACH PHASE OF THE PROCESS Evaluating a Vendor Management System (VMS) can be an overwhelming process

More information

IFP No: 05/18 INVITATION FOR PREQUALIFICATION FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES

IFP No: 05/18 INVITATION FOR PREQUALIFICATION FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES IFP No: 05/18 INVITATION FOR PREQUALIFICATION FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES SECRETARIAT OF ADMINISTRATION AND FINANCE (SAF) GENERAL SECRETARIAT

More information

BID No: 04/17 REQUEST FOR PROPOSALS FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES

BID No: 04/17 REQUEST FOR PROPOSALS FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES BID No: 04/17 REQUEST FOR PROPOSALS FOR TRAVEL MANAGEMENT SERVICES FOR THE GENERAL SECRETARIAT OF THE ORGANIZATION OF AMERICAN STATES SECRETARIAT OF ADMINISTRATION AND FINANCE (SAF) GENERAL SECRETARIAT

More information

REQUEST FOR PROPOSAL

REQUEST FOR PROPOSAL REQUEST FOR PROPOSAL Solicitation No.: COMPASS-201803-02 Issue Date: March 9, 2018 Closing Date: March 23, 2018 5:00 PM EDT Award Expected: March 30, 2018 Respond to: Maria Marta Sobico MSobico@fhi360.org

More information

INTERNATIONAL FOUNDATION FOR ELECTORAL SYSTEMS (IFES) RFQ/11/055

INTERNATIONAL FOUNDATION FOR ELECTORAL SYSTEMS (IFES) RFQ/11/055 REQUEST FOR QUOTATION INTERNATIONAL FOUNDATION FOR ELECTORAL SYSTEMS (IFES) Request for Quotation to supply: SIMULTANIOUS INTERPRETATION SYSTEM IRAQ RFQ/11/055 May 26, 2011 Page 2 of 11 Table of Contents

More information

Notice is hereby given of the following changes to the above-referenced SOLICITAITON:

Notice is hereby given of the following changes to the above-referenced SOLICITAITON: FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4381 Fax: (850) 414-4951 ADDENDUM NO. 2 DATE: May 10, 2016 RE: BID #:

More information

Vendor Ratings, VDR Alan H. Tiedrich, Howard J. Dresner

Vendor Ratings, VDR Alan H. Tiedrich, Howard J. Dresner Vendor Ratings, Alan H. Tiedrich, Howard J. Dresner Research Note 7 May 2003 Vendor Rating: arcplan s Growth Rate Masks Its Challenges arcplan s rapid revenue growth comes from impressive technology and

More information

Request for Quotation (RFQ) for Updation of Best of India in Pharmaceuticals for India Brand Equity Foundation (IBEF)

Request for Quotation (RFQ) for Updation of Best of India in Pharmaceuticals for India Brand Equity Foundation (IBEF) Request for Quotation (RFQ) for Updation of Best of India in Pharmaceuticals for India Brand Equity Foundation (IBEF) Request for Quotation [RFQ] April 2015 India Brand Equity Foundation, Apparel House,

More information

Support to Development of a Global Competency Framework for UHC. Request for Proposals (RFP) Bid Reference 2018/HIS/HWF/HPS/01

Support to Development of a Global Competency Framework for UHC. Request for Proposals (RFP) Bid Reference 2018/HIS/HWF/HPS/01 1 Support to Development of a Global Competency Framework for UHC Request for Proposals (RFP) Bid Reference Unit Name Human Resources for Health Policy and Standards 2 The World Health Organization (WHO)

More information

REQUEST FOR PROPOSAL (RFP) FOR CONTRACT MANAGEMENT SYSTEM ISSUED BY THE RFP INFORMATION

REQUEST FOR PROPOSAL (RFP) FOR CONTRACT MANAGEMENT SYSTEM ISSUED BY THE RFP INFORMATION REQUEST FOR PROPOSAL (RFP) FOR CONTRACT MANAGEMENT SYSTEM ISSUED BY THE NEW YORK ehealth COLLABORATIVE CONTACT NAME EMAIL ADDRESS SUBMISSION DEADLINE RFP INFORMATION NYeC RFP rfpcontact@nyehealth.org September

More information

NTA Metropolitan Mass Transit System. To: All Bidders Re: Tender 055/2017 for the Signaling and Train Control of the Red Line Project. Addendum No.

