1 Grout Filled Steel Pipe Integrated With Shear Key for Precast Concrete Connection AHMAD BAHARUDDIN ABD. RAHMAN and ONG HERN YEE Department of Structure and Materials, Faculty of Civil Engineering Department Universiti Teknologi Malaysia, Skudai, Johor, MALAYSIA Abstract: - This paper presents the use of steel pipe integrated with shear keys as an alternative for splice connections in precast concrete construction. The experimental results involved 17 grout-filled splice sleeve with different configuration, in terms of reinforcement bar sizes, embedment length of reinforcement bar and embedment length of shear key were subjected to tensile test. All the specimens were subjected to increasing axial tension until failure. The effect of reinforcement bar sizes, embedment length of reinforcement bar and embedment length of shear key on the ultimate tensile load and mode of failure were analysed. The results shows that an inexpensive steel pipe combined with shear keys can be adopted as a connection for use in precast concrete construction. Key-Words: - Grouted splice connection, confinement, ultimate bond stress, precast concrete connection. 1 Introduction Precast concrete buildings have gained popularity worldwide, see Figure 1. Buildings which were previously constructed with cast-in-situ concrete could be constructed with precast concrete components prefabricated in the factories. These ready-made loose components such as precast concrete wall panels are installed on site. To facilitate the process of installation, connections such as special reinforced bar splicing systems are needed to join the loose precast concrete components together. Also, the connection has the ability to increase the structural integrity of precast concrete components. Fig. 1: Precast concrete wall building In Malaysia, there are currently two methods for connecting precast concrete structural members; ISBN:

2 first is the conventional lapping of reinforcement bar and second, the mechanical connections such as splice sleeve connections. A sleeve is a cylindrical shape mechanical coupler that is used to join steel reinforcement bars for joining precast concrete components, see Figure 2. This sleeve act as a reinforcement bar connection using non shrink high strength grout as the medium for load transferring and bonding material. The grout provides a continuity of compressive forces across the joints whereas the reinforcement bars provide continuity for tensile forces. The use of grouted sleeve connections in precast concrete structure reduces the lap length of reinforcement bars. Fig. 2: Precast concrete wall to wall connection In the late 60 s, Dr. Alfred A. Yee developed a grouted splice sleeve connection. This mechanical coupler can be embedded into the precast units and grouted by injection from the exterior, resulting in a fully continuous reinforcement steel splice with no pockets to patch during erection [1]. It utilizes grout to transfer the forces in one bar to another to achieve continuity of the reinforcement in the precast structural members. Bond between steel and concrete is essential for the integrity of any reinforced concrete structure. Nevertheless, bond is a complex problem and depends on many parameters. Due to its significance for practical design, the study of bond between steel and concrete has always been a popular issue in the field of research. According to Untrauer and Henry [2], bond can be defined as the adhesion of concrete or mortar to reinforcement bar or to other surfaces against which it is placed. Bond can also be defined simply as the gripping effect of an annulus, usually concrete or cement on an embedded length of a steel bar to resist the tendency of forces to slide the bar longitudinally [3]. Abrams [4], who first mentioned the deformability characteristics of bond-slip relationship and reported the results of about 1500 pull-out tests carried out in displacement said that there are two different mechanisms of load transfer between the bar and the surrounding concrete: 1. The adhesive resistance, developed before relative movement between bar and concrete (slip) begins, and 2. sliding resistance, when this slip takes place. Adhesive resistance is due to tangential adhesion, of a chemical nature, and static friction. As soon as the sum of these contributions is overcome, a relative movement takes place and bond stress develops with a frictional mechanism (sliding resistance); this mechanism has the same nature with respect to the static friction component. The quality of bond between the reinforcement bar and the grout to ensure the success of load transfer depends on many factors such as grout compressive strength and confinement. There have been a number of research studies on the effects of concrete confinement on the bond behaviour and the effective bond strength between reinforcing bars and the surrounding concrete. From a structural point of view, confinement is achieved by applying force in a direction perpendicular to the applied stress. Moreover, confinement can also be achieved by means of transverse reinforcement, by providing thick concrete cover to the main reinforcing bar, or by increasing the spacing between the reinforcing bars. One of the earliest investigation works on the effect of lateral pressure on bond was done by Untrauer and Henry [2]. They found out that the bond strength between steel and concrete increases linearly with normal pressure. They also derived an equation that represents the relationship between the compressive strength of concrete, normal pressure and reinforcing bond strength. The effects of confinement on bond behaviour can also be observed through the modes of bond failure. Typically, bond failure of deformed bars involves local crushing of concrete in front of the bar ribs, and splitting of the concrete due to radial cracks around the bar. When the confinement provided by either surrounding concrete or transverse reinforcement is large or the rib height is small, the local crushing occurs. This mechanism of bond failure tends to be ductile. However, splitting of the concrete dominates when the confinement is small or the rib height is large, the failure mechanism is brittle [5]. Lutz and Gergely [6] found out that in cases where confinement is not provided, deformed bars fail in bond by splitting, which depends mainly on the force on the concrete and not so significant on the bar stress and the bar perimeter (see Figure ISBN:

3 3(a)). In the present of confinement, normally by the use of stirrups or a large concrete cover, bond failure occurs by shear failure of the concrete keys between the steel ribs, see Figure 3(b), and the ultimate load per unit length depends increasingly on the bar perimeter. After adhesion is lost and ribs begin to bear on the concrete, slip occurs by progressive crushing of the porous concrete paste structure in front of the rib. The compacted crushed concrete creates a wedge that becomes lodged in front of the rib and moves along with it [6]. This produces a rib with a face angle of 30 to 40 degrees. Thus, as the load acting on the reinforcing bar increases, the angle at which the steel rib bears on the concrete changes. The consequence is radial splitting stresses tend to increase at a rate greater than the parallel bond stresses as tensile load in the bar rises. pipe which will be detailed as A Y16 represents Series A with 35 mm shear key length, pipe length of 210 mm and main bar diameter of 16 mm, in high yield grade steel, respectively. All the specimens were subjected to increasing axial tensile loads in order to determine the maximum capacity and failure modes of the connections. The purpose was to study the bond behaviour of the connections as well as to investigate the feasibility of the different configurations of the grouted pipe connection. Table 1 and Figure 4 show the specimen identification descriptions and details of the specimens with further dimensions and properties. All the specimens had the same inner pipe diameter of 52 mm. Specimens in A Series have shear key with length of 35 mm, whereas B series and C series had shear key of length 65 mm and 95 mm respectively. The shear keys consisted of high yield deformed steel reinforcement welded to the inside of steel pipes. Only B series was slightly unique as the three sizes of reinforcement bar of Y12, Y16 and Y20 were analysed together with the variation in shear key embedment length that made up a total of nine specimens in this series. Table 1: Specimen details (a) (b) Fig. 3: (a) Bond failure by splitting (b). Bond failure by shearing of concrete keys in between ribs [6] 2 Experimental Program The experimental program was conducted to study the behavior and performance of a proposed grouted pipe connection with integrated shear keys that involved 17 specimens with different parameters such as embedment length of reinforcement, diameter of reinforcement bar and length of shear key incorporated in the sleeve pipe. The specimens were divided into three series, namely A, B and C series. The names were based on the length of shear key incorporated in the sleeve ISBN:

