Development of a Quantitative Roof Maintenance Management Model

Size: px
Start display at page:

Download "Development of a Quantitative Roof Maintenance Management Model"

Transcription

1 International Journal of Architecture, Engineering and Construction Vol 4, No 3, September 2015, Development of a Quantitative Roof Maintenance Management Model Danny P. M. Cheng and K. C. Lam Department of Civil and Architectural Engineering, City University of Hong Kong, Hong Kong, China Abstract: Sustainable property maintenance is becoming an important issue in public organizations owning or managing large portfolio of properties in view of the increasing maintenance and repair costs and awareness of sustainability. With the ageing property stocks and limiting budget, it is an important task for these public organizations to ensure funding is allocated to the property mostly in need. The current maintenance management approach adopted by many of these public organizations is based on individual facility manager s assessment of property condition to decide on the works priority. Such qualitative approach is fraught with problems of subjective judgment and inconsistency. Targeting at roofing system, this paper aims to develop a generic, quantitative and objective model of maintenance management which combines the use of mathematical methods and opinions of experts and stakeholders. To ensure a balanced outcome is obtained, two sub-models namely Condition Assessment Model and Asset Priority Model are developed respectively. On one hand, the Condition Assessment Model will investigate the different sub-components of roofing system and provide appropriate weightings to reflect their influence to the overall condition of the roofing system. On the other hand, the Asset Priority Model will involve maintenance experts and stakeholders to look into and allocate weightings to the different major factors which influence the importance of asset toward achieving the missions of the organization. The combined use of these two sub-models provides a quantitative and objective means to prioritize the ranking of different roofing maintenance projects strategically. With this maintenance management model, not only the problems of subjective judgment and inconsistencies in decision making are minimized, but also the most cost effective and efficient budget strategy can be achieved. Keywords: Building condition assessment, roof maintenance, questionnaire survey, analytic hierarchy process, asset prioritization DOI: /IJAEC INTRODUCTION According to British Standard ISO (ISO 2002), service life performance audits are undertaken to ensure that performance over time has been adequately considered in the pre-briefing, briefing, design, construction, life care management (including refurbishment, alteration) and disposal of a constructed asset, and to provide a reasonable assurance that the required service life performance will be achieved. Condition assessment for the roof system during its normal operation period is one type of service life performance audit within its asset life cycle. The consistent, objective and reliable results of the condition assessment is of significant importance for the facility managers to accurately predict the performance of roof systems, properly choose the maintenance action and reasonably make budgeting decisions in both long-term and short-term planning horizon. Roof system and its components, deteriorating over time under the combined effect of usage, climate and unpredictable accident, protects the occupiers and building from the serious climate (e.g. water ingress or penetration, intensive etc.) and reduce the energy consumption of the whole building to some extent. Throughout the life of a building, the roof will inevitably undergo a serious of patch repairs or planned re-roofing (i.e. complete replacement of roofing installation) at certain time intervals. In order to ensure that all the roof systems could function satisfactorily, a notably large sum of resources in roof maintenance management are required. However, it is commonly *Corresponding Author. dannyatsowers@gmail.com 140

2 found that the condition assessment for the roof system is mainly based on individual maintenance staff s experiences and professional judgment. Such a qualitative and subjective approach in condition assessment does not ensure an optimal use of maintenance resource which needs to be carefully planned in view of the continual aging and deteriorating building conditions. 2 CURRENT ROOF MAINTENANCE PRACTICES It is common practice that condition surveys are conducted at regular intervals to obtain information on the current condition and performance of the existing roofing system by the maintenance staff. Such condition survey is meant to give a general overview of the condition of the roofing system and help to develop works plan for future maintenance actions if required. The condition survey record form, if adopted, is normally designed in a simple but practical format that the overall condition of the roofing system is classified into basic categories such as good, acceptable and poor. There is seldom any specific requirement to inspect and consider the criticality, severity, intensity and extent of deficiencies identified. In deciding whether patch repair or re-roofing is to be carried out, although water seepage records of top floor flats are considered, other subjective factors such as local political pressure and strong complaint cases will also play an influential role. This could easily lead to the situation that some roofs are re-roofed pre-maturely while others are kept repaired again and again in a patchy manner without receiving adequate resources for the launch of re-roofing as needed. In terms of prioritization of identified maintenance works, factors such as severity of defects, potential hazards to users, damage due to usage, location, importance and usage frequency of the asset, and whether the asset is subject to complaints or performance pledge are supposedly taken into consideration by the responsible maintenance staff, nevertheless the relative importance of these factors is often judged by the knowledge and experience of staff concerned. There may be a lack of consistency when different staff are involved. With an aim to develop a quantitative-based method for roof condition assessment, an extensive literatures review on building condition assessment as well as roof maintenance management has been carried out as background study for a good understanding of the subject problem as described in next section. 3 LITERATURES REVIEW Around 1990 s in US, the US Army Construction Engineering Research Laboratory (USACERL) developed a decision support system for roofing system (ROOFER) by combining engineering, architectural and management methods with data base management technology to facilitate maintenance managers in determining an optimal level of maintenance and repair for roofing system. A comprehensive set of functional condition attributes, rating scales, and method of weighting the attributes was integrated and developed into a decision support model to help army facility managers to measure the functionality of a facility objectively. USACERL had also developed an inspection and distress manual for roofing systems which included standardized information needed to conduct the visual inspection survey. Procedures for distress density calculations were also provided. Roof inspectors could use this information to objectively determine the indexes that reflected the ability of the roof membrane and flashing to perform their functions, needed level of maintenance, and waterproof integrity. Similarly in Canada, the National Research Council Canada (NRCC) developed the Building Envelop Life Cycle Asset Management (BELCAM) project which embraced technologies of maintenance management, life cycle economics, service life prediction, user requirement modeling, risk analysis and product modeling. The project was applied to roof maintenance management and assisted asset managers in selecting a proper maintenance, repair or replacement solution. Moreover, Straub (2002) suggested that objective and reliable information about performance loss and defects of building components could be obtained by adopting the methodology of condition assessment of building components in Netherlands (which was later developed into the Dutch Standard NEN 2767) using a six-point condition scale with consideration to the criticality, intensity and extent of defects. He further added that by using the Dutch standard for condition assessment, building inspectors could provide property managers with objective data about the condition status of building components. Aggregated condition data could be used for setting condition targets for built assets and for benchmarking (Straub 2009). Other similar condition assessment methods were developed such as the European TOBUS project which aimed to assess the degree of physical degradation, extent of any degradation, extent of the necessary works and costs for selecting office building upgrading solutions (Wittchen and Brandt 2002) and the five-point colour-coded rating system developed by Abbott et al. (2007) with value addition including converting condition assessments into condition-based maintenance budgets, eradication of backlog maintenance, performance assessment of effectiveness of maintenance actions and service life prediction. In Queensland of Australia, the Maintenance Management Framework (MMF) is the whole-of-government policy for managing building maintenance. By adhering to the policy requirements in the MMF, departments will have a consistent approach to the management, planning and delivery of building maintenance. In UK, recently 141

