1 DECISION MEMO Pine Ridge Fire Vegetation Project USDA Forest Service Fremont-Winema National Forest Chiloquin Ranger District Klamath County, Oregon Legal Location: Township 34 South, Range 7 East, Sections 25 and 26 Background The purpose of this project is to re-establish forest vegetation within the burned area of the Pine Ridge Fire to improve scenic quality, protect cultural values, enhance wildlife habitat and connectivity, and reduce the amount of fuel available to future wildfires. To achieve these goals the following actions will be taken: Removal of standing dead trees that are a danger to forest visitors using the area and forest workers who would plant trees in the project area. Replanting of ponderosa pine, Douglas-fir, and incense-cedar, reestablishing the ecological diversity lost in the fire. Removal of dead and/or dying trees contributing to an elevated fuel load which may increase the severity of future wildfires. Decision I have decided to implement the proposal to remove dead and/or dying trees on approximately 175 acres within the burned area through a commercial salvage operation. Residual fuels would be removed to reduce the fuel loading and reduce the need for future fuels treatments. Tree seedlings would be planted on 175 acres of the burn area following removal of dead and/or dying trees. An additional 20 acres having steep terrain and low volume would be planted without the removal of dead and dying trees. The majority (approximately 95%) of tree seedlings would be ponderosa pine. Trees would be replanted at the rate of 220 seedlings per acre where appropriate. No new roads will be constructed, only pre-existing landings and hauling roads will be used.
2 This action is categorically excluded from documentation in an environmental impact statement or an environmental assessment because this project meets the requirements defined in 36 CFR Part (e) (13); Salvage of dead and/or dying trees not to exceed 250 acres, requiring no more than ½ mile of temporary road construction. The proposed action may include incidental removal of live or dead trees for landings, skid trails, and road clearing. The categorical exclusion is appropriate in this situation. Although two of the resource conditions as listed in 36 CFR (b) (1) (vi) and (vii) related to American Indian cultural sites exist within the project area, there will be no effects on these resources. This determination is based on the mitigation measures listed on page three. I considered comments received during the scoping process and have decided that they have been addressed through project design, Best Management Practices and/or mitigation measures prescribed in specialist reports. Public Involvement The Request for Public Comment notice appeared in the paper of record, the Herald and News, on November 26, The scoping letter was mailed on November 26, 2008 to 57 individuals or organizations. The scoping letter was also delivered to the Klamath Tribes on November 26, The mailing list is available from the project file. Several supporting comments were received. Comments requiring a response were received from Jerry Bastian; Kyle Haines, Klamath Forest Alliance; Chandra LeGue, Oregon Wild; and Sally Wells, Concerned Friends of the Winema. Comments received from Sally Wells were responded to both in writing and by phone in December. Comments from Oregon Wild were addressed during a conference call with Chandra LeGue and several members of the IDT on January 15, On January 20, 2009 members of the IDT met with Kyle Haines of the Klamath Forest Alliance to review the project area and discuss their concerns. The Klamath Tribes was consulted during and immediately after the fire and have actively participated in aspects of project design. A Post-Fire Recovery Initial Thoughts and Observation memo, dated June 21, 2008 from Will Hatcher, Klamath Tribes Natural Resources Director, to myself, documents the tribes concerns and preferences regarding protection activities for both cultural and natural resources. Comments received and our responses to them are available in the project record.
3 Findings Required by Other Laws This decision is consistent with management direction, including standards and guidelines, as outlined in the Winema Forest Land and Resource Management Plan, as amended, and the Final Environmental Impact Statement documenting the analysis for the Plan as required by the National Forest Management Act. The project was designed in conformance with forest plan decisions for the Scenic Management, Middleground Partial Retention Area (MA 3C). The goal for Management Area 3C is to provide attractive scenery that contributes to the visual strength of the characteristic landscape. HYDROLOGY This action will comply with requirements of the Clean Water Act. CULTURAL No significant impact is expected on cultural resources. All project activities will adhere to the required mitigation measures as specified in the specialist report. Cultural Resource inventories were completed in the summers of 1986, 1996, and A total of 290 acres have been adequately surveyed, representing nearly 100 percent of the project area. SHPO concurrence was signed on November 17, 2008, John Kaiser, Forest Archeologist. Mitigation Measures The Heritage Resource Specialist