4 Fig. 4: Details of connection In preparing the specimens, plywood frames were made to hold the specimens and reinforcement bars in position, to ease the process of pouring grout into the sleeve pipe. The sleeve pipe was first tied onto the frame before the reinforcement bar was inserted into the pipe and tied onto the frame. Steel wires were used to tie the reinforcement bars and pipe sleeve in position and the bottom part of sleeve was covered with plywood filled with silicone to prevent grout from flowing out during grouting. After the reinforcement bars and pipes were fixed on the plywood frames as shown in Figure 5, the grouting was performed. The grout was mixed using a mixer according to the specification as stated. The grouting process was done by pouring the grout into a cone connecting to the pipe. The cone was used to speed up the grouting process as the whole grouting process must be done within half an hour to prevent the grout from harden. All the specimens were loaded with increasing axial force to failure, see Figure 6. The tensile tests were carried out after 28 days, to allow the grout to achieve the target strength. The maximum applied load up to the point of failure was recorded using a computer, and the mode of failure was observed and documented. All the specimens were also equipped with strain gauges to measure the longitudinal strains in the pipe and the axial strains in the reinforcement bar. Fig. 6: Experimental setup of the specimen 3 Results and Discussion Table 2 summarizes the test results for all the specimens. The results are categorized according to the type of series, specimen labels, ultimate tensile load, displacement and mode of failure. In addition, the specimen series consisted of control specimens, i.e. 1. The upper boundary condition consisted of steel pipe with three shear keys which are fully integrated in the pipe ends and 2. The lower boundary condition, consisted of pipe without any shear key provided in the sleeve. Table 2: Test results Figures 7, 8 and 9 show the modes of failure that occurred to the specimens. Fig. 5: Assembly of the specimens on the plywood frame ISBN:

5 35 mm is adequate to ensure the main bar fractured outside the sleeve. Referring to Table 2, similarly, for other specimens with shear keys of 65 mm and 95 mm and with main bar of Y12, Y16 and Y20 no groutpipe failure occurred. Therefore, in short a minimum of 3 shear keys with length of 35 mm is adequate to ensure that there is no grout-pipe failure. Fig. 7: Bar tensile failure for A Y16 Fig. 10: Tensile load versus the length of shear key Fig. 8: Grout-bar bond failure for B Y16 Fig. 9: Grout-pipe bond failure for control specimen Y20 bar without any shear key 3.1 Effect of Shear Key Length The shear keys were provided to avoid groutpipe bond failure. Figure 10 shows the response of tensile load versus length of shear key. From the A Series with shear key length of 35 mm, Specimens A Y16 with main bar embedment length of 100 mm and A Y16 with main bar embedment length of 150 mm failed at kn and kn respectively by grout-bar bond failure. On the other hand, Specimen A Y16 with similar 35 mm shear key length but with main bar embedment length of 200 mm failed by bar fracture. The results of A series with Y16 main bar showed that there was no grout-pipe bond failure. These results indicate that for Y16 main bar with embedment length of 200 mm, a shear key length of Another two control specimens were tested to further study the effect of shear key length on the mode of failure, namely the lower bound Y20 and upper bound Y20. The mode of failure for lower bound Y20 was grout-pipe bond failure whereas for the upper bound Y20 was grout-bar bond failure. These two specimens proved that lower bound Y20, without shear key, had caused the grout to be pulled out together with the reinforcement bar. Then, when shear key of length 65mm was provided as in specimen B Y20, the mode failure observed was grout-bar bond failure. This finding shows that the addition of shear key has provided good bond resistance between the pipe and grout and eventually provide enough resistance to avoid slippage of grout from the steel pipe. As pulling force was applied on reinforcement bar, the interlock between grout key and bar ribs resisted the slippage of main bar. The inclined surfaces of ribs caused resultant resistance force which can be derived into two components; normal and longitudinal to the reinforcement bar as shown in Figure 11. Shear resistance of grout keys between bar ribs resisted the longitudinal component resulting in reduction of slippage of reinforcement bar. On the other hand, the normal component caused the grout to move away from the reinforcement bar, which led to splitting force, where the grout moved outwards and split at all direction. The combination of these two components then caused splitting cracks onto the grout surrounding the reinforcement bar. ISBN:

6 However, the confinement by the steel pipe controls the action of splitting by the grout as a result of pulling action [7], [8]. It can be observed in Figure 12, the pattern of cracks on the side of the connection as a result of confinement by sleeve and shear key. Fig. 13: Tensile load versus the embedment length of reinforcement bar Fig. 11: The normal and longitudinal components acting from the rib surfaces [7] (a) (b) Fig. 12: a) Normal forces exhibited by bar ribs; b) Sleeve providing confinement to control crack splitting [7] 3.2 Effect of Size of Reinforcement Bar Three different sizes of reinforcement bar were tested and the results are as shown in Figure 13. The three sizes of reinforcement bar exhibited the same characteristics, which is as the embedment length of reinforcement bar increases, the ultimate tensile load increases. One clear finding from the figure indicates that only the series of reinforcement bar of Y20 show significant increase whereas the other two series of Y12 and Y16 show slight increase. Referring to Table 2, for larger bar size of 20 mm, the embedment lengths of 100 mm and 150 mm are not adequate to achieve bar fracture failure, as can be seen from Specimens B Y20 and B Y20 which failed by bar-grout bond failure. 3.2 Effect of Embedment Length of Main Reinforcement Bar From the test results shown in Figure 14, it can observed that as the embedment length of reinforcement bar increases, the ultimate tensile load increases for all three different length of shear key provided in the sleeve. All specimens with embedment length of reinforcement bar of 200mm failed by bar fractured. Amin Einea [10], concluded that the lap splice or embedment length as short as seven times the bar diameter can achieve bar development when the appropriate grout compressive strength and confinement are provided. From the results shown in Table 3, only three specimens failed by bar tensile failure which were A Y16, B Y16 and C Y16. These three specimens have adequate development and embedment length as short as seven times as required. Thus, judging from the ratio of L e /Ø for the three specimens which are for A Y16, 8.44 for B Y16 and 6.56 for C Y16, these results further clarify the Amin Einea s finding which stated that lap splice or embedment lengths as short as seven times the bar diameter can achieve bar development when the appropriate grout compressive strength and confinement are provided. ISBN:

7 Table 3: Ratio of embedment length/bar diameter L e /Ø results discussed in this paper show the performance of the connections under axial tension only. In real practice, the connections such as in the precast concrete wall-to-wall or column-to-column might be subjected to bending. Therefore further tests of the connections subjected to increasing flexural load could be studied. Acknowledgement The authors would like to thank the Universiti Teknologi Malaysia (UTM) for the financial support offered in conducting this experimental study. From the result, it is observed that embedment length of approximately 7 times is required for specimen C Y16 to achieve bar fractured failure. As the length of shear key increases, the ratio of L e /Ø decreases. 4 Conclusion Based on the results of this experimental study, the following conclusions can be drawn: 1. The incorporation of shear key changes the mode of failure from grout-pipe bond failure to grout-bar bond failure. All specimens with shear key did not showed any grout-pipe bond failure. The addition of shear key improves the performance of splice connection and only a minimum 35 mm length of shear key is needed to avoid grout-pipe bond failure. 2. As the diameter of reinforcement bar in the connection increases, the larger embedment length of main reinforcement is required to achieve bar fracture failure outside the steel pipe. 3. The effect of embedment length of reinforcement bar plays a significant role in determining the performance of the splice sleeve. A minimum embedment length of 200 mm is required to ensure Y12, Y16 and Y20 bars fracture failure outside the steel pipe. The experimental configuration showed convincing results as more than half of the connections fulfilled the requirement for a successful splice connection. However, the test References: [1] Yee, Alfred, A., Structural and economic benefits of precast/prestressed concrete construction, PCI Journal, [2] Untrauer, R.E., and Henry, R.., Influence of normal pressure on bond strength, ACI Journal, V.69, No. 5, [3] Mahdi, M., Ahmad, J., and Arash, K. 2003, Bond of cement grouted reinforcing bars under constant radial pressure, Master Project, Universiti Teknologi Malaysia, [4] Abrams, D. 1913, Test of bond between concrete and steel, Bulletin No.71, Univ. Illinois Bull. [5] Tepfers, R., A theory of bond applied to overlapped tensile reinforcement slices for deformed bars, Chalmers University of Technology, Division of Concrete Structures, 1973 [6] Lutz, L. A., and Gergely, P., Mechanics of Bond and Slip of Deformed Bars in Concrete, ACI Journal, American Concrete Institute, Vol. 64, No. 11, [7] Ling, J.H., Baharuddin, A., Karim, A., and Hamid, Z.A. 2008, Performance of CS sleeve under direct tensile load, Part I failure modes, Malaysian Journal of Civil Engineering, Vol. 20, No [8] Seyed Jamal Aldin Hosseini and Ahmad Baharuddin Abd. Rahman, Analysis of spiral reinforcement in grouted pipe splice connectors, Građjevinar, 65 (6), 1-10, [9] Seyed Jamal Aldin Hosseini, Ahmad Baharuddin Abd. Rahman, Mohd Hanim Osman, Aziz Saim, Azlan Adnan, Bond behavior of spirally confined splice of deformed bars in grout, Construction and Building Materials, Elsevier, Vol. 80, [10] Einea, A., Yamane, T., Tadros, M.K. 1995, Grout-filled pipe splices for precast concrete construction, PCI Journal ISBN:

