YD05. Strain gage. Designed for historic structures. YAPIDESTEK LTD. ODTÜ TEKNOKENT KOSGEB Teknoloji Geliştirme Merkezi Binası No:102 Çankaya / ANKARA
|
|
- Britton Lewis
- 5 years ago
- Views:
Transcription
1 YAPIDESTEK LTD. ODTÜ TEKNOKENT KOSGEB Teknoloji Geliştirme Merkezi Binası No:102 Çankaya / ANKARA INSTRUCTION MANUAL YD05 Strain gage Designed for historic structures This instruction manual and product cannot be reproduced, fully or partially by any means without the explicit written consent of Yapidestek Ltd. This document holds information that is believed to be accurate and reliable. However, Yapidestek Ltd. assumes no responsibility for unintended errors or misinterpretations by the user. The information in this document may be subjected to change without notification. Copyright by Yapidestek Ltd., Page 1
2 Warranty statement YD05 is made of high quality materials and under warranty for free of defects in material and workmanship under service and normal use conditions for a duration of 13 months by Yapidestek Ltd. The warranty would be VOID if any signs of improper installation, tampering, misuse, excessive heat, water, high voltage etc are observed. There are no warranties for people, equipment, or other direct or indirect losses and total warranty is limited by the initial cost of the sensor. Yapidestek is will not reimburse any possible loss incurred in removing or reinstalling and for data lost during the time in between. Caution Please read the installation guide carefully before installing the YD05 product. 1. Maximum allowable strain is 3000 µε. 2. Max supply voltage = 4 volts 3. Don t immerse in water 4. The maximum axial force on anchors should be limited to 30 N. 5. Don t pull wire with force, it can damage connections. 6. Avoid bending the gage along any axis. 7. Avoid twisting of gage during tightening or loosening. Installation instructions YD05 is made of rust free steel material, designed and optimized for monitoring of historical structures. Gages are temperature compensated and provide high precision readings. Please follow the installation steps as follows: 1) Make sure the seal is not broken and gage inside has no major bent or twist. 2) After removing the gage, check the resistance between the terminals; the resistance between (Brown & Yellow) pair and (White & Green) pair should be around 120 Ω and resistance between all other cables should be 90 Ω. Do not install the gage if the readings are much different than those values. Page 2
3 3) The base installation has two options, either a) use the glue on footings or b) m6 mechanical anchors for fastening the gage. The footings are specifically designed to use the strain gage on historic masonry structures, where drilling should be avoided to damage historic heritage. The footings have about 25 mm 25 mm base area where a safe load of 70 N can be transmitted by about 1 MPa compressive strength mortar, since some bending related tension and shear are combined. This mortar may be safely removed from the footing base after the gage is removed. Alternatively, the M6 mechanical anchor provided in the installation box can be used to install the gage on stone, mortar, or concrete material. Installation on concrete should be careful to avoid possible rebars inside the concrete that can be detected using Ferroscan or Profometer like instruments. Installation on steel structures may also be carried out using the metal footings by means of epoxy. The YD05 strain gage is specifically designed to have low axial stiffness, so that it can be used by weakly attached footings or delicate surface where the material strength has depreciated. For extremely low strength materials, use of mechanical anchors may be preferred. 4) If mechanical anchors will be used, drill two holes that are 155 mm apart from each other. Small deviations in the order of a few millimeters may be compensated by the oval hole on one end of the gage. If metal on-surface footings will be used, use a mortar of about 1 MPa compressive strength and apply it on the surface. Let the mortar cure and gain strength before installing the gages. The mechanical anchors are usually ok to be used immediately after installation. If anchors are installed on very weak material, the material at the edges of the anchors may creep and crack sometime after installation. If such effect is suspected, check the stiffness of the mechanical anchors and see