3 many local authorities have adopted a Housing Asset Management Strategy in order to ensure their housing stocks are able to meet the need of the community whilst ensuring best use of resources available (Charnwood Borough Council 2009). It is noted that building condition assessment practices differ from one country to another but one emerging theme coming up strongly is the adoption of quantifiable and grading approach in rating the performance standards. It is observed in many of the public organizations in Canada, Netherlands (Straub 2002), USA, Australia (Kenley et al. 2010) and UK (Jones et al. 2007) where more and more resources are being deployed to develop an objective condition assessment method for their property asset management systems. 4 IDENTIFICATION OF CRITICAL INSPECTION ITEMS For the purpose of this paper, roof system is selected as the targeted building component under consideration for the development and application of a generic quantitative-based condition assessment model. To start with, common inadequacies in roofing systems identified during inspections and audits were studied in order to obtain a comprehensive list on the critical inspection items in roof condition assessment. 4.1 Common inadequacies Water Ponding Inadequacy and unevenness of fall of the waterproofing membrane can cause ponding of stagnant water which becomes a source of water leakage. The prime causes of the deficiency are summarized as follows: No specification of degree of fall of finishes Incorrect orientation of horizontal waterproofing membrane Presence of efflorescence at concrete curbs blocked water flow Blockage of rainwater outlet by accrued debris Poor workmanship and inadequate design Detachment of Horizontal Waterproofing Membrane Detachment of waterproofing membrane can exist in the form of blistering, buckling, wrinkling, cracks and open seam. The major causes of the defect are believed to be: Dust particles and demolition debris are not thoroughly cleaned during primer application Poor torch-flame control in immaturely melted bituminous substance on waterproofing membrane mat, which cannot adhere strongly onto the primed substrate Building up of water vapor pressure underneath waterproofing membrane due to exposure of screed receiving waterproofing membrane and inadequate drying time for newly laid screed Detachment of Vertical Waterproofing Membrane at Skirting Detachment of vertical waterproofing membrane and backing rendering from substrate is one of the most common deficiencies. Detachment usually occurs at the interface either between vertical waterproofing membrane skirting and backing rendering, or between backing rendering and concrete wall surface. In addition to the same prime causes of deficiency as horizontal waterproofing membrane as mentioned above, other causes are: Tuck-in groove not deep enough and irregular in cross section Sealant pointing at tuck-in groove so thin that it deteriorates at a much quicker pace than a full sealant pointing Waterproofing membrane skirting too tall hence easily gets buckled, bulged out or fallen down Use of inappropriate sealant at tuck-in groove Corroded metal lathing at skirting Missing of angle fillet to prevent cracking at the junction between horizontal and vertical waterproofing membrane Missing of flashing to protect the skirting Joints of roof tiles Water will penetrate through the layer of roof tiles if the joints between tiles are not properly designed and constructed. The prime causes of the deficiency are: Depth of expansion joint not reaching the bottom of bedding screed, most probably due to bedding screed not divided into bays when being laid Undersized backer rod is used for filling up the joints Waterproofing at rainwater outlet and pipe penetration through slab Areas around rainwater outlet and penetration through slab are vulnerable to water leakage due to: Poor workmanship in sealing up the gap between the pipe or rainwater outlet grating and surrounding concrete Blockage of rainwater outlet by debris causing water ponding and seepage Missing of pipe collar 4.2 Major sub-components From the review on the above findings, a total of 8 major sub-components of roofing system which should be carefully examined during the condition survey are identified as follows: Concrete tiles Cement sand screed bedding (fall of finishes) 142

4 Waterproofing membrane Skirting Flashing Pipe penetration Expansion joint Rainwater outlet 5 DEVELOPING A NEW MAINTENANCE MANAGEMENT MODEL The proposed decision support model for roof maintenance management is underpinned respectively by two quantitative sub-models, i.e. condition assessment model to analyze the physical condition of the roofing system and asset prioritization model to determine the priority of asset. 5.1 Condition Assessment Model (CAM) An accurate assessment on the condition of the asset is vital to the decision making on maintenance management. To achieve an accurate assessment, there must be quantifiable criteria and performance standards which can be evaluated by building inspectors objectively and consistently. A condition assessment model for roofing system is developed as an analytical tool to provide objective evaluation with the use of standardized inspection process and established performance standards to ensure consistent condition index ratings. The prime objective of this condition assessment model is to collect the necessary amount of information required both to define the overall condition of a roofing system and its sub-components by a Facility Condition Index (FCI). The development of the Condition Assessment Model is divided into the following stages: Identification of major sub-components Allocation of weighting to each major subcomponent Assessment of each major sub-component with defects classified according to their criticality, intensity and extent Calculation of weighted condition scores Establishment of a Facility Condition Index A pilot questionnaire is prepared to obtain the practitioners opinions towards the relative importance of the above mentioned major sub-components when assessing the roof condition. The questionnaire is divided into three parts as shown in Appendix 1. Part 1 will request the maintenance experts or practitioners to provide the information of their experiences in handling roof repair or replacement projects. This information will be useful for identifying the experts to be interviewed at the second stage questionnaire survey. Part 2 will request the practitioners to rate the importance of the 8 major sub-components using the 7-point Likert Scaling method. Part 3 are open-ended questions to obtain the practitioners comments on the improvement areas in roof condition assessment. The second-stage questionnaire survey as shown in Appendix 2 is designed to calculate the weighting of each major sub-components based on the use Analytic Hierarchy Process (AHP) approach. The AHP was developed by Satty (1980) in the early 1970 s to deal with multi-criteria decision problems and allow decision makers to evaluate a complex problem using a hierarchical structure. It provides decision makers with an intuitive and common-sense approach to evaluate the importance of every element of a decision through a pair-wise comparison process by incorporating both subjective and objective data into a logical hierarchy framework. Application of this methodology can be found in maintenance prioritization in the building sectors (Shen et al. 1998), determination of the relative significance of maintenance priority ranking factors (Ramadhan et al. 1995) and selection of the maintenance policy (Bevilacquaa and Braglia 2000) etc. The first step of the AHP process is to breakdown the problem into its component parts and develop a hierarchy. The structuring of hierarchy developed obeying to the following guideline: (a) an overall goal is positioned at the top of hierarchy; (b) a set of criteria (if any) that relate the alternatives to the goal are located at midlevel; (c) and a set of alternatives are at the bottom. The second step is to establish the priorities by determining the importance of the objectives in achieving the goal through pair-wise comparisons, which is represented by the pair-wise comparison matrix A, which allows for subjective and objective data to be used. The third step is the calculation of the global priority order and global consistency for each alternative by synthesizing the results. Saaty s eigenvector method is the most popular method to derive the priorities of the alternatives. The eigenvector method computes w as the principal eigenvector that corresponds to the largest eigenvalue, called the principal eigenvalue λ max, of the comparison matrix A. Aw = λ max w (1) where λ max n, w = [w 1, w 2,..., W n ] T. Normalizing the principal eigenvector w results in a priority vector w is established for each criterion and sub criterion, as well as the alternatives under each sub criterion, V i represents the overall priority weight of alternative i and is computed as follows: V i = j W j X ij (2) where W j is the weight assigned to criterion j and X ij is the weight of alternative i given criterion j. Discrepancies are common during pairwise comparison for consistency in preference judgments; hence AHP allows for 10% consistent in human judgments. 143

5 The consistency ratio CR is used to examine the consistency of the entire matrix A as follows: CR = CI RI where the consistency index CI is given by: CI = λmax n (4) n 1 where n is the size of the matrix and RI is the random consistency index, obtained by computing the CI value for randomly generated matrix. Hence, a matrix is considered consistent if CR 0.1. Interviewees were asked to complete the questions by choosing the relative importance of major subcomponents through the pairwise comparison exercise. From the questionnaire results analysis, a weighted geometric mean complex judgment matrix is constructed based on the weighting of the pair-wise comparison matrix as shown in Figure 1. (3) The weightings of importance level of the major subcomponents are obtained by rounding up or down to the nearest 5% as presented below: Waterproofing membrane 30% Flashing 15% Pipe penetration 15% Expansion joint 10% Rainwater outlet 10% Skirting 10% Concrete tile 5% Cement sand bedding 5% Besides the identification of relative importance of sub-component, the criticality, extent and intensity of the defects shall also be taken into consideration during the condition rating for each sub-component; the condition rating is carried out according to the schemes as shown in Table 1-4 (Straub 2009; NEN 2006): Table 1. Condition rating matrix for critical defects Extent Intensity <2% 2-10% 10-30% 30-70% 70% Low Middle High Table 2. Condition rating matrix for serious defects Extent Intensity <2% 2-10% 10-30% 30-70% 70% Low Middle High After the rating to each sub-components under assessment is given by the inspector, total score representing the Facility Condition Index of the roof system could be calculated by summing up the weighted scores of all the sub-components. The higher the score of FCI, the poorer the condition and the higher priority to carry out maintenance works. A worked example is depicted at Table 5 for illustration. Table 3. Condition rating matrix for minor defects Extent Intensity <2% 2-10% 10-30% 30-70% 70% Low Middle High Table 4. Six point scale for condition assessment Condition rating General condition description 1 Excellent (score 0) 2 Good (score 20) 3 Fair (score 40) 4 Poor (score 60) 5 Very poor (score 80) 6 Fail (100) 5.2 Asset Prioritization Model (APM) To overcome the shortcomings of considering the asset s physical condition only, an asset prioritization model was developed as an analytical tool to determine the importance of an asset towards contributing to the achievement of organization s missions. The development of asset prioritization model is divided into the following stages: Identification of major factors Allocation of weighting to each major factor Assessment of each major factor Calculation of weighted scores Establishment of an Asset Priority Index Major factors affecting the importance of an asset towards contributing to the organization s mission were identified through a focus group discussion with facility managers and other stakeholders including internal and external customers as follows: Leakage history Use of the building under the roof area Age of the roofing system Disturbance to occupiers Durability of waterproofing membrane Constructability of roofing Susceptibility to damage Each major factor was assigned with a weighting through the discussions of focus group so that its relative importance towards achieving the organization s mission could be established. The allocated weightings, rating scale and judgment reference were decided by the focus group. The assessment process for the major factors was structured in a way that rating scale for each factor was set out clearly with judgment reference for the 144

