1 Exhibit AGP-1 Table 5: Projected Demand and Energy Savings Broken ut by PrograPn?gfbFLVA Customer Class 218 Projected Savings (at meter Customer Class and Program k kh Commercial 11,27 18,15,152 Commercial SP 7 3,66, Small Commercial Solutions MTP 73 3,197,4 Large C&I Solutions MTP 2,11 8,88,18 Texas SCRE MTP 7 2,759,4 Load Management SP 7, 14, Commercial Rebate Pilot Program 66 26,172 Residential 558 2,74,19 Residential Solutions MTP ,336 Livin ise MTP 14 1,341,683 Hard-to-Reach 8 1,51,2 Hard-to-Reach Solutions MTP 8 1,51,2 Total 12,565 21,23,371 Projected Savings 217 (at meter Customer Class and Program k kh Commercial 11,25 18, 9,26 Commercial SP 684 2,995,92 Small Commercial Solutions MTP 73 3,197,4 Large C&I Solutions MTP 2,11 8,88,18 Texas SCRE MTP 75 2,956,5 Load Management SP 7, 14, Commercial Rebate Pilot Program 3 118,26 Residential 618 1,778,77 Residential Solutions MTP ,336 Livi isek MTP 2 1,45,741 Hard-to-Reach 8 1,51,2 Hard-to-Reach Solutions MTP 8 1,51,2 I 'Total 12,623 2,919,537 El Paso Electric Company Energy Efficiency Plan and Report 75

2

3 IV. Program Budgets Exhibit AGP-1 Page 18 of 41 Table 6 presents the total proposed budget allocations required to achieve EPE's projected demand reduction and energy savings shown in Table 5. The budget allocations are broken down by customer class, program, and the different budget categories: incentive payments, administration and research and development (R&D) expenses. Table 6 also includes the estimated annual expenses for the statewide EM&V contractor and the EECRF proceeding expenses. EPE has made some modifications to the individual program budgets that were identified in the 215 EEPR, but, as shown in Table 6, the overall program budget for 216 remains at $4,384,65. These modifications were made because the third party implementer of EPE's Appliance Recycling Program was placed into receivership on ovember 18, 215. Accordingly, EPE discontinued the Appliance Recycling Program at that time and the funds for 216 were re-distributed to the Commercial SP and the Texas SCRE MTP and the demand goals for these programs were adjusted. The number of customers in each of the customer classes shown in Table 3 was considered in budget allocations for those classes. EPE first ensured that the 5% goal for Hard-to-Reach customers was met and then allocated the remaining funding to the residential and commercial classes. A variety of additional factors and assumptions also went into the decision process. Hard-to-Reach customers are residential customers at or below 2% of the Federal Poverty Guidelines. This is estimated to be approximately 11,551 customers, or 37.2% of EPE's total residential load in Texas (see Footnote 4). Avoided costs for 216, as established by the PUCT, were set at $8 per k per year and $.588 per kh. As directed in the EE Rule, EPE will limit administrative costs to a maximum of 15% of the total program costs and R&D costs to a maximum of 1% of the total program costs; however, the cumulative cost of administration and R&D will not exceed 2% of EPE's total program costs. EPE used a 6.613% post-tax discount rate to calculate the present value of the avoided cost associated with a project and assumed a 2% escalation rate. For simplicity, it is assumed that an EESP that completes an energy efficiency project in a given year receives all the incentives associated with that project in that year. Administration costs, however, may be committed in one year and expended in another. EPE will offer a portfolio of SPs, MTPs and one self-delivered program that will be available to all eligible customer classes_ It should be noted, however, that the actual distribution of the goal and budget must remain flexible based upon the response of the marketplace, the potential interest of customer classes towards specific programs, and the overriding objective of meeting the legislative goal. Should funds not be reserved and used as prescribed by program milestones, EPE reserves the right to reallocate those unused funds to other programs in order to maximize contributions towards EPE's energy efficiency goal. El Paso Electric Company Energy Efficiency Plan and Report 76

4

5 Exhibit AGP-1 Table 6: Proposed Annual Budget Broken ut by Program for Each Customer ClasPsage 19 of Incentives Admin & R&D Total Budget Commercial $3,68,75 $5,555 $3,118, 63 Commercial SP $431, $4, $471, Small Commercial Solutions MTP $461,115 $ $461,115 Large C&I Solutions MTP $1,5,396 $ $1,5,396 Texas SCRE MTP $615,569 $ $615,569 Load Management SP $46, $ $46, Commercial Rebate Pilot Program $94,995 $1,555 $15,55 Residential $576,346 $ $576,346 Residential Solutions MTP $23, $ $23, Livin isea MTP $346,346 $ $346,346 Hard-to-Reach $6, $ $6, Hard-to-Reach Solutions MTP $6, $ $6, Administration $89,674 $89,674 Subtotal Budgets $4,244,421 $14,229 $4,384,65 EM&V (Est PY215 Review nly) $51,29 $51,29 EECRF Proceeding Expenses $85, $85, Total Budgets $4,244,421 $276,519 $4,52, Incentives Admin & R&D Total Budget Commercial $3,68,75 $46, $3,114,75 Commercial SP $391,995 $4, $431,995 Small Commercial Solutions MTP $461,115 $ $461,115 Large C&1 Solutions MTP $1,5,396 $ $1,5,396 Texas SCRE MTP $74,569 $ $74,569 Load Management SP $46, $ $46, Commercial Rebate Pilot Program $45, $6, $51, Residential $576,346 $ $576,346 Residential Solutions MTP $23, $ $23, Livin ise MTP $346,346 $ $346,346 Hard-to-Reach $6, $ $6, Hard-to-Reach Solutions MTP $6, $ $6, Administration $94,229 $94,229 Research and Develo pment $1, $1, Subtotal Budgets $4,244,421 $15,229 $4,394,65 EM&V (PUCT - no contract for EM&V) $ $ EECRF Proceeding Expenses $85, $85, Total Budgets $4,244,421 $235,229 $4,479,65 El Paso Electric Company Energy Efficiency Plan and Report 77

6

7 EERGY EFFICIECY REPRT Exhibit AGP-1 Page 2 of 41 V. Historical Demand Goals and Energy Targets for Previous Five Years Table 7 documents EPE's actual demand reduction goals and energy targets for the previous five years ( ) calculated in accordance with 16 TAC Table 7: Historical Demand Savings Goals and Energy Targets ( at Meter) Calendar Year Demand Goals (M) Energy Targets (Mh ) Actual Demand Reduction (M) Actual Energy Savings (Mh ) , , , , ; 19, , " , , , , M goal and Mh target as reported in EPE's EEPR filed April 1, 215 under Project o demand reduction and actual energy savings reported in this document, Project o M goal and Mh target as reported in EPE's EEPR filed April 1, 214 under Project o demand reduction and actual energy savings reported in this document, Project o M goal and Mh target as reported in EPE's EEPR filed March 29, 213 under Project o demand reduction and actual energy savings reported in Project o M goal and Mh target as reported in EPE's EEPR filed March 3, 212 under Project o demand reduction and energy savings modified pursuant to settlement of Docket o M goal and Mh target as reported in EPE's EEPR filed April 1, 211 under Project o demand reduction and energy savings modified pursuant to settlement of Docket o El Paso Electric Company

8

9 VI. Projected, Reported and Verified Demand and Energy Savi ibit AGP-1 age 21 of 41 Revised Table 8: Projected versus Reported Savings for 214 and 215 (at Meter) 214 Projected Savings Reported and Verified Savin s Customer Class and Program M Mh M Mh Commercial , ,977 Commercial SP.6 2, ,197 Small Comm. Solutions MTP.73 3, ,124 Large C&I Solutions MTP 1.8 7, ,633 Texas SCRE MTP.5 1, Load Management SP Commercial Rebate Pilot Program Residential.46 2, Residential Solutions MTP Livin ise' MTP.6 1, Hard-to-Reach.8 1, ,75 Hard-to-Reach Solutions MTP.8 1, ,75 Residential / Commercial.443 1, ,91 Appliance Recycling MTP.22 1, ,591 Solar PV Pilot MTP Total , , Projected Savings Reported and Verified Savin Customer Class and Program M Mh M Mh Commercial , ,263 Commercial SP.6 2, ,897 Small Comm. Solutions MTP.73 3, ,7 Large C&1 Solutions MTP 1.8 7, ,54 Texas SCRE MTP.5 1, ,775 Load Management SP Commercial Rebate Pilot Program Residential.54 2, ,767 Residential Solutions MTP Livin ise"" MTP.14 1, ,166 Hard-to-Reach.8 1, ,48 Hard-to-Reach Solutions MTP.8 1, ,48 Residential / Commercial.443 1, ,773 Appliance Recycling MTP.22 1, ,235 Solar PV Pilot MTP Total , ,283 El Paso Electric Company Energy Efficiency Plan and Report 79

10

11 ac`a.c E ' 5 v_ c cn Iq V Q 4- U D Co V RS Lt'! m m w CL C fn w cm U CL :,, tp 7.- U.E... r_ a ca m 3 -L af -ft-u) Zn > a) CL Q X C w (D +-' > o '6 Cy cn c '- cc cn QYE c d x c x o v C V7 1 &- cs C' :3 3 (j) C c"i Q j C > C X - ar-) ow > E C L = C na Q E R a_ EY a? e 'v o U) co Z E (o cv ca = = F- U -.I- H M m _ o o co _ Q o w m o co a co a td z e'f M. M E cd (D a T Ln a ~ it w ir3 w o P. co V n < cc ( d C ao _ n t- d T M ( m m M tf) z f tc) Ae r M C'S h + ' f Q) C 'Q f Ql Qf ) r C ) Cl Li) C _ C to C GD r D C - to Y V 1 C C C d ) V to Gfl Lp Ln M td M h ( fh Hf M M M 4 V' at _ T -C V# ffl fa EA fa Y4 V) EA tfl fa d V) a v o o c co c 611) d3 613, <fl EA Vi 6s ell to d o at co co d Q w 4 to 4Ṉ 11 1p m n ( ) P 1 C < L f- r- P7 tf) tl) I- d! 'V _ z r a3 r 6) C') It m C L D_ co co d tf! 1Q C P' C) C) 1 Ili Lf) lf>. w s it " " v co t7 Co Do ( f d V {! f ) r (A L (p ' el ER fa (A m d3 to c ) H3 69 fa w t C d EH k Hf 69 C f am t Mi M d o o C CD Yf V) M M C T EA 69 fa to V% Yi fa H# M V Q7 V Z td u) 1.- C7 M t+] C t fa b9 M p r L L!) L() td _ ED co Co M r co C < co M C9 Co f- t C M M C7 d C t Z t wi ( C) I + M co 1- M!'M t r!' d t fd f (M P h It d [ t tt co M1 ) V to R M M V I ' ' C t a 4 T f V L; C ) i to It ER fa 16S A ffi Vl 6 9 w EF 3 69 fa a w w a CD Cl CD r q r U) a L fa to 613 fa fr EA EH fa to Z M U5 H th M M e f» us t+f 3 h Cl cv to co d v a U-) to vs Lp r u U-) co c') V r _ C C Q7 C Qf ) h D -- M Q) tf c'i M - mm z f f -Q ad c m d V' f C9 to 16 P d td t V r a L!) to (D td V. f- co 1[) 1l) ; a C 4 a U Q 1 69 fpr V V E! m n ) d!_ fpr Vi th 44 <fl d9 EA cn m 1A f ) D C. <. ir f!j Efl H3 ER V EA!f)!!f T Ffl r- - Z c7 w C C; w d9 ta 61 L!) I C (V o) h 4 ( v V' C P < h C t IT Co U) Qf to Ir 1- It (`') > ) ( - I C C7 't C) "t V t C 'ff Z D m D td!- co cd r t} V f"! "f y a ID C ) V - V IT tfy U7 M V' 1 d' 'd r M V (M V [) EH V) M 4 U) M EH fa ER 49 E9 M fa fa Ml V tf M V) f/t m a c o) ` d o 4 y m a a v> > w E a o L o, Ua w > o -d d A - a c a u U ad - d E I E - as y a m = En o a. r b P E t6 9 Q1? m n f C i p x a ci U n F- 3 w w FE :3 C (D x G) to V z v a` c Cl CE Ir a w E d (D o m o z U y C: CL C x cn.- w co 6- z U y 7 (D Q. c c d -o E m o w m f 6 4) o z U a7 - x r CL m a C m C m FL U C U_ 7+ 1 ) c to 7+ C C E U t) U w I 8

