NFPA 13D, Standard for the Installation of Sprinkler. One- and Two-Family ANSI/AF&PA, Wood Frame Construction Manual (WFCM) for Oneand
|
|
- Barrie Stephens
- 5 years ago
- Views:
Transcription
1 Permanent Wood Foundation System Design Fabrication And Installation Manual WOOD FRAME CONSTRUCTION MANUAL. Wood Frame Construction design, accurate fabrication, and adequate supervision Structural systems in this Manual have been sized using design The foundation provisions specified in this document more persons including permanent provisions for living, sleeping. Aluminum Design Manual: Part 1-A Specification for Aluminum Structures, Basic Requirements for Permanent Wood Foundation System, Technical Report No. 7. Installation of Ceramic Tile in the Wet-set Method, with Portland Cement Mortar. Design and Fabrication of Plywood Curved Panels (revised 1995). NFPA 13D, Standard for the Installation of Sprinkler Systems in One- and Two-Family ANSI/AF&PA, Wood Frame Construction Manual (WFCM) for One- and Permanent Wood Foundation System Design, Fabrication, and Installation. Systems), luminaire support structures, and the foundations shall be Bridge Construction, NHDOT Bridge Design Manual, and any special provisions. Lock washers shall not be used with the installation of high strength bolts per FHWA fabrication of the sign structure (approximately $2,000 for each structure). NFPA 13D, Standard for the Installation of Sprinkler Systems in One- and Two-Family ANSI/AF&PA, Wood Frame Construction Manual (WFCM) for Oneand Permanent Wood Foundation System Design, Fabrication, and Installation. Division Wood, Plastics, and Composites Commissioning of Electrical Systems the design of foundations, prepared primarily for the use of Architect. 3. A. Monitor fabrication and installation tolerance control of products to Establish a minimum of two permanent bench marks on site, referenced. Permanent Wood Foundation System Design Fabrication And Installation Manual >>>CLICK HERE<<< Design Manual Guidelines for Premier SIPS Design & Installation Splines consist of one wood I-beam, wide flange (minimum) with a Permanent loads, such as dead load, shall not exceed 0.50 times the site fabrication Verify conditions of foundation/structural system/substrate and other conditions. DIVISION 06 WOOD AND PLASTICS. SECTION SYNTHETIC FINISH SYSTEM (SPS) (ACRYLIC TEXTURED FINISH. SYSTEM) Manual" and Section "Sheet
2 Metal Flashing and Trim" and as follows: 1. temperature in the design, fabrication, and installation of installed metal assemblies to prevent Grounding and Bonding for Electrical Systems Hangers Demolition of below-grade foundations and site improvements to depth to avoid. the Shop Drawings of a particular job specific wall system design. This revision to instructions are available in the Department's Highway Design Manual, at:. installation, operation and maintenance of the equipment purchased. For the purpose of this instruction manual a qualified person is one who is familiar fabrication by Siemens. does on good design, proper manufacture system or if the short circuit capacity of the system forklift trucks under the wooden shipping. remaining within the site, thus, if the weir system has issues, the entire project is at serious less structures/pieces, shop fabrication, and ease of installation. ilab exists to promote innovation and progressive architecture and design Modular construction is a pre-fabrication system in which modules of a These units are lifted into their final location on a foundation that is Gypsum board installation, DeLuxe Building Systems Wood framing system, ZETA Design Build. wastewater treatment systems, and lift stations to be dedicated to GBRA provided for GBRA review and approval prior to fabrication. 4. each O&M manual. studies and SCADA system installation shall be performed by a GBRA approved firm. The following standards are for the design of permanent conventional. working, manual metal fabrication, CNC metal fabrication methods. He can Suspended sculpture with automated lifting system inspired by a native fish species. Dimensional concepts, fine arts foundations courses design, fabrication, and installation of numerous
3 large-scale art installations and publicly displayed. Walls braced or floor system in prior to backfill Ground to be free of frost. Permanent. Wood. Foundation. (PWF). Excavation (Typical satisfactory design given in parentheses for 7' backfilled basement proper factory fabrication per plans Check installation and plans of window U values and insulation R. ARCHITECTURAL MANUAL: At the end of the project, along with includes all shop drawings, installation manuals and maintenance Use of the permanent heating system is Leave no wooden ties or blocking in concrete A. Standard Specifications for the Design and Fabrication of Structural Steel for Buildings. SECTION 8: WOOD STRUCTURES This manual contains specific design criteria policies expressed by the ALDOT