6 Figure 1. Weighted geometric mean complex judgment matrix (major sub-components) 145

7 Sub-component under assessment Concrete tiles (including tile joints) Cement sand screed bedding (fall of finishes) Waterproofing membrane Table 5. An Example of Assessed Roof Condition Checklist Allocated Weighting % Importance of defects Intensity of defects Assessment Results Extent of defects Condition rating Condition score 5 Serious Low <2% Critical Low 10-30% Critical Middle 2-10% Skirting 10 Minor High <2% Flashing 15 Serious High 10-30% Pipe penetration 15 Serious Middle <2% Expansion joint 10 Critical Middle 70% Rainwater outlet (including channel) 10 Serious Middle 70% Facility Condition Index (FCI) 27 Table 6. An Example of API Calculation Weighted Score A B C D E F G Factor of assessment Leakage history (% of flats underneath the roof have leakage) Importance factor (use of building under roof area) Age of the roofing system (expected useful life of roofing) Disturbance to tenants (number of tenants affected) Durability (Existing membrane toughness) Constructibility (Ease of repair or replacement) Susceptibility to damage (Ease of damage) Allocated Rating Notional Weighted Weighting % Score Score Asset Priority Index (API) 65 assessor to follow. The most relevant judgment reference would determine the score for the factor under assessment. A weighted score for each factor would be obtained by combining the assessed rating and weighting of the factor. In this way, a consistent judgment process was established to ensure that meaningful assessment could be made. After assessment and with all the weighted scores of major factor summed up, an Asset Priority Index (API) was established to provide facility manager with a quantitative and objective priority of asset. A worked example is depicted at Table 6 for illustration. The priority of asset is represented by the Asset Priority Index (API). The API is a balanced scorecard approach that allows maintenance managers and other stakeholders to compare the relative importance of the asset in relation to one another. The higher the score of API for a roof, the more importance of that roof for the organization, i.e. the higher priority to carry out maintenance works. 5.3 Prioritization of Works with Combined use of FCI and API In an environment of limited funding, it is important to focus funding on the asset with the most impact to the organization s mission in relation to customer s satisfaction, building operation, building sustainability, safety and cost effectiveness. The adoption of combined use of FCI and API could transform facility managers evaluation process into one where strategic decisions were supported by data and information rather than being made as a reaction to a particular need. The overall framework of the maintenance priority methodology for roofing system is shown in Figure

8 Table 7. Prioritization based on FCI and API Priority FCI API Descriptions 1 F CI i F CI mean AP I i AP I mean Important asset with worse condition 2 F CI i < F CI mean AP I i AP I mean Important asset with better condition 3 F CI i F CI mean AP I i < AP I mean Unimportant asset with worse condition 4 F CI i < F CI mean AP I i < AP I mean Unimportant asset with better condition Note: F CI mean = 50 AP I mean = 50 Priority of maintenance projects can then be allocated according to the sequence in Table 7. Table 8. Project Prioritization Project FCI API Priority A P4 B P3 C P1 D P2 E P2 F P3 Through the adoption of an objective and quantitative approach with a step-by-step process of assessment, subjective elements in the decision making process of the surveyor are minimized and assessment standards can be aligned to a consistent level across different teams and districts. 7 CONCLUSION Figure 2. Framework for roofing maintenance works prioritization 6 APPLICATION OF THE NEWLY-PROPOSED MODEL In order to investigate the applicability and effectiveness of the proposed roofing maintenance management model, case studies of six planned re-roofing projects were conducted. The responsible facility managers for the six projects are requested to conduct the condition assessment with the use of the inspection checklist to obtain the Facility Condition Index (FCI) and evaluate the priority of asset with the use of Asset Priority Index (API) assessment form as developed above. Results of the case studies are summarized in Table 8. The proposed maintenance management model is proved to be a useful tool for condition assessment and works prioritization. Based on the quantitative and systematic process of proposed model, maintenance managers are enabled to give objective assessment about the condition status of building components in a consistent manner. Being capable of quantifying the condition status of a building component through the proposed model, the performance-overtime for that building component can be measured and its rate of deterioration can be ascertained. With the predicted serviceable life, the maintenance requirements of the building component can be forecasted and necessary works program and resources can be planned ahead to meet the requirements. To enhance the reliability and consistency of the condition assessment process, specialized training with measuring equipment and pictorial guides for identification of defects will be useful for the inspectors to align their assessment standards. Another merit of the proposed model is that it can give an objective and quantifiable condition rating as the desired maintenance level to be performed by the building component. Any drop in the maintenance level will trigger off necessary maintenance and improvement actions to bring back the performance of the building component to the required level. When maintenance budget is limited and several projects are competing for funding to proceed, it is necessary to set the priority of different projects so that 147

9 resources are utilized in the most cost effective manner. In the past, the priority of maintenance works is set by the professional judgment of facility managers. With the support of Asset Prioritization Model, the decision made by facility managers would likely be more objective and contributive towards the achievement of the mission of the organization. In conclusion, the establishment of the newly-proposed quantitative maintenance management model for grading the condition of building component and determining priority of asset can provide the decision makers an effective tool to benchmark with different projects and assist the priority setting of maintenance works. REFERENCES Abbott, G., McDuling, J., Parsons, S., and Schoeman, J. (2007). Building condition assessment: a performance evaluation tool towards sustainable asset management. CIB World Building Congress, International Council for Research and Innovation in Building and Construction, Cape Town, South Africa (14-18 May, 2007). Bevilacquaa, M. and Braglia, M. (2000). The analytic hierarchy process applied to maintenance strategy s- election. Reliability Engineering and System Safety, 70, Charnwood Borough Council (2009). Housing Asset Management Strategy. Loughborough, United Kingdom. ISO (2002). Buildings and constructed assets service life planning part 3: Performance audit and reviews. Report No , ISO, Geneva. Jones, K., Cooper, J., et al. (2007). The role of routine maintenance in improving the sustainability of existing social housing. Proceedings of the European Network for Housing Research W07 Housing Regeneration and Maintenance, Rotterdam, Netherlands. Kenley, R., Chiazor, M., Hall, J., and Heywood, C. (2010). Good practices for managing australia s public and community housing assets. Report No. Final Report Series, No. 148., AHURI, Melbourne. NEN (2006). Condition assessment of building and installation components part 1: Methodology. Report No. NEN 2767, NEN, Delft (in Dutch). Ramadhan, R., Wahhab, H., and Duffuaa, S. (1995). The use of an analytical hierarchy process in pavement maintenance priority ranking. Journal of Quality Maintenance Engineering, 5(1), Satty, T. (1980). The Analytics Hierarchy Process. McGraw-hill, New York, United States. Shen, Q., Lo, K., and Wang, Q. (1998). Priority setting in maintenance management: a modified multiattribute approach using analytic hierarchy process. Construction Management Econmic, 16, Straub, A. (2002). Strategic technical management of housing stock: Lesson from dutch housing associations. The Journal of Building Research and Information, 30(5), Straub, A. (2009). Dutch standard for condition assessment of buildings. Structural Survey, 327(1), Wittchen, K. B. and Brandt, E. (2002). Developm ent of a methodology for selecting office building upgrading solutions based on a test survey in european buildings. Energy and Buildings, 34(2),

