Final MCGOURVEY RUN WATERSHED TMDL Clarion County

Size: px
Start display at page:

Download "Final MCGOURVEY RUN WATERSHED TMDL Clarion County"

Transcription

1 Final MCGOURVEY RUN WATERSHED TMDL Clarion County Prepared by: Pennsylvania Department of Environmental Protection October

2 TABLE OF CONTENTS FIGURES Introduction... 3 Directions to the McGourvey Run Watershed... 4 Segments addressed in this TMDL... 4 Clean Water Act Requirements... 4 Section 303(d) Listing Process... 5 Basic Steps for Determining a TMDL... 6 Watershed History... 7 TMDL Endpoints... 8 Other Inorganics... 9 TMDL Elements (WLA, LA, MOS)... 9 TMDL Allocations Summary... 9 Allocation Summary Recommendations Public Participation TABLES Table 1. Section 303(d) Sub-List... 3 Table 2. Applicable Water Quality Criteria... 9 Table 3. Correlation Between Metals and Flow for Selected Points... 9 Table 4. Summary Table McGourvey Run Watershed ATTACHMENTS ATTACHMENT A McGourvey Run Watershed Map ATTACHMENT B AMD Methodology, The ph Method And Surface Mining Control and Reclamation Act ATTACHMENT C Example Calculation: Lorberry Creek ATTACHMENT D TMDLs By Segment ATTACHMENT E Excerpts Justifying Changes Between the 1996, 1998, Draft 2000, and Draft (d) Lists ATTACHMENT F Water Quality Data Used In TMDL Calculations ATTACHMENT G Comment and Response

3 1 Final TMDL McGourvey Run Watershed Clarion County, Pennsylvania Introduction This report presents the Total Maximum Daily Loads (TMDLs) developed for segments in the McGourvey Run Watershed (Attachment A). These were done to address the impairments noted on the 1996 Pennsylvania Section 303(d) list of impaired waters, required under the Clean Water Act, and covers one segment on this list (shown in Table 1). High levels of metals and depressed ph, caused these impairments. All impairments resulted from acid drainage from abandoned coal mines. The TMDL addresses the three primary metals associated with acid mine drainage (iron, manganese, aluminum) and ph. Table 1. Section 303(d) Sub-List State Water Plan (SWP) Subbasin: 17-B Clarion River Year Miles Segment ID DEP Stream Code Stream Name Designa ted Use Data Source Source McGourvey Run McGourvey Run 2000 No additional assessment data collected McGourvey Run McGourvey Run EPA 305(b) Cause Code Resource Extraction=RE Cold Water Fishes=CWF Surface Water Monitoring Program = SWMP Abandoned Mine Drainage = AMD See Attachment E, Excerpts Justifying Changes Between the 1996, 1009, and Draft 2000 Section 202(d) Lists. The use designation for the stream segments in this TMDL can be found in PA Title 25 Chapter 93. Note: It is covered as Unnamed Tributaries to Clarion River. All of McGourvey Run has been impacted by acid mine drainage. CWF 305(b) Report RE Metals,pH, & other inorganics CWF SWMP AMD Metals, ph, & other inorganics CWF SWMP AMD Metals, ph, & other inorganics CWF SWMP AMD Metals, ph, & other inorganics 1 Pennsylvania s 1996 and 1998 Section 303(d) lists were approved by the Environmental Protection Agency (EPA). The 1996Section 303(d) list provides the basis for measuring progress under the 1997 lawsuit settlement of American Littoral Society and Public Interest Group of Pennsylvania v. EPA. 3

4 Directions to the McGourvey Run Watershed The McGourvey Run Watershed is approximately 1.22 square miles in area. Segment ID# 5399 is 2.17 miles in length and flows through the north central most area of the main bituminous coal region in northwestern PA. It enters the Clarion River at river mile It is located on the Lucinda and Strattanville 7 ½ minute series topographic maps. (Attachment A) Access to the mouth of McGourvey Run can be gained by taking Exit #9 (Clarion) of Interstate 80. Take PA Rt. 68 North 2.2 miles to Clarion, continue straight 4.0 miles on 1005 to the village of Miola. Turn Right (East) on (Tar Kiln Road) T miles to ESE to T572. Continue 1 mile SE to bottom of hill. Walk upstream along the Clarion River 0.6 miles to the mouth of McGourvey Run (McGourvey Run #A). Access to the headwaters can be gained by taking Exit #9 (Clarion) of Interstate 80. Take PA Rt North 2.2 miles to Clarion, continue straight 5.5 miles on 1005 to the point where 1005 crosses McGourvey Run. Segments addressed in this TMDL Depressed ph and elevated metals cause 0.6 miles of impairment; other inorganics are responsible for an additional 0.7 miles of impairment. The impairment associated with this is the result of acid drainage from abandoned coalmines and the natural condition of ground water associated with an absence or paucity of alkaline producing material in the flow path of the water. The TMDL addresses ph and the three primary metals associated with acid mine drainage (iron, manganese, aluminum). PA has water quality criteria for the metals listed. However, the only water quality criteria for ph is that it be between 6 and 9. There are no mining operations in the watershed that are actively pumping and treating water. However, C & K Coal Company is capturing and treating toe of spoil discharges from Mine Drainage Permit (MDP) # 3777SM10, see the watershed history section. All the other discharges in the watershed are from abandoned mining operations and will be treated as nonpoint sources. The distinction between non-point and point sources in this case is determined on the basis of whether or not there is a responsible party for the discharge. Where there is no responsible party the discharge is considered to be a non-point source. The TMDL will be expressed as a long-term average loading. Due to the nature and complexity of mining effects on the watershed, expressing the TMDL as a long-term average gives a better representation of the data used for the calculations. See Attachment E for TMDL calculations. Clean Water Act Requirements Section 303(d) of the 1972 Clean Water Act requires states, territories, and authorized tribes to establish water quality standards. The water quality standards identify the uses for each waterbody and the scientific criteria needed to support that use. Uses can include designations for drinking water supply, contact recreation (swimming), and aquatic life support. Minimum goals set by the Clean Water Act require that all waters be fishable and swimmable. 4

5 Additionally, the federal Clean Water Act and the U.S. Environmental Protection Agency s (USEPA) implementing regulations (40 CFR Part 130) require: States to develop lists of impaired waters for which current pollution controls are not stringent enough to meet water quality standards (the list is used to determine which streams need TMDLs); States to establish priority rankings for waters on the lists based on severity of pollution and the designated use of the waterbody; states must also identify those waters for which TMDLs will be developed and a schedule for development; States to submit the list of waters to USEPA every two years (April 1 of the even numbered years); States to develop TMDLs, specifying a pollutant budget that meets state water quality standards and allocate pollutant loads among pollution sources in a watershed, e.g., point and nonpoint sources; and USEPA to approve or disapprove state lists and TMDLs within 30 days of final submission. Despite these requirements, states, territories, authorized tribes, and USEPA have not developed many TMDLs since Beginning in 1986, organizations in many states filed lawsuits against the USEPA for failing to meet the TMDL requirements contained in the federal Clean Water Act and its implementing regulations. While USEPA has entered into consent agreements with the plaintiffs in several states, many lawsuits still are pending across the country. In the cases that have been settled to date, the consent agreements require USEPA to backstop TMDL development, track TMDL development, review state monitoring programs, and fund studies on issues of concern (e.g., AMD, implementation of nonpoint source Best Management Practices (BMPs), etc.). These TMDLs were developed in partial fulfillment of the 1996 lawsuit settlement of American Littoral Society and Public Interest Group of Pennsylvania v. EPA. Section 303(d) Listing Process Prior to developing TMDLs for specific waterbodies, there must be sufficient data available to assess which streams are impaired and should be on the Section 303(d) list. With guidance from the USEPA, the states have developed methods for assessing the waters within their respective jurisdictions. The primary method adopted by the Pennsylvania Department of Environmental Protection (Pa. DEP) for evaluating waters changed between the publication of the 1996 and 1998 Section 303(d) lists. Prior to 1998, data used to list streams were in a variety of formats, collected under 5

6 differing protocols. Information also was gathered through the Section 305(b) 2 reporting process. Pa. DEP is now using the Unassessed Waters Protocol (UWP), a modification of the USEPA Rapid Bioassessment Protocol II (RPB-II), as the primary mechanism to assess Pennsylvania s waters. The UWP provides a more consistent approach to assessing Pennsylvania s streams. The assessment method requires selecting representative stream segments based on factors such as surrounding land uses, stream characteristics, surface geology, and point source discharge locations. The biologist selects as many sites as necessary to establish an accurate assessment for a stream segment; the length of the stream segment can vary between sites. All the biological surveys included kick-screen sampling of benthic macroinvertebrates, habitat surveys, and measurements of ph, temperature, conductivity, dissolved oxygen, and alkalinity. Benthic macroinvertebrates are identified to the family level in the field. After the survey is completed, the biologist determines the status of the stream segment. The decision is based on the performance of the segment using a series of biological metrics. If the stream is determined to be impaired, the source and cause of the impairment is documented. An impaired stream must be listed on the state s Section 303(d) list with the documented source and cause. A TMDL must be developed for the stream segment. A TMDL is for only one pollutant. If a stream segment is impaired by two pollutants, two TMDLs must be developed for that stream segment. In order for the process to be more effective, adjoining stream segments with the same source and cause listing are addressed collectively, and on a watershed basis. Basic Steps for Determining a TMDL Although all watersheds must be handled on a case-by-case basis when developing TMDLs, there are basic processes or steps that apply to all cases. They include: 1. Collection and summarization of pre-existing data (watershed characterization, inventory contaminant sources, determination of pollutant loads, etc.); 2. Calculate TMDL for the waterbody using USEPA approved methods and computer models; 3. Allocate pollutant loads to various sources; 4. Determine critical and seasonal conditions; 5. Submit draft report for public review and comments; and 6. USEPA approval of the TMDL. This document will present the information used to develop the McGourvey Run Watershed TMDL. 2 Section 305(b) of the Clean Water Act requires a biannual description of the water quality of the waters of the state. 6

