Hydraulic Modeling and System Optimization

Size: px
Start display at page:

Download "Hydraulic Modeling and System Optimization"

Transcription

1 DRINKING WATER ENERGY MANAGEMENT WORKSHOP SERIES TAKING ENERGY IMPROVEMENTS TO THE NEXT LEVEL: Hydraulic Modeling and System Optimization Steven Jones, M.S., P.E. September 4, 2013

2

3 What is a Water System Hydraulic Model? A digital (virtual) representation of a water distribution system in computer software that simulates hydraulic and water quality behavior within the pressurized pipe network.

4 Hydraulic model components: Pipes Pipe Junctions (Nodes) Pumps Valves (PRVs, etc.) Storage Tanks Reservoirs

5 Tank Reservoir Pump Pipe Valve Node

6 Data needed for pipes: Diameter Length Roughness (based on material and age)

7 Data needed for nodes: Elevation Water Demand

8 Data needed for valves: Type Position (open/closed) Setting (pressure, flow)

9 Data needed for pumps: Pump Curve Power Data Status (open/closed)

10 Data needed for wells: Pump Curve Power Diameter Pump Depth Ground water level during pumping

11 Data needed for tanks: Dimensions (Volume) Overflow elevation Floor drain elevation Water surface elevation

12 Data needed for reservoirs: Water surface elevation

13 Hydraulic computer models utilize userspecified input parameters to calculate: The water flow direction and flow rate in each pipe Operating pressure at each node Elevation of the water in each tank Concentration of a chemical or compound throughout the network Power used at each pump

14 STEADY-STATE vs. EXTENDED PERIOD

15 Water Distribution System Modeling Steady-State Represents a snapshot in time used to determine system behavior under static conditions Extended-Period Represents system behavior over a period of time used to model tanks filling and draining, pressures and flows rates changing throughout the system in response to varying demands

16

17

18

19 Control Settings PRV settings Booster settings Tank level controls

20 Extended-Period Water Model

21 Level (feet) Extended-Period Water Model TANK LEVEL SCADA System Model :00 AM 4:00 AM 8:00 AM 12:00 PM 4:00 PM 8:00 PM 12:00 AM

22 Flow (gpm) Extended-Period Water Model Well Flow SCADA Systeml Model :00 AM 4:00 AM 8:00 AM 12:00 PM 4:00 PM 8:00 PM 12:00 AM

23 WATER SYSTEM OPTIMIZATION

24 Energy consumption in most Water systems could be reduced by at least 25 percent through cost-effective efficiency actions - Alliance to Save Energy

25 Pumping water is often the largest share of a public entity s energy costs.

26 Much of the focus to date has been on improving equipment efficiencies, which is only a small portion of the potential energy savings in water systems. We have found many systems have significant opportunities to improve the efficiency of how a water system is operated overall.

27 In addition to energy inefficiencies, we have found many drinking water systems have inefficiencies in: Design Operation Performance Water Quality Water Use

28

29 Common Untapped Water System Performance and Energy Efficiency Measures Use an extended period model to better understand how the system operates Understand how control settings affect system efficiency More efficient use of equalization storage Meet peak demand without over-using sources Detect and prevent pumping in circles

30 Common Untapped Water System Performance and Energy Efficiency Measures (continued) Understand that system over-design can hurt efficiency Efficient vs. inefficient system layouts Use lowest cost water first Improve pressure management Detect inefficient pumps and motors Use the best electricity rate schedule for the application

31 Common Untapped Water System Performance and Energy Efficiency Measures (continued) Detect and repair water leaks Understand that poor maintenance and aging infrastructure robs the system of efficiency Identify and resolve water quality issues Understand how metering and rate schedules affect water use Understand how water conservation measures affect performance and efficiency

32 Better Understand Your System with an Extended Period Model See where water goes, how pressure fluctuates, velocity changes, pumps turning on and off, and tanks emptying and filling Understand the consequences of control and setting changes A tool to help operators, engineers, and managers understand each other

33 Better Understand Your System with an Extended Period Model System inventory and mapping Operator training and system operation guide Emergency response and trouble shooting tool Customer support

34 Control Settings PRV settings Booster settings Tank level controls

35 Efficient use of Storage Use equalization storage to meet peak demands instead of using sources Use storage as a battery pump water to the storage tank using an off peak electricity rate Identify where emergency and fire suppression storage levels are in tanks At the appropriate time, empty space in the tank can be as important as a full tank

36

37 Level Fluctuation at a Tank

38 FLOW (gpm) 12:00:00 AM 10:00:00 PM 8:00:00 PM 6:00:00 PM 4:00:00 PM 2:00:00 PM 12:00:00 PM 10:00:00 AM 8:00:00 AM 6:00:00 AM 4:00:00 AM 2:00:00 AM 12:00:00 AM Demand Flow Source Flow 60,000 50,000 Peak Instantaneous = 49,500 gpm 40,000 Peak Day Average = 32,500 gpm 30,000 20,000 10,000 Total Peak Day Volume = 46.8 MG Volume above Peak Day = 6.9 MG Volume from Storage = TIME

39 FLOW (gpm) PEAK MONTH SOURCE FLOWS DAY

40

41

42 FLOW (gpm) Keep Sources Constant It is generally more expensive to meet peak demand with sources Keep sources constant at highest operating efficiency Use flow control valves on wholesale connections to maximize the use of equalization storage and avoid peaking charges PEAK MONTH SOURCE FLOWS DAY

43 Eliminate Re-pumping of Water Use a water model to predict how much water should be pumped Use the model to trace where the pumped water is going to see if water is being re-pumped Determine if water is recirculating or leaking within the pump station through a PRV, relief valve, or surge protection device

44 Overdesign can hurt efficiency A water model allows you to better visualize how a design will meet project and system wide goals Helps to refine the design criteria for increased efficiency Oversized pump stations are not energy efficient Oversized pipelines and storage tanks can have slow recirculation, increasing water quality issues Design to accommodate increasing demand without sacrificing efficiency