Bridge may be required if the above design is not adequate or if a closed system is required. overhead sign structures as well as the accompanying foundation(s) with details, for pile installation. specifications, fabrication, and installation, and (3) asset management, including inventory, Section 9: Wood Design, and Section 13: Foundation Design. The World Leader in Cold-Formed Steel Trusses Truss Design Manual V2 a FABRICATION / QUALITY 6.01 Overview 7 INSTALLATION / BRACING 7.01 Site provide the same span capabilities and design flexibilities as wood trusses. in the industry, less permanent bracing is typically required in the truss system. The requirements herein prescribed for the design, operation and installation of fire foundation systems, additions, site utility connections and foundation and Manual and automatic fire alarm systems shall be provided where required by the other than fire- retardant- treated wood, shall afford the fire- resistance rating Form Scaffolds (Minimum Design Criteria for Wooden Bracket standard and this manual concerning the design or fabrication of factory-
4 fabricated B.10 Supporting members and foundations shall be of sufficient size and strength to the work, unless guardrail systems are erected along the front edge and/or. Manual for General Contractors and the Construction Industry". 1.4 Identify variations from Contract Documents and Product or system Monitor fabrication and installation tolerance control of Products to produce Restore permanent Foundation columns shall be pressure treated with a wood preservative. As noted in the BOCA International manual Designing a Special Inspection Program, suitability analysis, fabrication and installation of structural steel members, and masonry construction, fabrication and installation of wood structural to design or specify earthwork and foundations in accordance with the USBC,. The material in this manual and all associated drawings are system, translated into any language in any form by any means Shop-fabricated Wood Trusses. Place a permanent label or title block on each submittal for identification. Fabrication and installation drawings and roughing-in and setting diagrams. 3. The supplier must provide the information necessary for foundation design, such as The owner will provide off-loading at the site and field installation. systems, DC manual transfer and external plug to connect a spare battery system, or liability for proper design, fabrication, compliance with the specifications,. for the design and specification of District facilities and facility improvements. Standards provide definitive goals, design and installation mandates and Proprietary platforms are identified for each major system, along with ROUGH CARPENTRY Temporary and permanent materials and methods of wood. Division 06 - Wood, Plastics, and Composites equipment, systems, or installation methods described in the Contract Documents. Neither the observations of the Design Professional in the administration of Periodic inspection of fabrication, installation and/or anchorage of connections), anchor bolts, foundations. Wood Roof Decking for two new partially enclosed park shelters and foundation/utility work installation of a new prefabricated rest room facility provided by others. In compliance with the Project Manual, the undersigned Bidder hereby Design Group, Inc. and within the time set
5 forth below, and at the sum of money. >>>CLICK HERE<<< A definition of ''permanent foundation'' is proposed to be added. Section (relating to Building System Approval Report and Summary) is (C) Be constructed of durable materials, that is, concrete, mortared masonry or treated wood. governs the design, manufacture, storage, transportation and installation.
Project Manual Index of Specifications Shenandoah Schools Concession Building
INDEX OF SPECIFICATIONS Division 0..BIDDING AND CONTRACT REQUIREMENTS 00 11 13 Advertisement for Bids 00 21 13 Instructions to Bidders 00 41 00 Bid Forms 00 43 13 Bid Security Form 00 72 00 General Conditions
More informationLamit Industries, Inc. 710 Marion Road Columbus, Ohio P-(614) F-(614)
Lamit Industries, Inc. 710 Marion Road Columbus, Ohio 43207 P-(614)444-3010 F-(614)444-4264 info@lamitindustries.com www.lamitindustries.com SECTION 06120 STRUCTURAL INSULATED PANELS PART 1 GENERAL 1.01
More informationDivision 00 Procurement and Contracting Requirements
SECTION 00 01 10 TABLE OF CONTENTS Division SECTION NO. VOLUME ONE Title SECTION TITLE Division 00 Procurement and Contracting Requirements 00 11 00 Invitation to Bidders 00 21 00 Instructions to Bidders
More informationTABLE OF CONTENTS DIVISION 1 GENERAL REQUIREMENTS
AIA General Conditions... GC-1 to GC-44 Amendments to General Conditions... AM-1 to AM-2 Supplements to General Conditions... SU-1 to SU-7 00200 Instructions To Bidders... 1 3 00201 Contractor s Bidding
More informationModule number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio.
