Conger Rock Harvesting Project

Size: px
Start display at page:

Download "Conger Rock Harvesting Project"

Transcription

1 Decision Notice and Finding of No Significant Impact Conger Rock Harvesting Project Aspen-Sopris Ranger District White River National Forest Gunnison County, Colorado T11S, R88W, Section 21 and 22 Decision This notice documents my decision for the Conger Rock Harvesting project. An environmental analysis of the proposal was undertaken in response to a plan of operations submitted by Gallegos Corporation; the plan outlines a request for removal of mineral materials located on National Forest System (NFS) lands near Marble, Colorado. In this case, the desired material is considered decorative rock comprised mostly of granodiorite and quartz monzonite found within a natural talus deposit. The Gallegos Corporation has been removing the same rock down slope on private land since 1998 under State of Colorado and Gunnison County permits and requested to continue harvesting from adjacent forest lands. Gallegos owns the 7.84-acre private property adjacent south to the affected area (NE ¼ Section 28) where the past operations have occurred and this site would continue to serve as a staging area for future operations. Attached to the land title is a perpetual non-exclusive easement across private land located in NW ¼ NW ¼ of Section 27 for all purposes of ingress and egress between their property and County Road 3. After considering information provided in the environmental assessment (EA), design criteria, public comments, consultation with other agencies, review of the White River National Forest Land and Resource Management Plan, and internal Forest Service specialist input, I have decided to select the proposed action, which authorizes Gallegos Corporation to remove rock from NFS lands as described in this notice. My decision allows up to 1,244 tons of decorative rock to be removed between June 21 and October 31 (or the first snow, whichever comes first) each year. The operation will be initially limited to a 5.86-acre area located in the SE ¼ SE ¼ of Section 21 (see EA, Figure 2). Expansion of the rock harvesting north and east into Section 22 will be considered once it is determined suitable material has been exhausted in the initial harvest area and will be subject to additional review under the National Environmental Policy Act (NEPA). Authorization to remove rock will be granted through a Contract for the Sale of Mineral Materials (form FS ), which expires after one year. Additional contracts can be issued and will be subject to the company submitting a new request each year and re-evaluation by the Forest Service. With this type of contract, the Forest Service will be monitoring operations periodically throughout the season in order to verify quantity of material removed and compliance with contract stipulations. Decision Notice and FONSI for Conger Rock Harvesting 1

2 A majority of the operation involves gathering and stacking rocks by hand, but heavy equipment is also used to complete the harvesting process. Equipment used on public land includes a frontend loader to move rocks into windrows and a skid steer to move pallets from harvest to staging. A backhoe may be used for reclamation work at the end of each season. No other heavy equipment, roads, structures, or surface activities will be permitted on NFS lands. Design Criteria In addition to criteria listed in the EA, my decision requires the following stipulations be added to the contract: Hours of operation for heavy equipment will be restricted between the hours of 7:00 a.m. to 7:00 p.m., Monday through Friday in accordance with Colorado Noise Statute Lighter colored rocks will be stained to blend in with the existing darker rocks on the surface when visible from below. To determine when and where staining is necessary, the Forest Service will review photographs taken from established key observation points at the beginning and end of season. One-step rock staining products such as Permeon are suggested, which chemically react with the rock and sunlight to accelerate the weathering process. Rocks may be stained at the end of each season, as needed. Stain would be applied by an authorized applicator with a backpack-mounted manual sprayer under the supervision of the Forest Service and only once in a given area. The design criteria already specify that individual trees and tree islands will be avoided and no tree cutting will be allowed without Forest Service authorization. For further clarification, if accidental loss occurs or a tree cannot be avoided, replacement will be in kind (same species) at a 2:1 ratio to ensure establishment. The Forest Service has authority to impose the above restrictions and other design criteria on NFS lands only; control over uses and activity on private land is outside the Federal government s jurisdiction. Gallegos Corporation will also need to obtain necessary permits and clearance from the State of Colorado and Gunnison County before removing any material. The state and county may impose additional requirements or restrictions. As part of its contract obligation with the Forest Service, Gallegos Corporation will need to demonstrate compliance with all applicable state and county regulations. As part of the permitting process, a reclamation bond will be put in place to the satisfaction of both the State and Forest Service. Rationale The sale of mineral materials in this proposed action meets the purpose and need of the project. As determined during the forest planning process, the primary supply of decorative rock is on public lands and public demand for building stone from the White River National Forest is high. This project helps fulfill some of that demand without having to develop entirely new access roads and other infrastructure. Furthermore, the Forest Service will be able to maintain regular control and oversight of the permitted activity by reviewing the mineral materials contract on an annual basis. Because our agency will need to conduct periodic monitoring throughout the operating season, we will be able to help observe and document compliance with State and county requirements as needed. Decision Notice and FONSI for Conger Rock Harvesting 2

3 Alternatives Considered Two alternatives were considered in detail: No Action and the Proposed Action. Under No Action, no mineral materials permit would be issued and no rock harvesting would take place. Current management plans would continue to guide management of the area. The No Action alternative was used as a baseline to compare the effects of the Proposed Action. A summary comparison of the two alternatives can be found in the EA on pages 12 and 13. Public Involvement Preliminary information about the proposal was sent to 25 individuals, organizations, and other agencies for scoping on September 18, Consultation with affected Tribes was also initiated at this time. Additionally, public notices and news releases were published in the Aspen Daily Times, Glenwood Springs Post Independent, Crystal Valley Echo & Marble Times, and Daily Sentinel between September and October Several phone calls, s, and letters were received in response to this early public notice. Based on this early input, I determined that scenery, noise, transportation, air quality, vegetation, and wildlife were key issues to be analyzed in the EA. These issues also helped us identify design criteria to be followed during project implementation. The EA was prepared and published in late February and a legal notice of opportunity to comment appeared in the Aspen Times, the newspaper of record, on March 1, Twentyseven comments were received during the 30-day notice and comment period, which ended on March 31, A few additional comment letters were received after the deadline. A majority of comments came from residents living near the project area, with primary concerns related to noise and visual impacts. These concerns are what prompted me to require adding the hours of operations and rock staining stipulations discussed earlier. These additional design criteria will help reduce short-term noise impacts and avoid long-term visual impacts. Other comments did not present any new issues or required changes to the EA. These other comments are addressed in the Finding of No Significant Impact. Finding of No Significant Impact After considering the context and intensity of environmental impacts described in the EA, I have determined that the proposed action will not have a significant effect on the quality of the human environment. Therefore, an environmental impact statement will not be prepared. My determination is based on the following criteria outlined in the implementing regulations for the National Environmental Policy Act (40 CFR ). Context This project is a site-specific action that by itself does not have statewide, regional, national, or international importance. As disclosed in the EA, up to acres of NFS lands could be affected; this acreage represents approximately 1/1000 th of the entire White River National Forest. Environmental impacts would be limited to the area described in the EA and will have little influence upon regional or state resources. Within in this area and over a potential 30-year timeframe, a total of 37,320 tons of rock could be removed. This figure is a theoretical maximum because, as stated before, continuation of the rock harvesting will be subject to re-evaluation on an annual basis and additional NEPA review. Removal of rock is considered an irreversible Decision Notice and FONSI for Conger Rock Harvesting 3

