Landfill Layout and Operation

Size: px
Start display at page:

Download "Landfill Layout and Operation"

Transcription

1 Landfill Layout and Operation Site layout Access roads permanent main roads temporary haul roads good access in all weather 22' wide, crowned for drainage slopes 7% for full truck 10% for empty truck Copyright Morton A. Barlaz, NC State University, 1

2 Landfill Layout and Operation Equipment shelters Office/scale house or trailer weight is required waste screening (2-4% of vehicles) Soil stockpile area Site buffer/visual screen Leachate treatment Sediment pond Copyright Morton A. Barlaz, NC State University, 2

3 Landfill Layout and Operation Truck washing area water accumulation in a depression an actual rinse Drop-off areas recyclables, HHW, white goods, tires, oil, car batteries yard waste - possibly composting Construction and demolition debris unlined section?? Copyright Morton A. Barlaz, NC State University, 3

4 Fill Plan Daily cell - typically the amount of refuse received in one day and covered Not to be confused with a larger cell 4-20 high, 8-12 typical Orient working face to minimize wind Placement of temporary litter control fence Copyright Morton A. Barlaz, NC State University, 4

5 Copyright Morton A. Barlaz, NC State University, 5

6 Fill Plan Size working face to minimize at-site time to extent practical ~20 per vehicle Normal vs. wet vs. windy weather disposal areas Copyright Morton A. Barlaz, NC State University, 6

7 Daily Cover Protects Against: wind blown debris odor animals Minimize the amount of cover needed historically soil at a ratio of: 4 yd 3 refuse/ 1 yd 3 soil now 9:1 is more typical, includes scraping some off in the morning Stockpile cover for wet and freezing periods excavate in areas of southern exposure Copyright Morton A. Barlaz, NC State University, 7

8 Alternative Daily Cover Foams which are sprayed on and last overnight Posi-shell Compost Mixed waste residual from a MRF Yard waste Plastic sheet one use multiple use C&D fines (without wallboard) Copyright Morton A. Barlaz, NC State University, 8

9 Alternative Daily Cover Revenue generating material contaminated soil foundry sand ash auto shredder fluff C&D fines Lime stabilized sludge Use soil as a fire break weekly Copyright Morton A. Barlaz, NC State University, 9

10 Plastic Sheets Pulled Over Refuse Sani-cover: vendor literature Lifecycle - 30 applications per panel claim 30 minute installation Must be held in place with soil, sandbags, tires One time use: 4 mil film, punch holes in morning Copyright Morton A. Barlaz, NC State University, 10

11 Copyright Morton A. Barlaz, NC State University, 11

12 Site Hydrology Run-on must be minimized through the use of diversion ditches Design for 25 year storm Manage water so minimum amount is contaminated Temporary berms Phased construction to avoid stormwater accumulation Valving/berm to segregate clean and contaminated water Sediment ponds to treat clean runoff Test impounded water before release Copyright Morton A. Barlaz, NC State University, 12

13 scale attendant /record keeper equipment operators compact refuse Push refuse haul cover? litter control traffic control manager mechanic/handyman site engineer - monitor fill plan miscellaneous Personnel Copyright Morton A. Barlaz, NC State University, 13

14 Personnel 2500 TPD Site: - 1-traffic control - 2-compactors - 2-laborers - 1-gate attendant Copyright Morton A. Barlaz, NC State University, 14

15 Refuse Density AUF airspace utilization factor Allow lb/yd 3 initially This values allows for: cover soil settlement Copyright Morton A. Barlaz, NC State University, 15

16 Variables in Compaction Lift thickness Number of passes Compactor weight Refuse Density Field test done under controlled conditions with 2000 tons of refuse No C&D waste, sludge, soil covers Heavy vehicles generally achieved better compaction but not always 4 passes 8 passes 1' lift lb/yd 3 1' lift lb/yd 3 2.5' lift lb/yd 3 2.5' lift lb/yd 3 Waste Age - Aug., 1994 Copyright Morton A. Barlaz, NC State University, 16

17 Landfill Fires Causes hot loads lightening cigarette butts hot equipment aeration due to wind spontaneous combustion? Copyright Morton A. Barlaz, NC State University, 17

18 Landfill Fires Most occur on windward side slopes Spreading from burning grass Practices to minimize potential for fire: good compaction soil cover daily load screening Copyright Morton A. Barlaz, NC State University, 18