45 Efficient Pump Station Design

46 Inefficient System Layout Unusable equalization storage because of tank location or elevation Inadequate transmission capacity Unnecessary relief of source water pressure Too much source and storage in the upper pressure zone with a majority of the demand in the lower pressure zone

47 Use Lowest Cost Water First Determine the total unit cost of using each source Know the limitations of each source (water rights, capacity, water quality) Facility Name Pumping Capacity (gpm) Pumping Cost (cost per ac-ft) Well A 1,000 $22.04 Booster #1 3,000 $36.09 Well B 3,000 $42.34 Pump Station 1,400 $45.71 Well C 1,600 $72.31 Well D 1,500 $129.85

48 Use Lowest Cost Water First Determine the total unit cost of using each source Know the limitations of each source (water rights, capacity, water quality) Understand the additional cost of using more than one source or pump station at once. Have prioritized source operation plans that maximize the use of lower cost water

49 Use Lowest Cost Water First Automate the prioritized operation plans as much as possible Use proper PRV settings and control settings that don t allow high cost water to be used over lower cost water Keep higher cost water where it is needed Maximize the use of lower cost water in the areas of the system where it can be used

50 Trace Movement of Water

51 Improve Pressure Management Higher pressures increase the potential for water loss, system failures and higher water use

52 Improve Pressure Management Higher pressures increase the potential for water loss, system failures and higher water use Identify whether a low pressure is caused by elevation or high velocity Identify large pressure fluctuations (large pressure fluctuations = inefficiencies Identify the cause of high velocities (inadequate transmission capacity, system imbalance)

53 Visualize Pressure and Velocity Results

54 Pressure Fluctuation at a Connection

55 Inefficient Pumps and Motors Use a water model to predict how much energy pumps should be using Track the performance and energy use of pumps and motors over time

56 Use the Cheapest Rate Schedule Understand the electricity rate schedules available Use the water model to identify which rate options and system operation schedules are the most feasible Use the water model to calculate electricity costs using the possible rate options and operation schedules and select the best rate schedule

57 Eliminate Water Loss Use the model to develop the most efficient flushing program Determine how much water loss the system has Use pressure tests, SCADA and meter data during the lowest demand period to calibrate a water leakage model Model actual metered demand data and source flows during the lowest demand period Use emitter coefficients to predict water leakage hot spots in the system

58 Poor Maintenance Tuberculation in old cast iron pipe can dramatically decrease capacity and increase head loss

59 Poor Maintenance Tuberculation in old cast iron pipe can dramatically decrease capacity and increase head loss Leaks in old pipes, valves, and facilities Worn pumps and motors Malfunctioning PRVs and relief valves Malfunctioning SCADA and controls

60 Water Quality Issues A water model can simulate water quality in your system Understand the fate of chlorine and the concentration of fluoride in your system and increase efficiency Help you understand water age and contaminant concentration Track the location of a contaminant source Predict how source mixing can improve water quality

61 Understanding Water Quality Patterns

62 Common Barriers to Improving Drinking Water System Efficiency Lack of Awareness. People will not make changes towards efficiency unless they are aware of the cost-benefit arguments for doing so. This is especially true in the case of applying energy efficiency to water supply, since those who operate day to day in the water sector are not accustomed to focusing on energy.

63 Common Barriers to Improving Drinking Water System Efficiency Risk. Deviating from the usual routine is associated with risk, real or perceived, such as added burden on staff or financial risk. Fear of change has a rational basis and breaking through it requires that the fears be addressed and that the benefits of change clearly outweigh risks.

64 Common Barriers to Improving Drinking Water System Efficiency Change May Imply a Problem with the Status Quo. It is not uncommon for staff to be resistant to new ideas and procedures due to a feeling that suggestions for change imply criticism of their performance and ability.

65 Common Barriers to Improving Drinking Water System Efficiency Cost. Understanding energy and water inefficiency in a water system costs money that many find hard to budget for. How can a water system afford not to get rid of inefficiency? Many untapped water system efficiency measures cost little if anything to implement and the payback is ongoing. Measures that require upfront capital costs generally have short payback periods.

66 IN SUMMARY 1. 1 Water systems have significant untapped efficiency improvement potential 2. We have identified solutions to many common inefficiencies found in water systems 3. An extended period water model is a valuable tool to improve system performance and energy efficiency

Hydraulic Modeling, PUDs & Managing Water System Growth

Hydraulic Modeling, PUDs & Managing Water System Growth Hydraulic Modeling, PUDs & Managing Water System Growth American Water Resources Association Intermountain Section October 9, 2013 Utah Division of Drinking Water Ying-Ying Macauley Presentation Topics

More information

SYSTEM ID: KY 10 NARRATIVE DESCRIPTION

SYSTEM ID: KY 10 NARRATIVE DESCRIPTION SYSTEM ID: KY 10 NARRATIVE DESCRIPTION KY 10 is primarily a branched system in Kentucky with the following assets: 13 Tanks, 13 Pumps, 1 Water Treatment Plant, and approximately 1353879 feet of pipe. KY

More information

SYSTEM ID: KY 3 NARRATIVE DESCRIPTION

SYSTEM ID: KY 3 NARRATIVE DESCRIPTION SYSTEM ID: KY 3 NARRATIVE DESCRIPTION KY 3 is primarily a grid system in Kentucky with the following assets: 3 Tanks, 5 Pumps, 1 Water Treatment Plant, and approximately 277,022 feet of pipe. KY 3 provides

More information

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT

ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT H A E S T A D M E T H O D S ADVANCED WATER DISTRIBUTION MODELING AND MANAGEMENT F i r s t E d i t i o n Table of Contents Preface Continuing Education Units About the Software xv xix xxi Chapter 1 Introduction

