SECTION SYNTHETIC TRACK SURFACING SYSTEM - BEYNON
|
|
- Julianna Turner
- 5 years ago
- Views:
Transcription
1 PART1 GENERA L 1.01 SUMMARY SECTION SYNTHETIC TRACK SURFACING SYSTEM - BEYNON A. Beynon Track Surfacing System is to be bid as Deduct Alternate No. 1- The base bid is for the Mondo Track Surfacing System. Deduct Alternate No. 1 calls for substituting the Mondo Track Surfacing System with the Beynon Track Surfacing System as described in this specification. In addition to the change in systems for surfacing, the track and field event curb and edge details shall be modified for a full pour product instead of the pre-manufactured sheet good product (Mondo System). Other items referred to in the details, drawings, and specifications such as field event covers shall be modified for a full pour system. AII costs associated with this modification and selection of Deduct Alternate No. 1 shall be included and accounted for in the bid price listed in the Bid Form. B. Full knowledge and understanding of all drawings, specifications, and general provisions of the bidding documents and related foundation and utilities work is required by the Synthetic Surfacing Contractor (SSC). 1. This section covers all labor and materials required to install a first-class, synthetic track and field surface. 2. The General Contractor (GC) is responsible for the installation, if any, of the track subbase-works, drainage systems and asphalt base-works, designed by others, to corrected levels per NCAA requirements as required or detailed in the project drawings and these specifications. 3. The SSC is responsible for installing all synthetic-surfacing materials as designated in the project drawings and these specifications. 4. The SSC is responsible for all line markings required for NCAA track and field events as directed by these specifications and the Owner. 5. The GC is responsible for the purchase and installation of all inground track and field equipment if required CODES AND STANDARD S A. Codes and standards follow the current guidelines set forth by the International Association of Athletic Federations (IAAF) and the National Collegiate Athletic Association (NCAA). Where discrepancies are noted between these various governing bodies, the rules of the NCAA shall be enforced RELATED SECTION S A Bituminous Surfacing 1.04 SUBMITTALS A. The following information shall be submitted by the SSC with the bid documentation : 1. Standard printed specifications of the synthetic surfacing system that is being installed. 2. Installation process and requirements for the base, and any conditions that may limit the sports installation, or affect quality of installation. 3. Temperature / climatic conditions limiting quality of installation. 4. The SSC is required to provide documentation that shows the selected specified and installed product meets the IAAF Performance Specification for Synthetic Surfaced Athletics Tracks (Outdoor) and is certified in terms of the IAAF certification system as updated on April 1, SSC to provide a list of completed facilities, minimum of 10, which are certified to meet NCAA rules & regulations, utilizing the same product as specified. B. The following information shall be submitted by the SSC as requested by the Owner prior to installation : 1. Provide a five- (5) year manufacturer's warranty against workmanship, installation and materials on the synthetic surface. 2. The SSC installing the material shall submit an affidavit attesting that the surfacing material to be installed meets the requirements defined in the manufacturers currentl y Project No Section Page 1 of 6
2 published specifications and any modifications outlined in these technical specifications prior to the commencement of any work. 3. A letter signed by an authorized representative of the SSC, that the track and field surfacing has no measurable traces of heavy metals, leachable mercury, and any other hazardous materials identified by the EPA. A 8" x 10 sample of the material to be installed, for testing by the owners independent laboratory to verify the above and establish parameters against which random spot tests by the owners agent during installation can be compared. This sample must be provided prior to installation. 4. A further product sample 8" x 10" in size, the same colour, texture, thickness, etc. as the type of surfacing to be installed for this project. This must be a representative sample of the product for comparison of color and texture during installation. This sample must be submitted and approved by the Owner prior to installation. 5. Upon completion of all line Markings, the SSC shall submit to the Owner a certification of accuracy submitted by a Registered Engineer or Surveyor. This document shall state that the track markings and layout meets the NCAA requirements and the requirements of these bid documents QUALITY ASSURANC E A. Bids will only be accepted from those SSC that have completed at least 10 Track and Field facilities that have been properly certified to meet NCAA specifications or rules. The SSC shall have installed a minimum of ten (10) tracks with a product that has been approved by the IAAF and meets all requirements of the IAAF Performance Specification for Synthetic Surfaced Athletics Tracks (Outdoor). B. SSC must provide a list of projects at least 5 years old in similar environmental conditions that are available for inspection by the Owner. C. The synthetic track surface shall be installed by authorized applicators acceptable to the Owner. The Owner reserves the right of final acceptance with regards to any crewmembers of the SSC. D. Each bidder shall be fully acquainted with the existing facility and utilities and shall fully understand the difficulties and restrictions attending the execution of the work under contract. AII bidders shall advise the Owner before submitting bids of any restrictions or anticipated difficulty. E. AII material shall be guaranteed to the extent that the surfacing : 1. Has been manufactured and applied in accordance with these and the manufacturer's specifications. 2. Will hold fast and/or adhere to the asphalt, concrete, edging, filler and patches or overlay materials. 