World Engineering Congress 2010, 2 nd 5 th August 2010, Kuching, Sarawak, Malaysia Conference on Engineering and Technology Education

World Engineering Congress 2010, 2 nd 5 th August 2010, Kuching, Sarawak, Malaysia Conference on Engineering and Technology Education STRUCTURAL PERFORMANCE OF SPLICE SLEEVE CONNECTOR WITH VERTICAL AND SPIRAL REINFORCEMENT BAR UNDER DIRECT TENSILE LOAD Shuhaimi Shaedon 1, Ahmad Baharuddin Abd Rahman 2, Izni Syahrizal Ibrahim 3, Zuhairi

More information

PERFORMANCE OF SPLICE SLEEVE CONNECTOR WITH SPIRAL REINFORCEMENT BAR UNDER DIRECT TENSILE LOAD

PERFORMANCE OF SPLICE SLEEVE CONNECTOR WITH SPIRAL REINFORCEMENT BAR UNDER DIRECT TENSILE LOAD PERFORMANCE OF SPLICE SLEEVE CONNECTOR WITH SPIRAL REINFORCEMENT BAR UNDER DIRECT TENSILE LOAD Shuhaimi Shaedon 1, Ahmad Baharuddin Abd. Rahman 2, Izni Syahrizal Ibrahim 3, Zuhairi Abd. Hamid 4 1 Faculty

More information

Jurnal Teknologi BOND STRESS IN GROUTED SPIRAL CONNECTORS. Full Paper

Jurnal Teknologi BOND STRESS IN GROUTED SPIRAL CONNECTORS. Full Paper Jurnal Teknologi BOND STRESS IN GROUTED SPIRAL CONNECTORS Ahmad Baharuddin Abd Rahman *, Mahyar Mahdinezhad, Izni Syahrizal Ibrahim, Roslli Noor Mohamed Department of Structures and Materials, Faculty

More information

STRUCTURAL PERFORMANCE OF SPLICE CONNECTOR FOR PRECAST CONCRETE STRUCTURES

STRUCTURAL PERFORMANCE OF SPLICE CONNECTOR FOR PRECAST CONCRETE STRUCTURES STRUCTURAL PERFORMANCE OF SPLICE CONNECTOR FOR PRECAST CONCRETE STRUCTURES Jen Hua LING PhD Student, Dept. of Structures and Materials, Faculty of Civil Engineering, Universiti Teknologi Malaysia, Malaysia.

More information

TENSILE PERFORMANCE OF GROUTED MILD STEEL PIPE SPLICE CONNECTOR FOR PRECAST CONCRETE CONNECTION.

TENSILE PERFORMANCE OF GROUTED MILD STEEL PIPE SPLICE CONNECTOR FOR PRECAST CONCRETE CONNECTION. World Engineering Congress 1, nd 5 th August 1, Kuching, Sarawak, Malaysia TENSILE PERFORMANCE OF GROUTED MILD STEEL PIPE SPLICE CONNECTOR FOR PRECAST CONCRETE CONNECTION Ling Jen Hua 1, Ahmad Baharuddin

More information

Effects of Confinement of Tubular Pipe to Bond Stress between Deformed Steel Bar and Grout Siti Noorliyana Fadilah, Ahmad Baharuddin Abd.

Effects of Confinement of Tubular Pipe to Bond Stress between Deformed Steel Bar and Grout Siti Noorliyana Fadilah, Ahmad Baharuddin Abd. Effects of Confinement of Tubular Pipe to Bond Stress between Deformed Steel Bar and Grout Siti Noorliyana Fadilah, Ahmad Baharuddin Abd. Rahman Faculty of Civil Engineering, Universiti Teknologi Malaysia,

More information

PERFORMANCE OF GROUTED SPLICE SLEEVE CONNECTOR UNDER TENSILE LOAD Gambang, Kuantan, Pahang, Malaysia. Phone: ; Fax:

PERFORMANCE OF GROUTED SPLICE SLEEVE CONNECTOR UNDER TENSILE LOAD Gambang, Kuantan, Pahang, Malaysia. Phone: ; Fax: Journal of Mechanical Engineering and Sciences (JMES) ISSN (Print): 2289-4659; e-issn: 2231-8380; Volume 7, pp. 1094-1102, December 2014 Universiti Malaysia Pahang, Malaysia DOI: http://dx.doi.org/10.15282/jmes.7.2014.8.0106

More information

Tensile performance of grouted splice connectors in precast concrete structures

Tensile performance of grouted splice connectors in precast concrete structures Precast connection detailing Tensile performance of grouted splice connectors in precast concrete structures This paper presents the test results of twelve grouted splice connectors, made from standard

More information

In-plane testing of precast concrete wall panels with grouted sleeve

In-plane testing of precast concrete wall panels with grouted sleeve In-plane testing of precast concrete wall panels with grouted sleeve P. Seifi, R.S. Henry & J.M. Ingham Department of Civil Engineering, University of Auckland, Auckland. 2017 NZSEE Conference ABSTRACT:

More information

EFFECT OF RIB GEOMETRY ON BOND BEHAVIOR AND FAILURE MODES

EFFECT OF RIB GEOMETRY ON BOND BEHAVIOR AND FAILURE MODES VIII International Conference on Fracture Mechanics of Concrete and Concrete Structures FraMCoS-8 J.G.M. Van Mier, G. Ruiz, C. Andrade, R.C. Yu and X.X. Zhang (Eds) EFFECT OF RIB GEOMETRY ON BOND BEHAVIOR

More information

Experimental Investigation of Vertical Connections in Precast Wall Panel under Shear Load

Experimental Investigation of Vertical Connections in Precast Wall Panel under Shear Load IJSTE - International Journal of Science Technology & Engineering Volume 2 Issue 12 June 2016 ISSN (online): 2349-784X Experimental Investigation of Vertical Connections in Precast Wall Panel under Shear

More information

EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS

EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS EXPERIMENTAL INVESTIGATION ON THE INTERACTION OF REINFORCED CONCRETE FRAMES WITH PRECAST-PRESTRESSED CONCRETE FLOOR SYSTEMS B.H.H. Peng 1, R.P. Dhakal 2, R.C. Fenwick 3, A.J. Carr 4 and D.K. Bull 5 1 PhD