10 APPENDIX 1 149

11 APPENDIX 2 150

USING AHP TO ANALYZE THE PRIORITY OF PERFORMANCE CRITERIA IN NATIONAL ENERGY PROJECTS

USING AHP TO ANALYZE THE PRIORITY OF PERFORMANCE CRITERIA IN NATIONAL ENERGY PROJECTS USING AHP TO ANALYZE THE PRIORITY OF PERFORMANCE CRITERIA IN NATIONAL ENERGY PROJECTS Hsin-Pin Fu, Department of Marketing and Distribution Management, National Kaohsiung First University of Science and

More information

Product Evaluation of Rijal Tashi Industry Pvt. Ltd. using Analytic Hierarchy Process

Product Evaluation of Rijal Tashi Industry Pvt. Ltd. using Analytic Hierarchy Process Proceedings of IOE Graduate Conference, 2016 pp. 239 244 Product Evaluation of Rijal Tashi Industry Pvt. Ltd. using Analytic Hierarchy Process Rojan Shrestha 1, Shree Raj Sakya 2 1,2 Department of Mechanical

More information

Using the Analytic Hierarchy Process in Long-Term Load Growth Forecast

Using the Analytic Hierarchy Process in Long-Term Load Growth Forecast Journal of Electrical Engineering 5 (2017) 151-156 doi: 10.17265/2328-2223/2017.03.005 D DAVID PUBLISHING Using the Analytic Hierarchy Process in Long-Term Load Growth Forecast Blagoja Stevanoski and Natasa

More information

Chapter 4 Fuzzy Analytic Hierarchy Process of Green Supply Chain Management in the Pharmaceutical Industry

Chapter 4 Fuzzy Analytic Hierarchy Process of Green Supply Chain Management in the Pharmaceutical Industry Chapter 4 Fuzzy Analytic Hierarchy Process of Green Supply Chain Management in the Pharmaceutical Industry 4.1 Introduction During the past decade with increasing environmental concerns, a consensus, the

More information

The Use of AHP (Analytical Hierarchy Process) as Multi Criteria Decision Tool for the Selection of Best Water Supply Source for Benin City

The Use of AHP (Analytical Hierarchy Process) as Multi Criteria Decision Tool for the Selection of Best Water Supply Source for Benin City Nigerian Journal of Environmental Sciences and Technology (NIJEST) www.nijest.com Vol 1, No. 1 March 2017, pp 169-176 The Use of AHP (Analytical Hierarchy Process) as Multi Criteria Decision Tool for the

More information

A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT

A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT A RANKING AND PRIORITIZING METHOD FOR BRIDGE MANAGEMENT Saleh Abu Dabous and Sabah Alkass Department of Building, Civil and Environmental Engineering, Concordia University, Rm: EV-6139 1455 de Maisonneuve,

More information

MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process

MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process MULTIPLE-OBJECTIVE DECISION MAKING TECHNIQUE Analytical Hierarchy Process Business Intelligence and Decision Making Professor Jason Chen The analytical hierarchy process (AHP) is a systematic procedure

More information

Application of AHP in Education Legislation Project. Ying-ying YAO and Yong-sheng GE *

Application of AHP in Education Legislation Project. Ying-ying YAO and Yong-sheng GE * 2017 3rd International Conference on Applied Mechanics and Mechanical Automation (AMMA 2017) ISBN: 978-1-60595-479-0 Application of AHP in Education Legislation Project Ying-ying YAO and Yong-sheng GE

More information

The Development of Condition Assessment for Heritage Building

The Development of Condition Assessment for Heritage Building The Development of Condition Assessment for Heritage Building Siti Nor Fatimah Zuraidi 1*, Mohammad Ashraf Abdul Rahman 1, Zainal Abidin Akasah 2 1 Faculty of Technology Engineering, Universiti Tun Hussein

More information

An Approach of Contractor Selection By Analytical Heirarchy Process

An Approach of Contractor Selection By Analytical Heirarchy Process An Approach of Contractor Selection By Analytical Heirarchy Process Multi Criteria Decision Making System Meghalkumar I Zala (PG Student) Master of Engineering in Construction Eng. & Management Birla Vishvakarma

More information

Use of Fuzzy Analytic Hierarchy Process in Pavement Maintenance Planning

Use of Fuzzy Analytic Hierarchy Process in Pavement Maintenance Planning Use of Fuzzy Analytic Hierarchy Process in Pavement Maintenance Planning J. Farhan & T. F. Fwa Department of Civil Engineering, National University of Singapore, Singapore ABSTRACT: In pavement management,

More information

Analytical hierarchy process (AHP) approach to the selection of heritage building element

Analytical hierarchy process (AHP) approach to the selection of heritage building element Analytical hierarchy process (AHP) approach to the selection of heritage building element Siti Nor Fatimah Zuraidi 1, Mohammad Ashraf Abdul Rahman 2, Zainal Abidin Akasah 3 1,2 Facutly of Engineering Technology,

More information

Humanities and Social Sciences

Humanities and Social Sciences Humanities and Social Sciences 2016; 4(2): 34-41 http://www.sciencepublishinggroup.com/j/hss doi: 10.11648/j.hss.20160402.13 ISSN: 2330-8176 (Print); ISSN: 2330-8184 (Online) Effectiveness Evaluation of

More information

Use of AHP Method in Efficiency Analysis of Existing Water Treatment Plants

Use of AHP Method in Efficiency Analysis of Existing Water Treatment Plants International Journal of Engineering Research and Development ISSN: 78-067X, Volume 1, Issue 7 (June 01), PP.4-51 Use of AHP Method in Efficiency Analysis of Existing Treatment Plants Madhu M. Tomar 1,

More information

TILING SPECIFICATIONS

TILING SPECIFICATIONS TILING SPECIFICATIONS SPECIFICATION NUMBER: NR204-16 PREPARED BY: Mike Cubley PREPARED FOR: Porcelain Plus ATTENTION: Kirk Pollock INSTALLATION: 712 Turner Floor and Wall Tiling Specification. M40 STONE/

More information

Introduction. Analytical Hierarchy Process. Why AHP? 10/31/2011. The AHP is based on three principles: Decomposition of the decision problem

Introduction. Analytical Hierarchy Process. Why AHP? 10/31/2011. The AHP is based on three principles: Decomposition of the decision problem Introduction A multi-criteria decision making process. Analytical Hierarchy Process The analytical hierarchy process (AHP) is a comprehensive, logical and structured framework. 56:134 Process Engineering

More information

The Potential Utilization of the Analytical Hierarchy Process (AHP) for the Selection of a Tenure Track Faculty Position

The Potential Utilization of the Analytical Hierarchy Process (AHP) for the Selection of a Tenure Track Faculty Position The Potential Utilization of the Analytical Hierarchy Process (AHP) for the Selection of a Tenure Track Faculty Position Raida Abuizam Purdue University Calumet John J. Lucas Purdue University Calumet

More information

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT CONSOLIDATED EDISON COMPANY OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DISTRIBUTION EQUIPMENT SPECIFICATION EO-1007 REVISION 13 DECEMBER 2013 EFFECTIVE DATE DECEMBER 16,

More information

Introduction. Key Words: Analytic Hierarchy Process (AHP), Fuzzy AHP, Criteria weightings, Decisionmaking

Introduction. Key Words: Analytic Hierarchy Process (AHP), Fuzzy AHP, Criteria weightings, Decisionmaking Application of AHP and Fuzzy AHP to Decision-Making Problems in Construction Sangwook Lee, Ph.D. University of Wisconsin-Platteville Platteville, Wisconsin The approach to selecting key factors has been