NRG BRANDYWINE ASH STORAGE SITE BRANDYWINE, MARYLAND 2015 ANNUAL CCR INSPECTION REPORT

NRG BRANDYWINE ASH STORAGE SITE BRANDYWINE, MARYLAND 2015 ANNUAL CCR INSPECTION REPORT NRG BRANDYWINE ASH STORAGE SITE BRANDYWINE, MARYLAND 2015 ANNUAL CCR INSPECTION REPORT To: Walter Johnson, NRG MD Ash Management LLC From: Jeffrey Hutchins, P.E., AECOM Date: January 6, 2016 RE: Annual

More information

CCP Annual Inspection Report

CCP Annual Inspection Report CCP Annual Inspection Report Brickhaven No. 2 Mine Tract A Structural Fill DWM Permit 1910, DEMLR Permit 19-25 Charah, Inc. Moncure, North Carolina February 2018 This page intentionally left blank. Charah,

More information

Washington County Landfill Reconstruction Project: Progress Updates

Washington County Landfill Reconstruction Project: Progress Updates Home Site Index Glossary What's New Ask MPCA Visitor Center MPCA Home > Clean Up > Perfluorochemicals > Perfluorochemical (PFC) Waste Sites > Washington County Site Progress Updates Washington County Landfill

More information

Air classifier: Zig-zag. Copyright Anders Damgaard & Morton A. Barlaz, NC State University 36

Air classifier: Zig-zag. Copyright Anders Damgaard & Morton A. Barlaz, NC State University 36 Air classifier: Zig-zag Copyright Anders Damgaard & Morton A. Barlaz, NC State University 36 Material settling velocity Copyright Anders Damgaard & Morton A. Barlaz, NC State University 37 Optical sorting

More information

Water Pollution Control for Work in Sensitive Areas

Water Pollution Control for Work in Sensitive Areas Water Pollution Control for Work in Sensitive Areas 10-1. WATER POLLUTION CONTROL The Contractor is advised that failure to fully comply with the provisions of this Section, and all requirements listed

More information

Solid Waste Transfer Facility Daily Log of Operations {as required by OAC Rule } Yearly Cover Sheet (Form 1)

Solid Waste Transfer Facility Daily Log of Operations {as required by OAC Rule } Yearly Cover Sheet (Form 1) Division of Materials & Waste Management Solid Waste Transfer Facility Daily Log of Operations {as required by OAC Rule 3745-555-615} Yearly Cover Sheet (Form 1) This daily log cover sheet should be completed

More information

Landfill Operations to Improve Installation of Cap and Gas Collection

Landfill Operations to Improve Installation of Cap and Gas Collection Landfill Operations to Improve Installation of Cap and Gas Collection Mr. Amarjit Riat, P.E. Assistant Director, I-95 Landfill Complex Manager County of Fairfax, Virginia Methane to Markets Partnership

More information

2018 ANNUAL DUST CONTROL REPORT

2018 ANNUAL DUST CONTROL REPORT 2018 ANNUAL DUST CONTROL REPORT CCR Unit SCE&G Wateree Station 142 Wateree Station Road Eastover, S.C. 29044 SCANA Environmental Services December 19, 2018 TABLE OF CONTENTS SECTION 1 REGULATORY REQUIREMENTS...

More information

ENVIRONMENTAL EXCELLENCE TRANSFER STATION OPERATION PLAN

ENVIRONMENTAL EXCELLENCE TRANSFER STATION OPERATION PLAN ENVIRONMENTAL EXCELLENCE TRANSFER STATION OPERATION PLAN 2011 Bonneville County 605 N. Capital Ave. Idaho Falls, Idaho 83402 (208) 528-5550 INTRODUCTION ENVIRONMENTAL EXCELLENCE TRANSFER STATION OPERATION

More information

Florida Department of Environmental Protection Inspection Checklist 1659 NORTHWEST 10TH STREET

Florida Department of Environmental Protection Inspection Checklist 1659 NORTHWEST 10TH STREET Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: GILCHRIST COUNTY CENTRAL WASTE MANAGEMENT FACILITY - On-Site Inspection Start Date: On-Site Inspection

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: DELAND LANDFILL, CLASS III On-Site Inspection Start Date: On-Site Inspection End Date: WACS : 29244

More information

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION INSPECTION CHECKLIST

FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION INSPECTION CHECKLIST Facility Information: Facility Name: On-Site Inspection Start Date: 06/05/2008 On-Site Inspection End Date: 06/05/2008 WACS : 73114 Facility Street Address: STOCKADE RD @ CR846 City: IMMOKALEE County Name:

More information

Construction & Demolition Debris Facility Daily Log of Operations {as required by O.A.C. Rules (B)(9)&(10)} Yearly Cover Sheet Form 1

Construction & Demolition Debris Facility Daily Log of Operations {as required by O.A.C. Rules (B)(9)&(10)} Yearly Cover Sheet Form 1 Division of Materials & Waste Management Construction & Demolition Debris Facility Daily Log of Operations {as required by O.A.C. Rules 3745-400-11(B)(9)&(10)} Yearly Cover Sheet Form 1 This daily log

More information

Concrete Waste Management

Concrete Waste Management Objectives EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Objective

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO. 0199-S3N-R3 AFIN: 35-00110 JANUARY 15, 2016 ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

CCP Annual Inspection Report

CCP Annual Inspection Report CCP Annual Inspection Report Brickhaven No. 2 Mine Tract A Structural Fill DWM Permit 1910, DEMLR Permit 19-25 Charah, Inc. Moncure, North Carolina October 2016 This page intentionally left blank. Charah,

More information

Annual CCR Fugitive Dust Control Report

Annual CCR Fugitive Dust Control Report Annual CCR Fugitive Dust Control Report Mill Creek Generating Station Louisville Gas & Electric Company Jefferson County, Kentucky December 2017 Annual CCR Fugitive Dust Control Report Mill Creek Generating

More information

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES Construction Best Management Practices Handbook www.montereysea.org BEST MANAGEMENT PRACTICES 26 www.montereysea.org Construction Best Management Practices Handbook VEHICLE TRACKING AND DUST CONTROL IN

More information

APPROVED ALTERNATIVE DAILY COVER MATERIALS FOR USE AT SANITARY LANDFILLS

APPROVED ALTERNATIVE DAILY COVER MATERIALS FOR USE AT SANITARY LANDFILLS North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section APPROVED ALTERNATIVE DAILY COVER MATERIALS FOR USE AT SANITARY LANDFILLS Date of Issue: July 21, 2017

More information

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN

COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN COAL COMBUSTION RESIDUALS FUGITIVE DUST CONTROL PLAN NRG BRANDYWINE COAL ASH MANAGEMENT SITE Prepared for NRG MD Ash Management LLC 25100 Chalk Point Road Aquasco, MD. 20608 September 28, 2015 12420 Milestone

More information

Jim Bridger Power Plant

Jim Bridger Power Plant 2015 Coal Combustion Residuals Annual Inspection Jim Bridger Power Plant Industrial Landfill Prepared for PacifiCorp Energy North Temple Office 1407 West North Temple Salt Lake City, Utah 84116 Final December

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: BASELINE LANDFILL CLASS I On-Site Inspection Start Date: On-Site Inspection End Date: WACS : 20906

More information

Concrete Waste Management

Concrete Waste Management Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

WASTE MANAGEMENT OF NEW YORK CHAFFEE FACILITY WESTERN LANDFILL EXPANSION 6 NYCRR PART 360 SOLID WASTE MANAGEMENT PERMIT MODIFICATION APPLICATION

WASTE MANAGEMENT OF NEW YORK CHAFFEE FACILITY WESTERN LANDFILL EXPANSION 6 NYCRR PART 360 SOLID WASTE MANAGEMENT PERMIT MODIFICATION APPLICATION WASTE MANAGEMENT OF NEW YORK CHAFFEE FACILITY WESTERN LANDFILL EXPANSION 6 NYCRR PART 360 SOLID WASTE MANAGEMENT PERMIT MODIFICATION APPLICATION PART VIII OPERATION AND MAINTENANCE MANUAL Prepared for:

More information

CCE AWARD SUBMISSION BARRIE LANDFILL RECLAMATION AND RE-ENGINEERING

CCE AWARD SUBMISSION BARRIE LANDFILL RECLAMATION AND RE-ENGINEERING CCE AWARD SUBMISSION BARRIE LANDFILL RECLAMATION AND RE-ENGINEERING 2 CCE AWARD SUBMISSION GOLDER ASSOCIATES LTD. SUMMARY The City of Barrie landfill was impacting water resources and required remediation.