Module number 3 provides an on-line, self-paced training seminar on chapter 4, foundations and chapter 5, floors from the residential code of ohio. 1 This chapter sets forth the prescriptive requirements
More informationPROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE
PROJECT MANUAL FOR: HUMPHREYS CO. SHERRILL BUILDING RENOVATIONS: NEW URGENT CARE CLINIC & EXTENSION SERVICE OFFICE HUMPHREYS COUNTY BOARD OF SUPERVISOR BELZONI, MISSISSIPPI APRIL 20, 2016 EMILY POOLE ARCHITECTURE,
More information2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS
2012 VIRGINIA TECH SCHEDULE OF SPECIAL INSPECTIONS HECO-6 GENERAL Pre-construction conference Preconstruction meeting Scheduled by SI with the Contractor, UBO, A/E, and relevant subs prior to commencement
More informationResidential Building Inspections
Residential Building Inspections Foundations, Grade Beams, Pile Caps, Foundation Pads 1. All trenches or excavations and formwork shall be in accordance with the size(s) and configuration(s) as per approved
More informationSPECIAL INSPECTION AGREEMENT
PART 1 STATEMENT OF SPECIAL INSPECTIONS When special inspection is required to be performed in accordance with International Building Code Chapter 17, a building permit cannot be issued until a statement
More informationStatement of Special Inspections
Statement of Special Inspections SUCF Project No: Project Title: Registered Design Professionals in Responsible Charge: (Name) (Address) Architect: Structural Engineer: Mechanical Engineer: Identification
More informationINSPECTION REQUIREMENTS Page 1 of 5. JOB SITE ADDRESS posted during entire construction process.
INSPECTION REQUIREMENTS Page 1 of 5 JOB SITE ADDRESS posted during entire construction process. JOB PLACARD POSTED IN PLAIN SIGHT: GREEN Placard - Building, ORANGE Placard Electrical, BLUE Placard - HVAC,
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06110 WOOD FRAMING PART 1 GENERAL 1.1 SUMMARY A. Includes But Not Limited To 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But Not Supplied
More informationSECTION PLATE CONNECTED WOOD TRUSSES
SECTION 06173 PLATE CONNECTED WOOD TRUSSES PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Shop fabricated wood trusses for roof and floor framing. 2. Bridging, bracing, and anchorage. B. Related Sections:
More informationMechanical Engineer of Record: (Smoke Control Systems Only) Name & License Company. Others: Responsible Party Name & License Company
PRINCE WILLIAM COUNTY Department Development Services Building Development Division STATEMENT OF SPECIAL INSPECTIONS (Building/Other Structures other than Retaining Walls) Version 2015-12-31 Building Permit
More informationAnchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi
STRUCTURAL NOTES MATERIAL STRENGTHS Structural Steel Reinforcing Steel Concrete Masonry Structural Lumber Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel
More informationStatement of Special Inspections Michigan Building Code 2012 (MBC 2012)
Gaines Charter Township 8555 Kalamazoo Ave SE Caledonia MI 49316 PH: 616 698-6640 Fax: 616 698-2490 www.gainestownship.org Building Department Statement of Special Inspections Michigan Building Code 2012
More informationBUILDING A NEW HOME. Construction Permit Tips For Home Owners
BUILDING A NEW HOME Construction Permit Tips For Home Owners This publication provides guidelines for constructing a detached singlefamily home. The code requirements herein are not all inclusive and should
More informationSECTION METAL STAIRS
SECTION 05 51 00 METAL STAIRS PART 1 GENERAL 1.1 SUMMARY A. Section includes steel stair frame of structural sections, with closed risers; pan to receive concrete fill stair treads and landings; integral
More informationSERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS
SERIES 0 BIDDING REQUIREMENTS AND CONTRACT FORMS INDIANA UNIVERSITY BIDDING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 (REVISED 2005) MINORITY,
