Quantifying the Maintenance Costs Associated with Variable Operating Conditions

Size: px
Start display at page:

Download "Quantifying the Maintenance Costs Associated with Variable Operating Conditions"

Transcription

1 Quantifying the Maintenance Costs Associated with Variable Operating Conditions By Patrick A. March, Hydro Resource Solutions LLC Introduction In Greek mythology, the three Fates determine each person s destiny. Klotho, the Spinner, selects and prepares the thread representing a human life. Lachesis, the Lot- Caster, considers each thread carefully, feels its fibers, judges its strength, and weaves it into the great tapestry of life. Atropos, the Inexorable, halts the weaving, cuts off the thread, and ends the life (see Figure 1). Figure 1: The Three Fates (Bulfinch, 1898)

2 The destiny of industrial equipment is controlled by humans, but through forces akin to the three Fates. Atropos provides a long life when Klotho prepares a strong thread in the form of excellence in design and manufacturing and Lachesis weaves a harmonious tapestry of proper operating conditions and maintenance. In an increasingly deregulated power industry, politics, economics, and uncertainty take the place of the Fates in determining how equipment is used and maintained. For hydro plant owners, the ability to estimate the expected life of power-generating equipment under varying conditions has enormous value because it allows the economic assessment and optimization of operational parameters and the cost-effective performance of condition-based maintenance. This is the purpose for the maintenancecost methodology described in this paper. As part of its research program to develop knowledge-based tools for the hydro industry, Hydro Resource Solutions has adapted methodologies from fatigue and accelerated life testing to hydropower applications. Cumulative Damage Theory Cumulative damage theory, which was originally developed in conjunction with fatigue testing of metals (Palmgren, 1924; Miner, 1945; Brook and Parry, 1969), provides the foundation for this maintenance-cost methodology. The life of a fatigue specimen, over a wide range of stresses, follows a relationship of this form: Life = Aσ (-B) [1] where A is a constant of proportionality, σ is the level of stress in the specimen under test, and B is a numerical constant. Rabinowicz et al. (1970) applied cumulative damage theory to the accelerated life testing of a variety of mechanical and electromechanical systems, including bearings, light bulbs, electric motors, and electric tools. Their results suggest that cumulative damage theory is widely applicable to complex, real-world situations where the precise laws and mechanisms of deterioration are not explicitly known. Application to Hydroelectric Generating Equipment The maintenance-cost methodology, as applied to hydroelectric generating equipment, utilizes and expands the cumulative damage approach. The life for a component of a hydroelectric generating unit or an entire unit is assumed to follow the relationship: L = αs (-β) [2] where L is the life of the unit or component under consideration; α is a constant of proportionality; S is the generalized stress (which may include vibration level, cavitation intensity, bearing oil quality, an inefficiency parameter, a measured mechanical stress, a calculated mechanical stress, etc.) encountered in the operating environment of the equipment; and the exponent β is a numerical constant.

3 Hydroelectric plant owners and operators continually make decisions about when, and at what power level, to operate each generating unit. The effect of these decisions on a unit s life expectancy should play a role in the operational planning and the real-time operation of a hydro plant. Hydraulic performance for a hydroelectric unit is typically characterized by curves showing hydraulic efficiency as a function of gate opening or output power for a series of heads representing the expected operating range, as shown in Figure 2. This convention is adopted here. 100 Efficiency vs. Power 90 Efficiency (%) ft 190 ft 180 ft 170 ft Power (MW) Figure 2: Hydraulic Efficiency vs. Power over a Range of Heads In the more general case of a hydro unit operating under a variety of environmental stressors, S ij, then L ij = α ij S ij (-β ij ) [3] where L ij is the life of the component or unit resulting from stressor S i at operating condition (such as head or power) j, and α ij and β ij are the proportionality constant and the exponent, respectively, for stressor S i at operating condition j. Assume that a unit operates for a time t ij under the effects of stressor S i at operating condition j. The fraction of its life (l ij ) at these conditions is the ratio of the operating time t ij to the expected life L ij : At the time of failure, the following relationship applies: l ij = t ij /L ij. [4] Σ l ij = 1 (at failure). [5]

4 The life of the component is used up by the summation of effects from the environmental stressors, as illustrated in Figure 3. This theoretical relationship is supported by experimental data from the accelerated testing research of Rabinowicz et al. (1970). 1 l3j Failure Life l2j l1j 0 t1j t2j t3j Time Figure 3: Cumulative Damage Methodology At some time before failure, the remaining life R, expressed in nondimensional terms, is: When expressed as a percentage, Equation [6] becomes: Calculation of Maintenance Costs R = (1 - Σ l ij ). [6] R (in %) = 100(1 - Σ l ij ). [7] In applying these relationships to the maintenance-cost methodology, a maintenance cost M is assumed at failure. The fraction of this total cost due to operation at a condition corresponding to environmental stressor S i at operating condition j is: Fractional cost = l ij M. [8] Similarly, the fractional maintenance cost per unit time at the same operating conditions is:

5 Fractional cost per unit time = l ij M/t ij. [9] When Equations [3] and [4] are substituted, this expression becomes: Fractional cost per unit time = M/L ij [10] Fractional cost per unit time = M/α ij S (-β ij ). [11] In practice, the maintenance cost M and the typical unit or component lifetimes under best conditions are generally derived from the experience of maintenance personnel, from statistical analyses of plant or industry data, and from numerical simulations. Typical unit or component lifetimes under extreme conditions are generally derived from root-cause analyses of specific failure events, from on-line monitoring of operating data during failure events, and from maintenance experience under prolonged and severe operating conditions. The values for α ij and β ij can be determined from the best and the extreme maintenance data, using Equation [3]. The equations given above are for a single unit. A multi-unit application is a straightforward summation of the effects on individual units. Also, for simplicity, this analysis omits the time-varying aspects of maintenance costs, such as escalation, outage duration, technological advances, etc. Illustrative Example Turbine Guide Bearings In practical application, computer-based data acquisition and analysis systems can be used to monitor operational parameters, characterize unit performance and environmental stressors (such as inefficiency, turbine guide bearing vibrations, and cavitation-related acoustic emissions), and report expected maintenance costs associated with current operating conditions, calculated by using Equation 11. Such systems are installed at Chelan County Public Utility District's 11-unit, 1,280 MW Rocky Reach Hydro Plant and 18-unit, 660 MW Rock Island Hydro Plant, located on the Columbia River near Wenatchee, Washington, and, under a Cooperative Research and Development Agreement (CRADA) with the U. S. Bureau of Reclamation, at Unit G-24 of Reclamation s 6-unit, 4,500 MW Grand Coulee Third Powerhouse, located on the Columbia River near Coulee Dam, Washington. An example, in which these procedures are applied to turbine guide bearings, is provided below. Figure 4 displays measured turbine guide bearing vibrations as a function of power level for a hydro plant with three identical Francis-type generating units. The one unit data is based on measurements, and the two unit and three unit curves are constructed from the single unit data under the assumption of equal load distribution among units for multi-unit operations. Typical Francis unit vibrations are visible in the figure, including the peak due to draft tube swirl at 13 MW and the vibration minimum at the best efficiency point near 33 MW. For this plant, the operating head varies insignificantly throughout the year, so the output power effectively represents the operating conditions. Maintenance personnel estimate an expected life of twenty years for continuous operation under the best (i.e.,