12

13 VI11. Program Funding and Explanation of Administration Costj 't AGP-1 age 23 of 41 Calendar Year 215 As shown in the subtotal of Table 1, EPE spent $3,955,988 on program expenses (excluding EM&V and EECRF Proceeding Expenses) for its PUCT-approved energy efficiency programs in 215. These programs were funded by EPE's 215 EECRF. These expenses account for 9.2% of the total forecasted program budget for 215 of $4,384,65. The difference between the forecasted program budget and the actual program expenditures is attributed to the Commercial SP, Load Management, Commercial Rebate Pilot Program, and the Appliance Recycling Program not reaching the participation levels anticipated by EPE. Actual program funding levels are shown in Table 1 and Table 11. Administration expenses benefited the entire portfolio. These expenses include, but were not limited to, outsourced program administration, marketing ( i.e. website maintenance and promotional items), Electric Utility Marketing Managers of Texas ( EUMMT) expenses, costs associated with regulatory filings, and EM&V administration expenses outside of the actual cost associated with the PUCT appointed EM&V contractor. El Paso Electric Company Energy Efficiency Plan and Report 81

14

15 T r ov CL -a Q X CL CD co.r y co CD el i > t- tnp p D p C i M M lf T r 1p 1 I,: C6 t T M a L fi p" ap T { C r T tn st RV y tt LL. to ra w 1 6,1 1 1 v u w! r ŌCL m m CL U UL z fr ia!r tl4 V M Y p c4 cd C I- M cd c co T h M r- st I- ao x-- M M co T 1( 'T I- IT Lo T C co T!,32 w qt } M IT T C ) C M C9 d' r co Cr) D 1 D r. r.. d4 v w ifs v? vi 4 u4 w T Y 4) C c _ ti. -C to ti T o T g o r o r r.. co co 1% ce vi - C!M. 4A 41 4 i ip tf) a t co_ h- p v C r. (.. IL ti C D CD C' i C V: t S - C M ti C C r * In L v 'ci' M M C - C M M... ir fr 64& 44 IA M! CV E o C? a - T I 1 t T M M r T r Q,l T T T M (h r T YI r r to C 41 tq V! p Qp) td{ w t17 u) > p ID M tf) Ln 1f!!) _ tn ( co M m C> i co vi 1t) i ( to p F fa 69 fa EA go, to 4m. M Cf C C LL E ea C1 d.q lc F C o a_ tn V rn CL a CL cr) o o (b o E >, U) V` c U rn vy c6 (n C V 4 C C X w C e t, t a K U) c/i d w 6 h ) c a m a C o > C; L U U U) J J V) hp T C m - E U U h id d 82

16

17 C) IT CL o Q UI E L U) cr, V- Q L m w x IL M x w t.. G a+ d f V co r_ 9- U_ C_ C U_ ca U C_ E > C q Co " c Q M Q " a _ - Lt y. ` Q 4) 9 - $ - cv E to E tn L V a p 7 = C C m C C C C L t w v U v _ [S > «p Y a vm A a) U U C) " cc 'D U v) "Fu C C c 'D a p a a c S6 t4 (9 CL p>u L T)U E c6 ), U d (4 (a - ( Z p o o e o o c o p e a o o r- L C M 'I td CD ( ` pp P- cr fl- CD M G 1- C oo u') ) C t It m m IL tp D! h co fv I t 'a Iq Cfl CD C) mr co f G P- ( M C - ( M L Qf v L 1 1- r- h (Q cm 'It e- 'It V V' 'It Q> - Cp C CV h- C') V C r C e- f KS Lf) V T- 1 1i'i rv M r 'cf ) It M U) (V m CD C M CV 1 C M j bq v+ w v). ers L2 c rn co o co o CD u) L o a) r ) C C) to v IT CD qt LA t M ta +f) M co r r D a ar ti Cl ui L o Lri to Co Cl m oi o a co Co CD C) " X) Q'a CD T' Co Ch ' IA c) L C Hf tm to tl4 d4 d), tr fa p LL C f9 C c. U C a T 21 U) C c D- CL E U Eaf CL d C rc' d: (L y 1 2 4, a C - a a d o a c n o a cn o ' of " o c E m i a 6 (n 14 4) ai a, E i i:. V) E > U = d ' ++ U L 11 c fp C U -? E :2 - Gi cn (L 5; E U ca J H J U J I c' d -a o >. C c a E U U a) co a w 83

18

19 IX. Program Results for MTPs and Self-Delivered Program Exhibit AGP-1 Page 26 of 41 A. Market Transformation Programs Small Commercial Solutions MTP In 215, the Small Commercial Solutions MTP provided customers and participating contractors with cash and non-cash incentives. This program targeted commercial customers with a demand of less than 1 k. This program focused on improving the energy efficiency of small commercial facilities, as well as improving the installation practices of participating contractors. EPE contracted with a thirdparty program implementer to provide the non-cash incentives such as technical assistance, education on energy efficiency projects, and communications services to participating customers and contractors. The 215 goal for this program was 73 k. There were 194 projects completed in the Small Commercial Solutions MTP during 215. These projects reduced demand by 672 k and saved 3,7,513 kh in energy. Large C&1 Solutions MTP The Large C&I Solutions MTP was established to test a solutions-based approach toward garnering peak k savings among large commercial customers. Key components of the "solutions" approach included: EPE acting as a third-party unbiased player to assist business customers in identifying energy efficiency opportunities, realizing the financial benefits associated with such opportunities, evaluating contractor bids, and conveying the social and financial benefits by way of internal and community-wide communications efforts. Besides peak demand reduction, this program has also realized success in reaching out to the contracting community, including affiliated architectural and engineering firms. In 215, the Large C&I Solutions MTP provided customers with cash and non-cash incentives. This program targeted commercial customers with a demand of equal to or greater than 1 k. As with the Small Commercial Solutions MTP, EPE contracted with a third-party program implementer to provide non-cash incentives such as technical assistance, education on energy efficiency projects, measurement and verification, and communications services to participating customers. The 215 goal for this program was 1,8 k. There were 259 projects completed in the Large C&I Solutions MTP during 215 that reduced demand by 1,945 k and saved 9,53,826 kh in energy. Texas SCRE MTP As with the previous programs, the 215 Texas SCRE MTP provided customers with cash and noncash incentives. This program targeted schools districts, higher educational facilities and local governmental entities. EPE recognized that many school districts and local governments lack the technical knowledge, first-hand experience, and management decision-making processes that are necessary for identifying, prioritizing and completing projects that improve their facilities' energy performance and reduce operating costs. This program helped these customers identify, prioritize, budget, and complete energy efficiency projects. EPE contracted with a third-party program implementer to provide non-cash incentives such as benchmarking, technical assistance, education on energy efficiency projects, and communications services to participating customers. The 215 goal for this program was 5 k. This program had 44 projects from participating schools and local government entities in the EPE service territory These projects reduced demand by 577 k and saved 2,774,95 kh in energy. El Paso Electric Company Energy Efficiency Plan and Report 84

20

21 Residential Solutions MTP Exhibit AGP-1 Page 27 of 41 In 215, the Residential Solutions MTP offered residential customers, through the use of participating contractors, incentives for making energy efficient improvements to their homes. This program focused on improving the energy efficiency of residential buildings, as well as improving the installation practices of the participating contractors. EPE contracted with a third-party implementer to administer the Residential Solutions MTP The 215 goal for this program was 4 k. There were 938 participants that reduced demand by approximately 4 k and saved 6,956 kh in energy. Livingise MTP The Livingise MTP is an educational program that uses a school-based method that builds student knowledge, provides high energy efficiency devices to families and serves as an effective community outreach program. In 215, each participant received a kit that contained energy saving devices to be installed in their homes, as well as energy efficiency educational materials. The 215 goal for this program was 14 k. In 215, the Livingise"' MTP provided 9,371 Livingise kits. The savings from this program were 223 k in demand savings and 1,165,897 kh in energy savings. Hard-to-Reach Solutions MTP In 215, the Hard-to-Reach Solutions MTP offered residential customers who were at or below 2% of the Federal Poverty Guidelines, through the use of participating contractors, incentives for making energy efficient improvements to their homes. This program focused on improving the energy efficiency of low income residential buildings, as well as improving the installation practices of the participating contractors. EPE contracted with a third-party implementer to administer the Hard-to-Reach Solutions MTP. The 215 goal for this program was 8 k. There were 1,157 projects in this program that reduced demand by 964 k and saved 1.479,742 kh in energy. Appliance Recycling MTP In 215, the Appliance Recycling MTP provided incentives to encourage EPE customers to recycle their older, less efficient refrigerators and freezers. This program removed these appliances from the electric grid, thus reducing system-wide load and peak demand. The 215 goal for this program was 22 k. EPE removed and recycled 1,95 units through the Appliance Recycling MTP. This program reduced demand by 189 k and saved 1.235,16 kh of energy savings. Solar PV Pilot MTP In 215, the Solar PV Pilot MTP provided EPE customers with incentives, through participating contractors, for installing solar PV distributed generation systems. This program encouraged customers to install solar PV systems on their homes and businesses by reducing the up-front cost of these systems. The 215 goal for this program was 241 k There were 39 projects that reduced demand by 279 k and saved 537,642 kh El Paso Electric Company Energy Efficiency Plan and Report 85