More information

ScienceDirect. Analytic Hierarchy Process of Academic Scholars for Promoting Energy Saving and Carbon Reduction in Taiwan

ScienceDirect. Analytic Hierarchy Process of Academic Scholars for Promoting Energy Saving and Carbon Reduction in Taiwan Available online at www.sciencedirect.com ScienceDirect Procedia Environmental Sciences 20 ( 2014 ) 526 532 The 4 th International Conference on Sustainable Future for Human Security, SustaiN 2013 Analytic

More information

ROOF SUBSTRATE PREP MANUAL

ROOF SUBSTRATE PREP MANUAL ROOF SUBSTRATE PREP MANUAL ALDOCOAT Liquid Applied Roof Restoration Systems AFTER BEFORE JULY 2016 1604 N. Main St. Kannapolis, NC 28081 (800) 474-6019 www.aldoproducts.com ROOF SUBSTRATE PREPARATION Preparation

More information

6 Analytic Hierarchy Process (AHP)

6 Analytic Hierarchy Process (AHP) 6 Analytic Hierarchy Process (AHP) 6.1 Introduction to Analytic Hierarchy Process The AHP (Analytic Hierarchy Process) was developed by Thomas L. Saaty (1980) and is the well-known and useful method to

More information

DECISION SUPPORT FOR SOFTWARE PACKAGE SELECTION: A MULTICRITERIA METHODOLOGY

DECISION SUPPORT FOR SOFTWARE PACKAGE SELECTION: A MULTICRITERIA METHODOLOGY 5-03-30 INFORMATION MANAGEMENT: STRATEGY, SYSTEMS, AND TECHNOLOGIES DECISION SUPPORT FOR SOFTWARE PACKAGE SELECTION: A MULTICRITERIA METHODOLOGY Farrokh Mamaghani INTRODUCTION Software selection is a critical

More information

Product quality evaluation system based on AHP fuzzy comprehensive evaluation

Product quality evaluation system based on AHP fuzzy comprehensive evaluation Journal of Industrial Engineering and Management JIEM, 2013 6(1):356-366 Online ISSN: 2013-0953 Print ISSN: 2013-8423 http://dx.doi.org/10.3926/jiem.685 Product quality evaluation system based on AHP fuzzy

More information

International Journal of Advance Engineering and Research Development STUDY OF SOME PERFORMANCE MEASUREMENT INDICES OF SUPPLY CHAIN MANAGEMENT

International Journal of Advance Engineering and Research Development STUDY OF SOME PERFORMANCE MEASUREMENT INDICES OF SUPPLY CHAIN MANAGEMENT Scientific Journal of Impact Factor (SJIF): 4.14 International Journal of Advance Engineering and Research Development Volume 3, Issue 3, March -2016 e-issn (O): 2348-4470 p-issn (P): 2348-6406 STUDY OF

More information

The Analytic Hierarchy Process Based Supplier Selection Approach for Collaborative Planning Forecasting and Replenishment Systems

The Analytic Hierarchy Process Based Supplier Selection Approach for Collaborative Planning Forecasting and Replenishment Systems The Analytic Hierarchy Process Based Selection Approach for Collaborative Planning Forecasting and Replenishment Systems Rajesh A. Kubde Associate Professor, Mechanical Engineering Department. Prof. Ram

More information

A Stochastic AHP Method for Bid Evaluation Plans of Military Systems In-Service Support Contracts

A Stochastic AHP Method for Bid Evaluation Plans of Military Systems In-Service Support Contracts A Stochastic AHP Method for Bid Evaluation Plans of Military Systems In-Service Support Contracts Ahmed Ghanmi Defence Research and Development Canada Centre for Operational Research and Analysis Ottawa,

More information

Submitted to the Grand Rapids Community College Provost and AGC Executive Committee.

Submitted to the Grand Rapids Community College Provost and AGC Executive Committee. Oscar Neal Fall 2012 Sabbatical Report Submitted to the Grand Rapids Community College Provost and AGC Executive Committee. The main objective of my sabbatical was to complete my dissertation proposal

More information

RESEARCH ON DECISION MAKING REGARDING HIGH-BUSINESS-STRATEGY CAFÉ MENU SELECTION

RESEARCH ON DECISION MAKING REGARDING HIGH-BUSINESS-STRATEGY CAFÉ MENU SELECTION RESEARCH ON DECISION MAKING REGARDING HIGH-BUSINESS-STRATEGY CAFÉ MENU SELECTION Cheng-I Hou 1, Han-Chen Huang 2*, Yao-Hsu Tsai 3, Chih-Yao Lo 4 1 Department of Leisure Management, Yu Da University of

More information

E-Commerce Logistics Mode Selection Based on Network Construction

E-Commerce Logistics Mode Selection Based on Network Construction Modern Economy, 2019, 10, 198-208 http://www.scirp.org/journal/me ISSN Online: 2152-7261 ISSN Print: 2152-7245 E-Commerce Logistics Mode Selection Based on Network Construction Hanlin Qian School of Business

More information

VENDOR RATING AND SELECTION IN MANUFACTURING INDUSTRY

VENDOR RATING AND SELECTION IN MANUFACTURING INDUSTRY International Journal of Decision Making in Supply Chain and Logistics (IJDMSCL) Volume 2, No. 1, January-June 2011, pp. 15-23, International Science Press (India), ISSN: 2229-7332 VENDOR RATING AND SELECTION

More information

WPM WATERPROOFING MEMBRANE

WPM WATERPROOFING MEMBRANE WPM 300 - WATERPROOFING MEMBRANE Description WPM 300 Waterproofing Membrane is a single-pack, water based polyurethane modified synthetic rubber polymer, liquid membrane developed specifically as a tough,

More information

PRIORITISATION OF ROAD CORRIDORS BY DEVELOPING COMPOSITE INDEX

PRIORITISATION OF ROAD CORRIDORS BY DEVELOPING COMPOSITE INDEX ISSN (Online) : 2319-8753 ISSN (Print) : 2347-6710 International Journal of Innovative Research in Science, Engineering and Technology An ISO 3297: 2007 Certified Organization, Volume 2, Special Issue

More information

Presentation Program Outline

Presentation Program Outline Presentation Program Outline MASTERPLAN PROCESS EFFECTIVE PLANNING ELEMENTS DECISION MAKING PROCESS ANALYTICAL HIERARCHY PROCESS (AHP) HOW TO APPLY AHP SIMPLE EXAMPLE CASE STUDY APPLICATION WHDS MDP Decision

More information

The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools

The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools 5 MCDM Methods 5.1 INTRODUCTION The Multi criterion Decision-Making (MCDM) are gaining importance as potential tools for analyzing complex real problems due to their inherent ability to judge different

More information

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017

SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE. Product. Scope. Appraisal No. 811 [2013] Appraisal No. 811 (2013) Amended 28 August 2017 SIKALASTIC-152 EXTERIOR WATERPROOFING MEMBRANE Amended 28 August 2017 BRANZ Appraisals Technical Assessments of products for building and construction. Sika (NZ) Ltd PO Box 19 192 Avondale Auckland 1746

More information

The Investment Comparison Tool (ICT): A Method to Assess Research and Development Investments

The Investment Comparison Tool (ICT): A Method to Assess Research and Development Investments Syracuse University SURFACE Electrical Engineering and Computer Science College of Engineering and Computer Science 11-15-2010 The Investment Comparison Tool (ICT): A Method to Assess Research and Development

More information

Leader Culling Using AHP - PROMETHEE Methodology

Leader Culling Using AHP - PROMETHEE Methodology Chapter 4 Leader Culling Using AHP - PROMETHEE Methodology 4.1 Introduction In earlier two chapters we worked on Multi Objective Decision Making (MODM) models where multiple objectives are simultaneously

More information

ISSN: ISO 9001:2008 Certified International Journal of Engineering and Innovative Technology (IJEIT) Volume 3, Issue 9, March 2014

ISSN: ISO 9001:2008 Certified International Journal of Engineering and Innovative Technology (IJEIT) Volume 3, Issue 9, March 2014 A Comprehensive Model for Evaluation of Sport Coaches Performance Qiang ZHANG 1* Bo HOU 1 Yue WANG 1 Yarong XIAO 1 1. College of Optoelectronic Engineering Chongqing University Chongqing P.R. China 400044

More information

Construction Standards PAGE

Construction Standards PAGE Construction Standards PAGE 071619-1 SECTION 071619 PART 1 - GENERAL 1.1 M.S.U. ISSUES A. Below grade construction should be protected by self-adhering sheet waterproofing in accordance with SECTION 071326

More information

SECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints.