6 maximum efficiency, lowest vibration) conditions. The assumed cost for a typical unscheduled repair is $100,000 for a single turbine guide bearing. Also, based on previous experience in an extreme situation, a similar unit operated for ten hours at a turbine guide bearing vibration of 50 mils before a bearing failure occurred One Unit Two Units Three Units TGB Vibrations (mils, ptp) Power (MW) Figure 4: Turbine Guide Bearing Vibrations vs. Power By defining the vibration level as the stressor S in Equation [3], values for α and β can be determined from these estimates as shown in Figure 5. TGB Vibration (mils, ptp) Life (hours) Proportionality Constant Exponent S L α β Figure 5: Computation of Vibration-Related Values from Equation [3] The turbine guide bearing vibration data from Figure 4, the proportionality constant α and the exponent β shown in Figure 5, hourly operating data for a 566-day period, and Equation [7] were used to determine the amount of the three turbine bearings life used up during the evaluation period of the analysis (see Figure 6). During the 566-day evaluation period, about 74% of the three bearings total life (for three turbines, the total life is 300%) has been used up, with much of the damage occurring in the less efficient but economically attractive operating range between 110 MW and 120 MW, where the units are typically operated. The maintenance cost over this 566-day evaluation period was computed in a similar manner, and the results (which are the products of each percentage in Figure 6 and the repair cost M, as shown in Equation [8]), are provided in Figure 7.

7 15.0 Turbine Guide Bearing Life "Used Up" (%) Operating Period = 566 Days Life "Used Up" = 74 % Life Remaining = 226 % (300 % total life for 3 units) Power (MW) Figure 6: Computation of Bearing Life Used Up under Varying Operating Conditions $15,000 Operating Period = 566 Days Total Maintenance Cost = $73,746 Maintenance Cost ($) $10,000 $5,000 $ Power (MW) Figure 7: Vibration-Related Maintenance Costs under Varying Operating Conditions

8 Illustrative Example Cavitation Damage A similar analysis can be used to compute the cavitation-related costs under varying operating conditions, using the measured output from a cavitation monitor (Jones et al., 1989; Derakhshan et al., 1990; March and Jones, 1991) as a function of power level. Figure 8 presents output from an acoustic emissions-based cavitation monitoring system as a function of power level for old (1930s vintage) runners and for new runners of modern design. The one unit data is based on measurements, and the two unit and three unit curves are constructed from the single unit data under the assumption of equal load distribution among units for multi-unit operations. For comparison purposes, the higher output for the new turbine design has been normalized to provide an equivalent best efficiency near 33 MW. Note that the new runners have cavitation levels that are significantly lower throughout the operating range. Cavitation levels for the most efficient single unit load and for the maximum single unit load were used in Equation [3] as the environmental stressor. Corresponding cavitation repair intervals were estimated and used to determine values for α and β, as shown for the old and new runners in Figures 9 and 10, respectively One Unit Two Units Three Units Output from Cavitation Monitor (Volts) Power (MW) Figure 8: Output from Cavitation Monitor vs. Power (Old and New Runners)

9 Output from Cavitation Monitor (volts) Life (hours) Proportionality Constant Exponent S L α β Figure 9: Computation of Cavitation-Related Values for Old Runners Output from Cavitation Monitor (volts) Life (hours) Proportionality Constant Exponent S L α β Figure 10: Computation of Cavitation-Related Values for New Runners The cavitation monitoring data from Figure 8, the values of the proportionality constant α and the exponent β shown in Figures 9 and 10, the hourly operating data for the 566- day evaluation period, Equation [7], and an assumed single unit cavitation repair cost of $50,000 were used to determine the amount of the cavitation life used up during the evaluation period and the corresponding total cavitation damage cost for the evaluation period. These results are presented for the old runners and new runners in Figure Cavitation-Related Maintenance Costs ($) Old Runners New Runners Operating Period = 566 Days Cavitation Damage Cost (Old Units) = $100,000 Cavitation Damage Cost (New Units) = $ 20, Power (MW) Figure 11: Cavitation-Related Maintenance Costs under Varying Operating Conditions

10 Using data for the 566-day evaluation period, the cavitation damage cost for the old runners is about $100,000, while the corresponding cavitation damage cost for the new runners would be about $20,000. Most of the cavitation damage costs correspond to operation in the less efficient but economically attractive range between 110 MW and 120 MW, where the units are typically operated. Illustrative Example Inefficiency For these analyses, three years of data were examined for a 21-unit, 600 MW, mainriver hydroplant that is typically operated for load control. The years of data include: (1) 1998, a representative wet year; (2) 1999, a normal year of rainfall; and (3) 2000, a dry year. A WaterView optimization module (March, 2001) was used with a DataWolff analysis automation engine to compute the optimized plant dispatch (i.e., the most efficient allocation of available units to provide the specified load) at 15-minute intervals for the same three years. The revenue gains from the optimized plant dispatch, relative to the actual revenues, were calculated by assuming that the additional energy resulting from the more efficiently optimized operation was sold at the market price available at the time it could have been produced (Wolff and March, 2002). The maintenance-cost benefits from the optimized unit operation were also computed, using the WaterView maintenance-cost module (see Figure 12). The life of a unit was assumed to depend on a single environmental stressor, in this case the unit inefficiency. These additional assumptions were used in the analyses: a unit life of 40 years while operating at the best efficiency point (i.e., a best reference inefficiency); a unit life of 10 years while operating at the maximum power output (i.e., an extreme reference inefficiency); and a unit replacement cost of $5,000,000. Figure 13 presents the computed energy gains and the corresponding revenue gains that the optimized plant dispatch would have provided, compared to the actual plant dispatch. Figure 13 also presents the separately computed maintenance-cost reductions, based on the assumptions listed above. An additional $2,600,000 in reduced maintenance costs over the units lives could have been achieved by optimized plant operation over the three-year period. The simplified analyses summarized in Figure 13 present a methodology to evaluate operational decisions within a quantitative economic framework. For example, although Kaplan hydroturbines are well suited for automatic generation control because of their relatively flat performance curves, in many cases they are not used for this purpose because of concerns about the extra wear that may occur on the blade and gate linkages. The maintenance-cost methodology can be used to evaluate whether or not this is an economically sound decision. Similarly, the additional maintenance costs due to unit start-ups and shut-downs can be evaluated.