22

23 B. Self-Delivered Program Commercial Rebate Pilot Program Exhibit AGP-1 Page 28 of 41 In 215, the Commercial Rebate Pilot Program provided commercial customers with rebates for two measures, the room HVAC controls measure and the vending machine controls measure This program encouraged customers to install these energy saving devices by subsidizing part of the up-front cost of these measures. The 215 goal for this program was 66 k. There was one participant that reduced 16 k of demand savings and 46,488 kh in energy savings. The acceptance of this program by customers has been very slow; however, EPE anticipates higher participation in 216. X. Current Energy Efficiency Cost Recovery Factor (EECRF) Report for 215 In Docket o , EPE was granted approval for recovery through its 215 EECRF of (a) $4,384,65 in energy efficiency program costs projected to be incurred from January 1 through December 31, 215, (b) The Company's share of the costs of the PUCT EM&V contractor's 214 and 215 budgeted expenses in the amount of $99,722, (c) the 213 under-recovery revenue amount of $82,871, (d) a performance incentive for 213 of $2,35,783 and (e) EPE's 213 EECRF proceeding expenses of $85,1. EPE requested that the EECRF be applicable beginning January 1, 215. The Final rder in Docket o concluded that the filing conformed to the requirements of the EE Rule. 14 The order also found the allocation of the energy efficiency costs and performance incentive in accordance with the EE Rule.15 The recovery of the agreed-upon EECRF amount of $6,688,126 is based on a dollar per kh rate. The cost recovery factors by rate are listed in Table 12. Table 12: 215 EECRF Monthly Rates Energy Efficiency Cost Recovery Rate o. escri ption Factor $Ikh ) 1 Residential Service Rate $ Small Commercial Service Rate $ utdoor Recreational Lighting Service Rate $ Governmental Street Lighting and Signal Service Rate $ (.46) 11 Municipal Pumping Service Rate $ TU Time-f-Use Municipal Pumping Service Rate $.653 H ater Heating $ (.454) 22 Irrigation Service Rate $ General Service Rate $ Large Power Service Rate (excludes transmission) $ Cotton Gin Service Rate $(.494) 14 Docket o 42449, Final rder at Findings of Fact o. 1 (ovember 24, 214) 15 Id. at Conclusion of Law o. 7 and Findings of Fact o, 19 El Paso Electric Company Energy Efficiency Plan and Report 86

24

25 41 City and County Service Rate $. 29 ni 43 University Service Rate $ (.149) Maintenance Power Service For Cogeneration And Small Power Production Facilities $.494 Backup Power Service For Cogeneration And Small Power Production Facilities $ (.494) 1 41 XI. Revenue Collected through EECRF In 215, EPE collected a total of $6,634,67 under Rate Schedule o Energy Efficiency Cost Recovery Factor. XII. ver/under Recovery of Energy Efficiency Program Costs In 215, EPE over-recovered an amount of $38,39 as shown in Table 13. Table 13: Authorized and Actual Recovery Amounts Description Authorized in Docket o. Actual January 1- December 31, 215 Energy Efficiency Costs $ 4,384,65 $ 3,955, and 215 EM&V Costs (PY214 Review) $ 99,722 $ 94, ver /Under Recovery $ 82,871 $ 82, Performance Bonus $ 2,35,783 $ 2,35, EECRF Proceeding Costs $ 85,1 $ 85,1 215 Total Costs and Bonus $ 6,688, ,254, EECRF Revenues $ 6,634, ver /Under Recovery $ 38,39 XItI. Underserved Counties EPE serves customers in three Texas counties: Culberson, Hudspeth, and El Paso. During 215, the majority of energy efficiency projects were in El Paso County. EPE has defined Underserved Counties as any county in the Texas EPE service territory that EPE reported no demand or energy savings through any of its 215 energy efficiency programs. Based on this definition, only Culberson County had no demand or energy savings in 215. Table 14: 215 Energy Efficiency Activities by County Re rted Savings County Participants k kh E1 Paso County 13,94 12,34 22,275,162 Culberson County Hudspeth County ,365 Total 13,129 12,35 22,282,527 El Paso Electric Company Energy Efficiency Plan and Report 87

26

27 XIV. Performance Incentive Calculation Exhibit AGP-1 Page 3 of 41 EPE achieved a M reduction in demand from its energy efficiency programs offered in 215. EPE's demand reduction goal for 215 was M. EPE's achievement represents 11.26% of its demand reduction goal, qualifying it for a performance incentive. Per 16 TAC , EPE is eligible for a performance incentive of $667,545 which it plans to request in its 216 EECRF filing. Per the PUCT, the total program costs to be used in the performance incentive calculation below include the 215 EM&V cost allocation of $58,21 as provided by the statewide EM&V evaluator, rather than EPE's actual booked EM&V costs of $78,15 as shown in Table 1. The performance incentive calculation below also includes the 215 municipal EECRF proceeding costs of $26,94. As a result, the total program costs for the performance incentive calculation will not match the actual total program costs exhibited in Table 1. Table 15: 215 Performance Incentive Calculations k kh Demand and Energy Goals 11,16 19,552,32 Demand and Energy Savings Actual Demand and Energy Savings (including Hard-to-Reach) 12,35 22,282,527 Reportederified Hard-to-Reach 964 PUCT-App roved Avoided Costs per k $8 per kh $.5321 Inflation Rate 2.% Discount Rate 6.613% Total Avoided Costs $17,112, Program Costs (includes allocated EM&V and municipal EECRF proceeding costs ) $4,97,49 et Benefits $13,14,567 Performance Incentive $667,545 El Paso Electric Company Energy Efficiency Plan and Report 88

28

29 C&I CFL DR DSM EEPR ACRYMS Commercial and Industrial Compact Fluorescent Lamp Demand Response Demand Side Management Energy Efficiency Plan and Report Exhibit AGP-1 Page 31 of 41 EE Rule Energy Efficiency Rule, 16 TAC and EESP EPE ERCT EM&V HTR M&V MTP PUCT PURA PV R&D REP RES SCRE SP TAC Energy Efficiency Service Provider El Paso Electric Company Electric Reliability Council of Texas Evaluation, Measurement & Verification Hard-To-Reach Measurement and Verification Market Transformation Program Public Utility Commission of Texas Public Utility Regulatory Act Photovoltaic Research and Development Retail Electrical Provider Residential Schools and Cities Conserving Resources Standard ffer Program Texas Administrative Code GLSSARY Glossary is the same as the definitions in 16 TAC (c). El Paso Electric Company A Energy Efficiency Plan and Report 89

30

31 APPEDIX A: REPRTED DEMAD AD EERGY REDUCTI Table 16: Program Savings by County BY d"141f'p'1 Page 32 of 41 Commercial SP County # of Participants Reported Savings k kh El Paso County ,896,843 Total ,896,843 Small Commercial Solutions MTP County # of Participants Reported Savings k kh El Paso County ,7,513 Total ,7,513, Large C81 Solutions MTP County # of Participants Reported Savings k kh El Paso County 259 1,945 9,53,826 Total 259 1, ,826 Texas SCRE MTP County # of Participants Reported Savings k kh El Paso County ,744,95 Total ,744,95, Load Management SP County # of Participants Reported Savings k kh El Paso County 1 6,711 33,555 Total 1 6,711 33,555 El Paso Electric Company A Energy Efficiency Plan and Report 9

32

33 Commercial Rebate Pilot Program County # of Participants Reported Savings k kh El Paso County ,488 Total ,488 Residential Solutions MTP Livingise" MTP County # of Participants Reported Savings k kh El Paso County ,956 Total ,956, County # of Participants Reported Savings k kh El Paso County 9, ,161,916 Hudspeth County ,981 Total 9, ,165,897 Hard-to-Reach Solutions MTP County # of Participants Reported Savings k kh El Paso County 1, ,479,742 Total 1, ,479,742, Appliance Recycling MTP Solar PV Pilot MTP County # of Participants Reported Savings k kh El Paso County 1, ,231,776 Hudspeth County ,384, Total 1, ,235,16 Exhibit AGP-1 Page 33 of 41 County # of Participants Reported Savings k kh El Paso County ,642 Total ,642, El Paso Electric Company A Energy Efficiency Plan and Report 91

34

35 REDLIE PAGES ExhibitAGP-1 Page 34 of 41 El Paso Electric Company 216 Energy Efficiency Plan and Report 16 Texas Administrative Code and April 1, 216 (Revised April 18, 216) Project o El Paso Electric 92

36

37 EXECUTIVE SUMMARY Exhibit AGP-1 Page 35 of 41 The Energy Efficiency Plan portion of this EEPR details EPE's plans to meet the energy efficiency demand reduction goal for 216 as established pursuant to 16 TAC (e)(2). The final order of Docket o ' issued on ovember 6, 215, established the EECRF rates applicable to EPE for 216. The order also left in place the same demand reduction goal as EPE had in 215 for the 216 energy efficiency programs. This goal was M, which is greater than fourtenths of one percent of EPE's average weather-adjusted peak demand at meter for 21 through 214. In accordance with 16 TAC (e)(1)(E), EPE's demand reduction goal in any year shall not be lower than its goal for the prior year, so EPE's 217 demand reduction goal should also remain at M. The final order of Docket o also established an energy efficiency program budget for 216 of $4,384,65.2 EPE made some modifications to the individual program budgets that were identified in the 215 EEPR, but the overall program budget for 216 remained at $4,384,65. These modifications were made due to the fact that the third party implementer for EPE's Appliance Recycling Program was placed into receivership on ovember 18, 215. EPE discontinued this program at that time and the funds for 216 were re-distributed to the Commercial SP and the Texas Schools and Cities Conserving Resources (Texas SCRE) MTP and the demand goals for these programs was adjusted. The goals, budgets and implementation plans that are included in this EEPR are influenced substantially by the requirements of the EE Rule and lessons learned regarding energy efficiency service providers and customer participation in the various energy efficiency programs. A summary of projected goals and budgets is presented in Table 1. The Energy Efficiency Report portion of this EEPR shows that, in 215, EPE achieved a demand reduction in excess of its goal. This was accomplished through the implementation of SPs, MTPs and a utility self-delivered program. In 215, the Company achieved a demand reduction of M which exceeded the demand reduction goal of M by _26%. The SPs that EPE provided in 215 were the Commercial SP and the Load Management SP The MTPs were the Small Commercial Solutions MTP, the Large Commercial & Industrial (C&I) Solutions MTP, the Texas SCRE MTP, the Residential Solutions MTP, the Livingisee MTP, the Hard-to-Reach Solutions MTP, the Appliance Recycling MTP, and the Solar Photovoltaic (PV) Pilot MTP. The self-delivered program for 215 was the Commercial Rebate Pilot Program. Table 1: Summary of 216 & 217 Projected Goals, Savings and Budgets' Goal Metric: Average Goal Metric: Statutory 3'ib of 5-year Projected Projected Growth in e A% of S-year Peak Energy M Proposed Calendar M Dem nd Average Peak Dbnund Goal Budget Year Growth f Savings Savings (M at derrend (M Goal tmy)* (111111, at (at Meter) (at Motor) e) Meter) at Meter) (M Mater) , ,23 $4, , ,92 $4,48 ' Demand goal is never lower than the prior year's goal "- Calculated using a 2% conservation load factor 'Application of E/ Paso Electric Company for Approval to Revise its Energy Efficiency Cost Recovery Factor and Request to Establish Revised Cost Cap, Docket o Z!d. at Finding of Fact o Average Growth in Demand and eather Adjusted Peak Demand are found in Table 4, Projected Demand and Energy Reductions are found in Table 5, and Proposed Budgets are found in Table 6 Ei Paso Electric Company Energy Efficiency Plan and Report 93