NTA Metropolitan Mass Transit System. To: All Bidders Re: Tender 055/2017 for the Signaling and Train Control of the Red Line Project. Addendum No. Date: 12 th July 2017 #1069265 To: All Bidders Re: Tender 055/2017 for the Signaling and Train Control of the Red Line Project Addendum No. 5 Addendum no. 5 is issued for inclusion into the tender documents.

More information

REQUEST FOR PROPOSAL INVENTORY MANAGEMENT SYSTEM

REQUEST FOR PROPOSAL INVENTORY MANAGEMENT SYSTEM REQUEST FOR PROPOSAL INVENTORY MANAGEMENT SYSTEM ST. CHARLES COUNTY AMBULANCE DISTRICT (Herein referred to as District ) 4169 OLD MILL PARKWAY ST. PETERS, MO 63376 SPECIFICATIONS FOR Inventory Management

More information

SERVICE ORIENTED ARCHITECTURE (SOA)

SERVICE ORIENTED ARCHITECTURE (SOA) International Civil Aviation Organization SERVICE ORIENTED ARCHITECTURE (SOA) ICAO APAC OFFICE BACKGROUND SOA not a new concept. Sun defined SOA in late 1990s to describe Jini. Services delivered over

More information

Report to: General Committee Meeting Date: September 04, 2018

Report to: General Committee Meeting Date: September 04, 2018 Report to: General Committee Meeting Date: September 04, 2018 SUBJECT: Award of Proposal 134-R-17 Supply and Installation, Customer Relationship Management Solution (CRM) PREPARED BY: Lyrae Ignacio, Client

More information

IBM /Ariba Applications Sizing and Planning Questionnaire- Ariba Products

IBM /Ariba Applications Sizing and Planning Questionnaire- Ariba Products IBM /Ariba Applications Sizing and Planning Questionnaire- Ariba Products IBM Americas Techline Sizing Center Phone 800-426-0222 (NA only) or 770-835-6690 When completed, please submit to Techline for

More information

Digitalizing Procurement for Midsize Companies: The First Step in Doing More with Less

Digitalizing Procurement for Midsize Companies: The First Step in Doing More with Less SAP Ariba Solutions SAP Ariba Snap Digitalizing Procurement for Midsize Companies: The First Step in Doing More with Less 1 / 11 Table of Contents 3 Quick Facts 4 Preconfigured with Spend Categories for

More information

Request For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS)

Request For Information (RFI) For a. Spectrum Management & Monitoring System (SMMS) Request For Information (RFI) For a Spectrum Management & Monitoring System (SMMS) Table of Contents 1 Introduction... 3 1.1 About Iraq CMC... 3 1.2 The Iraq CMC Objectives... 3 1.3 RFI Process... 4 2

More information

Indirect Access Guide for SAP Installed Base Customers. April / SAP SE or an SAP affiliate company. All rights reserved.

Indirect Access Guide for SAP Installed Base Customers. April / SAP SE or an SAP affiliate company. All rights reserved. Indirect Access Guide for SAP Installed Base Customers April 2018 1 / 8 Table of Contents 3 Licensing Use of SAP ERP systems and Types of Access 4 Indirect Access Licensing Misconceptions 5 Common Indirect

More information

IBM Maximo Mobile Asset Manager Version 7 Release 5. User Guide

IBM Maximo Mobile Asset Manager Version 7 Release 5. User Guide IBM Maximo Mobile Asset Manager Version 7 Release 5 User Guide Note Before using this information and the product it supports, read the information in Notices on page 13. This edition applies to version

More information

Request for Quotation (RFQ) for. Conducting audit of Online Campaign for Indian Plantations for IBEF. Request for Quotation [RFQ]

Request for Quotation (RFQ) for. Conducting audit of Online Campaign for Indian Plantations for IBEF. Request for Quotation [RFQ] 1 Request for Quotation (RFQ) for Conducting audit of Online Campaign for Indian Plantations for IBEF Request for Quotation [RFQ] 20th Floor, Jawahar Vyapar Bhawan Tolstoy Marg New Delhi 110001 2 PART

More information

Logistics Agreement Version 2

Logistics Agreement Version 2 Logistics Agreement Version 2 Introduction Introduction The present recommendation offers operational guidelines for logistics exchanges between parties, in the attempt to clarify traditional rules, to

More information

IBM Kenexa BrassRing on Cloud. IBM Kenexa BrassRing on Cloud Release Notes. July 2016 IBM