4 commitment of resources because rock is not a renewable product. After all desired materials have been handpicked and transported off site, it is estimated that at least five feet of rock will remain on the talus slope. Intensity 1) Both beneficial and adverse effects have been considered in my decision. Over the long-term, the existing steep hillside will be gradually reclaimed to a more stable slope, lowering the risk of exposure to life and property that is present under current conditions. Approximately 50 homes are located within visual and auditory range of the project area. Sounds from heavy equipment being used on the hill would be heard on an intermittent basis (2-3 days a week) for up to one-third of the year. Removing surface rocks would also result in a long-term color contrast in the talus slope. These impacts are why I decided to add hours of operation and rock staining requirements. Hours of operation will help preserve quiet hours in the evenings and weekends valued by full and part-time residents. Staining will help blend freshly exposed rock surfaces with the surrounding darker rock within a couple weeks of application. Some wildlife is likely to leave the area to avoid noise and disturbance; however, they are expected to return after the harvesting concludes each year. These impacts are considered short-term in nature and will not impair long-term productivity and as thus, they are not considered to be of significant intensity. 2) The limited amount of truck traffic associated with this activity will not exceed traffic levels from the past 10 years and will pose no more threat to residents than existing visitor and residential traffic currently does on a daily basis. Incidental dust may be generated from rocks and equipment moving around on the talus slope located on NFS lands and our design criteria includes watering to minimize dust as needed. More potential for dust originates on private land where bare soil is exposed (staging area and private access road) which is outside the control of the Forest Service. We recommend Gunnison County consider this impact and appropriate dust abatement procedures when evaluating the land use application from the Gallegos Corporation. Rock harvesting is not anticipated to cause disproportionate adverse human health or environmental effects to air quality. 3) The project area can be seen from a 0.5 mile stretch of the Crystal River, of which 20 miles is considered eligible for wild and scenic rivers status as a recreation river. Scenery is one of the outstandingly remarkable values (ORV) identified for this segment of river. Rock staining will preserve scenic quality in the river view corridor and result in no long-term impact to the scenery ORV or effect to the eligibility, potential classification, or potential suitability of the area. Noise and incidental dust generated by the operation would not be detectable in the nearby Maroon Bells-Snowmass or Raggeds Wilderness areas. The project does not require any road access through the adjacent Gallo Hill roadless area. There will be no impacts on research natural areas or designated parklands or prime farmlands since these do not exist within the affected area. 4) The effects on the quality of the human environment are not highly controversial, because there is no substantial dispute as to the size, nature or effects of the proposed action among scientists. 5) The environmental effects analysis (EA, Chapter 3) demonstrates that the effects are not uncertain and do not involve unique or unknown risk. 6) This site-specific action does not establish a precedent for future actions, which may have significant effects; nor does it represent a decision in principle about a future action. Decision Notice and FONSI for Conger Rock Harvesting 4

5 7) Past, present and reasonable foreseeable future actions have been considered and analyzed in conjunction with the proposed action and there were no cumulative effects determined to be significant. Cumulative effects are disclosed in the EA (Chapter 3). 8) In compliance with the National Historic Preservation Act, a cultural resource inventory was completed in September 2008 and concludes that rock harvesting would result in no historic properties affected. The Colorado State Historic Preservation Office (SHPO) has been notified. Native American Tribes were consulted on this project and no concerns were raised. 9) In compliance with the Endangered Species Act, a Biological Assessment (BA) was prepared. The BA determined that rock harvesting would have no effect to federally listed fish or contribute to downstream water depletions and would have no effect to Canada lynx or its critical habitat. No other federally endangered or threatened species are known or have potential to occur in the area. 10) This action does not violate other Federal, State, or local laws or requirements designed for the protection of the environment. Other applicable laws and regulations were reviewed and considered in the EA and are summarized hereafter. Findings Required by Other Laws Mineral Materials Act of 1947, as amended: This law grants the Forest Service authority for the disposal of mineral materials. Forest Service policy (36 CFR 228, Subpart C) is to make mineral materials on NFS lands available to the public and other entities where reasonable protection of, or mitigation of effects on, other resources in assured, and where removal is not prohibited. National Forest Management Act (NFMA) of 1976, as amended: This project, and associated design criteria, complies with White River National Forest Plan standards and guidelines and management area direction applicable to the project area. Clean Water Act of 1972, as amended: Silt fences required by the design criteria will further limit the extremely low potential for sediment to enter the Crystal River. Clean Air Act of 1970, as amended: Incidental fugitive dust created by traffic to and from the rock harvest operation will not exceed air quality standards for particulate matter. Executive Order (environmental justice): No low-income or minority populations would be adversely or disproportionately affected by the project. Administrative Review or Appeal Opportunities Individuals or organizations who submitted comments during the comment period specified at may appeal this decision. The notice of appeal must meet the appeal content requirements at 36 CFR The appeal must be filed (regular mail, fax, , hand-delivery, or express delivery) with the Appeal Deciding Officer at: USDA Forest Service, Rocky Mountain Region, 740 Simms, Golden, CO 80401; FAX: (303) Decision Notice and FONSI for Conger Rock Harvesting 5

