Architectural Details. Walls. Including PVC cove, UL Listed Raceway, & Integration to Flooring. AES Pharma Wall & Walk-On Ceiling Cleanroom System

Size: px
Start display at page:

Download "Architectural Details. Walls. Including PVC cove, UL Listed Raceway, & Integration to Flooring. AES Pharma Wall & Walk-On Ceiling Cleanroom System"

Transcription

1 Architectural Details Section One Walls Including PVC cove, UL Listed Raceway, & Integration to Flooring AES Pharma Wall & Walk-On Ceiling Cleanroom System

2 Architectural Components AES PHARMA SYSTEM AES Pharma Wall System & Walkable Ceiling Wall Panels Introduction The AES Pharma Cleanroom System wall panel is an aluminum framed composite panel designed for cgmp environments. Material - Composite Panel The wall panel is a smooth, white, upvc- coated, galvanized sheet steel. Panel Facing The metal skins of the panel (both sides) consist of 24 gauge (0.7 mm) thick cold rolled galvanized steel (zinc coating of 272 g/m2 to both surfaces). Surface Finish (both sides) The surface finish of the metal skins is a proprietary blend of 4 mil (0.12µm) thick unplasticized polyvinyl chloride (upvc). Core AES Pharma Wall cleanroom panels are constructed, as standard, with an aluminum honeycomb core. Additional core options are available to suit the requirements of individual projects such as EPS (expanded polystyrene) and XPS (extruded polystyrene). Composite Thickness 2 (50mm) thick composite panel Framing & Extrusions The AES Pharma Wall panel is framed with an aluminum extruded section incorporating a groove to accept an interconnecting tongue forming a rigid panel to panel construction. AES Pharma Wall Series wall panels are mounted on an adjustable extruded aluminum floor track that includes a recess for various flooring materials to be coved and finished flush with the face of the cleanroom wall panel. UL-Rated Raceways The aluminum framing provides 2 x 3 (50mm x 75mm) UL listed vertical raceways for services. General Information FDA Compliance AES Pharma System Wall Panels conform to FDA standards governing raw materials coming in contact with pharmaceuticals. FM Approvals AES Pharma System Wall Panels are approved by Factory Mutuals Approvals for installtion in Factory Mutual Global insured facilities. System Features PVC cold-welded seams - No caulk PVC floor/ceiling coves - No exposed metal UL-rated raceway for electrical service Non-combustible Non-outgassing Impact resistant Manufacturing AES Pharma Systems wall panels are manufactured by AES Clean Technology, Inc., under controlled factory conditions in accordance with AES Clean-Build Protocol. The face of each AES wall panel is protected by a polyethylene sheet prior to crating. The poly film protection remains on the wall and ceiling panels until completion of installation in the field, prior to PVC cold-welding. Quality Assurance AES implements and maintains a comprehensive program for the Copyright 2007, AES Clean Technology, Inc. All Rights Reserved. The information in this document is subject to change without notice. AES assumes no responsibility for any errors that may inadvertently appear in this document.

3 Architectural Components: Wall Panels, continued AES PHARMA SYSTEM AES Pharma Wall System & Walkable Ceiling full-scope of manufacture from material receiving through crating and shipping finished product. Finished panels are individually inspected, numbered, and receive a quality control check label prior to crating. AES maintains a Quality Control Inspection Report for each shipment. Installation The AES Pharma Wall and Walk-On Ceiling System is sold as an installed system. Installation is performed in the field by technicians trained in the AES Pharma System. Assembly of the system is governed by AES clean-build protocol and AES modular project execution best practices, systematized into the Construction Quality Plan (CQP) to ensure that quality is built into process as work is performed, as opposed to being checked during commissioning activity. The QCP describes the overall strategy, specifies the required steps and corresponding deliverable. Roles and responsibilities are defined, as well as turnover points. The audited documentation of the QCP is part of the turnover package to support qualification. Special attention is given to Current Good Manufacturing Practices (CGMP) processes and the supporting systems, and all systems are installed using Current Good Engineering Practices (CGEP). Essential principles for installation include: Inspection of all materials, components, and equipment upon receipt Tracking all items through fabrication and installation Auditing to ensure all systems are fabricated and constructed in accordance with specifications In-process inspections, closeout inspections, formal turnover walkdowns Following the AES Clean-Build Sequence to isolate dirty construction activities outside of the cleanroom environment, and to maintaining optimal clean conditions throughout the project. Copyright 2007, AES Clean Technology, Inc. All Rights Reserved. The information in this document is subject to change without notice. AES assumes no responsibility for any errors that may inadvertently appear in this document.