IBM Kenexa BrassRing on Cloud. IBM Kenexa BrassRing on Cloud Release Notes. July 2016 IBM IBM Kenexa BrassRing on Cloud IBM Kenexa BrassRing on Cloud Release Notes July 2016 IBM IBM Kenexa BrassRing on Cloud IBM Kenexa BrassRing on Cloud Release Notes July 2016 IBM Note Before you use this

More information

COM J. Holincheck, J. Comport

COM J. Holincheck, J. Comport J. Holincheck, J. Comport Research Note 7 October 2003 Commentary PeopleSoft Merger Presents a Process Fusion Opportunity PeopleSoft supplies most of the infrastructure required to support business process

More information

SAP Business One OnDemand. SAP Business One OnDemand Solution Overview

SAP Business One OnDemand. SAP Business One OnDemand Solution Overview SAP Business One OnDemand SAP Business One OnDemand Solution Overview SAP Business One OnDemand Table of Contents 4 Executive Summary Introduction SAP Business One Today 8 A Technical Overview: SAP Business

More information

IBM TRIRIGA Version 10 Release 5.2. Procurement Management User Guide IBM

IBM TRIRIGA Version 10 Release 5.2. Procurement Management User Guide IBM IBM TRIRIGA Version 10 Release 5.2 Procurement Management User Guide IBM Note Before using this information and the product it supports, read the information in Notices on page 29. This edition applies

More information

IBM TRIRIGA Version 10 Release 5.2. Procurement Management User Guide IBM

IBM TRIRIGA Version 10 Release 5.2. Procurement Management User Guide IBM IBM TRIRIGA Version 10 Release 5.2 Procurement Management User Guide IBM Note Before using this information and the product it supports, read the information in Notices on page 29. This edition applies

More information

Request for Quotation (RFQ) for IT Support Services for India Brand Equity Foundation (IBEF)

Request for Quotation (RFQ) for IT Support Services for India Brand Equity Foundation (IBEF) Request for Quotation (RFQ) for IT Support Services for India Brand Equity Foundation (IBEF) Request for Quotation [RFQ] India Brand Equity Foundation, Apparel House, 5th Floor, # 519-22, Sector 44, Gurgaon

More information

OCEAN COUNTY COLLEGE PURCHASING MANUAL

OCEAN COUNTY COLLEGE PURCHASING MANUAL OCEAN COUNTY COLLEGE PURCHASING MANUAL 1 OCEAN COUNTY COLLEGE PURCHASING MANUAL Issued by the Office of the Vice President of Finance & Administration January 1, 2014 The purpose of this manual is to assist

More information

CITY OF FULTON, MISSOURI INVITATION FOR BID

CITY OF FULTON, MISSOURI INVITATION FOR BID CITY OF FULTON, MISSOURI INVITATION FOR BID MAIL BIDS TO: CITY OF FULTON C/O Courtney Crowson, City Clerk P.O. BOX 130 FULTON, MO 65251-0130 HAND DELIVER TO City Clerks Office: 18 EAST 4 TH. STREET EXPRESS

More information

Information Delivery with SOA

Information Delivery with SOA Context Srikanth Inaganti Today enterprises are looking at SOA as a vehicle to improve IT efficiency and reduce the complexity. Improving the efficiency and complexity would directly map on to the way

More information

Product Compliance for Discrete Manufacturers

Product Compliance for Discrete Manufacturers SAP Brief SAP s for Sustainability Product Safety and Stewardship s from SAP Objectives Product Compliance for Discrete Manufacturers Protect marketability and automate product compliance Protect marketability

More information

Invitation to Negotiate

Invitation to Negotiate Invitation to Negotiate Programming, Design, and Consulting Services Lisa Daws 4/3/2012 CLERKS OF COURT OPERATIONS CORPORATION Table of Contents Agency Background... 3 Statement of Purpose... 3 Scope of

More information

Gain Greater Efficiency and Control by Automating Intercompany Transactions

Gain Greater Efficiency and Control by Automating Intercompany Transactions SAP Brief SAP s for Small Businesses and Midsize Companies Intercompany Integration for SAP Business One Gain Greater Efficiency and Control by Automating Intercompany Transactions SAP Brief Streamline

More information

IBM Balanced Warehouse Buyer s Guide. Unlock the potential of data with the right data warehouse solution

IBM Balanced Warehouse Buyer s Guide. Unlock the potential of data with the right data warehouse solution IBM Balanced Warehouse Buyer s Guide Unlock the potential of data with the right data warehouse solution Regardless of size or industry, every organization needs fast access to accurate, up-to-the-minute

More information

Migration Use Cases with the Migration Manager IBM Redbooks Solution Guide

Migration Use Cases with the Migration Manager IBM Redbooks Solution Guide Migration Use Cases with the Migration Manager IBM Redbooks Solution Guide Migration Manager is a feature of the Tivoli process automation engine that enables you to migrate configuration content from

More information

The Federal Enterprise Architecture's reference models contain concepts that can be leveraged by state and local governments.