3. Will perform as specified in these specifications and the specifications of the product manufacturer in the current standard product information literature and specification sheets. 4. Will not de-laminate, bubble, blister, fade, crack or wear excessively during the guarantee period. F. AII machinery and materials used must be only those approved by the Owner and the approved manufacturer of the selected synthetic surfacing material SPECIAL PROJECT CONDITION S A. Any required drainage and base works are the responsibility of the GC. The GC will provide a technician on-site during sub-contract installations through the completion of the contract. B. The SSC will provide a technician who will review the asphalt specification as supplied by the GC and accepting that the specification is acceptable, verify the suitability of the HMAC after installation SPECIFIC SCOPE OF WOR K A. At the completion of the construction of the track and field base, the GC shall supply to the SSC a topographic survey confirming that the elevations/slopes of the base meet the rules/requirements of the sport and/or the specifications and to show that the track and field areas will meet the rules of the sport. The GC will provide adequate test results verifying that Project No Section Page 2 of 6
3 the installed asphalt is to required specification. The asphalt testing and topographic survey is for the account of the GC. B. The SSC shall provide all labor, materials and equipment to perform the following work : 1. Review Bidding documents and specifications, verify suitability of installation of, by GC's sub-contractors, the base and the in-ground track and field equipment. 2. Sufficiently clean down all areas to be surfaced and protect all areas not to receive synthetic surface. 3. Install approved synthetic surfacing material on all areas as defined by the Bidding documents. 4. Install removable synthetic surfacing (rubber or full pour polyurethane), as covers in all throwing circles within synthetic aprons, on pole vault box covers, on long/triple jump blanking boards and, if included, apply synthetic surfacing to the sand pit covers and the steeplechase waterjump pit cover. 5. Stripe all lane lines, start-finish lines, event markings, 5 sets of lane numbers (one colour) and runway borders according to NCAA standards per the listing hereafter. 400m track markings (NCAA based) 1. Official NCAA Events : a. 100 meters One directions on home straight- a-way b. 100 meter hurdles One directions on home straight-a-way c. 110 meter hurdles One directions on home straight-a-way d. 200 meters AII in lanes, one tur n e. 400 meters AII in lanes f. 400 meter hurdles AII in lane s g. 800 meters Waterfall start and 1-turn stagger h meters Water fall star t i meters Water fall start j meter steeplechase Water fall start k meters Water fall start I. 10,000 meters Water fall start m. 400 meter relay (4 x 100 meters) AII in lane s n meter relay (4 x 400 meters) Three Turn Stagger o. Shot Put, Discus, and Hammer events Paint dividing lines ; p. Shot Put, Discus, Hammer, and Javelin Paint sector lines (not in circle or on runway) q. Javelin Paint foul lin e r. Pole vault, long & triple jump, and javelin Paint runway lines s. Common Finish Line - In compliance with the NCAA rule book, the intersection of each lane line and the finish line shall be painted blac k t. Lane Numbers - paint at least 6" beyond the common finish line in compliance with the NCAA rule book, facing timing devic e u. International relay acceleration zones, marked in compliance with the NCAA rule book. v. AII starting lines to have the event name painted on the synthetic surface. 2. Other NCAA Relays : a. 800 meter relay (4 x 200 meters) AII in lane s b. Sprint Medley Relay (200, 200, 400, 800 meters) 2 turn stagger c. Distance Medley Relay (1200, 400, 800, 1600 meters ) d. 200 meter relay (4 x 800 meters) e meter relay (4 x 1500 meters) 3. Other College Events : a. 1-mile ru n b. Common finish line - Paint lean lines in lanes, 1 meter before finish line. 4. High School Events : (These events to be verified w/ Owner prior to installation) a. 300 meter hurdles b meters c meters Project No Section Page 3 of 6
4 d or 2000 meter steeplechase 5. Paint : a. AII lane lines, start and finish lines to receive 2 coat s b. Numbers are to be 36" high ; five (5) sets of numbers are required, location verified by Owner prior to installation COORDINATION A. The SSC shall coordinate the work specified with an authorized and appointed representative of the Owner so as to perform the work during a period and in a manner acceptable to the Owner. PART2 PRODUCTS 2.01 TRACK AND FIELD SURFACIN G A. The surface shall be full pour polyurethane by : 1. Beynon Sports Surfaces, 4435 Sunny Slope Avenue, Omaha, NE 68134, Tel: c/o Approved Equa l B. Beynon product is the Class I IAAF certified Beynon BSS 2000 Dual Durometer Embedde d Track Surfacing or approved equal : 2.02 MINIMUM SURFACE THICKNESS, COLOR AND SHORE HARDNESS `A' MEASUREMENT S A. NOTE: These parameters apply to all surfaces being offered for installation. Please note that this is a one color surface installation. B. Colors: Standard Red. C. Total thickness - Average 13mm or as specified 2.03 SURFACING MATERIA L A. Minimum thickness : As specified in 2.02 above. B. Colors: As specified in 2.02 above. AII components shall match identically. C. Synthetic surfacing material shall conform to the following properties : Physical Properties Standard Specificatio n Force Reduction IAAF IAAF 35% - 50% Modified Vertical IAAF 0.6 mm m m Deformatio n Tensile Properties: Strength IAAF > 0.5 Mpa Elongation at break IAAF > 40 % Coefficient of Friction (wet) 47 TRRL Scale > 0. 5 D. Synthetic surfacing material shall exhibit a high resistance to track shoe spike traffic, cigarette burns and chemical agents. E. Surface must be in place in similar climatic conditions for a period no less than 5 years and available for inspection by the owner or owners rep at SSC cost CRACK FILLER & PATCHING MATERIA L A. Material for all cracks and patching shall be an approved material compatible with the specified surfacing. Specified material shall be perthe manufacturer's specification ELASTOMERIC POLYURETHAN E A. The two-component U.V. stabilized elastomeric polyurethane compounded from polyol and isocyanate components, based on one hundred percent Methylene Diphenyl Isocyanate (MDI). No Toluene Diisocyanate Isocyanate (TDI) will be allowed. B. The elastomeric polyurethane shall be black in color EPDM GRANULATE A. The EPDM granulates shall be approximately 1 to 3mm in. B. The EPDM granulates and the U.V. stabilized elastomeric polyurethane shall be color matched. Project No Section Page 4 of 6