report includes standard mitigation measures that ensure protection of cultural sites. The following are abbreviated versions of these mitigations: Protection of heritage resource sites by avoidance. If previously undiscovered sites are found during the course of project activities all activities will cease and the site area will be protected until the site is recorded and evaluated by a qualified archaeologist. See Timber Sale Contract clause C6.24. Prior to implementation and layout phases, the archaeologist or a cultural resource technician will be actively engaged during the entire layout phases of all timber and fuel reduction treatment areas. Protective buffers around rock feature/vision quest site will ensure that trees are not inadvertently felled onto sites. All cultural and historic sites along or adjacent to treatment areas will be flagged for identification and protection. Cultural resource monitors will be used to monitor activities. WILDLIFE
4 No significant impact is expected on Proposed, Endangered, Threatened, or Sensitive (TES) terrestrial species. All other terrestrial wildlife TES species received a determination of No Effect, No Impact, or May Impact Individuals or Habitat, but will not likely contribute to a trend toward federal listing or loss of viability to the population or species (MIIH). Mitigation Measures: Due to the proximity of a known bald eagle nest, mitigation measures and project design features as specified in the Wildlife Specialist Report (page 10 and page 33) will be adhered to during the life of the project. Mitigations and project design features are listed on page 33 of the Wildlife Specialist Report. Number 2 of these mitigation and project design features emphasizes minimum snag retention requirements (see table). The actual snag retention numbers for this project are expected to significantly exceed these minimums. BOTANY No significant impact is expected on any Federally Listed, proposed, or Candidate plant or fungi species. No significant impact is expected on any Region 6 Sensitive Species plant or fungi as they are not known to occur in or near the project area. These determinations may be found in the Botany and Terrestrial Mollusk Biological Evaluation on file in the project record. NOXIOUS WEEDS These mitigation measures will decrease the potential for the introduction of invasive species to the project area. Mitigation Measures Mitigation measures and implementation measures as specified in the Botany Report will be adhered to during the life of the project. These measures include: Requiring off-road equipment to be fee of soil, seeds, vegetative matter, or other debris that could contain or hold seeds prior to coming onto National Forest lands Standard contract clause (WO-C/CT 6.36) requiring cleaning of off-road equipment prior to entry onto the Forest The project area will be monitored for noxious weeds after completion of the salvage sale by the Zone Botanist. OTHER No significant impact is expected on parkland, floodplains, wetlands, prime farmlands, wild and scenic rivers or ecologically critical areas. Best Management Practices, as recommended in the Hydrologist Report on file with the project record, will protect water quality during implementation of the proposed activities. There are no anticipated significant impacts on consumers, minority groups, American Indians, women or civil rights. There are no anticipated significant impacts to Treaty and trust responsibilities with the Klamath Tribes. There are no known significant indirect, cumulative, or unavoidable adverse effects on the
5 environment. There is no threat to public health or safety. Implementation of this proposal meets the resource protection requirements of 36 CFR Administrative Review or Appeal Opportunities This decision is subject to appeal pursuant to 36 CFR, part 215. Any written notice of appeal of the decision must be fully consistent with 36 CFR , Appeal Content. The notice of appeal must be filed hard copy or hand delivered to the address below during business hours, 9 am to 4:30 pm Monday through Friday. USDA, Forest Service Fremont-Winema National Forest ATTN: Karen Shimamoto, Forest Supervisor 1301 South G Street Lakeview, OR The Notice of Appeal may alternatively be faxed to: USDA, Forest Service Fremont-Winema National Forest ATTN: Karen Shimamoto, Forest Supervisor (541) Or sent electronically to appeals-pacificnorthwest-fremont-winema@fs.fed.us, The appeal must be postmarked or delivered within 45 days of the day after the legal notice for this decision appears in the Klamath Falls Herald and News, the publication of record. The publication date of the legal notice in the newspaper of record is the exclusive means for calculating the time to file an appeal ( (a)). The day after the publication of the legal notice of the decision in the Klamath Falls Herald and News is the first day of the appeal-filing period. Those wishing to appeal should not rely on dates or timeframes provided by any other source. Electronic appeals must be submitted as part of the actual message, or as an attachment in Microsoft Word (.doc), rich text format (.rtf) or portable document format (.pdf) only. s submitted to addresses other than the one listed above, in other formats than those listed, or containing viruses will be rejected. Only individuals or organizations that submitted comments during the comment period may appeal. It is the appellant s responsibility to provide sufficient project or activity specific evidence and rationale, focusing on the decision, to show why the Responsible Official s decision should be reversed. At a minimum, an appeal must include the following: Appellant s name and address, with a telephone number if available; Signature or other verification of authorship upon request (a scanned signature for electronic mail may be filed with the appeal);