11 Figure 12: Summary Screen and Unit Curves for Maintenance-Cost Module 600 MW, 21-Unit Hydroplant ( ) Cumulative Revenue Increase ($) $3,500,000 $3,000,000 $2,500,000 $2,000,000 $1,500,000 $1,000,000 Revenue Increase Revenue Increase Revenue Increase Maint.-Cost Savings Maint.-Cost Savings Maint.-Cost Savings Energy Increase Energy Increase Energy Increase , , ,000 80,000 60,000 40,000 Cumulative Energy Increase (MWH) $500,000 20,000 $0 01/98 07/98 01/99 07/99 01/00 07/00 12/00 Date Figure 13: Production, Revenue, and Maintenance-Cost Improvements due to Optimized Operations 0

12 Summary This paper describes the technical background and provides illustrative examples of a simple technique for quantifying the maintenance costs associated with variable operating conditions. The maintenance-cost methodology assists owners and operators in making sound economic decisions about the operation and maintenance of hydroelectric generating facilities. Specifically, a user of the methodology can: Quantify the effects of operating conditions on maintenance costs; Determine real-time maintenance costs associated with current operating conditions for use in planning and in operational decision-making; Facilitate and support condition-based maintenance by estimating and tracking the remaining life in equipment and components; Gather quantitative information for use in defining avoidance zones and cavitation limits; and Develop a quantitative basis for operations-based maintenance planning, maintenance budgets, and maintenance practices. This maintenance-cost methodology represents a departure from traditional approaches to predictive maintenance monitoring because the primary focus is on quantifying the effects of varying operating conditions on the maintenance costs. This will be an increasingly important concern as market forces, particularly in the ancillary services area, push hydro owner/operators into non-traditional operational modes and present new challenges for effective asset management while providing new opportunities to profit from hydropower s unique characteristics. References Brook, R. H. W., and J. S. C. Parry, Cumulative Damage in Fatigue: A Step Toward Its Understanding, Journal of Mechanical Engineering Science, Vol. 11, 1969, pp Bulfinch, T., Age of Fable, or Beauties of Mythology, edited by Rev. J. L. Scott, Philadelphia, PA: David McKay, Publisher, Derakhshan, O., J. R. Houghton, R. K. Jones, and P. A. March, Cavitation Monitoring of Hydroturbines with True-RMS Acoustic Emission Measurement, ASTM Special Publication 1077, Philadelphia: American Society for Testing and Materials, October Jones, R. K., P. A. March, and J. M. Epps, Monitoring Hydroturbines for Efficiency and Cavitation, Hydro Review, June 1989, pp

13 March, P. A., Knowledge Management System for Water Resources Promotes Beneficial Paradigm Shifts to Optimize Energy and Environment, Proceedings of the Fourth Inter-American Dialogue on Water Management, Foz do Iguaçu, Paraná, Brazil, September March, P. A., and R. K. Jones, Laboratory and Field Experience with Cavitation Monitoring of Hydroturbines, Proceedings of Waterpower 91, July Miner, M. A., Cumulative Damage in Fatigue, Journal of Applied Mechanics, Transactions of the ASME, Vol. 12, June 1945, pp Palmgren, A., Die Lebensdauer von Kugellagern, Z. Verein. Deutschland Ingeniur, Vol. 50, 1924, pp Rabinowicz, E., R. H. McEntire, and B. Shiralkar, A Technique for Accelerated Life Testing, Journal of Engineering for Industry, Transactions of the ASME, August 1970, pp Wolff, Paul J., and P. A. March, New Methodology for Evaluating the Benefits of Hydro Automation, Norris, Tennessee: Tennessee Valley Authority, TVA ER&TA Project Report, Revision 1, September Author Patrick March is Senior Product Development Manager for the Tennessee Valley Authority's Resource Management business and General Manager of Hydro Resource Solutions LLC, which is jointly owned by TVA and Voith Siemens Hydro. Mr. March is a member of ASME Power Test Code Committee 18 (Hydraulic Turbines and Pump- Turbines) and a board member for the Hydro Research Foundation. Mr. March has over thirty years of hydropower and water resources experience, primarily in the areas of performance improvements, water quality improvements, condition assessment and monitoring, flow measurement, hydraulic modeling, cavitation erosion, and vibration analysis.

Best Practice Guidelines for Hydro Performance Processes

Best Practice Guidelines for Hydro Performance Processes Best Practice Guidelines for Hydro Performance Processes by Patrick A. March, Charles W. Almquist, and Paul J. Wolff Abstract This paper discusses hydro performance processes and presents draft Best Practice

More information

Update on Development of Auto-Venting Turbine Technology

Update on Development of Auto-Venting Turbine Technology Update on Development of Auto-Venting Turbine Technology Paul Hopping 1, Patrick 2, Thomas Brice 3, and Joseph Cybularz 4 Abstract Since the 1970s, the Tennessee Valley Authority (TVA) has been active

More information

Turbine Cavitation Diagnostics and Monitoring Multidimensional and Simple Techniques

Turbine Cavitation Diagnostics and Monitoring Multidimensional and Simple Techniques Turbine Cavitation Diagnostics and Monitoring Multidimensional and Simple Techniques Branko Bajic Korto Cavitation Services, Luxembourg korto@korto.com www.korto.com The consequences of cavitation erosion

More information

Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest

Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest Hydroelectric Pumped Storage Potential and Renewable Energy Integration in the Northwest Wind generation on Bonneville Power Administration s (BPA) system in the Northwest grew from almost nothing in 1998

More information

HyCon MD Monitoring, Analysis and Diagnosis

HyCon MD Monitoring, Analysis and Diagnosis HyCon MD Monitoring, Analysis and Diagnosis The Voith HyCon MD Monitoring, Analysis and Diagnosis system combines our engineering and manufacturing expertise with your operational experience and knowledge

More information

Hydraulic and Environmental Performance of Aerating Turbines

Hydraulic and Environmental Performance of Aerating Turbines Hydraulic and Environmental Performance of Aerating Turbines Presented by Patrick A. March Principal Consultant, Hydro Performance Processes Inc. EPRI/DOE Conference on Environmentally-Enhanced Hydropower

More information

Monitoring and Analyzing Generator Displacements to Understand Alignment Problems

Monitoring and Analyzing Generator Displacements to Understand Alignment Problems Monitoring and Analyzing Generator Displacements to Understand Alignment Problems by Paul J. Wolff, Matthew T. Davis, and Patrick A. March Introduction Detailed data analysis is an important component

More information

Frequency Sensitive Control Mode and Fatigue Assessment for Kaplan and Bulb Turbine Runners

Frequency Sensitive Control Mode and Fatigue Assessment for Kaplan and Bulb Turbine Runners Frequency Sensitive Control Mode and Fatigue Assessment for Kaplan and Bulb Turbine Runners Brandon Vigil Sr. Mechanical Engineer, Turbine Engineering Voith Hydro Inc. 760 East Berlin Rd. York, PA 17408

More information

Plant Reliability Improvement and Financial Gain: What s the Connection?