The Federal Enterprise Architecture's reference models contain concepts that can be leveraged by state and local governments. G. Kreizman Research Note 28 July 2003 Commentary What the Federal Enterprise Architecture Means to You The Federal Enterprise Architecture's reference models contain concepts that can be leveraged by

More information

REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL

REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL 5006 EOI REQUEST FOR EXPRESSIONS OF INTEREST 5006 EOI DETERRENT PROGRAM FOR SNOW GEESE CONTROL Responses to this Request for Expressions of Interest will be received at the Information Counter, Main Floor,

More information

The Information Integration Platform

The Information Integration Platform The Information Integration Platform IIS Product and Technology Vision & Roadmap Bob Zurek Director, Advanced Technologies and Product Strategy Information Integration Solutions IBM Software Group IBM

More information

REQUEST FOR PROPOSAL ( RFP )

REQUEST FOR PROPOSAL ( RFP ) REQUEST FOR PROPOSAL ( RFP ) RFP Title: Association Management System online integrated website and membership management system Issue Date: Contracting Authority: Name: JF Champagne Title: President December

More information

Scott Lowden SAP America Technical Solution Architect

Scott Lowden SAP America Technical Solution Architect SAP NetWeaver Training Overview - SAP Exchange Infrastructure Scott Lowden SAP America Technical Solution Architect NetWeaver Components Detail Exchange Infrastructure SAP AG 2003, Title of Presentation,

More information

SAP Global License Audit and Compliance Update

SAP Global License Audit and Compliance Update SAP Global License Audit and Compliance Update April 2018 1 / 14 Table of Contents 3 Overview 3 Clear Separation of License Audit and Sales 3 mination of Audits 4 Dedicated Audit Delivery Personnel 4 Commercial

More information

IBM TRIRIGA Version 10 Release 5.2. Inventory Management User Guide IBM

IBM TRIRIGA Version 10 Release 5.2. Inventory Management User Guide IBM IBM TRIRIGA Version 10 Release 5.2 Inventory Management User Guide IBM Note Before using this information and the product it supports, read the information in Notices on page 19. This edition applies to

More information

Invitation to Tender for the Provision of

Invitation to Tender for the Provision of Invitation to Tender Invitation to Tender for the Provision of Catering Services To be supplied to the Bala Cranberry Festival 1 Invitation To Tender for Bus Services By participating in this tender you

More information

SAVVION PROGRESS BPM SERVER PROGRESS SAVVION BPM SERVER OVERVIEW

SAVVION PROGRESS BPM SERVER PROGRESS SAVVION BPM SERVER OVERVIEW D A T A S H E E T PROGRESS BPM SERVER PROGRESS BPM SERVER OVERVIEW The process execution and integration capabilities of Progress Savvion BusinessManager Platform are provided by the Progress Savvion BPM

More information

Request for Proposal For: 2018 American Bar Association Temporary Services

Request for Proposal For: 2018 American Bar Association Temporary Services Table of Contents Bid Timetable [2] 1.0 General Bid Information [3] 2.0 Proposal Requirements [5] 3.0 Criteria for Selection [7] 4.0 Specifications and Work Statement [7] Appendix A: Bidder Response Sheet

More information

City of Tacoma Department of Public Utilities - Tacoma Power

City of Tacoma Department of Public Utilities - Tacoma Power City of Tacoma Department of Public Utilities - Tacoma Power Service Oriented Architecture (SOA) Integration Infrastructure Implementation RFP Specification No. PS15-0233F QUESTIONS and ANSWERS All interested

More information

MARYLAND STATE TREASURER S OFFICE Louis L. Goldstein Treasury Building 80 Calvert Street, Room 109 Annapolis, Maryland 21401

MARYLAND STATE TREASURER S OFFICE Louis L. Goldstein Treasury Building 80 Calvert Street, Room 109 Annapolis, Maryland 21401 MARYLAND STATE TREASURER S OFFICE Louis L. Goldstein Treasury Building 80 Calvert Street, Room 109 Annapolis, Maryland 21401 QUESTIONS AND ANSWERS FOR RFP FOR MICROSOFT DYNAMICS ENTERPRISE 365 IMPLEMENTATION

More information

Contents Working with Oracle Primavera Analytics... 5 Legal Notices... 10

Contents Working with Oracle Primavera Analytics... 5 Legal Notices... 10 Analytics System Architecture Data Sheet for On-Premises Version 17 July 2017 Contents Working with Oracle Primavera Analytics... 5 About Oracle Primavera Analytics... 6 About Oracle Primavera Data Warehouse...