4 Architectural Components PVC Coving AES PHARMA SYSTEM AES Pharma Wall System & Walkable Ceiling Introduction As an exclusive design principle, the AES Pharma System coving is the same PVC material as the wall panels, providing an aseptic detail at all wall-to-wall and wall-to-ceiling junctions, to create a homogenous cleanroom system. Description 3 (75 mm) radius cove White, extruded PVC to match wall surface Vacuum-formed corner pieces Installation The AES cove is retained in position with a continuous extruded aluminum section, which is installed throughout all junctions where feasible. PVC Welds All wall-to-wall panel joints, ceiling-to-ceiling panel joints, coves and trims, are sealed with a white liquid upvc system which provides a weld between the adjacent panel surfaces forming a homogeneous finish throughout the cleanroom. All other room features, including door frames, trims, fixtures and fittings will be sealed with a white, liquid upvc filler. Alternative sealants will be used when materials are incompatible with the liquid upvc system, such as glazing and flooring materials. Benefits No exposed metal Easy-to-clean, totally swept detail Creates a homogenous cleanroom wall system Copyright 2007, AES Clean Technology, Inc. All Rights Reserved. The information in this document is subject to change without notice. AES assumes no responsibility for any errors that may inadvertently appear in this document.

5 Architectural Components UL Listed Raceway AES PHARMA SYSTEM AES Pharma Wall System & Walkable Ceiling Introduction As an exclusive design principle, the AES Pharma System wall panel incorporates a raceway for electrical and process wires and cables. Dimensions 2 x 3 (50 mm x 75mm) Certification Underwriters Laboratories, (UL) has granted Assembly Approval for electrical raceways incorporated into the AES Pharma architectural system, [Prefabricated Buildings] Composite Panels, File Number MH This assembly is under on-going UL follow-up inspections, with the most recent Inspection Report available for review by qualified AES customers. Voltage Receptacle: 120/250 Light: 120/277 Construction Two electrical raceways are formed on 4 centers using the AES Pharma wall panel. The raceway is a standard component of the wall panel, forming the side frames of each panel. The aluminum extrusion forms an integral conduit for electrical wires to be fed vertically through the wall panel from above the cleanroom. Benefits Reduces installation costs Speeds placement of wires & cables Eliminates wires, surface mounted conduits, etc. Copyright 2007, AES Clean Technology, Inc. All Rights Reserved. The information in this document is subject to change without notice. AES assumes no responsibility for any errors that may inadvertently appear in this document.

6 Architectural Components AES PHARMA SYSTEM AES Pharma Wall System & Walkable Ceiling Flooring AES can offer, as part of the cleanroom scope of work, various flooring systems including vinyl, epoxy and terrazzo. Floor to Wall Integration Standard AES Pharma Wall System wall panels are located at the base on an extruded aluminum adjustable floor track. The track is bolted, using anchor bolts to the floor slab. The adjustable floor track is nominally 4 high and sits centrally beneath the 2 wall panel. This allows a recess for the flooring material to be coved and finished flush with the face of the clean room wall panel. Epoxy AES can offer a comprehensive selection of epoxy resin floors from simple coatings to 3/8 (8mm) thick screeds to advanced antistatic systems all suitable for cleanroom applications. The epoxy is, generally, poured out, and trowelled down into a completely monolithic, lightweight, flexible, long lasting/durable, easy to clean, non-porous, chemical and fire resistant seamless flooring system. Vinyl Generally, vinyl flooring can be 1/16 (2mm) thick sheet vinyl in laid in accordance with the manufacturers recommended adhesive and installation methods. Vinyl seams can be heat welded providing an impervious, hard wearing, homogeneous floor finish. The gap between wall and floor cove will be sealed. AES can provide any vinyl flooring type such as static dissipative or other types, as required for individual projects and is not limited to specific suppliers. Copyright 2007, AES Clean Technology, Inc. All Rights Reserved. The information in this document is subject to change without notice. AES assumes no responsibility for any errors that may inadvertently appear in this document.

7 Copyright, 2008, AES Clean Technology. All Rights Reserved.

8 Copyright, 2008, AES Clean Technology. All Rights Reserved.

9 Copyright, 2008, AES Clean Technology. All Rights Reserved.

10 Copyright, 2008, AES Clean Technology. All Rights Reserved.

A. Access doors and frames are part of an access door and frame allowance.

A. Access doors and frames are part of an access door and frame allowance. SECTION 08 31 13 ACCESS DOORS AND FRAMES PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

SECTION WALL AND DOOR PROTECTION

SECTION WALL AND DOOR PROTECTION PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 26 00 WALL AND DOOR PROTECTION SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable to

More information

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100

COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Pan System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR PAN SYSTEM PART 1 GENERAL 1.1

More information

AMBICO Limited 7\2018 Section and OVERSIZED METAL DOORS AND FRAMES Page 1

AMBICO Limited 7\2018 Section and OVERSIZED METAL DOORS AND FRAMES Page 1 Page 1 This section includes Oversize Steel Doors and Frames and relies on the Canadian Steel Door Manufacturers Association (CSDMA.org) industry standard, as well as on the Hollow Metal Manufacturers

More information

HOTEL SPECIFICATION SECTION 08100

HOTEL SPECIFICATION SECTION 08100 Part 1 General HOTEL SPECIFICATION SECTION 08100 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified including, but not limited

More information

Modular Architectural Cleanroom Systems

Modular Architectural Cleanroom Systems Modular Architectural Cleanroom Systems the PORTAFAB ADVANTAGE Experience For over 30 years, PortaFab has been helping organizations with all of their cleanroom and environmental control needs. Our staff