Plant Reliability Improvement and Financial Gain: What s the Connection? ASSET MANAGEMENT Plant Reliability Improvement and Financial Gain: What s the Connection? By Marcus B. Punch As hydro plant owners modernize and replace generating equipment, they are considering how decisions

More information

Engineering for SH Operations Voith s new StreamDiver technology. StreamDiver B Murtha, NWHA Sisters Oregon

Engineering for SH Operations Voith s new StreamDiver technology. StreamDiver B Murtha, NWHA Sisters Oregon Engineering for SH Operations Voith s new StreamDiver technology 1 97% of existing dams in the US are not used for hydropower and similarly with 85% worldwide. Today the investment costs and projected

More information

Performance Indicator Hydropower Maximize Power Production March 28, 2011

Performance Indicator Hydropower Maximize Power Production March 28, 2011 Performance Indicator Hydropower Maximize Power Production March 28, 2011 Performance Indicator (PI): Maximize Hydropower production. The operations of the hydropower plants in the Great Lakes St. Lawrence

More information

Multidimensional Cavitation Monitor in FPGA/RT Technology. By Branko Bajic Korto Cavitation Services, Luxembourg

Multidimensional Cavitation Monitor in FPGA/RT Technology. By Branko Bajic Korto Cavitation Services, Luxembourg Multidimensional Cavitation Monitor in FPGA/RT Technology By Branko Bajic Korto Cavitation Services, Luxembourg www.korto.com korto@korto.com Multidimensional Cavitation Monitor in FPGA/RT Technology 1

More information

ABSTRACT. Energy is a critical factor in developing countries for economic growth as well

ABSTRACT. Energy is a critical factor in developing countries for economic growth as well ABSTRACT Energy is a critical factor in developing countries for economic growth as well as for social development and human welfare. Hydropower is a renewable source of energy, which is economical, non-polluting

More information

Spokane River Assessment

Spokane River Assessment Spokane River Assessment David Schwall, PE Senior Engineer david.schwall@avistacorp.com 509.495.2330 Amir Datoo ARMS Reliability Austin, TX, USA adatoo@armsreliability.com www.armsreliabiliy.com Avista

More information

Modernization of Hydropower plants. Prof. François Avellan, Eng. Dr. September 12, 2016

Modernization of Hydropower plants. Prof. François Avellan, Eng. Dr. September 12, 2016 Prof. François Avellan, Eng. Dr. September 12, 2016 Reasons for Modernization Time History of Concession Limits for Swiss Hydropower Plants New Concession Drastic Cost Reduction Water Protection Act (LEaux)

More information

Water-Energy Nexus: Economics of Hydropower

Water-Energy Nexus: Economics of Hydropower Water-Energy Nexus: Economics of Hydropower George F. McMahon, Ph.D., PE, D.WRE ARCADIS-US, Atlanta GA 1 2014 NWRA Annual Conference Efficiency and Optimization Session February 6, 2014 8 February 2014

More information

Rock Island Powerhouse 2 Rehabilitation. Board Presentation. November 20, 2017

Rock Island Powerhouse 2 Rehabilitation. Board Presentation. November 20, 2017 Rock Island Powerhouse 2 Rehabilitation Board Presentation November 20, 2017 Objectives Present recommendation for scope, schedule and budget for Rock Island Powerhouse 2 (RI PH2) Rehabilitation program

More information

REPORT ON VISIT TO SACRAMENTO CALIFORNIA, U.S.A.

REPORT ON VISIT TO SACRAMENTO CALIFORNIA, U.S.A. REPORT ON VISIT TO SACRAMENTO CALIFORNIA, U.S.A. TO ATTEND HYDROVISION INTERNATIONAL - 2011 July, 15 th to July, 25 th - 2011 Mahaweli Complex Office 40/20, Ampitiya Road Kandy W.R.A. Perera DGM (Mahaweli

More information

Review of BC Hydro s Alternatives Assessment Methodology

Review of BC Hydro s Alternatives Assessment Methodology Review of BC Hydro s Alternatives Assessment Methodology Prepared for BC Hydro September 23, 2014 AUTHORS Rachel Wilson Bruce Biewald David White 485 Massachusetts Avenue, Suite 2 Cambridge, Massachusetts

More information

Downstream Juvenile Salmonid Passage at Columbia and Snake River Dams

Downstream Juvenile Salmonid Passage at Columbia and Snake River Dams Downstream Juvenile Salmonid Passage at Columbia and Snake River Dams John Beeman USGS Western Fisheries Research Center Columbia River Research Laboratory Cook, Washington U.S. Department of the Interior

More information

Hydroelectric power plants

Hydroelectric power plants Hydroelectric power plants Hydroelectric power plants can drive from a water stream or accumulation reservoir. Run-of-river hydroelectric plants (those without accumulation reservoirs) built along a river

More information

Alden Turbine Development: Overview of Preliminary Engineering

Alden Turbine Development: Overview of Preliminary Engineering Alden Turbine Development: Overview of Preliminary Engineering November 16 th, 2010 Voith Hydro All rights reserved. Presentation Overview Engineering Overview Design Modifications Model Testing Mechanical

More information

Hydro Plant Risk Assessment Guide

Hydro Plant Risk Assessment Guide September 2006 Hydro Plant Risk Assessment Guide Appendix E6: Turbine Condition Assessment E6.1 GENERAL The hydraulic turbine is a critical component of a hydroelectric powerplant but it may not be apparent

More information

Tom Key, EPRI

Tom Key, EPRI Panel: Valuing Existing and Developing New Pumped Storage Assets in the West Northwest Hydroelectric Association 010 Winter Meeting February 17, 010 Tom Key, EPRI tkey@epri.com DOE-Industry Project: Quantifying

More information

Hydraulic design of Three Gorges right bank powerhouse turbine for improvement of hydraulic stability

Hydraulic design of Three Gorges right bank powerhouse turbine for improvement of hydraulic stability IOP Conference Series: Earth and Environmental Science Hydraulic design of Three Gorges right bank powerhouse turbine for improvement of hydraulic stability To cite this article: Q Shi 2010 IOP Conf. Ser.:

More information

Northwest Power and Conservation Council

Northwest Power and Conservation Council Northwest Power and Conservation Council Pumped Storage GRAC Meeting Banks Lake Pumped Storage Project (North Dam) FERC Project No. 14329 Portland, Oregon January 27, 2015 Presented by: Lloyd Reed and

More information

IGHEM 2008 MILANO 3 rd -6 th September International Conference on Hydraulic Efficiency Measurements

IGHEM 2008 MILANO 3 rd -6 th September International Conference on Hydraulic Efficiency Measurements Session 4 Paper 1 IGHEM 2008 MILANO 3 rd -6 th September International Conference on Hydraulic Efficiency Measurements INDEX TESTS OF A FRANCIS UNIT USING THE SLIDING GATE METHOD ANDRÉ ABGOTTSPON Lucerne

More information

voith.com Monitoring, analysis and diagnosis OnCare.Health Hydro

voith.com Monitoring, analysis and diagnosis OnCare.Health Hydro voith.com Monitoring, analysis and diagnosis 1 The monitoring, analysis and diagnosis system combines our engineering and manufacturing expertise with your operational experience and knowledge to design