More information

Hydraulic Modeling Predicting and Resolving Water Quality Issues

Hydraulic Modeling Predicting and Resolving Water Quality Issues Alliance of Indiana Rural Water September 21, 2016 Hydraulic Modeling Predicting and Resolving Water Quality Issues Jim McNulty, P.G. Strand Associates, Inc. The content of this presentation is not to

More information

Table of Contents. 3.1 Source Capacity Analysis

Table of Contents. 3.1 Source Capacity Analysis Table of Contents 3.1 Source Capacity Analysis... 3-1 3.1.1. Design Criteria... 3-1 3.1.2. Source Capacity Evaluation... 3-1 3.1.2.1 Plateau Zone... 3-1 3.1.2.2 Cascade View Zone... 3-4 3.2 Storage Capacity

More information

Storage and pumping capacity analysis using hydraulic modeling

Storage and pumping capacity analysis using hydraulic modeling Storage and pumping capacity analysis using hydraulic modeling G. MacPherson City of Chilliwack, B.C., Canada W. de Schaetzen & S. Cripps GeoAdvice Inc., Vancouver, B.C., Canada ABSTRACT: This paper summarizes

More information

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011

Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge. Presentation to Board April 21, 2011 Montara Water and Sanitary District 2011 New Customer CIP and Water Capacity Charge Presentation to Board April 21, 2011 PRESENTATION OUTLINE Master Plan Overview Purpose and Approach Supply and Demand

More information

Section 7 Hydraulic Model Development and Evaluation Criteria

Section 7 Hydraulic Model Development and Evaluation Criteria Section 7 Hydraulic Model Development and Evaluation Criteria The hydraulic evaluation conducted to develop this master plan was performed using a computer model of the reclaimed water distribution system.

More information

Utilities are constantly striving to

Utilities are constantly striving to Comprehensive Approach to Increase Effectiveness & Efficiency of Flushing Programs Using Latest Hydraulic & Water Quality Monitoring Tools Kelcia D. Mazana, Edward H. Talton Jr., and C. Robert Reiss Utilities

More information

The Next Generation Of Network Management And Leakage Detection Systems

The Next Generation Of Network Management And Leakage Detection Systems The Next Generation Of Network Management And Leakage Detection Systems 2016 AWWA Southwest Section Annual Conference Glyn Addicott - Hydraulic Analysis Group Overview The USA and Europe are both facing

More information

SYSTEM ID: New York Tunnels System

SYSTEM ID: New York Tunnels System SYSTEM ID: New York Tunnels System NARRATIVE DESCRIPTION The New York Tunnels System represents the major water supply transmission tunnels for the City of New York in 1969. The system consists of 1 reservoir

More information

Report. Lake Water Supply Hydraulic Modeling. Village of. Lindenhurst, IL. April 2012

Report. Lake Water Supply Hydraulic Modeling. Village of. Lindenhurst, IL. April 2012 Lake Water Supply Hydraulic Modeling Report Village of Lindenhurst, IL April 2012 R:\MAD\Documents\Reports\Archive\2012\Lindenhurst, IL\Lake Water Supply.HM.1290.039.mjf.jan\Report\!Front Cover (Blue=Water)

More information

About Me. Overview. Seattle Regional Water System. Seattle Regional Water System. Water System Analysis and Design at Seattle Public Utilities

About Me. Overview. Seattle Regional Water System. Seattle Regional Water System. Water System Analysis and Design at Seattle Public Utilities About Me Water System Analysis and Design at Seattle Public Utilities Jon C. Ford, P.E. CEE 481 October 1, 8 Senior Civil Engineer, Seattle Public Utilities BSCE, Seattle University MSCE, University of

More information

CHAPTER 4 HYDRAULIC ANALYSIS

CHAPTER 4 HYDRAULIC ANALYSIS CHAPTER 4 HYDRAULIC ANALYSIS This chapter presents information on the computer hydraulic model of the City s water system and the results of hydraulic analyses. The purpose of the hydraulic analysis is

More information

Partnership for Safe Water Distribution System Optimization Program. Barbara Martin, AWWA

Partnership for Safe Water Distribution System Optimization Program. Barbara Martin, AWWA Partnership for Safe Water Distribution System Optimization Program Barbara Martin, AWWA Why Optimize? Assessment benefits: System-specific learning opportunity Prepare for future regulations Water quality

More information

ENERGY EFFICIENY OF WATER DISTRIBUTION SYSTEMS

ENERGY EFFICIENY OF WATER DISTRIBUTION SYSTEMS ENERGY EFFICIENY OF WATER DISTRIBUTION SYSTEMS A limited number of options exist to save energy in water distribution operation. Turning off lights in pump stations and using pickup trucks with small engines

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 314.04.100) FINAL REPORT January 2009 ACKNOWLEDGMENTS Successful completion of this study was made possible by the cooperation and assistance

More information

Session 2 Pump Selection. Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017

Session 2 Pump Selection. Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017 Session 2 Pump Selection Mark Markham, P.E. Gresham, Smith and Partners September 14, 2017 Quick Refresh System Curves graphically show the relationship between flow rates and associated total dynamic

More information

Before 1990, roughly 116 wastewater

Before 1990, roughly 116 wastewater F W R J Going Beyond Steady-State Wastewater System Modeling in Sarasota County: A Case for Extended-Period Simulation Christopher C. Baggett, Fatih Gordu, Roberto A. Rosario, and Christopher B. Cole Before

More information

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN. (HAL Project No.: )

PRESSURIZED IRRIGATION SYSTEM MASTER PLAN. (HAL Project No.: ) PRESSURIZED IRRIGATION SYSTEM MASTER PLAN (HAL Project No.: 348.09.200) May 2012 TABLE OF CONTENTS TABLE OF CONTENTS... i LIST OF TABLES... ii LIST OF FIGURES... ii ACKNOWLEDGEMENTS... iii GLOSSARY OF

More information

Partnership for Safe Water: Distribution System Optimization Program. Adam Feffer San Jose Water Company November 8, 2017