if they move if a moderate shaking is applied by hand (e.g. about N force). If the anchors are moving, mortar or epoxy may have to be used around the anchors or surface footing supports may have to be used. 5) After the footing or anchors are properly placed, start with the circular hole on one end of the gage. Then pass the oval hole over the other support. Secure the circular side by tightening the nut over it. Make sure the bolt tightening won t turn the gage by holding the gage from the side that you are tightening. Continue by tightening the other end with the nut again holding the gage making sure it won t turn or twist during tightening the bolt. 6) Use #22 AWG 7 wire strand cables for extension similar to the one shown below, where each pair has separate shielding. Provide proper connection for the extension cable. 7) Connect the brown (+) and yellow (-) cables to the power input (excitation) to the sensor with about 2.5 Volts (for a maximum of 4 Volts). Connect the White (+) and Green (-) cables for output in the data logger. The sensors have about 500 /mv/v sensitivity and each calibration value is provided on the gage and data sheets. 500 /mv/v means if the sensor is excited using 1 V input and reads 1 mv output, it corresponds to 500 strain. If the input excitation is 2 Volts, then the same 500 strain would yield 2 mv output. If excitation is 2.5 Volts, then the sensor will have a calibration factor of 1250 /mv. Please use the calibration coefficient provided on the gage and calibration sheet for each gage separately. Page 3
4 Brown V in (+) Cable Yellow V in (-) Green V out (+) White V out (-) Excitation: Brown V ext + Yellow V ext - Read: White Read + Green Read - 8) The sensor should preferably covered by a protective After the footing or anchors are properly placed, start with the circular hole on one end of the gage. Then pass the oval hole over the other support. Secure the circular side by tightening the nut over it. Make sure the bolt tightening won t turn the gage by holding the gage from the side that you are tightening. Continue by tightening the other end with the nut again holding the gage making sure it won t turn or twist during tightening the bolt. The gage shape and dimensions are shown below. Page 4
5 Calibration Certificate Calibration has been performed in accordance of Yapidestek Calibration Protocol YD Details of calibration are as below: Serial No. Data of Calibration YD Nov-2015 Device Condition Manufactured Repaired Re-Calibrated Damage Type Burned Bent Skewed N/A Gage Factor = 548 µε/mv/v R 2 = The results are valid at the time of calibration. Signature and Stamp Page 5
Model: LoLander Series Truck Scale Model: LL FT Model: LL FT Installation, Set-Up and Operation Manual
SCALE WORKS, INC. Model: LoLander Series Truck Scale Model: LL8035-10FT Model: LL8035-11FT Installation, Set-Up and Operation Manual Cambridge Scale Works, Inc. P.O. Box 670 Honey Brook, PA. 19344 (800)
More informationModel: 770 Light Vehicle Scale Size: 8 x30 x5 Size: 10 x30 x5 Capacity: 40K CLC: 20K Capacity: 60K CLC:30K Installation, Set-Up and Operation Manual
SCALE WORKS, INC. Model: 770 Light Vehicle Scale Size: 8 x30 x5 Size: 10 x30 x5 Capacity: 40K CLC: 20K Capacity: 60K CLC:30K Installation, Set-Up and Operation Manual Cambridge Scale Works, Inc. P.O. Box
More informationQuarter Arm Strain Gage Completion Module Operations Manual
Quarter Arm Strain Gage Completion Module Operations Manual No part of this instruction manual may be reproduced, by any means, without the written consent of Bridge Diagnostics, Inc. The information contained
More informationAegis Heavy Capacity 20K Floor Scale. MODEL: 6200 Series. Installation Manual
Installation Manual Aegis Heavy Capacity 20K Floor Scale MODEL: 6200 Series Copyright 1997-2014 Fairbanks Scales, Inc. Revision 3 50637 All Rights Reserved 07/14 Aegis Heavy Capacity 20K Floor Scale Model:
More informationPOWER PINNER BENCH HAND WELDER 7250 OPERATOR S MANUAL
POWER PINNER BENCH HAND WELDER 7250 OPERATOR S MANUAL Copyright: November 20, 2018 Revised: Serial No. Gripnail Corporation An Employee Owned Company 97 Dexter Road East Providence, Rhode Island 02914-2045
More informationGeneral-Purpose Scale Bases
General-Purpose Scale Bases Models LB30, LB60, PL100, PL150 Instruction Manual Ohaus Corporation 1994, all rights reserved. TABLE OF CONTENTS INTRODUCTION... 3 DESCRIPTION... 3 UNPACKING... 4 INSTALLATION...