6 The office business hours for submitting hand-delivered appeals are: Monday through Friday 7:30 a.m. to 4:00 p.m., excluding holidays. Electronic appeals must be submitted in a format such as an message, plain text (.txt), rich text format (.rtf), or Word (.doc) to: appeals-rocky-mountain-regional-office@fs.fed.us The appeal must have an identifiable name attached or verification of identity will be required. A scanned signature may serve as verification on electronic appeals. Appeals, including attachments, must be filed within 45 days from the publication date of a legal notice of decision in the Aspen Times, the newspaper of record. Attachments received after the 45-day appeal period will not be considered. For this decision, the publication date in the Aspen Times is the exclusive means for calculating the time to file an appeal. Those wishing to appeal this decision should not rely upon dates or timeframe information provided by any other source. Implementation If no appeals are filed within the 45-day time period, implementation of the decision may occur on, but not before, 5 business days from the close of the appeal filing period. When appeals are filed, implementation may occur on, but not before, the 15th business day following the date of the last appeal disposition. Contact Person For additional information concerning this decision or the Forest Service appeal process, contact Skye Sieber, West Zone NEPA Coordinator, (970) or ssieber@fs.fed.us. /s/ Irene L. Davidson 7/17/09 IRENE L. DAVIDSON Date District Ranger Decision Notice and FONSI for Conger Rock Harvesting 6

Draft Decision Notice Maroon Bells - Snowmass Wilderness Overnight Visitor Use Management Plan

Draft Decision Notice Maroon Bells - Snowmass Wilderness Overnight Visitor Use Management Plan Draft Decision Notice Maroon Bells - Snowmass Wilderness Overnight Visitor Use Management Plan USDA Forest Service Aspen-Sopris Ranger District, White River National Forest Gunnison Ranger District, Grand

More information

SAN LUIS VALLEY PUBLIC LANDS CENTER

SAN LUIS VALLEY PUBLIC LANDS CENTER Decision Notice And Finding of No Significant Impact Watershed and Fisheries Conservation Treatments SAN LUIS VALLEY PUBLIC LANDS CENTER USDA Forest Service Rocky Mountain Region Public Lands Center Rio

More information

DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT OUTFITTER GUIDE MOTORIZED TOURS SPECIAL USE PERMIT ISSUANCES

DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT OUTFITTER GUIDE MOTORIZED TOURS SPECIAL USE PERMIT ISSUANCES Decision Notice and Finding of No Significant 1 Impact for the Outfitter Guide Motorized Tours DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT OUTFITTER GUIDE MOTORIZED TOURS SPECIAL USE PERMIT ISSUANCES

More information

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT

DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT DECISION MEMO OREGON DEPARTMENT OF TRANSPORTATION (ODOT) SAND SHED CINDER PIT EXPLORATION PROJECT USDA Forest Service Bend/Fort Rock Ranger District, Deschutes National Forest Deschutes County, Oregon

More information

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE

FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE FINDING OF NO SIGNIFICANT IMPACT OWL CREEK GRAVEL PIT EXPANSION U.S. FOREST SERVICE OURAY RANGER DISTRICT OURAY COUNTY, COLORADO BACKGROUND The Owl Creek Gravel Pit, also known as the Spruce Ridge Pit,

More information

Kinder/Morgan Southern Natural Gas. Right-of-Way Maintenance Project Woody Vegetation Control. Decision Notice And Finding of No Significant Impact

Kinder/Morgan Southern Natural Gas. Right-of-Way Maintenance Project Woody Vegetation Control. Decision Notice And Finding of No Significant Impact Kinder/Morgan Southern Natural Gas United States Department of Agriculture Southern Region Forest Service March 2013 Right-of-Way Maintenance Project Woody Vegetation Control Decision Notice And Finding

More information

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT Blue River and KP Creek Wild and Scenic River Suitability Study USDA Forest Service, Southwestern Region Apache-Sitgreaves National Forests Alpine and

More information

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact

Blanche Park Reservoir Decision Notice and Finding of No Significant Impact Blanche Park Reservoir Decision Notice and Finding of No Significant Impact U.S. Forest Service Grand Mesa, Uncompahgre, and Gunnison National Forests Delta County, Colorado INTRODUCTION The Grand Mesa

More information

Decision Notice and Finding of No Significant Impact

Decision Notice and Finding of No Significant Impact United States Department of Agriculture Forest Service June 2011 Decision Notice and Finding of No Significant Impact Vail Ski Area Forest Health Project Holy Cross Ranger District, White River National

More information

DECISION MEMO. Pine Ridge Fire Vegetation Project. USDA Forest Service Fremont-Winema National Forest Chiloquin Ranger District Klamath County, Oregon

DECISION MEMO. Pine Ridge Fire Vegetation Project. USDA Forest Service Fremont-Winema National Forest Chiloquin Ranger District Klamath County, Oregon DECISION MEMO Pine Ridge Fire Vegetation Project USDA Forest Service Fremont-Winema National Forest Chiloquin Ranger District Klamath County, Oregon Legal Location: Township 34 South, Range 7 East, Sections

More information

USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT BILLINGS COUNTY, NORTH DAKOTA

USDA FOREST SERVICE DAKOTA PRAIRIE GRASSLANDS LITTLE MISSOURI NATIONAL GRASSLAND MEDORA RANGER DISTRICT BILLINGS COUNTY, NORTH DAKOTA GMX RESOURCES INC. LITTLE MISSOURI FEDERAL 24-10-1H OIL AND GAS WELL AND ACCESS ROAD #734-22 LOCATED WITHIN SW¼ of SE¼, SECTION 10, T141N, R100W BILLINGS COUNTY, NORTH DAKOTA USDA FOREST SERVICE DAKOTA

More information

Preliminary Decision Memo

Preliminary Decision Memo Preliminary Decision Memo USDA Forest Service Mt. Baker-Snoqualmie National Forest Snoqualmie Ranger District Kittitas County, Washington Pacific Crest Chairlift Enhancement Background It is my decision