38

39 EERGY EFFICIECY REPRT Exhibit AGP-1 Page 36 of 41 V. Historical Demand Goals and Energy Targets for Previous Five Years Table 7 documents EPE's actual demand reduction goals and energy targets for the previous five years ( ) calculated in accordance with 16 TAC Table 7: Historical Demand Savings Goals and Energy Targets ( at Meter) Calendar Year Demand Goals (M) Energy Targets (Mh) Actual Demand Reduction Actual Energy Savings (Mh 215a , , , , , , " , , 'z , , M goal and Mh target as reported in EPE's EEPR filed April 1, 215 under Project o demand reduction and actual energy savings reported in this document, Project o M goal and Mh target as reported in EPE's EEPR filed April 1, 214 under Project o demand reduction and actual energy savings reported in this document, Project o M goal and Mh target as reported in EPE's EEPR filed March 29, 213 under Project o demand reduction and actual energy savings reported in Project o " 212 M goal and Mh target as reported in EPE's EEPR filed March 3, 212 under Project o demand reduction and energy savings modified pursuant to settlement of Docket o M goal and Mh target as reported in EPE's EEPR filed April 1, 211 under Project o demand reduction and energy savings modified pursuant to settlement of Docket o El Paso Electric Company

40

41 Vl. Projected, Reported and Verified Demand and Energy Savi -Eybibit AGP-1 "la'ge 37 of 41 Revised Table 8: Projected versus Reported Savings for 214 and 215 (at Meter) Reported and Verified 214 Projected Savings Savinns Customer Class and Program M Mh M Mh Commercial , ,977 Commercial SP ,197 Small Comm. Solutions MTP.73 3, ,124 Large C&I Solutions MTP ,633 Texas SCRE MTP ,948 Load Management SP Commercial Rebate Pilot Program Residential.46 2, Residential Solutions MTP Livin isek MTP.6 1,535,89 45 Hard-to-Reach.8 1, ,75 Hard-to-Reach Solutions MTP ,75 Residential / Commercial.443 1, ,91. Appliance Recycling MTP.22 1, ,591 Solar PV Pilot MTP Total , Projected Savings Reported and Verified SavInns Customer Class and Prog ram M Mh M Mh Commercial , ,263 Commercial SP.6 2, ,897 Small Comm. Solutions MTP.73 3, ,7 Large C&l Solutions MTP 1.8 7, ,54 Texas SCRE MTP.5 1, ,775 Load Management SP Commercial Rebate Pilot Program Residential.54 2, ,767 Residential Solutions MTP.4 71,4 61 Livi n ise IR MTP.14 1, ,166 Hard-to-Reach.8 1, ,48 Hard-to-Reach Solutions MTP.8 1, ,48 Residential! Commercial.443 1, ,773 Appliance Recycling MTP.22 1, ,235 Solar PV Pilot MTP Total , ,283 El Paso Electric Company Energy Efficiency Plan and Report 95

42

43 Residential Solutions MTP Exhibit AGP-1 Page 38 of 41 In 215, the Residential Solutions MTP offered residential customers, through the use of participating contractors, incentives for making energy efficient improvements to their homes. This program focused on improving the energy efficiency of residential buildings, as well as improving the installation practices of the participating contractors. EPE contracted with a third-party implementer to administer the Residential Solutions MTP. The 215 goal for this program was 4 k. There were 938 participants that reduced demand by approximately 4 k and saved 6,956 kh in energy. Livingise MTP The Livingise MTP is an educational program that uses a school-based method that builds student knowledge, provides high energy efficiency devices to families and serves as an effective community outreach program. In 215, each participant received a kit that contained energy saving devices to be installed in their homes, as well as energy efficiency educational materials. The 215 goal for this program was 14 k. In 215, the Livingise" MTP provided 9,371 Livingise kits. The savings from this program were 223 k in demand savings and 1,165,897 kh in energy savings. Hard-to-Reach Solutions MTP In 215, the Hard-to-Reach Solutions MTP offered residential customers who were at or below 2% of the Federal Poverty Guidelines, through the use of participating contractors, incentives for making energy efficient improvements to their homes. This program focused on improving the energy efficiency of low income residential buildings, as well as improving the installation practices of the participating contractors. EPE contracted with a third-party implementer to administer the Hard-to-Reach Solutions MTP. The 215 goal for this program was 8 k There were 1,157 projects in this program that reduced demand by 964 k and saved 1,479,742 kh in energy. Appliance Recycling MTP In 215, the Appliance Recycling MTP provided incentives to encourage EPE customers to recycle their older, less efficient refrigerators and freezers. This program removed these appliances from the electric grid, thus reducing system-wide load and peak demand. The 215 goal for this program was 22 k. EPE removed and recycled 1,95 units through the Appliance Recycling MTP. This program reduced demand by 189 k and saved 1,235,16 kh of energy savings. Solar PV Pilot MTP In 215, the Solar PV Pilot MTP provided EPE customers with incentives, through participating contractors, for installing solar PV distributed generation systems. This program encouraged customers to install solar PV systems on their homes and businesses by reducing the up-front cost of these systems. The 215 goal for this program was 241 k. There were 39 projects that reduced demand by 2g3-279 k and saved ,642 kh. El Paso Electric Company Energy Efficiency Plan and Report 96

44

45 41 City and County Service Rate 1 $.qm AU 39 ni University Service Rate $ (.149) 46 Maintenance Power Service For Cogeneration And Small Power Production Facilities $ (.494) 47 Backup Power Service For Cogeneration And Small Power Production Facilities $ (.494) XI. Revenue Collected through EECRF In 215, EPE collected a total of $6,634,67 under Rate Schedule o Energy Efficiency Cost Recovery Factor. XIi. verlunder Recovery of Energy Efficiency Program Costs In 215, EPE over-recovered an amount of $38,39 as shown in Table 13. Table 13: Authorized and Actual Recovery Amounts Description Authorized in Docket o. Actual January 1- December 31, 215 Energy Efficiency Costs $ 4,384,65 $ 3,955, and 215 EM&V Costs (PY214 Review) $ 99,722 $ 94, ver /Under Recovery $ $ 82, Performance Bonus $ 2,35,783 $ 2,35, EECRF Proceeding Costs $ 85,1 $ 85,1 215 Total Costs and Bonus $ 6,688,126 $ 6,254, EECRF Revenues $ 6, (ver)/under Recovery $ (38,39) XIII. Underserved Counties EPE serves customers in three Texas counties: Culberson, Hudspeth, and El Paso. During 215, the majority of energy efficiency projects were in El Paso County. EPE has defined Underserved Counties as any county in the Texas EPE service territory that EPE reported no demand or energy savings through any of its 215 energy efficiency programs. Based on this definition, only Culberson County had no demand or energy savings in 215. Table 14: 215 Energy Efficiency Activities by County County Participants Re rted Savings k kh El Paso County 13,94 12, Culberson County Hudspeth County ,365 Total 13,129 t2-,3u12, ,4; El Paso Electric Company Energy Efficiency Plan and Report 97

46 XIV. Performance Incentive Calculation Exhibit AGP-1 Page 4 of 41 ( EPE achieved a12: M reduction in demand from its energy efficiency programs offered in 215. EPE's demand reduction goal for 215 was M. EPE's achievement represents % of its demand reduction goal, qualifying it for a performance incentive, Per 16 TAC , EPE is eligible for a performance incentive of $67q-,948667,545 which it plans to request in its 216 EECRF filing. Per the PUCT, the total program costs to be used in the performance incentive calculation below include the 215 EM&V cost allocation of $58,21 as provided by the statewide EM&V evaluator, rather than EPE's actual booked EM&V costs of $78,15 as shown in Table 1. The performance incentive calculation below also includes the 215 municipal EECRF proceeding costs of $26,94. As a result, the total program costs for the performance incentive calculation will not match the actual total program costs exhibited in Table 1. Table 15: 215 Performance Incentive Calculations kw kh Demand and Energy Goals 11,16 19,552,32 Demand and Energy Savings Actual Demand and Energy Savings (including Hard-to-Reach) 12, ,34-4.a Reportedeniied Hard-to-Reach 964 PUCT-Approved Avoided Costs per k $8. per kh $.5321 Inflation Rate 2 % Discount Rate 6,613% Total Avoided Costs $17.467;445112, Program Costs (includes allocated EM&V and municipal EECRF proceedin g costs) $4,97,49 et Benefits $13,Ara Performance Incentive $&7-7,$qgg El Paso Electric Company Energy Efficiency Plan and Report 98

47 Commercial Rebate Pilot Program County # of Parti c ipants Reported Savings k kh El Paso County ,488 Total ,488 Residential Solutions MTP Livingise'k MTP C ounty # of Part i c ipants Reported Savings k kh El Paso County ,956 Total ,956, C ounty # of Part i c i pants Reported Savings k kh El Paso County 9, ,161,916 Hudspeth County ,981 Total 9, ,165,897 Hard-to-Reach Solutions MTP C ounty # of Partic ipants Reported Savings k kh El Paso County 1, ,479,742 Tota l 1, ,479,742 Appliance Recycling MTP County # of Partic ipants Reported Savings k kh El Paso County 1, ,231,776 Hudspeth County ,384 Total 1, ,235,16 Solar PV Pilot MTP County # of Participants Reported Savings k kh El Paso County , Total ; Exhibit AGP-1 Page 41 of 41 El Paso Electric Company A Energy Efficiency Plan and Report 99