6 The name of the project or activity for which the decision was made; The name and title of the Responsible Official; The date of the decision; Any specific change(s) in the decision that the appellant seeks, and rationale for those changes; Any portion(s) of the decision with which the appellant disagrees, and explanation for the disagreement; Why the appellant believes the Responsible Official s decision failed to consider the appellant s comments; How the appellant believes the decision specifically violates law, regulation, or policy. When multiple names are listed on an appeal, identification of the lead appellant (215.2) must be included. Verification of the identity of the lead appellant must be made available upon request. If no appeal is received, implementation of this project will not occur prior to 5 days after the end of the appeal period. If an appeal is filed, implementation will not occur prior to 15 days following the date of appeal disposition. If multiple appeals are filed, the disposition date of the last appeal will control the implementation date. Contact Person For additional information concerning this decision or the Forest Service appeal process, contact the project lead, Brian Sebastian, SW Zone Assistant Silviculturist, Hwy 97 North, Chiloquin, OR /s/mike Lawrence January 28, 2009 MIKE LAWRENCE District Ranger Chiloquin Ranger District RESPONSIBLE OFFICIAL DATE
DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT
DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT USDA Forest Service Bend/Fort Rock Ranger District, Deschutes National Forest Deschutes County, Oregon
More informationDecision Memo for Pax Ponderosa Pine Planting Project
Decision Memo for Pax Ponderosa Pine Planting Project USDA Forest Service Pacific Northwest Region Fremont-Winema National Forests Lakeview Ranger District Lake County, Oregon Introduction The Lakeview
More informationDECISION MEMO. Verizon Spring Creek Hill Cell Tower
DECISION MEMO Verizon Spring Creek Hill Cell Tower Fremont-Winema National Forests Chiloquin Ranger District Klamath County, OR PROPOSED ACTION: Verizon, through Cascadia P.M., L.L.C., has submitted an
More informationSAN LUIS VALLEY PUBLIC LANDS CENTER
Decision Notice And Finding of No Significant Impact Watershed and Fisheries Conservation Treatments SAN LUIS VALLEY PUBLIC LANDS CENTER USDA Forest Service Rocky Mountain Region Public Lands Center Rio
More informationDecision Memo for Juniper Ridge Opal Mine
for USDA Forest Service Pacific Northwest Region Fremont-Winema National Forests Bly Ranger District Klamath County, Oregon Introduction The Bly Ranger District has received a proposed operating plan for
More informationDECISION MEMO PROJECT NAME: CLARK CREEK BLOWDOWN USDA FOREST SERVICE IDAHO PANHANDLE NATIONAL FOREST BONNERS FERRY RANGER DISTRICT
United States Department of Agriculture Forest Service Idaho Panhandle National Forests Bonners Ferry Ranger District 6286 Main Street Bonners Ferry, ID 83805 (208) 267-5561 File Code: 1950 Date: July
More informationDECISION MEMO. Aurora New Horizons Project
Page 1 of 7 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County In 2005 a decision covering approximately the same proposal was analyzed and a Decision Memo was signed.
More informationDecision Memo. Agriculture Irrigation & Livestock Watering System Easement Conditions for Tull Reservoir
Agriculture Irrigation & Livestock Watering System Easement Conditions for Tull Reservoir USDA Forest Service Pacific Northwest Region Fremont-Winema National Forests Bly Ranger District Klamath County,
More informationPreliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project
Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon The Crescent Ranger
More informationPreliminary Decision Memo Crooked River National Grassland Firewood Units
Preliminary Decision Memo Crooked River National Grassland Firewood Units Decision to be Implemented USDA Forest Service Crooked River National Grassland Jefferson County, Oregon Townships 12 and 13 South,
More informationRECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-04-24 Lease or Serial #: N/A Project Name: Surveyor Salvage CX Location: T.38S., R.5E., Sections 25,26,35,36;
More informationpreliminary Decision Memo Wickiup Acres Hazardous Fuels Reduction
preliminary Decision Memo Wickiup Acres Hazardous Fuels Reduction USDA Forest Service Crescent Ranger District, Deschutes National Forest Deschutes County, Oregon T. 22 S., R. 8 E., Section 36, T., 22
More informationScoping and 30-Day Notice and Comment Period for. Grassy Knob American Chestnut Planting
United States Department of Agriculture Forest Service Monongahela National Forest Greenbrier Ranger District Box 67 Bartow, WV 24920 Phone (304) 456-3335 File Code: 2020/2070/1950 Date: November 15, 2012