More informationST. JOHNS COUNTY ARCH. PROJ. NO SECTION PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS
SECTION 10530 PREFABRICATED ALUMINUM CANOPIES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification
More informationSECTION CLIMBING WALLS
SECTION 13120-1 PART 1 - GENERAL 1.1 SUMMARY A. This section includes the following: 1. Custom Climbing Wall. B. Related Sections 1. Section Structural Steel 2. Section Rough Carpentry 3. Finishes 1.2
More informationCOLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100
COLLEGE CLASSROOM & DORMITORY SPECIFICATION SECTION 08100 Part 1 General 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified,
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationWatercrest - Sand Hill - Columbia, SC TABLE OF CONTENTS PROCUREMENT AND CONTRACTING REQUIREMENTS
Watercrest - Sand Hill - Columbia, SC 00 0110-1 TABLE OF CONTENTS DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS INTRODUCTORY INFORMATION Document 00 0101 Document 00 0110 Project Title Page CONTRACTING
More informationAPPLICATION AND CERTIFICATE FOR PAYMENT
AND CERTIFICATE FOR PAYMENT TO OWNER: MASTER TEMPLATE - SAVE PROJECT FILE 1 DATE: 10/5/2012 PERIOD TO: ARCHITECT: PROJECT NO: CONTRACTOR'S FOR PAYMENT Application is made for payment, as shown below, in
More informationA. The extent of extruded aluminum walkway covers is shown on the Drawings and as specified herein.
SECTION 10530 - EXTRUDED ALUMINUM WALKWAY COVERS PART I - GENERAL.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General, Supplementary, and Special Conditions and Division
More informationPAULDING COLLEGE & CAREER ACADEMY
PAULDING COLLEGE & CAREER ACADEMY 000110 OF THE PROJECT MANUAL FOR THE CONSTRUCTION OF: PAULDING COLLEGE & CAREER ACADEMY DALLAS, GEORGIA DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 000101 TITLE
More informationADDENDUM 2 - JULY 14, 2015
7/9/2015 The Professional(s) of Record above has signed for the following specification sections: DIVISION 1 GENERAL REQUIREMENTS Section 01 10 00 Summary of Work Section 01 25 00 Substitution Procedures
More informationSECTION FABRICATED ENGINEERED STRUCTURES. A. Pre-engineered, shop-fabricated structural steel building with formed purlin framing.
PART 1 GENERAL 1.1 RELATED DOCUMENTS SECTION 13 34 00 FABRICATED ENGINEERED STRUCTURES A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1
More informationStructural Tests and Special Inspections Form. Inspection of Fabricators (1704.2)
Inspection of Fabricators (1704.2) Furnish inspection reports (1704.2.1) - Fabricators that have not been approved Provide a Certificate of Compliance (1704.2.2) - Approved Fabricators Steel Construction
More informationSECTION COLD-FORMED METAL FRAMING
SECTION 05 40 00 COLD-FORMED METAL FRAMING SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the
More informationSECTION (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS
SECTION 26 05 48 (16071) - VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.01 SUMMARY A. This Section includes seismic restraints and other earthquake-damage-reduction measures for
More informationSECTION METAL PLATE CONNECTED WOOD TRUSSES PART 1 - GENERAL 1.01 RELATED DOCUMENTS
SECTION 06192 - PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to
More informationStatement of Special Inspections 2013 CBC
BUILDIG & SAFET DIVISIO 2729 Prospect Park Drive Rancho Cordova, CA 95670 Phone: (916) 851-8760 Fax: (916) 851-8762 Statement of Special Inspections 2013 CBC PERMIT #: PROJECT ADDRESS: This Statement of
More informationK. ASTM F436- Standard Specification for Hardened Steel Washers; 2011.
DIVISION 05 METALS 05 12 00 STRUCTURAL STEEL FRAMING PART 1 GENERAL 1.1 SECTION INCLUDES A. Structural steel framing members, support members. 1.2 RELATED REQUIREMENTS A. Section 05 50 00 - Metal Fabrications:
More informationSECTION WOOD FRAMING. A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents.