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Modular Galvanized System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF MODULAR GALVANIZED SYSTEM PART

More information

Modular Clean Room System

Modular Clean Room System Modular Clean Room System The correct preparation and administration of compounded sterile preparations (CSPs) is a complex process that must be conducted by highly skilled professionals in a specialized

More information

SECTION PATIENT BED SERVICE WALLS

SECTION PATIENT BED SERVICE WALLS PART 1 GENERAL 1.1 DESCRIPTION: SECTION 10 25 13 PATIENT BED SERVICE WALLS SPEC WRITER NOTES: 1. Delete between // // if not applicable to project. 2. Due to the very specialized nature of Patient Wall

More information

SECTION ACCORDION FOLDING PARTITIONS

SECTION ACCORDION FOLDING PARTITIONS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 22 26.13 ACCORDION FOLDING PARTITIONS SPEC WRITER NOTE: Delete between // // if not applicable to project. Also delete any other item or paragraph not applicable

More information

Modular Architectural Cleanroom Systems

Modular Architectural Cleanroom Systems Modular Architectural Cleanroom Systems the PortaFab Advantage Experience For over 30 years, PortaFab has been helping organizations with all of their cleanroom and environmental control needs. Our staff

More information

.1 [Non-rated] [fire rated] pressed steel, lead-lined steel frames. .2 [Non-rated] [fire rated] hollow metal, lead-lined doors [and panels].

.1 [Non-rated] [fire rated] pressed steel, lead-lined steel frames. .2 [Non-rated] [fire rated] hollow metal, lead-lined doors [and panels]. Page 1 This section includes Lead-Lined Steel Doors and Frames manufactured by AMBICO Limited that can be fire rated or non-rated. This section relies on both the Canadian Steel Door Manufacturers Association

More information

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL

HOLLOW METAL DOORS AND FRAMES SECTION HOLLOW METAL DOORS AND FRAMES PART 1 - GENERAL 13686.00 HOLLOW METAL DOORS AND FRAMES 081113-1 SECTION 081113 - HOLLOW METAL DOORS AND FRAMES 1.1 RELATED DOCUMENTS: PART 1 - GENERAL A. Drawings and general provisions of Contract, including General

More information

SECTION INTEGRATED POWER ASSEMBLY (IPA)

SECTION INTEGRATED POWER ASSEMBLY (IPA) INTEGRATED POWER ASSEMBLY (IPA) PART 1 GENERAL 1.01 1.02 1.03 SCOPE The specification covers requirements applicable to the provision of Integrated Power Assembly (IPA). The IPA shall be environmentally

More information

SECTION CRC575 UNITARY CLEANROOM WALL SYSTEM STUDLESS CLEANROOMWALL SYSTEM ME175 3-IN-1 CLEANROOM WALL SYSTEM

SECTION CRC575 UNITARY CLEANROOM WALL SYSTEM STUDLESS CLEANROOMWALL SYSTEM ME175 3-IN-1 CLEANROOM WALL SYSTEM SECTION 13200 CRC575 UNITARY CLEANROOM WALL SYSTEM 175-300 STUDLESS CLEANROOMWALL SYSTEM ME175 3-IN-1 CLEANROOM WALL SYSTEM PART 1 GENERAL 1.01 WORK INCLUDED A. This Section provides the requirements necessary

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09665 RESILIENT SHEET FLOORING PART 1 - GENERAL 1.1 DESCRIPTION A. This Section specifies the installation of sheet flooring with backing and integral cove base. 1.2 RELATED WORK A. Color and pattern:

More information

International, Inc Evans Ave. Phone: Akron, OH Fax: SPECIFICATIONS

International, Inc Evans Ave. Phone: Akron, OH Fax: SPECIFICATIONS International, Inc. 1019 Evans Ave. Phone: 888-566-5400 Akron, OH 44305 Fax: 888-566-5415 Website: www.mwintl.net Email: sales@mwintl.net SPECIFICATIONS This section is based on the FC-300 Demountable

More information

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System

SECTION RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System SECTION 13096 RADIO FREQUENCY SHIELDING ENCLOSURE RF Welded System Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13096-1 RF WELDED SYSTEM PART 1 GENERAL 1.1 SECTION

More information

SPECIFICATION: CLASSIC PROGRESSIVE MOVABLE WALL SYSTEM DEMOUNTABLE STEEL STUD AND GYPSUM BOARD PARTITIONS

SPECIFICATION: CLASSIC PROGRESSIVE MOVABLE WALL SYSTEM DEMOUNTABLE STEEL STUD AND GYPSUM BOARD PARTITIONS SPECIFICATION: CLASSIC PROGRESSIVE MOVABLE WALL SYSTEM DEMOUNTABLE STEEL STUD AND GYPSUM BOARD PARTITIONS PART 1 GENERAL 1.1 RELATED WORK SPECIFIED IN OTHER SECTIONS 1.2 DESCRIPTION OF SYSTEM A. GENERAL:

More information

AMBICO Limited Section and DETENTION STEEL DOOR AND FRAME ASSEMBLIES Page 1

AMBICO Limited Section and DETENTION STEEL DOOR AND FRAME ASSEMBLIES Page 1 Page 1 This section includes AMBICO Detention Steel Door and Frame assemblies that can be fire rated or non-rated. This section relies on both the Canadian Steel Door Manufacturers Association (CSDMA.org)

More information

Metal Roof Panels

Metal Roof Panels University of New Hampshire University of New Hampshire Scholars' Repository Division 07 Thermal and Moisture Protection Chapter 5 Technical Construction and Renovation Standards 1-25-2013 074113 - Metal

More information

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.