More information

Oracle Application Integration Architecture

Oracle Application Integration Architecture Oracle Application Integration Architecture Oracle Communications Pre-Built Integrations Release Notes Release 11.1 E25506-02 October 2011 Oracle Application Integration Architecture Oracle Communications

More information

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017.

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: August 10, DUE DATE: August 23, 2017. REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: August 10, 2017 DUE DATE: August 23, 2017 Issued by: Trenton Parking Authority NOTE: In the event an interested

More information

State of North Carolina Department of Health and Human Services

State of North Carolina Department of Health and Human Services State of North Carolina Department of Health and Human Services REQUEST FOR PROPOSAL (RFP) Addendum #6 Date: September 5, 2018 RFP Number: 30-180397 RFP Description: Independent Verification and Validation

More information

Request for Proposal Internet Access Columbus Urban League

Request for Proposal Internet Access Columbus Urban League Request for Proposal Internet Access Columbus Urban League 1 REQUEST FOR PROPOSAL Internet Access Columbus Urban League The Columbus Urban League invites vendors to submit proposals in accordance with

More information

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017

REQUEST FOR QUALIFICATIONS. FOR THE PROVISION OF LEGAL SERVICES General Counsel. ISSUE DATE: December 11, DUE DATE: December 28, 2017 REQUEST FOR QUALIFICATIONS FOR THE PROVISION OF LEGAL SERVICES General Counsel ISSUE DATE: December 11, 2017 DUE DATE: December 28, 2017 Issued by: Rahway Parking Authority NOTE: In the event an interested

More information

Innovate 2 Succeed Invitation to Tender External Evaluator - June 2017

Innovate 2 Succeed Invitation to Tender External Evaluator - June 2017 1. Introduction: Innovate 2 Succeed Invitation to Tender External Evaluator - June 2017 1.1 Invitation to Tender This is an invitation to submit a tender to provide services ( Services ) to meet the requirements,

More information

Transform Payables into Strategic Assets

Transform Payables into Strategic Assets SAP Brief SAP Ariba Financial Supply Chain SAP Ariba Payables Transform Payables into Strategic Assets SAP Brief Time your payments to improve your company s balance sheet Your ability to time payments

More information

O AHU ENERGY STORAGE SYSTEM REQUEST FOR PROPOSALS RFP NO

O AHU ENERGY STORAGE SYSTEM REQUEST FOR PROPOSALS RFP NO O AHU ENERGY STORAGE SYSTEM REQUEST FOR PROPOSALS RFP NO. 072114-01 REQUEST FOR PROPOSALS Hawaiian Electric Company, Inc. ( Hawaiian Electric ) hereby requests a proposal for a firm lump- sum price proposal

More information

CUSTOMER NAME Security Awareness Education Request for Proposal. Program Content & Hosting Services Date

CUSTOMER NAME Security Awareness Education Request for Proposal. Program Content & Hosting Services Date CUSTOMER NAME Security Awareness Education Request for Proposal Program Content & Hosting Services Date Contents SAE Project Overview... 3 SAE Vendor Qualifications... 3 Project Milestones... 3 CUSTOMER

More information

Oracle Retail Merchandising Analytics. Product Overview. Characteristics. Release Notes Release 13.2

Oracle Retail Merchandising Analytics. Product Overview. Characteristics. Release Notes Release 13.2 Oracle Retail Merchandising Analytics Release Notes Release 13.2 March 2011 This document announces the release of Oracle Retail Analytics and its first module, Oracle Retail Merchandising Analytics. Release

More information

Request for Proposal. 4229P PeopleSoft HCM Technical Consulting Services

Request for Proposal. 4229P PeopleSoft HCM Technical Consulting Services Request for Proposal 4229P PeopleSoft HCM Technical Consulting Services 1. Introduction The City of Richmond (the City ) requires the services of a PeopleSoft technical consultant (the Consultant ) to