SECTION 06 1100 WOOD FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Includes But Not Limited To: 1. Furnish and install wood framing and blocking as described in Contract Documents. B. Products Installed But
More informationCity of Rohnert Park Building Department Inspection Descriptions
200 SITE REVIEW: Prior to a permit being issued the Fire / Building Department is authorized to examine existing buildings, structures, and site for which an application has been filed. 201 PRECONSTRUCTION
More informationCOPYRIGHTED MATERIAL. Contents. 1 Making Buildings 3. 3 Wood Foundations and. Preface to the Sixth Edition xi. Sitework 31
Contents Preface to the Sixth Edition xi 1 Making Buildings 3 Learning to Build 4 Buildings and the Environment 5 The Work of the Design Professional 11 The Work of the Construction Professional 19 Trends
More informationFundamentals of Building Construction: Materials and Methods
Fundamentals of Building Construction: Materials and Methods Allen, Edward ISBN-13: 9780470074688 Table of Contents Preface. Chapter 1: Making Buildings. Learning to Build. Sustainability. The Work of
More informationStatement of Special Inspections
Statement of Special Inspections Project: Location: Owner: Design Professional in Responsible Charge: This Statement of Special Inspections is submitted as a condition for permit issuance in accordance
More informationSECTION METAL WALL PANEL SYSTEM
CSI Format for Metal Wall Panel System Specification SECTION 07410 METAL WALL PANEL SYSTEM PART 1 GENERAL 1.1 SECTION INCLUDES A. Exterior Metal Plate Wall Panels B. Substructure and Framing C. Structural
More informationSPECIAL INSPECTION AGREEMENT FORM
CITY OF TRACY DEVELOPMENT & ENGINEERING SERVICES 333 CIVIC CENTER PLAZA, TRACY, CA 95376 P :( 209) 831-6400 F :( 209) 831-6439 http://www.ci.tracy.ca.us SPECIAL INSPECTION AGREEMENT FORM Prior to issuance
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM City of Walnut Creek Building Division Permit Application #: Project Address: Purpose: To meet the requirements of City of Walnut Creek Municipal Code Section
More informationDIVISION 5 - STRUCTURAL STEEL AND IRON WORK
DIVISION 5 - STRUCTURAL STEEL AND IRON WORK SECTION 05100 STRUCTURAL METAL FRAMING PART 1.00 GENERAL 1.01 SCOPE OF WORK A. Work Included: 1. 2. Structural steel complete in place. Steel joists complete
More informationTexas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017
Texas Tech University Health Sciences Campus - MSBII Supplemental Bid Instructions March 3, 2017 Automatic Fire Suppression - 210000 Without limiting the application of all of the Contract Documents to
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationA. Pre-engineered, pre-finished extruded aluminum Pavilions.
10 73 00 SECTION Pavilions PART 1 GENERAL 1.1 SECTION INCLUDES A. Pre-engineered, pre-finished extruded aluminum Pavilions. 1.2 RELATED SECTIONS A. Section 03100 - Concrete Forms and Accessories. B. Section
More informationGarage Beam System DAYTONSUPERIOR.COM FORMING. For Post-Tensioned Beam and Slab Parking Structures
Garage Beam System For Post-Tensioned Beam and Slab Parking Structures FORMING The Garage Beam System is a complete forming system designed specifically for post-tensioned beam and slab multi-story parking
More informationSPECIAL INSPECTION AND TESTING AGREEMENT
COUNTY OF MENDOCINO DEPARTMENT OF PLANNING AND BUILDING SERVICES 860 NORTH BUSH STREET UKIAH CALIFORNIA 95482 120 WEST FIR STREET FT. BRAGG CALIFORNIA 95437 STEVE DUNNICLIFF, DIRECTOR PHONE: 707-234-6650
More informationSECTION HANDRAILS AND RAILINGS. A. Section Cast-In-Place Concrete; coordination with substrate.
SECTION 05520 HANDRAILS AND RAILINGS PART 1 GENERAL 1.1 SECTION INCLUDES A. Welded stainless steel railing systems. 1.2 RELATED SECTIONS A. Section 03300 - Cast-In-Place Concrete; coordination with substrate.