More informationUser Manual Agreto Heavy Duty Modules 5t/10t/15t
User Manual Agreto Heavy Duty Modules 5t/10t/15t 21.6.2017 Content 1 Introduction... 3 2 Scope of delivery... 3 3 Intended use... 3 4 Security... 4 5 Technical Specifications... 5 6 Mounting the Agreto
More informationInstallation Manual. Omnicell. Model: 9102 FB by Fairbanks Scales, Inc. Revision 4 08/16 All rights reserved
Installation Manual Omnicell Model: 9102 FB 51175 2007-2016 by Fairbanks Scales, Inc. Revision 4 08/16 All rights reserved Amendment Record Omnicell 9102 FB Installation Manual DOCUMENT 51175 Manufactured
More informationHILTI HY 150 REBAR DESIGN GUIDE
HILTI HY 150 REBAR DESIGN GUIDE HILTI HY 150 REBAR DESIGN GUIDE 1 HY150 Rebar Dowelling using Limit States Concrete Design ( A23.3-94) The design method presented here was originally based on Eurocode
More informationVN Series Floor Scale Instruction Manual
99 Washington Street Melrose, MA 02176 Phone 781-665-1400 Toll Free 1-800-517-8431 Visit us at www.testequipmentdepot.com VN Series Floor Scale Instruction Manual VN Series Floor Scale EN-1 INTRODUCTION
More informationAnchor Load Cells Installation - considerations
Anchor Load Cells Installation - considerations This article outlines the main points to check during installation of load cells to control tensions while installing and service life, applied on bar and
More informationV 2.0 ASSEMBLY GUIDE. TS Platform Scale Series 2
V 2.0 ASSEMBLY GUIDE Series 2 TABLE OF CONTENTS OVERVIEW General Specifications...1 Cautions and Disclaimers...1 Contents of Kit...1 Tools Required For Assembly...2 Time Required to Assemble...2 ASSEMBLING
More informationInstallation Instructions. Overview. Important Notes. LINCTM Enclosure EDB-WPM-GRX-6-CE
Installation Instructions Please Read Before Installing Overview The Enclosure is for use with Wallbox Power Modules (WPM) or 6-zone Grafik Eye Main Control Units. The Enclosure provides a means to prewire
More informationINSTALLATION MANUAL IN-GROUND
INSTALLATION MANUAL IN-GROUND Dig holes according to positions on drawings (see the following pages). Dimensions of holes: e.g. 50 x 50 x 75 cm (see the following pages). Fill with concrete leaving a depth
More informationInstallation Manual. Omnicell. Model: 9101 FB by Fairbanks Scales, Inc. Revision 2 03/16 All rights reserved
Installation Manual Omnicell Model: 9101 FB 51172 2016 by Fairbanks Scales, Inc. Revision 2 03/16 All rights reserved Amendment Record Omnicell 9101 FB DOCUMENT 51172 Manufactured by Fairbanks Scales
More informationTORQUE TESTING & INSTALLATION INSPECTION OF DRILLED - IN ANCHORS
INFORMATION BULLETIN / PUBLIC - BUILDING CODE REFERENCE NO.: LAMC 98.0501 Effective: 04/30/02 DOCUMENT NO. P/BC 2002-092 Revised: Previously Issued As: Guideline #3 TORQUE TESTING & INSTALLATION INSPECTION
More informationSECTION MISCELLANEOUS METAL FABRICATIONS
SECTION 05500 PART I - GENERAL 1.01 DESCRIPTION: A. Scope: Work under this Section shall include all material and installation necessary to provide Miscellaneous Metal Fabrications, as shown and detailed
More informationPART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER
PART 7 COMMUNICATIONS, LIGHTING, TRAFFIC CONTROL, POWER COMMUNICATIONS LIGHTING Street Lighting Plan 710 Riser... 287 730 Collar for street light pole... 289 731 Pull box... 291 732 Trench for street light
More informationINSTALLATION HANDBOOK
INSTALLATION HANDBOOK WALL/CEILING MOUNTED CONCRETE HORIZONTAL LIFELINE SafetyLink is an innovative anchor company achieving success and keeping you safe whilst working at heights. ROOF ANCHORS HORIZONTAL
More informationTILT-UP LIFTING PRODUCTS
TILT-UP LIFTING PRODUCTS 37 Super-Lift www.meadowburke.com 877-518-7665 STRONGBACKS When will they be needed? A. If a panel looks like it would fall over when standing up. The strongback acts as a crutch
More informationModel T2642E Wall Mount. Television Wall Mount with Tilt Option
Model T2642E Wall Mount Television Wall Mount with Tilt Option Getting Started Introduction Congratulations on the purchase of your new Audio Solutions T2642E Television Wall Mount. For maximum benefit,
More informationAM1620 Precision Industrial Platinum Resistance Thermometer User s Guide
AM1620 Precision Industrial Platinum Resistance Thermometer Table of Contents Before you start ---- Warnings & Cautions... 2 1 Introduction... 3 1.1 Main Application... 3 1.2 Main Features... 3 1.3 Calibrations...