More information

Request for Proposal

Request for Proposal Request for Proposal FOR PROCUREMENT OF DESKTOP COMPUTERS, LAPTOPS & NETWORK SERVERS RFP# 2018-08-07 ISSUED DATE: AUGUST 7, 2018 SUBMISSION DATE: AUGUST 17, 2018 AT 5:00 P.M. ET RFP #2018-08-07 1 Table

More information

Integrated business planning with SAP Business Planning and Consolidation

Integrated business planning with SAP Business Planning and Consolidation Integrated business planning with SAP Business Planning and Consolidation Public Pras Chatterjee, SAP EPM Product Marketing November 2016 Legal disclaimer The information in this presentation is confidential

More information

TERP10. SAP ERP Integration of Business Processes COURSE OUTLINE. Course Version: 17 Course Duration: 10 Day(s)

TERP10. SAP ERP Integration of Business Processes COURSE OUTLINE. Course Version: 17 Course Duration: 10 Day(s) TERP10 SAP ERP Integration of Business Processes. COURSE OUTLINE Course Version: 17 Course Duration: 10 Day(s) SAP Copyrights and Trademarks 2016 SAP SE or an SAP affiliate company. All rights reserved.

More information

DATE: 02/05/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/002 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

DATE: 02/05/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/002 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF DATE: 02/05/2018 REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/002 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF Recruitment, on-boarding and staff administration services United

More information

SAP Simple Finance Your Key for a Technology Driven Transformation. Susana Fernandes, Office of the CFO Solutions

SAP Simple Finance Your Key for a Technology Driven Transformation. Susana Fernandes, Office of the CFO Solutions SAP Simple Finance Your Key for a Technology Driven Transformation Susana Fernandes, Office of the CFO Solutions SAP Business Suite 4 SAP HANA Run Simple with the Next Generation Business Suite Simple

More information

Oracle Siebel CRM On Demand Integration Pack for JD Edwards EnterpriseOne (Opportunity to Cash)

Oracle Siebel CRM On Demand Integration Pack for JD Edwards EnterpriseOne (Opportunity to Cash) Oracle Siebel CRM On Demand Integration Pack for JD Edwards EnterpriseOne (Opportunity to Cash) An AMX International White Paper January 2008 Page 1 NOTE: The following is intended to outline our general

More information

Gadsden City Schools

Gadsden City Schools Bid # 2017-08 Specifications and Proposal For Athletic Uniform Contract Bid Opening: May 31, 2017 10:00 a.m. Note: All questions concerning these specifications and proposal should be directed in writing

More information

Application Lifecycle Management for SAP Powered by IBM Rational

Application Lifecycle Management for SAP Powered by IBM Rational Application Lifecycle Management for SAP Powered by IBM Rational Change is Critical to Business Innovation There are 3 key drivers for change events Business Drivers Modified Business Processes M&A and

More information

Illinois Valley Regional Dispatch RFP Disclaimer Logging Recorder

Illinois Valley Regional Dispatch RFP Disclaimer Logging Recorder Illinois Valley Regional Dispatch RFP Disclaimer Logging Recorder To the extent any of the following requirements are propriety or vendor specific or in any way limits open and competitive proposals IVRD

More information

Demo Script. Procure-to-Pay - Stock Classification: Internal and for Partners. SAP Business ByDesign Reference Systems.

Demo Script. Procure-to-Pay - Stock Classification: Internal and for Partners. SAP Business ByDesign Reference Systems. Demo Script Procure-to-Pay - Stock Classification: Internal and for Partners SAP Business ByDesign Reference Systems Table of Content 1 Demo Script Overview... 3 1.1 Demo Overview... 3 1.2 Intended Audience...

More information

SAP S/4HANA. James Wade March 20, 2017

SAP S/4HANA. James Wade March 20, 2017 SAP S/4HANA James Wade March 20, 2017 Agenda Introduction to S/4HANA Introduction to Central Finance Demonstration Benefits 2 Digital Finance: What Digitalization Means Digitalization is transforming your

More information

INTERNATIONAL CENTRE FOR RESEARCH IN AGROFORESTRY. ICRAF House, UN Avenue Gigiri PO Box Nairobi Kenya

INTERNATIONAL CENTRE FOR RESEARCH IN AGROFORESTRY. ICRAF House, UN Avenue Gigiri PO Box Nairobi Kenya INTERNATIONAL CENTRE FOR RESEARCH IN AGROFORESTRY ICRAF House, UN Avenue Gigiri PO Box 30677 00100 Nairobi Kenya Tel. +254 20 524 000, Fax: +254 20 524 001 TENDER No. ICRAF /ME/09/2018 REQUEST FOR PROPOSAL