SECTION Specification for Building Limes Specification For Building Sands from Natural Sources Methods of Tests for Paints. SECTION 09200 PART 1 - GENERAL 1.01 DESCRIPTION A. Extent of Work: The extent of lath and plaster work is shown on the drawings and in schedules and includes interior and exterior plaster work, and fibreglass

More information

MOISTURE MANAGEMENT. Providing roofing and waterproofing solutions. Zionsville High School Roof Asset Management Plan

MOISTURE MANAGEMENT. Providing roofing and waterproofing solutions. Zionsville High School Roof Asset Management Plan MOISTURE MANAGEMENT Providing roofing and waterproofing solutions. Zionsville High School Roof Asset Management Plan Executive Summary Moisture Management conducted a detailed investigation of 34 roof

More information

Knowledge-Based Systems

Knowledge-Based Systems -Based Systems 22 (2009) 363 367 Contents lists available at ScienceDirect -Based Systems journal homepage: www.elsevier.com/locate/knosys An measurement model for knowledge management Yuan-Feng Wen *

More information

Establishment of Legal Metrology Conformity Assessment Model Based on Risk Management

Establishment of Legal Metrology Conformity Assessment Model Based on Risk Management Establishment of Legal Metrology Conformity Assessment Model Based on Risk Management Chun-Min Su, Cheng-Tsair Yang and Jiunn-Haur Shaw Center for Measurement Standards/ITRI, Taiwan NCSLI 2011, National

More information

AS Interpretation of External Waterproofing as it applies to Melbourne, Class 1 buildings

AS Interpretation of External Waterproofing as it applies to Melbourne, Class 1 buildings AS4654.2 Interpretation of External Waterproofing as it applies to Melbourne, Class 1 buildings Climate Zone: 6 Wind Class: N1 Membrane Types: Liquid Applied Class II and Class III as defined and tested

More information

Application of AHP for Lean Implementation Analysis in 6 MSMEs

Application of AHP for Lean Implementation Analysis in 6 MSMEs Application of AHP for Lean Implementation Analysis in 6 MSMEs 1 Ravikumar M.M*,1, Marimuthu K 2, H. Abdul Zubar 3 Research Scholar, Faculty of Mechanical Engineering, Anna University, India (Email ID:

More information

Combining AHP and TOPSIS Approaches to Support Site Selection for a Lead Pollution Study

Combining AHP and TOPSIS Approaches to Support Site Selection for a Lead Pollution Study 2012 2nd International Conference on Environmental and Agriculture Engineering IPCBEE vol.37 (2012) (2012) IACSIT Press, Singapore Combining AHP and TOPSIS Approaches to Support Site Selection for a Lead

More information

Key Knowledge Generation Publication details, including instructions for author and Subscription information:

Key Knowledge Generation Publication details, including instructions for author and Subscription information: This article was downloaded by: Publisher: KKG Publications Registered office: 18, Jalan Kenanga SD 9/7 Bandar Sri Damansara, 52200 Malaysia Key Knowledge Generation Publication details, including instructions

More information

Asbestos Management Policy

Asbestos Management Policy Asbestos Management Policy Date submitted to the Board: 31 st May 2017 Policy to take effect from: May 2017 To be reviewed: March 2019 Version No. 4.0 Introduction This policy describes how we manage the

More information

Transportation Report to SPC on Transportation and Transit 2017 April 19. ISC: UNRESTRICTED TT Page 1 of 7

Transportation Report to SPC on Transportation and Transit 2017 April 19. ISC: UNRESTRICTED TT Page 1 of 7 Page 1 of 7 EXECUTIVE SUMMARY The City of Calgary owns and maintains over 12,200 km of sidewalks, curbs and gutters with a current replacement value of $5.1 billion. The quality of new concrete and condition

More information

Customer Satisfaction Parameters for Fruits and Vegetables Retail- An AHP Approach

Customer Satisfaction Parameters for Fruits and Vegetables Retail- An AHP Approach Customer Satisfaction Parameters for Fruits and Vegetables Retail- An AHP Approach Dr. Lamay Bin Sabir Assistant Professor, Al-Barkaat Institute of Management Studies, Aligarh +91-9045968133 Abstract In

More information

AN IMPROVEMENT ON SAATY'S AHP

AN IMPROVEMENT ON SAATY'S AHP AN IMPROVEMENT ON SAATY'S AHP Feng Kong, Hongyan Liu Department of Economics and management, North China Electric Power University, Baoding, P.R. China, 7 Abstract: Key words: AHP is a commonly used method

More information

METHOD STATEMENT 003 SCYRON-CEMENT SHEETING BALCONY WATERPROOFING FOR DIRECT FIXED TILES

METHOD STATEMENT 003 SCYRON-CEMENT SHEETING BALCONY WATERPROOFING FOR DIRECT FIXED TILES This Document is designed to cover best practice installation methods for the installation of a class 2/3 waterproof membrane system to external Scyron-cement sheet balconies to AS 4654.2 PRELIMINARY WORK

More information

Bituminous Sheet Flat Roofs: Their repair and maintenance

Bituminous Sheet Flat Roofs: Their repair and maintenance Bituminous Sheet Flat Roofs: Their repair and maintenance Flat roof covered in sheets of bituminous felt Introduction Whilst flat roofs are often regarded as inferior to their pitched counterparts and

More information

A feasibility evaluation on the outsourcing of quality testing and inspection

A feasibility evaluation on the outsourcing of quality testing and inspection Available online at www.sciencedirect.com International Journal of Project Management 27 (2009) 89 95 www.elsevier.com/locate/ijproman A feasibility evaluation on the outsourcing of quality testing and

More information

AS The External Waterproofing Membranes Standard

AS The External Waterproofing Membranes Standard AS 4654-2 The External Waterproofing Membranes Standard NOTE This external waterproofing standard contains solutions for problems which have not been addressed in other countries. CONFORMANCE CONDITIONS

More information

The Importance-Weights Determination of the Safety Factors of Fishing Ports in Zhuhai via the AHP Method

The Importance-Weights Determination of the Safety Factors of Fishing Ports in Zhuhai via the AHP Method Advances in Computer Science Research, volume nd International Conference on Computer Engineering, Information Science & Application Technology (ICCIA 0) The Importance- Determination of the Safety Factors

More information

APPLICATIONS AND FUNCTION:

APPLICATIONS AND FUNCTION: Since the usage and finishing of the product is not under our control, we accept no liability for the success of the work and can therefore only guarantee the nature of our products as per the accompanying

More information

Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran

Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran Determining and ranking essential criteria of Construction Project Selection in Telecommunication of North Khorasan-Iran Majid Mojahed, Rosnah bt Mohd Yusuff, Mohammad Reyhani Abstract Economy project

More information

HAWAII DEPARTMENT OF TRANSPORATION HIGHWAYS DIVISION PAVEMENT PREVENTIVE MAINTENANCE GUIDELINES JUNE 2003

HAWAII DEPARTMENT OF TRANSPORATION HIGHWAYS DIVISION PAVEMENT PREVENTIVE MAINTENANCE GUIDELINES JUNE 2003 HAWAII DEPARTMENT OF TRANSPORATION HIGHWAYS DIVISION PAVEMENT PREVENTIVE MAINTENANCE GUIDELINES JUNE 2003 Reviewed and accepted by FHWA on September 29, 2003 Note: Guidelines was revised on to correct

More information

National Construction Code Series (NCC 2016) Building Code Of Australia (BCA)

National Construction Code Series (NCC 2016) Building Code Of Australia (BCA) Appraisal No. 958 [2017] HYDRATHANE EXTERIOR WATERPROOFING MEMBRANE BRANZ Appraisals Technical Assessments of products for building and construction. Construction Chemicals Pty Ltd 49-57 Davis Street Wingfield

More information

SECTION 39 - MANHOLES TABLE OF CONTENTS

SECTION 39 - MANHOLES TABLE OF CONTENTS Section SECTION 39 - MANHOLES TABLE OF CONTENTS Page 39-1 GENERAL... 39.1 39-2 CONCRETE MANHOLES... 39.1 39-2.01 NOT USED... 39.1 39-2.02 Concrete Storm Drain Manholes... 39.1 39-3 SADDLE SEWER MANHOLES...