K. ASTM F436- Standard Specification for Hardened Steel Washers; 2011. DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:

More information

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS

SECTION MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS SECTION 13096 MODULAR GALVANIZED RF SHIELDING SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 MODULAR GALVANIZED RF SHIELDING SYSTEM PART

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING PART 1 - GENERAL 1.1 DESCRIPTION SECTION 09 65 16 A. This Section includes resilient sheet flooring. 1. Use this section only for NCA projects. 2. Delete between // ---- // if not applicable to project.

More information

SECTION METAL DOORS & FRAMES

SECTION METAL DOORS & FRAMES SECTION 08100 METAL DOORS & FRAMES PART 1 GENERAL 1.1 SCOPE Drawings and general provisions of the Contract, including General and Supplementary General Conditions and other Division 00 & 01 specification

More information

Rytec Corporation One Cedar Parkway Jackson, WI GO-RYTEC (262)

Rytec Corporation One Cedar Parkway Jackson, WI GO-RYTEC (262) Rytec Corporation One Cedar Parkway Jackson, WI 53037 1-888-GO-RYTEC (262) 677-9046 WWW.Rytecdoors.com Pharma-Swing Model Number PSW12002 SECTION 08300 HIGH PERFORMANCE FIBERGLASS SWING DOOR PAIR PART

More information

AMBICO Limited Section and STAINLESS STEEL DOORS AND FRAMES Page 1

AMBICO Limited Section and STAINLESS STEEL DOORS AND FRAMES Page 1 Page 1 This section includes standard commercial Stainless Steel Doors and Frames. This section relies on both the Canadian Steel Door Manufacturers Association (CSDMA.org) industry standard, as well as

More information

SECTION DIRECTORIES

SECTION DIRECTORIES PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 10 13 00 DIRECTORIES SPEC WRITER NOTES: 1. Delete // // if not applicable to project. Also delete any other item or paragraph not applicable in the section and

More information

Alply CLASSIC WALL Architectural Insulated Panel Wall System

Alply CLASSIC WALL Architectural Insulated Panel Wall System SECTION 07 42 13 INSULATED METAL WALL PANELS ALPLY Insulated Panels Alply CLASSIC WALL Architectural Insulated Panel Wall System PART 1 / GENERAL 1.1 SYSTEM DESCRIPTION A. Smooth, non-embossed steel, insulated

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] OMNIFLEX 300 MODULAR WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations

DIVISION 11 - EQUIPMENT FOOD SERVICE EQUIPMENT LABORATORY FUME HOODS. A. Design Considerations DIVISION 11 - EQUIPMENT 11400 FOOD SERVICE EQUIPMENT A. Design Considerations 1. The A/E shall use the services of a food service equipment specialist in preparation of kitchen areas and other food preparation

More information

SECTION ALUMINUM HANDRAIL SYSTEMS

SECTION ALUMINUM HANDRAIL SYSTEMS SECTION 05520 ALUMINUM HANDRAIL SYSTEMS PART 1 - GENERAL 1.01 SUMMARY A. Section includes aluminum handrails and railings. B. Related Work: 1. Section 03300 - Cast-in-Place Concrete C. References: 1. American

More information

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1 Louis Armstrong New Orleans International Airport NOAB Project # 8910-01233 PART 1 - GENERAL SECTION 07 71 29 - MANUFACTURED ROOF EXPANSION JOINTS 1.1 RELATED DOCUMENTS A. Drawings and general provisions

More information

SECTION METAL EQUIPMENT LOCKERS

SECTION METAL EQUIPMENT LOCKERS SECTION 10 51 13 - METAL EQUIPMENT LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified

More information

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows: SECTION 16130 (Master Template Final-05) ELECTRICAL BOXES PART 1 GENERAL 1.01 SECTION INCLUDES A. Provide boxes for electrical equipment and wiring devices as follows: 1. Wall and ceiling outlet boxes.

More information

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish.

C. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish. SECTION 083113 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

ROBERTSON "3 + 1" SLAB-ON-GRADE SINGLE LEVEL RACEWAY SYSTEM (Revised July 2000)

ROBERTSON 3 + 1 SLAB-ON-GRADE SINGLE LEVEL RACEWAY SYSTEM (Revised July 2000) ROBERTSON "3 + 1" SLAB-ON-GRADE SINGLE LEVEL RACEWAY SYSTEM (Revised July 2000) PART 1 - GENERAL 1.01 SCOPE Furnish complete electrical distribution system including: Cellular deck units, trench headers,

More information

E. Fume hood to have set baffling system. No adjustable baffles allowed.

E. Fume hood to have set baffling system. No adjustable baffles allowed. 1.01 SUMMARY A. Section Includes: 1. Laboratory fume hoods. B. Related Sections: 1. Section 6500 Laboratory casework 2. Section 15 Mechanical: Furnishing and installation of plumbing utilities and final

More information

Expansion Joint Covers (079513)

Expansion Joint Covers (079513) Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO. 2017-26R Stone Group Architects Project No. 1731 ADDENDUM DATE: September 14, 2017 BID DATE: September 18, 2017 2:00 P.M. C.S.T. SCOPE OF THIS ADDENDUM:

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] PORTAMAX 458 ALUMINUM WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

ADVANCE METAL INDUSTRIES L.L.C.