More information

Converting Non-Powered Dams to Produce Electricity Andrew Scott HSA10-7 The Economics of Oil and Energy March 7, 2014

Converting Non-Powered Dams to Produce Electricity Andrew Scott HSA10-7 The Economics of Oil and Energy March 7, 2014 1 Converting Non-Powered Dams to Produce Electricity Andrew Scott HSA10-7 The Economics of Oil and Energy March 7, 2014 I. Overview Hydropower is the oldest form of power generation known to man, employed

More information

Effect of a Prototype Surface Collector and Juvenile Fish Diversion Screens on Turbine Efficiency Measured at Unit 5, Bonneville Dam

Effect of a Prototype Surface Collector and Juvenile Fish Diversion Screens on Turbine Efficiency Measured at Unit 5, Bonneville Dam Effect of a Prototype Surface Collector and Juvenile Fish Diversion Screens on Turbine Efficiency Measured at Unit 5, Bonneville Dam By D. D. Lemon, ASL Environmental Sciences Inc., Sidney, BC, Canada,

More information

Development of Design Tool for Low-Head Francis Turbine. * Corresponding author

Development of Design Tool for Low-Head Francis Turbine. * Corresponding author Proceedings of the International Symposium on Current Research in Hydraulic Turbines CRHT VI March 14, 2016, Turbine Testing Lab, Kathmandu University, Dhulikhel, Nepal Paper no. CRHT2016-20 Development

More information

Impacts of running Turbines in non-design modes

Impacts of running Turbines in non-design modes Impacts of running Turbines in non-design modes Author: Mr. Steven R. Potter, Western Regional Manager/ Welding Engineer/CWI Voith Hydro Services Inc., 2885 Olympic Street, Springfield, OR 98478, USA.

More information

HYDRO-ABRASIVE EROSION OF PELTON TURBINES

HYDRO-ABRASIVE EROSION OF PELTON TURBINES HYDRO-ABRASIVE EROSION OF PELTON TURBINES Ph.D. THESIS by ANANT KUMAR RAI ALTERNATE HYDRO ENERGY CENTRE INDIAN INSTITUTE OF TECHNOLOGY ROORKEE ROORKEE - 247 667 (INDIA) SEPTEMBER, 2017 HYDRO-ABRASIVE EROSION

More information

GEOS / ENST Lecture 11: mechanical -> mechanical (wind and water, the modern version)

GEOS / ENST Lecture 11: mechanical -> mechanical (wind and water, the modern version) GEOS 24705 / ENST 24705 Lecture 11: mechanical -> mechanical (wind and water, the modern version) Can t wring more power out of existing consumption of coal Electricity production is growing but steam

More information

Hydro Capacity Preservation & Expansion

Hydro Capacity Preservation & Expansion Hydro Capacity Preservation & Expansion ALEX D. MOSLEY General Manager Hydro Generation March 1, 2016 TVA Overview Tennessee Valley Authority Established 1933 Nation s largest public power system Wholly-owned

More information

Sediment Erosion in Hydro Turbines

Sediment Erosion in Hydro Turbines Sediment Erosion in Hydro Turbines Hari Prasad Neopane, PhD Associate Professor & Head Department of Mechanical Engineering Kathmandu University Nepal Outline of Presentation Status of Electricity Generation

More information

The Role of Public-Private Partnerships in Advanced Turbine Development

The Role of Public-Private Partnerships in Advanced Turbine Development The Role of Public-Private Partnerships in Advanced Turbine Development Michael J. Sale Conference on Environmentally Enhanced Hydropower Turbines Washington, DC, May 19, 2011 Slide 1 Hydropower is a well-established

More information

Francis Turbine Upgrade for the Lushui Generating Station by Using Computational Fluid Dynamics - A Case Study

Francis Turbine Upgrade for the Lushui Generating Station by Using Computational Fluid Dynamics - A Case Study Francis Turbine Upgrade for the Lushui Generating Station by Using Computational Fluid Dynamics - A Case Study J. Huang, Ph.D., Hydraulic Energy Group, Sustainable Buildings and Communities, CANMET Energy

More information

Chapter Six. Load Forecast and Need for Power

Chapter Six. Load Forecast and Need for Power Chapter Six Load Forecast and Need for Power Chapter Six: Load Forecast and Need for Power TVA s need for power is based on an analysis of the ability of existing power facilities to meet customers projected

More information

Hydropower Impact Analyses for Water Supply Reallocation Studies

Hydropower Impact Analyses for Water Supply Reallocation Studies Hydropower Impact Analyses for Water Supply Reallocation Studies Russell L. Davidson, MSCE, PE Water Supply Workshop 2 June 2009 Tulsa, OK 2 June 2009 Hydropower Analysis Center 1 Other 6% Fossil Steam

More information

Chapter 5 1. Hydraulic Pumps (pp , Gorla & Khan; Wiki)

Chapter 5 1. Hydraulic Pumps (pp , Gorla & Khan; Wiki) Chapter 5 1. Hydraulic Pumps (pp. 47 90, Gorla & Khan; Wiki) 1. Two Basic Categories of Pumps Positive Displacement (PD) Pumps A positive displacement pump causes a fluid to move by trapping a fixed amount

More information

Hydroelectricity What is hydroelectricity? Hydroelectricity or hydroelectric power is the electricity obtained by

Hydroelectricity What is hydroelectricity? Hydroelectricity or hydroelectric power is the electricity obtained by Troy D. Stafford IDS- Filson / Clay February 19, 2006 Hydroelectricity What is hydroelectricity? Hydroelectricity or hydroelectric power is the electricity obtained by harnessing the power of water flowing

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD IEC 62256 Edition 2.0 2017-05 colour inside Hydraulic turbines, storage pumps and pump-turbines Rehabilitation and performance improvement INTERNATIONAL ELECTROTECHNICAL COMMISSION

More information

6/20/2018. Cold Spray Repair and Mitigation for Hydropower Parts. Fusion Welding. Solid Phase Processing (SSP) Goals. Introduction: Cavitation

6/20/2018. Cold Spray Repair and Mitigation for Hydropower Parts. Fusion Welding. Solid Phase Processing (SSP) Goals. Introduction: Cavitation Introduction: Cavitation Most metal hydropower components are manufactured and repaired using materials and techniques used 30 years ago Cold Spray Repair and Mitigation for Hydropower Parts KEN ROSS,

More information

Flexible Operation of Hydroelectric Turbines and Generators

Flexible Operation of Hydroelectric Turbines and Generators Flexible Operation of Hydroelectric Turbines and Generators Patrick March, Hydro Performance Processes Inc., Doylestown, Pennsylvania pamarch@hydroppi.com 865.603.0175 William Moore, Electric Power Research

More information

Raising automation level at a Swiss HPP

Raising automation level at a Swiss HPP 1 Raising automation level at a Swiss HPP Raising automation level at a Swiss HPP Rene Neubert, Sales Director Valmet Automation Felsenau HPP - more than 100 years in operation Owner: Energie Wasser Bern,