Partnership for Safe Water: Distribution System Optimization Program. Adam Feffer San Jose Water Company November 8, 2017 Partnership for Safe Water: Distribution System Optimization Program Adam Feffer San Jose Water Company November 8, 2017 Overview Partnership for Safe Water Mission and background Program mechanics & self-assessment

More information

BUILDING A WORLD OF DIFFERENCE. Madison Water Utility Infrastructure Management Plan

BUILDING A WORLD OF DIFFERENCE. Madison Water Utility Infrastructure Management Plan Madison Water Utility Infrastructure Management Plan February 17, 2009 BUILDING A WORLD OF DIFFERENCE Infrastructure Failure Can Have Serious Consequences! B&V - 2 MADISON WATER UTILITY WATER MASTER PLAN

More information

ENGINEERING REPORT WATER SUPPLY

ENGINEERING REPORT WATER SUPPLY PROPOSED RESIDENTIAL DEVELOPMENT, CORAL SPRINGS TRELAWNY FCS #: 1124/76/C ENGINEERING REPORT WATER SUPPLY PREPARED FOR Gore Developments Limited 2c Braemar Ave, Kingston 10 FEBRUARY 2012 1 TABLE OF CONTENTS

More information

Section 9 Distribution System Analysis

Section 9 Distribution System Analysis Section 9 Distribution System Analysis This section presents the analysis of the City of Sunnyside s (City) distribution system. Hydraulic modeling was performed to evaluate the adequacy of existing facilities

More information

Energy Savings in Water and Wastewater Systems

Energy Savings in Water and Wastewater Systems Energy Savings in Water and Wastewater Systems A Bentley White Paper Dr. Tom Walski Senior Product Manager, Bentley Systems Tony Andrews Solutions Executive, Water and Wastewater Published: July 2015 www.bentley.com

More information

Anew approach to prioritizing water

Anew approach to prioritizing water FWRJ Calibrated Hydraulic and Water Quality Model Predictions Merge with Break History for an Innovative Approach to Prioritizing Water Main Replacement Roberto A. Rosario, Christopher C. Baggett, and

More information

Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems

Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems Hydraulic Analysis Comparing Efficiency of One and Two Zone Pressure Water Systems 1 Agenda: - Background - Objectives - Water Distribution System Overview - GIS and Hydraulic Modeling Relationship - Hydraulic

More information

Hydraulic Modeling Assisting in Water Quality. Jinghua Jing Xiao, Ph.D., P.E. Senior Planning Engineer SE PA-AWWA Fall Conference 2018

Hydraulic Modeling Assisting in Water Quality. Jinghua Jing Xiao, Ph.D., P.E. Senior Planning Engineer SE PA-AWWA Fall Conference 2018 Hydraulic Modeling Assisting in Water Quality Jinghua Jing Xiao, Ph.D., P.E. Senior Planning Engineer SE PA-AWWA Fall Conference 2018 WHO WE ARE We are the largest and most geographically diverse publicly

More information

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES

Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES Section V WATER DISTRIBUTION SYSTEM DESIGN GUIDELINES A. GENERAL 1. The following water system design guidelines are based on Federal, State and local health requirements and the Hilton Head No. 1 Public

More information

Section 5 - Planning Criteria. Section 5

Section 5 - Planning Criteria. Section 5 Section 5 - Planning Criteria Section 5 SECTION 5 PLANNING CRITERIA This section presents the design criteria and methodologies for analysis used to evaluate the existing distribution system and its facilities

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

EPANET. Ivan Solinas

EPANET. Ivan Solinas EPANET Ivan Solinas agronomi@gmail.com The Irrigation Questions How to irrigate How much to irrigate When to Irrigate Pressurized pipe network What is EPANET EPANET is a computer program that performs

More information

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS

UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS UNIFORM DESIGN AND CONSTRUCTION STANDARDS FOR EXTENDING WATER DISTRIBUTION SYSTEMS SECTION 2 DESIGN STANDARDS DESIGN STANDARDS SECTION 2 INDEX ITEM DESCRIPTION 2.00 GENERAL STATEMENT 2.01 WATER DISTRIBUTION

More information

Leveraging Hydraulic Models

Leveraging Hydraulic Models Leveraging Hydraulic Models presented by Melissa Brunger, P.E. GAWP Fall Conference November 14, 2017 Hydraulic Modeling Applications Case Studies Conclusions/Lessons Learned AGENDA System curves for pump

More information

SAWEA Workshop 2010 Innovative Water and Wastewater Networks Presented by Greg Welch, AECOM

SAWEA Workshop 2010 Innovative Water and Wastewater Networks Presented by Greg Welch, AECOM SAWEA Workshop 2010 Innovative Water and Wastewater Networks Presented by Greg Welch, AECOM Basic Hydraulic Principles Open channel flow Closed conduit / pressurized flow systems Orifices, weirs and flumes

More information

Intermittent Water Supplies An International Update. By Richard Taylor, Thomas Civil & Environmental Consultants h PWC 14-9 September 2014

Intermittent Water Supplies An International Update. By Richard Taylor, Thomas Civil & Environmental Consultants h PWC 14-9 September 2014 Intermittent Water Supplies An International Update By Richard Taylor, Thomas Civil & Environmental Consultants h PWC 14-9 September 2014 Background I attended the International Water Association (IWA)

More information

Water System Modeling A Unique Way to Use Meter Technology. John Brady, PE x 1121

Water System Modeling A Unique Way to Use Meter Technology. John Brady, PE x 1121 Water System Modeling A Unique Way to Use Meter Technology John Brady, PE 610-373-6667 x 1121 jbrady@entecheng.com Steve Riley, PE NE MD Client Manager John Brady, PE Hydraulic Modeler Engineering Consultant