More information

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 0200-S3N-R2 AFIN: 32-00042 JANUARY 15, 2016 ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL 2015 ANNUAL ENGINEERING

More information

R.I.G. Alternate Daily Cover The easiest way to improve efficiency of MSW systems

R.I.G. Alternate Daily Cover The easiest way to improve efficiency of MSW systems R.I.G. Alternate Daily Cover The easiest way to improve efficiency of MSW systems SWANA Northern Lights Chapter Annual Conference Measuring Success Slide 1 Best Practices Build landfill progressively in

More information

Performance Standards Compliance Checklist

Performance Standards Compliance Checklist Truckee Meadows Regional Stormwater Quality Management Program Performance Standards Compliance Checklist The checklist that follows identifies the BMPs that can be used at construction sites to meet each

More information

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects

Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects Best Management Practices (BMPs) for Construction Sites & Home Remodeling Projects Stormwater Program Department of Public Works City of Rancho Santa Margarita 22112 El Paseo Rancho Santa Margarita, CA

More information

Guidance on Debris Management for Recovery: Lessons Learned

Guidance on Debris Management for Recovery: Lessons Learned Guidance on Debris Management for Recovery: Lessons Learned 1. General The main priority is to focus on those recovery and collection activities that will be the quickest to implement, with the least amount

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: On-Site Inspection Start Date: On-Site Inspection End Date: WACS : INSPECTION PARTICIPANTS: (Include

More information

Florida Department of Environmental Protection Inspection Checklist

Florida Department of Environmental Protection Inspection Checklist Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: SOUTH DADE LF On-Site Inspection Start Date: On-Site Inspection End Date: WACS : 56824 Facility

More information

Local Governments and the Solid Waste Disposal Tax

Local Governments and the Solid Waste Disposal Tax Local Governments and the Solid Waste Disposal Tax Presented by: Amanda Bader, P.E., S.C. Harnett County Engineer and Solid Waste Director North Carolina SWANA Chapter Board Member Local Governments A

More information

Fugitive Dust Control Plan Sherburne County Generating Plant

Fugitive Dust Control Plan Sherburne County Generating Plant Fugitive Dust Control Plan Sherburne County Generating Plant Original Publication: September 2015 Review No. 3: October 2018 Revision No: 0 Table of Contents Annual Review Log... 1 Revision Log... 2 Certification

More information

THE FONDCOLE SANITARY LANDFILL

THE FONDCOLE SANITARY LANDFILL DOMINICA SOLID WASTE MANAGEMENT CORPORATION THE FONDCOLE SANITARY LANDFILL BYEN VINI.WELCOME. Description of Site The Fond Cole Sanitary Landfill is located in Fond Cole, one (1) mile north of Roseau.

More information

Niagara Falls Storage Site Safety Measures During Remediation

Niagara Falls Storage Site Safety Measures During Remediation Niagara Falls Storage Site Safety Measures During Remediation On-Site Worker Protection Community and Environmental Protection Transportation and Disposal Safety Fully enclosed Retrieval Facility Regular

More information

Paving and Grinding Operations

Paving and Grinding Operations Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category

More information

FF-8 MINOR CONSTRUCTION

FF-8 MINOR CONSTRUCTION FF-8 MINOR CONSTRUCTION The matrix below identifies required activity-specific Minimum Designated Best Management Practices (BMPs) and Pollution Prevention Methods (PPMs) for Municipal Minor Construction

More information

Application For Waste Regulation (Check all that apply)

Application For Waste Regulation (Check all that apply) Environmental Protection and Growth Management Department ENVIRONMENTAL ENGINEERING AND PERMITTING DIVISION 1 North University Drive, Mailbox #201 Plantation, Florida 33324 954-519-1483 FAX 954-519-1412

More information

Florida Department of Environmental Protection Inspection Checklist N. SIDE OF HWY. 20-W.OF FREEPT

Florida Department of Environmental Protection Inspection Checklist N. SIDE OF HWY. 20-W.OF FREEPT Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: On-Site Inspection Start Date: On-Site Inspection End Date: WACS : 15091 Facility Street Address:

More information

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building...

11. Construction processes and materials Power House Maintenance Building Fuel Treatment Building... Contents 11. Construction processes and materials... 11-2 11.1 Power House... 11-2 11.2 Maintenance Building... 11-2 11.3 Fuel Treatment Building... 11-3 11.4 Roads & Paths... 11-3 11.5 Fencing... 11-3

More information

To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER

To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER To reduce the environmental impact we should ISOLATE or CONTAIN the waste in an IMPERMEABLE BARRIER 1 COMPONENTS OF ENGINEERED LANDFILL a) A Liner System b) A Leachate Collection Facility c) A Gas Control

More information

NC2 ASH DISPOSAL AREA

NC2 ASH DISPOSAL AREA POST-CLOSURE PLAN OPPD NEBRASKA CITY GENERATING STATION FOSSIL FUEL COMBUSTION ASH DISPOSAL AREA NC2 ASH DISPOSAL AREA Prepared for: OMAHA PUBLIC POWER DISTRICT NEBRASKA CITY GENERATING STATION OTOE COUNTY,

More information

Erosion Control Inspection Form

Erosion Control Inspection Form Project Name Address Inspection Date Time Name of Certified Erosion Sediment Lead (CESCL) or qualified inspector if less than one acre Print Name: Approximate rainfall amount since the last inspection

More information

This annual inspection report has been prepared to meet the requirements of 40 CFR (b).