5 2.07 RUBBER GRANULATE A. Black butyl rubber processed ground to a graded size not to exceed.5-2.5mm. B. A maximum of twenty percent, by weight, of the butyl rubber will be allowed in the force reduction layer LINE MARKING PAIN T A. Single-component, moisture cured, aliphatic polyurethane paint. PART 3 INSTALLATIO N 3.01 INSTALLATION REQUIREMENTS A. The GC is to purchase and install, all fixtures and structures, and all inground track & field equipment. B. The SSC is to purchase and install all synthetic surfacing, including on pole vault box covers, throwing circles and take-off board blanking lids ; surfacing on junction boxes installed flush with asphalt within synthetic finished areas. C. The following installation requirements must be met by the SSC : 1. The SSC is required to follow the operations listed under Section : Specific Scope of Work. 2. Installation by approved technicians. Local laborers may be hired for non-technical work, only. 3. Technical representative from the approved manufacturer of the synthetic surfacing must verify suitability of the installation of the asphalt base for the track and field surface TIMING, LIMITATIONS, AND CONDITIONS AFFECTING INSTALLATIO N A. Weather and Climate : If in the opinion of the synthetic track surfacing manufacturer or the Owner, weather and climatic conditions are having or will have an adverse effect on installation, work shall be delayed until the adverse condition has passed. B. Adjacent and Concurrent Construction : Installation shall not take place until the completion of adjacent or concurrent construction operations which generate dust, airborne abrasives, or any other by-product that, in the opinion of the Owner or synthetic track surfacing manufacturer, would be harmful to the track material. C. The minimum curing time for the asphalt base is 28 days. It shall be the responsibility of the SSC to determine if the asphalt substrate has cured sufficiently prior to the application of the polyurethane surfacing system SUBBAS E A. The synthetic track surfacing system shall be laid on an approved subbase. The GC shall provide compaction test results of 95% or greater for the installed subbase and asphalt surface. B. For NCAA certification the following criteria must be followed. The track surface, i.e. asphalt substrate, shall not vary from planned cross slope by more than +.2%, with a maximum lateral slope outside to inside of 1%, and a maximum slope of 0.1 % in any running direction. The finished asphalt shall not vary under a 10' straight edge more than 1/8". C. It should be the responsibility of the asphalt paving contractor to flood the surface immediately after the asphalt is capable of handling traffic, but within 24 hours. If, after 20 minutes of drying time, there are are areas of ponded water "birdbaths" evident, it shall be the responsibility of the surfacing contractor, to determine the method of correction. The contractor shall obtain the Engineer's written approval for correction methodology prior to proceeding with corrective work. No cold tar patching, skin patching or sand mix patching will be acceptable. D. Any oil spills (hydraulic, diesel, motor oil, etc.) must be completely removed and replaced with either polyurethane or new, keyed in asphalt. E. It shall be the responsibility of the GC to determine if the asphalt substrate meets all design specifications, i.e. cross slopes, planarity and specific project criteria. After all the above conditions are met, the synthetic surfacing contractor must, in writing, accept the planarity of the asphalt receiving base, before work can commence EQUIPMEN T A. The BSS 2000 Dual Durometer Embedded (or approved equal) synthetic track surfacing system components shall be processed and installed by specially designed machinery wit h Project No Section Page 5 of 6
6 automatic electronic portioning, which provides continuous mixing, feeding and finishing for accurate quality controlled installation. B. No hand mixing will be allowed MATERIALS A. Force Reduction Laye r 1. The black butyl granules and UV stabilized elastomeric polyurethane shall be metered and mixed together on site to regulate the ratio/quantity of butyl, not to exceed fourteen percent in the system and to insure an even distribution of the granules throughout the 8mm force reduction layer. No multi-layered system allowed. B. Resilient Wearing Laye r 1. The 1 to 3 millimeter EPDM granules shall be mechanically integrated with a UV stabilized elastomeric polyurethane to the full depth of the 5mm wearing layer. The resilient textured finish shall be a dense matrix of embedded EPDM granules SITE CONDITION S A. Installation shall not take place if adjacent or concurrent construction generates excessive dust, abrasives or any other byproduct that, in the opinion of the installer, would be harmful to the track material, until completion of such works. B. If, in the opinion of the installer of the synthetic material, the weather and/or climatic conditions are detrimental to the proper installation of the surfacing materials, work shall be delayed until conditions are acceptable. Preferred installed temperature is 50 degrees Fahrenheit and rising. Installation shall be executed only in dry conditions LINE MARKING S A. General line markings of the track and field events, shall be spray applied, using only paint, primers and finishes supplied and guaranteed by the approved manufacturer and/or supplier. B. AII markings shall be spray applied under the direction of a qualified line marker which meet the NCAA rules and regulations. The line marker shall be approved by the SSC and experienced in the layout of track and field markings. C. AII markings shall be in accordance with the rules of the NCAA and shall be certified for accuracy. D. The SSC shall submit a certification of accuracy prepared by the registered Engineer or Surveyor. The Engineer or Surveyor shall certify the actual line markings on the facility, not the line markers drawings or computations. The track markings and layout must meet NCAA requirements and the requirements of the drawings and specifications. END OF SECTIO N Project No Section Page 6 of 6