More information

WATER SUPPLY CHALLENGES FOR AN ISLAND COMMUNITY

WATER SUPPLY CHALLENGES FOR AN ISLAND COMMUNITY WATER SUPPLY CHALLENGES FOR AN ISLAND COMMUNITY Britton Corbin, P.E. Janet McSwain, P.E. AUTHORS: Britton Corbin, Project Engineer, Earth Tech AECOM 2456 Remount Rd. Charleston, SC 29406 Janet McSwain,

More information

Increasing the efficiency of water distribution

Increasing the efficiency of water distribution 28 ABB review 4 11 Every drop counts Increasing the efficiency of water distribution Frederik Blank, Markus Gauder Drinking water is a precious but scarce commodity, and is not equally distributed on our

More information

CHAPTER 4 Hydraulic Model Management and Documentation Protocols

CHAPTER 4 Hydraulic Model Management and Documentation Protocols CHAPTER 4 Hydraulic Model Management and Documentation Protocols It is important for the City s hydraulic model to be updated regularly to reflect newly installed/modified water system pipelines and facility

More information

Distribution Reservoir Management: Evaluating & Maintaining Water Quality in Reservoirs & Tanks

Distribution Reservoir Management: Evaluating & Maintaining Water Quality in Reservoirs & Tanks Distribution Reservoir Management: Evaluating & Maintaining Water Quality in Reservoirs & Tanks Cheryl Capron Seattle Public Utilities PNWS-AWWA Conference May 2013 Resources Recommended Standards For

More information

Index. Note: f. indicates a figure; t. indicates a table.

Index. Note: f. indicates a figure; t. indicates a table. Index Note: f. indicates a figure; t. indicates a table. All-mains models, 12, 13 All-pipes models, 20, 21f., 22 All-pipes reduced models, 20, 21f. American Water Works Association Calibration Guidelines

More information

Teton County Solid Waste Transfer Station Water Supply Study

Teton County Solid Waste Transfer Station Water Supply Study Teton County Solid Waste Transfer Station Water Supply Study Prepared for TETON COUNTY INTEGRATED SOLID WASTE & RECYCLING November 2018 NELSON ENGINEERING 430 S. CACHE STREET JACKSON, WY INTRODUCTION Teton

More information

SALEM CITY REQUEST FOR PROPOSAL CULINARY AND SECONDARY WATER MASTER PLAN 5/2/2018

SALEM CITY REQUEST FOR PROPOSAL CULINARY AND SECONDARY WATER MASTER PLAN 5/2/2018 SALEM CITY REQUEST FOR PROPOSAL CULINARY AND SECONDARY WATER MASTER PLAN 5/2/2018 Salem City (City) is now accepting Proposals for the development of a comprehensive Salem City Culinary Water and Secondary

More information

Why does my water bill cost so much?

Why does my water bill cost so much? Why does my water bill cost so much? A brief overview from an engineer/operator June 24, 2017 Presented by: Mark Hurley, M.S., P.E., S-1, D-2 What is a water system? Water Production I. Surface Water Intakes

More information

City of Richland Comprehensive Water System Plan

City of Richland Comprehensive Water System Plan City of Richland June 2010 RH2 Engineering, Inc 114 Columbia Point Drive, Suite C Richland, WA 99352 Contact: Paul R. Cross, P.E. (509) 946-5181 Prepared by: June 2010 Signed: 6/28/2010 Signed: 6/28/2010

More information

Water distribution systems throughout

Water distribution systems throughout FWRJ Innovative and Cost-Effective Ways to Improve Water Quality Using Distribution System Models Kelcia Mazana and Migdalia Hernandez Water distribution systems throughout Florida are facing distribution

More information

Water Treatment Plant and Water Supply Study CITY OF SNOHOMISH, WASHINGTON

Water Treatment Plant and Water Supply Study CITY OF SNOHOMISH, WASHINGTON Water Treatment Plant and Water Supply Study CITY OF SNOHOMISH, WASHINGTON May 2009 TABLE OF CONTENTS EXECUTIVE SUMMARY Page Purpose and Background... ES-1 Existing Water System... ES-1 Water Demands...

More information

AR No. # Efficient Irrigation

AR No. # Efficient Irrigation AR No. # Efficient Irrigation Recommendation Optimize the facilities irrigation pumping system by ensuring pumps are operating at their Best Efficiency Point (BEP). We estimate the system pumping efficiency

More information

NZQA registered unit standard version 4 Page 1 of 5

NZQA registered unit standard version 4 Page 1 of 5 Page 1 of 5 Title Describe drinking-water supply reticulation systems Level 5 Credits 8 Purpose People credited with this unit standard are able to describe: the reticulated services found on public and

More information

OTCO 12/11/13 Water Audits Meter Testing & Leaks

OTCO 12/11/13 Water Audits Meter Testing & Leaks OTCO 12/11/13 Water Audits Meter Testing & Leaks Aaron M. Horbovetz PMP, EIT Project Engineer What is a Water Audit? It s like a Scouting before you hunt. Why is an Audit Important? It tells you where

More information

QC Analytical Water Treatment/Distribution Conference

QC Analytical Water Treatment/Distribution Conference QC Analytical Water Treatment/Distribution Conference May 23, 2016 QC Analytical Training Facility LeClaire, IA by Brian Roth, P.E. Principal Civil Engineer Stanley Consultants, Inc. Muscatine, IA Alice:

More information

UDF is Easier in the Office: Pilot Testing a System with Wells Equipped with Variable Frequency Drives

UDF is Easier in the Office: Pilot Testing a System with Wells Equipped with Variable Frequency Drives UDF is Easier in the Office: Pilot Testing a System with Wells Equipped with Variable Frequency Drives Jeremy Cox City of Woodland Irene Suroso,P.E. West Yost Associates Flushing Program City of Woodland

More information

ScienceDirect. Numerical model of a district water distribution system in Bucharest. A.-M. Georgescu a, *, S. Perju a, S.-C. Georgescu b, A.