More informationVW Total Pressure Cell
VW Total Pressure Cell 52608299 Copyright 2004 Slope Indicator Company. All Rights Reserved. This equipment should be installed, maintained, and operated by technically qualified personnel. Any errors
More information1. GENERAL INFORMATION CAUTIONS AND GENERAL NORMS DESCRIPTION AND INTENDED USE MARKING OF DTW WEIGHBRIDGES...
INDEX 1. GENERAL INFORMATION... 3 2. CAUTIONS AND GENERAL NORMS... 4 3. DESCRIPTION AND INTENDED USE... 5 4. MARKING OF DTW WEIGHBRIDGES... 5 4.1 TECHNICAL AND METROLOGICAL MARKING OF WEIGHING BARS...
More informationRailroad Track Scale
Installation & Service Manual Railroad Track Scale Model: 8710 2003 by Thurman Scale Company All rights reserved 50727 Issue #1 8/03 Amendment Record Railroad Track Scale Model: 8710 50727 Manufactured
More informationNOTICE XX/2017 SUPPLY AND ERECT PRE-CAST CONCRETE PALISADE FENCING WITHIN THE KOUGA MUNICIPAL AREA
NOTICE XX/2017 SUPPLY AND ERECT PRE-CAST CONCRETE PALISADE FENCING WITHIN THE KOUGA MUNICIPAL AREA 1. STANDARD TYPE FENCE 1.1 Pre-fabricated Concrete Elements 1.1.1 Workmanship and finish General All concrete
More informationST350 - STRAIN TRANSDUCER
ST350 - STRAIN TRANSDUCER OPERATIONS MANUAL: ST350 STRAIN TRANSDUCER Document Revision History Version Date Changes 1.0 5/15/2012 Initial release document 2.0 6/7/2012 Updated to reflect the change in
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER OPR:CT 1 of 5 APPR:JAR:DBP:09-07-11 FHWA:APPR:09-07-11 a. Description. This work consists of furnishing and installing
More informationCONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION OPSS.PROV 772 NOVEMBER 2017 (Formerly OPSS 772, November 2012) Note: The PROV published in November 2017 replaces OPSS 772 COMMON, November 2012 with no technical
More informationA EN ROUND STORAGE SILO. Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL. ARSKAMETALLI LTD
A70-1001-EN-201805 ROUND STORAGE SILO Ø480cm, Ø560cm, Ø640cm, Ø720cm ASSEMBLY AND USER MANUAL ARSKAMETALLI LTD www.arskametalli.fi CONTENTS Introduction Delivery information EU Declaration of Conformity
More informationMULTI-POINT BOREHOLE EXTENSOMETER (MPBX) INSTALLATION INSTRUCTIONS
MULTI-POINT BOREHOLE EXTENSOMETER (MPBX) INSTALLATION INSTRUCTIONS Overview This document describes the installation of Mine Design Technologies (MDT) Multi-Point Borehole Extensometer (MPBX). This document
More informationRL8000HE/RL8500HE Load Cell Mounting Kit. Installation Guide
RL8000HE/RL8500HE Load Cell Mounting Kit Installation Guide 63286 Contents 1.0 Introduction... 1 2.0 Mechanical Installation... 2 2.1 General Installation Guidelines for Tank Mounts...2 2.2 Installing
More informationAMP Low Voltage Landscape Lighting AMP LED Hardscape Lights AHS-67XX Series
INSTALLATION & MAINTENANCE GUIDE AMP Low Voltage Landscape Lighting AMP LED Hardscape Lights AHS-67XX Series Help Hotline: 1-813-978-3900 Mon-Fri 9am-6pm (EST) INSTALLATION & MAINTENANCE GUIDE! AMP LED
More informationModel # 158-P4. 12/12/2013 Page 1 of 11
Model # 158-P4 12/12/2013 Page 1 of 11 2/12/2013 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationSpecial Provision No. 541S01 October OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced with the following:
CHAIN LINK FENCE - Item No. GATES - Item No. Special Provision No. 541S01 October 1998 AMENDMENT TO OPSS 541, DECEMBER 1990 OPSS 541, Construction Specifications for Chain Link Fence, is deleted and replaced
More informationModel # 238HS-P8. 4/27/2011 Page 1 of 11
Model # 238HS-P8 4/27/2011 Page 1 of 11 4/27/2011 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationTP EA. Product Description. Properties and Benefits. Applications. Reaction Resin Mortar Based on Epoxy Acrylate. Approvals / Certificates:
Approvals / Certificates: Product Description The TP EA is a 2-component reaction resin mortar based on an epoxy acrylate. This product may be used in combination of a hand-, battery- or pneumatic tool
More information7 PIECE TUBE FLARING KIT
7 PIECE TUBE FLARING KIT Model 5969 Set up And Operating Instructions Diagrams within this manual may not be drawn proportionally. Due to continuing improvements, actual product may differ slightly from
More informationFosroc Lokfix E75. High performance pure epoxy 3:1 resin cartridge system, for anchoring reinforcement and fixings into a variety of substrates.