More information

Decision Memo. Delta A Septic Repair (#33)

Decision Memo. Delta A Septic Repair (#33) Decision Memo Delta A Septic Repair (#33) USDA Forest Service Willamette National Forest McKenzie River Ranger District T16S, R5E, Section 16 Lane County, OR Proposed Action The McKenzie River Ranger District

More information

DECISION MEMO Lazyman Repeater Shelter and Tower Replacement

DECISION MEMO Lazyman Repeater Shelter and Tower Replacement Page 1 of 5 Background DECISION MEMO Lazyman Repeater Shelter and Tower Replacement USDA Forest Service Madison Ranger District Madison County The Lazyman Repeater was installed in 1988 and serves parts

More information

Record of Decision Darroughs Hot Springs Geothermal Leasing Project

Record of Decision Darroughs Hot Springs Geothermal Leasing Project Record of Decision Darroughs Hot Springs Geothermal Leasing Project Background USDA Forest Service Humboldt-Toiyabe National Forest Tonopah Ranger District Nye County, Nevada The production, transmission,

More information

Draft Decision Notice & Finding of No Significant Impact For The Mammoth Lakes Basin Hazardous Fuels Reduction Project

Draft Decision Notice & Finding of No Significant Impact For The Mammoth Lakes Basin Hazardous Fuels Reduction Project Draft Decision Notice & Finding of No Significant Impact For The Mammoth Lakes Basin Hazardous Fuels Reduction Project USDA Forest Service Mammoth Ranger District, Inyo National Forest Mono County, California

More information

DECISION MEMO IDAHO DREAM PLAN OF OPERATIONS

DECISION MEMO IDAHO DREAM PLAN OF OPERATIONS Page 1 of 7 BACKGROUND DECISION MEMO USDA Forest Service Dillon Ranger District Beaverhead County The project area is included in the Ermont Mining District in T5S R11W Section 36 and T6S R11W Section

More information

East Aspen Metro District Mosquito Abatement Environmental Assessment

East Aspen Metro District Mosquito Abatement Environmental Assessment United States Department of Agriculture Forest Service Rocky Mountain Region March 2015 East Aspen Metro District Mosquito Abatement Environmental Assessment DRAFT DECISION NOTICE Located in portions of:

More information

DECISION MEMO. USDA Forest Service. Butte District Silver Bow County T4N, R8W, Section 36

DECISION MEMO. USDA Forest Service. Butte District Silver Bow County T4N, R8W, Section 36 Page 1 of 5 Background DECISION MEMO USDA Forest Service Butte District Silver Bow County T4N, R8W, Section 36 Northwestern Energy operates utility systems and facilities on federal lands under a Master

More information

Scoping and 30-Day Notice and Comment Period for. Grassy Knob American Chestnut Planting

Scoping and 30-Day Notice and Comment Period for. Grassy Knob American Chestnut Planting United States Department of Agriculture Forest Service Monongahela National Forest Greenbrier Ranger District Box 67 Bartow, WV 24920 Phone (304) 456-3335 File Code: 2020/2070/1950 Date: November 15, 2012

More information

Draft DECISION NOTICE And Finding of No Significant Impact

Draft DECISION NOTICE And Finding of No Significant Impact Draft DECISION NOTICE And Finding of No Significant Impact Number Two Canyon Trails Project USDA Forest Service Okanogan-Wenatchee National Forest Wenatchee River Ranger District Chelan County, Washington

More information

DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S.

DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S. DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT ROAD/TRAIL DECOMMISSIONING AND SEASONAL CLOSURE PROJECT U.S. FOREST SERVICE CHATTAHOOCHEE-OCONEE NATIONAL FORESTS CONASAUGA RANGER DISTRICT FANNIN,

More information

DECISION MEMO PROJECT NAME: CLARK CREEK BLOWDOWN USDA FOREST SERVICE IDAHO PANHANDLE NATIONAL FOREST BONNERS FERRY RANGER DISTRICT

DECISION MEMO PROJECT NAME: CLARK CREEK BLOWDOWN USDA FOREST SERVICE IDAHO PANHANDLE NATIONAL FOREST BONNERS FERRY RANGER DISTRICT United States Department of Agriculture Forest Service Idaho Panhandle National Forests Bonners Ferry Ranger District 6286 Main Street Bonners Ferry, ID 83805 (208) 267-5561 File Code: 1950 Date: July

More information

Notice of Proposed Action. Colorado Department of Transportation

Notice of Proposed Action. Colorado Department of Transportation Colorado Department of Transportation Colorado State Highway 133 Horseshoe Bend Fill Site and Placita Restoration USDA Forest Service Aspen and Sopris Ranger District, White River National Forest SW1/4

More information

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT (FONSI)

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT (FONSI) DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT (FONSI) FOR CASA LOMA RECREATION RESIDENCE PERMIT RENEWAL U.S. FOREST SERVICE CIBOLA NATIONAL FOREST SANDIA RANGER DISTRICT BERNALILLO COUNTY, NEW MEXICO

More information

Small Project Proposal

Small Project Proposal Combined Scoping and Notice and Comment Document Small Project Proposal USDA Forest Service Fishlake National Forest Beaver Ranger District Sevier County, Utah The purpose of this document is to inform

More information

Helicopter landings in the Twin Peaks, Lone Peak, and Mount Timpanogos wilderness areas to capture and collar mountain goats and bighorn sheep Project

Helicopter landings in the Twin Peaks, Lone Peak, and Mount Timpanogos wilderness areas to capture and collar mountain goats and bighorn sheep Project for the Helicopter landings in the Twin Peaks, Lone Peak, and Mount Timpanogos wilderness areas to capture and collar mountain goats and bighorn sheep Project USDA Forest Service Uinta-Wasatch-Cache National

More information

On/Off periods Improvements Grazing System. 2 fence segments. 1 water development, 2 cattle guards

On/Off periods Improvements Grazing System. 2 fence segments. 1 water development, 2 cattle guards DECISION NOTICE HENRY CREEK AND SWAMP CREEK RANGE ALLOTMENT MANAGEMENT PLANS REVISION U.S. FOREST SERVICE PLAINS/THOMPSON FALLS RANGER DISTRICT LOLO NATIONAL FOREST SANDERS COUNTY, MONTANA DECISION Based