More information

Development Length, Lap Splices and curtailment of reinforcement

Development Length, Lap Splices and curtailment of reinforcement Lecture 05 Development Length, Lap Splices and curtailment of reinforcement By: Prof Dr. Qaisar Ali Civil Engineering Department UET Peshawar drqaisarali@uetpeshawar.edu.pk 1 Topics Addressed Development

More information

Grout-Filled Pipe Splices for Precast Concrete Construction

Grout-Filled Pipe Splices for Precast Concrete Construction Grout-Filled Pipe Splices for Precast Concrete Construction Amin Einea Ph.D., P.E., S.E. Research Assistant Professor Center for Infrastructure Research University of Nebraska-Lincoln Omaha, Nebraska Takashi

More information

Compression Test for Precast Encased Composite Columns with Corrugated Steel Tube

Compression Test for Precast Encased Composite Columns with Corrugated Steel Tube Compression Test for Precast Encased Composite Columns with Corrugated Steel Tube *Kwang-Won Jo 1) and Hong-Gun Park 2) 1), 2) Dept. of Architecture and Architectural Engineering, Seoul National Univ.,

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 INVESTIGATION OF GROUTED PRECAST CONCRETE WALL CONNECTIONS AT SUBFREEZING CONDITIONS Douglas J. Provost-Smith MSc Student, University of Western Ontario, Canada

More information

Southeast University, Nanjing, Jiangsu , China. *Corresponding author

Southeast University, Nanjing, Jiangsu , China. *Corresponding author 2017 International Conference on Energy, Environment and Sustainable Development (EESD 2017) ISBN: 978-1-609-2-3 Experimental Study on Seismic Performance of Full Precast Shear Wall-Frame Structures Jun-wei

More information

Joint Design of Precast Concrete Moment Frame using Hollow Precast Concrete Column Soo-Yeon Seo, Tae-Wan Kim, Jong-Wook Lim, Jae-Yup Kim

Joint Design of Precast Concrete Moment Frame using Hollow Precast Concrete Column Soo-Yeon Seo, Tae-Wan Kim, Jong-Wook Lim, Jae-Yup Kim Joint Design of Precast Concrete Moment Frame using Hollow Precast Concrete Column Soo-Yeon Seo, Tae-Wan Kim, Jong-Wook Lim, Jae-Yup Kim Abstract In order to develop a proper design procedure of the joints

More information

An Experimental Study of Welded Bar Sleeve Wall Panel Connection under Tensile, Shear, and Flexural Loads

An Experimental Study of Welded Bar Sleeve Wall Panel Connection under Tensile, Shear, and Flexural Loads International Journal of Concrete Structures and Materials Vol.11, No.3, pp.525 540, September 2017 DOI 10.1007/s40069-017-0202-y ISSN 1976-0485 / eissn 2234-1315 An Experimental Study of Welded Bar Sleeve

More information

PERFORMANCE OF AN INNOVATIVE PRE-CAST COLD-FORMED STEEL AS COMPOSITE BEAM WITH SINGLE AND DOUBLE C- CHANNELS

PERFORMANCE OF AN INNOVATIVE PRE-CAST COLD-FORMED STEEL AS COMPOSITE BEAM WITH SINGLE AND DOUBLE C- CHANNELS PERFORMANCE OF AN INNOVATIVE PRE-CAST COLD-FORMED STEEL AS COMPOSITE BEAM WITH SINGLE AND DOUBLE C- CHANNELS 1 ANIS SAGGAFF, 2 MAHMOODMD TAHIR, 3 TALAL AL-HAJRI, 4 POI-NGIAN SHEK, 5 MOHAMMADAMIN AZIMI

More information

Chapter 2 Notation and Terminology

Chapter 2 Notation and Terminology Reorganized 318 Chapter Titles Chapter 1 General 1.1 Scope 1.2 Purpose 1.3 Interpretation 1.4 Drawings and Specifications 1.5 Testing and Inspection 1.6 Administatration and Enforcement 1.6.1 Retention

More information

CHAPTER III METHODS AND MATERIALS

CHAPTER III METHODS AND MATERIALS CHAPTER III METHODS AND MATERIALS 3.1: Tensile Tests 3.1.1: Introduction The first phase of testing for the experimental program, was to conduct tensile tests of No. 4, No. 5, and No. 6 nominal diameter

More information

K. Ahmed 1, Z. A. Siddiqi 1 & M. Yousaf 1

K. Ahmed 1, Z. A. Siddiqi 1 & M. Yousaf 1 Slippage of Steel in High and Normal Strength Concrete K. Ahmed 1, Z. A. Siddiqi 1 & M. Yousaf 1 1 Assistant Professor, Civil Engineering Department, University of Engineering & Technology, Lahore, Pakistan.

More information

Lap Splices in Tension Between Headed Reinforcing Bars And Hooked Reinforcing Bars of Reinforced Concrete Beam

Lap Splices in Tension Between Headed Reinforcing Bars And Hooked Reinforcing Bars of Reinforced Concrete Beam IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 232-334X, Volume 13, Issue 3 Ver. I (May- Jun. 216), PP 71-75 www.iosrjournals.org Lap Splices in Tension Between

More information

CHAPTER 10: GENERAL STRUCTURAL DETAILS

CHAPTER 10: GENERAL STRUCTURAL DETAILS CHAPTER 10: GENERAL STRUCTURAL DETAILS 10.1 GENERAL It shall be in accordance with JSCE Standard Specification (Design), 9.1, "steel" shall be taken to signify "steel or CFRM". 10.2 CONCRETE COVER (1)

More information

Experimental study on the seismic performance of RC moment resisting frames with precast-prestressed floor units.

Experimental study on the seismic performance of RC moment resisting frames with precast-prestressed floor units. Experimental study on the seismic performance of RC moment resisting frames with precast-prestressed floor units. B.H.H. Peng, R.C. Fenwick, R.P. Dhakal & D.K. Bull Department of Civil and Natural Resources

More information

RESILIENT INFRASTRUCTURE June 1 4, 2016

RESILIENT INFRASTRUCTURE June 1 4, 2016 RESILIENT INFRASTRUCTURE June 1 4, 2016 BOND BEHAVIOUR OF GROUTED CONNECTIONS UNDER MONOTONIC TENSILE LOADS Mohamed, Elsayed PhD Student, University of Western Ontario, Canada Douglas, James Provost-Smith

More information

SEISMIC RESPONSE OF LINEAR, FLANGED, AND CONFINED MASONRY SHEAR WALLS

SEISMIC RESPONSE OF LINEAR, FLANGED, AND CONFINED MASONRY SHEAR WALLS SEISMIC RESPONSE OF LINEAR, FLANGED, AND CONFINED MASONRY SHEAR WALLS M. T. Shedid 1, W. W. El-Dakhakhni 2, and R. G. Drysdale 3 1 Ph.D. Candidate, Dept. of Civil Engineering, McMaster University, Hamilton.

More information

ABC-UTC. Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC. March, 2017

ABC-UTC. Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC. March, 2017 ABC-UTC Research Progress Report (Feasibility Study) Title: Alternative ABC Connections Utilizing UHPC ABSTRACT March, 2017 Accelerated Bridge Construction (ABC) is a method of bridge construction designed

More information

Modelling of RC moment resisting frames with precast-prestressed flooring system

Modelling of RC moment resisting frames with precast-prestressed flooring system Modelling of RC moment resisting frames with precast-prestressed flooring system B.H.H. Peng, R.P. Dhakal, R.C. Fenwick & A.J. Carr Department of Civil Engineering, University of Canterbury, Christchurch.