More information

ERP SOFTWARE PERISHABLE PRODUCTS EXPORT CONTROL BOARD (PPECB) OFFICES

ERP SOFTWARE PERISHABLE PRODUCTS EXPORT CONTROL BOARD (PPECB) OFFICES RFI REFERENCE: RFI/ICT/ERP/2018/13 ERP SOFTWARE PERISHABLE PRODUCTS EXPORT CONTROL BOARD (PPECB) OFFICES Closing Date: 26 November 2018 Closing Time: 11H00 ISSUED BY: PREPARED BY: PERISHABLE PRODUCTS EXPORT

More information

Oracle Procurement Cloud Security Reference

Oracle Procurement Cloud Security Reference Oracle Procurement Cloud Security Reference Release 12 Part Number E74087-01 This guide also applies to on-premise implementations. Title and Copyright Information Oracle Procurement Cloud Security Reference

More information

DATE: 05/03/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF

DATE: 05/03/2018. REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF DATE: 05/03/2018 REQUEST FOR PROPOSAL: No. RFP/2018/UNHCR/PSP/MENA/001 FOR THE ESTABLISHMENT OF A FRAME AGREEMENT FOR THE PROVISION OF Recruitment and staff administration services in Gulf Cooperation

More information

Please note the following policy concerning communication between Consultants and the City of Dublin during the announcement and selection process:

Please note the following policy concerning communication between Consultants and the City of Dublin during the announcement and selection process: 01-08-19 Posting Date FRA-33-3.70 Smart Technology Connected Vehicle Roundabout Application Project PID No. 109356 City of Dublin Response Due Date: 01-24-19 Communications Restrictions Please note the

More information

Tender Document for the Provision of services for the: Development and Testing of a Dynamic Positioning Prototype for Small Vessels

Tender Document for the Provision of services for the: Development and Testing of a Dynamic Positioning Prototype for Small Vessels Tender Document for the Provision of services for the: Development and Testing of a Dynamic Positioning Prototype for Small Vessels Employer: Super Toys Country: Greece Contents INVITATION TO TENDER...

More information

IDBI BANK. REQUEST FOR PROPOSAL FOR DOCUMENT MANAGEMENT SYSTEM (RFP / Bid reference no: IDBI/APP/ /001 Issued on )

IDBI BANK. REQUEST FOR PROPOSAL FOR DOCUMENT MANAGEMENT SYSTEM (RFP / Bid reference no: IDBI/APP/ /001 Issued on ) IDBI BANK REQUEST FOR PROPOSAL FOR DOCUMENT MANAGEMENT SYSTEM (RFP / Bid reference no: IDBI/APP/2013-14/001 Issued on 12.08.2013) 2 nd Corrigendum to the captioned RFP Sr. Section. 1 Section 1 3-Eligibility

More information

Oracle Technical Cloud Consulting Services Descriptions. January 25, 2018

Oracle Technical Cloud Consulting Services Descriptions. January 25, 2018 Oracle Technical Cloud Consulting Services Descriptions January 25, 2018 Services B83899 - Oracle Consulting Architecture Blueprint and Roadmap for Oracle Cloud... 2 B83896 - Oracle Consulting Rapid Start

More information

Ariba Network Enabling Business Commerce in a Digital Economy

Ariba Network Enabling Business Commerce in a Digital Economy SAP Brief SAP Ariba s Ariba Network Ariba Network Enabling Business Commerce in a Digital Economy SAP Brief Automate commerce to connect In a digital economy, moving from paper to electronic processing

More information

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK

MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK MICHIGAN DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET IT SERVICES for FileNet Enterprise Content Management (ECM) STATEMENT OF WORK Michigan Commission on Law Enforcement Standards The FileNet Enterprise

More information

Oracle Procurement Cloud Security Reference. Release 13 (update 17D) Part Number E

Oracle Procurement Cloud Security Reference. Release 13 (update 17D) Part Number E Oracle Procurement Cloud Security Reference Release 13 (update 17D) Part Number E89292-01 Title and Copyright Information Oracle Procurement Cloud Security Reference Release 13 (update 17D) Part Number

More information

CORE APPLICATIONS ANALYSIS OF BUSINESS-CRITICAL ADABAS & NATURAL

CORE APPLICATIONS ANALYSIS OF BUSINESS-CRITICAL ADABAS & NATURAL ADABAS & NATURAL ANALYSIS OF BUSINESS-CRITICAL CORE APPLICATIONS CONTENTS 2 Core applications in a changing IT landscape 3 The need for comprehensive analysis 4 The complexity of core applications 5 An