48 o Y ry oo c a m -i n ad m m 6 U1 Q rv + s$1 z go mw V Q Qi vrvt rv Q h ao vi pp a b n o' y p p V1 Q m vt vt. v' tn va vl /1 V VT H A Vf e+1 l Vf i tb!'1 1l1 M n C t '1 f+l Vl IA ld M 1 M1 VI td 4 y ei H V1 VF Vl tn VF Vl i!1 la LL >' r ud A Ci b V h V h t+ h. u1 Q h l Q+.i b I m A (i C Ki 1'y o ` o n.- a a v -`a V.... '. 1. M $ Q.+ r+f i Q ID L1 d ad M!' V? Q+ g Q Q Q m V> Vf Vf tm1 th ta V1 Vf U1 UY b b M-+ ] ST i i M M.- Q t b I M a h id +1 m Q i ' pp y C b m Q r+ Q.lt M ei Ip Y1 E 6T Lo V? an V} VY V4 Ul Vt V1 ia 111 u if $ 'a m oo n oo b V1.- oa.n b v Q w h o m m o. m ca h e.n a $. i vi r e+ v rn vi ro n m ga Vi +/F V4 a/1 U1 +! VY o ~ ~ ; cm m E t - 3 $ rv. e M v o n v m ov a+i 3 m m Q o rv v m v1 t/1 - tn tn M D ro J V ld Q p D M I' e -i \ VI If1 m M + _ h.n y m D m p r- a o fv r M1 rv + Q Qi Q Q4.-i y b m - I a aq p hh u i Q M m E E o A f n a a o = p E a f ci Y A c o m /- z y w a o m v `oo y s pp E c _ E C E V vvi o,, V?i a. o E m m a o J d v E? Q a V V 1-2 C Vi V cc 1

49 Cl) CL.- M (1. x Q) a E ipp 3 a y at l l-i co " Go h d'.- K1 o n v v o.is n o vn ar> d in o An ci v o v LZ p yr 41 td n A o 11 v nt -1 oo C "t M V1 r'1 mul r, m r4 eq 1-4 m co fv ld n Ql L!1 M Vi Vi VS D Q1 co 1.f1 Ct I-I td f/1 n y d Y 11, a 7a x l M ta tl1 V ld t/1 l e- vt ld co en s/! 1f1 o C K1 +n M ld l V V1 l C2' ( _j 7 V1 M tn C1 M lzf K1 LA l l a f+] th c/? Vi C v Q x a! Z U U U wj / v/ CL J 'a c v x E Co rn d c f/) Co n E LM a) V1 u"i m td D C v v 6 4 oo i. C ; c o 'V M 61 ( 1 y co o co n co m oa v) ad. It V co rn -- -Z f- f_ C co CD M f, C'r p Q1 7 tp X rn v m vi vi v vi m ai m In i/y 'l? i/t E Lo eo a = '" a T c T E v CL T * E 3 T. u n u aj E. o E u o T u E on? o w w x w u z v v Cl) o a' ' " y a t- ai v 3 ( ax i o z y t o T L a a a U c M m VI) x ) Q Q V w w svi cno ton ' C -1 M ct 111 C I- C Ch J 2 T C 1-4 C C cr u a x a w 'o ti.. > a a, C C o, U C d t,~ y 319 w= 7 y C all "C T w oa o. a,.ac c M a c w v + y CL u a x * a r 11

50 CL o CD - Q.. CL x w r, m n rn p m oo al rn m CL o j 1/F <n n v.n.n v cn n vt v v..gy Y t y C Y G 1 ax 1-4 C m r4 M In.-i Q In C o o ) CIS pp 4 i. In Ql M t r It r It In!1 co Ql L!1 E7 I" v I'D.--4 m t, >- p rl x U U > C U (1) c U) Q d c J CL E U w y C'ti Y v C C p. x p 7S In co LID v In rn n rn r n i* lp M 1 M 1 V1 ryl m h to pl u) M r/ V LM n') - M In.-1 m M m m m cm VT V} ta Lf Vf ta v) In In In V1 M In 11 L+r1 C.r1 u'f m 1. M ' ['t C u"f q? D M 6'i pi LID 1 U1 ld CJ1 Ln In,-+ co m ld co In ri r14 v K; vi -i oi. o L!1 Cl It m LID ) ld t m G e-i ld 7 1 t m CQ r-1 rl M t -- In M x in m v v v v v v t!y In V? c u c E ro v C. E 7 * E, v = v ai C } Q E m a m CL v 76 E C. so >. E > a w u o CJ U Z u } c rv CL. C ia C1 V1 C C1 Q X Ckb 2 C C 13 7 u a x aj > = C o. C t 'A y 3fD w v, : a C kd a+ Q u 3 G d a y 4) m vc a CL. = c6 fc C v GJ CL } Z y 1- y C L w y ' c o a axi > a a u 11 o V) ln l!1 f- a w 'G Q V' V a X M Z m d in to rl C Qi 12

Energy Efficiency Accomplishments of Texas Investor-Owned Utilities Calendar Year 2012

Energy Efficiency Accomplishments of Texas Investor-Owned Utilities Calendar Year 2012 Energy Efficiency Accomplishments of Texas Investor-Owned Utilities Calendar Year 2012 1 Accomplishments Frontier Associates LLC In 2012, the majority of the Texas investor-owned utilities (IOUs) exceeded

More information

Colorado PUC E-Filings System. Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado

Colorado PUC E-Filings System. Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado Colorado PUC E-Filings System Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado March 31, 2017 / Proceeding No. 14A-1057EG 2016 xcelenergy.com 2017

More information

Submitted to: Pennsylvania Public Utility Commission

Submitted to: Pennsylvania Public Utility Commission PECO Exhibit No. 1 PECO PROGRAM YEARS 2016-2020 ACT 129 - PHASE III ENERGY EFFICIENCY AND CONSERVATION PLAN Submitted to: Pennsylvania Public Utility Commission Submitted by: November 30, 2015 Table of

More information

PUCO STAFF KRISTIN BRAUN

PUCO STAFF KRISTIN BRAUN Energy Efficiency i Overview October, 2012 PUCO STAFF KRISTIN BRAUN (KRISTIN.BRAUN@PUC.STATE.OH.US) Disclaimer These comments are on behalf of Staff and These comments are on behalf of Staff and should

More information

CenterPoint Oklahoma Demand Programs Annual Report 2016

CenterPoint Oklahoma Demand Programs Annual Report 2016 CenterPoint Oklahoma Demand Programs Annual Report 2016 March 31, 2017 Executive Summary... 1 165:45-23-7(c)(1): Demand Programs by Category... 5 165:45-23-7(c)(2): Programs and Date Started... 6 165:45-23-7(c)(3):

More information

The Future Energy Jobs Act. Will Baker Midwest Energy Efficiency Alliance

The Future Energy Jobs Act. Will Baker Midwest Energy Efficiency Alliance The Future Energy Jobs Act Will Baker Midwest Energy Efficiency Alliance MEEA The Trusted Source on Energy Efficiency We are a nonprofit membership organization with 160+ members, including:»utilities»research

More information

Infection Prevention & Control Department. Credentials Committee Presentation

Infection Prevention & Control Department. Credentials Committee Presentation Infection Prevention & Control Department Credentials Committee Presentation Hospital Isolation Precaution Most frequently used first: Contact gloves and gowns. Contact Plus gloves and gown mandatory used

More information

Annual Report to the Pennsylvania Public Utility Commission

Annual Report to the Pennsylvania Public Utility Commission Annual Report to the Pennsylvania Public Utility Commission For the Period June 2009 through May 2010 Program Year 2009 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation Plan Prepared

More information

Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado. March 30, 2016/ Proceeding No.

Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado. March 30, 2016/ Proceeding No. Demand-Side Management Annual Status Report Electric and Natural Gas Public Service Company of Colorado March 30, 2016/ Proceeding No. 14A-1057EG 2015 xcelenergy.com 2016 Xcel Energy Inc. Xcel Energy is

More information

Quarterly Report to the Pennsylvania Public Utility Commission and Act 129 Statewide Evaluator

Quarterly Report to the Pennsylvania Public Utility Commission and Act 129 Statewide Evaluator Quarterly Report to the Pennsylvania Public Utility Commission and Act 129 Statewide Evaluator For the period December 1, 2011 to February 29, 2012 Program Year 3 For Act 129 of 2008 Energy Efficiency

More information

Utility DSM Program Data 2017 and 2018

Utility DSM Program Data 2017 and 2018 Utility DSM Program Data 2017 and 2018 New Mexico Gas Company NV Energy PNM Questar Gas Company Salt River Project El Paso Electric Xcel Energy - CO Xcel Energy NM TEP UNSE Program Residential Commercial

More information

EDC PROGRAM YEAR 7 ANNUAL REPORT

EDC PROGRAM YEAR 7 ANNUAL REPORT EDC PROGRAM YEAR 7 ANNUAL REPORT Program Year 7: June 1, 2015 May 31, 2016 Presented to: PENNSYLVANIA PUBLIC UTILITY COMMISSION Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation Plan Prepared

More information

EDC PROGRAM YEAR 7 ANNUAL REPORT

EDC PROGRAM YEAR 7 ANNUAL REPORT EDC PROGRAM YEAR 7 ANNUAL REPORT Program Year 7: June 1, 2015 May 31, 2016 Presented to: PENNSYLVANIA PUBLIC UTILITY COMMISSION Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation Plan Prepared

More information

Final Annual Report for the Pennsylvania Public Utility Commission

Final Annual Report for the Pennsylvania Public Utility Commission Final Annual Report for the Pennsylvania Public Utility Commission For the Period June 2012 through May 2013 Program Year 4 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation Plan Prepared

More information

PECO PROGRAM YEAR 6 ANNUAL REPORT

PECO PROGRAM YEAR 6 ANNUAL REPORT PECO PROGRAM YEAR 6 ANNUAL REPORT Program Year 6: June 1, 2014 May 31, 2015 Presented to: PENNSYLVANIA PUBLIC UTILITY COMMISSION Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation Plan Prepared

More information

Final Annual Report to the Pennsylvania Public Utility Commission

Final Annual Report to the Pennsylvania Public Utility Commission Final Annual Report to the Pennsylvania Public Utility Commission For the Period June 2012 through May 2013 Program Year 4 For Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation Plan Prepared

More information

UNS ELECTRIC, INC ENERGY EFFICIENCY IMPLEMENTATION PLAN

UNS ELECTRIC, INC ENERGY EFFICIENCY IMPLEMENTATION PLAN UNS ELECTRIC, INC. 2015 ENERGY EFFICIENCY IMPLEMENTATION PLAN JUNE 2, 2014 Table of Contents I. 2015 IMPLEMENTATION PLAN EXECUTIVE SUMMARY...1 II. INTRODUCTION...3 III. PROGRAM PORTFOLIO OVERVIEW...5 IV.