More information

Supplemental Plan Check List for Concrete Special Moment Resisting Frame

Supplemental Plan Check List for Concrete Special Moment Resisting Frame Plan Check / PCIS Application Number: Your feedback is important, please visit our website to complete a Customer Survey at /LADBSWeb/customer-survey.jsf. If you have any questions or need clarification

More information

SEISMIC BEHAVIOR OF RC COLUMNS WITH VARIOUS TIE CONFIGURATIONS

SEISMIC BEHAVIOR OF RC COLUMNS WITH VARIOUS TIE CONFIGURATIONS SEISMIC BEHAVIOR OF RC COLUMNS WITH VARIOUS TIE CONFIGURATIONS By Y. L. Mo, 1 Member, ASCE, and S. J. Wang 2 ABSTRACT: To expedite the fabrication of reinforcement cages of columns, a new configuration

More information

INFLUENCE OF PRSTRESS LEVEL ON SHEAR BEHAVIOR OF SEGMENTAL CONCRETE BEAMS WITH EXTERNAL TENDONS

INFLUENCE OF PRSTRESS LEVEL ON SHEAR BEHAVIOR OF SEGMENTAL CONCRETE BEAMS WITH EXTERNAL TENDONS - Technical Paper - INFLUENCE OF PRSTRESS LEVEL ON SHEAR BEHAVIOR OF SEGMENTAL CONCRETE BEAMS WITH EXTERNAL TENDONS Dinh Hung NGUYEN *1, Ken WATANABE *2, Junichiro NIWA *3 and Tsuyoshi HASEGAWA *4 ABSTRACT

More information

HRC T-Headed Bars Advantages for the user

HRC T-Headed Bars Advantages for the user HIGH PERFORMANCE REINFORCEMENT PRODUCTS HRC T-Headed Bars Advantages for the user HRC T-headed bars have some special characteristics which distinguish them from conventional reinforcement. HRC T-heads

More information

New ICC/ACI Design Concept for Post-Installed Reinforcement Bars Kelly Chua, B.Eng (Civil and Structural)

New ICC/ACI Design Concept for Post-Installed Reinforcement Bars Kelly Chua, B.Eng (Civil and Structural) New ICC/ACI Design Concept for Post-Installed Reinforcement Bars Kelly Chua, B.Eng (Civil and Structural) ABSTRACT: Post-installed reinforcement bars have always been used in structural joints of reinforced

More information

UHPC Connection of Precast Bridge Deck

UHPC Connection of Precast Bridge Deck Jan L. Vitek, Metrostav, a.s. and CTU in Prague Jiri Kolisko, CTU in Prague, Klokner Institute David Citek, CTU in Prague, Klokner Institute Stanislav Rehacek, CTU in Prague, Klokner Institute Robert Coufal,

More information

SUSTAINABLE CONCRETE COLUMNS WITH INNOVATIVE MULTI-SPIRAL SHEAR REINFORCEMENT ABSTRACT

SUSTAINABLE CONCRETE COLUMNS WITH INNOVATIVE MULTI-SPIRAL SHEAR REINFORCEMENT ABSTRACT SUSTAINABLE CONCRETE COLUMNS WITH INNOVATIVE MULTI-SPIRAL SHEAR REINFORCEMENT Samuel Y. L. Yin a, Raymond Wang b, and Tony C. Liu c ABSTRACT Lateral reinforcement used to provide shear strength, concrete

More information

An Experimental Study on the Effect of Opening on Confined Masonry Wall under Cyclic Lateral Loading

An Experimental Study on the Effect of Opening on Confined Masonry Wall under Cyclic Lateral Loading An Experimental Study on the Effect of Opening on Confined Masonry Wall under Cyclic Lateral Loading M. Suarjana, D. Kusumastuti & K.S. Pribadi Department of Civil Engineering, Institut Teknologi Bandung

More information

Ductile moment-resisting connections in glulam beams

Ductile moment-resisting connections in glulam beams Ductile moment-resisting connections in glulam beams Andy Buchanan, Peter Moss and Niles Wong Wood Technology Research Centre, and Department of Civil Engineering University of Canterbury, Christchurch

More information

Behavior of Reinforced Concrete Walls with Mesh Reinforcement Subjected to Cyclic Loading

Behavior of Reinforced Concrete Walls with Mesh Reinforcement Subjected to Cyclic Loading 17 Published in 5th International Symposium on Innovative Technologies in Engineering and Science 29-3 September 17 (ISITES17 Baku - Azerbaijan) Behavior of Reinforced Concrete Walls with Mesh Reinforcement

More information

PRESTRESSED CONCRETE STRUCTURES. Amlan K. Sengupta, PhD PE Department of Civil Engineering Indian Institute of Technology Madras

PRESTRESSED CONCRETE STRUCTURES. Amlan K. Sengupta, PhD PE Department of Civil Engineering Indian Institute of Technology Madras PRESTRESSED CONCRETE STRUCTURES Amlan K. Sengupta, PhD PE Department of Civil Engineering Indian Institute of Technology Madras Module 5: Analysis and Design for Shear and Torsion Lecture-23: Analysis

More information

Ductile Detailing for Earthquake Resistant R C Structures. Dr. S. K. PRASAD Professor of Civil Engineering S.J. College of Engineering Mysore

Ductile Detailing for Earthquake Resistant R C Structures. Dr. S. K. PRASAD Professor of Civil Engineering S.J. College of Engineering Mysore Ductile Detailing for Earthquake Resistant R C Structures Dr. S. K. PRASAD Professor of Civil Engineering S.J. College of Engineering Mysore 570 006 1 Ductile Detailing Objective To provide adequate toughness

More information

REVIEW PAPER ON USAGE OF FERROCEMENT PANELS IN LIGHTWEIGHT SANDWICH CONCRETE SLABS

REVIEW PAPER ON USAGE OF FERROCEMENT PANELS IN LIGHTWEIGHT SANDWICH CONCRETE SLABS REVIEW PAPER ON USAGE OF FERROCEMENT PANELS IN LIGHTWEIGHT SANDWICH CONCRETE SLABS K. Vetri Aadithiya 1, Dr. P. Chandrasekaran 2 1PG Student, Department of Civil Engineering, Kongu Engineering College,

More information

Seismic Behavior of Two-Story Shear Wall with Concrete Filled Steel Tube Columns

Seismic Behavior of Two-Story Shear Wall with Concrete Filled Steel Tube Columns Seismic Behavior of Two-Story Shear Wall with Concrete Filled Steel Tube Columns Liwei Wu, Youpo Su, Jianwei Chen, Liutao Han Abstract To investigate the seismic behavior of concrete filled steel tube

More information

EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF INTERIOR JOINTS OF PRECAST PRESTRESSED CONCRETE FRAMES

EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF INTERIOR JOINTS OF PRECAST PRESTRESSED CONCRETE FRAMES EXPERIMENTAL STUDY ON SEISMIC BEHAVIOR OF INTERIOR JOINTS OF PRECAST PRESTRESSED CONCRETE FRAMES J. Feng, J.G. Cai, H.J. Zhu, L.F. Huang 4 and Y. Chen 5 Professor, School of Civil Engineering, Southeast

More information

ACCEPTANCE CRITERIA FOR THREADED HIGH-STRENGTH STEEL BARS FOR CONCRETE REINFORCEMENT PREFACE

ACCEPTANCE CRITERIA FOR THREADED HIGH-STRENGTH STEEL BARS FOR CONCRETE REINFORCEMENT PREFACE www.icc-es.org (800) 423-6587 (562) 699-0543 A Subsidiary of the International Code Council ACCEPTANCE CRITERIA FOR THREADED HIGH-STRENGTH STEEL BARS FOR CONCRETE REINFORCEMENT AC237 Approved June 2009