This annual inspection report has been prepared to meet the requirements of 40 CFR (b). 2015 ANNUAL INSPECTION REPORT CALEDONIA ASH LANDFILL January 11, 2016 1.0 INTRODUCTION This annual inspection report has been prepared to meet the requirements of 40 CFR 257.84(b). The active area of the

More information

EMISSIONS ACTIVITY CATEGORY FORM LANDFILLS

EMISSIONS ACTIVITY CATEGORY FORM LANDFILLS FOR OHIO EPA USE FACILITY ID: EMISSIONS ACTIVITY CATEGORY FORM LANDFILLS This form is to be completed for any solid waste or construction and demolition debris landfill. State/Federal regulations which

More information

CCR Fugitive Dust Control Plan

CCR Fugitive Dust Control Plan CCR Fugitive Dust Control Plan Mill Creek Generating Station Louisville Gas & Electric Company Jefferson County, Kentucky October 2015 CCR Fugitive Dust Control Plan - Mill Creek Generating Station Page

More information

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Closure Plan Ash Disposal Area PGE Boardman Power Plant FIRST ISSUE REVISION 0 Closure Plan Ash Disposal Area PGE Boardman Power Plant Prepared for Portland General Electric September 2015 2020 SW 4th Avenue, Suite 300 Portland, Oregon 97201 This document was

More information

Design and Operation of Landfills

Design and Operation of Landfills Design and Operation of Landfills Soils and hydrogeology Site selection criteria Site layout and landfill operations Liner design Water balance Biological reactions in landfills Leachate quality Gas production

More information

Solid Waste Management Waste Management. Liquid and solid Waste ( )

Solid Waste Management Waste Management. Liquid and solid Waste ( ) Liquid and solid Waste (0670545) Very Important Note: Most of the figures and tables are downloaded from google and various text books Solid Waste Evolution and Concepts: Since the beginning of humanity,

More information

A. 1. Provide a description of each of the soils indicated on Map E utilizing the following format:

A. 1. Provide a description of each of the soils indicated on Map E utilizing the following format: 15. SOILS A. 1. Provide a description of each of the soils indicated on Map E utilizing the following format: Table 15.A.1 Soil Descriptions Soil Name Soil Description Seasonal High Water Table Depth Duration

More information

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report Green CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2017 Annual Inspection Report January 11, 2018 Prepared By: Project ID: 170138B Big Rivers

More information

Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery

Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery Craig Dufficy U.S. EPA Office of Resource Conservation and Recovery Overview What is a Landfill? Basic waste properties. Area and Volume calculations. What is allowed in a landfill and what is not. How

More information

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.)

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.) CLOSURE COST ESTIMATE WORKSHEET FOR MSW LANDFILL FORM 1 OWNER: TOTAL PERMITTED AREA: AREA CURRENTLY OPEN: Total Volume of Site: LARGEST AREA TO EVER BE OPEN AT ANY TIME: (use this area for estimating closure

More information

Preventing Storm Water Pollution: What We Can Do. ~Fleet Maintenance~

Preventing Storm Water Pollution: What We Can Do. ~Fleet Maintenance~ ~Fleet Maintenance~ FUELING GENERAL GUIDELINES DISPOSAL METHODS Maintain vehicles and equipment in designated areas. Clean fueling areas often using approved methods. DO NOT top off fuel tank. Know location

More information

Flow Diversion Banks: General

Flow Diversion Banks: General Flow Diversion Banks: General DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] Flow diversion

More information

SECTION EARTHWORK

SECTION EARTHWORK SECTION 02200 EARTHWORK PART 1 - GENERAL 1.01 WORK INVOLVED A. Provide all labor, materials and equipment as required for all excavation, grading, providing borrow materials, hauling, placing and compacting

More information

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine

Closure Plan Limited Purpose Landfill TransAlta Centralia Mine Closure Plan Limited Purpose Landfill TransAlta Centralia Mine Prepared for TransAlta Centralia Mining LLC December 5 East Front Street Suite Boise, Idaho 87 /6/5 This document was prepared under direct

More information

Waste Management. Innovation, Sustainability and Customer Value Tennessee Symposium: Growing Tennessee s Recycling Economy.