More information

DECISION MEMO. Vipond Water Development

DECISION MEMO. Vipond Water Development Page 1 of 5 DECISION MEMO USDA Forest Service Wise River Ranger District Beaverhead County T2S, R10W, Sections 12, 13, 14, &18 Background This project is located in the Pioneer Landscape, East Face Management

More information

Decision Memo for Juniper Ridge Opal Mine

Decision Memo for Juniper Ridge Opal Mine for USDA Forest Service Pacific Northwest Region Fremont-Winema National Forests Bly Ranger District Klamath County, Oregon Introduction The Bly Ranger District has received a proposed operating plan for

More information

Scoping: Midstate Telephone Company replacement of 20,000 feet of fiber optic telephone line Open for Comment: June 30 to July 29, 2015

Scoping: Midstate Telephone Company replacement of 20,000 feet of fiber optic telephone line Open for Comment: June 30 to July 29, 2015 United States Department of Agriculture Forest Service Dakota Prairie Grasslands Medora Ranger District 99 23 rd Ave. West, Suite B Dickinson, ND 58601 File Code: 1950/2720 Date: June 30, 2015 To: Dakota

More information

Preliminary Decision Memo Recreation Residence Septic Repairs

Preliminary Decision Memo Recreation Residence Septic Repairs Preliminary Decision Memo 2014 Recreation Residence Septic Repairs USDA Forest Service McKenzie River Ranger District Willamette National Forest Lane County, Oregon T. 16 S., R. 5 E, Section 16 Willamette

More information

Environmental Assessment Gold Digger Mining Plan of Operations

Environmental Assessment Gold Digger Mining Plan of Operations Environmental Assessment Gold Digger Mining Plan of Operations June 2016 i ;..-.I ' Lead Agency Responsible Official For Further Information, Contact: US Forest Service Seward Ranger District Francisco

More information

TENMILE RECREATION PATH ENVIRONMENTAL ASSESSMENT

TENMILE RECREATION PATH ENVIRONMENTAL ASSESSMENT TENMILE RECREATION PATH ENVIRONMENTAL ASSESSMENT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT DECEMBER 2011 USDA Forest Service White River National Forest Dillon Ranger District The U.S. Department

More information

DECISION MEMO. Aurora New Horizons Project

DECISION MEMO. Aurora New Horizons Project Page 1 of 7 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County In 2005 a decision covering approximately the same proposal was analyzed and a Decision Memo was signed.

More information

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT PLAINS EXPLORATION AND PRODUCTION COMPANY HELL S GULCH NORTH, PHASE 2 April 2008 USDA Forest Service Region 2 White River National Forest Rifle Ranger

More information

Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension

Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension Draft Decision Memo Santiam Junction Maintenance Station Truck Shop Extension USDA Forest Service McKenzie River Ranger District Willamette National Forest Linn County, OR T.13 S., R.7 E., Section 14,

More information

DECISION DECISION RATIONALE

DECISION DECISION RATIONALE DRAFT DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT COASTAL CAROLINA RUNWAY 4 OBSTRUCTION REMOVAL U.S. FOREST SERVICE CROATAN NATIONAL FOREST CRAVEN COUNTY, NC DECISION Based upon my review of the

More information

Public Rock Collection

Public Rock Collection Public Rock Collection Eagle-Holy Cross Ranger District, White River national Forest Eagle County, Colorado T7S, R80W, Section 18 & T6S, R84W, Section 16 Comments Welcome The Eagle-Holy Cross Ranger District

More information

Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations

Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations March 2017 Chugach National Forest Seward Ranger District 29847 Seward Highway Seward, Alaska 99664 Decision It

More information

Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project

Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project Preliminary Decision Memo 2017 BPA Utility Corridor Maintenance and Danger Tree Project USDA Forest Service Crescent Ranger District, Deschutes National Forest Klamath County, Oregon The Crescent Ranger

More information

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing

DECISION MEMO. West Fork Blacktail Deer Creek Hardened Crossing Page 1 of 6 Background DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W, Section 30 The project is in the Gravelly Landscape, Snowcrest Recommended Wilderness Management

More information

Decision Memo. USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho

Decision Memo. USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho Decision Memo BOGUS CREEK OUTFITTERS SPECIAL USE PERMIT RENEWAL USDA Forest Service Mountain Home Ranger District, Boise National Forest Boise County, Idaho August 2014 DECISION It is my decision to renew

More information

Decision Notice And. Finding of No Significant Impact. for the. Willow Creek Cattle & Horse Allotment

Decision Notice And. Finding of No Significant Impact. for the. Willow Creek Cattle & Horse Allotment USDA Forest Service Intermountain Region Sawtooth National Forest Fairfield Ranger District Decision Notice And Finding of No Significant Impact for the Willow Creek Cattle & Horse Allotment September

More information

Hermosa Creek Watershed Management Plan

Hermosa Creek Watershed Management Plan DRAFT United States Department of Agriculture Forest Service Hermosa Creek Watershed Management Plan DRAFT Decision Notice Columbine Ranger District, San Juan National Forest, La Plata and San Juan Counties,

More information

My Decision. Page 1 0/9

My Decision. Page 1 0/9 DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT Lake Hemet Telecommunication Project San Jacinto Ranger District San Bernardino National Forest USDA Forest Service, Riverside County, California The United

More information

Yankee Hill Fuel Treatment Project Decision Notice & Finding of No Significant Impact

Yankee Hill Fuel Treatment Project Decision Notice & Finding of No Significant Impact Yankee Hill Fuel Treatment Project Decision Notice & Finding of No Significant Impact USDA Forest Service Arapaho and Roosevelt National Forests And Pawnee National Grassland Clear Creek Ranger District

More information

East Aspen Metro District Mosquito Abatement Environmental Assessment

East Aspen Metro District Mosquito Abatement Environmental Assessment United States Department of Agriculture Forest Service Rocky Mountain Region May 2015 East Aspen Metro District Mosquito Abatement Environmental Assessment Final Decision Notice and Finding of No Significant