More information

TECHNICAL MANUAL. SUMO Wall Shoe. For Bolted Wall Connections

TECHNICAL MANUAL. SUMO Wall Shoe. For Bolted Wall Connections TECHNICAL MANUAL Wall Shoe For Bolted Wall Connections Version: PEIKKO GROUP 11/2014 Wall Shoe For bolted wall connections System benefits Strong tensile connection: enables shear walls to be built of

More information

Seismic Detailing of RC Structures (IS: )

Seismic Detailing of RC Structures (IS: ) Seismic Detailing of RC Structures (IS:13920-1993) Sudhir K Jain Indian Institute of Technology Gandhinagar November 2012 1 Outline This lecture covers: Covers important clauses of IS13920 With particular

More information

Seismic Behaviour of RC Shear Walls

Seismic Behaviour of RC Shear Walls Ductile Detailing of RC Structures :: IS:13920-1993 1993 Short Course on Seismic Design of RC Structures Durgesh C. Rai Department of Civil Engineering, IIT Kanpur The material contained in this lecture

More information

Experimental study on bending behavior of prefabricated dry connection wall

Experimental study on bending behavior of prefabricated dry connection wall Experimental study on bending behavior of prefabricated dry connection wall *Xiang-Guo Wu 1) and Xinlei Xia 2) 1),2) Key Lab of Structures Dynamic Behavior and Control of the Ministry of Education, Harbin

More information

International Journal of Advance Engineering and Research Development REVISION OF IS: A REVIEW (PART 2)

International Journal of Advance Engineering and Research Development REVISION OF IS: A REVIEW (PART 2) Scientific Journal of Impact Factor (SJIF): 4.72 International Journal of Advance Engineering and Research Development Volume 5, Issue 01, January -2018 REVISION OF IS: 13920 A REVIEW (PART 2) Dr. Archana

More information

PRECAST CONCRETE CONNECTIONS

PRECAST CONCRETE CONNECTIONS PRECAST CONCRETE CONNECTIONS IES lecture 24 Oct 2018, Wed (750pm-830pm) Dr. Kong Kian Hau SENIOR LECTURER (CEE NUS) B.Eng (Civil) (1 st Class Hons., NUS), PhD (Structural Engineering), Chartered Structural

More information

SHEAR OF CONCRETE MASONRY WALLS

SHEAR OF CONCRETE MASONRY WALLS 11 th Canadian Masonry Symposium, Toronto, Ontario, May 31- June 3, 2009 SHEAR OF CONCRETE MASONRY WALLS A.F. Oan 1 and N.G. Shrive 2 1 PhD Student, Department of Civil Engineering, University of Calgary,

More information

Eurocode 8 Timber and Masonry structures

Eurocode 8 Timber and Masonry structures Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 8 Timber and Masonry structures E C Carvalho, Chairman TC250/SC8 Brussels, 18-20 February 2008 Dissemination of information

More information

EXPERIMENTAL INVESTIGATION ON SEISMIC BEHAVIOUR OF KNEE JOINTS IN REINFORCED CONCRETE FRAMES

EXPERIMENTAL INVESTIGATION ON SEISMIC BEHAVIOUR OF KNEE JOINTS IN REINFORCED CONCRETE FRAMES EXPERIMENTAL INVESTIGATION ON SEISMIC BEHAVIOUR OF KNEE JOINTS IN REINFORCED CONCRETE FRAMES Shaoliang BAI 1, Jianping FU 2 And Chuan ZHANG 3 SUMMARY On the basis of cyclic loading experiments of twenty

More information

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS

CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS 30 CHAPTER 3 BEHAVIOUR OF FERROCEMENT HOLLOW SLABS 3.1 INTRODUCTION There are numerous similarities between ferrocement and reinforced concrete. Both use similar matrix and reinforcement materials. They

More information

Fagà, Bianco, Bolognini, and Nascimbene 3rd fib International Congress

Fagà, Bianco, Bolognini, and Nascimbene 3rd fib International Congress COMPARISON BETWEEN NUMERICAL AND EXPERIMENTAL CYCLIC RESPONSE OF ALTERNATIVE COLUMN TO FOUNDATION CONNECTIONS OF REINFORCED CONCRETEC PRECAST STRUCTURES Ettore Fagà, Dr, EUCENTRE, Pavia, Italy Lorenzo

More information

OVERVIEW OF EMPIRICAL EQUATION PREDICTION FOR ULTIMATE AXIAL LOAD OF PRECAST LIGHTWEIGHT FOAMED CONCRETE SANDWICH PANEL (PLFP)

OVERVIEW OF EMPIRICAL EQUATION PREDICTION FOR ULTIMATE AXIAL LOAD OF PRECAST LIGHTWEIGHT FOAMED CONCRETE SANDWICH PANEL (PLFP) OVERVIEW OF EMPIRICAL EQUATION PREDICTION FOR ULTIMATE AXIAL LOAD OF PRECAST LIGHTWEIGHT FOAMED CONCRETE SANDWICH PANEL (PLFP) W. I. Goh 1, N. Mohamad 1, R. Abdullah 2 and A. A. A. Samad 1 1 Universiti

More information

Hybrid-steel concrete connections under reversed cyclic loadings

Hybrid-steel concrete connections under reversed cyclic loadings Hybrid-steel concrete connections under reversed cyclic loadings Bing Li, W.K. Yip and C.L. Leong Nanyang Technological University, Sch. of Civil & Env. Eng., Singapore 639798 ABSTRACT: The aim of the

More information

COLUMNS 1- Definition: The Egyptian code defines columns as : 2- Types of concrete columns

COLUMNS 1- Definition: The Egyptian code defines columns as : 2- Types of concrete columns COLUMNS 1- Definition: Columns are vertical compression members which carry primarily axial compression load; the axial load may be associated with bending moments in one or two directions, as shown in

More information

Behavior and Strength of Slab-Edge Beam-Column Connections under Shear Force and Moment

Behavior and Strength of Slab-Edge Beam-Column Connections under Shear Force and Moment Behavior and Strength of Slab-Edge Beam-Column Connections under Shear Force and Moment Omar M. Ben-Sasi Abstract A total of fourteen slab-edge beam-column connection specimens were tested gradually to

More information

The Use of Bolted U-Link Swimmer Bars in the Reinforced Concrete Beams

The Use of Bolted U-Link Swimmer Bars in the Reinforced Concrete Beams IOSR Journal of Engineering (IOSRJEN) e-issn: 2250-3021, p-issn: 2278-8719 Vol. 3, Issue 10 (October. 2013), V5 PP 26-32 The Use of Bolted U-Link Swimmer Bars in the Reinforced Concrete Beams Moayyad M.

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 2, No 2, 2011

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 2, No 2, 2011 INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 2, No 2, 2011 Copyright 2010 All rights reserved Integrated Publishing services Research article ISSN 0976 4399 Nonlinear Seismic Behavior

More information

Behavior of Skew Reinforced and Prestressed Concrete Composite Decks. Hany Ahmed Ahmed Dahish, Ahmed Foad El-ragi and Alaa Aly El-Sayed

Behavior of Skew Reinforced and Prestressed Concrete Composite Decks. Hany Ahmed Ahmed Dahish, Ahmed Foad El-ragi and Alaa Aly El-Sayed Life Science Journal 212;9(4) Behavior of Skew Reinforced and Prestressed Concrete Composite Decks Hany Ahmed Ahmed Dahish, Ahmed Foad El-ragi and Alaa Aly El-Sayed Faculty of Engineering, Fayoum University

More information

SPLITTING CRACKS IN REINFORCED CONCRETE ELEMENTS UNDER TENSILE LOADS

SPLITTING CRACKS IN REINFORCED CONCRETE ELEMENTS UNDER TENSILE LOADS Fracture Mechanics of Concrete Structures Proceedings FRAMCOS-3 AEDIFICA TIO Publishers, D-7914 Frei burg, Germany SPLITTING CRACKS IN REINFORCED CONCRETE ELEMENTS UNDER TENSILE LOADS B. Tork, J. Galvez,