7 Watershed History This area was only sporadically mined from the late 19 th to the late 20 th centuries. TDK Coal Company Surface Mine Permit (SMP)# was issued 9/10/98, by the end of October 2003 this permit is in stage II bond release with the mining affected area backfilled, graded, and planted. Other permits in the watershed included: Benninger & Maxwell #17255, issued 10/18/57; B&M # 17254, issued 10/18/57; Zacherl Coal Co. MDP # 464BSM43, issued 9/17/64; A.P. Weaver Coal Company MDP# s 2565BSM9 and 2565BSM24, issued 7/20/65; A.P. Weaver Coal Company MDP# 2766BSM46 issued 10/25/66 and C&K Coal Company MDP# 3777SM10, issued 8/8/77. Only the latter, A.P. Weaver and C&K permits have post-mining discharges and the C&K post-mining discharge is being treated by the company. The C & K coal company has gone bankrupt and has abandoned two treatment systems. These natural treatment systems are, at this point, still operating. All the remaining permits, with the exception of TDK Coal are pre-act. In addition to these permitted mine sites there are several prepermitting drift mines that were utilized for house coal. When a mining company, with active mining and NPDES permits, goes bankrupt: the permits are suspended and no further mining is allowed. What happens next varies on a case-by-case bassis; there is no typical scenario. The post bankruptcy actions that may occur include: if there is mining potential remaining in the permitted area the permits may be kept active to re-issue if another company wants to continue mining, steps may be taken to forfeit the bond, there may be a one to four year legal activity with the involved surety that may result in a negotiated deal that waives collection of the bond for the surety to address any outstanding liability. In the event the surety addresses the problem the permits go away. Although there isn t an NPDES permit, the discharge is considered abandoned, the treated discharge is required to meet BAT limits. C & K Coal Co. MDP# 377SM10 Permit Limits Effluent Characteristics Maximum Allowable ph within the range 6.0 to 9.0 TDK Coal Sales, Inc. SMP# Mine Drainage Treatment Facility Discharge Parameter Average Monthly Maximum Daily Instantaneous Maximum Total Iron Total Manganese Total Suspended Solids ph >6.0 <9.0 standard ph units at all times Alkalinity must exceed acidity at all times Average of Daily values for 30 Consecutive Discharge Days Total Iron Total Manganese Total Suspended Solids

8 TDK Coal Sales, Inc. SMP# Erosion and Sedimentation Control Facility Discharge Parameter Average Monthly Maximum Daily Instantaneous Maximum Total Iron 7.0 Settleable Solids 0.5 ml/l ph >6.0 <9.0 standard ph units at all times Alkalinity must exceed acidity at all times TDK Coal Sales, Inc. SMP# At a minimum, any other discharge from areas disturbed by mining activities, including areas disturbed by mineral preparation, processing or handling facilities shall comply with the following discharge limitations. Discharge Parameter Average Monthly Maximum Daily Instantaneous Maximum Total Iron 7.0 Total Manganese 5.0 Total Suspended Solids 90.0 ph >6.0 <9.0 standard ph units at all times Alkalinity must exceed acidity at all times Note: The above discharge limitations pertain to discharges which may occur unexpectedly, (i.e., were not originally anticipated when this permit was issued). The Department reserves the right to modify these limitations based upon the need to protect water quality in the receiving stream. For the McGourvey Run watershed, the focus of the TMDL is on abandoned mine discharges from the A.P. Weaver Coal Company permits and the treated discharges from the C&K MDP# 3777SM10, however a visual inspection revealed that an abandoned flowing gas well may also be causing impairment. TMDL Endpoints One of the major components of a TMDL is the establishment of an instream numeric endpoint, which is used to evaluate the attainment of applicable water quality. An instream numeric endpoint, therefore, represents the water quality goal that is to be achieved by implementing the load reductions specified in the TMDL. The endpoint allows for comparison between observed instream conditions and conditions that are expected to restore designated uses. The endpoint is based on either the narrative or numeric criteria available in water quality standards. Because of the nature of the pollution sources in the watershed, the TMDLs component makeup will be load allocations (LAs) that are specified above a point in the stream segment. All allocations will be specified as long-term average daily concentrations. These long-term average daily concentrations are expected to meet water quality criteria 99 percent of the time. Pennsylvania Title 25 Chapter 96.3(c) specifies that the water quality standards be met 99 percent of the time. The iron TMDLs are expressed as total recoverable. Pennsylvania does have dissolved criteria for iron; however, the data used for this analysis report iron as total recoverable. Table 2 shows the water quality criteria for the selected parameters. 8

9 Table 2. Applicable Water Quality Criteria Parameter Criterion Value () Total Recoverable/Dissolved Aluminum (Al) 0.75 Total Recoverable Iron (Fe) Day Average; Total Recoverable Manganese (Mn) 1.00 Total Recoverable ph * N/A *The ph values shown will be used when applicable. In the case of freestone streams with little or no buffering capacity, the TMDL endpoint for ph will be the natural background water quality. These values are typically as low as 5.4 (Pennsylvania Fish and Boat Commission). Other Inorganics The cause of inorganic impairment as listed on the 1996 Section 303(d) list is sulfates. Due to Title 25 Chapter 96.3(d) a TMDL to address sulfates is not necessary. The nearest potable water withdrawal to McGourvey Run occurs approximately 12 miles downstream of the mouth at Piney Creek Project(# ). Sulfate data from WQN0821, located on the Clarion River at the Rt. 854 bridge approximately 3 miles downstream of the water supply intake, shows that the sulfate criteria of 250 mg/l is not exceeded. The average sulfate concentration calculated from 7 years of WQN data, located in Table 3 of Appendix F, is mg/l. A map of the water supply intake, WQN Station, and USGS Gage Station is located in Appendix A and sulfate and flow data for the WQN station is located in Appendix F. TMDL Elements (WLA, LA, MOS) A TMDL equation consists of a wasteload allocation, load allocation and a margin of safety. The wasteload allocation is the portion of the load assigned to point sources. The load allocation is the portion of the load assigned to nonpoint sources. The margin of safety is applied to account for uncertainties in the computational process. The margin of safety may be expressed implicitly (documenting conservative processes in the computations) or explicitly (setting aside a portion of the allowable load). TMDL Allocations Summary Analyses of data for metals for points MP-H and MP-B indicated that there was no single critical flow condition for pollutant sources, and further, that there was no significant correlation between source flows and pollutant concentrations (Table 3). Point Identification Table 3. Correlation Between Metals and Flow for Selected Points Number of Samples Flow vs. Iron Manganese Aluminum MP-H N/A N/A 14 MP-B Data since June 6,

10 Allocation Summary These TMDLs will focus remediation efforts on the identified numerical reduction targets for each watershed. As changes occur in the watershed, the TMDL may be re-evaluated to reflect current conditions. Table 4 presents the estimated reductions identified for all points in the watershed. Attachment D gives detailed TMDLs by segment analysis for each allocation point. Table 4. Summary Table McGourvey Run Watershed Measured Sample Data Allowable Reduction Identified Station Parameter Conc. Load LTA Conc. Load () (lb/day) () (lb/day) Percent MP-U Al Fe Mn Acidity Alkalinity MP-H MP-D MP-B MP-A Recommendations Al Fe Mn Acidity Alkalinity Al Fe Mn Acidity Alkalinity Al Fe Mn Acidity Alkalinity Al Fe Mn Acidity Alkalinity Two primary programs that provide reasonable assurance for maintenance and improvement of water quality in the watershed are in effect. The PADEP s efforts to reclaim abandoned mine lands, coupled with its duties and responsibilities for issuing NPDES permits, will be the focal points in water quality improvement. 10

11 Additional opportunities for water quality improvement are both ongoing and anticipated. Historically, a great deal of research into mine drainage has been conducted by PADEP s Bureau of Abandoned Mine Reclamation, which administers and oversees the Abandoned Mine Reclamation Program in Pennsylvania, the United States Office of Surface Mining, the National Mine Land Reclamation Center, the National Environmental Training Laboratory, and many other agencies and individuals. Funding from EPA s 319 Grant program, and Pennsylvania s Growing Greener program have been used extensively to remedy mine drainage impacts. These many activities are expected to continue and result in water quality improvement. The PA DEP Bureau of Mining and Reclamation administers an environmental regulatory program for all mining activities, mine subsidence regulation, mine subsidence insurance, and coal refuse disposal; conducts a program to ensure safe underground bituminous mining and protect certain structures form subsidence; administers a mining license and permit program; administers a regulatory program for the use, storage, and handling of explosives; provides for training, examination, and certification of applicants for blaster s licenses; and administers a loan program for bonding anthracite underground mines and for mine subsidence. Administers the EPA Watershed Assessment Grant Program, the Small Operator s Assistance Program (SOAP), and the Remining Operators Assistance Program (ROAP). Reclaim PA is DEP s initiative designed to maximize reclamation of the state s quarter million acres of abandoned mineral extraction lands. Abandoned mineral extraction lands in Pennsylvania constituted a significant public liability more than 250,000 acres of abandoned surface mines, 2,400 miles of streams polluted with mine drainage, over 7,000 orphaned and abandoned oil and gas wells, widespread subsidence problems, numerous hazardous mine openings, mine fires, abandoned structures and affected water supplies representing as much as one third of the total problem nationally. Mine reclamation and well plugging refers to the process of cleaning up environmental pollutants and safety hazards associated with a site and returning the land to a productive condition, similar to DEP s Brownfields program. Since the 1960 s, Pennsylvania has been a national leader in establishing laws and regulations to ensure reclamation and plugging occur after active operation is completed. Pennsylvania is striving for complete reclamation of its abandoned mines and plugging of its orphaned wells. Realizing this task is no small order, DEP has developed concepts to make abandoned mine reclamation easier. These concepts, collectively called Reclaim PA, include legislative, policy land management initiatives designed to enhance mine operator, volunteer land DEP reclamation efforts. Reclaim PA has the following four objectives. To encourage private and public participation in abandoned mine reclamation efforts To improve reclamation efficiency through better communication between reclamation partners To increase reclamation by reducing remining risks To maximize reclamation funding by expanding existing sources and exploring new sources. 11