BSS 3000 Embedded Synthetic Track Surfacing System System Specifications
G.3 - Bidder: FieldTurf USA, Inc. Part 1 General 1.1 Scope BSS 3000 Embedded Synthetic Track Surfacing System System Specifications The synthetic surfacing contractor shall furnish all labor, materials,
More informationBSS 300 Embedded Synthetic Track Surfacing System System Specifications
BSS 300 Embedded Synthetic Track Surfacing System System Specifications G.3 - Bidder: FieldTurf USA, Inc. Part 1 General 1.1 Scope The synthetic surfacing contractor shall furnish all labor, materials,
More informationConversion of a BSS 100/200 to a BSS 300 Track Surfacing System Specifications
Conversion of a BSS 100/200 to a BSS 300 Track Surfacing System Specifications Part 1 General 1.1 Scope The synthetic surfacing contractor shall furnish all labor, materials, equipment, supervision and
More informationBSS 300 Embedded Synthetic Track Surfacing System Specifications
BSS 300 Embedded Synthetic Track Surfacing System Specifications Part 1 General 1.1 Scope The synthetic surfacing contractor shall furnish all labor, materials, equipment, supervision and services necessary
More informationBSS 200 Synthetic Track Surfacing System System Specifications
BSS 200 Synthetic Track Surfacing System System Specifications G.3 - Bidder: FieldTurf USA, Inc. Part I - General 1.1 - Scope The synthetic surfacing contractor shall furnish all labor, materials, equipment,
More informationBSS 50 Synthetic Track Surfacing System Specifications
BSS 50 Synthetic Track Surfacing System Specifications Part 1 - General 1.1 - Scope The synthetic surfacing contractor shall furnish all labor, materials, equipment, supervision, and services necessary
More informationBSS 100 SYNTHETIC TRACK RESURFACING SYSTEM SPECIFICATIONS
BSS 100 SYNTHETIC TRACK RESURFACING SYSTEM SPECIFICATIONS Part 1 General 1.1 Scope The synthetic surfacing contractor shall furnish all labor, materials, equipment, supervision, and services necessary
More informationSECTION RESILIENT TRACK SURFACING
SECTION 32 2000 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification Sections, apply
More informationPRODUCT SPECIFICATIONS FOR CONIPUR ISP AN IMPERMEABLE POLYURETHANE BASE MAT STRUCTURAL SPRAY SYSTEM
PRODUCT SPECIFICATIONS FOR CONIPUR ISP AN IMPERMEABLE POLYURETHANE BASE MAT STRUCTURAL SPRAY SYSTEM PART 1 General 1.01 Work Included This work includes furnishing and installing an IAAF certified synthetic
More informationNo Fault Safety Surface & SAF DEK for Playgrounds Product Specification
PART 1 GENERAL 1.01 WORK INCLUDED POURED-IN-PLACE RUBBER EPDM SURFACING FOR PLAYGROUNDS This work includes furnishing and installing the No Fault Safety Surface. The surfacing Manufacturer/installer shall
More information1.01 Work Included This work includes furnishing and installing a synthetic all-weather running track surface.
PRODUCT SPECIFICATIONS FOR (13MM) LATEX MAT SYSTEM PART 1 Scope of work 1.01 Work Included This work includes furnishing and installing a synthetic all-weather running track surface. 1.02 Description of
More informationInvitation to Bid Running Track
Invitation to Bid 20160621-Running Track Responses to an Invitation to Bid will be received by the Purchasing Supervisor, Sumner County Board of Education, 1500 Airport Road, Gallatin, TN 37066 for 20160621-Running
More informationTotTurf EPDM Product Specification
TotTurf EPDM Product Specification PART 1 GENERAL 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf EPDM poured in place rubber playground surfacing shall consist of a polyurethane binder mixed with 100%
More informationTotTurf Pigmented Poured in Place Product Specifications TOTTURF a PLAYCORE company July 2011
PART 1 General TotTurf Pigmented 1.01 TotTurf PIGMENTED POURED IN PLACE PLAYGROUND SURFACING TotTurf Pigmented poured in place rubber playground surfacing shall consist of a polyurethane binder mixed with
More informationTotTurf Bonded TotTurf Bonded Poured in Place Product Specifications TOTTURF a PLAYCORE company May 2011
PART 1 General TotTurf Bonded 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf Bonded poured in place playground surfacing consists of a polyurethane binder mixed with 100% recycled, shredded tire material
More informationControl XT SECTION Resilient Athletic Flooring
Control XT SECTION 09 65 22 Resilient Athletic Flooring PART 1: GENERAL 1.0 SUMMARY 1.0.1 Work Included A. Rubber sports flooring B. Adhesive and accessories required for installation and maintenance.
More informationTotTurf TPV (1-4mm) Product Specification
TotTurf TPV (1-4mm) Product Specification PART 1 GENERAL 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf TPV poured in place rubber playground surfacing shall consist of a polyurethane binder mixed with
More informationSECTION Resilient Athletic Flooring
PART 1: GENERAL SECTION 09 65 66 Resilient Athletic Flooring 1.0 SUMMARY 1.0.1 Work Included A. Prefabricated Rubber Sports Flooring B. Adhesive and accessories required for installation and maintenance
More informationTotTurf TPV Supreme (.5-1.5mm) Product Specification
TotTurf TPV Supreme (.5-1.5mm) Product Specification PART 1 GENERAL 1.1 POURED IN PLACE PLAYGROUND SURFACING TotTurf Supreme poured in place rubber playground surfacing shall consist of a polyurethane
More informationSPECIFICATIONS FOR RUBAROC SAFETYDECK (FOR PLAYGROUND SURFACES)
SPECIFICATIONS FOR RUBAROC SAFETYDECK (FOR PLAYGROUND SURFACES) PART I GENERAL 1.1 WORK INCLUDED: Work in this section includes furnishing all labour, materials, equipment, and services required to install
More informationSECTION PLAYGROUND PROTECTIVE SURFACING
SECTION 32 18 16.13 PART 1 - GENERAL 1.1 SCOPE A. Furnish labor, material, and equipment necessary to install the poured-in-place, resilient surfacing system as shown on the drawings and specified herein.