Waste Management. Innovation, Sustainability and Customer Value Tennessee Symposium: Growing Tennessee s Recycling Economy. Waste Management Innovation, Sustainability and Customer Value 2013 Tennessee Symposium: Growing Tennessee s Recycling Economy August 15, 2013 Jessica Preston, ATAK Market Area Sustainability Program Director

More information

SPECIAL SPECIFICATION. Attachment A, Work Specification for Emergency Debris Removal and Disposal

SPECIAL SPECIFICATION. Attachment A, Work Specification for Emergency Debris Removal and Disposal SPECIAL SPECIFICATION Attachment A, Work Specification for Emergency Debris Removal and Disposal 1. Description. This is a callout contract. This contract will be for an initial term of 180 calendar days

More information

2017 Annual Inspection Report

2017 Annual Inspection Report 2017 Annual Inspection Report for Compliance with the Coal Combustion Residuals Rule (40 CFR Part 257) Hayden Station 13125 U.S. Highway 40 Hayden, Colorado 81638 January 18, 2018 Table of Contents Certification...

More information

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

2017 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN: 217 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO. 2-S3N-R2 AFIN: 32-42 JANUARY 17, 218 217 Landfill Inspection Report Entergy Independence Plant Class 3N

More information

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO 2016 LANDFILL INSPECTION REPORT GERS-16-004 CARDINAL PLANT BRILLIANT, OHIO PREPARED BY GEOTECHNICAL ENGINEERING AEP SERVICE CORPORATION 1 RIVERSIDE PLAZA COLUMBUS, OHIO Cardinal Plant Landfill Inspection

More information

Texas Commission on Environmental Quality

Texas Commission on Environmental Quality Texas Commission on Environmental Quality Permit For Municipal Solid Waste (MSW) Management Facility Issued under provisions of Texas Health and Safety Code Chapter 361 MSW Permit No.: 2383 Name of Site

More information

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO. 0200-S3N-R2 AFIN 32-00042 OCTOBER 12, 2016 LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT

More information

Industrial Solid Waste Landfill Daily Log of Operations {as required by O.A.C (E)(10)} Yearly Cover Sheet (Form 1)

Industrial Solid Waste Landfill Daily Log of Operations {as required by O.A.C (E)(10)} Yearly Cover Sheet (Form 1) Division of Materials & Waste Management Industrial Solid Waste Landfill Daily Log of Operations {as required by O.A.C. 3745-29-19(E)(10)} Yearly Cover Sheet (Form 1) This daily log cover sheet should

More information

Florida Department of Environmental Protection Inspection Checklist N. SIDE OF HWY. 20-W.OF FREEPT

Florida Department of Environmental Protection Inspection Checklist N. SIDE OF HWY. 20-W.OF FREEPT Florida Department of Environmental Protection Inspection Checklist FACILITY INFORMATION: Facility Name: On-Site Inspection Start Date: On-Site Inspection End Date: WACS : 15091 Facility Street Address:

More information

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9

Table of Contents. Attachments Attachment A Photos Attachment B Site Map. Pages 3 of 9 Table of Contents 1.0 Introduction...4 2.0 Description of Landfill...4 3.0 Review of Available Information...5 4.0 Inspection...5 4.1 Changes in Geometry since Last Inspection...5 4.2 Volume...5 4.3 Definitions

More information

FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York

FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK PREPARED FOR: Huntley Power, LLC Tonawanda, New York PREPARED BY: GZA GeoEnvironmental of New York Buffalo, New

More information

Concrete Waste Management WM-8

Concrete Waste Management WM-8 Standard Symbol BMP Objectives Soil Stabilization Sediment Control Tracking Control Wind Erosion Control Non-Storm Water Management Materials and Waste Management Definition and Purpose Appropriate Applications

More information

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report

Green CCR Landfill. Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report Green CCR Landfill Disposal of Coal Combustion Residuals (CCR) from Electric Utilities Final Rule CCR Landfill 2016 Annual Inspection Report January 10, 2017 Prepared By: Project ID: 160122B Big Rivers

More information

Landfill Closure. SWANA NLC Conference May 2017

Landfill Closure. SWANA NLC Conference May 2017 Landfill Closure SWANA NLC Conference May 2017 CLOSURE DISCUSSIONS What is Final Closure? Regulations Steps to Implement Final Closure Design Considerations Cover Systems Contaminating Lifespan Financial