12 Should funding be available, an alkalinity generating system e.g. a diversion well, or anoxic limestone drain (ALD) or Successive Alkalinity Producing (SAP) vertical flow treatment system in combination with wetland treatment systems constructed in the headwaters above points G, I, could be used to raise the ph. The increase in alkalinity would neutralize the acidity and provide some buffering capacity. The increase in ph would promote the removal of the metals from the A.P. Weaver Coal Co site discharges. The steepness of the stream valley of the main branch of McGourvey Run would preclude any passive treatment other than diversion wells. The downside of diversion wells is that the precipitation of metals takes place in the stream immediately below the point at which the alkalinity is introduced and they require continuous recharging with limestone via manual labor. Although data on ferric iron and dissolved oxygen is not presently available for any of the points, the data for aluminum suggests that passive treatment utilizing an ALD would not be technologically feasible. The average aluminum concentration of all sample points having aluminum data is greater than 6. This includes points H (7.6 ); GH (6.18 ); D (6.6 ); C (6.81 ); and B (6.22 ). Although we don't have aluminum data for points J, I, G, and E, given the depressed ph, high acidity, and elevated iron, it is likely the aluminum at these points would also preclude conventional passive treatment via an ALD. Historically, aluminum levels (>6 ) have caused major clogging problems leading to short circuiting and premature failure even in SAP systems. Although controversial, capping the disturbed areas with fly ash could limit infiltration and promote runoff ultimately reducing the loading. This technology may also inhibit the production of AMD by substituting CO2 (which is trapped by the cap and can't dissolve) for oxygen. This dampens the convection thus shutting down the drafting of oxygen to the sulfides in the backfill spoil. Capping the seeping gas well near McGourvey Run #E would greatly decrease the metal loading to McGourvey Run. Public Participation Public notice of the draft TMDL was published in the Pennsylvania Bulletin on July, 13, 2002 and The Clarion News on August 1, 2002 to foster public comment on the allowable loads calculated. A public meeting was held on August 14, 2002, at the Holiday Inn in Clarion, Pennsylvania, to discuss and accept comments on the proposed TMDL. 12

13 Attachment A McGourvey Run Watershed Map 13

14 14

15 0 3 Miles Legend McGourvey Run #0 ( # USGS Gage Station Water Supply Intakes WQN Stations McGourvey Run Nonattaining Streams Nonattaining Unassessed Attaining ( Water Supply Intake # Piney Creek Project USGS Gage Station #0 ( WQN Station 0821 # 15

16 Attachment B AMD Methodology, The ph Method And Surface Mining Control and Reclamation Act 16

17 AMD Methodology Two approaches are used for the TMDL analysis of AMD-affected stream segments. Both of these approaches use the same statistical method for determining the instream allowable loading rate at the point of interest. The difference between the two is based on whether the pollution sources are defined as discharges that are permitted or have a responsible party, which are considered point sources. Nonpoint sources are then any pollution sources that are not point sources. For situations where all of the impact is due to nonpoint sources, the equations shown below are applied using data for a point in the stream. The load allocation made at that point will be for all of the watershed area that is above that point. For situations where there are only point-source impacts or a combination of point and nonpoint sources, the evaluation will use the point-source data and perform a mass balance with the receiving water to determine the impact of the point source. TMDLs and load allocations for each pollutant were determined using Monte Carlo simulation. Allocations were applied uniformly for the watershed area specified for each allocation point. For each source and pollutant, it was assumed that the observed data were log-normally distributed. Each pollutant source was evaluated separately 3 by performing 5,000 iterations to determine any required percent reduction so that the water quality criteria will be met instream at least 99 percent of the time. For each iteration, the required percent reduction is: PR = maximum {0, (1-Cc/Cd)} where (1) PR = required percent reduction for the current iteration Cc = criterion in Cd = randomly generated pollutant source concentration in based on the observed data Cd = RiskLognorm(Mean, Standard Deviation) where (1a) Mean = average observed concentration Standard Deviation = standard deviation of observed data The overall percent reduction required is the 99 th percentile value of the probability distribution generated by the 5,000 iterations, so that the allowable long-term average (LTA) concentration is: LTA = Mean * (1 PR99) where (2) Risk Analysis and Simulation Add-in for Microsoft Excel, Palisade Corporation, Newfield, NY,

18 LTA = allowable LTA source concentration in Once the required percent reduction for each pollutant source was determined, a second series of Monte Carlo simulations were performed to determine if the cumulative loads from multiple sources allow instream water quality criteria to be met at all points at least 99 percent of the time. The second series of simulations combined the flows and loads from individual sources in a stepwise fashion, so that the level of attainment could be determined immediately downstream of each source. Where available data allowed, pollutant-source flows used were the average flows. Where data were insufficient to determine a source flow frequency distribution, the average flow derived from linear regression was used. In general, these cumulative impact evaluations indicate that, if the percent reductions determined during the first step of the analysis are achieved, water quality criteria will be achieved at all upstream points, and no further reduction in source loadings is required. Where a stream segment is listed on the 303(d) list for ph impairment, the evaluation is the same as that discussed above; the ph method is fully explained in Attachment C. An example calculation from the Swatara Creek TMDL, including detailed tabular summaries of the Monte Carlo results, is presented for the Lorberry Creek TMDL in Attachment E. Information for the TMDL analysis performed using the methodology described above is contained in the TMDLs by segment section of this report in Attachment F. Accounting for Upstream Reductions in AMD TMDLs In AMD TMDLs, sample points are evaluated in headwaters (most upstream) to stream mouth (most downstream) order. As the TMDL evaluation moves downstream the impact of the previous, upstream, evaluations must be considered. The following examples are from the Beaver Run AMD TMDL (2003): BR08 BR02 BR04 BR05 In the first example BR08 is the most upstream sample point and BR02 is the next downstream sample point. The sample data, for both sample points, are evaluated (explained above) to calculate the existing loads, allowable loads, and a percentage reduction for aluminum, iron, manganese, and acidity (when flow and parameter data are available). 18

19 Any calculated load reductions for the upstream sample point, BR08, must be accounted for in the calculated reductions at sample point BR02. To do this (see table A) the allowable load is subtracted from the existing load, for each parameter, to determine the total load reduction. In table B the Total Load Reduction BR08 is subtracted from the Existing loads at BR02 to determine the Remaining Load. The Remaining Load at BR02 has the previously calculated Allowable Loads at BR02 subtracted to determine any load reductions at sample point BR02. This results in load reductions for aluminum, iron and manganese at sample point BR02. At sample point BR05 this same procedure is also used to account for calculated reductions at sample points BR08 and BR02. As can be seen in Tables C and D this procedure results in additional load reductions for iron, manganese and acidity at sample point BR04. Table A Alum. Iron Mang. Acidity BR08 (#/day) (#/day) (#/day) (#/day) existing load= allowable load= TOTAL LOAD REDUCTION= Table B. Necessary Reductions at Beaver Run BR02 Existing Loads at BR02 Total Load Reduction BR08 Remaining Load (Existing Load at BR02 - BR08) Al (#/day) Fe (#/day) Mn (#/day) Acidity (#/day) Allowable Loads at BR Percent Reduction 78.0% 76.0% 68.0% NA Additional Removal Required at BR At sample point BR05 (the most downstream) no additional load reductions are required, see Tables E and F. 19

20 Table C Alum. Iron Mang. Acidity BR08 & BR02 (#/day) (#/day) (#/day) (#/day) Total Load Reduction= Table D. Necessary Reductions at Beaver Run BR04 Al Fe Mn Acidity (#/day) (#/day) (#/day) (#/day) Existing Loads at BR Total Load Reduction BR08 & BR Remaining Load (Existing Load at BBR04 - TLR Sum Allowable Loads at BR Percent Reduction NA 82.3% 51.8% 0.8% Additional Removal Required at BR Table E Alum. Iron Mang. Acidity BR08 BR02 &BR04 (#/day) (#/day) (#/day) (#/day) Total Load Reduction= Table F. Necessary Reductions at Beaver Run BR05 Al (#/day) Fe (#/day) Mn (#/day) Acidity (#/day) Existing Loads at BR Total Load Reduction BR08, BR02 & BR Remaining Load (Existing Load at BBR05 - TLR Sum NA NA NA 3.8 Allowable Loads at BR Percent Reduction NA NA NA NA Additional Removal Required at BR Although the evaluation at sample point BR05 results in no additional removal this does not mean there are no AMD problems in the stream segment BR05 to BR04. The existing and allowable loads for BR05 show that iron and manganese exceed criteria and, any abandoned mine discharges in this stream segment will be addressed. 20

21 Method for Addressing Section 303(d) Listings for ph There has been a great deal of research conducted on the relationship between alkalinity, acidity, and ph. Research published by the Pa. Department of Environmental Protection demonstrates that by plotting net alkalinity (alkalinity-acidity) vs. ph for 794 mine sample points, the resulting ph value from a sample possessing a net alkalinity of zero is approximately equal to six (Figure 1). Where net alkalinity is positive (greater than or equal to zero), the ph range is most commonly six to eight, which is within the USEPA s acceptable range of six to nine and meets Pennsylvania water quality criteria in Chapter 93. The ph, a measurement of hydrogen ion acidity presented as a negative logarithm, is not conducive to standard statistics. Additionally, ph does not measure latent acidity. For this reason, and based on the above information, Pennsylvania is using the following approach to address the stream impairments noted on the Section 303(d) list due to ph. The concentration of acidity in a stream is at least partially chemically dependent upon metals. For this reason, it is extremely difficult to predict the exact ph values, which would result from treatment of abandoned mine drainage. Therefore, net alkalinity will be used to evaluate ph in these TMDL calculations. This methodology assures that the standard for ph will be met because net alkalinity is a measure of the reduction of acidity. When acidity in a stream is neutralized or is restored to natural levels, ph will be acceptable. Therefore, the measured instream alkalinity at the point of evaluation in the stream will serve as the goal for reducing total acidity at that point. The methodology that is applied for alkalinity (and therefore ph) is the same as that used for other parameters such as iron, aluminum, and manganese that have numeric water quality criteria. Each sample point used in the analysis of ph by this method must have measurements for total alkalinity and total acidity. Net alkalinity is alkalinity minus acidity, both being in units of milligrams per liter () CaCO 3. The same statistical procedures that have been described for use in the evaluation of the metals is applied, using the average value for total alkalinity at that point as the target to specify a reduction in the acid concentration. By maintaining a net alkaline stream, the ph value will be in the range between six and eight. This method negates the need to specifically compute the ph value, which for mine waters is not a true reflection of acidity. This method assures that Pennsylvania s standard for ph is met when the acid concentration reduction is met. There are several documented cases of streams in Pennsylvania having a natural background ph below six. If the natural ph of a stream on the Section 303(d) list can be established from its upper unaffected regions, then the ph standard will be expanded to include this natural range. The acceptable net alkalinity of the stream after treatment/abatement in its polluted segment will be the average net alkalinity established from the stream s upper, pristine reaches added to the acidity of the polluted portion in question. Summarized, if the ph in an unaffected portion of a stream is found to be naturally occurring below six, then the average net alkalinity for that portion (added to the acidity of the polluted portion) of the stream will become the criterion for the polluted portion. This natural net alkalinity level will be the criterion to which a 99 percent confidence level will be applied. The ph range will be varied only for streams in which a natural unaffected net alkalinity level can be established. This can only be done for streams that have upper segments that are not impacted by mining activity. All other streams will be required to reduce the acid load so the net alkalinity is greater than zero 99% of time. Reference: Rose, Arthur W. and Charles A. Cravotta, III Geochemistry of Coal Mine Drainage. Chapter 1 in Coal Mine Drainage Prediction and Pollution Prevention in Pennsylvania. Pa. Dept. of Environmental Protection, Harrisburg, Pa. 21