More information1. CONCRETE SUBFLOORS.SECTION a. Slab Depression: Equal to thickness of selected flooring (6, 8,10,12,13 or 14mm).
ProTraxx Specification PART 1 - GENERAL 1.1 DESCRIPTION: A. Scope 1.2 REFERENCES: The complete installation of a prefabricated sheet rubber sports surfacing system including adhesive and game line striping
More informationSECTION RESILIENT ATHLETIC SURFACING. B. Related Sections: Section(s) related to this section include:
CONNOR PowerDrop Page 1 SECTION 09624 RESILIENT ATHLETIC SURFACING PART 1 - GENERAL 1.01 SUMMARY A. Section includes: Resilient athletic surfacing, including [recycled] [virgin] rubber flooring B. Related
More informationTotTurf EPDM STANDARD PIP Product Specification
TotTurf EPDM STANDARD PIP Product Specification PART 1 GENERAL 1.01 POURED IN PLACE PLAYGROUND SURFACING TotTurf EPDM poured in place rubber playground surfacing shall consist of a polyurethane binder
More informationSTATE UNIVERSITY CONSTRUCTION FUND
DIRECTIVE 2-10 Issue date: July 2012 1. General SYNTHETIC TURF SYSTEM This Directive outlines the Fund s recommended requirements for the design and installation of Synthetic Turf Systems. 2. Design Criteria
More informationSECTION FLUID-APPLIED WATERPROOFING
SECTION 07140 FLUID-APPLIED WATERPROOFING PART 1 GENERAL 1.1 SUMMARY A. Section includes fluid applied rubberized asphalt and/or elastomeric membrane waterproofing; and surface dusting and/or protective
More informationSECTION Resilient Athletic Flooring
Specifier Note: the following CSI (Construction Specifications Institute) section describes the resilient athletic flooring system to be installed over concrete, for the specific project. If the provisions
More informationTotTurf SPLASH TREAD Product Specification
TotTurf SPLASH TREAD Product Specification PART 1 GENERAL 1.1 POURED IN PLACE PLAYGROUND SURFACING TotTurf Splash Tread poured in place playground surfacing shall consist of an Aliphatic binder mixed with
More information1/8 DECORATIVE BROADCAST FLOORING SYSTEM
AIA specification AIA specification AIA Specification 1/8 DECORATIVE BROADCAST FLOORING SYSTEM Part 1 - GENERAL General Provisions A. Work to be covered by this section, under written specification or
More informationSECTION BITUMINOUS CONCRETE PAVING AND ATHLETIC SURFACING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 321800 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationDesco Granite Flooring Specifications
Desco Granite Flooring Specifications PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1 Sections, apply
More informationFlorock Seamless Flooring Systems
Architectural Specification FloroCrete RT Rake/Trowel Urethane Mortar 3/16-1/4 (4.5-6.0 mm) Floor Resurfacing System Part 1: General 1.01 System Description A. System I Skid-Resistant Finish Resurfacing
More informationSPORTS AND LEISURE SYNTHETIC SURFACE SPECIALISTS POWERED BY
SPORTS AND LEISURE SYNTHETIC SURFACE SPECIALISTS POWERED BY FROM AMATEUR TO PROFESSIONAL We ve got you covered Rekortan and Spurtan are proudly produced by APT Asia Pacific. Our mission is to provide high
More informationSPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay
2004 Specifications SPECIAL SPECIFICATION 4429 Multiple-Layer Polymer Concrete Overlay 1. Description. Furnish and place a multi-layer polymer overlay consisting of a crack seal, polymer resin and aggregates.
More informationGAMECOURT OVER POUR System Division 9 Indoor Resilient Athletic Surfacing
GAMECOURT OVER POUR System Division 9 Indoor Resilient Athletic Surfacing PART 1 GENERAL 1.1 SECTION INCLUDES A. Supply and installation of the GAMECOURT OVERPOUR indoor resilient multipurpose athletic
More informationFlexGround Standard. Poured In Place Safety Surfacing. Manufacturer s Specifications
FlexGround Standard Poured In Place Safety Surfacing Manufacturer s Specifications This document provides the specifications for a poured in place safety surfacing system composed of a wearing layer upper
More informationPowerdek Fleck. SECTION Resilient Athletic Flooring
SECTION 09622 Resilient Athletic Flooring PART 1: GENERAL 1.0 SUMMARY 1.0.1 Work Included A. Prefabricated Rubber Sports Flooring B. Adhesive and accessories required for installation and maintenance 1.0.2
More informationASPHALT PAVEMENT TEXTURING SPECIFICATION
PART 1 GENERAL 1.1 DESCRIPTION A. Asphalt pavement texturing is a highly suitable solution for a wide variety of decorative pavement applications. Paved entranceways, parking lots, residential driveways,
More informationPAVEMENT MARKING, METHYL METHACRYLATE
PAVEMENT MARKING, METHYL METHACRYLATE PART 1 GENERAL 1.1 SECTION INCLUDES A. Methods and materials for installing durable colored pavement marking materials, consisting of anti-slip treated methyl methacrylate.