More information

EXAMPLES OF BENEFITS FROM EFFICIENCY EVALUATION USING COMPARATIVE TESTS

EXAMPLES OF BENEFITS FROM EFFICIENCY EVALUATION USING COMPARATIVE TESTS EXAMPLES OF BENEFITS FROM EFFICIENCY EVALUATION USING COMPARATIVE TESTS N. DAHLBÄCK, P. NORRLUND (Speaker) Vattenfall, Sweden; Uppsala University, Sweden niklas.dahlback@vattenfall.com, per.norrlund@vattenfall.com

More information

Plant Operation Optimization- A Case Study of Middle Marsyangdi Hydropower Station

Plant Operation Optimization- A Case Study of Middle Marsyangdi Hydropower Station Proceedings of IOE Graduate Conference, 2016 pp. 245 252 Plant Operation Optimization- A Case Study of Middle Marsyangdi Hydropower Station Sajan Shrestha 1, Mahesh Chandra Luintel 2 1, 2 Department of

More information

Priest Rapids Turbine Upgrade Project. May 26 th, 2015

Priest Rapids Turbine Upgrade Project. May 26 th, 2015 Priest Rapids Turbine Upgrade Project May 26 th, 2015 1 Agenda Project Update Change Order #1 Schedule & Next Steps 2 PROJECT UPDATE 3 Project Update Scope of Work 4 Project Update Major Components Contract

More information

Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference. Mark Cook, PE Manager, Hoover Dam

Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference. Mark Cook, PE Manager, Hoover Dam Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference Mark Cook, PE Manager, Hoover Dam Hoover Dam Type of Operation Impacts of Drought Mitigating Drought Impacts through Major

More information

Pumps, Turbines, and Pipe Networks, part 2. Ch 11 Young

Pumps, Turbines, and Pipe Networks, part 2. Ch 11 Young Pumps, Turbines, and Pipe Networks, part 2 Ch 11 Young Pump and Turbine Dimensional Analysis (11.5 Young) Say we want to replace turbines on the Hoover Dam Want to have a good design Essentially impossible

More information

Justifying, Specifying, and Verifying Performance of Aerating Turbines

Justifying, Specifying, and Verifying Performance of Aerating Turbines Justifying, Specifying, and Verifying Performance of Aerating Turbines Paul 1, Patrick March 2, and Paul Wolff 3 Abstract Owners of hydropower facilities face increasing demands to reduce or eliminate

More information

white paper JANUARY 2015 Powel Smart nergy Empowering smart decisions

white paper JANUARY 2015 Powel Smart nergy Empowering smart decisions white paper JANUARY 2015 Powel Smart nergy Empowering smart decisions www.powel.com suite - Empowering smart decisions for hydropower companies Table of contents Business benefits... 3 The main work processes

More information

Electricity Generation and Water- Related Constraints: An Empirical Analysis of Four Southeastern States

Electricity Generation and Water- Related Constraints: An Empirical Analysis of Four Southeastern States Electricity Generation and Water- Related Constraints: An Empirical Analysis of Four Southeastern States Gbadebo Oladosu, Stan Hadley, D.P. Vogt, and T.J. Wilbanks Oak Ridge National Laboratory, Oak Ridge

More information

Hydraulic turbines, storage pumps and pump-turbines Rehabilitation and performance improvement

Hydraulic turbines, storage pumps and pump-turbines Rehabilitation and performance improvement IEC 62256 Edition 2.0 2017-05 REDLINE VERSION colour inside Hydraulic turbines, storage pumps and pump-turbines Rehabilitation and performance improvement INTERNATIONAL ELECTROTECHNICAL COMMISSION ICS

More information

Performance Testing of The Robert Moses Niagara Power Plant and Sir Adam Beck Generating Station

Performance Testing of The Robert Moses Niagara Power Plant and Sir Adam Beck Generating Station Performance Testing of The Robert Moses Niagara Power Plant and Sir Adam Beck Generating Station By Albert F. Mikhail, P.Eng., Ontario Power Generation and Robert J. Knowlton, P.E., New York Power Authority

More information

Estimating uncertainties in turbine discharge measurements with the Acoustic Scintillation Flow Meter in low-head short-intake plants

Estimating uncertainties in turbine discharge measurements with the Acoustic Scintillation Flow Meter in low-head short-intake plants Estimating uncertainties in turbine discharge measurements with the Acoustic Scintillation Flow Meter in low-head short-intake plants David D. Lemon ASL Environmental Sciences Inc. Sidney, B.C. Canada

More information

A General Method for Fatigue Analysis of Vertical Axis Wind Turbine Blades*

A General Method for Fatigue Analysis of Vertical Axis Wind Turbine Blades* SAND82-2543 Unlimited Release Printed October 1983 Distribution Category UC-60 A General Method for Fatigue Analysis of Vertical Axis Wind Turbine Blades* Paul S. Veers Applied Mechanics Division IV 1524

More information

Appendix I. Dworshak Operations

Appendix I. Dworshak Operations Appendix I Dworshak Operations I. Introduction The 2008 Biological Opinion requires annual progress reports that describe actions taken to implement certain reasonable and prudent actions (RPA) for the

More information

ERRATA. Energy Resource Recovery Account (ERRA) Review Of Operations, 2016 Chapters I-VII PUBLIC VERSION

ERRATA. Energy Resource Recovery Account (ERRA) Review Of Operations, 2016 Chapters I-VII PUBLIC VERSION Application No.: A.1-0-00 Exhibit No.: SCE-01 A Witnesses: T. Champ S. Lelewer T. Condit E. Lopez D. Cox M. Palmstrom S. DiBernardo M. Wallenrod S. Handschin T. Watson J. Buerkle R. Hite S. Willis ERRATA

More information

U.S. Hydropower. Resource Assessments. Northwest Hydroelectric Association Small Hydro Workshop

U.S. Hydropower. Resource Assessments. Northwest Hydroelectric Association Small Hydro Workshop U.S. Hydropower Resource Assessments Northwest Hydroelectric Association Small Hydro Workshop September 22-23, 2011 Bend, Oregon presented by Brennan T. Smith, Ph.D., P.E. Water Power Program Manager Oak

More information

Fatigue and Accelerated Testing of Structural Components. Steffen Haslev Sørensen

Fatigue and Accelerated Testing of Structural Components. Steffen Haslev Sørensen Fatigue and Accelerated Testing of Structural Components Steffen Haslev Sørensen May 20, 2014 Topics Introduction Testing as part of other verification activities Fatigue Damage of structural component

More information

Chapter 5 1. Hydraulic Turbines (Gorla & Khan, pp )

Chapter 5 1. Hydraulic Turbines (Gorla & Khan, pp ) Electronic Notes Chapter 5 1. Hydraulic Turbines (Gorla & Khan, pp.91 141) 1. Terminologies Related to A Hydropower Plant Hoover Dam generates more than 4 billion kilowatt-hours of electricity each year,