More information

Elhuni, M. R. (Redha); Ahmad, M. M. (Munir)

Elhuni, M. R. (Redha); Ahmad, M. M. (Munir) TeesRep - Teesside's Research Repository Key Performance Indicators for Sustainable Production Evaluation in Oil and Gas Sector Item type Authors Citation Eprint Version Publisher Journal Additional Link

More information

Tile on Existing. Viewpoint

Tile on Existing. Viewpoint Viewpoint Tile on Existing Exterior Reinforced Concrete BalconieS By Steven C. Turner Exterior reinforced concrete balconies are often covered by tile set in mortar beds with grouted joints. These installations

More information

Assets Inspections A Real Knowledge for Risk and Asset Management

Assets Inspections A Real Knowledge for Risk and Asset Management Journal of Agricultural Science and Technology B 5 (2015) 44-54 doi: 10.17265/2161-6264/2015.01.005 D DAVID PUBLISHING Assets Inspections A Real Knowledge for Risk and Asset Management Nuno Reis and Francisco

More information

2013, IJARCSSE All Rights Reserved Page 392

2013, IJARCSSE All Rights Reserved Page 392 Volume 3, Issue 11, November 2013 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Risk Analysis

More information

Fuzzy AHP approach for the Selection of Groundwater Recharge Alternative: Sensitivity Analysis

Fuzzy AHP approach for the Selection of Groundwater Recharge Alternative: Sensitivity Analysis Fuzzy AHP approach for the Selection of Groundwater Recharge Alternative: Sensitivity Analysis Masengo Ilunga, Department of Civil Engineering and Chemical Engineering, University of South Africa, Pretoria,

More information

Road Maintenance Priority Based On Multi-Criteria Approach (Case Study of Bali Province, Indonesia)

Road Maintenance Priority Based On Multi-Criteria Approach (Case Study of Bali Province, Indonesia) Road Maintenance Priority Based On Multi-Criteria Approach (Case Study of Bali Province, Indonesia) Putu Alit Suthanaya 1 1 Department of Civil Engineering, Faculty of Engineering, Udayana University,

More information

Keywords- AHP, Operating System, MCDM, Linux, Mac, Windows.

Keywords- AHP, Operating System, MCDM, Linux, Mac, Windows. Volume 4, Issue 5, May 2014 ISSN: 2277 128X International Journal of Advanced Research in Computer Science and Software Engineering Research Paper Available online at: www.ijarcsse.com Operating System

More information

SOFTWARE PROCESS IMPROVEMENT PLANNING BY DESCRIPTIVE AHP

SOFTWARE PROCESS IMPROVEMENT PLANNING BY DESCRIPTIVE AHP ISAHP 2001, Berne, Switzerland, August 2-4, 2001 SOFTWARE PROCESS IMPROVEMENT PLANNING BY DESCRIPTIVE AHP Satoru Takahashi and Kiyotoshi Komaya Industrial Electronics and Systems Laboratory Mitsubishi

More information

A Decision Support System for Performance Evaluation

A Decision Support System for Performance Evaluation A Decision Support System for Performance Evaluation Ramadan AbdelHamid ZeinEldin Associate Professor Operations Research Department Institute of Statistical Studies and Research Cairo University ABSTRACT

More information

Pavement Rehabilitation Prioritization Using Analytical Hierarchy Process (AHP)

Pavement Rehabilitation Prioritization Using Analytical Hierarchy Process (AHP) Pavement Rehabilitation Prioritization Using Analytical Hierarchy Process (AHP) Anjali Ashok 1, Thasneem K M 2, Sony Vincent 3 U G Student, Department of Civil Engineering, IES College of Engineering,

More information

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate

Colphene BSW Training and Application Guide. Colphene BSW Waterproofing Membrane. 1. Prepare substrate Colphene BSW Training and Application Guide Colphene BSW Waterproofing Membrane. 1. Prepare substrate Substrate must be structurally sound. Surface must be free of voids, spalled areas, loose aggregate,

More information

Florock Seamless Flooring Systems

Florock Seamless Flooring Systems Architectural Specification -- FloroCryl Deck- 1/8 (125 mil) MMA (Methyl Methacrylate) Waterproofing 1/8 Flooring System Part 1: General 1.01 System Description A. Roller-applied penetrating MMA primer

More information

ANALYSIS OF THE EFFICIENCY OF BANKS IN MONTENEGRO USING THE AHP

ANALYSIS OF THE EFFICIENCY OF BANKS IN MONTENEGRO USING THE AHP ANALYSIS OF THE EFFICIENCY OF BANKS IN MONTENEGRO USING THE AHP Svetlana Rakocevic Faculty of Economics University of Montenegro Podgorica, Montenegro E-mail: svetr@cg.ac.yu Zdenka Dragasevic! Faculty

More information

DS411 Exterior. Product. BRANZ APPRAISAL No. 788 (2012) Scope. Wet-seal New Zealand Ltd P O Box Takapuna Auckland Tel:

DS411 Exterior. Product. BRANZ APPRAISAL No. 788 (2012) Scope. Wet-seal New Zealand Ltd P O Box Takapuna Auckland Tel: Product 1.1 Wet-seal DS411 Exterior Waterproofing Membrane is a single part waterproofing membrane for use under ceramic or stone tile finishes on external decks and balconies. Appraisal No.788 [2012]

More information

SELECTING A PROFOUND TECHNICAL SERVICE PROVIDER TO PERFORM A TECHNICAL FIELD DEVELOPMENT STUDY FROM GIVEN MULTIPLE CRITERIA

SELECTING A PROFOUND TECHNICAL SERVICE PROVIDER TO PERFORM A TECHNICAL FIELD DEVELOPMENT STUDY FROM GIVEN MULTIPLE CRITERIA SELECTING A PROFOUND TECHNICAL SERVICE PROVIDER TO PERFORM A TECHNICAL FIELD DEVELOPMENT STUDY FROM GIVEN MULTIPLE CRITERIA Slamet Riyadi, Lokman Effendi and Rafikul Islam Department of Business Administration,

More information

Royal North Shore Hospital Redevelopment and Community Health Service Project. Waterproofing Technical Analysis

Royal North Shore Hospital Redevelopment and Community Health Service Project. Waterproofing Technical Analysis Royal North Shore Hospital Redevelopment and Community Health Service Project Waterproofing Technical Analysis The Wolfin GWSK Waterproofing Membrane System has been installed on the critical areas of

More information

Fuzzy analytical hierarchy process for the selection of maintenance policies within petroleum industry

Fuzzy analytical hierarchy process for the selection of maintenance policies within petroleum industry Fuzzy analytical hierarchy process for the selection of maintenance policies within petroleum industry MOHAMED, Abdel and SAAD, Sameh Available from Sheffield Hallam