More information

You are the solution to water pollution. A guide for preventing water pollution in your own backyard

You are the solution to water pollution. A guide for preventing water pollution in your own backyard You are the solution to water pollution A guide for preventing water pollution in your own backyard Even if you live miles away from a river or stream, you may be polluting the water without even knowing

More information

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow Straw Bale Barrier SE-9 Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control

More information

Annual Inspection Report North CCR Surface Impoundment. MidAmerican Energy Company, Walter Scott Energy Center

Annual Inspection Report North CCR Surface Impoundment. MidAmerican Energy Company, Walter Scott Energy Center Annual Inspection Report North CCR Surface Impoundment MidAmerican Energy Company, Walter Scott Energy Center Rev 0 July 2018 Annual Inspection Report North CCR Surface Impoundment Prepared for MidAmerican

More information

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT

ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT ST. TAMMANY PARISH PATRICIA P. BRISTER PARISH PRESIDENT August 28, 2017 Please find the following addendum to the below mentioned BID. Addendum No.: 1 Bid#: 416-15-17-53-2 Project Name: Lower W-15 Area

More information

COUNTY: MUNICIPALITY: DPW LOCATION: STREET ADDRESS: PROPERTY OWNER: MAILING ADDRESS:

COUNTY: MUNICIPALITY: DPW LOCATION: STREET ADDRESS: PROPERTY OWNER: MAILING ADDRESS: NEW JERSEY DEPARTMENT OF ENVIRONMENTAL PROTECTION COMPLIANCE ASSISTANCE INSPECTION FORM MUNICIPAL DEPARTMENT OF PUBLIC WORKS (DPW) SITES COUNTY: MUNICIPALITY: DPW LOCATION: STREET ADDRESS: PROPERTY OWNER:

More information

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment

1993 Specifications CSJ'S & SPECIAL SPECIFICATION ITEM Tree Preservation and Treatment 1993 Specifications CSJ'S 0912-71-554 & 0912-71-555 SPECIAL SPECIFICATION ITEM 1016 Tree Preservation and Treatment 1. Description. This section specifies the requirements for protecting trees and related

More information

RE: Quarterly Inspection; AFIN ; Permit Number 0307-S4

RE: Quarterly Inspection; AFIN ; Permit Number 0307-S4 Document ID # 067264 August 15, 2012 The Honorable Keith Neely Bradley County Judge Bradley County Courthouse 101 East Cedar Warren, AR 71671 RE: Quarterly Inspection; AFIN 06-00163; Permit Number 0307-S4

More information

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01 Section 208. SOIL EROSION AND SEDIMENTATION CONTROL 208.01. Description. This work consists of installing and maintaining erosion and sedimentation controls to minimize soil erosion and control

More information

Storm Drain Inlet Protection

Storm Drain Inlet Protection Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category

More information

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No

STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents. SWMP Page # or Reference Location Yes/No STORMWATER MANAGEMENT PLAN CONTENTS CHECKLIST Stormwater Management Plan Contents Site Description A description of construction activity. The proposed sequence for major activities. Estimates of the total

More information

Construction and Demolition Material Recovery Facility Feasibility Study

Construction and Demolition Material Recovery Facility Feasibility Study FINAL REPORT North Central Texas Council of Governments Construction and Demolition Material Recovery Facility Feasibility Study AUGUST 2007 This study was funded through a solid waste management grant

More information

"INOGATE Technical Secretariat & Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives" Project

INOGATE Technical Secretariat & Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives Project "INOGATE Technical Secretariat & Integrated Programme in support of the Baku Initiative and the Eastern Partnership energy objectives" Project B U I L D I N G P A R T N E R S H I P S F O R E N E R G Y

More information

THORHILD LANDFILL FREQUENTLY ASKED QUESTIONS by Waste Management of Canada Corporation (WM)

THORHILD LANDFILL FREQUENTLY ASKED QUESTIONS by Waste Management of Canada Corporation (WM) THORHILD LANDFILL FREQUENTLY ASKED QUESTIONS by Waste Management of Canada Corporation (WM) Table of Contents About the Landfill Why have you selected Thorhild County to build a landfill?... 2 Why do you

More information

Commonwealth of Virginia Locality Recycling Rate Report For Calendar Year 2014

Commonwealth of Virginia Locality Recycling Rate Report For Calendar Year 2014 Commonwealth of Virginia Locality Recycling Rate Report For Calendar Year 2014 Contact Information Reporting Solid Waste Planning Unit: Person Completing This Form: Title: Address: Street/P.O. Box City