More informationDECISION MEMO. USDA Forest Service. Butte District Silver Bow County T4N, R8W, Section 36
Page 1 of 5 Background DECISION MEMO USDA Forest Service Butte District Silver Bow County T4N, R8W, Section 36 Northwestern Energy operates utility systems and facilities on federal lands under a Master
More informationDecision Memo Raptor 1 and 9 Prescribed Burns Project
Decision Memo Raptor 1 and 9 Prescribed Burns Project USDA Forest Service Chemult Ranger District, Fremont-Winema National Forests Klamath County, OR Township (T) 29 South (S), Range (R) 6 East (E), Section
More informationPRELIMINARY DECISION MEMO
PRELIMINARY DECISION MEMO Snoqualmie Christmas Tree Project USDA Forest Service Mt. Baker-Snoqualmie National Forest Snoqualmie Ranger District King County, Washington Proposed Action, Purpose and Need
More informationUSDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT BILLINGS COUNTY, NORTH DAKOTA
GMX RESOURCES INC. LITTLE MISSOURI FEDERAL 24-10-1H OIL AND GAS WELL AND ACCESS ROAD #734-22 LOCATED WITHIN SW¼ of SE¼, SECTION 10, T141N, R100W BILLINGS COUNTY, NORTH DAKOTA USDA FOREST SERVICE DAKOTA
More informationDECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho
DECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho I. Decision II. I have decided to authorize issuance of
More informationIndian Creek Aquatic Restoration Project
Decision Notice and Finding of No Significant Impact June 2005 Siuslaw National Forest South Zone District Lane County, Oregon Lead Agency: Responsible Official: For Information Contact: USDA Forest Service
More informationDECISION MEMO IDAHO DREAM PLAN OF OPERATIONS
Page 1 of 7 BACKGROUND DECISION MEMO USDA Forest Service Dillon Ranger District Beaverhead County The project area is included in the Ermont Mining District in T5S R11W Section 36 and T6S R11W Section
More informationDECISION MEMO Eureka Fire Whitebark Pine Planting
Page 1 of 6 DECISION MEMO Eureka Fire Whitebark Pine Planting USDA Forest Service Madison Ranger District Madison County T11S, R2W, Sections16, 17, 18, 19, 20, 29, 30, 31 & 32 T11S, R3W, Sections 25 &
More informationDECISION MEMO. Kelly s Pond / NFSR 204 Hazard Tree Removal. USDA Forest Service Sam Houston National Forest Montgomery County, Texas
DECISION MEMO Kelly s Pond / NFSR 204 Hazard Tree Removal USDA Forest Service Sam Houston National Forest Montgomery County, Texas Decision I have decided to remove approximately 500 hazard trees in and
More informationDECISION MEMO. Vipond Water Development
Page 1 of 5 DECISION MEMO USDA Forest Service Wise River Ranger District Beaverhead County T2S, R10W, Sections 12, 13, 14, &18 Background This project is located in the Pioneer Landscape, East Face Management
More informationINTRODUCTION DECISION
DRAFT DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT BIG SHEEP DIVIDE RANGELAND ANALYSIS U.S. FOREST SERVICE WALLOWA VALLEY RANGER DISTRICT WALLOWA COUNTY, OREGON INTRODUCTION An Environmental Assessment
More informationDECISION MEMO Pony Whitebark Pine Planting
Page 1 of 5 DECISION MEMO Pony Whitebark Pine Planting USDA Forest Service Jefferson Ranger District Madison County T2S, R3W, Sections 4 & 9 Background The Pony Fire of 2012 burned 5,157 acres on the (BDNF).
More informationProject Name: Gerber Stew Stewardship Contract CX Log #: OR-014 CX Chase Mtn./ Upper Bear Valley Plantation Thinnings
Decision Memorandum on Action and for Application of: Categorical Exclusion 516 DM2, Appendix 1, 1.12 Hazardous Fuel Reduction (PLAN CONFORMANCE AND CATEGORICAL EXCLUSION DETERMINATION) Project Name: Gerber
More informationDecision Notice. Finding of No Significant Impact. Ninemile North Non-WUI Fuel Reduction Project. Environmental Assessment
Page i Decision Notice And Finding of No Significant Impact Ninemile North Non-WUI Fuel Reduction Project Environmental Assessment May 29, 2009 Fremont-Winema National Forests Chiloquin Ranger District
More informationDraft Decision Notice Maroon Bells - Snowmass Wilderness Overnight Visitor Use Management Plan
Draft Decision Notice Maroon Bells - Snowmass Wilderness Overnight Visitor Use Management Plan USDA Forest Service Aspen-Sopris Ranger District, White River National Forest Gunnison Ranger District, Grand
More informationDECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT OUTFITTER GUIDE MOTORIZED TOURS SPECIAL USE PERMIT ISSUANCES
Decision Notice and Finding of No Significant 1 Impact for the Outfitter Guide Motorized Tours DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT OUTFITTER GUIDE MOTORIZED TOURS SPECIAL USE PERMIT ISSUANCES
More informationUSDA FOREST SERVICE UMATILLA NATIONAL FOREST POMEROY RANGER DISTRICT POMEROY, WASHINGTON
USDA FOREST SERVICE UMATILLA NATIONAL FOREST POMEROY RANGER DISTRICT POMEROY, WASHINGTON DECISION MEMO/CATEGORICAL EXCLUSION For the 2008 Non-Commercial Thinning and Fuels Reduction Project Asotin, Columbia
More informationPreliminary Decision Memo
Preliminary Decision Memo USDA Forest Service Mt. Baker-Snoqualmie National Forest Snoqualmie Ranger District Kittitas County, Washington Pacific Crest Chairlift Enhancement Background It is my decision
More informationThe location of the valve site is displayed on a map in the project file.