ScienceDirect. Numerical model of a district water distribution system in Bucharest. A.-M. Georgescu a, *, S. Perju a, S.-C. Georgescu b, A. Available online at www.sciencedirect.com ScienceDirect Procedia Engineering 70 ( 2014 ) 707 714 12th International Conference on Computing and Control for the Water Industry, CCWI2013 Numerical model

More information

INTEGRATION OF GIS WITH HYDRAULIC TRANSIENT MODELING: EXPLORING BENEFITS, APPLICATIONS AND IMPACT ON MODEL SKELETONIZATION

INTEGRATION OF GIS WITH HYDRAULIC TRANSIENT MODELING: EXPLORING BENEFITS, APPLICATIONS AND IMPACT ON MODEL SKELETONIZATION INTEGRATION OF GIS WITH HYDRAULIC TRANSIENT MODELING: EXPLORING BENEFITS, APPLICATIONS AND IMPACT ON MODEL SKELETONIZATION BongSeog Jung 1, Paul Boulos 2 1 Tebodin Middle East Ltd., UAE 2 Innovyze Inc.,

More information

APPENDIX B. WSSC Design Criteria for Water Distribution Systems

APPENDIX B. WSSC Design Criteria for Water Distribution Systems a. System Requirements ) Pressure Requirements APPENDIX B WSSC Design Criteria for Water Distribution Systems a) The water distribution system shall have adequate capacity to supply domestic demand to

More information

CUPSS Community CUPSS Call Community December 10, 2014

CUPSS Community CUPSS Call Community December 10, 2014 CUPSS Community Call December 10, 2014 Agenda Introduction CUPSS News Presentation by Wayne Cannon (Ohio Rural Community Assistance Program) The Ohio RCAP Approach to Asset Management and CMOM Q and A

More information

Susceptibility of PWS to Negative Pressure Transients

Susceptibility of PWS to Negative Pressure Transients Susceptibility of PWS to Negative Pressure Transients Kala Fleming, PhD VA AWWA Research Committee Seminar Monday, October 22, 2007 Pump Station 5-min Pressure Recording 50 40 Pressure (psi) 30 20 10 0

More information

UNIT WELL 15 VOLATILE ORGANIC COMPOUND (VOC) MITIGATION

UNIT WELL 15 VOLATILE ORGANIC COMPOUND (VOC) MITIGATION BUILDING A WORLD OF DIFFERENCE UNIT WELL 15 VOLATILE ORGANIC COMPOUND (VOC) MITIGATION Madison Water Utility Madison, Wisconsin Black & Veatch Corporation B&V Project 169092.0800 B&V File 41.0800 Black

More information

Prof. M. S. Mohan Kumar and Usha Manohar Department of Civil Engineering and CiSTUP Indian Institute of Science - Bangalore

Prof. M. S. Mohan Kumar and Usha Manohar Department of Civil Engineering and CiSTUP Indian Institute of Science - Bangalore Water and Water Distribution Networks in Urban Areas Prof. M. S. Mohan Kumar and Usha Manohar Department of Civil Engineering and CiSTUP Indian Institute of Science - Bangalore Urban Water Supply Water

More information

Distribution System Upgrades to Improve Water Quality

Distribution System Upgrades to Improve Water Quality Distribution System Upgrades to Improve Water Quality Christopher Evans, P.E., Hatch Mott MacDonald Outline Replace Water Lines Project Project Purpose Study Phase Utility Source Evaluation Elevated Storage

More information

Size Matters: Picking the Right Size of Piping System Components. April 13, 2017

Size Matters: Picking the Right Size of Piping System Components. April 13, 2017 Size Matters: Picking the Right Size of Piping System Components April 13, 2017 Did You Know? Pump systems account for ~25% of electric motor energy consumption and 20 60% of total electrical energy usage

More information

CITY OF MILTON PIERCE/KING COUNTY, WASHINGTON WATER SYSTEM PLAN

CITY OF MILTON PIERCE/KING COUNTY, WASHINGTON WATER SYSTEM PLAN CITY OF MILTON PIERCE/KING COUNTY, WASHINGTON WATER SYSTEM PLAN G&O #08474 July 2010 EXECUTIVE SUMMARY TABLE OF CONTENTS CHAPTER 1 DESCRIPTION OF THE WATER SYSTEM INTRODUCTION... 1-1 SYSTEM OWNERSHIP

More information

WATER MAIN EXTENSION DESIGN REQUIREMENTS

WATER MAIN EXTENSION DESIGN REQUIREMENTS This guideline provides minimum requirements for the design of new water main extensions. This guide is not to be used as a substitution for the detailed design of the water system. The Developer s Engineer

More information

Online Water Quality Monitoring Systems

Online Water Quality Monitoring Systems Online Water Quality Monitoring Systems Drinking Water Security & More U.S. Army Center for Health Promotion and Preventive Medicine Steven Clarke, PE 6 May 2009 AGENDA PURPOSE: Explain the usefulness

More information

Troubleshooting Piping Systems

Troubleshooting Piping Systems Troubleshooting Piping Systems Last of Three Parts by Ray Hardee (Engineered Software, Inc.) Parts 1 and 2 of this series (Pumps & Systems, September and October 2015) discussed the engineering principles

More information

Domestic Water Use and Piped Water Supply (PWS)

Domestic Water Use and Piped Water Supply (PWS) Domestic Water Use and Piped Water Supply (PWS) Om Damani (Adapting from the slides of Milind Sohoni, Pooja Prasad, and Puru Kulkarni) 2 3 4 5 6 7 8 9 10 11 Agenda Introduction to Piped water schemes (PWS)

More information

Coming and Going An Overview of Infrastructure Common to Water Distribution and Wastewater Collection Systems

Coming and Going An Overview of Infrastructure Common to Water Distribution and Wastewater Collection Systems Coming and Going An Overview of Infrastructure Common to Water Distribution and Wastewater Collection Systems Eric A. Smith, P.E. November 14, 2016 Raleigh, NC Agenda Introduction Importance of Distribution/Collection