More information

CFD Analysis of Pelton Runner

CFD Analysis of Pelton Runner International Journal of Scientific and Research Publications, Volume 4, Issue 8, August 2014 1 CFD Analysis of Pelton Runner Amod Panthee *, Hari Prasad Neopane **, Bhola Thapa ** * Turbine Testing Lab,

More information

Florentin POP Project Manager Hydro- Engineering Romania

Florentin POP Project Manager Hydro- Engineering Romania Florentin POP Project Manager Hydro- Engineering Romania Speakers should try not to exceed 24 slides per 30 minute presentation, roughly one slide per 1 or 2 minutes of talk. Do not forget to bring a copy

More information

Power Generation Asset Optimization: Optimal Generating Strategies in Volatile Markets (Case Study) Presented at POWER-GEN 2001 Las Vegas, Nevada

Power Generation Asset Optimization: Optimal Generating Strategies in Volatile Markets (Case Study) Presented at POWER-GEN 2001 Las Vegas, Nevada Power Generation Asset Optimization: Optimal Generating Strategies in Volatile Markets (Case Study) Presented at POWER-GEN 2001 Las Vegas, Nevada Presented By: Jason Kram, Power Costs, Inc. Scott Stallard,

More information

Session B2: An Overview of the Ice Harbor Turbine Replacement Project

Session B2: An Overview of the Ice Harbor Turbine Replacement Project University of Massachusetts Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish

More information

DECISIONS on operating transfer limits and transmission

DECISIONS on operating transfer limits and transmission 1144 IEEE TRANSACTIONS ON POWER SYSTEMS, VOL. 19, NO. 2, MAY 2004 Hydro Turbine-Governor Model Validation in Pacific Northwest Dmitry Kosterev Abstract This paper presents an approach for generator model

More information

Draft Application for New License for Major Water Power Project Existing Dam

Draft Application for New License for Major Water Power Project Existing Dam Draft Application for New License for Major Water Power Project Existing Dam Northfield Project Northfield Mountain Pumped Storage Project (FERC Project Number 2485) Turners Falls Hydroelectric Project

More information

AC-TEC THE COMPANY. Kaplan, Francis, Pelton, Cross Flow and Mini Turbines.

AC-TEC THE COMPANY. Kaplan, Francis, Pelton, Cross Flow and Mini Turbines. AC-TEC THE COMPANY Kaplan, Francis, Pelton, Cross Flow and Mini Turbines. The family business AC-TEC is specialized in the production of small hydro power plants for many decades and manufactures customized

More information

SIZING OPTIMIZATION OF A CENTRAL CHILLED WATER SYSTEM

SIZING OPTIMIZATION OF A CENTRAL CHILLED WATER SYSTEM SIZING OPTIMIZATION OF A CENTRAL CHILLED WATER SYSTEM by Jon B. Belcher, PE INTRODUCTION Your organization has decided to build a central chilled water plant to supply comfort cooling to several existing

More information

Site 25: Lappet Mill, Calder Vale

Site 25: Lappet Mill, Calder Vale Site 25: Lappet Mill, Calder Vale Site Assessment Report Title Figure 1 Map showing general layout Calder Vale Mill or Lappet Mill in Calder Vale is historically a water-powered cotton mill. It was built

More information

Friction Reduction of Unlined Power Tunnels for Increased Power and Energy Production

Friction Reduction of Unlined Power Tunnels for Increased Power and Energy Production Abstract Friction Reduction of Unlined Power Tunnels for Increased Power and Energy Production By Matthew Gass, Hetch Hetchy Water and Power, Moccasin Ca USA Many hydro power plants throughout the world

More information

1.818J/2.65J/3.564J/10.391J/11.371J/22.811J/ESD166J SUSTAINABLE ENERGY

1.818J/2.65J/3.564J/10.391J/11.371J/22.811J/ESD166J SUSTAINABLE ENERGY 1.818J/2.65J/3.564J/10.391J/11.371J/22.811J/ESD166J SUSTAINABLE ENERGY Prof. Michael W. Golay Nuclear Engineering Dept. 1 Energy Supply, Demand, and Storage Planning The Example of Electricity PRESENTATION

More information

Pressure Pulsations and Vibration Measurements in Francis Turbines with and without Freely Rotating Runner Cone Extension

Pressure Pulsations and Vibration Measurements in Francis Turbines with and without Freely Rotating Runner Cone Extension Proceedings of the International Symposium on Current Research in Hydraulic Turbines CRHT VI March 14, 2016, Turbine Testing Lab, Kathmandu University, Dhulikhel, Nepal Paper no. CRHT2016-15 Pressure Pulsations

More information

Online flowrate monitoring experiences at Hydro-Québec

Online flowrate monitoring experiences at Hydro-Québec Online flowrate monitoring experiences at Hydro-Québec J Nicolle 1, G Proulx 2, L Martell 1 1-Hydro-Québec Research s Institute, 1800 boul. Lionel Boulet, Varennes, Canada, J3X 1S1 2-Hydro-Québec ESP (Essais

More information

Cavitation measurements on a pump-turbine model

Cavitation measurements on a pump-turbine model Journal of Physics: Conference Series PAPER OPEN ACCESS Cavitation measurements on a pump-turbine model To cite this article: H Schmidt et al 2015 J. Phys.: Conf. Ser. 656 012071 Related content - Nucleation

More information

Sharing Experiences of the World s Largest Tidal Power Plant in Lake Sihwa, South Korea

Sharing Experiences of the World s Largest Tidal Power Plant in Lake Sihwa, South Korea Sharing Experiences of the World s Largest Tidal Power Plant in Lake Sihwa, South Korea Grafenberger P., Rammler A., Schneeberger M., Collins M. SIHWA TIDAL Project Background Location South Korea, near

More information

Estimating Carbon Emissions Avoided by Electricity Generation and Efficiency Projects: A Standardized Method (MAGPWR)

Estimating Carbon Emissions Avoided by Electricity Generation and Efficiency Projects: A Standardized Method (MAGPWR) LBNL-4663 Estimating Carbon Emissions Avoided by Electricity Generation and Efficiency Projects: A Standardized Method (MAGPWR) S. Meyers, C. Marnay, K. Schumacher, and J. Sathaye Energy Analysis Department

More information

Development of Business Standards and Deployment of MXES 6.2 at the U.S. Bureau of Reclamation Presented by Ken Maxey Manager, Maintenance Services

Development of Business Standards and Deployment of MXES 6.2 at the U.S. Bureau of Reclamation Presented by Ken Maxey Manager, Maintenance Services Development of Business Standards and Deployment of MXES 6.2 at the U.S. Bureau of Reclamation Presented by Ken Maxey Manager, Maintenance Services Office Before the Rocky Mt. Maximo Users Group May 7,

More information

Turbines II: Hydro and Wind GEOS 24705/ ENST 24705

Turbines II: Hydro and Wind GEOS 24705/ ENST 24705 Turbines II: Hydro and Wind GEOS 24705/ ENST 24705 Copyright E. Moyer 2012 Dam Hydropower Water is guided to the turbine via a penstock that controls flow and pressure Image: Xeneca Corp. 3 main dam hydro