DECISION MEMO Special Use Permit # RAR401201 Amendment #7 Hiawatha National Forest Rapid River Ranger District Delta County, Michigan I DECISION A. Description My decision is to issue an amendment to the
More informationKinder/Morgan Southern Natural Gas. Right-of-Way Maintenance Project Woody Vegetation Control. Decision Notice And Finding of No Significant Impact
Kinder/Morgan Southern Natural Gas United States Department of Agriculture Southern Region Forest Service March 2013 Right-of-Way Maintenance Project Woody Vegetation Control Decision Notice And Finding
More informationDecision Memo Cow Pen Project. USDA Forest Service Talladega National Forest - Oakmulgee District Bibb and Tuscaloosa Counties, Alabama
Decision Memo Cow Pen Project USDA Forest Service Talladega National Forest - Oakmulgee District Bibb and Tuscaloosa Counties, Alabama Decision and Rationale I have decided to implement the actions listed
More informationDECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT
DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT HIGH WEST ENERGY, INC. For A Single-Phase (2-Wire), Overhead Power Line US FOREST SERVICE Arapaho & Roosevelt National Forests and Pawnee
More informationMichigan Wing-Civil Air Patrol
DECISION MEMO Michigan Wing-Civil Air Patrol (CAP) Navigational Equipment Special Use Permit #MUN250 Hiawatha National Forest Munising Ranger District Alger County, Michigan I DECISION A. Description My
More informationDECISION MEMO REBEL CLAIMS EXPLORATION PROJECT
Page 1 of 7 DECISION MEMO REBEL CLAIMS EXPLORATION PROJECT USDA Forest Service Pintler Ranger District Granite County T8N, R15W, section 18 & 19 and T8N, R16W, sections 13 & 24 Background Charles Hinkle
More informationDECISION MEMO Lazyman Repeater Shelter and Tower Replacement
Page 1 of 5 Background DECISION MEMO Lazyman Repeater Shelter and Tower Replacement USDA Forest Service Madison Ranger District Madison County The Lazyman Repeater was installed in 1988 and serves parts
More informationIdaho Panhandle National Forests
United States Department of Agriculture Forest Service Idaho Panhandle National Forests St. Joe Ranger District 222 S. 7 th St. Suite 1 St. Maries, ID 83861 (208) 245-2531 File Code: 1950 Date: January
More informationCOUNTY, OREGON T20 S R14E SECTIONS 25 AND 36; T20S R15E SECTIONS 19-34; AND T21S R15E SECTIONS 3-9 AND
PINE MOUNTAIN SAGE GROUSE HABITAT RESTORATION PROJECT Bend/ Fort Rock Ranger District Deschutes National Forest DESCHUTES COUNTY, OREGON T20 S R14E SECTIONS 25 AND 36; T20S R15E SECTIONS 19-34; AND T21S
More informationGooseberry Ecological Restoration (30270) Decision Notice and Finding of No Significant Impact
Gooseberry Ecological Restoration (30270) Gooseberry Ecological Restoration (30270) Decision Notice and Finding of No Significant Impact Stanislaus National Forest Summit Ranger District Tuolumne County,
More informationBackground. Purpose and Need. Proposal. Mitigation and Design Features
United States Department of Agriculture Forest Service Beaverhead-Deerlodge National Forest Madison Ranger District 5 Forest Service Rd Ennis, MT 59729 406 682-4253 File Code: 1950 Date: November 20, 2013
More informationFinal Decision Memo. Murphy Meadow Restoration Project. USDA Forest Service Willamette National Forest McKenzie River Ranger District
Final Decision Memo Murphy Meadow Restoration Project USDA Forest Service Willamette National Forest McKenzie River Ranger District T19S, R5E, Sec. 23, 24. Lane County Oregon BACKGROUND The Murphy Meadow
More informationDecision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations
Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations March 2017 Chugach National Forest Seward Ranger District 29847 Seward Highway Seward, Alaska 99664 Decision It
More informationDECISION MEMO. Crow Creek Hardened Crossing
Page 1 of 5 DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W in Section 35 Background A perennial cattle crossing on Crow Creek in in the Gravelly Landscape in the Centennial
More informationSmall Project Proposal
Combined Scoping and Notice and Comment Document Small Project Proposal USDA Forest Service Fishlake National Forest Beaver Ranger District Sevier County, Utah The purpose of this document is to inform
More informationNational Forests in North Carolina Croatan National Forest Croatan Ranger District
United States Department of Agriculture Forest Service National Forests in North Carolina Croatan National Forest Croatan Ranger District 141 East Fisher Avenue New Bern, NC 28560-8468 252-638-5628 File
More informationDraft Decision Notice
United States Department of Agriculture Forest Service Draft Big Pines Restoration Project High Cascade Ranger District, Rogue River Siskiyou National Forest Jackson County, Oregon Township 31 South, Range
More informationDECISION MEMO. Griz Thin (Stand )
Background DECISION MEMO Griz Thin (Stand 507089) USDA Forest Service Siuslaw National Forest Central Coast Ranger District Lane County, Oregon Township 16 South, Range 10 West, Sections 6 and 7 The Cummins-Tenmile
More informationRECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-03-02 Lease or Serial #: OR 58195 Project Name: Peetsch Mineral Material Sale Applicant: Doug Peetsch Location:
More informationNational Forests in North Carolina Pisgah National Forest Grandfather Ranger District
United States Department of Agriculture Forest Service National Forests in North Carolina Pisgah National Forest Grandfather Ranger District 109 E Lawing Dr Nebo, NC 28761-9827 828-652-2144 File Code:
More informationDECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008
DECISION MEMO Robinhood Creek Helicopter Log Deck June, 2008 USDA Forest Service, Mt. Hood National Forest Hood River Ranger District Hood River County, Oregon Flooding in the fall of 2006 caused significant
More informationBLM Office: Lakeview District, Klamath Falls Resource Area Phone #:
Decision Memorandum on Action and for Application of: Categorical Exclusion 516 DM2, Appendix 1, 1.12 Hazardous Fuel Reduction (PLAN CONFORMANCE AND CATEGORICAL EXCLUSION DETERMINATION) CX Log #: CX-04-17
More informationDECISION MEMO FOR USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT SLOPE COUNTY, NORTH DAKOTA
DECISION MEMO FOR TWO (2) MEDORA RANGER DISTIRICT RANGE WATER PROJECTS ON ALLOTMENTS 023 AND 037 RANGE WATER STOCK TANKS AND PIPELINES AND RECLAIM and FENCE OUT DAMS USDA FOREST SERVICE DAKOTA PRAIRIE
More informationDecision Memo for the City of Detroit Root Rot Timber Sale Project
Decision Memo for the City of Detroit Root Rot Timber Sale Project USDA Forest Service Detroit Ranger District Willamette National Forest Marion and Linn Counties, OR T.10S., R.5 E., Section 2, Willamette
More informationPreliminary Decision Memo 2015 Recreation Residence Projects Odell Lake
2015 Recreation Residence Projects Odell Lake USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon Background The Crescent Ranger District maintains 66 recreation
More informationThe project will be conducted in partnership with the Nez Perce Tribe.
DECISION MEMO Tributary to Brushy Fork Culvert Replacements Private Land USDA Forest Service, Northern Region Powell Ranger District Nez Perce Clearwater National Forests Idaho County, Idaho I. Decision
More informationDECISION MEMORANDUM: Quartz Dreams Minerals Exploration Project, Nogales Ranger District
United States Department of Agriculture Forest Service Coronado National Forest 303 Old Tucson Road Nogales, Arizona 85621 Phone (520) 281-2296 FAX (520) 281-2396 File Code: 1950/2820 Date: Route To: Subject:
More informationDecision Memo. Ryan Ranch Meadow/Aspen/Willow Enhancement Project
Ryan Ranch Meadow/Aspen/Willow Enhancement Project DECISION TO BE IMPLEMENTED USDA Forest Service Bend-Ft. Rock Ranger District, Deschutes National Forest Deschutes County, Oregon T 19 S. R 11 E. Sections
More informationDECISION MEMO SFA EXPERIMENTAL FOREST HERBACEOUS POND RESTORATION AUGUST, 2009 ANGELINA/SABINE RANGER DISTRICT ANGELINA NATIONAL FOREST
402 C B B DECISION MEMO SFA EXPERIMENTAL FOREST HERBACEOUS POND RESTORATION AUGUST, 2009 ANGELINA/SABINE RANGER DISTRICT ANGELINA NATIONAL FOREST NACOGDOCHES COUNTY, TEXAS USDA FOREST SERVICE, REGION 8
More informationENVIRONMENTAL ASSESSMENT USDA
ENVIRONMENTAL ASSESSMENT USDA Forest Service Whitney Portal Walk-In Campground Expansion Project Mounty Whitney Ranger District; Inyo National Forest Inyo County, California PROPOSED ACTION The Inyo National
More informationDECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT (FONSI)
DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR CASA LOMA RECREATION RESIDENCE PERMIT RENEWAL U.S. FOREST SERVICE CIBOLA NATIONAL FOREST SANDIA RANGER DISTRICT BERNALILLO COUNTY, NEW MEXICO
More informationHuron-Manistee National Forests Mio Ranger District 107 McKinley Road Mio, MI 48647
United States Department of Agriculture Forest Service Huron-Manistee National Forests Mio Ranger District 107 McKinley Road Mio, MI 48647 989-826-3252 (Voice) 989-826-6073 (Fax) Dial 711 for relay service
More informationDecision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations
Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations June 2015 Chugach National Forest Seward Ranger District 29847 Seward Highway Seward, Alaska 99664 Decision It
More informationDECISION MEMO Jakabe Juniper/Aspen/Meadow Projects Paisley Ranger District, Fremont-Winema National Forests Lake County, Oregon
DECISION MEMO Jakabe Juniper/Aspen/Meadow Projects Paisley Ranger District, Fremont-Winema National Forests Lake County, Oregon Decision I have reviewed the environmental analysis project file and have
More informationProposed Action: In response to resource specialist concerns raised during internal scoping, the following restrictions will apply:
DECISION MEMO USDA Forest Service Inyan Kara Riders Motorcycle Enduro Event Rocky Mountain Region Thunder Basin National Grassland Medicine Bow-Routt National Forests Douglas Ranger District April 2011
More informationDRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S.
DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S. FOREST SERVICE CHATTAHOOCHEE-OCONEE NATIONAL FORESTS CONASAUGA RANGER DISTRICT FANNIN,
More informationPacific Southwest Region
United States Department of Agriculture Forest Service Pacific Southwest Region Regional Office, R5 1323 Club Drive Vallejo, CA 94592 (707) 562-8737 Voice (707) 562-9130 Text (TDD) File Code: 1570-1 Date:
More informationBeaverhead-Deerlodge National Forest Pintler Ranger District
United States Department of Agriculture Forest Service Beaverhead-Deerlodge National Forest Pintler Ranger District 88 Business Loop Philipsburg, MT 59858 406 859-3211 File Code: 1920 Date: April 20, 2012
More information3-13 Other Required Findings and Regulatory Compliance
Affected Environment and Environmental Consequences 3-13 Other Required Findings and Regulatory Compliance 3-13.1 Short-term Uses and Long-term Productivity NEPA requires consideration of the relationship
More informationDECISION MEMO Divide Creek Barrier Enhancement
Page 1 of 7 Background DECISION MEMO USDA Forest Service Butte Ranger District Silver Bow County, Montana T. 2 N., R. 9 W., Section 32 The North Fork of Divide Creek is approximately 4 miles west of the
More informationDraft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension
Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension USDA Forest Service McKenzie River Ranger District Willamette National Forest Linn County, OR T.13 S., R.7 E., Section 14,
More informationOtter Fire Salvage Project
Decision Memo Otter Fire Salvage Project North Fork John Day Ranger District, Umatilla National Forest Grant County, Oregon Township 7 South, Range 33 East, Sections 7, 8, 16, 17, 18, 20, 21, 22 Township
More informationDECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing
Page 1 of 6 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W, Section 30 The project is in the Gravelly Landscape, Snowcrest Recommended Wilderness Management
More informationPublic Rock Collection
Public Rock Collection Eagle-Holy Cross Ranger District, White River national Forest Eagle County, Colorado T7S, R80W, Section 18 & T6S, R84W, Section 16 Comments Welcome The Eagle-Holy Cross Ranger District
More informationRECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION Bureau of Land Management (BLM)
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION Bureau of Land Management (BLM) CX Log #: OR-014-CX-05-30 Lease or Serial #: N/A Project Name: _Gerber Guard Station Fence Replacement
More informationConger Rock Harvesting Project
Decision Notice and Finding of No Significant Impact Conger Rock Harvesting Project Aspen-Sopris Ranger District White River National Forest Gunnison County, Colorado T11S, R88W, Section 21 and 22 Decision
More informationBLM Office: Lakeview District, Klamath Falls Resource Area Phone #:
Decision Memorandum on Action and for Application of: Categorical Exclusion 516 DM2, Appendix 1, 1.12 Hazardous Fuel Reduction (PLAN CONFORMANCE AND CATEGORICAL EXCLUSION DETERMINATION) CX Log #: CX-04-15
More informationDecision Memo. USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho
Decision Memo BOGUS CREEK OUTFITTERS SPECIAL USE PERMIT RENEWAL USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho August 2014 DECISION It is my decision to renew
More informationDECISION MEMO. East Fork Blacktail Trail Reroute
Page 1 of 6 DECISION MEMO USDA Forest Service Madison Ranger District Madison County Background The East Fork Blacktail Trail #6069 is a mainline trail in the Snowcrest Mountains. The Two Meadows Trail
More informationDECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT USDA FOREST SERVICE TONGASS NATIONAL FOREST ADMIRAL TV ISLAND
DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT USDA FOREST SERVICE TONGASS NATIONAL FOREST ADMIRAL TV ISLAND HECLA GREENS CREEK MINE AGGREGATE SOURCE EXPANSION This Decision Notice contains a brief summary
More informationWildlife Habitat Restoration and Improvements FY 2007 Project
United States Department of Agriculture Forest Service Pacific Northwest Region Wildlife Habitat Restoration and Improvements FY 2007 Project Umpqua National Forest Diamond Lake Ranger District April 2008
More informationRECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-06-06 Lease or Serial #: OR62919 Project Name: _PacifiCorp Power-line right-of-way #2 Location: Bonanza USGS
More informationDraft Decision Memo OHV Trails 22 and 42 Reroute Project
Draft Decision Memo OHV Trails 22 and 42 Reroute Project USDA Forest Service McKenzie River Ranger District Willamette National Forest Linn County, OR T13S, R7E, Sections 25 and 34 Willamette Meridian