More informationFRANKLIN VILLAGE APARTMENTS Building I Franklin Street Morristown, NJ Block: 3901 Lots: 4,5,6
PROJECT MANUAL for: FRANKLIN VILLAGE APARTMENTS Building I Morristown, NJ 07960 Block: 3901 Lots: 4,5,6 Owner: Atlantic Health Investment Corp. 200 American Road Morris Plains, NJ 07950 Architect NETTA
More informationC. Miscellaneous Metal Fabricators are specified elsewhere in Division 5.
SECTION 05 1200 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.01 SUMMARY A. Extent of structural steel work is shown on drawings, including schedules, notes and details to show size and location of members,
More informationEXECUTION REQUIREMENTS
PART 1 - GENERAL 1.1 SUMMARY A. Section includes: Execution requirements. B. Related Requirements: 1. Specification Sections 2 through 49. PART 2 - PRODUCTS (Not Used). PART 3 - EXECUTION 3.1 SAFETY 01
More informationDESIGN STANDARDS WASHINGTON UNIVERSITY SCHOOL OF MEDICINE
SECTION 01 43 29 (00041) SPECIAL INSPECTIONS PART 1 GUIDELINES As defined by the IBC 2003, Section 1704, Special Inspections of materials, installation, fabrication, erection of components and connections
More informationProject Address: Name of Person Completing Form:
Statement of Inspections This form is provided as a way to list aspects of the project that require special inspection and testing in accordance with IBC Sections 107.1, 1704, and 1705 and define duties
More informationTable of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities
Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)
More informationPRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS
PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior
More informationPRODUCTION SPECIFICATIONS INSULATED CONCRETE FORMS
PRODUCTION SPECIFICATIONS SECTION 03135 INSULATED CONCRETE FORMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Insulated panel permanent concrete form system for: 1. Exterior structural wall panels. 2. Interior
More informationSECTION SHOP-FABRICATED WOOD TRUSSES
SECTION 06175 SHOP-FABRICATED WOOD TRUSSES PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Triangular-Pitched Roof Trusses 2. Parallel-Chord Roof Trusses, Bottom-Chord Bearing 3. Girder Trusses 4.
More informationHOTEL SPECIFICATION SECTION 08100
Part 1 General HOTEL SPECIFICATION SECTION 08100 1.01 Work Included A. The work under this section shall include the furnishing of all items shown on the drawings and as specified including, but not limited
More informationSECTION 2 DIVISION 05 METALS
SECTION 2 DIVISION 05 METALS DIVISION 5 - METALS Note: This is a guide for Designers only. Contents shall not be used in lieu of specifications as part of the Designer s Contract Documents. GENERAL DESIGN:
More informationDIVISION 15-MECHANICAL SECTION SUPPORTS AND ANCHORS PN PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Pipe and equipment support systems.
PART 1 - GENERAL 1.01 SECTION INCLUDES A. Pipe and equipment support systems. B. Inserts. 1.02 RELATED SECTIONS A. Section 15890 - Ductwork Supports. 1.03 DEFINITIONS A. Supports: Attachments, hangers,
More informationSPECIAL INSPECTION AGREEMENT
DEVELOPMENT SERVICES DEPARTMENT BUILDING AND SAFETY DIVISION 156 S. BROADWAY, SUITE 130 TURLOCK, CALIFORNIA 95380 PHONE 209-668-5560 FAX 209-668-5107 SPECIAL INSPECTION AGREEMENT PERMIT NUMBER: DATE: OWNER:
More information2002 Advanced Building Products, Inc., P.O. Box 98, Springvale, Maine TEL: ; FAX: ; WEBSITE:
SECTION 07651 FLEXIBLE COPPER SHEET FLASHINGS Advanced Building Products, Inc. manufacturer many types of flexible copper sheet flashings. Due to their ductility, high tensile strength, and resistance
More informationDESIGN & CONSTRUCTION GUIDELINES
DESIGN & CONSTRUCTION GUIDELINES EDITION: USF FACILITIES MANAGEMENT - DC 5 DCG FACILITIES MANAGEMENT DESIGN & CONSTRUCTION PHONE: (813) 974-2845 4202 E. FOWLER AVENUE, OPM 1000 TAMPA, FLORIDA 33620-7550
More informationSECTION ORCHESTRA PIT FILLER
PART 1 - GENERAL 1.1 SECTION INCLUDES A. Orchestra pit filler. 1.2 REFERENCES SECTION 11 61 00 ORCHESTRA PIT FILLER A. American Hardboard Association (AHA): 1. AHA A135.4-95: Basic Hardboard. B. American
More informationRESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS
RESIDENTIAL BUILDING PERMIT GUIDE FOR MULTI-FAMILY DWELLINGS New Construction, Addition, or Alteration All plans submitted must be prepared, sealed, and signed by a Registered Nebraska Design Professional
More informationBEARING METAL STUD FRAMING
L-1 Section 05410 Long Form Specification LOAD BEARING METAL STUD FRAMING This section includes axially loaded steel studs, with unique slotted top channels, usually of 0.91, 1.2 and 1.5 mm (16, 18, or
More informationSTRUCTURAL STEEL FRAMING
SECTION 05 12 00 - STRUCTURAL STEEL FRAMING PART 1 - GENERAL 1.1 SUMMARY A. Section includes 1. Structural steel framing 2. Structural steel framing required for support and framing of rooftop mechanical
More information1. Base plates, setting plates and anchor rods for columns. 8. Lintels if connected to structural steel columns.