More informationFlorock Seamless Flooring Systems
Part 1: General Architectural Specification FloroCrete SLX Self-Leveling Urethane Mortar w/broadcast nominal 3/16 Flooring System 1.01 System Description A. Squeegee/Troweled-applied, aggregate-rich polyurethane
More informationBROADCAST KITCHEN FLOORING SYSTEM
AIA specification AIA specification AIA Specification Part 1 - GENERAL BROADCAST KITCHEN FLOORING SYSTEM General Provisions A. Work to be covered by this section, under written specification or by drawing,
More informationFlorock Seamless Flooring Systems
Architectural Specification FloroBuild XT Extreme Impact & Abrasion Resistant Resurfacing System Part 1: General 1.01 System Description A. Roller applied 100% solids epoxy primer, followed by an extreme
More informationDist. by: BEST MATERIALS Ph:
Dist. by: BEST MATERIALS Ph: 800-474-7570 www.bestmaterials.com Email: Sales@BestMaterials.com NOVALINK SL SELF-LEVELING CONSTRUCTION SEALANT DIVISION 7 - THERMAL AND MOISTURE PROTECTION SECTION 07 92
More informationDECOCOLOR FLOORING SYSTEM
AIA Specification DECOCOLOR FLOORING SYSTEM Part 1 - GENERAL General Provisions A. Work to be covered by this section, under written specification or by drawing, shall comply with all provisions of the
More informationFlorock Seamless Flooring Systems
Architectural Specification Florotallic Epoxy and Urethane Flooring System Part 1: General 1.01 System Description A. Roller-applied 100% solids, penetrating pigmented epoxy primer, decorative pigmented
More informationPage 1 of 5 PART 1 GENERAL
PART 1 GENERAL SportLastic Track Pre-Fabricated Vulcanized Rubber Athletic Surface Guide Specifications Division 9 Indoor Resilient Athletic Surfacing Revised 01-02-10 1.1 SECTION INCLUDES A. Supply and
More informationMay 8, 2017 ADDENDUM #1. IFB Resin Floor System For Highway Department Central District Building
May 8, 2017 ADDENDUM #1 IFB 17-082 Resin Floor System For Highway Department Central District Building Addendum #1 is being issued to offer an alternate resin flooring system. 096700 FLUID-APPLIED FLOORING
More informationProduct Guide Specification
SofSURFACES, Inc. September 2004 4393 Discovery Line PO Box 239 Petrolia, Ontario N0N 1R0 Canada Toll Free (800) 263-2363 Phone (519) 882-8799 Fax (519) 882-2697 Website www.sofsurfaces.com E-mail alltinfo@sofsurfaces.com
More informationChapter 5: Designs for Recreational Uses 5-1 Asphalt Pavements for Non-Vehicular Use 5-1 Table 5-1: Thickness Design Chart: Bikeways, Paths, Trails
5-1 Asphalt Pavements for Non-Vehicular Use 5-1 Table 5-1: Thickness Design Chart: Bikeways, Paths, Trails and Walkways 5-3 Table 5-2: Thickness Design Chart: Playgrounds 5-4 Tennis Courts 5-5 Table 5-3:
More informationFlorock Seamless Flooring Systems
Part 1: General Florock Seamless Flooring Systems Architectural Specification FloroQuartz BC Epoxy - Colored Quartz 1/8 (0.125 mm) Double Broadcast Flooring System 1.01 System Description A. Roller-applied
More informationCON-DEK ICC-ES ESR-2097 SYSTEM
CON-DEK ICC-ES ESR-2097 SYSTEM Manufacturer Specifications Waterproof Deck Coating for Above Grade Concrete PART I. GENERAL 1.01 Scope A. Provide all labor, materials and equipment necessary to apply the
More informationDECOFLAKE DECORATIVE FLOORING SYSTEM
AIA Specification DECOFLAKE DECORATIVE FLOORING SYSTEM Part 1 - GENERAL General Provisions A. Work to be covered by this section, under written specification or by drawing, shall comply with all provisions
More informationPlayflex SAFETY TILES LAYOUT, DESIGN AND INSTALLATION NOTE BEFORE COMMENCING
Playflex SAFETY TILES LAYOUT, DESIGN AND INSTALLATION NOTE BEFORE COMMENCING (1) The customer or main contractor should always be made aware of the duration of the installation and limitations involved
More informationFlorock Seamless Flooring Systems
Architectural Specification FloroBuild PT/ HT Epoxy Mortar ¼ Power Trowel or Hand Trowel Flooring System Part 1: General 1.01 System Description A. Roller-applied 100% solids, penetrating epoxy primer
More informationThe following Supplemental Specification supersedes, in its entirety, the version contained in the Specifications for Bridge Construction
a. SUPPLEMENTAL SPECIFICATION SECTION 16, BRIDGE DECK WATERPROOFING The following Supplemental Specification supersedes, in its entirety, the version contained in the Specifications for Bridge Construction
More information1/16 Single Broadcast Polymer Flooring System
specification 1/16 Single Broadcast Polymer Flooring System Part 1 - GENERAL General Provisions A. Work to be covered by this section, under written specification or by drawing, shall comply with all provisions
More information1.02 RELATED REQUIREMENTS NOTE:
1 GENERAL NOTE: The following CSI (Construction Specifications Institute) section describes the resilient athletic flooring system to be installed on the specific project. The number and title of the section
More information1.02 RELATED REQUIREMENTS NOTE:
1 GENERAL NOTE: The following CSI (Construction Specifications Institute) section describes the resilient athletic flooring system to be installed on the specific project. The number and title of the section
More informationApplication Specification:
Application Specification: GW-15-UBU-HD April 2014 Supersedes 5/13 PART 1 - GENERAL 1.1 SUMMARY Division 07 18 16: GACOFLEX POLYURETHANE ELASTOMERIC COATING SYSTEM FOR VEHICULAR TRAFFIC DECKS AND RAMPS