More information

Retrofitting and Strengthening of Damaged Reinforced Concrete Columns Using Steel Angels Wrapped with Steel Wire Mesh

Retrofitting and Strengthening of Damaged Reinforced Concrete Columns Using Steel Angels Wrapped with Steel Wire Mesh International OPEN ACCESS Journal Of Modern Engineering Research (IJMER) Retrofitting and Strengthening of Damaged Reinforced Concrete Columns Using Steel Angels Wrapped with Steel Wire Mesh Abd-ELhamed,

More information

Experimental Study on the Behaviour of Plastered Confined Masonry Wall under Lateral Cyclic Load

Experimental Study on the Behaviour of Plastered Confined Masonry Wall under Lateral Cyclic Load Experimental Study on the Behaviour of Plastered Confined Masonry Wall under Lateral Cyclic Load Rildova, D. Kusumastuti, M. Suarjana & K.S. Pribadi Faculty of Civil and Environmental Engineering, Institut

More information

SEISMIC RESPONSE OF END-CONFINED REINFORCED CONCRETE BLOCK SHEAR WALLS

SEISMIC RESPONSE OF END-CONFINED REINFORCED CONCRETE BLOCK SHEAR WALLS 11 th Canadian Masonry Symposium, Toronto, Ontario, May 31- June 3, 2009 SEISMIC RESPONSE OF END-CONFINED REINFORCED CONCRETE BLOCK SHEAR WALLS B. R. Banting 1, M. T. Shedid 2, W. W. El-Dakhakhni 3, and

More information

The cracking behaviour of reinforced concrete beams under static and dynamic loading

The cracking behaviour of reinforced concrete beams under static and dynamic loading The cracking behaviour of reinforced concrete beams under static and dynamic loading J.A. Huffadine, A.G. van Bysterveldt, G.C. Clifton & G.W. Ferguson Department of Civil Engineering, University of Auckland,

More information

EXPERIMENTAL STUDY AND ACTUAL STRUCTURE DESIGNING OF LOOP JOINT USED FOR SEGMENTED PRECAST CONCRETE BRIDGE PIER AND CAISSON.

EXPERIMENTAL STUDY AND ACTUAL STRUCTURE DESIGNING OF LOOP JOINT USED FOR SEGMENTED PRECAST CONCRETE BRIDGE PIER AND CAISSON. EXPERIMENTAL STUDY AND ACTUAL STRUCTURE DESIGNING OF LOOP JOINT USED FOR SEGMENTED PRECAST CONCRETE BRIDGE PIER AND CAISSON. Abstract Nobuaki Arai 1 Hiroshi Shima 2 Masahiro Nakai 3 Generally, the pre-cast

More information

Precast concrete double-tee beams with thin stems

Precast concrete double-tee beams with thin stems Dapped ends of prestressed concrete thin-stemmed members: Part 1, experimental testing and behavior Amir W. Botros, Gary J. Klein, Gregory W. Lucier, Sami H. Rizkalla, and Paul Zia Precast concrete double-tee

More information

Investigating the Use of Spliced Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beams

Investigating the Use of Spliced Swimmer Bars as Shear Reinforcement in Reinforced Concrete Beams IOSR Journal of Engineering (IOSRJEN) ISSN (e): 2250-3021, ISSN (p): 2278-8719 Vol. 05, Issue 02 (February. 2015), V2 PP 47-54 www.iosrjen.org Investigating the Use of Spliced Swimmer Bars as Shear Reinforcement

More information

CHAPTER 4 PUNCHING SHEAR BEHAVIOUR OF RECYCLED AGGREGATE CONCRETE TWO WAY SLABS

CHAPTER 4 PUNCHING SHEAR BEHAVIOUR OF RECYCLED AGGREGATE CONCRETE TWO WAY SLABS 103 CHAPTER 4 4.1 GENERAL PUNCHING SHEAR BEHAVIOUR OF RECYCLED AGGREGATE CONCRETE TWO WAY SLABS The problem of punching shear in reinforced concrete slabs under a concentrated load or around a column has

More information

Special Reinforced Concrete Structural Walls

Special Reinforced Concrete Structural Walls 135 Special Reinforced Concrete Structural Walls The requirements of this section apply to special reinforced concrete structural walls serving as part of the earthquake force-resisting system. Shear Strength:

More information

Experimental Investigation on the Effect of Bond-Slip Behaviour of Steel Rebars in Concrete

Experimental Investigation on the Effect of Bond-Slip Behaviour of Steel Rebars in Concrete GRD Journals- Global Research and Development Journal for Engineering Volume 1 Issue 4 March 2016 ISSN: 2455-5703 Experimental Investigation on the Effect of Bond-Slip Behaviour of Steel Rebars in Concrete

More information

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights 1 Exam Prep Placing Reinforcing Bars Tabs and s These 1 Exam Prep Tabs are based on the CRSI Placing Reinforcing Bars Recommended Practices, 9 th Edition. Each 1 Exam Prep tabs sheet has five rows of tabs.

More information

STUDIES IN BOND STRENGTH IN RC FLEXURAL MEMBERS

STUDIES IN BOND STRENGTH IN RC FLEXURAL MEMBERS ASIAN JOURNAL OF CIVIL ENGINEERING (BUILDING AND HOUSING) VOL. 8, NO. 1 (27) PAGES 89-96 STUDIES IN BOND STRENGTH IN RC FLEXURAL MEMBERS M. Shahiq Khan, A.R. Reddy, M. Shariq and J. Prasad Department of

More information

EXPERIMENTAL INVESTIGATION ON LOCAL BOND-SLIP BEHAVIOUR IN LIGHTWEIGHT FIBER REINFORCED CONCRETE UNDER CYCLIC ACTIONS

EXPERIMENTAL INVESTIGATION ON LOCAL BOND-SLIP BEHAVIOUR IN LIGHTWEIGHT FIBER REINFORCED CONCRETE UNDER CYCLIC ACTIONS 13 th World Conference on Earthquake Engineering Vancouver, B.C., Canada August 1-6, 24 Paper No. 287 EXPERIMENTAL INVESTIGATION ON LOCAL BOND-SLIP BEHAVIOUR IN LIGHTWEIGHT FIBER REINFORCED CONCRETE UNDER

More information

Effect of corrosion on the bond between steel and concrete: an overview K. Lundgren

Effect of corrosion on the bond between steel and concrete: an overview K. Lundgren Effect of corrosion on the bond between steel and concrete: an overview K. Lundgren Published in Magazine of Concrete Research, see journal homepage http://www.icevirtuallibrary.com/content/journals Permission

More information

Bond between ribbed bars and concrete. Part 1: Modified model K. Lundgren

Bond between ribbed bars and concrete. Part 1: Modified model K. Lundgren Bond between ribbed bars and concrete. Part 1: Modified model K. Lundgren Published in Magazine of Concrete Research, see journal homepage http://www.icevirtuallibrary.com/content/journals Permission is

More information

High Performance and Efficiency of Joints in Precast Members

High Performance and Efficiency of Joints in Precast Members High Performance and Efficiency of Joints in Precast Members M.J.Gopinathan #1, K.Subramanian #2, #1 Research Scholar, Anna University, Chennai, India #2 Professor and Head, Dept of Civil Engineering Coimbatore

More information

5.4 Analysis for Torsion

5.4 Analysis for Torsion 5.4 Analysis for Torsion This section covers the following topics. Stresses in an Uncracked Beam Crack Pattern Under Pure Torsion Components of Resistance for Pure Torsion Modes of Failure Effect of Prestressing