High performance pure epoxy 3:1 resin cartridge system, for anchoring reinforcement and fixings into a variety of substrates. Re-usable Slow gel times allow for more complex procedures 24 month shelf life
More informationWall Down Light MR16 Low Voltage GANWL-MC60D-MR16. Adjustable Twin Light MR16 Low Voltage GANWL-MC60AT-MR16
INSTALLATION INSTRUCTIONS Wall Down Light MR16 Low Voltage GANWL-MC60D-MR16 Adjustable Single Wall Light MR16 Low Voltage GANWL-MC60AS-MR16 Adjustable Twin Light MR16 Low Voltage GANWL-MC60AT-MR16 Up/Down
More informationEngineering Specifications
Engineering Specifications Tension Weigh Modules The portions of this specification that have been left blank ( ) should be filled with information about the specific application. Information for the blanks
More informationP R E - I N S U L AT E D PIPE SYSTEMS COMPRESSION WALL SEAL INSTALLATION GUIDE. Compression Wall Seal Installation Guide
P R E - I N S U L AT E D PIPE SYSTEMS COMPRESSION WALL SEAL INSTALLATION GUIDE Compression Wall Seal Installation Guide Uponor Pre-insulated Pipe Systems Compression Wall Seal Installation Guide Published
More informationUnit Substation Transformer Construction Checklist (under 500 kva)
Unit Substation Transformer Checklist (under 500 kva) Building: Location: Submittal / Approvals Submittal. The above equipment and systems integral to them are complete and ready for functional testing.
More informationSECTION INTERIOR STONE INTERIOR STONE
SECTION 04401- INTERIOR STONE 04401-1 PART ONE: GENERAL 1.1 Description INTERIOR STONE 1.1.1 Work of this Section, as shown or specified, shall be provided by the Interior Contractor/Vendor and shall be
More informationCHEMICAL /4" 3/8" to 5/8" /8" 3/4" to 1-1/4" 1 10
194 ASTM A193 GRADE B7 HIGH-STRENGTH CARBON, ZINC PLATED (ASTM B 633 YELLOW DICHROMATE) B7 (AISI 414) anchor rod is supplied with nuts meeting the requirements of ASTM Specification A 194, Grade 2H (ASTM
More informationSPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams
1993 Specifications CSJ 0162-01-080, etc. SPECIAL SPECIFICATION 4703 Repair Of Impact Damaged Prestressed Concrete Bridge Beams 1. Description. This Item shall govern for the repair of impact damaged prestressed
More informationCUKLT. 57 kg (125 lb) 37" - 80" ( cm) #: ( ) ENG MAX KG/LB
CUKLT 37" - 80" (94-203 cm) MAX KG/LB 57 kg (125 lb) ENG 1 2012-11-20 #:203-9320-3 (2013-04-17) WARNING ENG - This product was designed to be installed on wood stud, solid concrete or block walls. Before
More informationProper Practice. 2015, Pile Dynamics, Inc.