More informationFlorock Seamless Flooring Systems
Architectural Specification Floropoxy/Florospartic 5 Self-Leveling Epoxy/Polyaspartic Flooring System Part 1: General 1.01 System Description A. Roller applied 100% solids, penetrating pigmented epoxy
More informationDecorative Quartz Floor Coating System
Decorative Quartz Floor Coating System 1.01 - Work Included 1. Furnish necessary material, labor, and equipment required to prepare designated areas and install a DecoFloor Quartz System 2. Submit three
More informationSECTION COATED RUBBER ATHLETIC FLOORING
SECTION 09622 COATED RUBBER ATHLETIC FLOORING [Notes like this one help the specifier identify and make selections. Remove all notes when editing is complete. You can remove them quickly by selecting all
More informationSECURE LOCK INTERLOCKING TILES Product Guide Specification
SECURE LOCK INTERLOCKING TILES Product Guide Specification PART 1 - GENERAL 1.1 SECTION INCLUDES A. Resilient, Interlocking, Playground Safety Surfacing Tiles. 1.2 REFERENCES A. ASTM F1292-18 - Standard
More informationSECTION and/or Resilient Sheet Flooring and/or Resilient Tile Flooring
Specifier Note: the following CSI (Construction Specifications Institute) section describes the resilient flooring system to be installed on the specific project. The number and title of the section may
More informationHIGH PERFORMANCE COATED ASPHALT SPECIFICATION
PART 1 GENERAL 1.1 DESCRIPTION A. StreetBond Advanced Coatings for Asphalt are specifically formulated for application to asphalt pavement and have been confirmed by a certified testing facility to possess
More informationASPHALTIC CONCRETE PAVING SECTION
SECTION 31 50 00 PART 1: GENERAL 1-01 SECTION INCLUDES: A. Asphaltic concrete paving. B. Seal Coat. 1-02 RELATED SECTIONS: A. Division 31 Earthwork B. Section 31 60 00 Aggregate Base Course. C. Section
More informationSECTION COATED RUBBER ATHLETIC FLOORING
SECTION 09622 COATED RUBBER ATHLETIC FLOORING [Notes like this one help the specifier identify and make selections. Remove all notes when editing is complete. You can remove them quickly by selecting all
More informationParks, Recreation and Community Services
Parks, Recreation and Community Services MEMORANDUM DATE: TO: THRU: FROM: SUBJECT: August 10, 2015 MAYOR AND CITY COUNCIL Andrew Clinger, City Manager~~ Kate Thomas, Assistant City Mana~ Andy Bass, Director,
More informationApplication Specification:
Application Specification: GW-15-UBU-HP April 2014 Supersedes 5/13 PART 1 - GENERAL 1.1 SUMMARY Division 07 18 16: GACOFLEX POLYURETHANE ELASTOMERIC COATING SYSTEM FOR HELICOPTER PADS A. This section describes
More informationFlorock Seamless Flooring Systems
Architectural Specification -- FloroCryl Shop MMA (Methyl Methacrylate) - Silica Sand Single Broadcast 1/16 (1.59 mm) Flooring System Part 1: General 1.01 System Description A. Roller-applied penetrating
More informationSECTION SELF-ADHERING SHEET MEMBRANE WATERPROOFING
SECTION 07 13 26 PART 1 - GENERAL 1.1 SUMMARY A. Scope: 1. Apply waterproofing to: a. Exterior of walls below grade: 1) Waterproofing shall include exterior of walls surrounding elevator pits and sumps.
More informationCUSTOM BRICK. Custom Brick Finish Polymer System Specifications For Use On Vertical Walls DS151. Architectural Finish for Use on Vertical Walls
CUSTOM BRICK Architectural Finish for Use on Vertical Walls Custom Brick Finish Polymer System Specifications For Use On Vertical Walls PART I- GENERAL DRYVIT SYSTEMS, INC. MANUFACTURER S SPECIFICATION
More informationBroadcast Parking Garage System
AIA Specification Part 1 General Broadcast Parking Garage System 1.01 Work Included A. All work to be provided in this section shall include material, labor, and equipment necessary to furnish the complete
More informationSECTION RESINOUS FLOORING
SECTION 09705 PART I - GENERAL 1.01 DESCRIPTION A. Scope: Work of this Section includes all materials and installation necessary to provide resinous flooring system with integral cove base and top finish
More informationSECTION and/or Resilient Sheet Flooring and/or Resilient Tile Flooring
Specifier Note: the following CSI (Construction Specifications Institute) section describes the resilient flooring system to be installed on the specific project. The number and title of the section may
More informationFlorock Seamless Flooring Systems
Architectural Specification Florotallic Epoxy and Urethane Flooring System Part 1: General 1.01 System Description A. Roller-applied 100% solids, penetrating epoxy primer, decorative pigmented epoxy coatings
More informationPacific Polymers Elasto-Deck 5000X2 Guide Specification
1 071813-1 July 2018 Pacific Polymers Elasto-Deck 5000X2 Guide Specification SECTION 071813 TRAFFIC COATINGS ELASTO-DECK 5000X2 OVER CONCRETE 2 071813-2 July 2018 Pacific Polymers Elasto-Deck 5000X2 Guide
More informationITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS DESCRIPTION
ITEM P-609 SEAL COATS AND BITUMINOUS SURFACE TREATMENTS DESCRIPTION 609-1.1 This item shall consist of an aggregate filled polymerized seal coat composed of a single or two coat application placed on the
More informationSECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE
SECTION 09730 EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE PART 1 GENERAL 1.01 SUMMARY A. Related Sections: 1. 03300 - Cast-in-Place Concrete. 2. 09000 - Patching and Finishes. 3. 09900 - Painting. 4.