More information

Quarterly Report to the Pennsylvania Public Utility Commission and Act 129 Statewide Evaluator

Quarterly Report to the Pennsylvania Public Utility Commission and Act 129 Statewide Evaluator Quarterly Report to the Pennsylvania Public Utility Commission and Act 129 Statewide Evaluator For the period June 1, 2011 to August 31, 2011 Program Year 3 For Act 129 of 2008 Energy Efficiency and Conservation

More information

Quarterly Report to the Pennsylvania Public Utility Commission and Act 129 Statewide Evaluator

Quarterly Report to the Pennsylvania Public Utility Commission and Act 129 Statewide Evaluator Quarterly Report to the Pennsylvania Public Utility Commission and Act 129 Statewide Evaluator For the period June 1, 2011 to August 31, 2011 Program Year 3 For Act 129 of 2008 Energy Efficiency and Conservation

More information

PacifiCorp Annual Review of DSM Programs California

PacifiCorp Annual Review of DSM Programs California PacifiCorp 2009 Annual Review of DSM Programs California PacifiCorp Demand Side Management Team 3/15/2010 Table of Contents Introduction... 2 2009 Performance and Activity... 3 Stakeholder Meetings, Communications

More information

Pea Freezing Operations

Pea Freezing Operations I I Pea Freezing perations Part I. Vining G. B. Davis H. M. Hutchings Miscellaneous Paper 66 January 1959 Agricultural Experiment Station, regon State College, Corvallis in cooperation with Agricultural

More information

GLOSSARY OF TERMS January 2017

GLOSSARY OF TERMS January 2017 GLOSSARY OF TERMS January 2017 ENERGY EFFICIENCY GLOSSARY Advanced Meter Any new or appropriately retrofitted meter that functions as part of an advanced metering system and that has the features specified

More information

SENATE, No STATE OF NEW JERSEY

SENATE, No STATE OF NEW JERSEY SENATE BUDGET AND APPROPRIATIONS COMMITTEE STATEMENT TO SENATE, No. 2314 STATE OF NEW JERSEY DATED: APRIL 5, 2018 The Senate Budget and Appropriations Committee reports favorably Senate Bill No. 2314.

More information

Public Service Commission

Public Service Commission - l State of Florida Public Service Commission Capital Circle Office Center 2540 Shdmard Oak Boulevard Tallahassee, Florida 32399-0850 -M-E-M-O-R-A-N-D-U-M- DATE: July 9, 2015 TO: Office ofcommission Clerk

More information

Electric Association Annual Conference January 25, 2018

Electric Association Annual Conference January 25, 2018 Electric Association Annual Conference January 25, 2018 Teri Lewand CEM, LEED AP ComEd, Business Programs Mgr. C O N F I D E N T I A L Origin of Energy Efficiency Programs Illinois energy legislation passed

More information

ENERGY OPTIMIZATION. Annual Report

ENERGY OPTIMIZATION. Annual Report 216 ENERGY OPTIMIZATION Annual Report EO Table of CONTENTS 1. Executive Summary 9. Legislative Requirements 11. Program Portfolio 13. Residential 5. Education & Awareness 37. Commercial & Industrial 53.

More information

afe managers investment Defining a Global Fiduciary Standard of Excellence self-assessment of fiduciary excellence for Worldwide Edition

afe managers investment Defining a Global Fiduciary Standard of Excellence self-assessment of fiduciary excellence for Worldwide Edition self-assessment of fiduciary excellence for investment managers afe Defining a Global Fiduciary Standard of Excellence For organizations that manage separate accounts, mutual funds, unit trusts, and commingled

More information

Solar Photovoltaic Volumetric Incentive Program 2015 Report to the Legislative Assembly

Solar Photovoltaic Volumetric Incentive Program 2015 Report to the Legislative Assembly Solar Photovoltaic Volumetric Incentive Program 2015 Report to the Legislative Assembly Prepared by: Oregon Public Utility Commission January 1, 2015 Table of Contents Executive Summary... 2 Background...

More information

RR8 - Page 377 of 495

RR8 - Page 377 of 495 DOCKET NO. APPLICATION OF SOUTHWESTERN PUBLIC SERVICE COMPANY FOR AUTHORITY TO CHANGE RATES PUBLIC UTILITY COMMISSION OF TEXAS DIRECT TESTIMONY of SHAWN M. WHITE on behalf of SOUTHWESTERN PUBLIC SERVICE

More information

Angelica Salomon-Dealino & Dilip Limaye International Institute for Energy Conservation. Asian Development Bank, 19 June 2015

Angelica Salomon-Dealino & Dilip Limaye International Institute for Energy Conservation. Asian Development Bank, 19 June 2015 Angelica Salomon-Dealino & Dilip Limaye International Institute for Energy Conservation Asian Development Bank, 19 June 2015 Presentation Outline DSM Delivery Models, types and approaches Applicable Financing

More information

2011 Annual Report on Conservation Acquisition - Washington

2011 Annual Report on Conservation Acquisition - Washington Pacific Power 2011 Annual Report on Conservation Acquisition - Washington Revised 9/18/12 1 Table of Contents Introduction... 4 Advisory Group Meetings and Communications... 5 Demand-side Management Filings...

More information

New Jersey s Clean Energy Program

New Jersey s Clean Energy Program New Jersey s Clean Energy Program General Overview Energy Efficiency Michael Winka, Director New Jersey Board of Public Utilities Office of Clean Energy New Jersey s Clean Energy Program is a statewide

More information

Past reviews of utility performance incentives found that they typically fall into one of four categories:

Past reviews of utility performance incentives found that they typically fall into one of four categories: ACEEE developed this technical brief in response to the state of Missouri s request to provide information on investor-owned utility energy efficiency performance incentives. Energy efficiency is a low-cost

More information

Pennsylvania Electric Company

Pennsylvania Electric Company Attachment B Pennsylvania Electric Company Phase III Energy Efficiency & Conservation Plan (For the Period June 1, 2016 through May 31, 2021) November 23, 2015 Docket No. Energy Efficiency and Conservation

More information

Energy Efficiency Jennifer Heintz June 13, 2012,

Energy Efficiency Jennifer Heintz June 13, 2012, Energy Efficiency Jennifer Heintz June 13, 2012 Interaction between energy efficiency and renewable energy development Renewable energy standard (RES) development addresses the supply side of the energy

More information

Evaluating Costs of Energy Efficiency Programs

Evaluating Costs of Energy Efficiency Programs Evaluating Costs of Energy Efficiency Programs South-Central Partnership for Energy Efficiency as a Resource Phil Mihlmester, ICF International August 4, 2014 Outline Introduction to ICF Energy efficiency

More information

Renewables Portfolio Standards in the United States: A Status Update

Renewables Portfolio Standards in the United States: A Status Update Renewables Portfolio Standards in the United States: A Status Update Galen Barbose Lawrence Berkeley National Laboratory Renewable Energy Markets 214 December 4, 214 This analysis was funded by the National

More information

RELI GROUP, INC. Contractor Site Hourly Rate Page 1 of 10

RELI GROUP, INC. Contractor Site Hourly Rate Page 1 of 10 Escalation rate 2% 2% 2% 2% 2% 0001 AA01 Administrative Assistant Level I HR $42.85 $43.71 $44.58 $45.47 $46.38 $47.31 0001 AA02 Administrative Assistant Level II HR $53.06 $54.12 $55.20 $56.31 $57.43

More information

A New Market for Energy Regulation: Advancing the Clean Energy Revolution

A New Market for Energy Regulation: Advancing the Clean Energy Revolution A New Market for Energy Regulation: Advancing the Clean Energy Revolution NCSL Task Force on Energy Supply December 5, 2012 David W. Cash Commissioner Massachusetts Department of Public Utilities 1 The

More information

Strategic Operational Solutions Inc. Contractor Site-Hourly Rate Page 1 of 10

Strategic Operational Solutions Inc. Contractor Site-Hourly Rate Page 1 of 10 Escalation rate 2.5% 2.5% 2.5% 2.5% 2.5% 0001 AA01 Administrative Assistant Level I HR $34.14 $35.00 $35.87 $36.77 $37.69 $38.63 0001 AA02 Administrative Assistant Level II HR $43.63 $44.72 $45.84 $46.98

More information

Customer Energy Efficiency Solutions

Customer Energy Efficiency Solutions Customer Energy Efficiency Solutions Our Approach At Xcel Energy, we are empowering customers with energy solutions that give them more control over their energy use and their monthly energy bills. Our

More information

Leading Insights into Solar

Leading Insights into Solar Leading Insights into Solar Fong Wan Senior Vice President, Energy Procurement Pacific Gas and Electric Company CalSEIA - SolarTech Summit May 7, 2009 Agenda California s Clean Energy History Renewable

More information

DirectViz Solutions LLC Contractor Site-Hourly Rate Page 1 of 10

DirectViz Solutions LLC Contractor Site-Hourly Rate Page 1 of 10 Escalation rate 2% 2% 2% 2% 2% 0001 AA01 Administrative Assistant Level I HR $38.69 $39.46 $40.25 $41.06 $41.88 $42.72 0001 AA02 Administrative Assistant Level II HR $53.42 $54.49 $55.58 $56.69 $57.82

More information

SCE HOPPs Overview. Stakeholder Webinar, 7/14/16

SCE HOPPs Overview. Stakeholder Webinar, 7/14/16 SCE HOPPs Overview Stakeholder Webinar, 7/14/16 Ideas Search at a Glance SCE Effort Jan: HOPPs kick-off Feb.-Apr: Outreach for ideas Apr: Narrowing of ideas May-June: Prelim. drafts of applications June-July:

More information

ENLIGHTENED, INC. Contractor Site Hourly Rate Page 1 of 10

ENLIGHTENED, INC. Contractor Site Hourly Rate Page 1 of 10 Escalation rate 3% 3% 3% 3% 3% 0001 AA01 Administrative Assistant Level I HR $49.45 $50.93 $52.46 $54.04 $55.66 $57.33 0001 AA02 Administrative Assistant Level II HR $58.56 $60.32 $62.13 $63.99 $65.91

More information

Southwestern Public Service Company Energy Efficiency and Load Management Annual Report

Southwestern Public Service Company Energy Efficiency and Load Management Annual Report Southwestern Public Service Company 2012 Energy Efficiency and Load Management Annual Report Prepared in Compliance with the Efficient Use of Energy Act and 17.7.2 NMAC (Energy Efficiency Rule) August

More information

CLOUD NINE TECHNOLOGIES INC Contractor Site Hourly Rate Page 1 of 10

CLOUD NINE TECHNOLOGIES INC Contractor Site Hourly Rate Page 1 of 10 Escalation rate 3% 3% 3% 3% 3% 0001 AA01 Administrative Assistant Level I HR $43.27 $44.57 $45.90 $47.28 $48.70 $50.16 0001 AA02 Administrative Assistant Level II HR $50.19 $51.70 $53.25 $54.85 $56.49

More information

ALL POINTS LOGISTICS, LLC Contractor Site Hourly Rate Page 1 of 10

ALL POINTS LOGISTICS, LLC Contractor Site Hourly Rate Page 1 of 10 Escalation rate 2% 2% 2% 2% 2% 0001 AA01 Administrative Assistant Level I HR $45.70 $46.61 $47.54 $48.49 $49.46 $50.45 0001 AA02 Administrative Assistant Level II HR $52.94 $54.00 $55.08 $56.18 $57.31