More information

ESTABLISHING RELATIVE WEIGHTS FOR CONTRACTOR PREQUALIFICATION CRITERIA IN A PRE-QUALIFICATION EVALUATION MODEL

ESTABLISHING RELATIVE WEIGHTS FOR CONTRACTOR PREQUALIFICATION CRITERIA IN A PRE-QUALIFICATION EVALUATION MODEL ESTABLISHING RELATIVE WEIGHTS FOR CONTRACTOR PREQUALIFICATION CRITERIA IN A PRE-QUALIFICATION EVALUATION MODEL N. El-Sawalhi 1*, D. Eaton 2, and R. Rustom 3 1, 2 Research Institute for the Built and Human

More information

TORCH-FREE BITUMEN MEMBRANE DETAILING

TORCH-FREE BITUMEN MEMBRANE DETAILING TORCH-FREE BITUMEN MEMBRANE DETAILING TORCH-FREE DETAILING System overview Our detailing solution is designed specifically to deliver secure torch-free detailing in the vicinity of combustible construction

More information

USING AHP TO PRIORITIZE PROCESS CHANGE REQUESTS IN SOFTWARE PROCESS IMPROVEMENT 1

USING AHP TO PRIORITIZE PROCESS CHANGE REQUESTS IN SOFTWARE PROCESS IMPROVEMENT 1 ISAHP 2001, Berne, Switzerland, August 2-4, 2001 USING AHP TO PRIORITIZE PROESS HANGE REQUESTS IN SOFTWARE PROESS IMPROVEMENT 1 Ipininder S. Monga Wipro Infotech ipininder@hotmail.com Shivraj Kanungo Department

More information

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION. -Module Number Session

-SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION. -Module Number Session -SQA- SCOTTISH QUALIFICATIONS AUTHORITY NATIONAL CERTIFICATE MODULE: UNIT SPECIFICATION GENERAL INFORMATION -Module Number- 4210452 -Session- 1992-93 -Superclass- TG -Title- PROVIDING SURFACE FINISHING

More information

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT

GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT GAUTENG DEPARTMENT OF INFRUSTRUCTURE DEVELOPMENT BUILDING ASSESSMENT REPORT STRUCTURAL FOR CUSTOMS HOUSE JULY 2014 i P a g e Table of Contents 1. INTRODUCTION 3 1.1 Design Criteria and Specifications..

More information

Group Decision Support System for Multicriterion Analysis A Case Study in India

Group Decision Support System for Multicriterion Analysis A Case Study in India Group Decision Support System for Multicriterion Analysis A Case Study in India K. Srinivasa Raju Department of Civil Engineering, S.E.S.College of Engineering, Kopargaon 423 603, Maharashtra, India D.Nagesh

More information

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES. Chapter 10 CONTENTS 10.1 PLASTERWORK 10.2 SECOND AND THIRD FIX FINISHES 283 Chapter 10 FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 10.1 PLASTERWORK Workmanship i. All workmanship must be within the tolerances

More information

CHAPTER 2 LITERATURE REVIEW AND THEORIES

CHAPTER 2 LITERATURE REVIEW AND THEORIES CHAPTER 2 LITERATURE REVIEW AND THEORIES This chapter is divided into two sections, the literature review and the theories related to solve the issue. The literature review consists of previous researches

More information

A Strategic Model for Cleaner Production Implementation In a Paper Making Mill

A Strategic Model for Cleaner Production Implementation In a Paper Making Mill A Strategic Model for Cleaner Production Implementation In a Paper Making Mill P. Ghorbannezhad, M. Azizi, M. Layeghi* Department of Wood & Paper Science & Technology University of Tehran E-mail: Payam.gs2008@gmail.com

More information

The evaluation research on the rural infrastructure construction of. Shaanxi based on Grey-AHP

The evaluation research on the rural infrastructure construction of. Shaanxi based on Grey-AHP Advanced Materials Research Online: 2013-12-13 ISSN: 1662-8985, Vols. 869-870, pp 172-177 doi:10.4028/www.scientific.net/amr.869-870.172 2014 Trans Tech Publications, Switzerland The evaluation research

More information

A Fuzzy Analytic Hierarchy Process Approach for Optimal Selection of Manufacturing Layout

A Fuzzy Analytic Hierarchy Process Approach for Optimal Selection of Manufacturing Layout A Fuzzy Analytic Hierarchy Process Approach for Optimal Selection of Manufacturing Layout Lindley Bacudio 1, Giselle Joy Esmeria 1 and Michael Angelo Promentilla 2 1 Industrial Engineering Department,

More information

Specification. Project Name: Project reference: Written: by: Cathal Quinn Tel:

Specification. Project Name: Project reference: Written: by: Cathal Quinn   Tel: Project reference: 010050 Specification Project Name: Written: by: Cathal Quinn Email: cathal@moymaterials.com Tel: 07788 934895 Moy Materials Victoria House (4 th Floor) Victoria Road Chelmsford CM1 1JR

More information

Calgary Housing Company Asset Management Audit

Calgary Housing Company Asset Management Audit Calgary Housing Company Asset Management Audit October 5, 2015 THIS PAGE INTENTIONALLY LEFT BLANK ISC: UNRESTRICTED Table of Contents Table of Contents... 3 Executive Summary... 5 1.0 Background... 7 2.0

More information

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES

CHAPTER 10: Finishes CONTENTS 10.1 PLASTERWORK ND AND 3 RD FIX FINISHES CONTENTS 10.1 PLASTERWORK 10.2 2 ND AND 3 RD FIX FINISHES FUNCTIONAL REQUIREMENT 10.1 Plasterwork Workmanship Design Technical Manual TS-011-09-010412 i. All workmanship must be within defined tolerances

More information

FUNCTIONAL REQUIREMENTS

FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS FUNCTIONAL REQUIREMENTS 7.6 BALCONIES Workmanship i. All workmanship must be within the tolerances defined in Chapter 1 of this manual. ii. All work is to be carried out by a technically

More information

Supplier Selection Using Analytic Hierarchy Process: An Application From Turkey

Supplier Selection Using Analytic Hierarchy Process: An Application From Turkey , July 6-8, 2011, London, U.K. Supplier Selection Using Analytic Hierarchy Process: An Application From Turkey Betül Özkan, Hüseyin Başlıgil, Nergis Şahin Abstract Decision making is one of the most activities

More information

PERMAPHALT MASTIC ASPHALT ROOF WATERPROOFING SYSTEM. Product. Scope. Appraisal No [2018] Appraisal No (2018) BRANZ Appraisals

PERMAPHALT MASTIC ASPHALT ROOF WATERPROOFING SYSTEM. Product. Scope. Appraisal No [2018] Appraisal No (2018) BRANZ Appraisals PERMAPHALT MASTIC ASPHALT ROOF WATERPROOFING SYSTEM s Technical Assessments of products for building and construction. Neuchatel Limited 5a Miro Place Albany Auckland Tel: 09 441 4595 Email: info@neuchatel.co.nz

More information

PEKAY T570 RUBBERSEAL

PEKAY T570 RUBBERSEAL PEKAY T570 RUBBERSEAL DESCRIPTION Pekay Rubberseal T570 is a rubber-latex modified anionic bitumen emulsion, which dries to a pliable, flexible, waterproof, black coating. It may be used for a variety

More information

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES

DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES SECTION 15420 DRAINAGE AND VENT SYSTEMS PART 1 DESIGN DIRECTIVES 1.1 DESIGN CRITERIA A. All cleanouts above finished (accessible and non-accessible) ceilings shall be extended to the floor above. B. Do

More information

PRACTICE NOTES FOR QUANTITY SURVEYORS

PRACTICE NOTES FOR QUANTITY SURVEYORS PRACTICE NOTES FOR QUANTITY SURVEYORS Pre-Contract Estimates And Cost Plans Preface Preface A Working Committee with representatives from The Hong Kong Institute of Surveyors, Association of Consultant

More information

CERAMIC FLOORING TRADE SPECIFICATION

CERAMIC FLOORING TRADE SPECIFICATION CERAMIC FLOORING TRADE SPECIFICATION Revision G. Date 01/11/13 GENERAL a) BDW Trading Limited Barratt Homes, David Wilson Homes and Ward Homes are all trading names of BDW Trading Limited the Company.

More information