ADVANCE METAL INDUSTRIES L.L.C. ADVANCE METAL INDUSTRIES L.L.C. Copyright reserved for ADVANCE METAL ''Due to continuos progress and product improvement, ADVANCE METAL reserves the right to make changes without notice'' DISCLAIMER OF

More information

UBC Technical Guidelines Section Edition Fume Hoods Page 1 of 5

UBC Technical Guidelines Section Edition Fume Hoods Page 1 of 5 Page 1 of 5 1.0 GENERAL 1.1 Related UBC Guidelines.1 Section 12 35 53 Laboratory Casework.2 Section 23 38 16 Fume Hood Exhaust Systems.3 Section 20 00 08 Mechanical Identification for the details for fume

More information

Expansion Joint Covers

Expansion Joint Covers Expansion Joint Covers 07 95 00 (079513) PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and Division-1

More information

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE

ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE ARCHITECTURAL GUIDE SPECIFICATIONS - DESCRIPTIVE MANNINGTON COLORFIELDS SHEET RUBBER FLOORING Section 09 65 16 Sheet rubber Flooring (Thermoset Rubber) Created May 2012 Mannington Mills, Inc. P. O. Box

More information

SECTION IMPACT RESISTANT WALL PROTECTION

SECTION IMPACT RESISTANT WALL PROTECTION SECTION 10265 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work under this Section shall include all materials and installation necessary to provide Impact-Resistant Wall Protection including Wall guards,

More information

AMBICO Limited Section BULLET RESISTANT SLIDING STEEL DOOR ASSEMBLY Page 1

AMBICO Limited Section BULLET RESISTANT SLIDING STEEL DOOR ASSEMBLY Page 1 Page 1 This section includes AMBICO bullet resistant steel sliding steel door assembly which includes electric operators as an integral part of the assembly. This section relies on industry standard for

More information

INSULFRAME SPECIFICATIONS FOR

INSULFRAME SPECIFICATIONS FOR INSULFRAME SPECIFICATIONS FOR WALK-IN COOLERS AND FREEZERS The following information is intended to aid specification writers, architects, and food service consultants with projects that require prefabricated

More information

DIVISION 10 SPECIALTIES SECTION OPERABLE PARTITIONS

DIVISION 10 SPECIALTIES SECTION OPERABLE PARTITIONS DIVISION 10 SPECIALTIES SECTION 10 22 26 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1

Design No. HI/BP PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table 1 FIRESTOP JOINT SPRAY CFS-SP WB SILICONE JOINT SPRAY CFS-SP SIL F-RATING 2-HR. 2-HR. T-RATING -HR. -HR. APPLICATION THICKNESS PERIMETER FIRE BARRIER SYSTEM Hilti, Inc. ASTM E 2307 Table /8" WET FILM (/6"

More information

SECTION METAL ATHLETIC LOCKERS

SECTION METAL ATHLETIC LOCKERS SECTION 10 51 13 - METAL ATHLETIC LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified

More information

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Part 1 General 1. RELATED SECTIONS 1. Section 07 92 10 Joint Sealing 2. Section 08 71 00 Door Hardware 2. REFERENCES 1. American Society

More information

SECTION COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS

SECTION COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS SECTION 13096 COPPER/ SOLDERED RF SYSTEM SPECIFICATIONS Prepared by: NELCO 125 Chenoweth Lane, Ste. 206 Louisville, KY 40207 (502) 899-3726 13096-1 SECTION 13096 COPPER RADIO FREQUENCY SHIELDING ENCLOSURE

More information

SECTION AWNINGS

SECTION AWNINGS SECTION 10 73 13 AWNINGS PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Fixed metal awnings. 1.2 DEFINITIONS A. Awning: An architectural projection that provides weather protection,

More information

PART 1 / GENERAL SECTION ALUMINUM PLATE PANEL SYSTEM. ALPLY Insulated Panels. Alply TECH WALL Aluminum Plate System 2002

PART 1 / GENERAL SECTION ALUMINUM PLATE PANEL SYSTEM. ALPLY Insulated Panels. Alply TECH WALL Aluminum Plate System 2002 SECTION 07 42 13 ALUMINUM PLATE PANEL SYSTEM ALPLY Insulated Panels Alply TECH WALL Aluminum Plate System 2002 PART 1 / GENERAL 1.1 SYSTEM DESCRIPTION A. Preformed Aluminum Plate System for Screen wall

More information

SECTIONAL OVERHEAD DOORS SECTION SECTIONAL OVERHEAD DOORS PART 1 GENERAL

SECTIONAL OVERHEAD DOORS SECTION SECTIONAL OVERHEAD DOORS PART 1 GENERAL 13686.00 SECTIONAL OVERHEAD DOORS 083613-1 1.1 RELATED DOCUMENTS SECTION 083613 - SECTIONAL OVERHEAD DOORS PART 1 GENERAL A. Drawings and general provisions of Contract, including General and Supplementary

More information

.2 Section Waste Management and Disposal. 1.2 REFERENCES.1 Codes and Standards referenced in this section refers to the latest edition thereof.