More information

DECISION MEMO. Verizon Spring Creek Hill Cell Tower

DECISION MEMO. Verizon Spring Creek Hill Cell Tower DECISION MEMO Verizon Spring Creek Hill Cell Tower Fremont-Winema National Forests Chiloquin Ranger District Klamath County, OR PROPOSED ACTION: Verizon, through Cascadia P.M., L.L.C., has submitted an

More information

Decision Memo for Pax Ponderosa Pine Planting Project

Decision Memo for Pax Ponderosa Pine Planting Project Decision Memo for Pax Ponderosa Pine Planting Project USDA Forest Service Pacific Northwest Region Fremont-Winema National Forests Lakeview Ranger District Lake County, Oregon Introduction The Lakeview

More information

DECISION MEMO Pony Whitebark Pine Planting

DECISION MEMO Pony Whitebark Pine Planting Page 1 of 5 DECISION MEMO Pony Whitebark Pine Planting USDA Forest Service Jefferson Ranger District Madison County T2S, R3W, Sections 4 & 9 Background The Pony Fire of 2012 burned 5,157 acres on the (BDNF).

More information

DECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO

DECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO DECISION MEMO MANHATTAN FUELS REDUCTION PROJECT U.S. FOREST SERVICE CANYON LAKES RANGER DISTRICT LARIMER COUNTY, CO Background and Project Description In order to improve forest health and reduce hazardous

More information

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION Bureau of Land Management (BLM)

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION Bureau of Land Management (BLM) RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION Bureau of Land Management (BLM) CX Log #: OR-014-CX-05-30 Lease or Serial #: N/A Project Name: _Gerber Guard Station Fence Replacement

More information

DECISION MEMO. Kelly s Pond / NFSR 204 Hazard Tree Removal. USDA Forest Service Sam Houston National Forest Montgomery County, Texas

DECISION MEMO. Kelly s Pond / NFSR 204 Hazard Tree Removal. USDA Forest Service Sam Houston National Forest Montgomery County, Texas DECISION MEMO Kelly s Pond / NFSR 204 Hazard Tree Removal USDA Forest Service Sam Houston National Forest Montgomery County, Texas Decision I have decided to remove approximately 500 hazard trees in and

More information

INTRODUCTION DECISION

INTRODUCTION DECISION DRAFT DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT BIG SHEEP DIVIDE RANGELAND ANALYSIS U.S. FOREST SERVICE WALLOWA VALLEY RANGER DISTRICT WALLOWA COUNTY, OREGON INTRODUCTION An Environmental Assessment

More information

Hanging Lake Management Plan

Hanging Lake Management Plan DRAFT Decision Notice Hanging Lake Management Plan USDA Forest Service Eagle-Holy Cross Ranger District, White River National Forest Garfield County, Colorado Background The Hanging Lake project area consists

More information

Irabarne & Boardtree/Last Chance Grazing Allotments Management

Irabarne & Boardtree/Last Chance Grazing Allotments Management United States Department of Agriculture Forest Service Southwestern Region September 2009 Irabarne & Boardtree/Last Chance Grazing Allotments Management Decision Notice and Finding of No Significant Impact

More information

Gooseberry Ecological Restoration (30270) Decision Notice and Finding of No Significant Impact

Gooseberry Ecological Restoration (30270) Decision Notice and Finding of No Significant Impact Gooseberry Ecological Restoration (30270) Gooseberry Ecological Restoration (30270) Decision Notice and Finding of No Significant Impact Stanislaus National Forest Summit Ranger District Tuolumne County,

More information

Storrie and Rich Fire Area Watershed Improvement and Forest Road 26N67 Re-alignment Project

Storrie and Rich Fire Area Watershed Improvement and Forest Road 26N67 Re-alignment Project Notice of Proposed Action Opportunity to Provide Scoping Comments Storrie and Rich Fire Area Watershed Improvement and Forest Road 26N67 Re-alignment Project Mt. Hough Ranger District Plumas National Forest

More information

The location of the valve site is displayed on a map in the project file.

The location of the valve site is displayed on a map in the project file. DECISION MEMO Special Use Permit # RAR401201 Amendment #7 Hiawatha National Forest Rapid River Ranger District Delta County, Michigan I DECISION A. Description My decision is to issue an amendment to the

More information

DECISION MEMO. Crow Creek Hardened Crossing

DECISION MEMO. Crow Creek Hardened Crossing Page 1 of 5 DECISION MEMO USDA Forest Service Madison Ranger District Madison County T12S, R4W in Section 35 Background A perennial cattle crossing on Crow Creek in in the Gravelly Landscape in the Centennial

More information

The project will be conducted in partnership with the Nez Perce Tribe.

The project will be conducted in partnership with the Nez Perce Tribe. DECISION MEMO Tributary to Brushy Fork Culvert Replacements Private Land USDA Forest Service, Northern Region Powell Ranger District Nez Perce Clearwater National Forests Idaho County, Idaho I. Decision

More information

DECISION MEMO SPECIAL USE AUTHORIZATION FOR GROUNDWATER MONITORING WELLS

DECISION MEMO SPECIAL USE AUTHORIZATION FOR GROUNDWATER MONITORING WELLS DECISION MEMO SPECIAL USE AUTHORIZATION FOR GROUNDWATER MONITORING WELLS USDA-Forest Service, Eastern Region Huron-Manistee National Forests, Baldwin/White Cloud Ranger District Newaygo County, Michigan

More information

DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT

DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT DECISION MEMO ISSUE AN AMENDMENT TO AN EXISTING SPECIAL USE PERMIT HIGH WEST ENERGY, INC. For A Single-Phase (2-Wire), Overhead Power Line US FOREST SERVICE Arapaho & Roosevelt National Forests and Pawnee

More information

DECISION MEMORANDUM: Quartz Dreams Minerals Exploration Project, Nogales Ranger District

DECISION MEMORANDUM: Quartz Dreams Minerals Exploration Project, Nogales Ranger District United States Department of Agriculture Forest Service Coronado National Forest 303 Old Tucson Road Nogales, Arizona 85621 Phone (520) 281-2296 FAX (520) 281-2396 File Code: 1950/2820 Date: Route To: Subject:

More information

PRELIMINARY DECISION MEMO

PRELIMINARY DECISION MEMO PRELIMINARY DECISION MEMO Snoqualmie Christmas Tree Project USDA Forest Service Mt. Baker-Snoqualmie National Forest Snoqualmie Ranger District King County, Washington Proposed Action, Purpose and Need

More information

Decision Notice and Finding of No Significant Impact

Decision Notice and Finding of No Significant Impact Decision Notice and Finding of No Significant Impact Gold Lake Bog Research Natural Area Boundary Adjustment and Nonsignificant Forest Plan Amendment #53 USDA Forest Service Middle Fork Ranger District,

More information

DECISION MEMO SPECIAL USE AUTHORIZATION FOR PRIVATE ROAD PERMIT

DECISION MEMO SPECIAL USE AUTHORIZATION FOR PRIVATE ROAD PERMIT DECISION MEMO SPECIAL USE AUTHORIZATION FOR PRIVATE ROAD PERMIT USDA-Forest Service, Eastern Region Huron-Manistee National Forests, Baldwin Ranger District Newaygo County, Michigan I. DECISION A. Background

More information

National Forests in North Carolina Pisgah National Forest Grandfather Ranger District

National Forests in North Carolina Pisgah National Forest Grandfather Ranger District United States Department of Agriculture Forest Service National Forests in North Carolina Pisgah National Forest Grandfather Ranger District 109 E Lawing Dr Nebo, NC 28761-9827 828-652-2144 File Code:

More information

Decision Memo. North Fork Calispell Creek Restoration Project

Decision Memo. North Fork Calispell Creek Restoration Project Project Description Decision Memo North Fork Calispell Creek Restoration Project USDA Forest Service Newport-Sullivan Lake Ranger Districts Colville National Forest Pend Oreille County, Washington Surveys

More information

Decision Notice and Finding of No Significant Impact for the Arizona Interconnection Project Access Roads Permitting EA

Decision Notice and Finding of No Significant Impact for the Arizona Interconnection Project Access Roads Permitting EA Background Decision Notice and Finding of No Significant Impact for the Arizona Interconnection Project Access Roads Permitting EA USDA Forest Service Black Range, Quemado, and Reserve Ranger Districts

More information

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-03-02 Lease or Serial #: OR 58195 Project Name: Peetsch Mineral Material Sale Applicant: Doug Peetsch Location:

More information

DECISION MEMO. East Fork Blacktail Trail Reroute

DECISION MEMO. East Fork Blacktail Trail Reroute Page 1 of 6 DECISION MEMO USDA Forest Service Madison Ranger District Madison County Background The East Fork Blacktail Trail #6069 is a mainline trail in the Snowcrest Mountains. The Two Meadows Trail

More information

Decision Memo for the City of Detroit Root Rot Timber Sale Project

Decision Memo for the City of Detroit Root Rot Timber Sale Project Decision Memo for the City of Detroit Root Rot Timber Sale Project USDA Forest Service Detroit Ranger District Willamette National Forest Marion and Linn Counties, OR T.10S., R.5 E., Section 2, Willamette

More information

preliminary Decision Memo Wickiup Acres Hazardous Fuels Reduction

preliminary Decision Memo Wickiup Acres Hazardous Fuels Reduction preliminary Decision Memo Wickiup Acres Hazardous Fuels Reduction USDA Forest Service Crescent Ranger District, Deschutes National Forest Deschutes County, Oregon T. 22 S., R. 8 E., Section 36, T., 22

More information

Decision Memo Sawtooth Trail #3634 Reroute

Decision Memo Sawtooth Trail #3634 Reroute Decision Memo Sawtooth Trail #3634 Reroute USDA Forest Service Middle Fork Ranger District Willamette National Forest Lane County, OR T.25S, R.5.5E, Section 22, Willamette Meridian Purpose and Need The

More information

DECISION MEMO. Missoula Electric Cooperative Point 118. MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118)

DECISION MEMO. Missoula Electric Cooperative Point 118. MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118) DECISION MEMO Missoula Electric Cooperative Point 118 MEC - Buried Electric Powerline (Along West Fork Butte Access Road #37 to Point 118) USDA Forest Service - Lolo National Forest Missoula Ranger District

More information

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT. Bend-Fort Rock Ranger District Deschutes National Forest Lake County, Oregon

DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT. Bend-Fort Rock Ranger District Deschutes National Forest Lake County, Oregon DECISION NOTICE AND FINDING OF NO SIGNIFICANT IMPACT Bend-Fort Rock Ranger District Deschutes National Forest Lake County, Oregon Devil's Garden Planning Area Hole-in-the-Ground Subunit Environmental Assessment

More information

Wind Energy Development Specialist Report

Wind Energy Development Specialist Report United States Department of Agriculture Forest Service Southwestern Region Cibola National Forest and National Grasslands Wind Energy Development Specialist Report Kiowa, Rita Blanca, Black Kettle and

More information

Environmental Assessment White Rock Mining Plan of Operations

Environmental Assessment White Rock Mining Plan of Operations Environmental Assessment White Rock Mining Plan of Operations April 2015 Figure 1: Grant Lake aerial view Lead Agency Responsible Official For Further Information, Contact: US Forest Service Seward Ranger

More information

Michigan Wing-Civil Air Patrol

Michigan Wing-Civil Air Patrol DECISION MEMO Michigan Wing-Civil Air Patrol (CAP) Navigational Equipment Special Use Permit #MUN250 Hiawatha National Forest Munising Ranger District Alger County, Michigan I DECISION A. Description My

More information

Background. Purpose and Need. Proposal. Mitigation and Design Features

Background. Purpose and Need. Proposal. Mitigation and Design Features United States Department of Agriculture Forest Service Beaverhead-Deerlodge National Forest Madison Ranger District 5 Forest Service Rd Ennis, MT 59729 406 682-4253 File Code: 1950 Date: November 20, 2013

More information

USDA Forest Service Decision Memo. Mattie V Creek Minesite Rehabilitation Project