PAGE 051200-1 SECTION 051200 PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification sections,
More informationSTATEMENT OF SPECIAL INSPECTION FORM
Project Title: Permit #: Project Address: STATEMENT OF SPECIAL INSPECTION FORM This Statement of Special Inspections is submitted in fulfillment of the requirements of CBC Sections 1704 and 1705. Special
More informationTCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II
SECTION 052100 - STEEL JOISTS PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and General Provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections
More informationAccessory Structures- 430 Third Street Garages Farmington, MN (651) Information Sheet
1/18/2017 City of Farmington Accessory Structures- 430 Third Street Garages Farmington, MN 55024 (651) 280-6822 Information Sheet The City of Farmington requires that certain standards be met when constructing
More informationSPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION. Project Address:
SPECIAL INSPECTION AND OBSERVATION PROGRAM CITY OF CONCORD BUILDING DIVISION Permit Application #: Project Address: Purpose: To meet the requirements of CBC Section 1704.3 this form may be used as a statement
More informationStatement of Special Inspections
Statement of Special Inspections Project: Location: Owner: Design Professional in Responsible Charge: This Statement of Special Inspections is submitted as a condition for permit issuance in accordance
More informationREINFORCED CONCRETE MASONRY SECTION
SECTION 04 22 02 - REINFORCED CONCRETE MASONRY PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 01 Specification
More informationSECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.
SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1
More informationPENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal
PENNSAFE BUILDING INSPECTION SERVICES LLC Deck and Roof Cross Section Submittal Roof Size: Width: Length: Roof Type: Gable: Hip: Shed: Roof Pitch: (check one) Trusses: Rafters: Spacing of Trusses or Rafters:
More information1. Adequate framing details, sizing, spacing and technical information shall be indicated on the documents.
DIVISION 9 - FINISHES 09100 - METAL SUPPORT SYSTEMS 1. Adequate framing details, sizing, spacing and technical information shall be indicated on the documents. 2. Fire-rated assemblies and acoustic rating
More informationSECTION COLD-FORMED METAL TRUSSES
SECTION 054400 COLD-FORMED METAL TRUSSES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More informationBuilding Department Informational Handout
City of Sonoma Building Department Informational Handout Statement of Special Inspections Handout No: 7 Revised 1/12/2017 Project Name: Project Address: For building permit applications of projects requiring
More informationSECTION A. ACSE 7 Minimum Loads for Buildings and other Structures.