.2 Section Waste Management and Disposal. 1.2 REFERENCES.1 Codes and Standards referenced in this section refers to the latest edition thereof. Issued 2005/06/01 Section 09670 Gymnasium Flooring Page 1 of 5 PART 1 GENERAL 1.1 RELATED SECTIONS.1 Section 01330 Submittal Procedures.2 Section 01355 Waste Management and Disposal.3 Division 15 and 16

More information

A. Submit the following in addition to the standard requirements.

A. Submit the following in addition to the standard requirements. SECTION [13120] S3000 CLEAN ROOM WALL SYSTEM SECTION 1 GENERAL 1.01 SECTION INCLUDES A. This Section specifies all requirements necessary to furnish and install a complete modular wall system including,

More information

AMBICO Limited Section BLAST RESISTANT STEEL DOOR & FRAME ASSEMBLY Page 1

AMBICO Limited Section BLAST RESISTANT STEEL DOOR & FRAME ASSEMBLY Page 1 Page 1 This section includes AMBICO blast resistant steel door & frame assemblies: fire rated and non-fire rated. This section relies on both Canadian Steel Door Manufacturers Association (CSDMA) as well

More information

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets.

A. Product Data: For surface pathways, wireways and fittings, floor boxes, hinged-cover enclosures, and cabinets. ALLIANT ENERGY CENTER PAVILIONS Project No. 2013 027 SECTION 27 05 28 - PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features

Power Electronics, Inc. Packaged Equipment Center Standard Construction and Design Features DESIGN CRITERIA FOR STANDARD CONSTRUCTION: These standard design elements of the P.E.I. Power Equipment Center are utilized to meet the following design criteria per ASCE 7-05 as adopted by the IBC (International

More information

SECTION RESIDENTIAL OVERHEAD DOORS SIGNATURE COLLECTION WOOD GARAGE DOORS

SECTION RESIDENTIAL OVERHEAD DOORS SIGNATURE COLLECTION WOOD GARAGE DOORS SECTION 08361 RESIDENTIAL OVERHEAD DOORS SIGNATURE COLLECTION WOOD GARAGE DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. PART 1 GENERAL 1.1 SECTION INCLUDES. A.

More information

SSL-175. Specifications

SSL-175. Specifications SSL-175 Specifications Everlast Metals 10 Enterprise Court Lebanon, PA 17042 Phone: (717) 270-6554 Fax: (717) 270-6569 www.everlastmetals.com 7410 Preformed Metal Roofing PART 1: GENERAL 1.01 SECTION INCLUDES

More information

SECTION SLIDING PATIO DOORS. Display hidden notes to specifier by using Tools/Options/View/Hidden Text

SECTION SLIDING PATIO DOORS. Display hidden notes to specifier by using Tools/Options/View/Hidden Text SECTION 08260 SLIDING PATIO DOORS Display hidden notes to specifier by using Tools/Options/View/Hidden Text PART 1 GENERAL 1.1 SECTION INCLUDES A. Vinyl sliding patio doors (Spencer Walcott). 1.2 RELATED

More information

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 EZ-SLIDE 80 AND 180 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES

SECTION COMPOSITE WALL PANELS PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 07 4243 - PART 1 GENERAL 1.01 SECTION INCLUDES A. Composite wall panel system consisting of aluminum-faced composite panels in a rainscreen application as part of the assembly described below.

More information

Architectural Roof and Wall Products Guide Specifications

Architectural Roof and Wall Products Guide Specifications Architectural Roof and Wall Products Guide Specifications Western States Metal Roofing 901 W. Watkins St. Phoenix, AZ 85007 PH: 602-495-0048 FX: 602-261-7726 FORMED METAL WALL PANELS This Guide Specification

More information

A/E Project No January 27, 2014

A/E Project No January 27, 2014 SECTION 07 95 13 PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions and Division 01 Specification Sections, apply to this Section.