PDA Testing : Proper Practice 1997 1958 1965 1992 1982 2014 1973 2007 2015, Pile Dynamics, Inc. Luckily, no fatalities but sure slows job down NOTHING is more important than your safety! If you perceive
More informationAM1643 Full Immersion Platinum Resistance Thermometer User s Guide
AM1643 Full Immersion Platinum Resistance Thermometer User s Guide Please download the latest version at www.accumac.com Rev. 201609V3 Table of Contents Before you start ---- Warnings & Cautions... 2 1
More informationTower Site Inspection Procedures
Engineering, Manufacturing, Construction & Erection Specializing in Radio & TV Communication Towers 6037 S. Industrial Rd. 918-789-9020 Office 918-789-9922 Fax www.belltowercorp.com bob@belltowercorp.com
More informationAgilent 16034E Test Fixture
Agilent 16034E Test Fixture Operation and Service Manual Third Edition Agilent PN 16034-90041 December 1999 Printed in: Japan Notices The information contained in this document is subject to change without
More informationModel # 940SM-P8. Page 1 of 10
Model # 940SM-P8 Page 1 of 10 Page 2 of 10 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic coated elements. Ultra Play guarantees all items for one full year to be free of defects in
More informationRaised Basement. Mechanical Installation Guide
R Raised Basement Mechanical Installation Guide Ensure masonry work is correct. If recessed, the depth must be 14 inches deep unless otherwise specified for a custom application. Width and length may vary
More informationUltra-Thin LED/LCD TV Mount 23" to 42" Installation Guide
Ultra-Thin LED/LCD TV Mount 23" to 42" Installation Guide Ultra-Thin LED/LCD TV Wall Mount Material: 2.0mm Cold Rolled Steel Plate TV size: 23" - 42" Max load capacity: 110 lbs / 50 kgs Wall distance:
More informationHilti, Inc South 122 nd East Avenue Tulsa, OK
Attached are page(s) from the 2011 Hilti North American Product Tech Guide. For complete details on this product, including data development, product specifications, general suitability, installation,
More information1. Cast-in-place concrete is specified in Section
SECTION 03 38 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for furnishing and installing post-tensioned slabs, jacks, jacking and anchors at Parking Structure, and record
More informationModel # 940S-P6-BB. 6/7/2017 Page 1 of 10
Model # 940S-P6-BB 6/7/2017 Page 1 of 10 /7/2017 Page 2 of 10 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationCONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 541 NOVEMBER 2005 CONSTRUCTION SPECIFICATION FOR CHAIN-LINK FENCE TABLE OF CONTENTS 541.01 SCOPE 541.02 REFERENCES 541.03 DEFINITIONS 541.04 SUBMISSION
More informationAgilent 16047D Test Fixture
Agilent 16047D Test Fixture Operation and Service Manual Third Edition Agilent Technologies Japan, Ltd. Agilent PN 16047-90300 May 2000 Printed in Japan Notices The information contained in this document
More informationAM1660 Precision Industrial Platinum Resistance Thermometer User s Guide
AM1660 Precision Industrial Platinum Resistance Thermometer User s Guide Please download the latest version at www.accumac.com Rev. 201609V3 Table of Contents Before you start ---- Warnings & Cautions...
More informationPD6770 VANTAGEVIEW LOOP-POWERED PROCESS METER
PD6770 VANTAGEVIEW LOOP-POWERED PROCESS METER 4-20 ma input 1 V drop (4 V with Backlight) 3½ Digits LCD, 1" High Loop-Powered Backlight Option HART Protocol Transparent Plastic NEMA 4X, IP65 Enclosure
More informationProtective Capony RTC-16
Protective Capony RTC-16 ASSEMBLY AND OPERATION MANUAL Protective Canopy RTC-16 Assembly and Operation Manual CONTENT: 1 APPLICATION...3 2 OPERATION CONDITIONS...3 3 TECHNICAL SPECIFICATIONS...3 4 DELIVERY
More informationModel # BT238-U6. 9/30/2014 Page 1 of 12
Model # BT238-U6 9/30/2014 Page 1 of 12 /30/2014 Page 2 of 12 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationSECTION ELECTRICAL CABLE. 1. Trench excavation, backfill, and compaction; Section
02735-1 of 5 SECTION 02735 ELECTRICAL CABLE 02735.01 GENERAL A. Description Electrical cable installation shall include, but not necessarily be limited to, furnishing and placing electrical cable as shown
More informationCONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 630 APRIL 2004 CONSTRUCTION SPECIFICATION FOR INSTALLATION OF SECTIONAL STEEL HIGH MAST LIGHTING POLES TABLE OF CONTENTS 630.01 SCOPE 630.02 REFERENCES
More informationITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.