More information

AMAR Health IT LLC_J 1 Contractor Site Hourly Rate Page 1 of 10

AMAR Health IT LLC_J 1 Contractor Site Hourly Rate Page 1 of 10 Escalation rate 2.90% 2.90% 2.90% 2.90% 2.90% 2.90% 2.90% 2.90% 2.90% 0001 AA01 Administrative Assistant Level I HR $40.69 $41.87 $43.08 $44.33 $45.62 $46.94 $48.30 $49.70 $51.15 $52.63 0001 AA02 Administrative

More information

FINAL REPORT NEW YORK ENERGY $MART SM PROGRAM QUARTERLY EVALUATION AND STATUS REPORT QUARTERLY REPORT TO THE PUBLIC SERVICE COMMISSION

FINAL REPORT NEW YORK ENERGY $MART SM PROGRAM QUARTERLY EVALUATION AND STATUS REPORT QUARTERLY REPORT TO THE PUBLIC SERVICE COMMISSION NEW YORK ENERGY $MART SM PROGRAM QUARTERLY EVALUATION AND STATUS REPORT QUARTERLY REPORT TO THE PUBLIC SERVICE COMMISSION QUARTER ENDING JUNE 30, 2007 FINAL REPORT AUGUST 2007 Table of Contents 1 INTRODUCTION...1-1

More information

Energy Efficiency and Renewable Energy Portfolios Annual Evaluation Report (Volume I Executive Summary)

Energy Efficiency and Renewable Energy Portfolios Annual Evaluation Report (Volume I Executive Summary) Energy Efficiency and Renewable Energy Portfolios 2017 Annual Evaluation Report (Volume I Executive Summary) May 31, 2018 Prepared for: Prepared by: Opinion Dynamics Corporation With Subcontractors: Table

More information

Public Service Company of Oklahoma 2017 Energy Efficiency & Demand Response Programs: Annual Report

Public Service Company of Oklahoma 2017 Energy Efficiency & Demand Response Programs: Annual Report Public Service Company of Oklahoma 2017 Energy Efficiency & Demand Response Programs: Annual Report Prepared for: Oklahoma Corporation Commission In accordance with annual reporting requirements: Title

More information

Trends in Utility DSM Programs and Exemplary Programs for Low- Income Customers

Trends in Utility DSM Programs and Exemplary Programs for Low- Income Customers Trends in Utility DSM Programs and Exemplary Programs for Low- Income Customers Howard Geller Presentation at 2008 National Energy and Utility Affordability Conference Denver, CO June 18, 2008 Utility

More information

RIGHTDIRECTION TECHNOLOGY SOLUTIONS, LLC - Contractor Site-Hourly Rate Page 1 of 10

RIGHTDIRECTION TECHNOLOGY SOLUTIONS, LLC - Contractor Site-Hourly Rate Page 1 of 10 Escalation rate 2.50% 2.50% 2.50% 2.50% 2.50% 0001 AA01 Administrative Assistant Level I HR $46.03 $47.18 $48.36 $49.56 $50.80 $52.07 0001 AA02 Administrative Assistant Level II HR $53.90 $55.25 $56.63

More information

!"#$%&'()!*"+,-).!!/0#'1(2'01!3"'&"4051)6!7('&

!#$%&'()!*+,-).!!/0#'1(2'01!3'&4051)6!7('& !!!!""#$%&'("!)*+! Escalation rate 3% 3% 3% 3% 3% 3% 3% 3% 3% 0001 AA01 Administrative Assistant Level I HR $43.34 $44.64 $45.98 $47.36 $48.78 $50.24 $51.75 $53.30 $54.90 $56.55 0001 AA02 Administrative

More information

Field Name Data Type Notes. Text Required Text Required. Text Required Text Required. Required Number Required. Number Required.

Field Name Data Type Notes. Text Required Text Required. Text Required Text Required. Required Number Required. Number Required. CSV Invoice Format Column Position 1 2 3 4 5 6 7 8 9 10 Campus* Field Name Data Type Notes Supplier * Invoice * Order * Invoice Date* Total Invoice Amount* Total Sales Tax Amount* Discount Amount Discount

More information

Creating A Greener Energy Future For the Commonwealth MA Energy Future

Creating A Greener Energy Future For the Commonwealth MA Energy Future MA Energy Future Frank Gorke Director, Division of Energy Efficiency Frank.Gorke@state.ma.us October 15, 2009 DOER Mission Creating a Greener Energy Future, economically and environmentally: Achieving

More information

Synectics CIOSP3 Small Business Hourly Rates (Contractor Site)

Synectics CIOSP3 Small Business Hourly Rates (Contractor Site) Synectics CIOSP3 Small Business Hourly Rates (Contractor Site) ITEM DESCRIPTION U/M Escalation rate 3% 3% 3% 3% 3% 3% 3% 3% 3% 0002 AA01 Administrative Assistant Level I HR $57.83 $59.56 $61.35 $63.19

More information

VARIQ CV JV, LLC Contractor Site Hourly Rate. Page 1 of. Contract Year ITEM DESCRIPTION U/M

VARIQ CV JV, LLC Contractor Site Hourly Rate. Page 1 of. Contract Year ITEM DESCRIPTION U/M Escalation rate 2.5% 2.5% 2.5% 2.5% 2.5% 0001 AA01 Administrative Assistant Level I HR $46.72 $47.89 $49.09 $50.31 $51.57 $52.86 0001 AA02 Administrative Assistant Level II HR $63.71 $65.30 $66.94 $68.61

More information

VARIQ CV JV, LLC Government Site Hourly Rate. Page 1 of 5. Contract Year ITEM DESCRIPTION U/M

VARIQ CV JV, LLC Government Site Hourly Rate. Page 1 of 5. Contract Year ITEM DESCRIPTION U/M Escalation rate 2.5% 2.5% 2.5% 2.5% 2.5% 0002 AA01 Administrative Assistant Level I HR $41.71 $42.75 $43.82 $44.92 $46.04 $47.19 0002 AA02 Administrative Assistant Level II HR $56.88 $58.30 $59.76 $61.25

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE APPLICATION OF ) OKLAHOMA GAS AND ELECTRIC COMPANY ) FOR APPROVAL OF A GENERAL CHANGE IN ) DOCKET NO. -0-U RATES AND TARIFFS ) Direct

More information

Synectics CIOSP3 Small Business Hourly Rates (Government Site)

Synectics CIOSP3 Small Business Hourly Rates (Government Site) ITEM DESCRIPTION U/M Escalation rate 3% 3% 3% 3% 3% 3% 3% 3% 3% 0002 AA01 Administrative Assistant Level I HR $57.83 $59.56 $61.35 $63.19 $65.09 $67.04 $69.05 $71.12 $73.26 $75.46 0002 AA02 Administrative

More information

Designing Successful Energy Savings Targets

Designing Successful Energy Savings Targets Designing Successful Energy Savings Targets Although successful energy savings targets share common elements, state policymakers and regulators have flexibility in designing targets to take advantage of

More information

MEASUREMENT AND VERIFICATION GUIDELINES FOR RETROFIT AND NEW CONSTRUCTION PROJECTS

MEASUREMENT AND VERIFICATION GUIDELINES FOR RETROFIT AND NEW CONSTRUCTION PROJECTS EL PASO ELECTRIC COMPANY S LARGE COMMERCIAL AND INDUSTRIAL STANDARD OFFER PROGRAM MEASUREMENT AND VERIFICATION GUIDELINES FOR RETROFIT AND NEW CONSTRUCTION PROJECTS This document includes detailed information

More information

Implementing Pennsylvania Act 129 A Rebirth of Energy Efficiency at PECO

Implementing Pennsylvania Act 129 A Rebirth of Energy Efficiency at PECO Implementing Pennsylvania Act 129 A Rebirth of Energy Efficiency at PECO Frank Jiruska, PECO Greg Wikler, Global Energy Partners ACEEE 5 th National Conference on Energy Efficiency as a Resource Chicago,

More information

ers LIPA EFFICIENCY LONG ISLAND AND RENEWABLE ENERGY PORTFOLIO 2012 PROGRAM GUIDANCE DOCUMENT Final LONG ISLAND POWER AUTHORITY

ers LIPA EFFICIENCY LONG ISLAND AND RENEWABLE ENERGY PORTFOLIO 2012 PROGRAM GUIDANCE DOCUMENT Final LONG ISLAND POWER AUTHORITY ers LIPA EFFICIENCY LONG ISLAND AND RENEWABLE ENERGY PORTFOLIO 2012 PROGRAM GUIDANCE DOCUMENT Final Prepared for: LONG ISLAND POWER AUTHORITY Prepared by: OPINION DYNAMICS CORPORATION AND ENERGY RESOURCE

More information

PNM Energy Efficiency Programs

PNM Energy Efficiency Programs PNM Energy Efficiency Programs Nov 9, 2009 PNM Generation At-A-Glance Power Purchases 14% Wind 4% Natural Gas 10% Nuclear 15% Electricity Mix 8 - Power Plants ( 7 in New Mexico ) Own & Maintain 17,400

More information

Office of Clean Energy Comprehensive Energy Efficiency & Renewable Energy Resource Analysis Staff Straw Proposal

Office of Clean Energy Comprehensive Energy Efficiency & Renewable Energy Resource Analysis Staff Straw Proposal Office of Clean Energy Comprehensive Energy Efficiency & Renewable Energy Resource Analysis Staff Straw Proposal New Jersey s Clean Energy Program Proposed Funding Levels FY19-FY22 April 24, 2018 TABLE

More information

2015 Third Quarter Colorado DSM Roundtable Update

2015 Third Quarter Colorado DSM Roundtable Update ` 2015 Third Quarter Colorado DSM Roundtable Update November 4, 2015 Public Service Company of Colorado ( Public Service or the Company ) provides the following update regarding product status including

More information

DV United Labor Categories and Rates - Government Site

DV United Labor Categories and Rates - Government Site DV United Labor Categories and Rates - Government Site Escalation rate 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 2.4% 0002 AA01 Administrative Assistant Level I HR $30.47 $31.20 $31.95 $32.72 $33.50 $34.31

More information

CLOUD NINE TECHNOLOGIES INC Government Site Hourly Rate Page 6 of 10

CLOUD NINE TECHNOLOGIES INC Government Site Hourly Rate Page 6 of 10 Escalation rate 3% 3% 3% 3% 3% 0002 AA01 Administrative Assistant Level I HR $40.63 $41.84 $43.10 $44.39 $45.72 $47.10 0002 AA02 Administrative Assistant Level II HR $47.13 $48.54 $49.99 $51.49 $53.04

More information

ALL POINTS LOGISTICS, LLC Government Site Hourly Rate Page 6 of 10

ALL POINTS LOGISTICS, LLC Government Site Hourly Rate Page 6 of 10 Escalation rate 2% 2% 2% 2% 2% 0002 AA01 Administrative Assistant Level I HR $43.52 $44.39 $45.28 $46.18 $47.11 $48.05 0002 AA02 Administrative Assistant Level II HR $50.42 $51.43 $52.46 $53.51 $54.58