More information

EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION

EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION EXHIBIT B PLANT OPERATION AND RESOURCES UTILIZATION TABLE OF CONTENTS PAGE LIST OF FIGURES... i 1.0 PLANT OPERATION AND RESOURCES UTILIZATION... 1 1.1 PLANT OPERATION... 1 1.1.1 Adverse Flow... 1 1.1.2

More information

Profitability analysis of hydropower maintenance and reinvestment projects

Profitability analysis of hydropower maintenance and reinvestment projects Profitability analysis of hydropower maintenance and reinvestment projects T.M. Welte & E. Solvang O. Øen, R. Jordet & P. Golberg B. Børresen SINTEF Energy Research, Norway E-CO Energi, Norway Multiconsult,

More information

Flygt hydro turbines SMART AND COMPACT HYDROPOWER. 50 Hz

Flygt hydro turbines SMART AND COMPACT HYDROPOWER. 50 Hz Flygt hydro turbines SMART AND COMPACT HYDROPOWER 50 Hz Why submersible? In 1983 the first Flygt submersible turbine was installed in Sweden. Since then we have delivered over 350 turbines around the world.

More information

Introduction to Bonneville Power Administration

Introduction to Bonneville Power Administration Introduction to Bonneville Power Administration Greg Delwiche, Senior Vice President, BPA Power Services January 31, 2013 Federal Columbia River Power System Columbia River Basin & BPA Service Area WHAT

More information

Hydro Maintenance Re-engineering within the Snowy Mountains Scheme

Hydro Maintenance Re-engineering within the Snowy Mountains Scheme Hydro Maintenance Re-engineering within the Snowy Mountains Scheme By David Mead Snowy Mountains Hydro-electric Authority The Snowy Mountains Hydro-electric Authority has recently undertaken a program

More information

November 16, SUBJECT: Council s Regional Hydropower Potential Scoping Study

November 16, SUBJECT: Council s Regional Hydropower Potential Scoping Study Bill Bradbury Chair Oregon Henry Lorenzen Oregon W. Bill Booth Idaho James A. Yost Idaho Jennifer Anders Vice Chair Montana Pat Smith Montana Tom Karier Washington Phil Rockefeller Washington November

More information

PUMP TECHNOLOGY. Are we making any progress? S. Gopalakrishnan Flowserve Corporation Pump Division Vernon, California. ASME FEDSM May 31, 2001

PUMP TECHNOLOGY. Are we making any progress? S. Gopalakrishnan Flowserve Corporation Pump Division Vernon, California. ASME FEDSM May 31, 2001 PUMP TECHNOLOGY Are we making any progress? S. Gopalakrishnan Flowserve Corporation Pump Division Vernon, California ASME FEDSM May 31, 2001 PUMP DIVISION LARGEST PUMP HIGHEST HORSEPOWER American Electric

More information

Risk based decision making in Kaunas hydropower system during flood period

Risk based decision making in Kaunas hydropower system during flood period Risk Analysis V: Simulation and Hazard Mitigation 219 Risk based decision making in Kaunas hydropower system during flood period J. Simaityte Volskiene, J. Augutis & E. Uspuras Lithuanian Energy Institute,

More information

Justus B.C Mtolera Mtera Hydro plant Manager TANESCO TANZANIA

Justus B.C Mtolera Mtera Hydro plant Manager TANESCO TANZANIA Justus B.C Mtolera Mtera Hydro plant Manager TANESCO TANZANIA MAINTENANCE & REFURBISHMENT OF MTERA HYDRO POWER PLANT Layout: 1. Introduction 2. Technical data of Mtera Hydro Power Plant 3. Maintenance

More information

Capacity Revenues for Existing, Base Load Generation in the PJM Interconnection

Capacity Revenues for Existing, Base Load Generation in the PJM Interconnection Capacity Revenues for Existing, Base Load Generation in the PJM Interconnection A Pennsylvania Case Study Prepared by: Paul Peterson, David White, and Bruce Biewald 22 Pearl Street, Cambridge, MA 02139

More information

Mechanical Overhaul Guide For Hydroelectric Turbine Generators READ ONLINE

Mechanical Overhaul Guide For Hydroelectric Turbine Generators READ ONLINE Mechanical Overhaul Guide For Hydroelectric Turbine Generators READ ONLINE If you are searching for the ebook Mechanical overhaul guide for hydroelectric turbine generators in pdf form, then you've come

More information

Mini Voith Global Perspective, Local Solutions

Mini Voith Global Perspective, Local Solutions Mini Hydro @ Voith Global Perspective, Local Solutions Mini Hydro @ Voith Utilizing Untapped Potential Installation of Power Generation at Existing Sites Electrification of Decentralized Communities Realize

More information

Renewable and Alternative Energies

Renewable and Alternative Energies Department of Electrical and Energy Engineering This work is published under a license: Creative Commons BY-NC-SA 4.0 Contents Topic 1. Wind energy. Topic 2. Solar energy. Topic 3. Ocean energy.. Topic

More information

PJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper

PJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper PJM ENERGY PRICES 2005 Response to Howard M. Spinner Paper Joseph Bowring PJM Market Monitor Response to Howard M. Spinner Paper Re: PJM Energy Prices 2005 A March 13, 2006 paper ( Spinner paper ) by Howard

More information

DESIGN OF THE HYDROELECTRIC PAYMENT AMOUNTS

DESIGN OF THE HYDROELECTRIC PAYMENT AMOUNTS Filed: 00--0 EB-00-00 Page of 0 DESIGN OF THE HYDROELECTRIC PAYMENT AMOUNTS.0 PURPOSE This evidence provides a description of the proposed structure of the regulated hydroelectric payment amounts for the

More information

Recognizing the Value of Existing Hydropower June 25, 2009

Recognizing the Value of Existing Hydropower June 25, 2009 Recognizing the Value of Existing Hydropower June 25, 2009 Table of Contents Brookfield Asset Management Overview Brookfield Renewable Power Overview Hydropower is an Important Contributor to Renewable

More information

Recent approach to refurbishments of small hydro projects based on numerical flow analysis

Recent approach to refurbishments of small hydro projects based on numerical flow analysis Recent approach to refurbishments of small hydro projects based on numerical flow analysis by Swiderski Engineering Ottawa, Canada Preamble Computational Fluid Dynamics (CFD) already established its strong

More information

Research and Development Optimization of products and services

Research and Development Optimization of products and services Research and Development Optimization of products and services www.andritz.com/pumps Always a flow ahead ASTROE development and testing laboratory With ASTROE, center for hydraulic engineering and laboratory,

More information

Reserve Market Design and Energy Market Price Formation

Reserve Market Design and Energy Market Price Formation Reserve Market Design and Energy Market Price Formation EPFSTF November 1, 2018 Joe Bowring Catherine Tyler Energy and Reserve Price Formation Goals Prices should reflect nodal competitive supply and demand

More information