More informationDECISION MEMO. Non-Commercial Thinning on the Ocala National Forest (PALS project # 39238)
Decision DECISION MEMO Non-Commercial Thinning on the Ocala National Forest (PALS project # 39238) USDA Forest Service Ocala National Forest Lake, Marion, and Putnam County, Florida Based on the analysis
More informationEnvironmental Assessment White Rock Mining Plan of Operations
Environmental Assessment White Rock Mining Plan of Operations April 2015 Figure 1: Grant Lake aerial view Lead Agency Responsible Official For Further Information, Contact: US Forest Service Seward Ranger
More informationDECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT. Bend-Fort Rock Ranger District Deschutes National Forest Lake County, Oregon
DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT Bend-Fort Rock Ranger District Deschutes National Forest Lake County, Oregon Devil's Garden Planning Area Hole-in-the-Ground Subunit Environmental Assessment
More informationU.S.D.A. Forest Service National Forest & Grasslands in Texas Angelina National Forest Angelina/Sabine Ranger District Jasper County, Texas
DECISION MEMO WESTWOOD WATER SUPPLY CORPORATION SPECIAL USE PERMIT REISSUANCE AND MODIFICATION PROJECT U.S.D.A. Forest Service National Forest & Grasslands in Texas Angelina National Forest Angelina/Sabine
More informationDecision Notice and Finding of No Significant Impact
United States Department of Agriculture Forest Service June 2011 Decision Notice and Finding of No Significant Impact Vail Ski Area Forest Health Project Holy Cross Ranger District, White River National
More informationCascades Resource Area Soil Rehabilitation
Cascades Resource Area Soil Rehabilitation DECISION RECORD March 2007 United States Department of the Interior Bureau of Land Management Oregon State Office Salem District Cascades Resource Area Environmental
More informationDECISION MEMO. Cheat-Potomac Ranger District Multiple Recreation Facilities and Related Granger-Thye Concessions Special Use Permit
DECISION MEMO Cheat-Potomac Ranger District Multiple Recreation Facilities and Related Granger-Thye Concessions Special Use Permit United States Department of Agriculture Forest Service (FS) Eastern Region
More informationCoronado National Forest Sierra Vista Ranger District
United States Department of Agriculture Forest Service Coronado National Forest Sierra Vista Ranger District 4070 South Avenida Saracino Hereford, Arizona 85615 Phone (520) 378-0311 FAX (520) 378-0519
More informationDecision Memo Starkey Elk Handling Facility Water System Improvements
Decision Memo Starkey Elk Handling Facility Water System Improvements USDA Forest Service Wallowa-Whitman National Forest La Grande Ranger District Union County, Oregon I. DECISION TO BE IMPLEMENTED A.
More informationUSDA Forest Service Decision Memo. Mattie V Creek Minesite Rehabilitation Project
USDA Forest Service Decision Memo Mattie V Creek Minesite Rehabilitation Project Ninemile Ranger District Lolo National Forest Mineral County, Montana I. DECISION TO BE IMPLEMENTED A. Decision Description:
More informationLogo Department Name Agency Organization Organization Address Information Highway 35 Agriculture
Logo Department Name Agency Organization Organization Address Information United States Forest Mt. Hood National Forest Hood River Ranger District Department of Service 6780 Highway 35 Agriculture Mt.
More informationDecision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada
Decision Memo Halliburton Ann Exploration Project U.S. Forest Service Austin Ranger District, Humboldt-Toiyabe National Forest Nye County, Nevada Background The Ann Exploration Project is located on the
More informationFile Code: 1950 Date: November 17, 2015
Logo Department Name Agency Organization Organization Address Information United States Forest Deschutes National Forest 63095 Deschutes Market Road Department of Service Bend/Fort Rock Ranger District
More informationDraft Decision Notice & Finding of No Significant Impact For The Mammoth Lakes Basin Hazardous Fuels Reduction Project
Draft Decision Notice & Finding of No Significant Impact For The Mammoth Lakes Basin Hazardous Fuels Reduction Project USDA Forest Service Mammoth Ranger District, Inyo National Forest Mono County, California
More informationFarnsworth Project. Draft Decision Notice and Finding of No Significant Impacts. United States Department of Agriculture Forest Service
United States Department of Agriculture Forest Service Farnsworth Project Draft Decision Notice and Finding of No Significant Impacts Bradford Ranger District, Allegheny National Forest, Warren County,
More information