USDA Forest Service Decision Memo. Mattie V Creek Minesite Rehabilitation Project USDA Forest Service Decision Memo Mattie V Creek Minesite Rehabilitation Project Ninemile Ranger District Lolo National Forest Mineral County, Montana I. DECISION TO BE IMPLEMENTED A. Decision Description:

More information

Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations

Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations Decision Notice and Finding of No Significant Impact Gold Digger Mining Plan of Operations June 2015 Chugach National Forest Seward Ranger District 29847 Seward Highway Seward, Alaska 99664 Decision It

More information

DRAFT Decision Notice & Finding of No Significant Impact Byway Lakes Enhancement Project

DRAFT Decision Notice & Finding of No Significant Impact Byway Lakes Enhancement Project United States Department of Agriculture Forest Service August 2013 DRAFT Decision Notice & Finding of No Significant Impact Byway Lakes Enhancement Project Hell Canyon Ranger District, Black Hills National

More information

Rocky Mountain Regional Office

Rocky Mountain Regional Office Forest Service File Code: 1570 Route To: Rocky Mountain Regional Office 740 Simms Street Golden, CO 80401-4702 Voice: 303-275-5350 TDD: 303-275-5367 Date: June 13, 2013 Subject: To: Recommendation Memorandum

More information

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT USDA FOREST SERVICE TONGASS NATIONAL FOREST ADMIRAL TV ISLAND

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT USDA FOREST SERVICE TONGASS NATIONAL FOREST ADMIRAL TV ISLAND DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT USDA FOREST SERVICE TONGASS NATIONAL FOREST ADMIRAL TV ISLAND HECLA GREENS CREEK MINE AGGREGATE SOURCE EXPANSION This Decision Notice contains a brief summary

More information

Indian Creek Aquatic Restoration Project

Indian Creek Aquatic Restoration Project Decision Notice and Finding of No Significant Impact June 2005 Siuslaw National Forest South Zone District Lane County, Oregon Lead Agency: Responsible Official: For Information Contact: USDA Forest Service

More information

I. Background. Clarion River Comprehensive River Management Plan 1

I. Background. Clarion River Comprehensive River Management Plan 1 Decision Notice and Finding of No Significant Impact for Environmental Assessment for the Clarion River Comprehensive River Management Plan USDA-Forest Service Allegheny National Forest Marienville Ranger

More information

DECISION MEMO REBEL CLAIMS EXPLORATION PROJECT

DECISION MEMO REBEL CLAIMS EXPLORATION PROJECT Page 1 of 7 DECISION MEMO REBEL CLAIMS EXPLORATION PROJECT USDA Forest Service Pintler Ranger District Granite County T8N, R15W, section 18 & 19 and T8N, R16W, sections 13 & 24 Background Charles Hinkle

More information

Coronado National Forest Sierra Vista Ranger District

Coronado National Forest Sierra Vista Ranger District United States Department of Agriculture Forest Service Coronado National Forest Sierra Vista Ranger District 4070 South Avenida Saracino Hereford, Arizona 85615 Phone (520) 378-0311 FAX (520) 378-0519

More information

Draft Decision Memo OHV Trails 22 and 42 Reroute Project

Draft Decision Memo OHV Trails 22 and 42 Reroute Project Draft Decision Memo OHV Trails 22 and 42 Reroute Project USDA Forest Service McKenzie River Ranger District Willamette National Forest Linn County, OR T13S, R7E, Sections 25 and 34 Willamette Meridian

More information

DECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho

DECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho DECISION MEMO FOURTH OF JULY PARK 2 USDA Forest Service, Northern Region Red River Ranger District, Nez Perce National Forest Idaho County, Idaho I. Decision II. I have decided to authorize issuance of

More information

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION

RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: OR-014-CX-06-06 Lease or Serial #: OR62919 Project Name: _PacifiCorp Power-line right-of-way #2 Location: Bonanza USGS

More information

Agency Organization Organization Address Information. Name United States Department of Agriculture

Agency Organization Organization Address Information. Name United States Department of Agriculture Logo Department Name United States Department of Agriculture Agency Organization Organization Address Information Forest Service Pacific Northwest Region 1220 SW Third Avenue (97204) P.O. Box 3623 Portland,

More information

Preliminary Decision Memo Crooked River National Grassland Firewood Units

Preliminary Decision Memo Crooked River National Grassland Firewood Units Preliminary Decision Memo Crooked River National Grassland Firewood Units Decision to be Implemented USDA Forest Service Crooked River National Grassland Jefferson County, Oregon Townships 12 and 13 South,

More information

DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL

DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL DECISION NOTICE & FINDING OF NO SIGNIFICANT IMPACT RAT RIVER RECREATIONAL TRAIL USDA FOREST SERVICE, CHEQUAMEGON-NICOLET NATIONAL FOREST LAKEWOOD-LAONA RANGER DISTRICT FOREST COUNTY, WISCONSIN T35N, R15E,

More information

NEPA: Analyzing Impacts (# ) Lesson 3 Determining Significance

NEPA: Analyzing Impacts (# ) Lesson 3 Determining Significance NEPA: Analyzing Impacts (#1620-10) Lesson 3 Objectives: Determine severity or intensity of an impact by considering one or more factors. Determine context of an impact by comparing it to the existing environment.

More information

DECISION MEMO SMART CREEK MINERAL EXPLORATION PROJECT

DECISION MEMO SMART CREEK MINERAL EXPLORATION PROJECT Page 1 of 7 DECISION MEMO SMART CREEK MINERAL EXPLORATION PROJECT Background USDA Forest Service Pintler Ranger District Granite County, Montana T8N, R13W, sections 5, 6 and 7 The Kennecott Exploration

More information

DECISION NOTICE AND FINDING OF No SIGNIFICANT IMPACT HOPKINS FIRE SALVAGE

DECISION NOTICE AND FINDING OF No SIGNIFICANT IMPACT HOPKINS FIRE SALVAGE DECISION NOTICE AND FINDING OF No SIGNIFICANT IMPACT HOPKINS FIRE SALVAGE DECISION U.S. FOREST SERVICE OCALA NATIONAL FOREST SEMINOLE RANGER DISTRICT MARION COUNTY, FLORIDA Based upon my review of the

More information