More information

La modellazione per la gestione efficiente della rete idrica Pedro Pina

La modellazione per la gestione efficiente della rete idrica Pedro Pina La modellazione per la gestione efficiente della rete idrica Pedro Pina Bentley Solutions for Infrastructure Buildings Rail and Transit Bridges Roads Utilities Campuses Power Generation Water and Wastewater

More information

BMPs for the Control of Disinfection By-Products

BMPs for the Control of Disinfection By-Products BMPs for the Control of Disinfection By-Products Issue: Long-term exposure to disinfection by-products in drinking water (and possibly short term exposures in pregnancies) may pose a health risk to the

More information

PipelineNet: A GIS Based Water Quality Model for Distribution Systems

PipelineNet: A GIS Based Water Quality Model for Distribution Systems PipelineNet: A GIS Based Water Quality Model for Distribution Systems William B. Samuels, Ph.D Science Applications International Corporation Hazard Assessment and Simulation Division McLean, Virginia

More information

EPA / WERF/ WaterRF Framework

EPA / WERF/ WaterRF Framework EPA / WERF/ WaterRF Framework 1. What is the current state of my assets? 2. What is the required LOS? System layout Data hierarchy Standards inventory Condition assessment Protocol Rating methodologies

More information

Presentation Summary. What, Why, and How. Building the Model. Facility Data Acquisition. Model Calibration. Real World Applications/Case Studies

Presentation Summary. What, Why, and How. Building the Model. Facility Data Acquisition. Model Calibration. Real World Applications/Case Studies Uday Khambhammettu Randolph Rostas VA AWWA Presentation Summary What, Why, and How Building the Model Facility Data Acquisition Model Calibration Real World Applications/Case Studies Model Maintenance

More information

An Innovative Approach to DMA. October 2015

An Innovative Approach to DMA. October 2015 An Innovative Approach to DMA October 2015 Data gathering - Sensors, collection, transfer, and storage of operational data are cheaper than ever Industry trends support the need for measuring, collecting

More information

MEETING MINUTES VILLAGE OF HOOSICK FALLS/TOWN OF HOOSICK ENGINEERING REPORTS FOR: WATER EXPANSION SEWER EXPANSION

MEETING MINUTES VILLAGE OF HOOSICK FALLS/TOWN OF HOOSICK ENGINEERING REPORTS FOR: WATER EXPANSION SEWER EXPANSION www. mrbgroup.com Engineering / Architecture / Surveying, P.C. : WATER EXPANSION SEWER EXPANSION REVIEW SESSION Date: Time: 1 pm Location: Municipal Building (24 Main St, Hoosick Falls, NY 12090) Attendees:

More information

Valve Nest Filter with Time Clock Control Installation and Operation Manual

Valve Nest Filter with Time Clock Control Installation and Operation Manual Valve Nest Filter with Time Clock Control Installation and Operation Manual Effective 5/24/12 Effective 5/24/12 Table of Contents Operating Data. 1 Pre-Installation Data... 2 Filter Parameters Installation

More information

Case Studies to Identify Occurrence, Accuracy and Causes of Reverse Flow Using Meter Systems

Case Studies to Identify Occurrence, Accuracy and Causes of Reverse Flow Using Meter Systems Executive Summary Case Studies to Identify Occurrence, Accuracy and Causes of Reverse Flow Using Meter Systems Project Number: 4384 Date Available: November 2016 Principal Investigators: Orren D. Schneider,

More information

Developing Mesopolis A Virtual City for Research in Water Distribution Systems and Interdependent Infrastructures

Developing Mesopolis A Virtual City for Research in Water Distribution Systems and Interdependent Infrastructures Developing Mesopolis A Virtual City for Research in Water Distribution Systems and Interdependent Infrastructures J. Garrett Johnston Mentored by Dr. Kelly Brumbelow Dwight Look College of Engineering,

More information

Dynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study

Dynamic Hydraulic Modeling of a Wastewater Treatment Plant. City of Fort Worth Case Study Dynamic Hydraulic Modeling of a Wastewater Treatment Plant City of Fort Worth Case Study AGENDA Drivers for a Dynamic Integrated Large WWTP Hydraulic Model Model Development Modeling Conduits and Bends

More information

The Impact of Pressure Management Techniques on the Water Age in an Urban Pipe Network The Case of Kos City Network

The Impact of Pressure Management Techniques on the Water Age in an Urban Pipe Network The Case of Kos City Network Proceedings The Impact of Pressure Management Techniques on the Water Age in an Urban Pipe Network The Case of Kos City Network Anastasia Kravvari, Vasilis Kanakoudis * and Menelaos Patelis Civil Engineering

More information

City of Yuba City. Yuba City Update to Water Demand and Infrastructure System Evaluation. Technical Memorandum

City of Yuba City. Yuba City Update to Water Demand and Infrastructure System Evaluation. Technical Memorandum City of Yuba City Yuba City Update to Water Demand and Infrastructure System Evaluation Technical Memorandum July 2006 Table of Contents Introduction... 1 Background...1 Purpose and Objectives...1 Water

More information

DUBAI ELECTRICITY AND WATER AUTHORITY GUIDELINES FOR NEW DEVELOPMENT PROJECTS UPDATE

DUBAI ELECTRICITY AND WATER AUTHORITY GUIDELINES FOR NEW DEVELOPMENT PROJECTS UPDATE DUBAI ELECTRICITY AND WATER AUTHORITY GUIDELINES FOR NEW DEVELOPMENT PROJECTS UPDATE - 2010 POWER & WATER PLANNING (WATER TRANSMISSION PLANNING) DUBAI ELECTRICITY AND WATER AUTHORITY WATER TRANSMISSION

More information

Woodbury - Aurora Metro Station

Woodbury - Aurora Metro Station Woodbury - Aurora Metro Station Master Utility Report Aurora, Colorado E. Centrepoint Dr. and E. Alameda Dr. Prepared By: Galloway 6162 S. Willow Drive, Suite 32 Greenwood Village, CO 8111 33.77.8884 POC:

More information

MOE Guidelines on Surge/Transients

MOE Guidelines on Surge/Transients Corporate Office Hydratek & Associates Inc. 216 Chrislea Road, Suite 501 Woodbridge, Ontario L4L 8S5 Canada www.hydratek.com MOE Guidelines on Surge/Transients Introduction The Ministry of the Environment

More information

CE2304 Environmental Engineering I PART A 1. Define the term potable water. 2. State the causes for water pollution. 3. Write the advantage of sub-surface sources 4. What are the uses of nomograms? 5.