22 Figure 1. Net Alkalinity vs. ph. Taken from Figure 1.2 Graph C, pages 1-5, of Coal Mine Drainage Prediction and Pollution Prevention in Pennsylvania 22

23 Surface Mining Control and Reclamation Act The Surface Mining Control and Reclamation Act of 1977 (SMCRA, Public Law 95-87) and its subsequent revisions were enacted to established a nationwide program to, among other things, protect the beneficial uses of land or water resources, and pubic health and safety from the adverse effects of current surface coal mining operations, as well as promote the reclamation of mined areas left without adequate reclamation prior to August 3, SMCRA requires a permit for the development of new, previously mined, or abandoned sites for the purpose of surface mining. Permittees are required to post a performance bond that will be sufficient to ensure the completion of reclamation requirements by the regulatory authority in the event that the applicant forfeits. Mines that ceased operating by the effective date of SMCRA, (often called pre-law mines) are not subject to the requirements of SMCRA. Title IV of the Act is designed to provide assistance for reclamation and restoration of abandoned mines, while Title V states that any surface coal mining operations shall be required to meet all applicable performance standards. Some general performance standards include: Restoring the affected land to a condition capable of supporting the uses which it was capable of supporting prior to any mining, Backfilling and compacting (to insure stability or to prevent leaching of toxic materials) in order to restore the approximate original contour of the land with all highwalls being eliminated, and topsoil replaced to allow revegetation, and Minimizing the disturbances to the hydrologic balance and to the quality and quantity of water in surface and ground water systems both during and after surface coal mining operations and during reclamation by avoiding acid or other toxic mine drainage. For purposes of these TMDLs, point sources are identified as NPDES-permitted discharge points, and nonpoint sources include discharges from abandoned mine lands, including but not limited to, tunnel discharges, seeps, and surface runoff. Abandoned and reclaimed mine lands were treated in the allocations as nonpoint sources because there are no NPDES permits associated with these areas. In the absence of an NPDES permit, the discharges associated with these land uses were assigned load allocations. The decision to assign load allocations to abandoned and reclaimed mine lands does not reflect any determination by EPA as to whether there are, in fact, unpermitted point source discharges within these land uses. In addition, by establishing these TMDLs with mine drainage discharges treated as load allocations, EPA is not determining that these discharges are exempt from NPDES permitting requirements. Related Definitions Pre-Act (Pre-Law) - Mines that ceased operating by the effective date of SMCRA and are not subject to the requirements of SMCRA. 23

24 Bond A instrument by which a permittee assures faithful performance of the requirements of the acts, this chapter, Chapters and the requirements of the permit and reclamation plan. Postmining pollution discharge A discharge of mine drainage emanating from or hydrologically connected to the permit area, which may remain after coal mining activities have been completed, and which does not comply with the applicable effluent requirements described in Chapters , 88.92, , , or The term includes minimal-impact postmining discharges, as defined in Section of the Surface Mining Conservation and Reclamation Act. Forfeited Bond Bond money collected by the regulatory authority to complete the reclamation of a mine site when a permittee defaults on his reclamation requirements. 24

25 Attachment C Example Calculation: Lorberry Creek 25

26 Lorberry Creek was evaluated for impairment due to high metals contents in the following manner: the analysis was completed in a stepwise manner, starting at the headwaters of the stream and moving to the mouth. The Rowe Tunnel (Swat-04) was treated as the headwaters of Lorberry Creek for the purpose of this analysis. 1. A simulation of the concentration data at point Swat-04 was completed. This estimated the necessary reduction needed for each metal to meet water quality criteria 99 percent of the time as a long-term average daily concentration. Appropriate concentration reductions were made for each metal. 2. A simulation of the concentration data at point Swat-11 was completed. It was determined that no reductions in metals concentrations are needed for Stumps Run at this time. Therefore, no TMDL for metals in Stumps Run is required at this time. 3. A mass balance of loading from Swat-04 and Swat-11 was completed to determine if there was any need for additional reductions as a result of combining the loads. No additional reductions were necessary. 4. The mass balance was expanded to include the Shadle Discharge (L-1). It was estimated that best available technology (BAT) requirements for the Shadle Discharge were adequate for iron and manganese. There is no BAT requirement for aluminum. A wasteload allocation was necessary for aluminum at point L-1. There are no other known sources below the Shadle Discharge. However, there is additional flow from overland runoff and one unnamed tributary not impacted by mining. It is reasonable to assume that the additional flow provides assimilation capacity below point L-1, and no further analysis is needed downstream. The calculations are detailed in the following section (Tables 1-8). Table 9 shows the allocations made on Lorberry Creek. 1. A series of four equations was used to determine if a reduction was needed at point Swat-04, and, if so the magnitude of the reduction. Table 1. Equations Used for Rowe Tunnel Analysis (SWAT 04) Field Description Equation Explanation 1 Swat-04 Initial Concentration Value (Equation 1A) = Risklognorm (Mean, St Dev) This simulates the existing concentration of the sampled data. 2 Swat-04 % Reduction (from the 99 th percentile of percent = (Input a percentage based on reduction target) This is the percent reduction for the discharge. reduction) 3 Swat-04 Final Concentration = Sampled Value x (1-percent This applies the given percent reduction Value 4 Swat-04 Reduction Target (PR) reduction) to the initial concentration. = Maximum (0, 1- Cd/Cc) This computes the necessary reduction, if needed, each time a value is sampled. The final reduction target is the 99 th percentile value of this computed field. 26

27 2. The reduction target (PR) was computed taking the 99 th percentile value of 5,000 iterations of the equation in row four of Table 1. The targeted percent reduction is shown, in boldface type, in the following table. Table 2. Swat-04 Estimated Target Reductions Name Swat-04 Aluminum Swat-04 Iron Swat-04 Manganese Minimum = Maximum = Mean = Std. Deviation = Variance = Skewness = Kurtosis = Errors Calculated = Targeted Reduction % = Target #1 (Perc%)= This PR value was used as the percent reduction in the equation in row three of Table 1. Testing was done to see that the water quality criterion for each metal was achieved at least 99 percent of the time. This verified the estimated percent reduction necessary for each metal. Table 3 shows, in boldface type, the percent of the time criteria for each metal was achieved during 5,000 iterations of the equation in row three of Table 1. Table 3. Swat-04 Verification of Target Reductions Name Swat-04 Aluminum Swat-04 Iron Swat-04 Manganese Minimum = Maximum = Mean = Std Deviation = Variance = Skewness = Kurtosis = Errors Calculated = Target #1 (value) (WQ Criteria)= Target #1 (Perc%)= These same four equations were applied to point Swat-11. The result was that no reduction was needed for any of the metals. Tables 4 and 5 show the reduction targets computed for, and the verification of, reduction targets for Swat

28 Table 4. Swat-11 Estimated Target Reductions Name Swat-11 Aluminum Swat-11 Iron Swat-11 Manganese Minimum = Maximum = Mean = Std Deviation = Variance = Skewness = Kurtosis = Errors Calculated = Targeted Reduction % = Target #1 (Perc%) = Table 5. Swat-11 Verification of Target Reductions Name Swat-11 Aluminum Swat-11 Iron Swat-11 Manganese Minimum = Maximum = Mean = Std Deviation = Variance = Skewness = Kurtosis = Errors Calculated = WQ Criteria = % of Time Criteria Achieved = Table 6 shows variables used to express mass balance computations. Table 6. Variable Descriptions for Lorberry Creek Calculations Description Variable Shown Flow from Swat-04 Q swat04 Swat-04 Final Concentration C swat04 Flow from Swat-11 Q swat11 Swat-11 Final Concentration C swat11 Concentration below Stumps Run C stumps Flow from L-1 (Shadle Discharge) Q L1 Final Concentration From L-1 C L1 Concentration below L-1 C allow 6. Swat-04 and Swat-11 were mass balanced in the following manner: The majority of the sampling done at point Swat-11 was done in conjunction with point Swat-04 (20 matching sampling days). This allowed for the establishment of a significant correlation between the two flows (the R-squared value was 0.85). Swat-04 was used as the 28

29 base flow, and a regression analysis on point Swat-11 provided an equation for use as the flow from Swat-11. The flow from Swat-04 (Q swat04 ) was set into function so it could be used to simulate loading into the stream. The cumulative probability function was used for this random flow selection. The flow at Swat-04 is as follows (Equation 1): Q swat04 = RiskCumul(min,max,bin range, cumulative percent of occurrence) (1) The RiskCumul function takes four arguments: minimum value, maximum value, the bin range from the histogram, and cumulative percent of occurrence. The flow at Swat-11 was randomized using the equation developed through the regression analysis with point Swat-04 (Equation 2). Q swat11 = Q swat 04 x (2) The mass balance equation is as follows (Equation 3): C stumps = ((Q swat04 * C swat04 ) + (Q swat11 * C swat11 ))/(Q swat04 +Q swat11 ) (3) This equation was simulated through 5,000 iterations, and the 99 th percentile value of the data set was compared to the water quality criteria to determine if standards had been met. The results show there is no further reduction needed for any of the metals at either point. The simulation results are shown in Table 7. Table 7. Verification of Meeting Water Quality Standards Below Stumps Run Name Below Stumps Run Aluminum Below Stumps Run Iron Below Stumps Run Manganese Minimum = Maximum = Mean = Std Deviation = Variance = Skewness = Kurtosis = Errors Calculated = WQ Criteria = % of Time Criteria Achieved = The mass balance was expanded to determine if any reductions would be necessary at point L-1. The Shadle Discharge originated in 1997, and very few data are available for it. The discharge will have to be treated or eliminated. It is the current site of a USGS test 29

THOMPSON RUN WATERSHED FINAL TMDL Allegheny County

THOMPSON RUN WATERSHED FINAL TMDL Allegheny County THOMPSON RUN WATERSHED FINAL TMDL Allegheny County Prepared for: Pennsylvania Department of Environmental Protection February 25, 2003 1 TABLE OF CONTENTS Introduction... 3 Directions to the Thompson Run

More information

Final. Bear Loop Run Watershed TMDL Cambria County

Final. Bear Loop Run Watershed TMDL Cambria County Final Bear Loop Run Watershed TMDL Cambria County For Acid Mine Drainage Affected Segments Prepared by the Pennsylvania Department of Environmental Protection February 2002 1 TABLE OF CONTENTS FIGURES

More information

FINAL Oven Run Watershed TMDL Somerset County

FINAL Oven Run Watershed TMDL Somerset County FINAL Oven Run Watershed TMDL Somerset County For Acid Mine Drainage Affected Segments Prepared by the Pennsylvania Department of Environmental Protection October 20, 2004 1 TABLE OF CONTENTS FIGURES Introduction...