More information

ISSN: Page 14

ISSN: Page 14 Shear Capacity Assessment of Reinforced Concrete Beams using Swimmer Bars as Shear Reinforcement Muneeb Ullah Khan 1, Muhammad Fahad 1, Khan Shahzada 1 1- Civil Engineering Department University of Engineering

More information

Axial Compression Behavior of a New Type of Prefabricated Concrete Sandwich Wall Panel

Axial Compression Behavior of a New Type of Prefabricated Concrete Sandwich Wall Panel IOP Conference Series: Materials Science and Engineering PAPER OPEN ACCESS Axial Compression Behavior of a New Type of Prefabricated Concrete Sandwich Wall Panel To cite this article: Xie Qun et al 2018

More information

Ductile Fiber Reinforced Panels for Seismic Retrofit

Ductile Fiber Reinforced Panels for Seismic Retrofit 9 Ductile Fiber Reinforced Panels for Seismic Retrofit Keith E. Kesner School of Civil & Environmental Engineering, Cornell University Research Supervisor: Sarah L. Billington, Assistant Professor Summary

More information

Steel Jacketing Technique used in Strengthening Reinforced Concrete Rectangular Columns under Eccentricity for Practical Design Applications

Steel Jacketing Technique used in Strengthening Reinforced Concrete Rectangular Columns under Eccentricity for Practical Design Applications Steel Jacketing Technique used in Strengthening Reinforced Concrete Rectangular Columns under Eccentricity for Practical Design Applications Ezz-Eldeen, H. A. Faculty of Engineering, Al Azhar University

More information

Revise Sections through of Part 1 of the 2009 Provisions as follows:

Revise Sections through of Part 1 of the 2009 Provisions as follows: PROPOSAL - (00) SCOPE: Sec.. Concrete Sec... Additional Detailing Requirements for Concrete Piles PROPOSAL FOR CHANGE: Revise Sec... and Sec.... of Part of the 00 Provisions as follows:.. Additional Detailing

More information

EXPERIMENTAL INVESTIGATION OF PRECAST CONCRETE BEAM TO COLUMN CONNECTIONS SUBJECTED TO REVERSED CYCLIC LOADS

EXPERIMENTAL INVESTIGATION OF PRECAST CONCRETE BEAM TO COLUMN CONNECTIONS SUBJECTED TO REVERSED CYCLIC LOADS 6 th International Conference on Seismology and Earthquake Engineering EXPERIMENTAL INVESTIGATION OF PRECAST CONCRETE BEAM TO COLUMN CONNECTIONS SUBJECTED TO REVERSED CYCLIC LOADS H. Shariatmadar 1, E.

More information

NON ENGINEERED REINFORCED CONCRETE BUILDINGSS

NON ENGINEERED REINFORCED CONCRETE BUILDINGSS Chapter 8 NON ENGINEERED REINFORCED CONCRETE BUILDINGS 8.1 INTRODUCTION With the spread of reinforced concrete construction to semi-urban and rural area in various countries, often buildings are constructed

More information

Effect of beam dimensions on structural performance of wide beam-column joints

Effect of beam dimensions on structural performance of wide beam-column joints Effect of beam dimensions on structural performance of wide beam-column joints J.S. Kuang 1) and *Wing Shan Kam 2) 1), 2) Department of Civil and Environmental Engineering, Hong Kong University of Science

More information

HALFEN HLB LOOP BOX Z-HLB-M50 13-E CONCRETE

HALFEN HLB LOOP BOX Z-HLB-M50 13-E CONCRETE HALFEN HLB LOOP BOX Z-HLB-M50 13-E CONCRETE Translation of the General Certificate of Approval Approval Office: German Institute for Construction Engineering (Deutsches Institut für Bautechnik DIBt) Kolonnenstrasse

More information

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 2, 2012

INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 2, 2012 INTERNATIONAL JOURNAL OF CIVIL AND STRUCTURAL ENGINEERING Volume 3, No 2, 2012 Copyright 2010 All rights reserved Integrated Publishing services Research article ISSN 0976 4399 Optimizing the use of swimmer

More information

A COMPOSITE FLOOR TRUSS TOP CHORD USING CONCRETE-FILLED STEEL TUBE (CFST)

A COMPOSITE FLOOR TRUSS TOP CHORD USING CONCRETE-FILLED STEEL TUBE (CFST) A COMPOSITE FLOOR TRUSS TOP CHORD USING CONCRETE-FILLED STEEL TUBE (CFST) S.V. Thilanka Janaka Perera Saitama University, Japan (email: janaka@mail.saitama-u.ac.jp) Abstract Steel and concrete composite

More information

PERFORMANCE OF EXTERIOR PRECAST UNDER CYCLIC LOADING. R. Vidjeapriya & K.P. Jaya Anna University, Chennai , India 1.

PERFORMANCE OF EXTERIOR PRECAST UNDER CYCLIC LOADING. R. Vidjeapriya & K.P. Jaya Anna University, Chennai , India 1. PERFORMANCE OF EXTERIOR PRECAST DOWEL BEAM-COLUMN CONNECTIONS DOWEL UNDER CONNECTIONS CYCLIC LOADING UNDER CYCLIC LOADING R. Vidjeapriya & K.P. Jaya Anna University, Chennai 600025, India SUMMARY: The

More information

Masonry and Cold-Formed Steel Requirements

Masonry and Cold-Formed Steel Requirements PC UFC Briefing September 21-22, 2004 Masonry and Cold-Formed Steel Requirements David Stevens, ARA Masonry Requirements Composite Construction Masonry is often used in composite construction, such as

More information

Research on Weight Reduction of PC Composite Members Using Ultra High Strength Fiber Reinforced Cementitious Composites (UFC)

Research on Weight Reduction of PC Composite Members Using Ultra High Strength Fiber Reinforced Cementitious Composites (UFC) Research on Weight Reduction of PC Composite Members Using Ultra High Strength Fiber Reinforced Cementitious Composites (UFC) H. Murata 1), J. Niwa 2), and C. Sivaleepunth 3) 1) Master course 2nd year

More information

SEISMIC RETROFIT OF BEAMS IN BUILDINGS FOR FLEXURE USING CONCRETE JACKETING

SEISMIC RETROFIT OF BEAMS IN BUILDINGS FOR FLEXURE USING CONCRETE JACKETING SEISMIC RETROFIT OF BEAMS IN BUILDINGS FOR FLEXURE USING CONCRETE JACKETING V. T. Badari Narayanan L&T Ramboll Consulting Engineers Ltd., India A. K. Sengupta and S. R. Satish Kumar Indian Institute of

More information

Beam-column joint tests with grade 500E reinforcing

Beam-column joint tests with grade 500E reinforcing Beam-column joint tests with grade 500E reinforcing L.M. Megget & N.J. Brooke Department of Civil & Environmental Engineering, University of Auckland, New Zealand. R.C. Fenwick Visitor, Department of Civil

More information

TECHNICAL MANUAL. PEC Column Shoe. Heavy-duty Bolted Column Connections

TECHNICAL MANUAL. PEC Column Shoe. Heavy-duty Bolted Column Connections TECHNICAL MANUAL PEC Column Shoe Heavy-duty Bolted Column Connections Version: PEIKKO GROUP 09/2018 PEC Column Shoe For bolted column connections Advanced casting process with the help of standard accessories

More information

The Open Civil Engineering Journal

The Open Civil Engineering Journal Send Orders for Reprints to reprints@benthamscience.ae The Open Civil Engineering Journal, 2017, 11, (Suppl-4, M5) 955-964 955 The Open Civil Engineering Journal Content list available at: www.benthamopen.com/tociej/

More information