More information

AUGUST 30, 2016 DRAFT WATER SYSTEM PLAN TEXT AND TABLES BYWATER BAY WATER SYSTEM WITHOUT SHINE PLAT

AUGUST 30, 2016 DRAFT WATER SYSTEM PLAN TEXT AND TABLES BYWATER BAY WATER SYSTEM WITHOUT SHINE PLAT AUGUST 30, 2016 DRAFT WATER SYSTEM PLAN TEXT AND TABLES BYWATER BAY WATER SYSTEM WITHOUT SHINE PLAT 1. SYSTEM OVERVIEW The Bywater Bay Water System (DOH Water System ID number 02043P) is located in eastern

More information

CHAPTER 5 SEWAGE PUMPS AND LIFT STATIONS

CHAPTER 5 SEWAGE PUMPS AND LIFT STATIONS 15 October 1973 FM 5-163 CHAPTER 5 SEWAGE PUMPS AND LIFT STATIONS 5-1. General Pumps for lifting sanitary sewage, storm water, and plant-unit effluents are usually high-capacity, low-head types with large

More information

Pumps and Pumping Stations

Pumps and Pumping Stations Pumps and Pumping Stations Pumps add energy to fluids and therefore are accounted for in the energy equation Energy required by the pump depends on: Discharge rate Resistance to flow (head that the pump

More information

Using Hydraulic Modeling to Determine Viable Emergency Water Supply Options for the City Of San Francisco s Largest Reservoir and Pressure Zone

Using Hydraulic Modeling to Determine Viable Emergency Water Supply Options for the City Of San Francisco s Largest Reservoir and Pressure Zone Using Hydraulic Modeling to Determine Viable Emergency Water Supply Options for the City Of San Francisco s Largest Reservoir and Pressure Zone October 28, 2015 Presented by: Brian Barry, SFPUC Karen Chu,

More information

CHAPTER 4 MINIMUM DESIGN CRITERIA

CHAPTER 4 MINIMUM DESIGN CRITERIA 4.1 INTRODUCTION CHAPTER 4 MINIMUM DESIGN CRITERIA Establishing realistic design criteria is paramount to evaluation of the existing water system s adequacy and planning for future water system improvements.

More information

Simulation of Existing Water Distribution Network by using EPANET: A Case Study of Surat City

Simulation of Existing Water Distribution Network by using EPANET: A Case Study of Surat City GRD Journals Global Research and Development Journal for Engineering Recent Advances in Civil Engineering for Global Sustainability March 2016 e-issn: 2455-5703 Simulation of Existing Water Distribution

More information

Evaluating Water Quality from Source to Tap: Using Hydraulic Modeling, Statistical Analysis and Other Tools to Improve Water Quality

Evaluating Water Quality from Source to Tap: Using Hydraulic Modeling, Statistical Analysis and Other Tools to Improve Water Quality Evaluating Water Quality from Source to Tap: Using Hydraulic Modeling, Statistical Analysis and Other Tools to Improve Water Quality Phil Brandhuber PhD 2014 HDR, all rights reserved. 2018 Surface Water

More information

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library. For additional information about this document and the document conversion process, please contact

More information

STUDY OF WATER DISTRIBUTION NETWORK USING EPANET

STUDY OF WATER DISTRIBUTION NETWORK USING EPANET STUDY OF WATER DISTRIBUTION NETWORK USING EPANET Darshan Mehta 1, Krunal Lakhani 2, Divy Patel 3, Govind Patel 4 Assistant Professor, Civil Engg. Dept., S.S.A.S.I.T, Surat, Gujarat, India 1 UG Student,

More information

The rest of this document describes the BBLAWN competition rules and framework.

The rest of this document describes the BBLAWN competition rules and framework. Battle of Background Leakage Assessment for Water Networks (BBLAWN) Water Distribution Systems Analysis Conference 2014 Bari, Italy, July 14-17, 2014 www.water-system.org/wdsa2014 Detailed Problem Description

More information

South Coast Water District 2017 Master Plan Updates

South Coast Water District 2017 Master Plan Updates South Coast Water District 2017 Master Plan Updates SCWD Sara Mathis, PE AECOM Henry Liang, PE Kelly McEnerney, EIT June 22, 2017 2017 Master Plan Update Presentation Outline Approach Potable Water System

More information

The Study on Water Supply System for Siem Reap Region in Cambodia Main Report Chapter 5

The Study on Water Supply System for Siem Reap Region in Cambodia Main Report Chapter 5 2) Meter District It is recommended to introduce a Meter District System (MDS) for the proposed distribution network. By introducing the MDS, the Waterworks can evaluate the effectiveness of water supply

More information

Irrigation Tech II HYDRAULIC TROUBLESHOOTING

Irrigation Tech II HYDRAULIC TROUBLESHOOTING Irrigation Tech II HYDRAULIC TROUBLESHOOTING How much water & pressure is needed? 2 Water Flow http://www.irrigationtutorials.com 3 Water Pressure Pressure is the force that moves water through a pipe

More information

Review & Design of the Apia Pressure Sewer System

Review & Design of the Apia Pressure Sewer System Review & Design of the Apia Pressure Sewer System Presented by Tainau Moefaauo Taputoa Titimaea - Samoa Water Authority & Paul Edwards Urban Water Solutions 1 Contents Project Background Project Team Data

More information