More information

POTATO GARDEN RUN WATERSHED FINALTMDL Allegheny County

POTATO GARDEN RUN WATERSHED FINALTMDL Allegheny County POTATO GARDEN RUN WATERSHED FINALTMDL Allegheny County Prepared for: Pennsylvania Department of Environmental Protection February 25, 2003 1 TABLE OF CONTENTS FIGURES Introduction... 3 Directions to the

More information

Whites Run TMDL: For Metals. Prepared by Pennsylvania Department of Environmental Protection

Whites Run TMDL: For Metals. Prepared by Pennsylvania Department of Environmental Protection Whites Run TMDL: For Metals Prepared by Pennsylvania Department of Environmental Protection March 1, 2001 Copied from parks run: Table of Contents Introduction... 2 Directions to the Whites Run Watershed...

More information

FINAL. CUCUMBER RUN WATERSHED TMDL Somerset County. For Acid Mine Drainage Affected Segments. Prepared by:

FINAL. CUCUMBER RUN WATERSHED TMDL Somerset County. For Acid Mine Drainage Affected Segments. Prepared by: FINAL CUCUMBER RUN WATERSHED TMDL Somerset County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection June 4, 2004 1 TABLE OF CONTENTS Introduction...

More information

DAGUSCAHONDA RUN WATERSHED TMDL Elk County, Pennsylvania

DAGUSCAHONDA RUN WATERSHED TMDL Elk County, Pennsylvania DAGUSCAHONDA RUN WATERSHED TMDL Elk County, Pennsylvania Prepared for: Pennsylvania Department of Environmental Protection March 28, 2005 1 TABLE OF CONTENTS FIGURES Introduction... 3 Directions to the

More information

Final. MUDDY BRANCH CREEK WATERSHED TMDL Schuylkill County

Final. MUDDY BRANCH CREEK WATERSHED TMDL Schuylkill County Final MUDDY BRANCH CREEK WATERSHED TMDL Schuylkill County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection March 9, 2005 1 TABLE OF CONTENTS FIGURES

More information

FINAL. BABB CREEK WATERSHED TMDL Tioga and Lycoming Counties. For Acid Mine Drainage Affected Segments. Prepared by:

FINAL. BABB CREEK WATERSHED TMDL Tioga and Lycoming Counties. For Acid Mine Drainage Affected Segments. Prepared by: FINAL BABB CREEK WATERSHED TMDL Tioga and Lycoming Counties For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection February 28, 2003 1 TABLE OF CONTENTS

More information

Final. WEST BRANCH SCHUYLKILL RIVER WATERSHED TMDL Schuylkill County

Final. WEST BRANCH SCHUYLKILL RIVER WATERSHED TMDL Schuylkill County Final WEST BRANCH SCHUYLKILL RIVER WATERSHED TMDL Schuylkill County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection March 25, 2005 1 TABLE OF CONTENTS

More information

FINAL. SHAFER RUN WATERSHED TMDL Somerset County. For Acid Mine Drainage Affected Segments. Prepared by:

FINAL. SHAFER RUN WATERSHED TMDL Somerset County. For Acid Mine Drainage Affected Segments. Prepared by: FINAL SHAFER RUN WATERSHED TMDL Somerset County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection January 21, 2007 1 TABLE OF CONTENTS Introduction...

More information

FINAL. UNT STONYCREEK RIVER WATERSHED TMDL Somerset County. For Acid Mine Drainage Affected Segments. Prepared by:

FINAL. UNT STONYCREEK RIVER WATERSHED TMDL Somerset County. For Acid Mine Drainage Affected Segments. Prepared by: FINAL UNT 45603 STONYCREEK RIVER WATERSHED TMDL Somerset County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection March 19, 2007 1 TABLE OF CONTENTS

More information

Final. MILL CREEK WATERSHED TMDL Schuylkill County

Final. MILL CREEK WATERSHED TMDL Schuylkill County Final MILL CREEK WATERSHED TMDL Schuylkill County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection March 8, 2005 1 TABLE OF CONTENTS FIGURES Introduction...

More information

WILSON CREEK WATERSHED TMDL Lackawanna County

WILSON CREEK WATERSHED TMDL Lackawanna County WILSON CREEK WATERSHED TMDL Lackawanna County Prepared for: Pennsylvania Department of Environmental Protection March 9, 2005 TABLE OF CONTENTS INTRODUCTION... 1 LOCATION... 1 SEGMENTS ADDRESSED IN THIS

More information

SANDY CREEK WATERSHED TMDL Clearfield County

SANDY CREEK WATERSHED TMDL Clearfield County SANDY CREEK WATERSHED TMDL Clearfield County Prepared for: Pennsylvania Department of Environmental Protection March 15, 2007 TABLE OF CONTENTS INTRODUCTION... 1 LOCATION... 2 SEGMENTS ADDRESSED IN THIS

More information

Tangascootack Creek Watershed TMDL

Tangascootack Creek Watershed TMDL Tangascootack Creek Watershed TMDL For Acid Mine Drainage Affected Segments Prepared by Pennsylvania Department of Environmental Protection February 23, 2001 1 Table of Contents Introduction...4 Directions

More information

FINAL. Unt BUFFALO CREEK Armstrong County, Pennsylvania

FINAL. Unt BUFFALO CREEK Armstrong County, Pennsylvania FINAL Unt BUFFALO CREEK Armstrong County, Pennsylvania Prepared by: Pennsylvania Department of Environmental Protection March 5, 2007 1 TABLE OF CONTENTS Introduction... 3 Directions to the Unt (42685)

More information

FINAL. FOUNDRY RUN WATERSHED TMDL Armstrong and Jefferson Counties. For Acid Mine Drainage Affected Segments. Prepared by:

FINAL. FOUNDRY RUN WATERSHED TMDL Armstrong and Jefferson Counties. For Acid Mine Drainage Affected Segments. Prepared by: FINAL FOUNDRY RUN WATERSHED TMDL Armstrong and Jefferson Counties For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection January 3, 2007 1 TABLE OF CONTENTS

More information

FINAL. WEST CREEK WATERSHED TMDL Elk County

FINAL. WEST CREEK WATERSHED TMDL Elk County FINAL WEST CREEK WATERSHED TMDL Elk County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection March 1, 2007 1 TABLE OF CONTENTS FIGURES Introduction...

More information

Narrows Creek Watershed TMDL Clearfield County, Pennsylvania

Narrows Creek Watershed TMDL Clearfield County, Pennsylvania Narrows Creek Watershed TMDL Clearfield County, Pennsylvania Prepared by: Pennsylvania Department of Environmental Protection September 30, 2008 1 TABLE OF CONTENTS Introduction...4 Directions to the Narrows

More information

LICK RUN WATERSHED TMDL Clearfield County

LICK RUN WATERSHED TMDL Clearfield County LICK RUN WATERSHED TMDL Clearfield County Prepared for: Pennsylvania Department of Environmental Protection March 9, 2005 TABLE OF CONTENTS INTRODUCTION... 1 LOCATION... 2 SEGMENTS ADDRESSED IN THIS TMDL...

More information

LITTLE MILL CREEK WATERSHED TMDL Clarion and Jefferson Counties, Pennsylvania

LITTLE MILL CREEK WATERSHED TMDL Clarion and Jefferson Counties, Pennsylvania LITTLE MILL CREEK WATERSHED TMDL Clarion and Jefferson Counties, Pennsylvania Prepared by: Pennsylvania Department of Environmental Protection October 25, 2005 1 TABLE OF CONTENTS Introduction... 3 Directions

More information

UNNAMED TRIBUTARY TO TROUT RUN TMDL Elk County

UNNAMED TRIBUTARY TO TROUT RUN TMDL Elk County UNNAMED TRIBUTARY 24679 TO TROUT RUN TMDL Elk County Prepared for: Pennsylvania Department of Environmental Protection September 30, 2004 TABLE OF CONTENTS INTRODUCTION... 1 LOCATION... 1 SEGMENTS ADDRESSED

More information

FINAL LOYALSOCK CREEK WATERSHED TMDL Sullivan and Lycoming Counties

FINAL LOYALSOCK CREEK WATERSHED TMDL Sullivan and Lycoming Counties FINAL LOYALSOCK CREEK WATERSHED TMDL Sullivan and Lycoming Counties For Acid Mine Drainage Affected Segments Prepared by the Pennsylvania Department of Environmental Protection February 15, 2005 1 TABLE

More information

CATAWISSA CREEK WATERSHED TMDL Carbon, Columbia, Luzerne, and Schuylkill Counties

CATAWISSA CREEK WATERSHED TMDL Carbon, Columbia, Luzerne, and Schuylkill Counties CATAWISSA CREEK WATERSHED TMDL Carbon, Columbia, Luzerne, and Schuylkill Counties Prepared for: Pennsylvania Department of Environmental Protection March 1, 2003 TABLE OF CONTENTS INTRODUCTION... 1 LOCATION...