More information

SPECIFICATIONS Section Gable Walkway Covers

SPECIFICATIONS Section Gable Walkway Covers Part 1: General 1.1 Related Documents SPECIFICATIONS Section 107303 Gable Walkway Covers A. The requirements of Division 1 specifications shall apply to work specified in the section. 1.2 Engineering Design

More information

Raceway Solutions TM. Conventional Underfloor Duct. Multi-Compartment Conventional Duct Saves Time and Money in Your In-Slab Wire Management System

Raceway Solutions TM. Conventional Underfloor Duct. Multi-Compartment Conventional Duct Saves Time and Money in Your In-Slab Wire Management System Multi-Compartment Conventional Duct Saves Time and Money in Your In-Slab Wire Management System The Raceway Solutions System is an in-slab wire management product for delivering power, voice and data services

More information

AMBICO Limited Section BLAST RESISTANT STEEL OVERHEAD DOOR ASSEMBLIES Page 1

AMBICO Limited Section BLAST RESISTANT STEEL OVERHEAD DOOR ASSEMBLIES Page 1 Page 1 This section includes Blast Resistant, Steel, Overhead Door Assemblies, with integral electric operators and accessories. This section includes proprietary, descriptive and performance type specification

More information

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS

SECTION CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS Page 1 of 6 SECTION 08 32 20 CRL70 HEAVY GLASS TOP HUNG SLIDING DOOR SYSTEMS USE THIS SECTION WHEN SPECIFYING OVERHEAD SUPPORTED GLASS [OR WOOD] PANEL PARTITIONS. SECTION INCLUDES OVERHEAD TRACK ASSEMBLY,

More information

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017

PASSAIC COUNTY TECHNICAL INSTITUTE CCA 1422 NEW S.T.E.M. BUILDING 2017 SECTION 10505 - METAL STUDENT LOCKERS PART 1 - GENERAL 1.01 SCOPE OF WORK A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification

More information

SECTION METAL ATHLETIC LOCKERS

SECTION METAL ATHLETIC LOCKERS SECTION 10 51 13 - METAL ATHLETIC LOCKERS PART 1 GENERAL 1.1 SECTION INCLUDES A. DESCRIPTION: Furnish and install factory-assembled Heavy-Duty MIG-Welded Metal Lockers, complete, as shown and specified

More information

DETAILED METAL DOOR SPECIFICATION. UNIVERSITY CONTACT: Mark Golden, Supervisor of Structural Services (302)

DETAILED METAL DOOR SPECIFICATION. UNIVERSITY CONTACT: Mark Golden, Supervisor of Structural Services (302) DETAILED METAL DOOR SPECIFICATION UNIVERSITY CONTACT: Mark Golden, Supervisor of Structural Services (302) 831-8456 PART 1 GENERAL DOORS 1.01 GENERAL PROVISIONS I. The Drawings and General Provisions of

More information

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.

SECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing. PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 13 34 00 FABRICATED ENGINEERED STRUCTURES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1

More information

EPOXY TERRAZZO 1 REV. 8/02

EPOXY TERRAZZO 1 REV. 8/02 PART 1 - GENERAL GUIDE SPECIFICATIONS section 9400 EPOXY THINSET TERRAZZO (Without A Crack Suppression Membrane) REVISED MAY 2003 1.1 RELATED DOCUMENTS A. Section includes thin-set epoxy terrazzo flooring

More information

AMBICO Limited Section and ACOUSTIC STEEL DOOR AND FRAME ASSEMBLIES Page 1

AMBICO Limited Section and ACOUSTIC STEEL DOOR AND FRAME ASSEMBLIES Page 1 Page 1 This section includes AMBICO Acoustic Steel Doors and Frames as well as perimeter and bottom acoustic seals, and glazing if required all of which can be fire rated or non-rated. The aforementioned

More information

SECTION EXPANSION JOINT COVER ASSEMBLIES

SECTION EXPANSION JOINT COVER ASSEMBLIES SECTION 07 95 13 EXPANSION JOINT COVER ASSEMBLIES SPEC WRITER NOTE: 1. Delete text between // // not applicable to project. Edit remaining text to suit project. 2. Do not use aluminum, brass, or bronze

More information

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES CONTENTS 10.1 PLASTERWORK 10.2 2 ND AND 3 RD FIX FINISHES FUNCTIONAL REQUIREMENT 10.1 Plasterwork Workmanship Design Technical Manual TS-011-09-010412 i. All workmanship must be within defined tolerances

More information

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions

Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions Specifiers: Click on the icon in the WORD toolbar to reveal detailed instructions (Specifier Note: The purpose of this guide specification is to assist the specifier in correctly specifying perforated

More information

Specifications for FL-100 Soffit Panel

Specifications for FL-100 Soffit Panel Union Corrugating Company Specifications for FL-100 Soffit Panel SECTION 07410 METAL SOFFIT PANELS PART 1 GENERAL 1.1 DESCRIPTON A. Section Includes: 1. Preformed metal soffit panel system 2. Associated

More information

STARRCO M O D U L A R O F F I C E S Y S T E M S S P A C E S O L U T I O N S F O R T O D A Y A N D T O M O R R O W

STARRCO M O D U L A R O F F I C E S Y S T E M S S P A C E S O L U T I O N S F O R T O D A Y A N D T O M O R R O W STARRCO M O D U L A R O F F I C E S Y S T E M S SPACE SOLUTIONS FOR TODAY W.W. Cannon, Inc. 2653 Brenner Dr. Dallas, TX 75220 Phone: 214-357-2846 Toll Free: 800-442-3061 Fax: 214-357-4576 www.wwcannon.com

More information

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces.