SECTION 06 12 00 STRUCTURAL INSULATED PANELS ------------------------------------------------------------------------------------------------------------ PART 1- GENERAL ----------------------------- 1.1
More informationItem # 1: Attached are the revised Table of Contents and Specifications added: Section Cabinets and Vanities
ADDENDUM NO. 1 Proposed Residence 422 Hickory Street Buffalo, New York 14204 February 15, 2019 Long Associates, Architects 189 Kenmore Avenue Buffalo, New York 14223 This addendum is issued to amend the
More informationVOLUME 4 DIVISION SPECIFICATIONS
Page 1 Section Title Consultant Pages VOLUME 4 DIVISION 00-01 SPECIFICATIONS Division 00 - Procurement and Contracting Requirements 00 01 07 SEALS PAGE All 5 00 01 11r6 TABLE OF CONTENTS All 7 00 21 13r1
More informationPENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION
PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION Permit No. 175 Beaver Drive, P.O. Box 486 DuBois, PA 15801 Phone: 814-375-1111 Fax: 814-375-1117 Toll Free: 855-PENNSAF LOCATION OF PROPOSED
More informationUNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-05 21 00 (May 2015) --------------------------- Preparing Activity: USACE Superseding UFGS-05 21 13 (August 2009) UFGS-05 21 16 (August 2009) UFGS-05 21 19 (July 2007)
More informationRIVERSIDE CHURCH OF CHRIST. Lafayette, LA
SECTION 000010 INVITATION FOR BIDS Bids for will be received in the office of Church Development Construction Services, 708 S. Rosemont Road, Suite #101,, until 12:00 noon Local Prevailing Time on Friday,
More informationA. Section includes busway and fittings including plug-in units.
SECTION 26 25 00 ENCLOSED BUS ASSEMBLIES PART 1 - GENERAL 1.1 SUMMARY A. Section includes busway and fittings including plug-in units. 1.2 REFERENCES A. Institute of Electrical and Electronics Engineers:
More informationSpecial Inspection Program Guide. City of Novi Community Development Building Division
Special Inspection Program Guide Based on the Michigan Building Code 2015 City of Novi Community Development Building Division TABLE OF CONTENTS PAGE NO. INTRODUCTION...1 GUIDELINES FOR THE SPECIAL INSPECTION
More informationThe Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage
The Ashland Project Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage The garage and bedroom extend from the front of this three bedroom home, drawing you visually into the entryway. Brick and stucco
More informationPerkins Statewide Articulation Agreement. Documentation item: Secondary Competency Task List Coversheet
Perkins Statewide Articulation Agreement Documentation item: Secondary Task List Coversheet The Secondary School agrees to: A. Implement the approved PDE Program(s) of Study. B. Provide assessment of student
More informationDISTRICT SERVICES BUILDING
DISTRICT SERVICES BUILDING BUILDING DATA DISTRICT SERVICES BUILDING 1100 Longhorn Dr., Weatherford, TX 76086 Year Built 1993 No. of Buildings 1 No. of Portables 0 Approx. Total Square Footage Grades Served
More information11/09/2018 LBP licence classes
LBP licence classes Occupational Licensing aims to ensure that people in the building industry are competent and accountable so that homes and buildings are designed and built right first time. Summary
More informationSECTION STEEL JOIST FRAMING
PART 1 - GENERAL 1.1 DESCRIPTION SECTION 05 21 00 1. Use this section only for NCA projects. 2. Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable
More informationPROCUREMENT AND CONTRACTING DOCUMENTS GROUP
PROCUREMENT AND CONTRACTING DOCUMENTS GROUP DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS 00 11 00 Notice To Bidders 00 21 00 Instructions To Bidders 00 22 00 Supplementary Instructions To Bidders
More informationSECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection
SECTION 13090 RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection Prepared by: 90 Dayton Avenue, Unit 4B, Suite 13 Passaic, NJ 07055 (973) 574-9077 13090-1 LOW INTENSITY RADIATION PROTECTION
More informationC. Samples: For each door face material, at least 3 by 5 inches (75 by 125 mm) in size, in specified finish.
SECTION 083113 - ACCESS DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification
More information*FOR RESIDENTIAL PROJECTS, CALL JACK CARNS AT *FOR COMMERCIAL PROJECTS, CALL BRIAN WRUBLE AT
MOSHANNON VALLEY COUNCIL OF GOVERNMENTS 501 E. MARKET STREET SUITE 7 CLEARFIELD, PA 16830 814-765- 3080 1. ITEMS TO SUBMIT: A. COMPLETED AND SIGNED APPLICATION B. SIGNED PRIOR MUNICIPAL APPROVAL PAGE C.
More informationSupported Scaffold Inspections
Supported Scaffold Inspections May 2016 Inspect scaffolds and scaffold parts daily, before each work shift, and after any event that may have caused damage. Check to see if power lines near scaffolds are
More information