More information

RAUSCH CREEK WATERSHED TMDL

RAUSCH CREEK WATERSHED TMDL RAUSCH CREEK WATERSHED TMDL For Acid Mine Drainage Affected Segments Prepared by the Pennsylvania Department of Environmental Protection March 2, 2001 Table of Contents Page Number Table of Contents 2

More information

Craig Run Watershed TMDL Armstrong and Indiana Counties, Pennsylvania

Craig Run Watershed TMDL Armstrong and Indiana Counties, Pennsylvania Craig Run Watershed TMDL Armstrong and Indiana Counties, Pennsylvania Prepared by: Pennsylvania Department of Environmental Protection October 16, 2008 1 TABLE OF CONTENTS Introduction... 4 Directions

More information

FINAL. SOUTH BRANCH BLACKLICK CREEK WATERSHED TMDL Cambria and Indiana Counties. For Acid Mine Drainage Affected Segments.

FINAL. SOUTH BRANCH BLACKLICK CREEK WATERSHED TMDL Cambria and Indiana Counties. For Acid Mine Drainage Affected Segments. FINAL SOUTH BRANCH BLACKLICK CREEK WATERSHED TMDL Cambria and Indiana Counties For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection January 14, 2005

More information

Final SUSQUEHANNA RIVER METALS TMDL Luzerne County

Final SUSQUEHANNA RIVER METALS TMDL Luzerne County Final SUSQUEHANNA RIVER METALS TMDL Luzerne County For Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection February 19, 2009 1 TABLE OF CONTENTS Introduction...

More information

PINE CREEK WATERSHED TMDL Schuylkill County

PINE CREEK WATERSHED TMDL Schuylkill County PINE CREEK WATERSHED TMDL Schuylkill County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection November 10, 2008 1 TABLE OF CONTENTS Introduction...

More information

INFORMATION SHEET. What is being proposed? A TMDL plan to improve the quality of water in the Redbank Creek Watershed.

INFORMATION SHEET. What is being proposed? A TMDL plan to improve the quality of water in the Redbank Creek Watershed. INFORMATION SHEET Proposed Total Maximum Daily Load (TMDL) for the Redbank Creek Watershed in Armstrong, Clarion, Clearfield, and Jefferson Counties Pennsylvania What is being proposed? A TMDL plan to

More information

UNNAMED TRIBUTARY TO THE MONONGAHELA RIVER WATERSHED TMDL Allegheny County

UNNAMED TRIBUTARY TO THE MONONGAHELA RIVER WATERSHED TMDL Allegheny County UNNAMED TRIBUTARY 39422 TO THE MONONGAHELA RIVER WATERSHED TMDL Allegheny County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection June 19, 2008

More information

INFORMATION SHEET. Proposed Total Maximum Daily Load (TMDL) for Stump Creek, Jefferson and Clearfield Counties, Pennsylvania

INFORMATION SHEET. Proposed Total Maximum Daily Load (TMDL) for Stump Creek, Jefferson and Clearfield Counties, Pennsylvania INFORMATION SHEET Proposed Total Maximum Daily Load (TMDL) for Stump Creek, Jefferson and Clearfield Counties, Pennsylvania What is being proposed? A TMDL plan to improve the quality of water in Stump

More information

FINAL WILSON CREEK WATERSHED TMDL Somerset County

FINAL WILSON CREEK WATERSHED TMDL Somerset County FINAL WILSON CREEK WATERSHED TMDL Somerset County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection April 10, 2008 1 TABLE OF CONTENTS Introduction...

More information

What is the purpose of the plan? Why did we choose Raccoon Creek? What pollutants does this TMDL address? Where do the pollutants come from?

What is the purpose of the plan? Why did we choose Raccoon Creek? What pollutants does this TMDL address? Where do the pollutants come from? INFORMATION SHEET Proposed Total Maximum Daily Load (TMDL) for Raccoon Creek Watershed, located in Allegheny, Beaver, and Washington Counties, Pennsylvania What is being proposed? A TMDL is a report that

More information

BEAVERDAM BRANCH WATERSHED TMDL Blair and Cambria Counties

BEAVERDAM BRANCH WATERSHED TMDL Blair and Cambria Counties BEAVERDAM BRANCH WATERSHED TMDL Blair and Cambria Counties Prepared for: Pennsylvania Department of Environmental Protection January 12, 2007 TABLE OF CONTENTS INTRODUCTION... 1 LOCATION... 1 SEGMENTS

More information

Redstone Creek TMDL Fayette County, Pennsylvania. Prepared by:

Redstone Creek TMDL Fayette County, Pennsylvania. Prepared by: Redstone Creek TMDL Fayette County, Pennsylvania Prepared by: November 30, 2008 1 TABLE OF CONTENTS Introduction...4 Directions to the Redstone Creek Watershed...7 Segments addressed in this TMDL...7 Clean

More information

BEAVERDAM BRANCH WATERSHED TMDL Blair and Cambria Counties

BEAVERDAM BRANCH WATERSHED TMDL Blair and Cambria Counties BEAVERDAM BRANCH WATERSHED TMDL Blair and Cambria Counties Prepared for: Pennsylvania Department of Environmental Protection March 8, 2007 TABLE OF CONTENTS INTRODUCTION... 1 LOCATION... 1 SEGMENTS ADDRESSED

More information

TURTLE CREEK WATERSHED TMDL Allegheny and Westmoreland Counties

TURTLE CREEK WATERSHED TMDL Allegheny and Westmoreland Counties TURTLE CREEK WATERSHED TMDL Allegheny and Westmoreland Counties For Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection June 29, 2009 1 TABLE OF CONTENTS Introduction...

More information

Revised. North Branch Bear Creek Watershed TMDL Butler County, Pennsylvania

Revised. North Branch Bear Creek Watershed TMDL Butler County, Pennsylvania Revised North Branch Bear Creek Watershed TMDL Butler County, Pennsylvania Prepared by: Pennsylvania Department of Environmental Protection June 25, 2008 1 TABLE OF CONTENTS Administrative Summary...4

More information

DRAFT. STREETS RUN WATERSHED TMDL Allegheny County. For Acid Mine Drainage Affected Segments. Prepared by:

DRAFT. STREETS RUN WATERSHED TMDL Allegheny County. For Acid Mine Drainage Affected Segments. Prepared by: STREETS RUN WATERSHED TMDL Allegheny County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection December 27, 2007 1 TABLE OF CONTENTS Introduction...

More information

LACKAWANNA RIVER WATERSHED TMDL Lackawanna, Luzerne, Susquehanna, and Wayne Counties

LACKAWANNA RIVER WATERSHED TMDL Lackawanna, Luzerne, Susquehanna, and Wayne Counties LACKAWANNA RIVER WATERSHED TMDL Lackawanna, Luzerne, Susquehanna, and Wayne Counties Prepared for: Pennsylvania Department of Environmental Protection March 9, 2005 TABLE OF CONTENTS INTRODUCTION... 1

More information

Pennsylvania s TMDL Program

Pennsylvania s TMDL Program Pennsylvania s TMDL Program Restoring water quality (June 2003) What is a TMDL? A Total Maximum Daily Load (TMDL) is the amount of pollutant loading that a waterbody can assimilate and meet our water quality

More information

INFORMATION SHEET. Proposed Total Maximum Daily Load (TMDL) for the Daguscahonda Run Watershed, located in Elk County, Pennsylvania

INFORMATION SHEET. Proposed Total Maximum Daily Load (TMDL) for the Daguscahonda Run Watershed, located in Elk County, Pennsylvania INFORMATION SHEET Proposed Total Maximum Daily Load (TMDL) for the Daguscahonda Run Watershed, located in Elk County, Pennsylvania What is being proposed? A TMDL is a report that documents the pollution

More information

What is the purpose of the plan? Why did we choose Raccoon Creek? What pollutants does this TMDL address? Where do the pollutants come from?

What is the purpose of the plan? Why did we choose Raccoon Creek? What pollutants does this TMDL address? Where do the pollutants come from? INFORMATION SHEET Proposed Total Maximum Daily Load (TMDL) for Harmon Creek, located in Hanover, Smith, Mount Pleasant, Robinson, Findlay, Independence, and Raccoon Townships, Allegheny, Beaver, and Washington

More information

SEWICKLEY CREEK WATERSHED TMDL Westmoreland County

SEWICKLEY CREEK WATERSHED TMDL Westmoreland County SEWICKLEY CREEK WATERSHED TMDL Westmoreland County For Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection March 12, 2009 1 TABLE OF CONTENTS Introduction...

More information

MONTOUR RUN WATERSHED TMDL Allegheny County

MONTOUR RUN WATERSHED TMDL Allegheny County MONTOUR RUN WATERSHED TMDL Allegheny County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection September 27, 2004 1 TABLE OF CONTENTS Introduction...

More information

LYCOMING CREEK TRIBUTARIES ATMOSPHERIC DEPOSITION TMDL Lycoming County

LYCOMING CREEK TRIBUTARIES ATMOSPHERIC DEPOSITION TMDL Lycoming County LYCOMING CREEK TRIBUTARIES ATMOSPHERIC DEPOSITION TMDL Lycoming County Prepared for: Pennsylvania Department of Environmental Protection November 29, 2012 TABLE OF CONTENTS INTRODUCTION... 1 Location...

More information

BUFFALO CREEK WATERSHED TMDL Somerset County

BUFFALO CREEK WATERSHED TMDL Somerset County BUFFALO CREEK WATERSHED TMDL Somerset County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection January 15, 2009 1 TABLE OF CONTENTS Introduction...

More information

FINAL. ALDER RUN WATERSHED TMDL Clearfield County. For Acid Mine Drainage Affected Segments. Prepared by:

FINAL. ALDER RUN WATERSHED TMDL Clearfield County. For Acid Mine Drainage Affected Segments. Prepared by: FINAL ALDER RUN WATERSHED TMDL Clearfield County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection June 8, 2005 1 TABLE OF CONTENTS Introduction...

More information

FINAL. STUMP CREEK WATERSHED TMDL Jefferson and Clearfield Counties

FINAL. STUMP CREEK WATERSHED TMDL Jefferson and Clearfield Counties FINAL STUMP CREEK WATERSHED TMDL Jefferson and Clearfield Counties For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection March 1, 2007-1 - TABLE OF CONTENTS

More information

Final ROCK RUN WATERSHED TMDL Cambria County

Final ROCK RUN WATERSHED TMDL Cambria County Final ROCK RUN WATERSHED TMDL Cambria County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection December 1, 2008 1 TABLE OF CONTENTS Introduction...