1. Temperature Change: 120 deg F (67 deg C), ambient; 180 deg F (100 deg C), material surfaces. SECTION 05500- METAL FABRICATIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification

More information

AMBICO Limited Section BLAST RESISTANT STEEL OVERHEAD DOORS Page 1

AMBICO Limited Section BLAST RESISTANT STEEL OVERHEAD DOORS Page 1 Page 1 This section includes AMBICO steel blast resistant overhead door assemblies, with integral electric operators. This section includes proprietary, descriptive and performance type specification requirements.

More information

SCI-FAB Product Specifications. Casework Section 1. Part 1 General

SCI-FAB Product Specifications. Casework Section 1. Part 1 General SCI-FAB Product Specifications Casework Section 1 Part 1 General 1.1 SCOPE OF WORK Includes all factory fabricated stainless steel casework as required by the project drawings. 1.2 TYPICAL INCLUSIONS A.

More information

.1 Blast-resistant non-fire rated pressed steel frames. .4 Factory supplied [and installed] glass and glazing.

.1 Blast-resistant non-fire rated pressed steel frames. .4 Factory supplied [and installed] glass and glazing. Page 1 This section includes AMBICO Blast Resistant Steel Window Frame assemblies. This section relies on both the Canadian Steel Door Manufacturers Association (CSDMA.org) industry standard, as well as

More information

SECTION RESILIENT SHEET FLOORING

SECTION RESILIENT SHEET FLOORING SECTION 09 65 16 RESILIENT SHEET FLOORING SPEC WRITER NOTE: Delete text between // // not applicable to project. Edit remaining text to suit project. PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1.

More information

Section STATIC DISSIPATIVE RESILIENT FLOORING

Section STATIC DISSIPATIVE RESILIENT FLOORING THIS DOCUMENT IS INTENDED AS A SUGGESTED GUIDE FOR CREATING, MODIFYING, OR EDITING YOUR CSI FORMATTED 3-PART ARCHITECTURAL GUIDE SPECIFICATIONS. TARKETT WILL NOT BE LIABLE FOR ANY DAMAGES ARISING OUT OF

More information

COLLEGE OF STATEN ISLAND

COLLEGE OF STATEN ISLAND SECTION 07415 ALUMINUM PLATE CEILING PANELS PART 1 GENERAL 1.01 SUMMARY A. Section Includes 1. The extent of panel system work is indicated on the drawings and in these specifications. The following specification

More information

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS

DIVISION 26 RACEWAYS AND BOXES FOR ELECTRICAL SYSTEMS PART 1 - GENERAL RELATED DOCUMENTS PART 1 - GENERAL 01.01 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this Section.

More information

SECTION LIGHTNING PROTECTION SYSTEM

SECTION LIGHTNING PROTECTION SYSTEM SECTION 16670 - LIGHTNING PROTECTION SYSTEM PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

SECTION ENTRANCE FLOOR GRILLES SPECIFICATIONS

SECTION ENTRANCE FLOOR GRILLES SPECIFICATIONS SECTION 12 48 16 ENTRANCE FLOOR GRILLES SPECIFICATIONS PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General Conditions, Supplementary Conditions and

More information

MODULAR ENCLOSURE SPECIFICATIONS

MODULAR ENCLOSURE SPECIFICATIONS FIRE PUMP SYSTEM & ACCESSORIES Part 3 Enclosure Modular Panel Design 3.1 System Enclosure: 1. The entire fire pump system shall be enclosed in a single module. The module shall be complete as specified

More information

Modular Architectural Cleanroom Systems

Modular Architectural Cleanroom Systems Modular Architectural Cleanroom Systems Modular Cleanroom Systems Why Modular For over 30 years, PortaFab has been the leading manufacturer of modular cleanroom wall systems. Our CleanLine, FabLine, and

More information

SECTION CAST-IN-PLACE CONCRETE

SECTION CAST-IN-PLACE CONCRETE PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 03 30 00 CAST-IN-PLACE CONCRETE A. Cast-in-place concrete building frame members, floors, shear walls, elevator shaft walls, foundation walls, footings, and

More information

SECTION DECORATIVE METAL AND GLASS RAILING

SECTION DECORATIVE METAL AND GLASS RAILING SECTION 05 73 00 DECORATIVE METAL AND GLASS RAILING PART 1 GENERAL 1.1 SUMMARY A) This section includes both standard and custom handrails as shown in the contract drawings. B) These include aluminum,

More information

Fabline Modular Cleanroom Wall Systems For The Most Demanding Cleanroom Requirements

Fabline Modular Cleanroom Wall Systems For The Most Demanding Cleanroom Requirements C l e a n r o o m W a l l S y s t e m s Fabline Modular Cleanroom Wall Systems For The Most Demanding Cleanroom Requirements Innovative Industries Demand Flexibility FabLine modular cleanroom wall systems

More information

SECTION OUTLET, PULL, AND JUNCTION BOXES

SECTION OUTLET, PULL, AND JUNCTION BOXES SECTION 16131 OUTLET, PULL, AND JUNCTION BOXES PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 09900 - Painting. 2. 16112 - Raceways and Conduits. 1.02 SYSTEM DESCRIPTION A. Performance Requirements:

More information