More information

Oracle. SCM Cloud Getting Started with Your Manufacturing and Supply Chain Materials Management Implementation. Release 13 (update 18B)

Oracle. SCM Cloud Getting Started with Your Manufacturing and Supply Chain Materials Management Implementation. Release 13 (update 18B) Oracle SCM Cloud Getting Started with Your Manufacturing and Supply Chain Materials Management Implementation Release 13 (update 18B) Release 13 (update 18B) Part Number E94278-01 Copyright 2011-2018,

More information

Survey Services Rev. 0 Bid # Scope of Work

Survey Services Rev. 0 Bid # Scope of Work Scope of Work I. Scope of Solicitation II. Instructions to Offerors III. Scope of Work / Specifications IV. Terms and Conditions - Special V. Appendices to Scope of Work (if required) VI. Bidding Schedule

More information

MANUFACTURING INNOVATION AT DOW CORNING:

MANUFACTURING INNOVATION AT DOW CORNING: MANUFACTURING INNOVATION AT DOW CORNING: A JOURNEY WITH SAP MII Brett Hoffman Manufacturing Application Development Manager MII Technology Steward Agenda Dow Corning: A Brief Introduction Our Challenges

More information

Business Process Management for Innovation and Optimisation. David Bate SOA Software Sales Executive IBM Asia Pacific

Business Process Management for Innovation and Optimisation. David Bate SOA Software Sales Executive IBM Asia Pacific Business Process Management for Innovation and Optimisation David Bate SOA Software Sales Executive IBM Asia Pacific Innovation that matters to CEOs and CIOs Top Innovation priorities for CEOs: Extend

More information

Request for Quotation (RFQ) for E-book conversion of Booklet on Achievements of Department of Commerce

Request for Quotation (RFQ) for E-book conversion of Booklet on Achievements of Department of Commerce Request for Quotation (RFQ) for E-book conversion of Booklet on Achievements of Department of Commerce Request for Quotation [RFQ] India Brand Equity Foundation, 20 th Floor, Jawahar Vyapar Bhawan Tolstoy

More information

SAP Inside Track Walldorf S/4HANA Cloud Q&A Session

SAP Inside Track Walldorf S/4HANA Cloud Q&A Session SAP Inside Track Walldorf S/4HANA Cloud Q&A Session Sven Denecken SVP, Head of S/4HANA Cloud Product & Co-Innovation, SAP SE @SDenecken S/4HANA Cloud Integrated and options to expand with extensibility

More information

Energy. Epicor for. An Innovative Breakthrough to Overcome the Barriers to Success for the Energy Industry. Functionality

Energy. Epicor for. An Innovative Breakthrough to Overcome the Barriers to Success for the Energy Industry. Functionality Epicor for Energy Functionality XXMaintenance Management ensures up time of mission critical assets XXProduct Lifecycle Management (PLM) for complex engineeringintensive product control XXEmbedded project

More information

Oracle. SCM Cloud Getting Started with Your Manufacturing and Supply Chain Materials Management Implementation. Release 13 (update 17D)

Oracle. SCM Cloud Getting Started with Your Manufacturing and Supply Chain Materials Management Implementation. Release 13 (update 17D) Oracle SCM Cloud Getting Started with Your Manufacturing and Supply Chain Materials Management Implementation Release 13 (update 17D) Release 13 (update 17D) Part Number E89209-01 Copyright 2011-2017,

More information

Lower Rio Grande Valley Development Council. Invitation to Bid (ITB): Online Training System for the Department. office.

Lower Rio Grande Valley Development Council. Invitation to Bid (ITB): Online Training System for the Department. office. The Lower Rio Grande Valley Development Council (LRGVDC) Invitation to Bid (ITB): Online Training System for the 9-1-1 Department Quotes Due Not Later than: Issuing Office: Monday, April 18 th, 2016 at

More information

Amsterdam. Accelerate digital transformation with the cloud for smarter business. Reimagining applications & data for growth and innovation

Amsterdam. Accelerate digital transformation with the cloud for smarter business. Reimagining applications & data for growth and innovation Accelerate digital transformation with the cloud for smarter business Amsterdam Reimagining applications & data for growth and innovation Andrew Brown Vice President IBM Cloud Software Europe @AndyBrown74

More information