More information

INFORMATION SHEET. Proposed Total Maximum Daily Load (TMDL) for Bens Creek, located in Portage and Washington Townships, Cambria County, Pennsylvania

INFORMATION SHEET. Proposed Total Maximum Daily Load (TMDL) for Bens Creek, located in Portage and Washington Townships, Cambria County, Pennsylvania INFORMATION SHEET Proposed Total Maximum Daily Load (TMDL) for Bens Creek, located in Portage and Washington Townships, Cambria County, Pennsylvania What is being proposed? A TMDL is a report that documents

More information

IMPLEMENTATION PLAN FOR JOHNSON CREEK

IMPLEMENTATION PLAN FOR JOHNSON CREEK IMPLEMENTATION PLAN FOR JOHNSON CREEK TIOGA COUNTY, PENNSYLVANIA Prepared for: The Arnot Sportsmen Association, Inc. P.O. Box 142 Arnot, PA 16911 Prepared by: Alder Run Engineering, LLC Civil & Environmental

More information

NEWPORT CREEK WATERSHED AMD TMDL Luzerne County

NEWPORT CREEK WATERSHED AMD TMDL Luzerne County NEWPORT CREEK WATERSHED AMD TMDL Luzerne County Prepared for: Pennsylvania Department of Environmental Protection February 5, 2009 TABLE OF CONTENTS INTRODUCTION... 1 Location... 1 Hydrology, Geology and

More information

IMPLEMENTATION PLAN FOR HUBLER RUN

IMPLEMENTATION PLAN FOR HUBLER RUN IMPLEMENTATION PLAN FOR HUBLER RUN CLEARFIELD COUNTY, PENNSYLVANIA Prepared for: The West Branch Sportsman s Association, Inc. 2657 Schoonover Road Kylertown, PA 16847 Prepared by: Alder Run Engineering

More information

Shamokin Creek Watershed TMDL

Shamokin Creek Watershed TMDL Shamokin Creek Watershed TMDL Prepared for: Bureau of Watershed Conservation Pennsylvania Department of Environmental Protection Prepared by: Pottsville District Mining Office Bureau of District Mining

More information

Anderson Creek TMDL West Branch Susquehanna River Clearfield County, Pennsylvania. Prepared By:

Anderson Creek TMDL West Branch Susquehanna River Clearfield County, Pennsylvania. Prepared By: Anderson Creek TMDL West Branch Susquehanna River Clearfield County, Pennsylvania Prepared By: December 1, 2014 i TABLE OF CONTENTS INTRODUCTION... 1 DIRECTIONS TO THE ANDERSON CREEK WATERSHED... 4 SEGMENTS

More information

Final Total Maximum Daily Load for the Monongahela River, Greene County PCBs and Chlordane

Final Total Maximum Daily Load for the Monongahela River, Greene County PCBs and Chlordane Final Total Maximum Daily Load for the Monongahela River, Greene County PCBs and Chlordane Point Marion Lock and Dam to Grays Landing Lock and Dam March 1, 1999 Table of Contents Introduction Background

More information

EXISTING AND READILY AVAILABLE DATA

EXISTING AND READILY AVAILABLE DATA EXISTING AND READILY AVAILABLE DATA The Bureau of Clean Water s Water Quality Division is seeking data for consideration in the 2018 303(d) assessment process. Data will be accepted until September 30

More information

March 20, 2007 Catawissa Creek Watershed Restoration Plan Update Addressing the TMDL

March 20, 2007 Catawissa Creek Watershed Restoration Plan Update Addressing the TMDL March 20, 2007 Catawissa Creek Watershed Restoration Plan Update Addressing the TMDL Identification and Summary of Problem and Pollution Sources The Catawissa Creek watershed is a very rural, relatively

More information

Ohio Environmental Protection Agency (Ohio EPA) Fact Sheet For. National Pollutant Discharge Elimination System (NPDES)

Ohio Environmental Protection Agency (Ohio EPA) Fact Sheet For. National Pollutant Discharge Elimination System (NPDES) NPDES Permit No.OHM000004 Ohio Environmental Protection Agency (Ohio EPA) Fact Sheet For National Pollutant Discharge Elimination System (NPDES) General Permit for Discharges Associated with Coal Surface

More information

Qualified Hydrologic Unit Plan Process. Todd Wood, P.E. Bureau of Abandoned Mine Reclamation Wilkes Barre District Office

Qualified Hydrologic Unit Plan Process. Todd Wood, P.E. Bureau of Abandoned Mine Reclamation Wilkes Barre District Office Qualified Hydrologic Unit Plan Process Todd Wood, P.E. Bureau of Abandoned Mine Reclamation Wilkes Barre District Office HISTORY 5,543 stream miles impaired by AMD 1990 Amendment to SMCRA Allowed for up

More information

BUREAU OF CLEAN WATER OUTSIDE AGENCY DATA AND QUALITY ASSURANCE REQUIREMENTS

BUREAU OF CLEAN WATER OUTSIDE AGENCY DATA AND QUALITY ASSURANCE REQUIREMENTS BUREAU OF CLEAN WATER OUTSIDE AGENCY DATA AND QUALITY ASSURANCE REQUIREMENTS JULY 2013 WATER QUALITY ASSESSMENT 305(b) Report/ 303(d) List EXISTING AND READILY AVAILABLE DATA MINIMAL DATA REQUIREMENTS

More information

The Total Maximum Daily Load (TMDL) Program in Illinois. Watershed Management Section Bureau of Water

The Total Maximum Daily Load (TMDL) Program in Illinois. Watershed Management Section Bureau of Water The Total Maximum Daily Load (TMDL) Program in Illinois Watershed Management Section Bureau of Water Illinois EPA TMDL Program Illinois Integrated Water Quality Report What is a TMDL The TMDL Process 11/10/2014

More information

Reclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act Application

Reclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act Application COMMONWEALTH OF PENNSYLVANIA DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION Reclamation Project or Water Pollution Abatement Project under the Environmental Good Samaritan Act

More information

Susquehanna River Basin Commission Bear Run Watershed Renaissance Mine Drainage Restoration Project

Susquehanna River Basin Commission Bear Run Watershed Renaissance Mine Drainage Restoration Project Susquehanna River Basin Commission Bear Run Watershed Renaissance Mine Drainage Restoration Project Publication 290 December 2013 INTRODUCTION T he Bear Run Watershed drains an area of about 19.3 square

More information

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION. Coal Refuse Disposal - Site Selection DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF MINING AND RECLAMATION DOCUMENT NUMBER: 563-2113-660 TITLE: Coal Refuse Disposal - Site Selection EFFECTIVE DATE: February 8, 1999 AUTHORITY: The Coal Refuse

More information

TOTAL MAXIMUM DAILY LOAD (TMDL)

TOTAL MAXIMUM DAILY LOAD (TMDL) TOTAL MAXIMUM DAILY LOAD (TMDL) For ph In Crab Orchard Creek Located In The Cumberland & Morgan County, Tennessee Prepared by: Tennessee Department of Environment and Conservation Division of Water Pollution

More information

Final Total Maximum Daily Load for the Susquehanna River, PCBs

Final Total Maximum Daily Load for the Susquehanna River, PCBs Final Total Maximum Daily Load for the Susquehanna River, PCBs PA Route 92 bridge at Falls to confluence with West Branch Susquehanna River March 12, 1999 Table of Contents Introduction Background TMDL

More information

SOUTH BRANCH SUBWATERSHED

SOUTH BRANCH SUBWATERSHED SOUTH BRANCH SOUTH BRANCH SUBWATERSHED The South Branch Subwatershed includes the South Branch drainage area plus all the drainage area along the main stream to the south from the mouth of Surrena Run

More information

Hunters Creek Watershed TMDL Juniata County, Pennsylvania. Prepared by:

Hunters Creek Watershed TMDL Juniata County, Pennsylvania. Prepared by: Hunters Creek Watershed TMDL Juniata County, Pennsylvania Prepared by: May, 2012 TABLE OF CONTENTS EXECUTIVE SUMMARY... 4 TABLE 1. SUMMARY OF TMDL FOR HUNTERS CREEK WATERSHED IN LBS./YR. & LBS./DAY...

More information

Quittapahilla Creek Watershed Implementation Plan

Quittapahilla Creek Watershed Implementation Plan Quittapahilla Creek Watershed Implementation Plan Introduction Founded in 1997, the Quittapahilla Creek Watershed Association has been working with landowners, private organizations and public agencies

More information

Advanced Planning Tools for Optimization of AMD Treatment

Advanced Planning Tools for Optimization of AMD Treatment Advanced Planning Tools for Optimization of AMD Treatment Jon Fripp, P.E., Hydraulic Engineer US Army Corps of Engineers, Baltimore District Baltimore, MD James M. Stiles, Ph.D., P.E., Environmental Engineer

More information

Black Branch Acid Mine Drainage Remediation. ADEM Nonpoint Source Conference January 15,2015

Black Branch Acid Mine Drainage Remediation. ADEM Nonpoint Source Conference January 15,2015 Black Branch Acid Mine Drainage Remediation Project ADEM Nonpoint Source Conference January 15,2015 Black Branch Small Watershed Drains approximately 3.3 square Miles Mulberry Fork Watershed Lost Creek

More information

Decision Rationale. Total Maximum Daily Load for Phosphorus for the Sassafras River, Cecil and Kent Counties, Maryland 4/1/2002

Decision Rationale. Total Maximum Daily Load for Phosphorus for the Sassafras River, Cecil and Kent Counties, Maryland 4/1/2002 Decision Rationale I. Introduction Total Maximum Daily Load for Phosphorus for the Sassafras River, Cecil and Kent Counties, Maryland 4/1/2002 The Clean Water Act (CWA) requires a Total Maximum Daily Load

More information

Final TMDL Implementation Plan. Prepared for Minnesota Pollution Control Agency

Final TMDL Implementation Plan. Prepared for Minnesota Pollution Control Agency Wirth Lake Final TMDL Implementation Plan Prepared for Minnesota Pollution Control Agency September 2010 4700 West 77 th Street Minneapolis, MN 55435-4803 Phone: (952) 832-2600 Fax: (952) 832-2601 wq-iw11-03c

More information

Division of Surface Water Response to Comments

Division of Surface Water Response to Comments Division of Surface Water Project: Enon Sand and Gravel, LLC receipt of a National Pollutant Discharge Elimination System permit application Ohio EPA ID #: (1IJ00141) Agency Contacts for this Project Division

More information

Annex A ENVIRONMENTAL PROTECTION PART I. DEPARTMENT OF ENVIRONMENTAL PROTECTION PROTECTION OF NATURAL RESOURCES ARTICLE II.