ITEM 461 STRUCTURAL PLATE STRUCTURES 461.1. Description. This Item shall govern for the furnishing and installing of structural plate pipes, pipe arches, arches, underpasses, box culverts and special shapes
More informationInstruction Manual HI RH/ C Transmitter. This Instrument is in Compliance with the CE Directives.
Instruction Manual HI 8666 RH/ C Transmitter This Instrument is in Compliance with the CE Directives www.hannainst.com Dear Customer, Thank you for choosing a Hanna Instruments Product. Please read this
More informationSTANDARD FLAT LOAD CELLS
1/2 G 1/2 FURNISHED ON DUAL BRIDGE CELLS ONLY K/k RECEPTACLE U.S. Patent No. 3,365,689 STANDARD FLAT LOAD CELLS ORDERING INFORMATION FL 25 U (C) - 2 S G K T T = Threaded Loading Hole B = K = Connector
More informationInstallation Guidelines for Flygt Pumps Pump Anchoring Recommendations
Issued: Installation Guidelines for Flygt Pumps Pump Anchoring Recommendations Introduction Proper installation and anchorage of Flygt pumps and installation accessories is critical to limiting vibration
More informationBioPrism Solid Surface
Please read all instructions before installing products. STORAGE & HANDLING: Check for damage that may have occurred during transit. Keep receptor flat on pallet, as it was shipped, until ready to install.
More informationAM1760/1762 Secondary Standard Platinum Resistance Thermometer User s Guide
AM1760/1762 Secondary Standard Platinum Resistance Thermometer User s Guide Please download the latest version at www.accumac.com Rev. 201609V3 Table of Contents Before you start ---- Warnings & Cautions...
More informationInstruction Manual. YieldPoint Inc. Jan 2011
d-gmm (DETECT) Instruction Manual YieldPoint Inc. Jan 2011 Copyright 2005 by YieldPoint Inc. The Information contained herein is the exclusive property of YieldPoint Inc., except as otherwise indicated
More informationModel # 358-OP. 8/5/2014 Page 1 of 12
Model # 358-OP 8/5/2014 Page 1 of 12 /5/2014 Page 2 of 12 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationModel #369S-PR. 8/23/2016 Page 1 of 11
Model #369S-PR 8/23/2016 Page 1 of 11 /23/2016 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationVW Strain Gauge Embedment VWS-2100 Series
DATASHEET VW Strain Gauge Embedment VWS-2100 Series Designed for direct embedment in concrete. Can be used within mass concrete with coarse aggregates as its heavy duty construction resists bending and
More informationUniversal Tilting TV Mount 32" to 60" Installation Instructions
Universal Tilting TV Mount 32" to 60" Installation Instructions Tiltable LCD / TFT TV Wall Mount Material: 2.0mm Cold Rolled Steel Plate TV size: 32" - 60" Tilt angle: 0-15 degrees Max load capacity: 165
More informationSTRENGTHENING OF MASONRY WITH CONCRETE SLAB USING SPRING BOX AND HEAT STRETCHED POST-TENSIONING BARS
STRENGTHENING OF MASONRY WITH CONCRETE SLAB USING SPRING BOX AND HEAT STRETCHED POST-TENSIONING BARS ABSTRACT : A. Turer 1 and M. Erdogdu 2 1 Asst. Professor, Dept. of Civil Engineering, Middle East Technical
More informationHFX Adhesive Anchor Adhesive Anchoring Systems
HFX Adhesive Adhesive ing Systems MD300 Dispenser HFX-M Mixer HFX Cartridge Standard Silicon Dispenser Product Description Hilti HFX is a new hybrid adhesive mortar combining resin, hardener, cement and
More informationDiamondback Truck Scale
Installation Manual Diamondback Truck Scale Portable Vehicle Scale 8560 PV Series 2007-2012 by Thurman Scale Inc. All rights reserved 51162 Revision 4 06/12 Disclaimer Every effort has been made to provide
More informationModel #369SM-RDP. 8/23/2016 Page 1 of 10
Model #369SM-RDP 8/23/2016 Page 1 of 10 /23/2016 Page 2 of 10 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationAM1730 Secondary Reference Platinum Resistance Thermometer User s Guide
AM1730 Secondary Reference Platinum Resistance Thermometer User s Guide Please download the latest version at www.accumac.com Rev. 201609V3 Table of Contents Before you start ---- Warnings & Cautions...