More information

Building Better Storm Water Quality

Building Better Storm Water Quality Building Better Storm Water Quality s Storm Water Pollution Prevention Guidelines for Development Construction Projects City of El Segundo 350 Main Street (310) 524-2380 El Segundo, California 90245 Introduction

More information

Annual Landfill Inspection 2015

Annual Landfill Inspection 2015 Annual Landfill Inspection 25 Westar Jeffrey Energy Center St. Mary s, KS KDHE Landfill Permit Number 359 Prepared for: Westar Energy 88 S. Kansas Ave. P.O. Box 889 Topeka, KS 666 Prepared by: Blackstone

More information

11/1/2011. Annual Employee Training

11/1/2011. Annual Employee Training MS4 Address activities at WWTP in SWMP 1987 CWA Amendments Storm Water NPDES Industrial WWTP Design Flow 1 MGD WWTP Required to have approved Pretreatment Program Lynette Hablitzel, PE Ohio EPA Division

More information

4.0 Material and Waste Controls

4.0 Material and Waste Controls 4.0 Material and Waste Controls 4.1 Material and Waste Control Description: Chemical management addresses the potential for stormwater to be polluted with chemical materials and wastes that are used or

More information

Orange County. Solid Waste Study. Mayors Group Meeting

Orange County. Solid Waste Study. Mayors Group Meeting Orange County Solid Waste Study Mayors Group Meeting April 27, 2012 Presentation Outline Orange County Solid Waste System Solid Waste Study Presentation Outline Orange County Solid Waste System Solid Waste

More information

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI

CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI CLOSURE AND POST-CLOSURE CARE PLAN JAMES RIVER POWER STATION UTILITY WASTE LANDFILL CITY UTILITIES OF SPRINGFIELD, MISSOURI INITIAL PREPARATION DATE: October 11, 2016 TABLE OF CONTENTS 1. CERTIFICATION

More information

NC1 ASH DISPOSAL AREA

NC1 ASH DISPOSAL AREA CLOSURE PLAN OPPD NEBRASKA CITY GENERATING STATION FOSSIL FUEL COMBUSTION ASH DISPOSAL AREA NC1 ASH DISPOSAL AREA Prepared for: OMAHA PUBLIC POWER DISTRICT NEBRASKA CITY GENERATING STATION OTOE COUNTY,

More information

WASTE MANAGEMENT IN SAN LUIS OBISPO COUNTY

WASTE MANAGEMENT IN SAN LUIS OBISPO COUNTY WASTE MANAGEMENT IN SAN LUIS OBISPO COUNTY INTRODUCTION The 2007-2008 Grand Jury undertook an investigation into waste management in San Luis Obispo County as a follow-up to the 2002-2003 Grand Jury report

More information

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective

More information

Figure -1 Functional Elements of the Life Cycle Analysis of Municipal Solid Waste Management Alternatives.

Figure -1 Functional Elements of the Life Cycle Analysis of Municipal Solid Waste Management Alternatives. System Description for a Life-Cycle Inventory of Municipal Solid Waste Management Alternatives Morton A. Barlaz and Ranji Ranjithan North Carolina State University (7/22/95) Executive Summary The objective

More information

Assessing the Feasibility of Bioreactor Landfill Operation. Part 1: Technical, Regulatory, and Site Opportunities and Constraints.

Assessing the Feasibility of Bioreactor Landfill Operation. Part 1: Technical, Regulatory, and Site Opportunities and Constraints. Assessing the Feasibility of Bioreactor Landfill Operation Part 1: Technical, Regulatory, and Site Opportunities and Constraints. Making the Decision to Design and Operate a Landfill as a Bioreactor First

More information

Closure/Post-Closure Care Plan Unit 3 AQCS Solids Landfill

Closure/Post-Closure Care Plan Unit 3 AQCS Solids Landfill Sherburne County Generating Plant MPCA Permit No. SW-293 Becker, MN Table of Contents Page 1.0 Introduction...1 2.0 Closure Plan...2 2.1 Notification of Final Cover Construction...2 2.2 Notification of

More information

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management

City of Daphne Standard Operating Guidance (SOGs) For Storm Drain System Management Standard Operating Guidance (SOGs) For Storm Drain System Management Phase II MS4 Creating a Clean Water Future. Standard Operating Guidance (SOGs) For Storm Drain System Management The City of Daphne

More information

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] Diversion Channels DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1] The design of permanent

More information