Annex A ENVIRONMENTAL PROTECTION PART I. DEPARTMENT OF ENVIRONMENTAL PROTECTION PROTECTION OF NATURAL RESOURCES ARTICLE II. Annex A TITLE 25. ENVIRONMENTAL PROTECTION PART I. DEPARTMENT OF ENVIRONMENTAL PROTECTION Subpart C. PROTECTION OF NATURAL RESOURCES ARTICLE II. WATER RESOURCES CHAPTER 95. WASTEWATER TREATMENT REQUIREMENTS

More information

Overview of PADEP 2014 Integrated List of All Waters (from Draft 2014 Pennsylvania Integrated Water Quality Monitoring and Assessment Report )

Overview of PADEP 2014 Integrated List of All Waters (from Draft 2014 Pennsylvania Integrated Water Quality Monitoring and Assessment Report ) Overview of PADEP 2014 Integrated List of All Waters (from Draft 2014 Pennsylvania Integrated Water Quality Monitoring and Assessment Report ) Background PADEP uses an integrated format for Clean Water

More information

Jordan River TMDL Update

Jordan River TMDL Update Jordan River TMDL Update 2010 Watershed Symposium August 4 th, 2010 Hilary N. Arens Utah Division of Water Quality Jordan River TMDL Outline What is a TMDL and what is the Jordan impaired for? Evaluation

More information

(3) Location, type, significance and interaction of pollutant sources;

(3) Location, type, significance and interaction of pollutant sources; ACTION: Original DATE: 11/14/2018 12:45 PM TO BE RESCINDED 3745-2-12 Total maximum daily loads. [Comment: For dates of non-regulatory government publications, publications of recognized organizations and

More information

Limestone Run Watershed TMDL Northumberland County and Montour County, Pennsylvania. Prepared by:

Limestone Run Watershed TMDL Northumberland County and Montour County, Pennsylvania. Prepared by: Limestone Run Watershed TMDL Northumberland County and Montour County, Pennsylvania Prepared by: February 2013 TABLE OF CONTENTS EXECUTIVE SUMMARY... 4 TABLE 1. SUMMARY OF TMDL FOR LIMESTONE RUN WATERSHED

More information

Summary of Basin Characteristics and Facilities. General Land-use Characteristics: Withdrawal and Discharge Sites: Sampling Site Statistics:

Summary of Basin Characteristics and Facilities. General Land-use Characteristics: Withdrawal and Discharge Sites: Sampling Site Statistics: -Digit Watershed Identity Number: 28 This report was prepared by the Kentucky Water Research Institute as a product of the statewide Kentucky Watershed Management process. Information presented in this

More information

Final Total Maximum Daily Load Allegheny River, Allegheny County PCBs

Final Total Maximum Daily Load Allegheny River, Allegheny County PCBs Final Total Maximum Daily Load Allegheny River, Allegheny County PCBs Lock and Dam 3 to mouth March 1, 1999 Revised March 12, 1999 Table of Contents Introduction Background TMDL Development TMDL Implementation

More information

Water Is Not a Pollutant

Water Is Not a Pollutant Water Is Not a Pollutant Jeff R. Bowman, MSPH, CHMM Texas A&M Engineering Extension Service September 17, 2013 What is Stormwater Runoff? Texas Definition: Rainfall runoff, snow melt runoff, and surface

More information

THE SUGAR CREEK COAL REFUSE PILE AND MINE DRAINAGE DISCHARGE RECLAMATION PROJECT

THE SUGAR CREEK COAL REFUSE PILE AND MINE DRAINAGE DISCHARGE RECLAMATION PROJECT THE SUGAR CREEK COAL REFUSE PILE AND MINE DRAINAGE DISCHARGE RECLAMATION PROJECT Eric E. Cavazza, P.E., Thomas C. Malesky, P.E., and Pamela J. Milavec Pennsylvania Department of Environmental Protection

More information

FINAL BACTERIA TOTAL MAXIMUM DAILY LOADS FOR STREAMS IN THE UPPER CIMARRON RIVER AREA, OKLAHOMA. Prepared By:

FINAL BACTERIA TOTAL MAXIMUM DAILY LOADS FOR STREAMS IN THE UPPER CIMARRON RIVER AREA, OKLAHOMA. Prepared By: FINAL BACTERIA TOTAL MAXIMUM DAILY LOADS FOR STREAMS IN THE UPPER CIMARRON RIVER AREA, OKLAHOMA Prepared By: OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY FINAL BACTERIA TOTAL MAXIMUM DAILY LOADS FOR STREAMS

More information

2013 MINERAL TOTAL MAXIMUM DAILY LOADS FOR RUSH CREEK WATERSHED, OKLAHOMA (OK310810)

2013 MINERAL TOTAL MAXIMUM DAILY LOADS FOR RUSH CREEK WATERSHED, OKLAHOMA (OK310810) DRAFT 2013 MINERAL TOTAL MAXIMUM DAILY LOADS FOR RUSH CREEK WATERSHED, OKLAHOMA (OK310810) Prepared for: OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY Prepared by: JULY 2013 DRAFT 2013 MINERAL TOTAL MAXIMUM

More information

3. Engage stakeholders as active participants in developing effective, long-term water resource management objectives and strategies.

3. Engage stakeholders as active participants in developing effective, long-term water resource management objectives and strategies. Guidelines for Developing an Integrated Resource Plan Under the Delaware River Basin Commission Southeastern Pennsylvania Ground Water Protected Area Regulations September 25, 2002 A. Introduction Integrated

More information

APPENDIX C Technical Approach Used to Generate Maximum Daily Loads

APPENDIX C Technical Approach Used to Generate Maximum Daily Loads APPENDIX C Technical Approach Used to Generate Maximum Daily Loads Summary This appendix documents the technical approach used to define maximum daily loads of TSS consistent with the average annual TMDL,

More information

Organization. Department of Natural Resources. Division of Reclamation Mining & Safety. Office of Active Mines. Office of Inactive Mines

Organization. Department of Natural Resources. Division of Reclamation Mining & Safety. Office of Active Mines. Office of Inactive Mines Organization Department of Natural Resources Division of Reclamation Mining & Safety Office of Active Mines Office of Inactive Mines Coal Program Minerals Program Abandoned Mined Lands Mine Safety Colorado

More information

Keystone and Rising Star Mines Shasta County, California

Keystone and Rising Star Mines Shasta County, California CASE STUDY Keystone and Rising Star Mines Shasta County, California August 2010 Prepared by The Interstate Technology & Regulatory Council Mining Waste Team Permission is granted to refer to or quote from

More information

Implementation Guidelines for the AMD Set-Aside Program in Pennsylvania. By Pam Milavec and Eric Cavazza Bureau of Abandoned Mine Reclamation

Implementation Guidelines for the AMD Set-Aside Program in Pennsylvania. By Pam Milavec and Eric Cavazza Bureau of Abandoned Mine Reclamation Implementation Guidelines for the AMD Set-Aside Program in Pennsylvania By Pam Milavec and Eric Cavazza Bureau of Abandoned Mine Reclamation July 15, 2009 The Surface Mining Control and Reclamation Act

More information

JEFFERSON RIVER METALS TMDL PROJECT. Public Meeting October 14, 2014 Whitehall, MT

JEFFERSON RIVER METALS TMDL PROJECT. Public Meeting October 14, 2014 Whitehall, MT JEFFERSON RIVER METALS TMDL PROJECT Public Meeting October 14, 2014 Whitehall, MT Presentation Outline Jefferson River Metals Project Area TMDL Basics Metals TMDL Development Next Steps Public Comment

More information

ACID MINE DRAINAGE TREATMENT IN GREENS RUN BY AN ANOXIC LIMESTONE DRAIN

ACID MINE DRAINAGE TREATMENT IN GREENS RUN BY AN ANOXIC LIMESTONE DRAIN ACID MINE DRAINAGE TREATMENT IN GREENS RUN BY AN ANOXIC LIMESTONE DRAIN Introduction Troy Titchenell and Jeff Skousen Anker Energy and West Virginia University From its headwaters in Pocahontas, Randolph

More information

Shaina Keseley MPCA-Rochester Watershed Project Manager

Shaina Keseley MPCA-Rochester Watershed Project Manager Shaina Keseley MPCA-Rochester Watershed Project Manager Why study Minnesota s waters? Basis of Clean Water work: Federal Clean Water Act of 1972 Goal Fishable/Swimmable by 1983 MPCA completes work for

More information

2012 Nutrient Regulations Update

2012 Nutrient Regulations Update 2012 Nutrient Regulations Update OWEA Government Affairs Workshop March 1, 2012 Guy Jamesson, PE, BCEE Malcolm Pirnie, The Water Division of ARCADIS Imagine the result Agenda Nutrient impacts Nutrient

More information

BACTERIA TOTAL MAXIMUM DAILY LOADS FOR STREAMS IN SALT CREEK AREA, OKLAHOMA

BACTERIA TOTAL MAXIMUM DAILY LOADS FOR STREAMS IN SALT CREEK AREA, OKLAHOMA FINAL BACTERIA TOTAL MAXIMUM DAILY LOADS FOR STREAMS IN SALT CREEK AREA, OKLAHOMA Prepared By: OKLAHOMA DEPARTMENT OF ENVIRONMENTAL QUALITY AUGUST 31, 2009 FINAL BACTERIA TOTAL MAXIMUM DAILY LOADS FOR

More information

Final Laurel Run Watershed TMDL Clearfield County

Final Laurel Run Watershed TMDL Clearfield County Final Laurel Run Watershed TMDL Clearfield County For Acid Mine Drainage Affected Segments Prepared by: Pennsylvania Department of Environmental Protection April 2, 2007 TABLE OF CONTENTS FIGURES Introduction...

More information