More informationSPECIAL SPECIFICATION 6623 Multi-Duct Conduit System
2004 Specifications Houston District SPECIAL SPECIFICATION 6623 Multi-Duct Conduit System 1. Description. Furnish and place a Multi-Duct Conduit (MDC) system that is suitable for installation in an outdoor
More informationModel # 940SM-V8. Page 1 of 10
Model # 940SM-V8 Page 1 of 10 Page 2 of 10 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic coated elements. Ultra Play guarantees all items for one full year to be free of defects in
More informationINSTALLATION INSTRUCTIONS FOR SURFACE MOUNT PAD
INSTALLATION INSTRUCTIONS FOR SURFACE MOUNT PAD MODEL GL-SM8-B DATE ISSUED 2007 GOODLIN SYSTEMS INC. www.goodlinsys.com CONTENTS Introduction --------------------------------------------------------------
More informationModel #369S-RDP. 8/23/2016 Page 1 of 11
Model #369S-RDP 8/23/2016 Page 1 of 11 /23/2016 Page 2 of 11 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationTnemec 394 Proprietary Long Form Coatings Schedule
1.1 PRIMER Tnemec 394 Proprietary Long Form Coatings Schedule A. Primer: Tnemec Series 394 PerimePrime Aromatic Polyurethane Mio/Zinc filled Primer applied @ 2.5-3.5 mils DFT and conforming to the following
More informationStrengthening of infilled RC frames by CFRP
Earthquake Resistant Engineering Structures V 591 Strengthening of infilled RC frames by CFRP G. Erol, K. Taskın, E. Yuksel & H. F. Karadogan Civil Engineering Faculty of Istanbul Technical University,
More informationXxxxx Xxxxxx Autoclave Validation Data Logging System
Xxxxx Xxxxxx Autoclave Validation Data Logging System INSTRUCTION SHEET MQS5775/0117 Shop online at omega.com SM e-mail: info@omega.com For latest product manuals: www.omegamanual.info Autoclave Validation
More informationPost-tensioned Concrete Design PT Installation Guidance
Post-tensioned Concrete Design PT Installation Guidance Lee Maartensz Construction Manager - Structural Systems UK Ltd PT Installation Bonded Flat Slabs Installation 1 Flat Slabs Beam and Slab Installation
More informationModel # 358H-PR. 4/8/2011 Page 1 of 12
Model # 358H-PR 4/8/2011 Page 1 of 12 4/8/2011 Page 2 of 12 1675 Locust Street Red Bud, IL 62278 Phone: 618-282-8200 Fax: 618-282-8202 WARRANTY & TERMS WARRANTY: 5 Year Limited Warranty on Thermoplastic
More informationDrawing Number: 1333 Product Code: SS402 (galvanised) SS204 (stainless) Permutation : Step 320 Brick. EN13101:2002 (including Annex ZA1)
Drawing Number: 1333 Product Code: SS402 (galvanised) SS204 (stainless) Permutation : Step 320 Brick Type of Test TYPE TEST Standard Tested to EN13101:2002 (including Annex ZA1) Step Specification Step,
More informationINSTALLATION MANUAL. B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP
INSTALLATION MANUAL B-710/760 H20 SERIES MODULAR UST to AST TRANSITION SUMP H20-RATED B-710 WITH 2 RISERS, RACK SYSTEM AND BOLLARDS B-710 SPLIT LID TRANSITION SUMP SHOWN WITH H20-RATED DIAMOND PLATE LID
More informationHilti anchor channels. Method statement. Issue 01 / HAC - method statement. Version 1.1 Issue 10 /2012 page 1
Hilti anchor channels HAC - method statement Method statement Issue 01 / 2013 Version 1.1 Issue 10 /2012 page 1 Recommendations in case of misplacement of the Hilti anchor channel system page 2 Version
More informationENGINEERING SPECIFICATION. PULTRUDED PEDESTRIAN FIBERGLASS GRATING SAFE-T-SPAN T1210 VINYL ESTER and ISOPHTHALIC. October 25, 2004 Revision 1
ENGINEERING SPECIFICATION PULTRUDED PEDESTRIAN FIBERGLASS GRATING SAFE-T-SPAN T1210 VINYL ESTER and ISOPHTHALIC 1 PART 1 - GENERAL 1.1 SCOPE OF WORK SECTION 06610 FIBERGLASS REINFORCED PLASTICS (FRP) FABRICATIONS
More information