More information

Contractor Site Hourly Rates

Contractor Site Hourly Rates Contractor Site Hourly Rates Escalation rate 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 0001 AA01 Administrative Assistant Level I HR $43.83 $44.93 $46.05 $47.20 $48.38 $49.59 $50.83 $52.10 $53.40 $54.74

More information

AMAR Health IT LLC_J 1 Government Site Hourly Rate Page 6 of 10

AMAR Health IT LLC_J 1 Government Site Hourly Rate Page 6 of 10 Escalation rate 2.90% 2.90% 2.90% 2.90% 2.90% 2.90% 2.90% 2.90% 2.90% 0002 AA01 Administrative Assistant Level I HR $37.95 $39.05 $40.18 $41.35 $42.55 $43.78 $45.05 $46.36 $47.70 $49.09 0002 AA02 Administrative

More information

TNMP s. Commercial Energy Efficiency Programs Kick-off Webinar. January 23,

TNMP s. Commercial Energy Efficiency Programs Kick-off Webinar. January 23, TNMP s Commercial Energy Efficiency Programs Kick-off Webinar January 23, 2014 Agenda Introductions Program Overviews SCORE CitySmart Commercial Solutions 2013 Program Results 2014 Program Updates and

More information

Attachment J-1: Government Site Hourly Rates - CIO-SP3 SB (Restricted)

Attachment J-1: Government Site Hourly Rates - CIO-SP3 SB (Restricted) Government Site Hourly Rates CIOSP3 SB (Small Business Category) : July 15, 2012 July 14, 2022 Attachment J1: Government Site Hourly Rates CIOSP3 SB (Restricted) 0002 AA01 Administrative Assistant Level

More information

2008 Electric Energy Efficiency Program. Annual Report

2008 Electric Energy Efficiency Program. Annual Report 2008 Electric Energy Efficiency Program Annual Report April 1, 2009 Table of Contents Introduction... 3 Executive Summary... 4 Independent Evalution... 5 Tariff Collections... 6 Regulatory Proceedings...

More information

West Virginia Division of Energy: Economic Development Through Energy Efficiency Conference. June 13, 2017

West Virginia Division of Energy: Economic Development Through Energy Efficiency Conference. June 13, 2017 West Virginia Division of Energy: Economic Development Through Energy Efficiency Conference June 13, 2017 Agenda Purpose of todays presentation FirstEnergy s WV Operating Companies: Potomac Edison Monongahela

More information

Value? Depends on who you are: The CSI Site

Value? Depends on who you are: The CSI Site How to Determine the Value of a Solar Investment The CSI Site Rob Baron Lakeland College CN Theatre, MacEwan University January 19, 2017 Note: This document contains corrected information that differs

More information

Pennsylvania Power Company. Energy Efficiency & Conservation Plan. (For the Period June 1, 2013 through May 31, 2016) February 6, 2013

Pennsylvania Power Company. Energy Efficiency & Conservation Plan. (For the Period June 1, 2013 through May 31, 2016) February 6, 2013 Pennsylvania Power Company Energy Efficiency & Conservation Plan (For the Period June 1, 2013 through May 31, 2016) February 6, 2013 Docket No. M-2012-2334395 Energy Efficiency and Conservation Plan Table

More information

Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619

Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 Renewable Energy Plan 2013 Biennial Review Lansing Board of Water & Light MSCP Case No. U-16619 This Biennial Review filing by the Lansing Board of Water & Light (LBWL) complies with State of Michigan

More information

2015 Second Quarter Colorado DSM Roundtable Update

2015 Second Quarter Colorado DSM Roundtable Update ` 2015 Second Quarter Colorado DSM Roundtable Update August 17, 2015 Public Service Company of Colorado ( Public Service or the Company ) provides the following update regarding product status including

More information

Pennsylvania Electric Company. Energy Efficiency & Conservation Plan. (For the Period June 1, 2013 through May 31, 2016) February 6, 2013

Pennsylvania Electric Company. Energy Efficiency & Conservation Plan. (For the Period June 1, 2013 through May 31, 2016) February 6, 2013 Pennsylvania Electric Company Energy Efficiency & Conservation Plan (For the Period June 1, 2013 through May 31, 2016) February 6, 2013 Docket No. M-2012-2334392 Energy Efficiency and Conservation Plan

More information

Pennsylvania Electric Company. Energy Efficiency & Conservation Plan. (For the Period June 1, 2013 through May 31, 2016) November 13, 2012

Pennsylvania Electric Company. Energy Efficiency & Conservation Plan. (For the Period June 1, 2013 through May 31, 2016) November 13, 2012 Pennsylvania Electric Company Energy Efficiency & Conservation Plan (For the Period June 1, 2013 through May 31, 2016) November 13, 2012 Docket No. P- Energy Efficiency and Conservation Plan Table of

More information

New England State and Federal Laws and Regulations and the Electric Power Sector

New England State and Federal Laws and Regulations and the Electric Power Sector New England State and Federal Laws and Regulations and the Electric Power Sector Northeast Energy and Commerce Association & Connecticut Power and Energy Society New England Energy Conference and Exposition

More information

PROJECT NO TX

PROJECT NO TX PROJECT NO. 2008-TX060-0001 PROCEEDING TO CONSIDER AND DETERMINE WHETHER TO IMPLEMENT THE FEDERAL RATEMAKING STANDARDS FOR INTEGRATED RESOURCE PLANNING, RATE DESIGN MODIFICATIONS TO PROMOTE ENERGY EFFICIENCY

More information

Rate Design and Resource Planning

Rate Design and Resource Planning Rate Design and Resource Planning Rate Considerations and Resource Planning Decisions El Paso Electric Company New Mexico Public Advisory Group Meeting December 11, 2014 Rates and Resource Planning The

More information

Renewable Portfolio Standards In the United States of America

Renewable Portfolio Standards In the United States of America Southern States Energy Board About the Southern States Energy Board The Southern States Energy Board is an interstate compact, comprised of governors and state legislators from sixteen southern states,

More information

Chief Information Officer - Solutions and Partners (CIO-SP3) (Unrestricted) Request for Proposal (RFP) NIHJT ACS Federal Solutions LLC

Chief Information Officer - Solutions and Partners (CIO-SP3) (Unrestricted) Request for Proposal (RFP) NIHJT ACS Federal Solutions LLC 0001 AA01 Administrative Assistant Level I HR $35.41 $36.33 $37.28 $38.24 $39.24 $40.26 $41.31 $42.38 $43.48 $44.61 0001 AA02 Administrative Assistant Level II HR $45.42 $46.60 $47.81 $49.06 $50.33 $51.64

More information

Annual Report to the Pennsylvania Public Utility Commission

Annual Report to the Pennsylvania Public Utility Commission Annual Report to the Pennsylvania Public Utility Commission For the period June 2010 to May 2011 Program Year 2 For Act 129 of 2008 Energy Efficiency and Conservation Program of Pennsylvania Electric Company

More information

EDC PROGRAM YEAR 7 ANNUAL REPORT

EDC PROGRAM YEAR 7 ANNUAL REPORT EDC PROGRAM YEAR 7 ANNUAL REPORT Program Year 7: June 1, 2015 May 31, 2016 Presented to: PENNSYLVANIA PUBLIC UTILITY COMMISSION Pennsylvania Act 129 of 2008 Energy Efficiency and Conservation Plan Prepared

More information

I International Bureau (10) International Publication Number (43) International Publication Date 6 December 2012 ( )

I International Bureau (10) International Publication Number (43) International Publication Date 6 December 2012 ( ) (12) INTERNATIONAL APPLICATION PUBLISHED UNDER THE PATENT COOPERATION TREATY (PCT) (19) World Intellectual Property Organization I International Bureau (10) International Publication Number (43) International

More information

Outline. Introduction to Wisconsin. Barriers to Generating Electricity from. Incentives and Regulations Intended to

Outline. Introduction to Wisconsin. Barriers to Generating Electricity from. Incentives and Regulations Intended to Experience of the United States in the Application of Incentives and Regulations for the Supply of Renewable Energy Chairperson Eric J. Callisto Public Service Commission of Wisconsin 20 May 2010 Outline

More information

CONSERVATION AND DEMAND MANAGEMENT CODE FOR ELECTRICITY DISTRIBUTORS

CONSERVATION AND DEMAND MANAGEMENT CODE FOR ELECTRICITY DISTRIBUTORS Ontario Energy Board Commission de l énergie de l Ontario CONSERVATION AND DEMAND MANAGEMENT CODE FOR ELECTRICITY DISTRIBUTORS Issued: September 16, 2010 Table of Contents 1. GENERAL AND ADMINISTRATIVE

More information

Assessment of Achievable Potential from Energy Efficiency and Demand Response Programs in the U.S. ( ) Executive Summary

Assessment of Achievable Potential from Energy Efficiency and Demand Response Programs in the U.S. ( ) Executive Summary Assessment of Achievable Potential from Energy Efficiency and Demand Response Programs in the U.S. (2010 2030) Executive Summary January 2009 Assessment of Achievable Potential from Energy Efficiency

More information

It s not easy being Green...

It s not easy being Green... It s not easy being Green... M. Gray Styers, Jr. Fox Rothschild LLP Raleigh, NC gstyers@foxrothschild.com 2018 Fox Rothschild It s not easy being Green....... Or Is It? M. Gray Styers, Jr. Fox Rothschild

More information

Focus on Energy Calendar Year 2014 Evaluation Report Volume I May 27, 2015

Focus on Energy Calendar Year 2014 Evaluation Report Volume I May 27, 2015 Focus on Energy Calendar Year 2014 Evaluation Report Volume I May 27, 2015 Public Service Commission of Wisconsin 610 North Whitney Way P.O. Box 7854 Madison, WI 53707-7854 This page left blank. Prepared

More information

PRODUCT GUIDE. LANDSCAPE & ARCHITECTURAL LIGHTING The Intersection of Art and Engineering. fxl.com

PRODUCT GUIDE. LANDSCAPE & ARCHITECTURAL LIGHTING The Intersection of Art and Engineering. fxl.com PRODUCT GUIDE LANDSCAPE & ARCHITECTURAL LIGHTING The Intersection of Art and Engineering fxl.com FINISHES Metals Powder coat Standard Powder coat Specialty Composites AB on copper AB on brass AT on copper

More information

Appendix 1 Idaho Cost Effectiveness

Appendix 1 Idaho Cost Effectiveness Appendix 1 Idaho Cost Effectiveness 1 Table of Contents Portfolio and Sector Level Cost Effectiveness... 3 Program Level Cost Effectiveness... 8 Home Energy Savers Program... 8 Refrigerator Recycling (See

More information

F I L E D :35 AM

F I L E D :35 AM EDF/eap 11/17/2011 F I L E D 11-17-11 10:35 AM BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Examine the Commission s Post-2008 Energy Efficiency Policies,

More information