More informationBid Opportunity Wilkes Reservoir North Cell Rehabilitation
Water and Waste MONOMER (EPDM) ROOFING Page 1 of 11 Part 1 General 1.1 REFERENCES.1 ASTM International Inc..1 ASTM D4637-14E1, Standard Specification for EPDM Sheet Used In Single-Ply Roof Membrane..2
More information1. Amarco Products Athletic Recycled Rubber Sports Flooring Rolls and Interlocking Tiles 2. Adhesives
PART 1.0 GENERAL 1.1 SUMMARY DIVISION 9 Finishes: SECTION 09 65 66 Resilient Athletic Flooring Amarco Products Sports Flooring Rolls and Interlocking Tiles Recycled Rubber Flooring Patent No. RE 9,096,045
More informationVapor-Clear. The high-performance, low-cost, eco-friendly, aesthetically-pleasing alternative to high-build epoxy floors and boring
advanced moisture control, inc. The high-performance, low-cost, eco-friendly, aesthetically-pleasing alternative to high-build epoxy floors and boring 250 polished concrete slabs! Made in Southern California,
More informationRust-Oleum Industrial Brands Specification
Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 22 A solvent based coating system Concrete Saver AS5400Anti-Slip High One-Step Epoxy System
More informationCUSTOM BRICK. Custom Brick Finish Polymer System Specifications For Use On Vertical Walls DS151. Architectural Finish for Use on Vertical Walls
CUSTOM BRICK Architectural Finish for Use on Vertical Walls Custom Brick Finish Polymer System Specifications For Use On Vertical Walls PART I- GENERAL DRYVIT SYSTEMS, INC. MANUFACTURER S SPECIFICATION
More informationSPECIAL SPECIFICATION 3289 High Friction Surface Treatment
2004 Specifications CSJ 0013-06-042, Etc. SPECIAL SPECIFICATION 3289 High Friction Surface Treatment 1. Description. Furnish and apply a high friction surfacing system in accordance with this Specification
More informationSECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE
PART 1 GENERAL 1.01 SUMMARY SECTION 09730 EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE A. Related Sections: 1. 03300 - Cast-in-Place Concrete. 2. 09000 - Patching and Finishes. 3. 09900 - Painting. 4.
More informationHMA PAVEMENT TEXTURING SPECIFICATION. SECTION High Performance HMA Pavement Texturing System
SECTION 02760 High Performance HMA Pavement Texturing System PART 1 GENERAL 1.1 DESCRIPTION A. HMA Pavement texturing is defined as a treatment of the surface of Hot Mixed Asphalt (HMA) pavement by imprinting
More informationStanford University Facilities Design Guidelines SECTION ASPHALT UNIT PAVING. A. ASTM C-33 Standard Specification for Concrete Aggregates.
SECTION 32 14 23 ASPHALT UNIT PAVING PART 1 GENERAL 1.1 DESCRIPTION Work Included: All labor, materials, appliances, tools, equipment, facilities, transportation, and services for and incidental to performing
More informationSECTION EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE
PART 1 GENERAL 1.01 SUMMARY SECTION 09730 EPOXY RESIN FLOORING WITH INTEGRAL COVE BASE A. Related Sections: 1. 03300 - Cast-in-Place Concrete. 2. 09000 - Patching and Finishes. 3. 09900 - Painting. 4.
More informationRust-Oleum Industrial Brands Specification
Rust-Oleum Industrial Brands Specification Coating Specification for Rust-Oleum Virtual Solutions Coating Solution 14 A 100% solids epoxy coating system Concrete Saver 6500 System 100% Solids Epoxy For
More informationStreetBondSR Specification Help
StreetBondSR Specification Help STREETBOND SR COATING PART 1 GENERAL 1.1 Description A. StreetBond coating is a highly specialised coating specifically designed for application onto asphalt pavement as
More informationEPOXY TERRAZZO 1 REV. 8/02
PART 1 - GENERAL GUIDE SPECIFICATIONS section 9400 EPOXY THINSET TERRAZZO (Without A Crack Suppression Membrane) REVISED MAY 2003 1.1 RELATED DOCUMENTS A. Section includes thin-set epoxy terrazzo flooring
More informationDivision 9: Section RESILIENT ATHLETIC SURFACING (Regupol AktivLok Recycled Rubber)
Division 9: Section 09 65 66 RESILIENT ATHLETIC SURFACING (Regupol AktivLok Recycled Rubber) PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Resilient Flooring, including recycled rubber flooring. 1.
More informationSECTION PLAYGROUND SAFETY SURFACING. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.
SECTION 321810 PART 1 GENERAL 1.01 GENERAL REQUIREMENTS A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION. B. Examine all conditions as they exist at the project prior to submitting
More informationAction Herculan RH Synthetic Floor System
Action Herculan RH 800 6+3 Synthetic Floor System SPORTS FLOOR SPECIFICATIONS Action Floor Systems, LLC toll free: 800-746-3512 4781 N. US Hwy 51 Mercer, WI 54547 voice: 715-476-3512 fax: 715-476-3585
More informationBONDED UNITARY RUBBER PROTECTIVE PLAYGROUND SURFACING
BONDED UNITARY RUBBER PROTECTIVE PLAYGROUND SURFACING PART 1 GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division
More informationECOfit Rolls GUIDE SPECIFICATIONS ECORE Commercial Flooring
September 10th, 2015-This document is provided solely as a convenience for spec writers in the drafting process. Ecore will not be held responsible for the use or alteration of any information contained
More information